Mine intelligent ventilation management and control method, system and equipment and storage medium

By acquiring and processing mine ventilation sensing parameters, building a digital twin model and executing joint control decision-making solutions, the problem of insufficient information interaction between subsystems of the existing mine ventilation system is solved, and the safety and regulation of the system are improved.

CN118838201APending Publication Date: 2024-10-25MEI KE TONG AN (BEI JING) ZHI KONG KE JI YOU XIAN GONG SI
View PDF 0 Cites 6 Cited by

Patent Information

Application Number
CN202410796670.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

The existing mine ventilation system lacks information interaction between subsystems, resulting in low coupling between monitoring, decision analysis and linkage control, and there are hidden dangers in safety, reliability and regulation.

Method used

By obtaining mine ventilation sensing monitoring parameters, we can determine system faults and handle them. We can build a digital twin model based on the sensing monitoring parameters, determine the joint control decision parameters, execute the joint control decision plan and adjust it through feedback to improve the information interaction and coupling between subsystems. .

Benefits of technology

It enhances the safety, reliability and adjustability of the mine ventilation system, improves the coupling degree of monitoring, decision-making analysis and linkage control links, and ensures the safe and efficient operation of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118838201A_ABST
    Figure CN118838201A_ABST
Patent Text Reader

Abstract

The invention provides a mine intelligent ventilation management and control method, system and device and a storage medium, and the method comprises the steps: collecting mine ventilation sensing parameters in a mine ventilation system through a ventilation parameter monitoring link, and determining ventilation joint control decision parameters; whether a ventilation joint control decision of the mine ventilation system is started or not is judged through a mine ventilation decision analysis link; and the mine ventilation linkage regulation and control link determines a mine ventilation joint control decision scheme under the condition that the judgment result is yes, executes the scheme and adjusts the mine ventilation joint control decision scheme through a feedback result. According to the invention, the coupling degree of a mine ventilation monitoring link, a mine ventilation decision analysis link and a mine ventilation linkage regulation link can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of mine ventilation technology, and in particular to a mine intelligent ventilation control method, device, equipment, and storage medium. Background Art

[0002] There are many auxiliary equipments in the existing mine ventilation system, among which the ventilation parameter monitoring, ventilation network solution, intelligent decision-making and ventilation equipment and facility monitoring subsystems are operated independently, lacking information interaction between subsystems. As a result, the mine ventilation monitoring link has weak support for the mine ventilation decision analysis link, and the mine ventilation decision analysis link has insufficient guidance for the mine ventilation linkage control link, resulting in low coupling between the mine ventilation monitoring link, the mine ventilation decision analysis link and the mine ventilation linkage control link. At the same time, the research depth of mine ventilation monitoring, mine ventilation decision analysis and mine ventilation linkage control in the existing mine ventilation system is insufficient, resulting in hidden dangers and defects in the safety, reliability, adjustability and disaster resistance of the mine ventilation system. Summary of the invention

[0003] The present invention provides a mine intelligent ventilation control method, device, equipment, and storage medium, aiming to construct a mine intelligent ventilation control system with a high degree of coupling among mine ventilation monitoring link, mine ventilation decision analysis link, and mine ventilation linkage regulation link.

[0004] To this end, the first object of the present invention is to propose a mine intelligent ventilation control method, comprising:

[0005] Obtain mine ventilation sensing monitoring parameters;

[0006] Determine whether the mine ventilation system is faulty based on the mine ventilation sensing monitoring parameters. If faulty, perform fault handling and obtain the mine ventilation sensing monitoring parameters after the fault handling.

[0007] Determine the mine ventilation joint control decision parameters based on the mine ventilation perception monitoring parameters;

[0008] Determine whether the mine ventilation system should start the ventilation joint control decision according to the mine ventilation joint control decision parameters;

[0009] If the judgment result is to start the ventilation joint control decision, the mine ventilation joint control decision plan is determined according to the mine ventilation joint control decision parameters;

[0010] Execute the mine ventilation joint control decision plan, and adjust the mine ventilation joint control decision plan based on the execution feedback results.

[0011] Among them, mine ventilation system failures include: ventilation power equipment failures, ventilation facility failures, and ventilation network failures in the mine ventilation system.

[0012] Among them, the mine ventilation sensing monitoring parameters include: the tunnel parameters and airflow status of the ventilation network, the parameters and operating status of the ventilation facilities, the parameters and operating status of the ventilation power equipment, the measured air volume of the mining working face, the measured air volume of the excavation working face, the measured air volume of the chamber, the measured operating efficiency of the local fan, the measured operating efficiency of the main fan, the measured equal accumulation holes of the mine ventilation system, the air volume and ventilation resistance of the mine ventilation system, and the ventilation status parameters.

[0013] Among them, judging whether the mine ventilation system is faulty based on the mine ventilation sensing monitoring parameters includes:

[0014] Using sensors deployed in the ventilation network to collect ventilation state parameters, real-time data of the ventilation state parameters are collected, and fault diagnosis of the ventilation network is performed based on the real-time data of the ventilation state parameters;

[0015] Using electromechanical sensors corresponding to the ventilation power equipment, sensors corresponding to ventilation state parameters, and sensors corresponding to the ventilation power equipment states to collect operating parameters, operating states, and ventilation state parameters of the ventilation power equipment, and performing fault diagnosis of intelligent ventilation equipment in the ventilation power equipment based on the operating parameters, operating states, and ventilation state parameters of the ventilation power equipment;

[0016] Using electromechanical sensors corresponding to the ventilation facilities, sensors corresponding to ventilation status parameters, and sensors corresponding to ventilation facility statuses to collect operation parameters, operation statuses, and ventilation status parameters of the ventilation facilities, and performing fault diagnosis of intelligent ventilation equipment in the ventilation facilities based on the operation parameters, operation statuses, and ventilation status parameters of the ventilation facilities;

[0017] Among them, ventilation power equipment includes: intelligent ventilation power equipment and non-intelligent ventilation power equipment;

[0018] Ventilation facilities include: intelligent ventilation facilities and non-intelligent ventilation facilities.

[0019] Among them, the mine ventilation joint control decision parameters are determined based on the mine ventilation perception monitoring parameters, including:

[0020] A digital twin model of the mine ventilation system is constructed based on the tunnel parameters and airflow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation perception monitoring parameters;

[0021] Obtain decision target data and input the decision target data into the digital twin model to obtain mine ventilation joint control decision parameters.

[0022] Among them, the digital twin model of the mine ventilation system is constructed based on the tunnel parameters and airflow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation perception monitoring parameters, including:

[0023] The initial digital twin model of the mine ventilation system is constructed using the tunnel parameters and airflow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation sensing monitoring parameters;

[0024] The initial digital twin model is updated and verified to obtain the digital twin model of the mine ventilation system.

[0025] Among them, the mine ventilation joint control decision parameters include: decision result parameters and decision target parameters;

[0026] The decision result parameters include: window opening area, main fan operating frequency and blade angle, local fan operating frequency, and damper opening and closing status;

[0027] The decision-making target parameters include: dynamic air volume requirement of mining working face meets the standard, dynamic air volume requirement of excavation working face meets the standard, dynamic air volume requirement of chamber meets the standard, local ventilation fan operating efficiency, main ventilation fan operating efficiency, mine equal accumulation holes, and matching of mine air volume and ventilation resistance.

[0028] Among them, judging whether the mine ventilation system starts the ventilation joint control decision according to the mine ventilation joint control decision parameters includes:

[0029] When the measured air volume of the mining face is less than the dynamic air volume required by the mining face, and / or when the measured air volume of the excavation face is less than the dynamic air volume required by the excavation face, and / or when the measured air volume of the chamber is less than the dynamic air volume required by the chamber, and / or the measured operating efficiency of the local fan is less than the target operating efficiency of the local fan, and / or the measured operating efficiency of the main fan is less than the target operating efficiency of the main fan, and / or the measured equal-area holes of the mine ventilation system are less than the target equal-area holes, and / or the air volume of the mine ventilation system does not match the ventilation resistance, the ventilation joint control decision is initiated.

[0030] Among them, the mine ventilation joint control decision plan is determined according to the mine ventilation joint control decision parameters, including:

[0031] According to the preset multiple adjustment schemes, the opening area of ​​the wind window, the operating frequency of the main fan, the blade angle, the operating frequency of the local fan, and the opening and closing state of the damper in the mine are adjusted in sequence;

[0032] Determine the performance index values ​​of the main fans and local fans corresponding to each adjustment scheme, and sort the index values ​​in descending order to form a performance index sequence;

[0033] The adjustment plan corresponding to the first performance indicator in the performance indicator sequence is selected as the mine ventilation joint control decision plan.

[0034] Among them, the implementation of the mine ventilation joint control decision-making plan includes:

[0035] The window opening area in the mine ventilation joint control decision plan is sent to the underground window adjustment control substation, and the window wind area is automatically adjusted through the PLC. If the window fails to execute the window wind area automatic adjustment command, a fault diagnosis is performed and the command is executed after the fault is eliminated;

[0036] The damper opening and closing status in the mine ventilation joint control decision-making plan is sent to the underground damper control substation, and the damper is automatically opened and closed through the PLC. If the damper does not execute the damper automatic opening and closing command, a fault diagnosis is performed and the command is executed after the fault is eliminated;

[0037] The local fan operating frequency in the mine ventilation joint control decision plan is sent to the underground local fan control substation, and the fan operating frequency is automatically adjusted through the PLC. If the local fan does not execute the instruction, a fault diagnosis is performed and the instruction is executed after the fault is eliminated;

[0038] The main fan operating frequency and blade angle in the mine ventilation joint control decision-making plan are sent to the main fan control substation, and the main fan operating frequency and blade angle are automatically adjusted through PLC. If the main fan fails to execute the instruction, fault diagnosis is performed and the instruction is executed after the fault is eliminated.

[0039] Among them, the mine ventilation joint control decision plan is adjusted by executing the feedback results, including:

[0040] Obtain the mine ventilation sensing monitoring parameters after executing the mine ventilation joint control decision-making plan;

[0041] The mine ventilation sensing monitoring parameters are compared with the target values ​​of the decision target parameters in the mine ventilation joint control decision parameters to determine whether the control target has been achieved. If the control target value has not been achieved, fault diagnosis of the main ventilation fan, local ventilation fan and adjustable air windows is performed.

