Method, device and equipment for acquiring power generation loss of wind power plant and storage medium
By obtaining the wind measurement data of the wind farm and predicting the icing period, the theoretical power curve is corrected, and the neural network model is used to predict the icing status. This solves the problem of large errors in estimating the blade icing status in the wind farm and realizes the power generation of the wind farm. Accurate assessment of losses.
Patent Information
- Application Number
- CN202410891154.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-10-25
AI Technical Summary
In the existing technology, the environmental conditions of different wind turbines in wind farms vary greatly, resulting in large errors in estimating blade ice coverage, making it difficult to accurately obtain the power generation loss caused by blade ice coverage.
By obtaining the wind measurement data of the wind farm to be built and predicting the icing period, the theoretical power curve is corrected, the lost power generation of the wind farm is calculated, and the neural network model is used to predict the icing state and power correction to improve the accuracy of the estimate.
It achieves accurate prediction of the icing period of the wind turbine generator in the wind farm and accurate calculation of power generation loss, reduces the estimation error, and improves the accuracy of the wind farm power generation loss assessment.
Smart Images

Figure CN118840221A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of wind power generation, and in particular to a method, device, equipment and storage medium for obtaining power generation loss in a wind farm. Background Art
[0002] In the related art, the freezing time of the wind tower in the wind farm is usually used to determine the blade icing condition of the wind turbine in the wind farm, and then determine the proportion of power loss caused by blade icing. However, the environmental conditions of different wind turbines in the same wind farm may vary greatly, and the above method has a large error in estimating the blade icing condition of the wind turbine. Summary of the invention
[0003] The present application aims to solve one of the technical problems in the related art at least to some extent.
[0004] In a first aspect, the present application proposes a method for obtaining power generation loss in a wind farm, the method comprising: obtaining wind measurement data of a wind farm to be built within a preset time period; obtaining a theoretical power curve of the wind farm to be built; predicting the icing state of each wind turbine to be built in the wind farm to be built within the preset time period based on the wind measurement data, and obtaining a predicted icing time period for each wind turbine to be built; correcting the theoretical power curve based on the wind measurement data, and obtaining a corrected power curve of the wind farm to be built; and obtaining the lost power generation of the wind farm to be built based on the wind measurement data, the predicted icing time period and the corrected power curve.
[0005] In one implementation, the wind measurement data includes at least one of the following: first wind speed data; first wind direction data; first air pressure data; first humidity data; first temperature data; and first altitude data of a wind measurement tower in the wind farm to be built.
[0006] In an optional implementation, the method predicts the icing state of each wind turbine to be built in the wind farm to be built within the preset time period based on the wind measurement data to obtain the predicted icing time period of each wind turbine to be built, including: obtaining second altitude data of each wind turbine to be built in the wind farm to be built; correcting the first temperature data based on the first altitude data and the second altitude data of each wind turbine to be built to obtain second temperature data corresponding to each wind turbine to be built; obtaining estimated wind speed data and estimated wind direction data of each wind turbine to be built based on the first wind speed data and the first wind direction data; and inputting the second temperature data, the estimated wind speed data, the estimated wind direction data and the first humidity data corresponding to each wind turbine to be built into an icing state prediction model respectively to obtain the predicted icing time period of each wind turbine to be built output by the icing state prediction model.
[0007] Optionally, the icing state prediction model is pre-trained by the following steps: obtaining historical wind measurement data of the first wind farm within a preset historical period and historical icing period data of each first wind turbine in the first wind farm; wherein the historical wind measurement data includes at least one of the following: second wind speed data of each first wind turbine in the first wind farm; second wind direction data of each first wind turbine in the first wind farm; third temperature data of the wind tower in the first wind farm; second air pressure data of the wind tower in the first wind farm; second humidity data of the wind tower in the first wind farm; third altitude data of the wind tower in the first wind farm; obtaining the ... third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind The fourth altitude data of each first wind turbine is obtained; based on the third altitude data and the fourth altitude data of each first wind turbine, the third temperature data is corrected to obtain the fourth temperature data corresponding to each first wind turbine; the fourth temperature data, the second wind speed data, the second wind direction data, the second humidity data and the historical icing period data corresponding to each first wind turbine are respectively input into the initial neural network model as a group of training data, and the initial neural network model is iteratively trained in combination with preset training parameters; based on the model parameters of the trained initial neural network model, the icing state prediction model is obtained.
[0008] In an optional implementation, the method of obtaining the lost power generation of the wind farm to be built based on the wind measurement data, the predicted icing period and the corrected power curve includes: obtaining target wind speed data corresponding to each wind turbine to be built based on the icing period and the wind measurement data of each wind turbine to be built; obtaining the target power generation corresponding to each wind turbine to be built based on the target wind speed data and the corrected power curve corresponding to each wind turbine to be built; and obtaining the lost power generation of the wind farm to be built during the icing period based on the target power generation corresponding to each wind turbine to be built and the icing period of each wind turbine to be built.
[0009] In one implementation, the correction of the theoretical power curve based on the wind measurement data to obtain the corrected power curve of the wind farm to be built includes the following steps: S1: obtaining the theoretical equivalent hours of the wind farm based on the theoretical power curve; S2: determining at least one first wind speed range and a first power correction strategy corresponding to each first wind speed range based on a preset first correction coefficient; S3: correcting the power corresponding to each first wind speed range in the theoretical power curve based on the first power correction strategy corresponding to each first wind speed range to obtain the first power curve after the i-th correction; wherein i is a positive integer; S4: obtaining the first equivalent hours of the wind farm to be built based on the first power curve and the wind measurement data; S5: in response to the first equivalent hours being less than the theoretical equivalent hours, obtaining a second power curve and a second equivalent hours corresponding to the second power curve, wherein the second power curve is the power curve obtained after the (i-1)th correction; S6: obtaining The first difference between the theoretical equivalent hours and the second equivalent hours, and the second difference between the first equivalent hours and the theoretical equivalent hours; S7: In response to the first difference being greater than the second difference, determining at least one preset second wind speed range and a second power correction strategy corresponding to each second wind speed range based on a preset third correction coefficient; S8: Based on the second power correction strategy corresponding to each second wind speed range, correct the power corresponding to each second wind speed range in the second power curve to obtain a third power curve; S9: Obtain the third equivalent hours of the wind farm to be built based on the third power curve; S10: In response to the difference between the theoretical equivalent hours and the third equivalent hours being within a preset difference range, using the third power curve as the corrected power curve, or, in response to the difference between the theoretical equivalent hours and the third equivalent hours being not within the difference range, updating the second correction coefficient, and returning to execute S7.
