Method, processor and device for updating side slope three-dimensional model and storage medium

By obtaining and processing the data of slope influence factors, it is determined whether the area needs to be updated, and the three-dimensional model is updated using drone or mine truck scanning data, which solves the problem of low update efficiency in the existing technology and achieves faster and more accurate edge detection. Slope monitoring.

CN118864745APending Publication Date: 2024-10-29ZHONGKE YUNGU TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410862384.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

In the existing technology, the update efficiency of the three-dimensional model of the mine slope is low, resulting in insufficient timely and comprehensive response to slope changes, which affects safe production.

Method used

By obtaining the current data of deformation, meteorology and update interval influencing factors in each area of ​​the slope, normalization processing and weighting calculation are performed to determine whether the area is a target area, and based on the comprehensive update value of the influencing factors, it is decided whether to update the three-dimensional model, using The drone or mining truck scans to obtain point cloud data for model update.

Benefits of technology

It improves the efficiency and accuracy of slope three-dimensional model update, can respond to slope changes more quickly, and enhances the guarantee of safe production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118864745A_ABST
    Figure CN118864745A_ABST
Patent Text Reader

Abstract

The invention discloses a method for updating a three-dimensional model of a side slope, a processor, a device and a storage medium, and belongs to the technical field of mine side slope monitoring. Comprising the steps that current data of multiple influence factors of all areas of a slope are acquired, and the multiple influence factors comprise deformation type influence factors, meteorological type influence factors and updating interval influence factors; carrying out normalization processing on the current data of the plurality of influence factors according to the maximum threshold value and a standard threshold value; according to a normalization processing result, a maximum threshold value, a standard threshold value and a preset weight of each type of impact factor, determining an updated value of each type of impact factor; according to the preset weight of each type of influence factor and the update value of each type of influence factor, determining the comprehensive update value of the influence factor of each region; judging whether the region is a target region or not according to the influence factor comprehensive update value; and obtaining point cloud data of the target area, and merging the point cloud data into the side slope three-dimensional model to update the side slope three-dimensional model. According to the invention, the updating efficiency of the slope three-dimensional model can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of mine slope monitoring, and in particular to a method, processor, device and storage medium for updating a three-dimensional slope model. Background Art

[0002] Slope stability monitoring is one of the key tasks during mining. There are many types of slope damage, such as collapse, spalling, landslide, etc. Among them, landslide disasters are the most common and most harmful disasters. Once a landslide disaster occurs on the slope of an open-pit mine, it will pose a serious threat to production safety. With the advancement of science and technology, slope radar monitoring technology has emerged. It can accurately, quickly, conveniently and efficiently monitor slope deformation. When applied, slope radar monitoring data is generally superimposed on the three-dimensional model of the slope for observation, so that monitoring personnel can more intuitively understand the regional deformation status. Therefore, the accuracy of the three-dimensional model of the slope is crucial for slope monitoring. In the existing technology, mining area monitoring personnel usually call drones to scan the three-dimensional point cloud data of the relevant area when they find that the slope has changed significantly, so as to update the overall three-dimensional model of the slope. This solution relies entirely on personnel experience to determine whether it is necessary to update and then assign drones. It does not respond to slope changes in a timely and comprehensive manner, resulting in low efficiency. Summary of the invention

[0003] The purpose of the embodiments of the present application is to provide a method, processor, device and storage medium for updating a three-dimensional slope model, so as to solve the problem of low efficiency of the updating method of the three-dimensional model of the mine slope in the prior art.

[0004] In order to achieve the above-mentioned object, the present application provides, in a first aspect, a method for updating a three-dimensional slope model, the method comprising:

[0005] Acquire current data of multiple influencing factors of each area of ​​the slope, wherein the multiple influencing factors include deformation influencing factors, meteorological influencing factors and update interval influencing factors;

[0006] Normalizing the current data of multiple influencing factors according to the maximum threshold and standard threshold predetermined by each influencing factor;

[0007] Based on the preset distance model, the updated values ​​of various influencing factors are determined according to the normalization processing result, the maximum threshold, the standard threshold and the preset weights of various influencing factors;

[0008] The comprehensive updated value of the impact factor of each region is determined according to the preset weights of various impact factors and the updated values ​​of various impact factors through the preset comprehensive updated value calculation model of the impact factor;

[0009] For any region, determine whether the region is a target region based on the comprehensive updated value of the impact factor;

[0010] The point cloud data of the target area is obtained, and the point cloud data is merged into the slope 3D model to update the slope 3D model.