[0042] Among them, the actual measured air volume of the mining working face and the actual measured air volume of the excavation working face are both measured by full-section scanning wind measurement or multi-point mobile wind measurement.

[0043] Among them, after obtaining the mine ventilation perception monitoring parameters, it also includes:

[0044] The mine ventilation sensing monitoring parameters are checked for rationality, interference data is eliminated, abnormal data fluctuations are captured, and data is time-averaged.

[0045] Among them, real-time data of ventilation status parameters are used to perform fault diagnosis of non-intelligent ventilation power equipment and non-intelligent ventilation facilities.

[0046] The second object of the present invention is to propose a mine intelligent ventilation management and control system, including a sensing subsystem, a decision subsystem and a control subsystem;

[0047] The sensing subsystem is used to obtain the mine ventilation sensing monitoring parameters;

[0048] A decision-making subsystem, used to determine a mine ventilation joint control decision plan based on mine ventilation sensing and monitoring parameters;

[0049] The control subsystem is used to execute the mine ventilation joint control decision plan and adjust the mine ventilation joint control decision plan through execution feedback results.

[0050] The decision-making subsystem includes:

[0051] A first determination module is used to determine mine ventilation joint control decision parameters based on mine ventilation perception monitoring parameters;

[0052] The first judgment module is used to judge whether the mine ventilation system starts the ventilation joint control decision according to the mine ventilation joint control decision parameters;

[0053] The second determination module is used to determine the mine ventilation joint control decision plan according to the mine ventilation joint control decision parameters if the judgment result is to start the ventilation joint control decision.

[0054] The decision-making subsystem also includes:

[0055] The first fault diagnosis module is used to determine whether the ventilation power equipment in the mine ventilation system is faulty, whether the ventilation facilities are faulty, and whether the ventilation network is faulty based on the mine ventilation sensing monitoring parameters;

[0056] The first fault processing module is used to perform fault processing when the ventilation power equipment and / or ventilation facilities and / or ventilation network fails, and obtain the mine ventilation sensing monitoring parameters after the fault processing.

[0057] Wherein, the first fault diagnosis module includes:

[0058] A first diagnosis unit is used to collect real-time data of the ventilation state parameters using sensors deployed in the ventilation network for collecting ventilation state parameters, and perform fault diagnosis of the ventilation network based on the real-time data of the ventilation state parameters;

[0059] A second diagnostic unit is used to collect operating parameters, operating status and ventilation status parameters of the ventilation power equipment using an electromechanical sensor corresponding to the ventilation power equipment, a sensor corresponding to the ventilation status parameter and a sensor corresponding to the ventilation power equipment status, and perform fault diagnosis of the intelligent ventilation equipment in the ventilation power equipment based on the operating parameters, operating status and ventilation status parameters of the ventilation power equipment;

[0060] A third diagnostic unit is used to collect operating parameters, operating status and ventilation status parameters of the ventilation facility using an electromechanical sensor corresponding to the ventilation facility, a sensor corresponding to the ventilation status parameter and a sensor corresponding to the ventilation facility status, and perform fault diagnosis of the intelligent ventilation equipment in the ventilation facility based on the operating parameters, operating status and ventilation status parameters of the ventilation facility;

[0061] Among them, ventilation power equipment includes: intelligent ventilation power equipment and non-intelligent ventilation power equipment;

[0062] Ventilation facilities include: intelligent ventilation facilities and non-intelligent ventilation facilities.

[0063] Among them, the mine ventilation sensing monitoring parameters include: the tunnel parameters and airflow status of the ventilation network, the parameters and operating status of the ventilation facilities, the parameters and operating status of the ventilation power equipment, the measured air volume of the mining working face, the measured air volume of the excavation working face, the measured air volume of the chamber, the measured operating efficiency of the local fan, the measured operating efficiency of the main fan, the measured equal accumulation holes of the mine ventilation system, the air volume and ventilation resistance of the mine ventilation system, and the ventilation status parameters.

[0064] Wherein, the first determination module includes:

[0065] The first construction unit is used to construct a digital twin model of the mine ventilation system based on the tunnel parameters and wind flow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation perception monitoring parameters;

[0066] The first determination unit is used to obtain decision target data and input the decision target data into the digital twin model to obtain mine ventilation joint control decision parameters.

[0067] Wherein, the first building block comprises:

[0068] Construct a submodule for constructing an initial digital twin model of the mine ventilation system using the tunnel parameters and wind flow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation sensing monitoring parameters;

[0069] The update verification submodule is used to update and verify the initial digital twin model to obtain the digital twin model of the mine ventilation system.

[0070] Among them, the mine ventilation joint control decision parameters include: decision result parameters and decision target parameters;

[0071] The decision result parameters include: window opening area, main fan operating frequency and blade angle, local fan operating frequency, and damper opening and closing status;

[0072] The decision-making target parameters include: dynamic air volume requirement of mining working face meets the standard, dynamic air volume requirement of excavation working face meets the standard, dynamic air volume requirement of chamber meets the standard, local ventilation fan operating efficiency, main ventilation fan operating efficiency, mine equal accumulation holes, and matching of mine air volume and ventilation resistance.

[0073] The first judgment module is specifically used for:

[0074] When the measured air volume of the mining face is less than the dynamic air volume required by the mining face, and / or when the measured air volume of the excavation face is less than the dynamic air volume required by the excavation face, and / or when the measured air volume of the chamber is less than the dynamic air volume required by the chamber, and / or the measured operating efficiency of the local fan is less than the target operating efficiency, and / or the measured operating efficiency of the main fan is less than the target operating efficiency, and / or the measured equal-area holes of the mine ventilation system are less than the target equal-area holes, and / or the air volume of the mine ventilation system does not match the ventilation resistance, the ventilation joint control decision is initiated.

[0075] Wherein, the second determination module includes:

[0076] The first adjustment unit is used to adjust the window opening area, the main fan operating frequency, the blade angle, the local fan operating frequency, and the damper opening and closing state in the mine in accordance with a plurality of preset adjustment schemes in sequence;

[0077] The second determination unit is used to determine the performance index values ​​of the main ventilator and the local ventilator corresponding to each adjustment scheme, and sort the index values ​​in descending order to form a performance index sequence;

[0078] The first selection unit is used to select the adjustment plan corresponding to the first performance indicator in the performance indicator sequence as the mine ventilation joint control decision plan.

[0079] Among them, the control subsystem includes:

[0080] The first control unit is used to send the window opening area in the mine ventilation joint control decision plan to the underground window adjustment control substation, and execute the automatic adjustment of the window wind area through the PLC. If the window fails to execute the automatic adjustment instruction of the window wind area, a fault diagnosis is performed, and the instruction is executed after the fault is eliminated;

[0081] The second control unit is used to send the damper opening and closing status in the mine ventilation joint control decision-making plan to the underground damper control substation, and execute the automatic opening and closing of the damper through the PLC. If the damper does not execute the automatic opening and closing command of the damper, it will perform fault diagnosis and execute the command after eliminating the fault;

[0082] The third control unit is used to send the operating frequency of the local fan in the mine ventilation joint control decision-making plan to the local fan control substation underground, and automatically adjust the fan operating frequency through PLC. If the local fan fails to execute the instruction, it will perform fault diagnosis and execute the instruction after eliminating the fault;

[0083] The fourth control unit is used to send the main fan operating frequency and blade angle in the mine ventilation joint control decision-making plan to the main fan control substation, and automatically adjust the main fan operating frequency and blade angle through PLC. If the main fan fails to execute the instruction, fault diagnosis is performed and the instruction is executed after the fault is eliminated.

[0084] Among them, the control subsystem includes:

[0085] The first execution unit is used to obtain the mine ventilation sensing monitoring parameters after executing the mine ventilation joint control decision-making plan;

[0086] The first judgment unit is used to compare the mine ventilation sensing monitoring parameters with the target values ​​of the decision target parameters in the mine ventilation joint control decision parameters to determine whether the control target is achieved. If the control target value is not achieved, fault diagnosis of the main ventilation fan and the local ventilation fan connected to the adjustable wind window is performed.

[0087] Among them, the sensing subsystem is used to measure the actual wind volume of the mining working face and the actual wind volume of the excavation working face by full-section scanning wind measurement or multi-point mobile wind measurement.

[0088] Among them, the mine intelligent ventilation control system also includes: data preprocessing module;

[0089] The data preprocessing module is used to perform rationality verification on mine ventilation sensing monitoring parameters, eliminate interference data, capture abnormal data fluctuations, and perform time-average processing on data.

[0090] The third object of the present invention is to provide an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute each step in the method of the aforementioned technical solution.

[0091] A fourth object of the present invention is to provide a non-transitory computer-readable storage medium storing computer instructions, wherein the computer instructions are used to enable a computer to execute each step in the method according to the aforementioned technical solution.

[0092] Different from the prior art, the mine intelligent ventilation control method provided by the present invention collects the mine ventilation perception parameters in the mine ventilation system through the ventilation parameter monitoring link of the mine ventilation system, determines the ventilation joint control decision parameters; determines whether to start the ventilation joint control decision of the mine ventilation system through the mine ventilation decision analysis link of the mine ventilation system; the mine ventilation linkage control link of the mine ventilation system determines the mine ventilation joint control decision plan when it is judged to be yes, executes the plan and adjusts the mine ventilation joint control decision plan through the feedback results. Through the present invention, it is possible to strengthen the information interaction between the subsystems of the mine ventilation system, improve the safety, reliability, adjustability and disaster resistance of the mine ventilation system, and at the same time improve the coupling degree of the mine ventilation monitoring link, the mine ventilation decision analysis link and the mine ventilation linkage control link. BRIEF DESCRIPTION OF THE DRAWINGS

[0093] The present invention and / or additional aspects and advantages will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0094] Figure 1 It is a flow chart of a mine intelligent ventilation control method provided by the present invention.

[0095] Figure 2 It is a structural schematic diagram of a full-section scanning wind measurement body in a mine intelligent ventilation control method provided by the present invention.

[0096] Figure 3 It is a structural schematic diagram of a multi-point mobile wind measuring body in a mine intelligent ventilation control method provided by the present invention.

[0097] Figure 4 It is a schematic diagram of the ventilation system fault diagnosis function architecture in a mine intelligent ventilation control method provided by the present invention.