[0010] In an optional implementation, the S7 further includes: in response to the second equivalent hours being greater than the theoretical equivalent hours, updating the first correction coefficient, and returning to execute the S2.
[0011] In a second aspect, the present application proposes a device for obtaining power generation loss in a wind farm, the device comprising: a first acquisition module, used to obtain wind measurement data of the wind farm to be built within a preset time period; a second acquisition module, used to obtain a theoretical power curve of the wind farm to be built; a prediction module, used to predict the icing state of each wind turbine to be built in the wind farm to be built within the preset time period based on the wind measurement data, and obtain a predicted icing time period for each wind turbine to be built; a first processing module, used to correct the theoretical power curve based on the wind measurement data, and obtain a corrected power curve of the wind farm to be built; a second processing module, used to obtain the lost power generation of the wind farm to be built based on the wind measurement data, the predicted icing time period and the corrected power curve.
[0012] In one implementation, the wind measurement data includes at least one of the following: first wind speed data; first wind direction data; first air pressure data; first humidity data; first temperature data; and first altitude data of a wind measurement tower in the wind farm to be built.
[0013] In an optional implementation, the prediction module is specifically used to: obtain second altitude data of each wind turbine to be built in the wind farm to be built; correct the first temperature data based on the first altitude data and the second altitude data of each wind turbine to be built to obtain second temperature data corresponding to each wind turbine to be built; obtain estimated wind speed data and estimated wind direction data of each wind turbine to be built based on the first wind speed data and the first wind direction data; respectively input the second temperature data, the estimated wind speed data, the estimated wind direction data and the first humidity data corresponding to each wind turbine to be built into an icing state prediction model to obtain the predicted icing period of each wind turbine to be built output by the icing state prediction model.
[0014] Optionally, the icing state prediction model is pre-trained by the following steps: obtaining historical wind measurement data of the first wind farm within a preset historical period and historical icing period data of each first wind turbine in the first wind farm; wherein the historical wind measurement data includes at least one of the following: second wind speed data of each first wind turbine in the first wind farm; second wind direction data of each first wind turbine in the first wind farm; third temperature data of the wind tower in the first wind farm; second air pressure data of the wind tower in the first wind farm; second humidity data of the wind tower in the first wind farm; third altitude data of the wind tower in the first wind farm; obtaining the ... third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind The fourth altitude data of each first wind turbine is obtained; based on the third altitude data and the fourth altitude data of each first wind turbine, the third temperature data is corrected to obtain the fourth temperature data corresponding to each first wind turbine; the fourth temperature data, the second wind speed data, the second wind direction data, the second humidity data and the historical icing period data corresponding to each first wind turbine are respectively input into the initial neural network model as a group of training data, and the initial neural network model is iteratively trained in combination with preset training parameters; based on the model parameters of the trained initial neural network model, the icing state prediction model is obtained.
[0015] In an optional implementation, the second processing module is specifically used to: obtain target wind speed data corresponding to each wind turbine to be built based on the icing period and the wind measurement data of each wind turbine to be built; obtain target power generation corresponding to each wind turbine to be built based on the target wind speed data and the corrected power curve corresponding to each wind turbine to be built; and obtain the lost power generation of the wind farm to be built during the icing period based on the target power generation corresponding to each wind turbine to be built and the icing period of each wind turbine to be built.
[0016] In one implementation, the first processing module is specifically used to perform the following steps: S1: obtaining the theoretical equivalent hours of the wind farm based on the theoretical power curve; S2: determining at least one first wind speed range based on a preset first correction coefficient, and a first power correction strategy corresponding to each of the first wind speed ranges; S3: based on the first power correction strategy corresponding to each of the first wind speed ranges, correcting the power corresponding to each of the first wind speed ranges in the theoretical power curve to obtain the first power curve after the i-th correction; wherein i is a positive integer; S4: obtaining the first equivalent hours of the wind farm to be built based on the first power curve and the wind measurement data; S5: in response to the first equivalent hours being less than the theoretical equivalent hours, obtaining a second power curve and a second equivalent hours corresponding to the second power curve, wherein the second power curve is the power curve obtained after the (i-1)th correction; S6: obtaining the theoretical equivalent hours and the second equivalent hours corresponding to the second power curve. A first difference between the equivalent hours, and a second difference between the first equivalent hours and the theoretical equivalent hours; S7: in response to the first difference being greater than the second difference, determining at least one preset second wind speed range and a second power correction strategy corresponding to each second wind speed range based on a preset third correction coefficient; S8: based on the second power correction strategy corresponding to each second wind speed range, correcting the power corresponding to each second wind speed range in the second power curve to obtain a third power curve; S9: obtaining the third equivalent hours of the wind farm to be built based on the third power curve; S10: in response to the difference between the theoretical equivalent hours and the third equivalent hours being within a preset difference range, using the third power curve as the corrected power curve, or, in response to the difference between the theoretical equivalent hours and the third equivalent hours being not within the difference range, updating the second correction coefficient, and returning to execute S7.
[0017] In an optional implementation, the first processing module is further used for: in response to the second equivalent hours being greater than the theoretical equivalent hours, updating the first correction coefficient and returning to execute S2.
[0018] In a third aspect, the present application proposes an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the method for obtaining the power generation loss of a wind farm as described in the first aspect.
[0019] In a fourth aspect, the present application proposes a computer-readable storage medium for storing instructions, which, when executed, enables the method described in the first aspect to be implemented.
[0020] In a fifth aspect, the present application proposes a computer program product, comprising a computer program, which, when executed by a processor, implements the steps of the method for obtaining power generation loss of a wind farm as described in the first aspect.