[0011] In the embodiment of the present application, based on the preset distance model, the update value of each type of influencing factor is determined according to the result of the normalization processing, the preset maximum threshold, the preset standard threshold and the preset weights of each type of influencing factor, including formula (1):

[0012]

[0013] Among them, V i is the updated value of various impact factors, w ij is the weight of each impact factor among various impact factors, z ij is the normalized processing result of the real-time data of each influencing factor, y ij is the maximum threshold of each type of impact factor, x ij is the standard threshold of each type of influencing factor, x is the real-time data of each type of influencing factor, MF is the distance from the maximum value, and MS is the distance from the standard value.

[0014] In the embodiment of the present application, the comprehensive updated value calculation model of the impact factor includes a first calculation model and a second calculation model. The comprehensive updated value of the impact factor of each region is determined according to the preset weights of various impact factors and the updated values ​​of various impact factors through the preset comprehensive updated value calculation model of the impact factor, including:

[0015] Determine the operating area and non-operating area in each area of ​​the slope according to the preset ore allocation plan;

[0016] Determine the comprehensive updated value of the influencing factors of each operation area according to the preset weights of various influencing factors and the updated values ​​of various influencing factors through the first calculation model;

[0017] Determine the comprehensive updated value of the influencing factors of each non-operating area according to the preset weights of various influencing factors and the updated values ​​of various influencing factors through the second calculation model;

[0018] The first calculation model includes formula (2):

[0019] V=(V1*O1+V2*O2+V3*O3) / K (2)

[0020] The second calculation model includes formula (3):

[0021] V=(V1*O1+V2*O2+V3*O3) (3)

[0022] Among them, V is the comprehensive updated value of the influencing factor, V1 is the updated value of the deformation influencing factor, V2 is the weight of the meteorological influencing factor, V3 is the weight of the update interval influencing factor, O1 is the weight of the deformation influencing factor, O2 is the weight of the meteorological influencing factor, O3 is the weight of the update interval influencing factor, O1+O2+O3=1, K is the addition constant, K>1.

[0023] In an embodiment of the present application, for any area, judging whether the area is a target area according to the comprehensive update value of the impact factor includes: for any area, judging whether the comprehensive update value of the impact factor is less than a preset update threshold; if it is determined that the comprehensive update value of the impact factor is less than the preset update threshold, determining the area as a target area.

[0024] In an embodiment of the present application, point cloud data of a target area is obtained, and the point cloud data is merged into a three-dimensional model of a slope to update the three-dimensional model of the slope, including: for any target area, determining whether there is a mining truck within a preset range of the target area; in the case where it is determined that there is a mining truck within the preset range of the target area, upon receiving an end operation signal of the mining truck, scheduling the mining truck to scan the target area to obtain first point cloud data; in the case where it is determined that there is no mining truck within the preset range of the target area, scheduling a drone to scan the corresponding target area to obtain second point cloud data; and merging the first point cloud data and the second point cloud data into the three-dimensional model of the slope through a preset modeling software to update the three-dimensional model of the slope.

[0025] In an embodiment of the present application, determining the maximum threshold and standard threshold of each influencing factor includes: obtaining historical data of multiple influencing factors in all areas of the slope within a preset time range; and determining the maximum threshold and standard threshold of each influencing factor based on the historical data.

[0026] In an embodiment of the present application, the maximum threshold and standard threshold of each influencing factor are determined respectively according to historical data, including: for deformation influencing factors and meteorological influencing factors, the daily average data is determined according to the historical data within a preset time range; the daily average data is sorted in order from low to high; the average value of a preset number of daily average data with a higher sorting level is taken as the average value to obtain the standard threshold value; the average value of a preset number of daily average data with a lower sorting level is taken as the average value to obtain the maximum threshold value.

[0027] A second aspect of the present application provides a processor configured to execute the above method for updating a three-dimensional slope model.