[0098] Figure 5 It is a structural schematic diagram of a mine intelligent ventilation control system provided by the present invention.

[0099] Figure 6 It is a schematic diagram of the intelligent joint control workflow of the ventilation system in the mine intelligent ventilation management and control system provided by the present invention.

[0100] Figure 7 It is a schematic diagram of a flow chart of decision-making and solving of a mine ventilation joint control scheme in a mine intelligent ventilation management and control system provided by the present invention.

[0101] Figure 8 It is a structural schematic diagram of a decision-making subsystem in a mine intelligent ventilation management and control system provided by the present invention.

[0102] Fig. 9It is a structural schematic diagram of a decision-making subsystem in another embodiment of a mine intelligent ventilation control system provided by the present invention.

[0103] Fig.10 It is a structural schematic diagram of a first fault diagnosis module in a mine intelligent ventilation control system provided by the present invention.

[0104] Fig.11 It is a structural schematic diagram of a first fault diagnosis module in a mine intelligent ventilation control system provided by the present invention.

[0105] Fig.12 It is a structural schematic diagram of the first building unit in a mine intelligent ventilation control system provided by the present invention.

[0106] Fig.13 It is a structural schematic diagram of a second determination module in a mine intelligent ventilation control system provided by the present invention.

[0107] Fig.14 It is a structural schematic diagram of a control subsystem in a mine intelligent ventilation management and control system provided by the present invention.

[0108] Fig.15 It is a structural schematic diagram of a control subsystem in another embodiment of a mine intelligent ventilation management and control system provided by the present invention.

[0109] Fig.16 It is a structural schematic diagram of a non-transitory computer-readable storage medium storing computer instructions provided by the present invention. DETAILED DESCRIPTION

[0110] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0111] Figure 1 The present invention provides a method for intelligent mine ventilation control, comprising:

[0112] Step S110: Acquire mine ventilation sensing monitoring parameters.

[0113] In an embodiment of the present invention, a unified mine ventilation sensing monitoring parameter system is constructed to obtain mine ventilation sensing monitoring parameters in the mine ventilation system, and the data source is mainly sensors arranged in various subsystems of the mine ventilation system.

[0114] A mine ventilation perception monitoring parameter system is established, and the acquired parameters are layered according to the acquisition method and calculation processing depth. The parameters directly acquired by the sensor are defined as mine ventilation perception monitoring parameters; the parameters obtained by statistical analysis and calculation of sensor data, the parameters obtained by combining mine ventilation perception monitoring parameters with artificial intelligence algorithms, and the parameters calculated based on the parameters obtained by combining mine ventilation perception monitoring parameters with artificial intelligence algorithms are defined as mine ventilation joint control decision parameters. The mine ventilation perception monitoring parameter system performs in-depth processing of parameters, which can improve the accuracy of parameter acquisition and can also quickly locate and trace the source after abnormal parameters occur.

[0115] The mine ventilation sensing monitoring parameters include: the tunnel parameters and airflow status of the ventilation network, the parameters and operating status of the ventilation facilities, the parameters and operating status of the ventilation power equipment, the measured air volume of the mining face, the measured air volume of the excavation face, the measured air volume of the chamber, the measured operating efficiency of the local fan, the measured operating efficiency of the main fan, the measured equal accumulation holes of the mine ventilation system, the air volume and ventilation resistance of the mine ventilation system, the ventilation status parameters, the opening and closing status of the automatic damper, the opening and closing status of the fire isolation door, the opening and closing status of the louvered adjustable wind window, and the airflow composition.

[0116] Specifically, the wind flow state parameters include air pressure, wind flow temperature and wind flow humidity; the wind flow composition parameters include methane, carbon dioxide, carbon monoxide and smoke; the tunnel parameters of the ventilation network include the cross-sectional area of ​​the mining tunnel and the average wind speed in the tunnel; the ventilation facility parameters include the operating status of the wind window; the ventilation facility operating status parameters include the air pressure difference on both sides of the wind window, the air pressure difference on both sides of the damper, and the pressure difference inside and outside the explosion-proof door of the wind shaft; the parameters of the ventilation power equipment include the local fan pressure, air volume and the main fan pressure, air volume; the ventilation power equipment operating status parameters include the local fan operating current, voltage, local fan operating frequency, main fan operating current, voltage and main fan operating frequency.

[0117] The average wind speed monitoring methods in tunnels include: full-section scanning wind measurement and multi-point mobile wind measurement.

[0118] The full-section scanning wind measurement is achieved by arranging a gantry track 1 in the tunnel, including a left column group 11, a right column group 12 and an arched crossbeam 13; the through-beam wind speed sensor 2 is installed on the left column group 11 and the right column group 12 of the gantry track 1 using a reciprocating mechanism 3, and reciprocates up and down in the tunnel at a preset speed, and can hover at a height to measure the wind. The through-beam wind speed sensor 2 is perpendicular to the wind flow direction of the tunnel, and performs full-section wind measurement on the wind flow. The measurement data is calculated and processed by the host computer in the background to obtain the average wind speed in the tunnel. Refer to the schematic diagram of the main structure of the full-section scanning wind measurement below. Figure 2 .

[0119] Multi-point mobile wind measurement uses the CFD method to simulate the wind speed structure field of the tunnel section, obtain the dimensionless wind speed structure field of the tunnel section, and determine the average wind speed distribution area of ​​the tunnel section; a mobile wind measuring bracket 4 is installed in the tunnel, including a left column 41, a right column 42 and an upper crossbeam 43. A folding flip bracket 6 is set on the upper crossbeam 43 of the mobile wind measuring bracket 4, which is used to fix the wind speed sensor 5. At the same time, a plurality of sensor crossbeams 44 are set between the left column 41 and the right column 42. The sensor crossbeams 44 are all provided with rodless cylinders 45 along the direction of the rod body. Each rodless cylinder 45 is connected to a wind speed sensor 5 and slides along the corresponding sensor crossbeam 44. Through the above arrangement, the wind speed sensor 5 collects wind volume and wind speed information along the average wind speed distribution area of ​​the tunnel section. For a schematic diagram of the main structure of the multi-point mobile wind measurement, refer to the following. Figure 3 .

[0120] S120: Determine whether the mine ventilation system is faulty based on the mine ventilation sensing monitoring parameters. If so, perform fault handling to obtain the mine ventilation sensing monitoring parameters after the fault handling.

[0121] In an embodiment of the present invention, the step of determining whether the mine ventilation system is faulty according to the mine ventilation sensing monitoring parameters includes:

[0122] S210: Based on the mine ventilation sensing monitoring parameters, determine whether the ventilation power equipment in the mine ventilation system is faulty, whether the ventilation facilities are faulty, and whether the ventilation network is faulty.

[0123] Ventilation system fault diagnosis definition: Based on the monitoring data of various sensors in the ventilation system, the status of the ventilation network and ventilation facilities is obtained, and the process of clarifying the type and cause of ventilation system faults is combined with logical analysis and judgment algorithms. Fault diagnosis is based on logical analysis or model calculations of data. Downhole sensor deployment and network communication are necessary prerequisites for ventilation system fault diagnosis. The ventilation system covers the ventilation network, ventilation facilities, and ventilation power. Ventilation system fault diagnosis involves ventilation network fault diagnosis, ventilation facility fault diagnosis, and ventilation power fault diagnosis.

[0124] Among them, for ventilation network fault diagnosis, we rely on wind speed and volume sensors and air pressure sensors deployed in the ventilation network to obtain real-time data of ventilation status parameters for fault diagnosis and analysis.

[0125] For ventilation facility fault diagnosis, ventilation facilities include intelligent ventilation facilities and non-intelligent ventilation facilities. Intelligent ventilation facilities include automatic dampers and automatically adjustable wind windows, and intelligent ventilation facilities are equipped with sensors. Non-intelligent ventilation facilities are not equipped with sensors, so they do not have the ability to self-diagnose faults. However, since the abnormal state of ventilation facilities will cause the airflow of the ventilation network to change, with the help of ventilation network fault diagnosis, it can be determined to a certain extent whether there is a problem with the non-intelligent ventilation facilities.

[0126] In the present invention, electromechanical sensors corresponding to the ventilation power equipment, sensors corresponding to the ventilation state parameters and sensors corresponding to the ventilation power equipment state are used to collect the operating parameters, operating state and ventilation state parameters of the ventilation power equipment, and fault diagnosis of the intelligent ventilation equipment in the ventilation power equipment is performed based on the operating parameters, operating state and ventilation state parameters of the ventilation power equipment.

[0127] For ventilation power fault diagnosis, ventilation power includes intelligent ventilation facilities and non-intelligent ventilation facilities. Intelligent ventilation facilities include ground main fans and local fans, and intelligent ventilation power equipment is equipped with sensors. Non-intelligent ventilation power equipment is not equipped with sensors, so it does not have fault self-diagnosis capabilities. However, since the abnormal state of ventilation power equipment will cause the airflow of the ventilation network to change, with the help of ventilation network fault diagnosis, it can be judged to a certain extent whether there is a problem with the non-intelligent ventilation power equipment.

[0128] The operating parameters, operating status and ventilation status parameters of the ventilation facilities are collected by using electromechanical sensors corresponding to the ventilation facilities, sensors corresponding to the ventilation status parameters and sensors corresponding to the ventilation facility status, and fault diagnosis of the intelligent ventilation equipment in the ventilation facilities is performed based on the operating parameters, operating status and ventilation status parameters of the ventilation facilities.

[0129] At the same time, real-time data of ventilation status parameters are used to diagnose faults of non-intelligent ventilation power equipment and non-intelligent ventilation facilities.

[0130] S220: When the ventilation power equipment and / or ventilation facilities and / or ventilation network fails, perform fault processing and obtain the mine ventilation sensing monitoring parameters after the fault processing.

[0131] After the fault is handled, the control method in the aforementioned embodiment continues to be used for intelligent ventilation control in the mine.

[0132] Through this embodiment, a fault diagnosis theory and method for the mine ventilation system is constructed, including ventilation network failures and ventilation equipment failures. After troubleshooting, ventilation management and control of the mine ventilation system is carried out, further improving the safety and reliability of the mine ventilation system.

[0133] If a fault is determined, the fault is handled and the mine ventilation sensing monitoring parameters after the fault is handled are obtained.