[0021] The method, device, system, equipment and storage medium for obtaining power generation loss of a wind farm provided by the present application can predict the icing period of the wind turbines in the wind farm to be built based on the wind measurement data and icing state prediction model of the wind farm to be built in a preset period, obtain the predicted icing period of the wind turbines in the wind farm to be built, and correct the theoretical power curve corresponding to the wind farm to be built based on the wind measurement data to obtain the corrected power curve, thereby determining the power generation lost by the wind turbines in the wind farm to be built during the predicted icing period based on the wind measurement data and the corrected power curve. A more accurate predicted icing period can be obtained based on the pre-trained neural network model and wind measurement data, and a more accurate power loss of the wind farm to be built can be obtained in combination with the corrected power curve.
[0022] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0024] Figure 1 It is a flow chart of a method for obtaining power generation loss of a wind farm provided in an embodiment of the present application;
[0025] Figure 2 It is a flow chart of another method for obtaining power generation loss of a wind farm provided in an embodiment of the present application;
[0026] Figure 3 It is a flow chart of another method for obtaining power generation loss of a wind farm provided in an embodiment of the present application;
[0027] Figure 4 is a schematic diagram of a power curve correction process provided by an embodiment of the present application;
[0028] Figure 5A is a schematic diagram of a power curve provided by an embodiment of the present application;
[0029] Figure 5B is a schematic diagram of another power curve provided in an embodiment of the present application;
[0030] Figure 5C is a schematic diagram of another power curve provided in an embodiment of the present application;
[0031] Figure 5D is a schematic diagram of another power curve provided in an embodiment of the present application;
[0032] Figure 6 It is a structural schematic diagram of a device for obtaining power generation loss of a wind farm provided in an embodiment of the present application;
[0033] Figure 7 It is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0034] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.
[0035] The following describes a method and device for obtaining power generation loss of a wind farm according to an embodiment of the present application with reference to the accompanying drawings.
[0036] Figure 1 FIG. 1 is a flow chart of a method for obtaining power generation loss of a wind farm provided in an embodiment of the present application. Figure 1 As shown, the method may include but is not limited to the following steps:
[0037] Step S101: obtaining wind measurement data of a wind farm to be built within a preset period of time.
[0038] For example, obtain the wind measurement data of the wind farm to be built in the past year.
[0039] In the embodiment of the present application, the above wind measurement data can be obtained by measuring a wind measurement tower that is pre-built in the wind farm to be built.
[0040] Among them, in an embodiment of the present application, the above-mentioned wind measurement data includes at least one of the following: first wind speed data; first wind direction data; first air pressure data; first humidity data; first temperature data; first altitude data of a wind measurement tower in a wind farm to be built.
[0041] It should be noted that, in the embodiments of the present application, the first wind speed data, the first wind direction data, the first air pressure data, the first humidity data and the first temperature data are time series data.
[0042] It should be noted that, in the embodiment of the present application, the first altitude data of the wind tower in the wind farm to be built is the altitude of the temperature sensor in the wind tower.
[0043] Step S102: obtaining a theoretical power curve of the wind farm to be built.
[0044] Specifically, based on the total capacity of wind turbines to be built in the wind farm to be built, a theoretical power curve of the wind farm to be built is obtained.
[0045] Step S103: predicting the icing state of each wind turbine to be built in the wind farm to be built within a preset period of time based on the wind measurement data, and obtaining the predicted icing period of each wind turbine to be built.
[0046] Specifically, actual wind measurement data of the period when wind turbine blades are iced in an already built wind farm with environmental conditions similar to those of the wind farm to be built is obtained, and the wind measurement data is corrected based on the positional relationship between the proposed construction location of each wind turbine to be built in the wind farm to be built and the wind measurement tower, to obtain the wind measurement data corresponding to each wind turbine to be built, and the wind measurement data corresponding to each wind turbine to be built within a preset time period is compared with the actual wind measurement data, and target wind measurement data similar to the actual wind measurement data is determined in the wind measurement data corresponding to each wind turbine to be built, and the time period corresponding to the target wind measurement data is used as the predicted iced period for each wind turbine to be built.
[0047] Step S104: correcting the theoretical power curve based on the wind measurement data to obtain a corrected power curve of the wind farm to be built.
[0048] Specifically, the corresponding powers at different wind speeds in the theoretical power curve are corrected based on the wind measurement data, so that the power curve is more consistent with the actual situation of the wind farm to be built, and a corrected power curve of the wind farm to be built is obtained.
[0049] Step S105: based on the wind measurement data, the forecast period and the modified power curve, the power generation loss of the wind farm to be built during the icing period is obtained.
[0050] Specifically, based on the wind measurement data and the modified power curve, the predicted power generation of the wind turbines in the wind farm to be built during the predicted icing period is determined, so as to obtain the power generation loss of the wind farm to be built during the icing period based on the predicted power generation.
[0051] By implementing the embodiments of the present application, the icing period of the wind turbines in the wind farm to be built can be predicted based on the wind measurement data and icing state prediction model of the wind farm to be built in the preset period, and the predicted icing period of the wind turbines in the wind farm to be built can be obtained, and the theoretical power curve corresponding to the wind farm to be built can be corrected based on the wind measurement data to obtain a corrected power curve, so as to determine the power generation lost by the wind turbines in the wind farm to be built during the predicted icing period based on the wind measurement data and the corrected power curve. A more accurate prediction of the icing period can be obtained based on the pre-trained neural network model and wind measurement data, and a more accurate loss of power generation of the wind farm to be built can be obtained in combination with the corrected power curve.
[0052] In some embodiments of the present application, the icing period of the wind farm to be built can be predicted based on the neural network model to obtain the icing period corresponding to the wind farm to be built. Figure 2 , Figure 2 FIG. 1 is a flow chart of another method for obtaining power generation loss of a wind farm provided in an embodiment of the present application. Figure 2 As shown, the method may include but is not limited to the following steps:
[0053] Step S201: obtaining wind measurement data of a wind farm to be built within a preset period of time.