[0028] According to a third aspect of the present application, there is provided an apparatus for updating a three-dimensional model of a slope, comprising: an acquisition module for acquiring current data of multiple influencing factors of each region of the slope, wherein the multiple influencing factors include deformation influencing factors, meteorological influencing factors and update interval influencing factors; a normalization processing module for normalizing the current data of the multiple influencing factors according to a predetermined maximum threshold and a standard threshold of each influencing factor; an influencing factor update value determination module for determining the update value of each type of influencing factor based on a preset distance model, according to the result of the normalization processing, the maximum threshold, the standard threshold and the preset weights of each type of influencing factor; an influencing factor comprehensive update value determination module for determining the comprehensive update value of the influencing factors of each region according to the preset weights of each type of influencing factors and the update value of each type of influencing factors through a preset influencing factor comprehensive update value calculation model; a judgment module for judging whether a region is a target region according to the comprehensive update value of the influencing factors for any region; and an updating module for acquiring point cloud data of the target region and merging the point cloud data into the three-dimensional model of the slope to update the three-dimensional model of the slope.

[0029] A fourth aspect of the present application provides a machine-readable storage medium having instructions stored thereon, the instructions being used to enable a machine to execute the above-mentioned method for updating a three-dimensional model of a slope.

[0030] Through the above technical solution, the current data of multiple influencing factors of each area of ​​the slope are obtained, wherein the multiple influencing factors include deformation influencing factors, meteorological influencing factors and update interval influencing factors, and then the current data of multiple influencing factors are normalized according to the predetermined maximum threshold and standard threshold of each influencing factor, and then based on the preset distance model, the update value of each type of influencing factor is determined according to the result of the normalization process, the maximum threshold, the standard threshold and the preset weights of each type of influencing factor. Through the preset comprehensive update value calculation model of the influencing factor, the comprehensive update value of the influencing factor of each area is determined according to the preset weights of each type of influencing factor and the update value of each type of influencing factor. For any area, whether the area is the target area is determined according to the comprehensive update value of the influencing factor, and finally the point cloud data of the target area is obtained, and the point cloud data is merged into the three-dimensional model of the slope to update the three-dimensional model of the slope. The present application can comprehensively judge whether the slope area needs to be updated by comprehensively judging factors such as slope deformation, meteorology, and update interval, which is more efficient than manual judgment or single deformation judgment.

[0031] Other features and advantages of the embodiments of the present application will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] The accompanying drawings are used to provide a further understanding of the embodiments of the present application and constitute a part of the specification. Together with the following specific implementations, they are used to explain the embodiments of the present application, but do not constitute a limitation on the embodiments of the present application. In the accompanying drawings:

[0033] Figure 1 A flowchart of a method for updating a three-dimensional slope model according to an embodiment of the present application is schematically shown;

[0034] Figure 2 The structure diagram of a device for updating a three-dimensional slope model according to an embodiment of the present application is schematically shown.

[0035] Description of Reference Numerals

[0036] 201 acquisition module 202 normalization processing module

[0037] 203 Impact factor update value determination module 204 Impact factor comprehensive update

[0038] Value determination module

[0039] 205 judgment module 206 update module DETAILED DESCRIPTION

[0040] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. It should be understood that the specific implementation methods described herein are only used to illustrate and explain the embodiments of the present application, and are not used to limit the embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0041] It should be noted that if the embodiments of the present application involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0042] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present application, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0043] Figure 1 A flowchart of a method for updating a three-dimensional slope model according to an embodiment of the present application is schematically shown. Figure 1 As shown, the embodiment of the present application provides a method for updating a three-dimensional slope model. Taking the method applied to a processor as an example, the method may include the following steps:

[0044] Step S101: obtaining current data of multiple influencing factors of each area of ​​the slope, wherein the multiple influencing factors include deformation influencing factors, meteorological influencing factors and update interval influencing factors.

[0045] Step S102: normalizing the current data of multiple influencing factors according to the predetermined maximum threshold and standard threshold of each influencing factor.

[0046] Step S103: Based on the preset distance model, the update value of each type of impact factor is determined according to the result of the normalization process, the maximum threshold, the standard threshold, and the preset weights of each type of impact factor.

[0047] Step S104: Determine the comprehensive updated value of the impact factor of each region according to the preset weights of various impact factors and the updated values ​​of various impact factors through the preset impact factor comprehensive updated value calculation model.