[0134] Specifically, the various sensor hosts or sensor monitoring substations arranged in the mine ventilation system of the present invention have edge computing functions, filter and screen the mine ventilation perception monitoring parameters collected by the sensors, and upload the screened data to the upper computer on the ground. Multiple sensor edge computing gateways are deployed on the ground and underground, and the mine ventilation perception monitoring parameters are transmitted to the edge computing gateway by wireless or wired means. The edge computing gateway embeds the edge computing module algorithm to perform edge computing processing on the mine ventilation perception monitoring parameters collected by the underground sensors. The core of the embedded edge computing module algorithm is a data filtering and noise reduction model based on the Gaussian filtering method, and a reasonable data value range is set for each sensor. The specific process of edge computing processing includes transmitting the mine ventilation perception monitoring parameters collected by the sensor to the edge computing gateway, performing raw data rationality verification, interference data elimination, data abnormal fluctuation capture, and data time-averaging processing through the edge computing gateway. The edge computing gateway uploads the screened data to the ground through the underground industrial ring network, and draws a distribution cloud map of the monitoring data in the mine ventilation system through data interpolation calculation, or solves and determines the mine ventilation joint control decision parameters.

[0135] S130: Base: The mine ventilation sensing monitoring parameters determine the mine ventilation joint control decision parameters.

[0136] The mine ventilation joint control decision parameters involved in the present invention are data obtained through the settlement of mine ventilation sensing monitoring parameters, including the following types:

[0137] Underground resource parameters, including the number of underground personnel and vehicles, the above data are obtained through system statistics;

[0138] Mine air volume parameters, including tunnel air volume, mine ventilation resistance, mine natural wind pressure, wind flow density, wind window and air door over-air volume, air shaft explosion-proof door air leakage, and local ventilator air duct leakage monitoring data;

[0139] Ventilation equipment operating power parameters, including local fan operating power and main fan operating power;

[0140] Ventilation equipment operating efficiency parameters, local fan operating efficiency and main fan operating efficiency;

[0141] Tunnel decision parameters include wind window wind area, tunnel wind resistance, mine ventilation system and other accumulated holes and mine ventilation resistance characteristic coefficient.

[0142] Specifically, the tunnel air volume includes the air volume of the mining face, the air volume of the excavation face, and the air volume of other air-using points. The tunnel air volume and the mine ventilation resistance are calculated by the following formula:

[0143] h=|P t |+h

[0144]

[0145] Where, T represents the wind flow temperature; ρ represents the wind flow density; represents the air flow humidity; Q represents the tunnel air volume; Δh represents the depth of the mine; S represents the wind window or air door wind area; P s Indicates the static pressure of wind flow; P t Indicates the total pressure of the wind flow; h z represents the natural wind pressure in the mine; h represents the ventilation resistance in the mine.

[0146] The natural wind pressure in a mine is related to the difference in elevation between the intake and return air shafts, the change in ground temperature, and the microclimate of the mine industrial square. If the elevation of the intake and return air shafts is the same, then

[0147] Winter natural wind pressure H 冬 The formula is:

[0148] H 冬 =(ρ 进冬 -ρ 回冬 )×H×g

[0149] Among them, ρ 回冬 Represents the average density of moist air in the return air shaft in winter; ρ 进冬 It represents the average density of moist air in the air intake shaft in winter; H represents the vertical depth of the shaft; g represents the acceleration of gravity.

[0150] The wind flow density formula is expressed as:

[0151] ρ=0.003484(P-0.3779φP qb ) / T′

[0152] Among them, T' represents the absolute temperature of the air; Pqb represents the saturated water vapor partial pressure when the air temperature is T; φ represents the relative humidity of the air.

[0153] The formula for the air flow rate of the wind window and the wind door is expressed as:

[0154]

[0155] Among them, Q is the air flow rate of the wind window or damper; R is the wind resistance value of the wind window or damper; S is the wind flow area of ​​the wind window or damper; S0 is the cross-sectional area of ​​the tunnel; B and C are the coefficients in the power function between the wind resistance of the wind window or damper and the wind flow area, which are determined by the structure and size of the wind window or damper and the tunnel size and cross-sectional shape of the tunnel where the wind window or damper is located, and are obtained by computational fluid dynamics (CFD) numerical simulation method and data fitting method.

[0156] The present invention establishes an excess air volume calculation model for wind windows and dampers, determines the excess air volume variable parameters, performs state analysis and judgment based on the excess air volume calculation model for ventilation facilities, mixes and plans the air volume with the minimum ventilation energy consumption target, the best adjustment position target, the best adjustment method target and the minimum adjustment number target, and optimizes the model step by step.

[0157] The local ventilation fan duct leakage monitoring data is obtained by controlling the substation to monitor the air volume F1 at the fan outlet and the air volume F2 at the end of the duct (facing the excavation working face) in real time, and calculating the duct leakage rate data (F1-F2) / F1.

[0158] The operating power formula of the main fan is expressed as:

[0159] N′ S =H′Q′ / 1000

[0160] Among them, N' S Indicates the operating power of the main fan; H' indicates the fan static pressure; Q' indicates the fan air volume;

[0161] The fan input power formula is expressed as:

[0162]

[0163] Where: N' represents the fan input power; U represents the fan motor voltage; I represents the fan motor current; represents the power factor; η1 represents the fan motor efficiency; η2 represents the fan transmission efficiency;

[0164] The wind window wind area formula is expressed as:

[0165]

[0166] The wind window involved in the present invention is described by taking a blind-type adjustable wind window as an example. In the above formula, S is the wind passing area of ​​the blind-type remote automatic adjustable wind window; n is the number of blinds of the blinds; l is the length of a single blind; b is the width of a single blind; θ is the opening angle of the blinds.

[0167] The formula for tunnel wind resistance is:

[0168] h 1-2 =P1-P2+ρ1gZ1-ρ2gZ2

[0169] Among them, h 1-2 represents the ventilation resistance of the tunnel; P1 and P2 represent the absolute atmospheric pressure at both ends of the tunnel; Z1 and Z2 represent the elevations at both ends of the tunnel; ρ1 and ρ2 represent the wind flow density at both ends of the tunnel.

[0170] The local fan operating efficiency is calculated by collecting the local fan performance characteristic curves, establishing the local fan characteristic curves with air volume and frequency as independent variables, and establishing a local fan performance characteristic curve database, which provides basic data for the local fan optimal operating area intelligent control decision model.

[0171] The operating efficiency of the main fan is determined by measuring the performance characteristic curve of the main fan, establishing the main fan characteristic curve with air volume, blade angle and frequency as independent variables, and establishing a main fan performance characteristic curve database. This database provides basic data for the intelligent control decision-making model of the main fan's optimal operating area.

[0172] The formula for the mine ventilation resistance coefficient is:

[0173]

[0174] Among them, R m It represents the total wind resistance of the mine, that is, the characteristic coefficient of the mine ventilation resistance; h is the mine ventilation resistance; Q is the total air volume of the mine;

[0175] The equal volume aperture formula of mine ventilation system is expressed as:

[0176] A=1.19 / R m

[0177] Among them, A represents the mine ventilation system and other accumulation holes. From the above formula, we can see that A is R m The function of R m The larger it is, the more difficult the mine ventilation is, and the smaller A is, so A can represent the difficulty of mine ventilation.

[0178] In the process of determining the mine ventilation joint control decision parameters based on mine ventilation perception monitoring parameters:

[0179] Firstly, a digital twin model of the mine ventilation system is constructed based on the tunnel parameters and airflow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation perception monitoring parameters.

[0180] In an embodiment of the present invention, an initial digital twin model of the mine ventilation system is constructed using the tunnel parameters and windflow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation perception monitoring parameters; the initial digital twin model is updated and verified to obtain a digital twin model of the mine ventilation system.

[0181] The mine ventilation system is in a dynamic state of change all the time, and the digital twin model of the mine ventilation system needs to be dynamically updated. The mine ventilation system is based on the ventilation network airflow status monitoring, intelligent ventilation facility status monitoring, and intelligent ventilation power monitoring data. The ventilation network laneway parameters and airflow status, ventilation facility parameters and operating status, and ventilation power parameters and operating status are updated to the mine ventilation system model to establish a digital twin model of the real mine ventilation system.

[0182] Then the decision target data is obtained and input into the digital twin model to obtain the mine ventilation joint control decision parameters.

[0183] The update of the digital twin model of the mine ventilation system is a necessary prerequisite for the real-time solution of the mine ventilation network. The real-time solution of the mine ventilation network is a necessary prerequisite for making decisions on the mine ventilation decision-making joint control plan. The real-time solution results of the ventilation network are used to verify whether the dynamic update of the ventilation system model is in place. If the real-time solution results of the mine ventilation network are inaccurate, it is necessary to verify the dynamic update of the ventilation system model.

[0184] In an embodiment of the present invention, the mine ventilation joint control decision parameters include: decision result parameters and decision target parameters;

[0185] The decision result parameters include: window opening area, main fan operating frequency and blade angle, local fan operating frequency, and damper opening and closing status;

[0186] The decision-making target parameters include: dynamic air volume requirement of mining working face meets the standard, dynamic air volume requirement of excavation working face meets the standard, dynamic air volume requirement of chamber meets the standard, local ventilation fan operating efficiency, main ventilation fan operating efficiency, mine equal accumulation holes, and matching of mine air volume and ventilation resistance.

[0187] S140: Determine whether the mine ventilation system starts the ventilation joint control decision according to the mine ventilation joint control decision parameters.

[0188] In this embodiment, mine ventilation perception monitoring parameters are acquired in real time, and the target value and actual value of the decision target parameter obtained based on the mine ventilation perception monitoring parameters are compared. According to the judgment result, it is determined whether to perform mine ventilation joint control.

[0189] During the judgment process, when the measured air volume of the mining face is less than the dynamic air volume required by the mining face, and / or when the measured air volume of the excavation face is less than the dynamic air volume required by the excavation face, and / or when the measured air volume of the chamber is less than the dynamic air volume required by the chamber, and / or the measured operating efficiency of the local fan is less than the target operating efficiency of the local fan, and / or the measured operating efficiency of the main fan is less than the target operating efficiency of the main fan, and / or the measured equal-area holes of the mine ventilation system are less than the target equal-area holes, and / or the air volume of the mine ventilation system does not match the ventilation resistance, the ventilation joint control decision is initiated.

