Multi-energy system collaborative optimization scheduling method based on P2G technology

By constructing a collaborative security optimization dispatching method of P2G technology in a multi-energy system, the security and flexibility issues of P2G units in multi-energy systems under emergencies are solved, and the safe operation of the energy network under sudden failures is achieved. and economic improvement.

CN118863318APending Publication Date: 2024-10-29QINGHAI ELECTRIC POWER DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410687817.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

The existing technology fails to effectively consider the safety and flexibility of P2G units in emergencies in multi-energy systems, and lacks coordinated scheduling among multiple energy hubs, resulting in reduced energy supply security and economy.

Method used

A multi-energy system collaborative safety optimization scheduling method based on P2G technology is adopted. By establishing the energy hub model, incorporating the P2G unit model, constructing the objective function and constraint model, the GAMS platform and MIP programming are used with the CPLEX solver for optimal scheduling to ensure that in emergencies Safe operation of energy networks under fault conditions.

Benefits of technology

It can effectively make up for the demand gap of electric load and heat load, improve the utilization rate of wind power generation, and ensure the safe and economical operation of multi-energy systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118863318A_ABST
    Figure CN118863318A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of power system multi-energy system optimization scheduling, and particularly relates to a P2G technology-based multi-energy system collaborative optimization scheduling method, which comprises the following steps of: establishing an energy concentrator model by using a transformer, a CHP unit and a gas-fired boiler; a power-to-gas device is incorporated into a scheduling system, and a P2G unit model is established; taking the minimum total operation cost of the energy concentrator network before and after the accidental fault of the power system and the natural gas system as a target function; establishing an equality constraint model of electrical load, thermal load and power consumption, an inequality constraint model of equipment unit operation and a P2G and wind driven generator integrated grid-connected constraint model of the system before and after emergency processing; on the basis of a GAMS platform, MIP programming and a CPLEX solver are adopted to solve the optimal scheduling model; the method can effectively make up the demand vacancy of the electric load and the thermal load within several hours when the sudden fault occurs, improves the utilization rate of wind power generation, and guarantees the safe and economical operation of the multi-energy system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of optimized scheduling of multi-energy systems in power systems, and specifically relates to a collaborative optimized scheduling method for multi-energy systems based on P2G technology. Background Art

[0002] In recent years, multi-energy systems have garnered widespread attention for their advantages in optimizing energy mix, improving energy efficiency, and contributing to energy conservation and environmental protection. Energy hubs serve as the interface platform between sources, the grid, and loads in multi-energy systems. As the number of energy hubs increases, optimized management of the energy network is necessary from the perspective of overall system energy security. Furthermore, various emergencies inevitably occur in multi-energy systems, potentially compromising energy supply security and economic efficiency. To meet diverse load demands, emergency energy alternatives are necessary. The introduction of P2G (Personal-to-Generating) (P2G) enables bidirectional energy flow between the power grid and natural gas grid, effectively offsetting shortfalls in electrical and thermal loads and significantly improving the dispatchability of multi-energy systems. Therefore, it is crucial to consider the coordinated optimization of multi-energy hubs with P2G to ensure energy network supply and demand security in the event of emergencies.

[0003] Currently, relevant research has evaluated the potential of P2G technology as an alternative energy source for balancing system supply and demand from economic, energy, and environmental perspectives. For optimizing scheduling strategies for cross-regional electricity-gas interconnected systems that accommodate large-scale wind power, the use of P2G technology will improve system safety and economic efficiency. Most studies optimize energy supply methods by minimizing total operating costs through the cost of curtailed wind and solar power. They employ a two-tier economic dispatch model for integrated natural gas and electricity systems, introducing dispatch-level constraints to maintain network security. However, these studies do not consider P2G units when assessing system security and flexibility following emergencies within the network. Furthermore, most of these studies only model or optimize scheduling for a single energy hub or P2G unit, lacking consideration for coordinated scheduling across multiple energy hubs. Summary of the Invention

[0004] The purpose of the present invention is to provide a multi-energy system collaborative safety optimization scheduling method based on P2G technology to solve the above-mentioned problems existing in the prior art.