[0048] Step S105: For any region, determine whether the region is a target region based on the comprehensive update value of the impact factor.

[0049] Step S106: acquiring point cloud data of the target area, and merging the point cloud data into the three-dimensional model of the slope to update the three-dimensional model of the slope.

[0050] It can be understood that the slope can be divided into multiple areas. The slope deformation factors, i.e., the deformation influencing factors of the slope, include deformation amount, deformation rate, and alarm frequency; the meteorological factors, i.e., the meteorological influencing factors, include rainfall and snow. Among them, the data of the deformation influencing factors can be uploaded and obtained by the slope radar, and the meteorological influencing factors can be obtained from the meteorological station. Each influencing factor has a range of variation, i.e., the standard threshold and the maximum threshold. The default value of the range of variation can be calculated and set based on historical data.

[0051] Specifically, for each area of ​​the slope, when the processor obtains the current data of multiple influencing factors of any area, the processor normalizes the current data of multiple influencing factors according to the maximum threshold and standard threshold predetermined by each influencing factor to comprehensively consider the influence of each influencing factor on the three-dimensional model of the slope, and then determines the update value of each influencing factor based on the result of the normalization process, the maximum threshold, the standard threshold and the preset weights of each influencing factor based on the preset distance model. Among them, the update value of each influencing factor is used to evaluate the urgency of the update under a single factor. Then, the various influencing factors are weighted and calculated, and the working surface is considered to determine whether the area needs to be updated, that is, the comprehensive update value of the influencing factors of each area is determined according to the preset weights of each influencing factor and the update value of each influencing factor through the preset comprehensive update value calculation model of the influencing factors. For any area, if the comprehensive update value of the influencing factor is less than the preset update threshold, it means that the area is the area that needs to be updated, that is, the target area, and the update flag updateFlag=true is set in the target area. After determining all the areas that need to be updated, mining trucks and drones are called to scan the areas that need to be updated to obtain point cloud data. Finally, the point cloud data is merged into the slope 3D model to complete the update of the slope 3D model.

[0052] Through the above technical solution, the current data of multiple influencing factors of each area of ​​the slope are obtained, wherein the multiple influencing factors include deformation influencing factors, meteorological influencing factors and update interval influencing factors, and then the current data of multiple influencing factors are normalized according to the predetermined maximum threshold and standard threshold of each influencing factor, and then based on the preset distance model, the update value of each type of influencing factor is determined according to the result of the normalization process, the maximum threshold, the standard threshold and the preset weights of each type of influencing factor. Through the preset comprehensive update value calculation model of the influencing factor, the comprehensive update value of the influencing factor of each area is determined according to the preset weights of each type of influencing factor and the update value of each type of influencing factor. For any area, whether the area is the target area is determined according to the comprehensive update value of the influencing factor, and finally the point cloud data of the target area is obtained, and the point cloud data is merged into the three-dimensional model of the slope to update the three-dimensional model of the slope. The present application can comprehensively judge whether the slope area needs to be updated by comprehensively judging factors such as slope deformation, meteorology, and update interval, which is more efficient than manual judgment or single deformation judgment.

[0053] In the embodiment of the present application, based on the preset distance model, the update value of each type of influencing factor is determined according to the result of the normalization processing, the preset maximum threshold, the preset standard threshold and the preset weights of each type of influencing factor, which may include formula (1):

[0054]

[0055] Among them, V i is the updated value of various impact factors, w ij is the weight of each impact factor among various impact factors, z ij is the normalized processing result of the real-time data of each influencing factor, y ij is the maximum threshold of each type of impact factor, x ij is the standard threshold of each type of influencing factor, x is the real-time data of each type of influencing factor, MF is the distance from the maximum value, and MS is the distance from the standard value.

[0056] Specifically, after determining the range of the standard threshold and the maximum threshold of each influencing factor, in order to comprehensively consider the impact of each influencing factor on the three-dimensional model of the slope, and subsequently evaluate the updating urgency of a single factor through the distance model, the processor firstly calculates the range of the standard threshold and the maximum threshold of each influencing factor based on the standard threshold and the maximum threshold of each influencing factor.