[0190] Specifically, the actual air volume of the mining working face is compared with the dynamic air volume requirement of the mining working face. The measured air volume of the mining working face is less than the dynamic air volume requirement of the mining working face, and does not meet the air volume requirement of the mining working face, so the decision-making joint control is initiated.

[0191] The actual air volume of the excavation working face is compared with the dynamic air volume required by the excavation working face. The measured air volume of the excavation working face is less than the dynamic air volume required by the excavation working face. The measured air volume of the excavation working face does not meet the required air volume requirement, and the decision-making joint control is initiated.

[0192] The actual air volume in the chamber is compared with the dynamic air volume required in the chamber. When the measured air volume in the chamber is less than the dynamic air volume required in the chamber and the measured air volume in the chamber does not meet the required air volume requirement, decision-making joint control is initiated.

[0193] The actual operating efficiency of the local fan is compared with the target operating efficiency. The measured operating efficiency of the local fan is less than the target operating efficiency of the local fan. The measured operating efficiency of the local fan does not meet the operating efficiency requirements of the local fan, and the decision-making joint control is initiated.

[0194] The actual operating efficiency of the main fan is compared with the target operating efficiency. The measured operating efficiency of the main fan is less than the target operating efficiency of the main fan. The measured operating efficiency of the main fan does not meet the operating efficiency requirements of the main fan, and the decision-making joint control is started.

[0195] The actual equal-area hole of the mine ventilation system is compared with the target equal-area hole. The measured equal-area hole of the mine ventilation system is smaller than the target equal-area hole. The actual equal-area hole of the mine ventilation system does not meet the equal-area hole requirements, and decision-making joint control is initiated.

[0196] Check whether the air volume and ventilation resistance of the mine ventilation system match. If they do not match, start decision-making joint control.

[0197] The actual air volume at other air consumption points is compared with the dynamic air volume requirement. The actual air volume at other air consumption points is less than the dynamic air volume requirement and does not meet the air volume requirement at other air consumption points, so the decision-making joint control is initiated.

[0198] At the same time, other determination conditions may be added, including manually input determination conditions.

[0199] S150: If the judgment result is to start the ventilation joint control decision, the mine ventilation joint control decision plan is determined according to the mine ventilation joint control decision parameters.

[0200] Specifically, the step of determining the mine ventilation joint control decision plan according to the mine ventilation joint control decision parameters includes the following steps:

[0201] The main fan characteristic curve is determined according to the main fan operating frequency and the fan blade angle, and the local fan characteristic curve is determined according to the local fan operating frequency.

[0202] A ventilation network air volume and wind resistance joint solution method or a ventilation network wind pressure adjustment streamline method or an optimal adjustment critical path method is used to solve and obtain the wind resistance of all wind windows in the mine, the air volume and negative pressure of the main fan, the air volume and wind pressure of the local fan, and the opening and closing status of all air doors in the mine; a safety analysis is performed on the solved air volume of all tunnels in the mine to determine whether the solved air volume and wind speed of all tunnels in the mine exceed the limit; based on the characteristic curve of the relationship between the opening area of ​​the wind window and the wind window wind resistance, it is determined whether each set of wind windows can achieve the wind window wind resistance solution result by adjusting the opening area of ​​the wind window; if it can be achieved, the opening area of ​​each wind window in the mine is calculated; based on the mine air volume and ventilation resistance, the equal accumulation holes of the mine ventilation system are calculated to determine whether the mine air volume matches the mine ventilation resistance.

[0203] According to the calculation results of the local fan air volume and negative pressure, combined with the characteristic curve of the local fan air volume and wind pressure relationship, calculate and record the power consumption and efficiency of the local fan operating point. Combined with the power consumption, efficiency, air volume and wind pressure of the local fan operating point, evaluate the safety and energy saving of the local fan operating point.

[0204] According to the calculation results of the main fan air volume and negative pressure, combined with the main fan air volume efficiency characteristic curve, calculate and record the main fan operating point power consumption and efficiency. Combined with the main fan operating point power consumption, efficiency, air volume and air pressure, evaluate the safety and energy saving of the main fan operating points.

[0205] If it is impossible to calculate the wind resistance of all the mine's wind windows, the main fan's air volume and negative pressure, the local fan's air volume and pressure, and the opening and closing status of all the mine's dampers, the main fan's operating frequency and fan blade angle, the local fan's operating frequency, the wind window's wind area, and the damper's opening and closing status shall be recorded as a mine ventilation joint control scheme.

[0206] If the air volume and wind speed in all the tunnels of the mine exceed the limit, each set of wind windows cannot reach the wind window wind resistance solution result by adjusting the wind window opening area, and the mine air volume does not match the mine ventilation resistance, then change the main fan operating frequency and fan blade angle, local fan operating frequency, and execute the above steps again in sequence.

[0207] If there is no room for adjustment in the operating frequency of the main fan, the angle of the fan blades and the operating frequency of the local fan, quantitatively compare the power consumption and efficiency of the main fan and the local fan of each of the above schemes to determine the best mine ventilation joint control scheme.

[0208] According to the preset multiple adjustment schemes, the opening area of ​​the wind window, the operating frequency of the main fan, the blade angle, the operating frequency of the local fan, and the opening and closing state of the damper in the mine are adjusted in sequence;

[0209] Determine the performance index values ​​of the main fans and local fans corresponding to each adjustment scheme, and sort the index values ​​in descending order to form a performance index sequence;

[0210] The adjustment plan corresponding to the first performance indicator in the performance indicator sequence is selected as the mine ventilation joint control decision plan.

[0211] S160: Execute the mine ventilation joint control decision plan, and adjust the mine ventilation joint control decision plan through the execution feedback results.

[0212] The steps in implementing the mine ventilation joint control decision-making plan include:

[0213] The window opening area in the mine ventilation joint control decision plan is sent to the underground window adjustment control substation, and the window wind area is automatically adjusted through the PLC. If the window fails to execute the window wind area automatic adjustment command, a fault diagnosis is performed and the command is executed after the fault is eliminated;

[0214] The damper opening and closing status in the mine ventilation joint control decision-making plan is sent to the underground damper control substation, and the damper is automatically opened and closed through the PLC. If the damper does not execute the damper automatic opening and closing command, a fault diagnosis is performed and the command is executed after the fault is eliminated;

[0215] The local fan operating frequency in the mine ventilation joint control decision plan is sent to the underground local fan control substation, and the fan operating frequency is automatically adjusted through the PLC. If the local fan does not execute the instruction, a fault diagnosis is performed and the instruction is executed after the fault is eliminated;

[0216] The main fan operating frequency and blade angle in the mine ventilation joint control decision-making plan are sent to the main fan control substation, and the main fan operating frequency and blade angle are automatically adjusted through PLC. If the main fan fails to execute the instruction, fault diagnosis is performed and the instruction is executed after the fault is eliminated.

[0217] Adjust the mine ventilation joint control decision plan through the execution feedback results, including:

[0218] Obtain the mine ventilation sensing monitoring parameters after executing the mine ventilation joint control decision-making plan;

[0219] The mine ventilation sensing monitoring parameters are compared with the target values ​​of the decision target parameters in the mine ventilation joint control decision parameters to determine whether the control target has been achieved. If the control target value has not been achieved, fault diagnosis of the main ventilation fan, local ventilation fan and adjustable air windows is performed.

[0220] The mine intelligent ventilation control method provided by the present invention collects the mine ventilation perception parameters in the mine ventilation system through the ventilation parameter monitoring link of the mine ventilation system, determines the ventilation joint control decision parameters; determines whether to start the ventilation joint control decision of the mine ventilation system through the mine ventilation decision analysis link of the mine ventilation system; the mine ventilation linkage control link of the mine ventilation system determines the mine ventilation joint control decision plan when it is judged to be yes, executes the plan and adjusts the mine ventilation joint control decision plan through the feedback result. Through the present invention, it is possible to strengthen the information interaction between the subsystems of the mine ventilation system, improve the safety, reliability and adjustability of the mine ventilation system, and at the same time improve the coupling degree of the mine ventilation monitoring link, the mine ventilation decision analysis link and the mine ventilation linkage control link.

[0221] The present invention constructs an automatic decision-making theory and method for the air volume adjustment scheme of the mine ventilation network with strong operational feasibility, constructs a dynamic update method for the ventilation system model, improves the consistency between the real-time solution result of the ventilation network and the field measurement result; scientifically calculates the daily air adjustment and control scheme of the mine, and realizes the air adjustment and control of the mine through automated remote control technology, and jointly regulates the local ventilator, main ventilator, wind window, damper and other types of equipment groups, realizes the simultaneous and safe regulation of the air volume in multiple locations, and reduces the energy consumption of mine ventilation. The method of the present invention is applicable to the measurement and management of the air volume of all mine ventilation systems, scientifically calculates the daily air adjustment and control scheme of the mine, and realizes the air adjustment and control of the mine through automated remote control technology, and jointly regulates the ventilation equipment group, realizes the simultaneous and safe regulation of the air volume in multiple locations, and can meet the different conditions of different mines and different lanes.

[0222] The present invention relates to a mine ventilation system as one of the eight systems for mining mine resources. Its design and management is not only to meet the life safety of underground workers, but also to provide a good working environment for underground workers. The intelligent ventilation control method of the mine system makes the air volume adjustment management more accurate, controllable and real-time, which can be promoted in various mine tunnels. At the same time, as a management mode of intelligent ventilation, it also has great promotion and application value.

[0223] like Figure 5 As shown, the present invention proposes a mine intelligent ventilation management and control system 300, including: a sensing subsystem 310, a decision subsystem 320 and a control subsystem 330.

[0224] The mine intelligent ventilation control system 300 of the present invention has constructed 14 links, including mine ventilation system perception monitoring and early warning, ventilation system fault diagnosis, mine ventilation system model update, mine ventilation network real-time solution, mine ventilation joint control plan decision start judgment, mine ventilation joint control plan decision preparation, mine ventilation joint control plan decision implementation, mine ventilation joint control plan output, mine ventilation joint control plan execution, mine ventilation joint control plan feedback verification, mine disaster emergency wind control plan decision, mine disaster emergency wind control plan execution, mine disaster emergency wind control plan execution feedback, etc., and established an information interaction channel between the perception subsystem 310, the decision subsystem 320, and the control subsystem 330, and highly coupled each subsystem to scientifically calculate the mine's daily wind adjustment and control plan, to achieve the safe operation of the mine ventilation system during non-disaster periods and the emergency disaster resistance of the ventilation system during fire periods, and to ensure the safety, reliability, and efficiency of the mine system's full-time domain intelligent ventilation control system. The workflow of the mine intelligent ventilation control system includes the mine ventilation system intelligent joint control workflow, referring to Figure 6 .