[0054] In the embodiments of the present application, step S201 can be implemented by any of the methods in the embodiments of the present application, and the embodiments of the present application do not limit this and will not be described in detail.
[0055] Step S202: Obtain a theoretical power curve of the wind farm to be built.
[0056] In the embodiments of the present application, step S202 can be implemented by any of the methods in the embodiments of the present application, and the embodiments of the present application do not limit this and will not be described in detail.
[0057] Step S203: obtaining second altitude data of each wind turbine to be built in the wind farm to be built.
[0058] Specifically, based on the altitude of the location to be built corresponding to each wind turbine to be built in the wind farm to be built and the estimated height corresponding to the wind turbine, the second altitude data of each wind turbine to be built in the wind farm to be built is obtained.
[0059] In the embodiment of the present application, the estimated height corresponding to the wind turbine may be the height of the hub of the wind turbine from the ground.
[0060] Step S204: correcting the first temperature data based on the first altitude data and the second altitude data of each wind turbine to be built, to obtain second temperature data corresponding to each wind turbine to be built.
[0061] Specifically, based on the difference between the first altitude of the wind tower in the wind farm to be built and the second altitude of each wind turbine to be built, the first temperature data is corrected to obtain the second temperature data at the hub of each wind turbine to be built in the wind farm to be built.
[0062] As an example, the following formula may be used to obtain the second temperature data corresponding to each wind turbine to be built.
[0063] t1i=t2-((h1i-h2) / 1000)*6.5
[0064] Among them, t1i is the temperature at the hub height of the i-th wind turbine in the wind farm to be built, t2 is the measured temperature of the wind tower in the wind farm to be built, h1i is the altitude of the hub height of the i-th wind turbine in the wind farm to be built, and h2 is the altitude of the temperature sensor of the wind tower in the wind farm to be built. i is a positive integer, and the maximum value of i is the total number of wind turbines to be built in the wind farm to be built.
[0065] Step S205: based on the first wind speed data and the first wind direction data, obtaining the estimated wind speed data and the estimated wind direction data of each wind turbine to be built.
[0066] Specifically, the first wind speed data and the first wind direction data are input into the wind resource assessment WT software to obtain the estimated wind speed data and the estimated wind direction data of each wind turbine to be built.
[0067] Step S206: input the second temperature data, estimated wind speed data, estimated wind direction data and first humidity data corresponding to each wind turbine to be built into the icing state prediction model respectively, and obtain the predicted icing period of each wind turbine to be built output by the icing state prediction model.
[0068] Specifically, an input matrix is generated based on the second temperature data, estimated wind speed data, estimated wind direction data and first humidity data corresponding to each wind turbine to be built, and the input matrix is input into a pre-trained icing state prediction model to obtain the predicted icing time period corresponding to each wind turbine to be built output by the icing state prediction model.
[0069] In some embodiments of the present application, the above ice cover state prediction model is pre-trained by the following steps:
[0070] A1: Obtain historical wind measurement data of the first wind farm within a preset historical period and historical icing period data of each first wind turbine in the first wind farm.
[0071] Among them, in an embodiment of the present application, the above-mentioned historical wind measurement data includes at least one of the following: second wind speed data; second wind direction data; third temperature data of the wind measurement tower in the first wind farm; second air pressure data of the wind measurement tower in the first wind farm; second humidity data of the wind measurement tower in the first wind farm; third altitude data of the wind measurement tower in the first wind farm.
[0072] It should be noted that, in the implementation set of the present application, the above-mentioned first wind farm may be an already built wind farm with environmental conditions similar to those of the wind farm to be built.
[0073] A2: Obtain fourth altitude data of each first wind turbine in the first wind farm.
[0074] A3: Correct the third temperature data based on the third altitude data and the fourth altitude data of each first wind turbine to obtain fourth temperature data corresponding to each first wind turbine.
[0075] Specifically, based on the difference between the third altitude of the wind tower in the first wind farm and the fourth altitude of each first wind turbine in the first wind farm, the third temperature data is corrected to obtain fourth temperature data at the hub of each first wind turbine in the first wind farm.
[0076] In the embodiment of the present application, the specific implementation method of obtaining the fourth temperature data corresponding to each first wind turbine may be the same as the specific implementation method of obtaining the second temperature data corresponding to each wind turbine to be built in the aforementioned step S204, and the present application will not repeat it here.
[0077] A4: The fourth temperature data, the second wind speed data, the second wind direction data, the second humidity data and the historical icing period data corresponding to each first wind turbine are respectively input into the initial neural network model as a set of training data until the preset training target is reached.
[0078] Specifically, the fourth temperature data, the second wind speed data, the second wind direction data and the second humidity data corresponding to each first wind turbine are respectively used to generate a set of input data matrices, and the corresponding historical icing period data are used as the target data matrix. The above input data matrix and the target data matrix are input into the initial neural network model, and the initial neural network model is iteratively trained using the Levenberg-Marquardt BP (Backpropagation Algorithm) algorithm in combination with preset training parameters.
[0079] In an embodiment of the present application, the training target includes at least one of the following: target error goal = 0.001, lr (Learing Rate) = 0.035, and maximum number of iterations epochs = 2000.
[0080] A5: Based on the model parameters of the trained initial neural network model, an ice cover state prediction model is obtained.
[0081] Specifically, model parameters are obtained from the trained initial neural network model to obtain an ice cover state prediction model based on the model parameters.
[0082] Step S207: Correct the theoretical power curve based on the wind measurement data to obtain a corrected power curve of the wind farm to be built.
[0083] In the embodiments of the present application, step S207 can be implemented by any of the methods in the embodiments of the present application, and the embodiments of the present application do not limit this and will not be described in detail.
[0084] Step S208: based on the wind measurement data, the forecast period and the modified power curve, the power generation loss of the wind farm to be built during the icing period is obtained.
[0085] In the embodiments of the present application, step S208 can be implemented in any of the ways in the embodiments of the present application, and the embodiments of the present application do not limit this and will not be described in detail.