[0005] To achieve the above object, the present invention adopts the following technical solutions:

[0006] A multi-energy system collaborative optimization scheduling method based on P2G technology, the multi-energy system collaborative safety optimization scheduling method comprising the following steps:

[0007] S1: Establish an energy hub model with transformers, CHP units and gas boilers;

[0008] S2: Incorporate the power-to-gas device into the dispatching system and establish a P2G unit model;

[0009] S3: The objective function is to minimize the total operating cost of the energy hub network before and after unexpected failures of the power system and natural gas system;

[0010] S4: Establish an equality constraint model for the system's electrical load, thermal load, and power consumption before and after emergency response, an inequality constraint model for equipment unit operation, and a P2G and wind turbine integrated grid connection constraint model;

[0011] S5: Based on the GAMS platform, MIP programming and CPLEX solver are used to solve the optimization scheduling model.

[0012] Furthermore, the S1 includes the following steps:

[0013] S101: Electricity and natural gas serve as energy inputs to this hub, meeting electrical load demands through transformers and CHP units;

[0014] S102: The system heat load demand is met through the CHP unit and the gas boiler.

[0015] Furthermore, the S2 includes the following steps:

[0016] S201: P2G takes electricity and water as input and produces hydrogen at the output through an electrolyzer;

[0017] S202: Calculate the total amount of methane injected into each gas pipeline;

[0018]

[0019] In the formula, superscripts 0 and 1 represent the conditions before and after emergency fault handling respectively; P m,out (t) and ptg are the total amount of methane produced at time t and the amount of methane injected into each gas network, respectively; s is the scenario set; lg is the number of natural gas networks;

[0020] S203: setting the standard limit of hydrogen in the pipeline to 1% of the total gas energy in the pipeline;

[0021]

[0022] Where, P Gnet (t, lg) and P H (t, lg) are the total gas consumed by the lg-th gas grid branch and the total power of injected hydrogen, respectively.

[0023] Furthermore, the step S3 includes the following steps:

[0024] S301: Calculating the total operating cost before the unexpected failure occurs;

[0025]

[0026] Where n is the total number of energy hubs; π e and π g is the price per kilowatt-hour of electricity and natural gas, and It is the penalty fee for each kilowatt-hour of electricity and gas load shedding;

[0027] S302: Calculating the expected operating cost after an unexpected failure occurs;

[0028]

[0029] S303: Calculate the equivalent economic loss when wind power generation is not used;

[0030]

[0031] Where α is the safety factor;

[0032] S304: Constructing the optimization scheduling model objective function:

[0033]

[0034] Furthermore, the S4 includes the following steps:

[0035] S401: Establishing power load supply and demand balance constraint conditions;

[0036]

[0037] Where, I ec (n, j) represents the grid connection status between hub units and is a 0-1 variable; n is the total number of hub units; η t and η CHP are the power conversion efficiency of transformer and CHP respectively; P t (t,n) is the input power of the primary side of the transformer; P CHP (t,n) represents the amount of natural gas consumed by CHP; P ex (t,n,j) represents the electrical interaction power between hub units;

[0038] S402: Establishing heat load supply and demand balance constraint conditions;

[0039]

[0040] Where, I hc(n, j) represents the gas network connection status between each hub unit and is a 0-1 variable; η t and η CHP are the power conversion efficiency of transformer and CHP respectively; P gb (t,n) represents the amount of natural gas consumed by the gas boiler; and η gb are variables representing the heat production efficiency of CHP units, gas boiler efficiency, and the amount of electricity exchanged with other hubs; P hx (t,n,j) represents the thermal interaction power between hub units;

[0041] S403: Establishing constraints on the hub's internal power consumption and the power grid and gas grid's power consumption;

[0042]

[0043] S403: Establish inequality constraints;

[0044]

[0045] Where, Indicates the maximum allowed value of power exchange between hubs, Indicates the maximum allowable heat energy exchange value;

[0046] S404: Establish P2G and wind turbine integration grid-connected constraints:

[0047]

[0048] Where, P Enet (t,le) is the input power of the grid; le represents the number of grids; the binary parameter I p (le) and I w (le) used to determine the location of P2G and wind turbines in the grid; It is the connection status between the power grid and the input terminals of each hub unit, which is a variable of 0 or 1.