[0057] Normalize the data that affects the shadow: ij =|xx ij | / |y ij -x ij |

[0058] Among them, z ij is the normalized processing result of the real-time data of each influencing factor, y ij is the maximum threshold of each type of impact factor, x ij is the standard threshold of each of the various influencing factors, and x is the real-time data of each of the various influencing factors.

[0059] After normalizing each influencing factor, the distance MF from the maximum value and the distance MS from the standard value are calculated respectively through the preset distance model, and the calculation method is shown in formula (1). MF and MS are both parameters used to characterize whether the parameters are healthy, among which MF is the distance from the maximum value, 0 represents abnormal, and the larger the value, the healthier; MS is the distance from the standard value, 0 represents very normal, and the larger the value, the unhealthier. If the two are divided by 0, it means abnormal, and the larger the quotient of the two, the healthier. In the embodiment of the present application, the MF / MS value, that is, the update value of each type of influencing factor, is used to evaluate the update urgency under a single factor, thereby judging whether the slope area is updated.

[0060] In the embodiment of the present application, the comprehensive updated value calculation model of the impact factor may include a first calculation model and a second calculation model. The comprehensive updated value of the impact factor of each region is determined according to the preset weights of various impact factors and the updated values ​​of various impact factors through the preset comprehensive updated value calculation model of the impact factor, which may include:

[0061] Determine the operating area and non-operating area in each area of ​​the slope according to the preset ore allocation plan;

[0062] Determine the comprehensive updated value of the influencing factors of each operation area according to the preset weights of various influencing factors and the updated values ​​of various influencing factors through the first calculation model;

[0063] Determine the comprehensive updated value of the influencing factors of each non-operating area according to the preset weights of various influencing factors and the updated values ​​of various influencing factors through the second calculation model;

[0064] The first calculation model includes formula (2):

[0065] V=(V1*O1+V2*O2+V3*O3) / K (2)

[0066] The second calculation model includes formula (3):

[0067] V=(V1*O1+V2*O2+V3*O3) (3)

[0068] Among them, V is the comprehensive updated value of the influencing factor, V1 is the updated value of the deformation influencing factor, V2 is the weight of the meteorological influencing factor, V3 is the weight of the update interval influencing factor, O1 is the weight of the deformation influencing factor, O2 is the weight of the meteorological influencing factor, O3 is the weight of the update interval influencing factor, O1+O2+O3=1, K is the addition constant, K>1.

[0069] Specifically, after evaluating the urgency of updating under a single factor through the distance model, it is necessary to perform a weighted calculation, combined with the consideration of the working surface, to finally determine whether the area needs to be updated. The mine MES (manufacturing execution system) will make a mining allocation plan every day, and the processor can parse the location of the working area based on the mining allocation plan. For the working area, the update value requirement is lower, so it is necessary to configure an addition K, K>1, and then combine the update values ​​of various influencing factors with preset weights to calculate the comprehensive update value of the influencing factors of the working area according to formula (2). For non-working areas, the comprehensive update value of the influencing factors is calculated directly according to formula (3) based on the preset weights of various influencing factors and the update values ​​of various influencing factors.

[0070] In an embodiment of the present application, for any area, judging whether the area is a target area based on the comprehensive update value of the impact factor may include: for any area, judging whether the comprehensive update value of the impact factor is less than a preset update threshold; if it is determined that the comprehensive update value of the impact factor is less than the preset update threshold, determining the area as a target area.

[0071] Specifically, the comprehensive update value of the influencing factors is the final update value obtained by weighted calculation of the deformation influencing factors, meteorological influencing factors and update interval influencing factors. For any area, by judging whether the corresponding comprehensive update value of the influencing factors is less than the preset update threshold, it can be determined whether the area needs to be updated. If the comprehensive update value of the influencing factors is less than the preset update threshold, it means that the area is the area that needs to be updated, that is, the target area, and the update flag updateFlag=true is set in the target area. Among them, the update threshold is set to 0.24 by default. Comprehensively judging whether the area needs to be updated by comprehensively considering factors such as slope deformation, meteorology, and update interval is more usable and efficient than manual judgment or single deformation judgment.