[0086] By implementing the embodiments of the present application, the icing period of the wind turbines in the wind farm to be built can be predicted based on the pre-trained icing state prediction model combined with the wind measurement data, so as to obtain the power generation lost in the icing period of the wind farm to be built according to the icing period of the wind turbines in the wind farm to be built. The icing period can be accurately predicted to improve the accuracy of the power generation lost in the icing period of the wind farm to be built.
[0087] In some embodiments of the present application, the power generation of the wind farm to be built during the ice-covered period can be obtained, so as to obtain the power generation of the wind farm to be built during the ice-covered period based on the power generation. Figure 3 , Figure 3 FIG. 1 is a flow chart of another method for obtaining wind farm power generation loss provided in an embodiment of the present application. Figure 3 As shown, the method may include but is not limited to the following steps:
[0088] Step S301: obtaining wind measurement data of a wind farm to be built within a preset time period.
[0089] In the embodiments of the present application, step S301 can be implemented in any of the embodiments of the present application, and the embodiments of the present application do not limit this and will not be described in detail.
[0090] Step S302: Obtain a theoretical power curve of the wind farm to be built.
[0091] In the embodiments of the present application, step S302 can be implemented by any of the methods in the embodiments of the present application, and the embodiments of the present application do not limit this and will not be described in detail.
[0092] Step S303: predicting the icing state of each wind turbine to be built in the wind farm to be built within a preset period of time based on the wind measurement data, and obtaining the predicted icing period of each wind turbine to be built.
[0093] In the embodiments of the present application, step S303 can be implemented by any of the methods in the embodiments of the present application, and the embodiments of the present application do not limit this and will not be described in detail.
[0094] Step S304: correcting the theoretical power curve based on the wind measurement data to obtain a corrected power curve of the wind farm to be built.
[0095] In the embodiments of the present application, step S304 can be implemented by any of the methods in the embodiments of the present application, and the embodiments of the present application do not limit this and will not be described in detail.
[0096] Step S305: acquiring target wind speed data corresponding to each wind turbine to be built based on the icing period and wind measurement data of each wind turbine to be built.
[0097] Specifically, based on the icing period of each wind turbine to be built, target wind speed data corresponding to the icing period of each wind turbine to be built is obtained from the wind measurement data of the wind farm to be built in a preset period.
[0098] Step S306: acquiring the target power generation corresponding to each wind turbine to be built based on the target wind speed data and the modified power curve corresponding to each wind turbine to be built.
[0099] Specifically, based on the corresponding relationship between power and wind speed in the modified power curve, the target wind power corresponding to the target wind speed data corresponding to each wind turbine to be built is obtained respectively.
[0100] Step S307: based on the target power generation corresponding to each wind turbine to be built and the icing period of each wind turbine to be built, the power generation loss of the wind farm to be built is obtained.
[0101] Specifically, the target power generation corresponding to each wind turbine to be built is multiplied by the icing period of each wind turbine to be built to obtain the lost power generation of each wind turbine to be built during the icing period, and the lost power generation of each wind turbine to be built during the icing period is added together to obtain the lost power generation of the wind farm to be built during the icing period.
[0102] By implementing the embodiments of the present application, the target wind speed of each wind turbine to be built in the wind farm to be built during the icing period can be obtained, and the corresponding power generation of each wind turbine to be built in the wind farm to be built during the icing period can be obtained based on the target wind speed and the modified power curve, so as to obtain the lost power generation of the wind farm to be built during the icing period based on the corresponding power generation of each wind turbine to be built and the duration of the icing period. A more accurate icing lost power generation of the wind farm to be built can be obtained.
[0103] In some embodiments of the present application, the theoretical power curve of the wind farm to be built can be corrected based on a preset power correction strategy to obtain a corrected power curve that is more in line with the actual situation of the wind farm to be built. Figure 4 , Figure 4 Schematic diagram of a power curve correction process provided by an embodiment of the present application. Figure 4 As shown, the power curve of the wind farm to be built can be corrected by the following steps.
[0104] S401: Obtain theoretical equivalent hours of the wind farm based on the theoretical power curve.
[0105] Specifically, the wind measurement data is input into the wind resource calculation software for calculation, and the theoretical power generation of the wind farm to be built after the wake reduction, the annual theoretical power generation of each wind turbine to be built in the wind farm to be built after the wake reduction, and the wind speed and wind direction time series of each wind turbine to be built in the wind farm to be built after the wake reduction are calculated; the theoretical power generation of the wind farm to be built after the wake reduction is multiplied by the preset comprehensive reduction coefficient of the wind farm to be built excluding the reduction for blade icing, to obtain the reduced total power generation of the wind farm to be built excluding the reduction for blade icing and the theoretical equivalent hours.
[0106] S402: Determine a first power correction strategy corresponding to each first wind speed range in at least one preset first wind speed range based on a preset first correction coefficient.
[0107] In some embodiments of the present application, the preset first correction coefficient when step S2 is performed for the first time may be 1.
[0108] S403: Based on the first power correction strategy corresponding to each first wind speed range, correct the power corresponding to each first wind speed range in the theoretical power curve to obtain the i-th corrected first power curve.
[0109] Wherein, i is a positive integer.
[0110] In the embodiment of the present application, the first power correction strategy based on each first wind speed range is used to correct the power corresponding to each first wind speed range in the theoretical power curve, and the correction steps are as follows:
[0111] B1: Adjust the power corresponding to 5.5m / s-12m / s in the theoretical power curve to the power corresponding to (5.5+n*0.5)m / s-(12+m*0.5)m / s.
[0112] Wherein, n is the first correction coefficient mentioned above.
[0113] As an example, see Figure 5A , Figure 5AFIG. 1 is a schematic diagram of a power curve provided in an embodiment of the present application. Figure 5A As shown, taking the first correction coefficient n=1 as an example, the power corresponding to 5.5m / s-12m / s in the power curve can be adjusted to the power corresponding to 6.5m / s-12.5m / s.
[0114] B2: Multiply the power corresponding to 0m / s-5m / s in the theoretical power curve by 0.5.