[0049] Furthermore, the S5 includes the following steps:

[0050] S501: Based on the GAMS platform, use the MIP programming language to write the objective function and constraints and establish an optimization scheduling model;

[0051] S502: Use the CPLEX solver to solve the model and obtain an optimized scheduling result.

[0052] Compared with the prior art, the present invention has the following beneficial effects:

[0053] The present invention provides a collaborative safety optimization scheduling method for a multi-energy system based on P2G technology. The method establishes an energy hub model using transformers, CHP units, and gas boilers; incorporates power-to-gas devices into the scheduling system to establish a P2G unit model; takes minimizing the total operating cost of the energy hub network before and after unexpected failures in the power system and natural gas system as the objective function; establishes an equality constraint model for the system's electric load, heat load, and power consumption before and after emergency processing, an inequality constraint model for the operation of equipment units, and a P2G and wind turbine integrated grid-connected constraint model; and solves the optimization scheduling model using MIP programming and the CPLEX solver on the GAMS platform. This method can effectively make up for the shortfall in electric and heat load demand within a few hours of a sudden failure in the system's main natural gas pipeline, improve wind power generation utilization, and ensure safe and economical operation of the multi-energy system. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Figure 1 It is a flow chart of the scheduling method of the present invention;

[0055] Figure 2 This is a schematic diagram of the network structure of the multi-energy hub provided by the present invention;

[0056] Figure 3 It is a schematic diagram of the hub model structure provided by the present invention. DETAILED DESCRIPTION

[0057] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments. The following embodiments are only used to illustrate the present invention but are not intended to limit the scope of the present invention.

[0058] Example 1

[0059] This embodiment provides a multi-energy system collaborative optimization scheduling method based on P2G technology, such as Figure 1 As shown, the method includes the following steps:

[0060] S1: Establish an energy hub model with transformers, CHP units and gas boilers;

[0061] S2: Incorporate the power-to-gas device into the dispatching system and establish a P2G unit model;

[0062] S3: The objective function is to minimize the total operating cost of the energy hub network before and after unexpected failures of the power system and natural gas system;

[0063] S4: Establish an equality constraint model for the system's electrical load, thermal load, and power consumption before and after emergency response, an inequality constraint model for equipment unit operation, and a P2G and wind turbine integrated grid connection constraint model;

[0064] S5: Based on the GAMS platform, MIP programming and CPLEX solver are used to solve the optimization scheduling model.

[0065] Specifically:

[0066] Said S1 comprises the following steps:

[0067] S101: Electricity and natural gas serve as energy inputs to this hub, meeting electrical load demands through transformers and CHP units;

[0068] S102: The system heat load demand is met through the CHP unit and the gas boiler.

[0069] The S2 comprises the following steps:

[0070] S201: P2G takes electricity and water as input and produces hydrogen at the output through an electrolyzer;

[0071] S202: Calculate the total amount of methane injected into each gas pipeline;

[0072]

[0073] In the formula, superscripts 0 and 1 represent the conditions before and after emergency fault handling respectively; P m,out (t) and ptg are the total amount of methane produced at time t and the amount of methane injected into each gas network, respectively; s is the scenario set; lg is the number of natural gas networks;

[0074] S203: setting the standard limit of hydrogen in the pipeline to 1% of the total gas energy in the pipeline;

[0075]

[0076] Where, P Gnet (t, lg) and P H (t, lg) are the total gas consumed by the lg-th gas grid branch and the total power of injected hydrogen, respectively.