[0072] In an embodiment of the present application, obtaining point cloud data of a target area and merging the point cloud data into a three-dimensional model of a slope to update the three-dimensional model of the slope may include: for any target area, determining whether there is a mining truck within a preset range of the target area; in the case where it is determined that there is a mining truck within the preset range of the target area, upon receiving an end operation signal from the mining truck, scheduling the mining truck to scan the target area to obtain first point cloud data; in the case where it is determined that there is no mining truck within the preset range of the target area, scheduling a drone to scan the corresponding target area to obtain second point cloud data; and merging the first point cloud data and the second point cloud data into the three-dimensional model of the slope through a preset modeling software to update the three-dimensional model of the slope.

[0073] Specifically, a mining truck refers to a professional vehicle that transports ore and other materials in the operating area of ​​a mine slope. Considering that drones are not available in bad weather and that mining trucks generally operate in the operating area, when the area to be updated is close to the mining truck operating area, the mining truck is scheduled to scan the slope point cloud data first after the operation is completed. That is to say, after determining the area to be updated, i.e., the target area, the processor obtains the current position of the mining truck in the operating area. If the area to be updated is close to the mining truck operating area, i.e., within the preset range, after the mining truck finishes the operation, the mining truck is scheduled to scan the point cloud data of the area to be updated, i.e., the first point cloud data. For other areas that need to be updated, drones are scheduled to scan the point cloud data of the corresponding area, i.e., the second point cloud data. If the drone in the area to be updated is not available, the information is pushed to the relevant personnel. Finally, the regional point cloud data scanned by the drone and the mining truck are merged into the global three-dimensional model through the modeling software to complete the update of the slope three-dimensional model. In this way, the comprehensive equipment scheduling of drones and unmanned mining trucks provides more available model update methods, making the model update more efficient.

[0074] In an embodiment of the present application, determining the maximum threshold and standard threshold of each influencing factor may include: obtaining historical data of multiple influencing factors in all areas of the slope within a preset time range; and determining the maximum threshold and standard threshold of each influencing factor based on the historical data.

[0075] In an embodiment of the present application, the maximum threshold and standard threshold of each influencing factor are determined respectively according to historical data, which may include: for deformation influencing factors and meteorological influencing factors, determining the daily average data according to the historical data within a preset time range; sorting the daily average data in order from low to high; averaging the preset number of daily average data that are ranked first to obtain the standard threshold; and averaging the preset number of daily average data that are ranked last to obtain the maximum threshold.

[0076] Specifically, deformation-related influencing factors include deformation, deformation rate, and alarm frequency, and meteorological influencing factors include rainfall and snow. The preset time range can be within one year. For deformation, deformation rate, and alarm frequency, the processor obtains the historical daily average data collected by the slope radar for the past year, sorts the daily average data from low to high, takes the minimum top 5% of the data as the average value, and uses this average value as the standard threshold; sorts the daily average data from low to high, takes the maximum top 5% of the data as the average value, and uses this average value as the maximum threshold. For rainfall and snow, the processor obtains the historical daily data collected by the meteorological station for the past year, sorts the rainfall and snow from low to high, respectively, takes the lowest top 5% of the data as the average value, and uses this average value as the standard threshold; takes the highest top 5% of the data as the average value, and uses this average value as the maximum threshold. For the update interval factor, the standard threshold can be set to 1 day and the maximum threshold can be set to 60 days based on historical data and experience. It should be noted that the maximum threshold and standard threshold of each influencing factor calculated based on historical data are default values. In actual applications, users can modify them according to actual needs.

[0077] An embodiment of the present application provides a processor configured to execute the above-mentioned method for updating a three-dimensional slope model.

[0078] Specifically, in an embodiment of the present application, the processor can be configured to: obtain current data of multiple influencing factors of each area of ​​the slope, wherein the multiple influencing factors include deformation influencing factors, meteorological influencing factors and update interval influencing factors; normalize the current data of the multiple influencing factors according to the maximum threshold and standard threshold predetermined for each influencing factor; based on a preset distance model, determine the update value of each type of influencing factor according to the result of the normalization processing, the maximum threshold, the standard threshold and the preset weights of each type of influencing factor; determine the comprehensive update value of the influencing factors of each area according to the preset weights of each type of influencing factors and the update value of each type of influencing factors through a preset comprehensive update value calculation model of the influencing factors; for any area, determine whether the area is a target area according to the comprehensive update value of the influencing factors; obtain point cloud data of the target area, and merge the point cloud data into the three-dimensional model of the slope to update the three-dimensional model of the slope.