[0115] As an example, see Figure 5B , Figure 5B is a schematic diagram of another power curve provided in an embodiment of the present application. Figure 5B As shown, the power corresponding to the wind speed of 0m / s-5m / s in the theoretical power curve can be multiplied by 0.5 to correct the power corresponding to the wind speed of 0m / s-5m / s in the theoretical power curve.
[0116] B3: The power corresponding to (5.5+n*0.5)m / s corrected in step B1 and the power corresponding to 5m / s corrected in step B2 are distributed in equal proportion to the power range corresponding to 5m / s-(5.5+n*0.5)m / s.
[0117] As an example, see Figure 5C , Figure 5C is a schematic diagram of another power curve provided in the embodiment of the present application. Figure 5A As shown, taking the first correction coefficient n=1 as an example, the power segment corresponding to 5m / s-6m / s in the power curve corrected by steps B1, B2 and B3 is proportionally distributed to the power segment corresponding to the wind speed of 5m / s-6.5m / s.
[0118] B4: For the power of the wind turbine generator set theoretical power curve (12+n*0.5)m / s-25m / s, take the same value as the theoretical power curve.
[0119] Specifically, taking the first correction coefficient n=1 as an example, the power segment corresponding to 12.5 m / s-25 m / s in the power curve is not corrected.
[0120] S404: Acquire a first equivalent number of hours of the wind farm to be built based on the first power curve and the wind measurement data.
[0121] Specifically, an interpolation calculation is performed on the first power curve based on the wind measurement data to obtain the power generation corresponding to different wind speeds in the wind measurement data, and the power generation corresponding to different wind speeds is summed to obtain the first equivalent hours.
[0122] S405: In response to the first equivalent hours being less than the theoretical equivalent hours, obtaining a second power curve and a second equivalent hours corresponding to the second power curve.
[0123] The second power curve is the power curve obtained after the (i-1)th correction.
[0124] It can be understood that the (i-1)th time represents the execution round of step S402 to step S405. For example, if step S402 to step S405 are executed for the first time, i=1.
[0125] Specifically, in response to the first equivalent hours being less than the theoretical equivalent hours, a second power curve obtained after the previous round of correction is obtained, and the second power curve is interpolated based on the wind measurement data to obtain the power generation corresponding to different wind speeds in the wind measurement data, and the power generation corresponding to different wind speeds is summed to obtain the second equivalent hours.
[0126] S406: Obtain a first difference between the theoretical equivalent hours and the second equivalent hours, and a second difference between the first equivalent hours and the theoretical equivalent hours.
[0127] S407: In response to the first difference being greater than the second difference, determining a second power correction strategy corresponding to each second wind speed range in at least one preset second wind speed range based on a preset second correction coefficient.
[0128] In some embodiments, step S407 further includes: in response to the second equivalent hours being greater than the theoretical equivalent hours, updating the first correction coefficient, and returning to execute S402.
[0129] For example, in response to the second equivalent hours being greater than the theoretical equivalent hours, the value obtained by adding 1 to the first correction coefficient is used as a new first correction coefficient, and the execution of step S402 and subsequent steps is returned based on the new first correction coefficient.
[0130] S408: Based on the second power correction strategy corresponding to each second wind speed range, correct the power corresponding to each second wind speed range in the second power curve to obtain a third power curve.
[0131] In an optional implementation, the second power correction strategy based on each second wind speed range corrects the power corresponding to each second wind speed range in the second power curve, which may include: for the power corresponding to (5.5+n*0.5)m / s-(12+n*0.5)m / s in the first power curve, subtracting the second correction coefficient from the corresponding power below the rated power, where n is the first correction coefficient.
[0132] As an example, see Figure 5D , Figure 5D is a schematic diagram of another power curve provided in the embodiment of the present application. Figure 5DAs shown, taking the first correction coefficient n=1 and the second correction coefficient k=1 as an example, the target power less than the rated power in the power segment corresponding to the wind speed of 6m / s-12.5m / s in the first power curve is obtained, and the above target power is reduced by 1.
[0133] S409: Obtaining a third equivalent number of hours of the wind farm to be built based on the third power curve.
[0134] Specifically, the third power curve is interpolated based on the wind measurement data to obtain the power generation corresponding to different wind speeds in the wind measurement data, and the third equivalent hours are obtained by summing the power generation corresponding to different wind speeds.
[0135] S410: In response to a difference between the theoretical equivalent hours and the third equivalent hours belonging to a preset difference range, using the third power curve as a modified power curve.
[0136] In some other embodiments of the present application, the above method further includes: in response to the difference between the theoretical equivalent hours and the third equivalent hours exceeding the difference range, updating the second correction coefficient, and returning to execute S407.
[0137] For example, in response to the difference between the theoretical equivalent hours and the third equivalent hours being greater than a preset difference range, the value obtained by adding 1 to the original second correction coefficient is used as a new second correction coefficient, and the aforementioned step S407 and subsequent steps are executed based on the new second correction coefficient.
[0138] By implementing the embodiments of the present application, the theoretical power curve can be corrected based on the correction coefficient and the preset power correction strategy to obtain a power curve that is more in line with the actual situation of the wind farm to be built, so as to obtain a more accurate loss of power generation of the wind turbines to be built in the wind farm to be built under icing conditions based on the power curve.
[0139] See also Figure 6 , Figure 6 Schematic diagram of a device for obtaining power generation loss of a wind farm provided in an embodiment of the present application. Figure 6 As shown, the device 600 includes: a first acquisition module 601, used to obtain wind measurement data of the wind farm to be built within a preset time period; a second acquisition module 602, used to obtain a theoretical power curve of the wind farm to be built; a prediction module 603, used to predict the icing state of each wind turbine to be built in the wind farm to be built within a preset time period based on the wind measurement data, and obtain the predicted icing period of each wind turbine to be built; a first processing module 604, used to correct the theoretical power curve based on the wind measurement data, and obtain a corrected power curve of the wind farm to be built; a second processing module 605, used to obtain the lost power generation of the wind farm to be built based on the wind measurement data, the predicted icing period and the corrected power curve.