[0225] The mine intelligent ventilation control system 300 has improved the workflow to more than 10 links, and has established theories and methods for fault diagnosis of mine ventilation systems, automatic decision-making theories and methods for air volume adjustment schemes of mine ventilation networks in non-disaster periods, dynamic decision-making theories and methods for emergency airflow control schemes of mine ventilation networks in fire periods, and dynamic update methods for ventilation system models. It scientifically calculates daily air adjustment and control schemes in mines, and realizes air adjustment and control in mines through automated remote control technology. It conducts joint control of various types of equipment groups, including local fans, main fans, wind windows, dampers, fireproof isolation doors, and rapid closures, to achieve safe and simultaneous control of air volume in multiple locations, while reducing energy consumption for mine ventilation. It can also achieve emergency control of mine fires and quickly discharge fire smoke from the mine ventilation system.

[0226] The sensing subsystem 310 in the system is used to obtain mine ventilation sensing monitoring parameters.

[0227] As the "eyes" of the mine intelligent ventilation control system, the perception subsystem 310 has the functions of mine ventilation status analysis-warning-diagnosis, intelligent ventilation equipment operation status analysis-warning-diagnosis, mine ventilation network real-time solution, mine ventilation system model (two-dimensional or three-dimensional) dynamic update, and mine airflow control decision-making. The mine ventilation decision-solving subsystem uses big data analysis, artificial intelligence, network solution technology, and cloud computing as core technologies. Based on the mine ventilation status parameter monitoring data, it performs real-time solution of the ventilation network, mine ventilation network fire simulation solution, automatic planning of disaster avoidance routes, dynamic analysis of required air volume, ventilation system fault diagnosis and location tracing, and real-time grasp of the operation status of ventilation equipment and facilities groups; with the goal of safe, efficient, green, and low-carbon operation of the mine as the guide, it performs ventilation control simulation and intelligent decision-making, and provides control plans for mine ventilation power and ventilation facilities; for various external fires such as the mine main transport lane, air intake shaft, mining area and coal mining face, and electromechanical chamber, it provides control plans for emergency wind control equipment and facilities in the mine with the goal of fire smoke diversion, blocking, and safe external discharge.

[0228] The decision subsystem 320 is used to determine the mine ventilation joint control decision plan based on the mine ventilation sensing monitoring parameters.

[0229] As the "brain" of the mine intelligent ventilation management and control system 300, the decision-making subsystem 320 has the functions of mine ventilation status analysis-early warning-diagnosis, intelligent ventilation equipment operation status analysis-early warning-diagnosis, mine ventilation network real-time solution, mine ventilation network fire simulation solution, automatic planning of disaster avoidance routes, dynamic update of mine ventilation system model, and mine airflow control decision-making. The mine ventilation decision-making solution subsystem uses big data analysis, artificial intelligence, network solution technology, and cloud computing as core technologies. Based on the mine ventilation status parameter monitoring data, it performs real-time solution of the ventilation network, dynamic analysis of required air volume, ventilation system fault diagnosis and location tracing, and real-time grasp of the operation status of the ventilation equipment and facility group; guided by the goal of safe, efficient, green, and low-carbon operation of the mine, it conducts ventilation control simulation and intelligent decision-making, and provides control plans for mine ventilation power and ventilation facilities; with the goal of fire smoke diversion, blocking, and safe discharge, it provides control plans for mine emergency wind control equipment and facilities. The decision-making and settlement process of the decision-making subsystem 320 for the ventilation joint control plan is as follows: Figure 7 shown.

[0230] The control subsystem 330 is used to execute the mine ventilation joint control decision plan and adjust the mine ventilation joint control decision plan through execution feedback results.

[0231] Control subsystem 330 is the "limbs" of mine intelligent ventilation control system 300, mainly composed of adjustable wind window, remote automatic damper, local fan remote control system, and main fan remote control system. Control subsystem 330 takes digitalization, visualization, and automation technology as the core, and accurately and orderly interconnects and controls mine ventilation power, ventilation facilities, and disaster emergency wind control facilities, so as to achieve dynamic and accurate control of working face, mining area, and mine air volume, realize emergency control of mine fire, and quickly discharge fire smoke from the mine ventilation system.

[0232] exist Figure 8 In one embodiment of the present invention shown, the decision subsystem 320 includes:

[0233] A first determination module 321 is used to determine the mine ventilation joint control decision parameters based on the mine ventilation sensing monitoring parameters;

[0234] The first judgment module 322 is used to judge whether the mine ventilation system starts the ventilation joint control decision according to the mine ventilation joint control decision parameters;

[0235] The second determination module 323 is used to determine the mine ventilation joint control decision plan according to the mine ventilation joint control decision parameters if the judgment result is to start the ventilation joint control decision.

[0236] exist Fig. 9 In another embodiment of the present invention shown, the decision subsystem 320 further includes:

[0237] The first fault diagnosis module 324 is used to determine whether the ventilation power equipment in the mine ventilation system is faulty, whether the ventilation facilities are faulty, and whether the ventilation network is faulty based on the mine ventilation sensing monitoring parameters;

[0238] The first fault processing module 325 is used to perform fault processing when the ventilation power equipment and / or ventilation facilities and / or ventilation network fails, and obtain the mine ventilation sensing monitoring parameters after the fault processing.

[0239] exist Fig.10 In another embodiment of the present invention shown, the first fault diagnosis module 324 includes:

[0240] The first diagnosis unit 3241 is used to collect real-time data of the ventilation state parameters using sensors deployed in the ventilation network for collecting ventilation state parameters, and perform fault diagnosis of the ventilation network based on the real-time data of the ventilation state parameters;

[0241] The second diagnosis unit 3242 is used to collect the operating parameters, operating status and ventilation status parameters of the ventilation power equipment by using the electromechanical sensor corresponding to the ventilation power equipment, the sensor corresponding to the ventilation status parameter and the sensor corresponding to the ventilation power equipment status, and perform fault diagnosis of the intelligent ventilation equipment in the ventilation power equipment based on the operating parameters, operating status and ventilation status parameters of the ventilation power equipment;

[0242] The third diagnosis unit 3243 is used to collect the operation parameters, operation status and ventilation status parameters of the ventilation facility by using the electromechanical sensor corresponding to the ventilation facility, the sensor corresponding to the ventilation status parameter and the sensor corresponding to the ventilation facility status, and perform fault diagnosis of the intelligent ventilation equipment in the ventilation facility based on the operation parameters, operation status and ventilation status parameters of the ventilation facility;

[0243] Ventilation power equipment includes: intelligent ventilation power equipment and non-intelligent ventilation power equipment;

[0244] Ventilation facilities include: intelligent ventilation facilities and non-intelligent ventilation facilities.

[0245] The mine ventilation sensing and monitoring parameters involved in the present invention include: tunnel parameters and airflow status of the ventilation network, parameters and operating status of ventilation facilities, parameters and operating status of ventilation power equipment, measured air volume of mining working face, measured air volume of excavation working face, measured air volume of chamber, measured operating efficiency of local fans, measured operating efficiency of main fans, measured equal accumulation holes of mine ventilation system, air volume and ventilation resistance of mine ventilation system, and ventilation status parameters.

[0246] Fig.11 In other embodiments of the present invention shown, the first determining module 321 includes:

[0247] The first construction unit 3211 is used to construct a digital twin model of the mine ventilation system based on the tunnel parameters and wind flow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation sensing monitoring parameters;

[0248] The first determination unit 3212 is used to obtain decision target data and input the decision target data into the digital twin model to obtain mine ventilation joint control decision parameters.

[0249] exist Fig.12 In other embodiments of the present invention shown, the first building unit 3211 includes:

[0250] The construction submodule 32111 is used to construct an initial digital twin model of the mine ventilation system by using the tunnel parameters and wind flow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation sensing monitoring parameters;

[0251] The update verification submodule 32112 is used to update and verify the initial digital twin model to obtain a digital twin model of the mine ventilation system.

[0252] Among them, the mine ventilation joint control decision parameters include: decision result parameters and decision target parameters;

[0253] The decision result parameters include: window opening area, main fan operating frequency and blade angle, local fan operating frequency, and damper opening and closing status;

[0254] The decision-making target parameters include: dynamic air volume requirement of mining working face meets the standard, dynamic air volume requirement of excavation working face meets the standard, dynamic air volume requirement of chamber meets the standard, local ventilation fan operating efficiency, main ventilation fan operating efficiency, mine equal accumulation holes, and matching of mine air volume and ventilation resistance.

[0255] In other embodiments of the present invention, the first determination module 322 is specifically used for:

[0256] When the measured air volume of the mining face is less than the dynamic air volume required by the mining face, and / or when the measured air volume of the excavation face is less than the dynamic air volume required by the excavation face, and / or when the measured air volume of the chamber is less than the dynamic air volume required by the chamber, and / or the measured operating efficiency of the local fan is less than the target operating efficiency, and / or the measured operating efficiency of the main fan is less than the target operating efficiency, and / or the measured equal-area holes of the mine ventilation system are less than the target equal-area holes, and / or the air volume of the mine ventilation system does not match the ventilation resistance, the ventilation joint control decision is initiated.

[0257] exist Fig.13 In other embodiments of the present invention shown, the second determination module 323 includes:

[0258] The first adjustment unit 3231 is used to adjust the window opening area, the main fan operating frequency, the blade angle, the local fan operating frequency, and the damper opening and closing state in the mine in accordance with a plurality of preset adjustment schemes in sequence;

[0259] The second determining unit 3232 is used to determine the performance index values ​​of the main ventilator and the local ventilator corresponding to each adjustment scheme, and sort the index values ​​in descending order to form a performance index sequence;

[0260] The first selection unit 3233 is used to select the adjustment scheme corresponding to the first performance indicator in the performance indicator sequence as the mine ventilation joint control decision scheme.