[0077] The S3 includes the following steps:

[0078] S301: Calculating the total operating cost before the unexpected failure occurs;

[0079]

[0080] Where n is the total number of energy hubs; π e and π g is the price per kilowatt-hour of electricity and natural gas, and It is the penalty fee for each kilowatt-hour of electricity and gas load shedding;

[0081] S302: Calculating the expected operating cost after an unexpected failure occurs;

[0082]

[0083] S303: Calculate the equivalent economic loss when wind power generation is not used;

[0084]

[0085] Where α is the safety factor;

[0086] S304: Constructing the optimization scheduling model objective function:

[0087]

[0088] The S4 comprises the following steps:

[0089] S401: Establishing power load supply and demand balance constraint conditions;

[0090]

[0091] Where, I ec (n, j) represents the grid connection status between hub units and is a 0-1 variable; n is the total number of hub units; η t and η CHP are the power conversion efficiency of transformer and CHP respectively; P t (t,n) is the input power of the primary side of the transformer; P CHP (t,n) represents the amount of natural gas consumed by CHP; P ex (t,n,j) represents the electrical interaction power between hub units;

[0092] S402: Establishing heat load supply and demand balance constraint conditions;

[0093]

[0094] Where, I hc (n, j) represents the gas network connection status between each hub unit and is a 0-1 variable; η t and η CHP are the power conversion efficiency of transformer and CHP respectively; P gb (t,n) represents the amount of natural gas consumed by the gas boiler; and η gb are variables representing the heat production efficiency of CHP units, gas boiler efficiency, and the amount of electricity exchanged with other hubs; P hx (t,n,j) represents the thermal interaction power between hub units;

[0095] S403: Establishing constraints on the hub's internal power consumption and the power grid and gas grid's power consumption;

[0096]

[0097]

[0098] S403: Establish inequality constraints;

[0099]

[0100] Where, Indicates the maximum allowed value of power exchange between hubs, Indicates the maximum allowable heat energy exchange value;

[0101] S404: Establish P2G and wind turbine integration grid-connected constraints:

[0102]

[0103] Where, P Enet (t,le) is the input power of the grid; le represents the number of grids; the binary parameter I p (le) and I w (le) used to determine the location of P2G and wind turbines in the grid; It is the connection status between the power grid and the input terminals of each hub unit, which is a variable of 0 or 1.

[0104] The S5 comprises the following steps:

[0105] S501: Based on the GAMS platform, use the MIP programming language to write the objective function and constraints and establish an optimization scheduling model;

[0106] S502: Use the CPLEX solver to solve the model and obtain an optimized scheduling result.

[0107] Example 2

[0108] The present invention provides a multi-energy system collaborative security optimization scheduling method based on P2G technology, which includes:

[0109] S1: Establish an energy hub model with transformers, CHP units and gas boilers;

[0110] The hub model consists of three components: a transformer, a CHP unit, and a gas boiler. Electricity and natural gas serve as the hub's energy inputs, meeting the electrical load through the transformer and CHP unit, and the system's thermal load through the CHP unit and gas boiler.

[0111] S2: Incorporate the power-to-gas device into the dispatching system and establish a P2G unit model;

[0112] The H2 produced by electrolysis combines with CO2 in a methanation unit to produce methane and water. The resulting methane gas is then directly injected into the natural gas pipeline. The entire network consists of two gas grids, each supplied by the P2G units.

[0113] S3: The objective function is to minimize the total operating cost of the energy hub network before and after unexpected failures of the power system and natural gas system;

[0114] By formula Calculate the total cost of operating the system.

[0115] S4: Establish an equality constraint model for the system's electrical load, thermal load, and power consumption before and after emergency response, an inequality constraint model for equipment unit operation, and a P2G and wind turbine integrated grid connection constraint model;

[0116] The constraints of the optimal scheduling model are constructed based on the basic power and heat demands of multiple energy hubs.

[0117] S5: Based on the GAMS platform, MIP programming and CPLEX solver are used to solve the optimization scheduling model;

[0118] By solving the problem with the CPLEX solver, we can obtain the shortfall in heat load demand and electricity load demand with and without P2G units. When an unexpected situation occurs in the gas network, P2G units play an important role in meeting the energy supply demand of the system, thereby effectively reducing penalty costs.

[0119] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the invention can be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, the embodiments should be considered in all respects as illustrative and non-restrictive, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations that come within the meaning and range of equivalents of the claims be embraced therein.