[0140] In one implementation, the wind measurement data includes at least one of the following: first wind speed data; first wind direction data; first air pressure data; first humidity data; first temperature data; and first altitude data of a wind tower in a wind farm to be built.
[0141] In an optional implementation, the prediction module 603 is specifically used to: obtain the second altitude data of each wind turbine to be built in the wind farm to be built; correct the first temperature data based on the first altitude data and the second altitude data of each wind turbine to be built to obtain the second temperature data corresponding to each wind turbine to be built; obtain the estimated wind speed data and the estimated wind direction data of each wind turbine to be built based on the first wind speed data and the first wind direction data; respectively use the second temperature data, the estimated wind speed data, the estimated wind direction data and the first humidity data corresponding to each wind turbine to be built to obtain the predicted icing period of each wind turbine to be built output by the icing state prediction model.
[0142] Optionally, the icing state prediction model is pre-trained by the following steps: obtaining historical wind measurement data of the first wind farm within a preset historical period and historical icing period data of each first wind turbine in the first wind farm; wherein the historical wind measurement data includes at least one of the following: second wind speed data of each first wind turbine in the first wind farm; second wind direction data of each first wind turbine in the first wind farm; third temperature data of the wind tower in the first wind farm; second air pressure data of the wind tower in the first wind farm; second humidity data of the wind tower in the first wind farm; third altitude data of the wind tower in the first wind farm; obtaining the ... third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data of the wind tower in the first wind farm; third temperature data The fourth altitude data of the wind turbine; based on the third altitude data and the fourth altitude data of each first wind turbine, the third temperature data is corrected to obtain the fourth temperature data corresponding to each first wind turbine; the fourth temperature data, the second wind speed data, the second wind direction data, the second humidity data and the historical icing period data corresponding to each first wind turbine are respectively input into the initial neural network model as a group of training data, and the initial neural network model is iteratively trained in combination with preset training parameters; based on the model parameters of the trained initial neural network model, an icing state prediction model is obtained.
[0143] In an optional implementation, the second processing module 605 is specifically used to: obtain target wind speed data corresponding to each wind turbine to be built based on the icing period and wind measurement data of each wind turbine to be built; obtain target power generation corresponding to each wind turbine to be built based on the target wind speed data and the corrected power curve corresponding to each wind turbine to be built; obtain the lost power generation of the wind farm to be built during the icing period based on the target power generation corresponding to each wind turbine to be built and the icing period of each wind turbine to be built.
[0144] In one implementation, the first processing module 604 is specifically used to perform the following steps: S1: obtaining the theoretical equivalent hours of the wind farm based on the theoretical power curve; S2: determining at least one first wind speed range based on a preset first correction coefficient, and a first power correction strategy corresponding to each first wind speed range; S3: based on the first power correction strategy corresponding to each first wind speed range, correcting the power corresponding to each first wind speed range in the theoretical power curve to obtain the first power curve after the i-th correction; S4: obtaining the first equivalent hours of the wind farm to be built based on the first power curve and the wind measurement data; S5: in response to the first equivalent hours being less than the theoretical equivalent hours, obtaining a second power curve and a second equivalent hours corresponding to the second power curve, wherein the second power curve is the power curve obtained after the (i-1)th correction; S6: obtaining the theoretical equivalent hours and the second equivalent hours. A first difference between two equivalent hours, and a second difference between the first equivalent hours and the theoretical equivalent hours; S7: in response to the first difference being greater than the second difference, determining at least one preset second wind speed range and a second power correction strategy corresponding to each second wind speed range based on a preset third correction coefficient; S8: based on the second power correction strategy corresponding to each second wind speed range, correcting the power corresponding to each second wind speed range in the second power curve to obtain a third power curve; S9: obtaining a third equivalent hours of the wind farm to be built based on the third power curve; S10: in response to the difference between the theoretical equivalent hours and the third equivalent hours belonging to a preset difference range, using the third power curve as a corrected power curve, or, in response to the difference between the theoretical equivalent hours and the third equivalent hours exceeding the difference range, updating the second correction coefficient, and returning to execute S7.
[0145] In an optional implementation, the first processing module 604 is further configured to: in response to the second equivalent hours being greater than the theoretical equivalent hours, update the first correction coefficient and return to execute S2.
[0146] In an optional implementation, the first processing module 604 is further configured to: in response to the difference between the theoretical equivalent hours and the third equivalent hours exceeding the difference range, update the second correction coefficient and return to execute S7.
[0147] Through the device of the embodiment of the present application, the icing period of the wind turbines in the wind farm to be built can be predicted based on the wind measurement data and icing state prediction model of the wind farm to be built in the preset period, and the predicted icing period of the wind turbines in the wind farm to be built can be obtained, and the theoretical power curve corresponding to the wind farm to be built can be corrected based on the wind measurement data to obtain the corrected power curve, so as to determine the power generation lost by the wind turbines in the wind farm to be built during the predicted icing period based on the wind measurement data and the corrected power curve. A more accurate prediction of the icing period can be obtained based on the pre-trained neural network model and wind measurement data, and a more accurate loss of power generation of the wind farm to be built can be obtained in combination with the corrected power curve.
[0148] It should be noted that the above explanations and descriptions of the embodiment of the method for obtaining power generation loss in a wind farm are also applicable to the device for obtaining power generation loss in a wind farm of this embodiment, and will not be described in detail here.
[0149] In order to implement the above embodiment, the present application also proposes an electronic device. Figure 7 , Figure 7 Schematic diagram of the structure of the electronic device provided in the embodiment of the present application. Figure 7 As shown, the electronic device 700 includes: a processor 701, and a memory 702 communicatively connected to the processor 701; the memory 702 stores computer-executable instructions; the processor 701 executes the computer-executable instructions stored in the memory to implement the method provided in the aforementioned embodiment.
[0150] In order to implement the above embodiments, the present application also proposes a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the methods provided by the above embodiments.
[0151] In order to implement the above embodiments, the present application also proposes a computer program product, including a computer program, which implements the methods provided by the above embodiments when executed by a processor.
[0152] In the description of the aforementioned embodiments, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0153] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0154] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.
[0155] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute the instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.