[0261] Further, if Fig.14 As shown, the control subsystem 330 includes:

[0262] The first control unit 331 is used to send the window opening area in the mine ventilation joint control decision plan to the underground window adjustment control substation, and execute the automatic adjustment of the window wind area through the PLC. If the window fails to execute the automatic adjustment instruction of the window wind area, a fault diagnosis is performed, and the instruction is executed after the fault is eliminated;

[0263] The second control unit 332 is used to send the damper opening and closing status in the mine ventilation joint control decision-making plan to the underground damper control substation, execute the automatic opening and closing of the damper through the PLC, and perform fault diagnosis if the damper does not execute the automatic opening and closing command of the damper, and execute the command after eliminating the fault;

[0264] The third control unit 333 is used to send the operating frequency of the local ventilator in the mine ventilation joint control decision-making plan to the underground local ventilator control substation, and automatically adjust the operating frequency of the ventilator through the PLC. If the local ventilator fails to execute the instruction, a fault diagnosis is performed, and the instruction is executed after the fault is eliminated;

[0265] The fourth control unit 334 is used to send the main fan operating frequency and blade angle in the mine ventilation joint control decision-making plan to the main fan control substation, and automatically adjust the main fan operating frequency and blade angle through PLC. If the main fan fails to execute the instruction, fault diagnosis is performed and the instruction is executed after the fault is eliminated.

[0266] exist Fig.15 In other embodiments of the present invention shown, the control subsystem 330 further includes:

[0267] The first execution unit 335 is used to obtain the mine ventilation sensing monitoring parameters after executing the mine ventilation joint control decision-making plan;

[0268] The first judgment unit 336 is used to compare the mine ventilation sensing monitoring parameters with the target values ​​of the decision target parameters in the mine ventilation joint control decision parameters to determine whether the control target is achieved. If the control target value is not achieved, fault diagnosis of the main ventilation fan and the local ventilation fan connected to the adjustable wind window is performed.

[0269] The sensing subsystem 310 of the present invention is used to measure the actual wind volume of the mining working face and the actual wind volume of the excavation working face by using full-section scanning wind measurement or multi-point mobile wind measurement.

[0270] The mine intelligent ventilation control system further includes: a data preprocessing module 340;

[0271] The data preprocessing module 340 is used to perform rationality verification, interference data elimination, data abnormal fluctuation capture, and data time averaging processing on the mine ventilation sensing monitoring parameters.

[0272] In order to implement the embodiment, the present invention also proposes an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute each step in the mine intelligent ventilation control method of the aforementioned technical solution.

[0273] like Fig.16 As shown, the non-transitory computer-readable storage medium includes a memory 810 of instructions, an interface 830, and the instructions can be executed by a processor 820 according to the mine intelligent ventilation control to complete the method. Optionally, the storage medium can be a non-transitory computer-readable storage medium, for example, the non-transitory computer-readable storage medium can be a ROM, a random access memory (RAM), a CD-ROM, a tape, a floppy disk, and an optical data storage device, etc.

[0274] In order to implement the embodiment, the present invention also proposes a non-temporary computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the intelligent ventilation management and control of the mine as in the embodiment of the present invention is implemented.

[0275] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0276] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0277] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present invention belong.

[0278] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples (non-exhaustive list) of computer-readable media include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0279] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the described embodiment, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0280] A person skilled in the art may understand that all or part of the steps of implementing the method of the embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0281] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0282] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present invention have been shown and described above, it can be understood that the embodiments are exemplary and cannot be construed as limiting the present invention. A person of ordinary skill in the art may change, modify, replace and modify the embodiments within the scope of the present invention.

Claims

1. A mine intelligent ventilation control method, characterized in that: The method comprises: Obtain mine ventilation sensing monitoring parameters; Determine whether the mine ventilation system is faulty according to the mine ventilation sensing monitoring parameters, and if so, perform fault handling to obtain the mine ventilation sensing monitoring parameters after the fault handling; Determining mine ventilation joint control decision parameters based on the mine ventilation sensing monitoring parameters; Determine whether the mine ventilation system starts the ventilation joint control decision according to the mine ventilation joint control decision parameter; If the judgment result is to start the ventilation joint control decision, then determine the mine ventilation joint control decision plan according to the mine ventilation joint control decision parameters; Execute the mine ventilation joint control decision plan, and adjust the mine ventilation joint control decision plan through execution feedback results.

2. The mine intelligent ventilation control method according to claim 1, characterized in that: The mine ventilation system failures include: Failure of ventilation power equipment, ventilation facilities and ventilation network in mine ventilation system.

3. The mine intelligent ventilation control method according to claim 2, characterized in that: The mine ventilation sensing monitoring parameters include: tunnel parameters and airflow status of the ventilation network, parameters and operating status of ventilation facilities, parameters and operating status of ventilation power equipment, measured air volume of mining working face, measured air volume of excavation working face, measured air volume of chamber, measured operating efficiency of local fans, measured operating efficiency of main fans, measured equal accumulation holes of mine ventilation system, air volume and ventilation resistance of mine ventilation system, and ventilation status parameters.

4. The mine intelligent ventilation control method according to claim 3, characterized in that: The determining whether the mine ventilation system is faulty according to the mine ventilation sensing monitoring parameters includes: Using sensors deployed in the ventilation network to collect ventilation state parameters, real-time data of the ventilation state parameters are collected, and fault diagnosis of the ventilation network is performed based on the real-time data of the ventilation state parameters; Using electromechanical sensors corresponding to the ventilation power equipment, sensors corresponding to ventilation state parameters, and sensors corresponding to the ventilation power equipment states to collect operating parameters, operating states, and ventilation state parameters of the ventilation power equipment, and performing fault diagnosis of intelligent ventilation equipment in the ventilation power equipment based on the operating parameters, operating states, and ventilation state parameters of the ventilation power equipment; Using electromechanical sensors corresponding to the ventilation facilities, sensors corresponding to ventilation status parameters, and sensors corresponding to ventilation facility statuses to collect operation parameters, operation statuses, and ventilation status parameters of the ventilation facilities, and performing fault diagnosis of intelligent ventilation equipment in the ventilation facilities based on the operation parameters, operation statuses, and ventilation status parameters of the ventilation facilities; Wherein, the ventilation power equipment includes: intelligent ventilation power equipment and non-intelligent ventilation power equipment; The ventilation facilities include: intelligent ventilation facilities and non-intelligent ventilation facilities.

5. The mine intelligent ventilation control method according to claim 3, characterized in that: The determining of the mine ventilation joint control decision parameters based on the mine ventilation sensing monitoring parameters includes: Constructing a digital twin model of the mine ventilation system based on the tunnel parameters and wind flow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation sensing monitoring parameters; Decision target data is acquired, and the decision target data is input into the digital twin model to obtain the mine ventilation joint control decision parameters.

6. The mine intelligent ventilation control method according to claim 5, characterized in that: The digital twin model of the mine ventilation system is constructed based on the tunnel parameters and wind flow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation sensing monitoring parameters, including: An initial digital twin model of the mine ventilation system is constructed using the tunnel parameters and wind flow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation sensing monitoring parameters; The initial digital twin model is updated and verified to obtain a digital twin model of the mine ventilation system.

7. The mine intelligent ventilation control method according to claim 5, characterized in that: The mine ventilation joint control decision parameters include: decision result parameters and decision target parameters; The decision result parameters include: window opening area, main fan operating frequency and blade angle, local fan operating frequency, and damper opening and closing status; The decision target parameters include: dynamic air volume requirement of mining working face meeting the standard, dynamic air volume requirement of heading working face meeting the standard, dynamic air volume requirement of chamber meeting the standard, local fan operating efficiency, main fan operating efficiency, mine equal accumulation holes, and matching of mine air volume and ventilation resistance.

8. The mine intelligent ventilation control method according to claim 7, characterized in that: The step of judging whether the mine ventilation system starts the ventilation joint control decision according to the mine ventilation joint control decision parameter comprises: When the measured air volume of the mining face is less than the dynamic air volume required by the mining face, and / or when the measured air volume of the excavation face is less than the dynamic air volume required by the excavation face, and / or when the measured air volume of the chamber is less than the dynamic air volume required by the chamber, and / or the measured operating efficiency of the local fan is less than the target operating efficiency, and / or the measured operating efficiency of the main fan is less than the target operating efficiency, and / or the measured equal-area holes of the mine ventilation system are less than the target equal-area holes, and / or the air volume of the mine ventilation system does not match the ventilation resistance, the ventilation joint control decision is initiated.

9. The mine intelligent ventilation control method according to claim 7, characterized in that: The step of determining the mine ventilation joint control decision scheme according to the mine ventilation joint control decision parameters comprises: According to the preset multiple adjustment schemes, the opening area of ​​the wind window, the operating frequency of the main fan, the blade angle, the operating frequency of the local fan, and the opening and closing state of the damper in the mine are adjusted in sequence; Determine the performance index values ​​of the main ventilator and the local ventilator corresponding to each adjustment scheme, and sort the index values ​​in descending order to form a performance index sequence; The adjustment scheme corresponding to the first performance indicator in the performance indicator sequence is selected as the mine ventilation joint control decision scheme.

10. The mine intelligent ventilation control method according to claim 9, characterized in that: The execution of the mine ventilation joint control decision-making plan includes: The window opening area in the mine ventilation joint control decision plan is sent to the underground window adjustment control substation, and the window wind area is automatically adjusted through the PLC. If the window does not execute the window wind area automatic adjustment instruction, a fault diagnosis is performed, and the instruction is executed after the fault is eliminated; The damper opening and closing status in the mine ventilation joint control decision-making plan is sent to the underground damper control substation, and the damper is automatically opened and closed through the PLC. If the damper does not execute the damper automatic opening and closing command, a fault diagnosis is performed, and the command is executed after the fault is eliminated; The local fan operating frequency in the mine ventilation joint control decision plan is sent to the underground local fan control substation, and the fan operating frequency is automatically adjusted through the PLC. If the local fan does not execute the instruction, a fault diagnosis is performed, and the instruction is executed after the fault is eliminated; The main fan operating frequency and blade angle in the mine ventilation joint control decision-making plan are sent to the main fan control substation, and the main fan operating frequency and blade angle are automatically adjusted through PLC. If the main fan fails to execute the instruction, fault diagnosis is performed and the instruction is executed after the fault is eliminated.