Claims

1. A collaborative optimization scheduling method for multi-energy systems based on P2G technology. It is characterized in that The method comprises the following steps: S1: Establish an energy hub model with transformers, CHP units and gas boilers; S2: Incorporate the power-to-gas device into the dispatching system and establish a P2G unit model; S3: The objective function is to minimize the total operating cost of the energy hub network before and after unexpected failures of the power system and natural gas system; S4: Establish the equality constraint model of the system's electrical load, thermal load and power consumption before and after emergency treatment, the inequality constraint model of the equipment unit operation and the P2G and wind turbine integrated grid-connected constraint model; S5: Based on the GAMS platform, MIP programming and CPLEX solver are used to solve the optimization scheduling model.

2. According to claim 1, a multi-energy system collaborative optimization scheduling method based on P2G technology, It is characterized in that The S1 comprises the following steps: S101: Electricity and natural gas are used as energy inputs of this hub to meet the electrical load demand through transformers and CHP units; S102: The system heat load requirement is met through CHP units and gas boilers.

3. According to claim 1, a multi-energy system collaborative optimization scheduling method based on P2G technology, It is characterized in that The S2 comprises the following steps: S201: P2G takes electricity and water as input and produces hydrogen at the output through an electrolyzer; S202: Calculate the total amount of methane injected into each gas pipeline; In the formula, the superscripts 0 and 1 represent the conditions before and after emergency fault handling respectively; P m,out (t) and ptg are the total amount of methane produced at time t and the amount of methane injected into each gas network, respectively; s is the scenario set; lg is the number of natural gas networks; S203: setting the standard limit of hydrogen in the pipeline to 1% of the total gas energy in the pipeline; Where P Gnet (t,lg) and P H (t, lg) are the total gas consumed by the lg-th gas grid branch and the total power of injected hydrogen, respectively.

4. According to claim 1, a multi-energy system collaborative optimization scheduling method based on P2G technology, It is characterized in that The S3 comprises the following steps: S301: Calculate the total operating cost before the unexpected failure occurs; Where n is the total number of energy hubs; π e and π g is the price per kilowatt-hour of electricity and natural gas, and It is the penalty fee for each kilowatt-hour of electricity and gas load shedding; S302: Calculating the expected operating cost after the unexpected failure occurs; S303: Calculate the equivalent economic loss when wind power generation is not used; In the formula, α is the safety factor; S304: Constructing the optimization scheduling model objective function:

5. According to claim 1, a multi-energy system collaborative safety optimization scheduling method based on P2G technology, It is characterized in that The S4 comprises the following steps: S401: Establishing power load supply and demand balance constraint conditions; In the formula, I ec (n,j) represents the grid connection status between the hub units, which is a 0-1 variable; n is the total number of hub units; η t and η CHP are the power conversion efficiency of transformer and CHP respectively; P t (t,n) is the input power of the primary side of the transformer; P CHP (t,n) represents the amount of natural gas consumed by CHP; P ex (t,n,j) represents the electrical interaction power between hub units; S402: Establish heat load supply and demand balance constraint conditions; In the formula, I hc (n,j) represents the gas network connection status between each hub unit, which is a 0-1 variable; η t and η CHP are the power conversion efficiency of transformer and CHP respectively; P gb (t,n) represents the amount of natural gas consumed by the gas boiler; and η gb are variables representing the heat production efficiency of CHP unit, gas boiler efficiency and the amount of electricity exchange with other hubs; P hx (t,n,j) represents the thermal interaction power between hub units; S403: Establishing constraints on the power consumption of the hub internally and the power grid and gas grid; S403: Establish inequality constraints; In the formula, Indicates the maximum allowed value of power exchange between hubs, Indicates the maximum allowable heat energy exchange value; S404: Establish P2G and wind turbine integrated grid connection constraints: Where P Enet (t,le) is the input power of the grid; le represents the number of grids; the binary parameter I p (le) and I w (le) used to determine the location of P2G and wind turbines in the grid; It is the connection status between the power grid and the input terminal of each hub unit, which is a 0 or 1 variable.

6. According to claim 1, a multi-energy system collaborative safety optimization scheduling method based on P2G technology, It is characterized in that The S5 comprises the following steps: S501: Based on the GAMS platform, the objective function and constraints are written using the MIP programming language to establish an optimization scheduling model; S502: Use CPLEX solver to solve the model and obtain the optimized scheduling result.