[0156] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0157] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0158] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0159] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present application. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present application.
Claims
1. A method for obtaining power generation loss of a wind farm, characterized in that: include: Obtaining wind measurement data of the wind farm to be built within a preset period of time; Obtaining a theoretical power curve of the wind farm to be built; Based on the wind measurement data, predict the icing state of each wind turbine to be built in the wind farm to be built within the preset time period, and obtain the predicted icing time period of each wind turbine to be built; Correcting the theoretical power curve based on the wind measurement data to obtain a corrected power curve of the wind farm to be built; Based on the wind measurement data, the predicted icing period and the corrected power curve, the lost power generation of the wind farm to be built is obtained.
2. The method according to claim 1, characterized in that The wind measurement data includes at least one of the following: First wind speed data; First, wind direction data; First air pressure data; First humidity data; First temperature data; The first altitude data of the wind measuring tower in the wind farm to be built.
3. The method according to claim 2, characterized in that The step of predicting the icing state of each wind turbine to be built in the wind farm to be built within the preset time period based on the wind measurement data to obtain the predicted icing time period of each wind turbine to be built includes: Acquire second altitude data of each wind turbine to be built in the wind farm to be built; Correcting the first temperature data based on the first altitude data and the second altitude data of each wind turbine to be built, to obtain second temperature data corresponding to each wind turbine to be built; Based on the first wind speed data and the first wind direction data, obtaining estimated wind speed data and estimated wind direction data of each wind turbine to be built; The second temperature data, the estimated wind speed data, the estimated wind direction data and the first humidity data corresponding to each wind turbine to be built are respectively input into an icing state prediction model to obtain the predicted icing time period of each wind turbine to be built output by the icing state prediction model.
4. The method according to claim 3, characterized in that The ice cover state prediction model is pre-trained by the following steps: Obtain historical wind measurement data of the first wind farm within a preset historical period and historical icing period data of each first wind turbine in the first wind farm; wherein the historical wind measurement data includes at least one of the following: second wind speed data of each first wind turbine in the first wind farm; second wind direction data of each first wind turbine in the first wind farm; third temperature data of the wind tower in the first wind farm; second air pressure data of the wind tower in the first wind farm; second humidity data of the wind tower in the first wind farm; third altitude data of the wind tower in the first wind farm; Acquiring fourth altitude data of each first wind turbine in the first wind farm; Correcting the third temperature data based on the third altitude data and the fourth altitude data of each of the first wind turbines to obtain fourth temperature data corresponding to each of the first wind turbines; The fourth temperature data, the second wind speed data, the second wind direction data, the second humidity data and the historical icing period data corresponding to each of the first wind turbines are respectively input into an initial neural network model as a group of training data, and the initial neural network model is subjected to cyclic iterative training in combination with preset training parameters; Based on the model parameters of the trained initial neural network model, the ice cover state prediction model is obtained.
5. The method according to claim 2, characterized in that The obtaining the lost power generation of the wind farm to be built based on the wind measurement data, the predicted icing period and the corrected power curve includes: Based on the icing period and the wind measurement data of each wind turbine to be built, respectively, the target wind speed data corresponding to each wind turbine to be built is obtained; Obtaining the target power generation corresponding to each wind turbine to be built based on the target wind speed data corresponding to each wind turbine to be built and the modified power curve; Based on the target power generation corresponding to each of the wind turbines to be built and the icing period of each of the wind turbines to be built, the power generation loss of the wind farm to be built is obtained.
6. The method according to claim 1, characterized in that The step of correcting the theoretical power curve based on the wind measurement data to obtain a corrected power curve of the wind farm to be built comprises the following steps: S1: obtaining the theoretical equivalent hours of the wind farm based on the theoretical power curve; S2: determining at least one first wind speed range based on a preset first correction coefficient, and a first power correction strategy corresponding to each first wind speed range; S3: Based on the first power correction strategy corresponding to each first wind speed range, correct the power corresponding to each first wind speed range in the theoretical power curve to obtain the first power curve after the i-th correction; wherein i is a positive integer; S4: acquiring a first equivalent number of hours for the wind farm to be built based on the first power curve and the wind measurement data; S5: In response to the first equivalent hours being less than the theoretical equivalent hours, obtaining a second power curve and a second equivalent hours corresponding to the second power curve, wherein the second power curve is a power curve obtained after the (i-1)th correction; S6: Obtain a first difference between the theoretical equivalent hours and the second equivalent hours, and a second difference between the first equivalent hours and the theoretical equivalent hours; S7: In response to the first difference being greater than the second difference, determining at least one preset second wind speed range and a second power correction strategy corresponding to each second wind speed range based on a preset third correction coefficient; S8: Based on the second power correction strategy corresponding to each second wind speed range, correct the power corresponding to each second wind speed range in the second power curve to obtain a third power curve; S9: Obtaining a third equivalent number of hours of the wind farm to be built based on the third power curve; S10: In response to the difference between the theoretical equivalent hours and the third equivalent hours being within a preset difference range, the third power curve is used as the corrected power curve; or, in response to the difference between the theoretical equivalent hours and the third equivalent hours being not within the difference range, the second correction coefficient is updated, and the process returns to execute S7.
7. The method according to claim 6, characterized in that The S7 further comprises: In response to the second equivalent hours being greater than the theoretical equivalent hours, the first correction coefficient is updated, and the step S2 is returned to be executed.
8. A device for obtaining power generation loss of a wind farm, characterized in that: include: The first acquisition module is used to acquire wind measurement data of the wind farm to be built within a preset period of time; A second acquisition module is used to acquire a theoretical power curve of the wind farm to be built; A first processing module, configured to predict the icing state of the wind farm to be built within the preset time period based on the wind measurement data, and obtain a predicted icing time period of the wind farm to be built; A second processing module is used to correct the theoretical power curve based on the wind measurement data to obtain a corrected power curve of the wind farm to be built; The third processing module is used to obtain the power generation lost by the wind farm to be built during the icing period based on the wind measurement data, the prediction period and the modified power curve.
9. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which are used to implement the method according to claims 1 to 7 when executed by a processor.