11. The mine intelligent ventilation control method according to claim 10, characterized in that: The step of adjusting the mine ventilation joint control decision plan by executing the feedback result includes: Acquire the mine ventilation sensing monitoring parameters after executing the mine ventilation joint control decision-making plan; The mine ventilation sensing monitoring parameters are compared with the target values ​​of the decision target parameters in the mine ventilation joint control decision parameters to determine whether the control target is achieved. If the control target value is not achieved, fault diagnosis of the main ventilation fan, local ventilation fan and adjustable air windows is performed.

12. The mine intelligent ventilation control method according to claim 3, characterized in that: The actually measured wind volume of the mining working face and the actually measured wind volume of the excavation working face are both measured by full-section scanning wind measurement or multi-point mobile wind measurement.

13. The mine intelligent ventilation control method according to claim 1, characterized in that: The method further includes obtaining the mine ventilation sensing monitoring parameters: The mine ventilation sensing monitoring parameters are respectively subjected to rationality verification, interference data elimination, data abnormal fluctuation capture, and data time averaging processing.

14. The mine intelligent ventilation control method according to claim 4, characterized in that: The real-time data of the ventilation status parameters is used to perform fault diagnosis on the non-intelligent ventilation power equipment and the non-intelligent ventilation facilities.

15. A mine intelligent ventilation control system, characterized in that: include: Perception subsystem, decision subsystem and control subsystem; The sensing subsystem is used to obtain mine ventilation sensing monitoring parameters; The decision subsystem is used to determine a mine ventilation joint control decision plan based on the mine ventilation sensing monitoring parameters; The control subsystem is used to execute the mine ventilation joint control decision plan and adjust the mine ventilation joint control decision plan through execution feedback results.

16. The mine intelligent ventilation control system according to claim 15, characterized in that: The decision-making subsystem includes: A first determination module is used to determine the mine ventilation joint control decision parameters based on the mine ventilation sensing monitoring parameters; A first judgment module is used to judge whether the mine ventilation system starts the ventilation joint control decision according to the mine ventilation joint control decision parameter; The second determination module is used to determine the mine ventilation joint control decision plan according to the mine ventilation joint control decision parameters if the judgment result is to start the ventilation joint control decision.

17. The mine intelligent ventilation control system according to claim 16, characterized in that: The decision-making subsystem also includes: A first fault diagnosis module is used to determine whether the ventilation power equipment, ventilation facilities and ventilation network in the mine ventilation system are faulty based on the mine ventilation sensing monitoring parameters; The first fault processing module is used to perform fault processing when the ventilation power equipment and / or the ventilation facilities and / or the ventilation network fail, and obtain the mine ventilation sensing monitoring parameters after the fault processing.

18. The mine intelligent ventilation control system according to claim 17, characterized in that: The first fault diagnosis module includes: A first diagnosis unit is used to collect real-time data of ventilation state parameters using sensors deployed in the ventilation network for collecting ventilation state parameters, and perform fault diagnosis of the ventilation network based on the real-time data of ventilation state parameters; A second diagnostic unit is used to collect operating parameters, operating status and ventilation status parameters of the ventilation power equipment using an electromechanical sensor corresponding to the ventilation power equipment, a sensor corresponding to the ventilation status parameter and a sensor corresponding to the ventilation power equipment status, and perform fault diagnosis of the intelligent ventilation equipment in the ventilation power equipment based on the operating parameters, operating status and ventilation status parameters of the ventilation power equipment; A third diagnostic unit is used to collect operating parameters, operating status and ventilation status parameters of the ventilation facility using an electromechanical sensor corresponding to the ventilation facility, a sensor corresponding to the ventilation status parameter and a sensor corresponding to the ventilation facility status, and perform fault diagnosis of the intelligent ventilation equipment in the ventilation facility based on the operating parameters, operating status and ventilation status parameters of the ventilation facility; Wherein, the ventilation power equipment includes: intelligent ventilation power equipment and non-intelligent ventilation power equipment; The ventilation facilities include: intelligent ventilation facilities and non-intelligent ventilation facilities.

19. The mine intelligent ventilation control system according to claim 18, characterized in that: The mine ventilation sensing monitoring parameters include: tunnel parameters and airflow status of the ventilation network, parameters and operating status of ventilation facilities, parameters and operating status of ventilation power equipment, measured air volume of mining working face, measured air volume of excavation working face, measured air volume of chamber, measured operating efficiency of local fans, measured operating efficiency of main fans, measured equal accumulation holes of mine ventilation system, air volume and ventilation resistance of mine ventilation system, and ventilation status parameters.

20. The mine intelligent ventilation control system according to claim 19, characterized in that: The first determining module includes: A first construction unit is used to construct a digital twin model of the mine ventilation system based on the tunnel parameters and wind flow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation sensing and monitoring parameters; The first determination unit is used to obtain decision target data and input the decision target data into the digital twin model to obtain the mine ventilation joint control decision parameters.

21. The mine intelligent ventilation control system according to claim 20, characterized in that: The first building block comprises: A construction submodule is used to construct an initial digital twin model of the mine ventilation system by using the tunnel parameters and wind flow status of the ventilation network, the parameters and operating status of the ventilation facilities, and the parameters and operating status of the ventilation power equipment in the mine ventilation sensing monitoring parameters; The update verification submodule is used to update and verify the initial digital twin model to obtain the digital twin model of the mine ventilation system.

22. The mine intelligent ventilation control system according to claim 21, characterized in that: The mine ventilation joint control decision parameters include: decision result parameters and decision target parameters; The decision result parameters include: window opening area, main fan operating frequency and blade angle, local fan operating frequency, and damper opening and closing status; The decision target parameters include: dynamic air volume requirement of mining working face meeting the standard, dynamic air volume requirement of heading working face meeting the standard, dynamic air volume requirement of chamber meeting the standard, local fan operating efficiency, main fan operating efficiency, mine equal accumulation holes, and matching of mine air volume and ventilation resistance.

23. The mine intelligent ventilation control system according to claim 22, characterized in that: The first judgment module is specifically used for: When the measured air volume of the mining face is less than the dynamic air volume required by the mining face, and / or when the measured air volume of the excavation face is less than the dynamic air volume required by the excavation face, and / or when the measured air volume of the chamber is less than the dynamic air volume required by the chamber, and / or the measured operating efficiency of the local fan is less than the target operating efficiency, and / or the measured operating efficiency of the main fan is less than the target operating efficiency, and / or the measured equal-area holes of the mine ventilation system are less than the target equal-area holes, and / or the air volume of the mine ventilation system does not match the ventilation resistance, the ventilation joint control decision is initiated.

24. The mine intelligent ventilation control system according to claim 23, characterized in that: The second determining module includes: The first adjustment unit is used to adjust the window opening area, the main fan operating frequency, the blade angle, the local fan operating frequency, and the damper opening and closing state in the mine in accordance with a plurality of preset adjustment schemes in sequence; The second determination unit is used to determine the performance index values ​​of the main ventilator and the local ventilator corresponding to each adjustment scheme, and sort the index values ​​in descending order to form a performance index sequence; The first selection unit is used to select the adjustment scheme corresponding to the first performance indicator in the performance indicator sequence as the mine ventilation joint control decision scheme.

25. The mine intelligent ventilation control system according to claim 24, characterized in that: The control subsystem comprises: The first control unit is used to send the window opening area in the mine ventilation joint control decision plan to the underground window adjustment control substation, and execute the automatic adjustment of the window wind area through the PLC. If the window fails to execute the automatic adjustment instruction of the window wind area, a fault diagnosis is performed, and the instruction is executed after the fault is eliminated; The second control unit is used to send the damper opening and closing status in the mine ventilation joint control decision-making plan to the underground damper control substation, execute the automatic opening and closing of the damper through the PLC, and perform fault diagnosis if the damper fails to execute the automatic opening and closing command of the damper, and execute the command after eliminating the fault; The third control unit is used to send the operating frequency of the local fan in the mine ventilation joint control decision-making plan to the underground local fan control substation, and automatically adjust the fan operating frequency through the PLC. If the local fan fails to execute the instruction, a fault diagnosis is performed, and the instruction is executed after the fault is eliminated; The fourth control unit is used to send the main fan operating frequency and blade angle in the mine ventilation joint control decision-making plan to the main fan control substation, and automatically adjust the main fan operating frequency and blade angle through PLC. If the main fan fails to execute the instruction, fault diagnosis is performed and the instruction is executed after the fault is eliminated.

26. The mine intelligent ventilation control system according to claim 25, characterized in that: The control subsystem comprises: A first execution unit is used to obtain the mine ventilation sensing monitoring parameters after executing the mine ventilation joint control decision-making scheme; The first judgment unit is used to compare the mine ventilation sensing monitoring parameters with the target values ​​of the decision target parameters in the mine ventilation joint control decision parameters to determine whether the control target is achieved. If the control target value is not achieved, fault diagnosis of the main ventilation fan, the local ventilation fan and the regulating wind window is performed.

27. The mine intelligent ventilation control system according to claim 19, characterized in that: The sensing subsystem is used to measure the actual wind volume of the mining working face and the actual wind volume of the excavation working face by using full-section scanning wind measurement or multi-point mobile wind measurement.

28. The mine intelligent ventilation control system according to claim 26, characterized in that: The mine intelligent ventilation control system also includes: a data preprocessing module; The data preprocessing module is used to perform rationality verification, interference data elimination, data abnormal fluctuation capture, and data time averaging processing on the mine ventilation sensing monitoring parameters.

29. An electronic device comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can perform each step in the method described in any one of claims 1-14.

30. A non-transitory computer-readable storage medium storing computer instructions, wherein: The computer instructions are used to enable the computer to execute each step in the method according to any one of claims 1 to 14.

Citation Information

Cited By

  • Intelligent ventilation method, system and device for coal mine

    CN119801616A

  • Intelligent Ventilation Method, System and Device for Coal Mines

    CN119801616B

  • Local fan remote control system and device based on edge calculation

    CN120626535A

  • Mine ventilation remote cooperative regulation and control method and system based on multi-source perception

    CN122219271A

  • Mine ventilation remote collaborative regulation method and system based on multi-source perception

    CN122219271B