[0079] In the embodiment of the present application, based on the preset distance model, the update value of each type of influencing factor is determined according to the result of the normalization processing, the preset maximum threshold, the preset standard threshold and the preset weights of each type of influencing factor, including formula (1):

[0080]

[0081] Among them, V i is the updated value of various impact factors, w ijis the weight of each impact factor among various impact factors, z ij is the normalized processing result of the real-time data of each influencing factor, y ij is the maximum threshold of each type of impact factor, x ij is the standard threshold of each type of influencing factor, x is the real-time data of each type of influencing factor, MF is the distance from the maximum value, and MS is the distance from the standard value.

[0082] In the embodiment of the present application, the processor may also be configured to: determine the operating area and the non-operating area in each area of ​​the slope according to a preset ore matching scheme;

[0083] Determine the comprehensive updated value of the influencing factors of each operation area according to the preset weights of various influencing factors and the updated values ​​of various influencing factors through the first calculation model;

[0084] Determine the comprehensive updated value of the influencing factors of each non-operating area according to the preset weights of various influencing factors and the updated values ​​of various influencing factors through the second calculation model;

[0085] The first calculation model includes formula (2):

[0086] V=(V1*O1+V2*O2+V3*O3) / K (2)

[0087] The second calculation model includes formula (3):

[0088] V=(V1*O1+V2*O2+V3*O3) (3)

[0089] Among them, V is the comprehensive updated value of the influencing factor, V1 is the updated value of the deformation influencing factor, V2 is the weight of the meteorological influencing factor, V3 is the weight of the update interval influencing factor, O1 is the weight of the deformation influencing factor, O2 is the weight of the meteorological influencing factor, O3 is the weight of the update interval influencing factor, O1+O2+O3=1, K is the addition constant, K>1.

[0090] In an embodiment of the present application, the processor can also be configured to: for any area, determine whether the comprehensive update value of the impact factor is less than the preset update threshold; if it is determined that the comprehensive update value of the impact factor is less than the preset update threshold, determine the area as the target area.

[0091] In the embodiment of the present application, the processor can also be configured to: for any target area, determine whether there is a mining truck within the preset range of the target area; when it is determined that there is a mining truck within the preset range of the target area, upon receiving the end operation signal of the mining truck, dispatch the mining truck to scan the target area to obtain first point cloud data; when it is determined that there is no mining truck within the preset range of the target area, dispatch a drone to scan the corresponding target area to obtain second point cloud data; and merge the first point cloud data and the second point cloud data into the three-dimensional model of the slope through the preset modeling software to update the three-dimensional model of the slope.

[0092] In the embodiment of the present application, the processor may also be configured to: obtain historical data of multiple influencing factors in all areas of the slope within a preset time range; and determine the maximum threshold and standard threshold of each influencing factor based on the historical data.

[0093] In an embodiment of the present application, the processor can also be configured to: for deformation-related influencing factors and meteorological influencing factors, determine the daily average data based on historical data within a preset time range; sort the daily average data in order from low to high; average the daily average data of a preset number of daily average data at the top of the sort to obtain a standard threshold; average the daily average data of a preset number of daily average data at the bottom of the sort to obtain a maximum threshold.

[0094] Through the above technical solution, the current data of multiple influencing factors of each area of ​​the slope are obtained, wherein the multiple influencing factors include deformation influencing factors, meteorological influencing factors and update interval influencing factors, and then the current data of multiple influencing factors are normalized according to the predetermined maximum threshold and standard threshold of each influencing factor, and then based on the preset distance model, the update value of each type of influencing factor is determined according to the result of the normalization process, the maximum threshold, the standard threshold and the preset weights of each type of influencing factor. Through the preset comprehensive update value calculation model of the influencing factor, the comprehensive update value of the influencing factor of each area is determined according to the preset weights of each type of influencing factor and the update value of each type of influencing factor. For any area, whether the area is the target area is determined according to the comprehensive update value of the influencing factor, and finally the point cloud data of the target area is obtained, and the point cloud data is merged into the three-dimensional model of the slope to update the three-dimensional model of the slope. The present application can comprehensively judge whether the slope area needs to be updated by comprehensively judging factors such as slope deformation, meteorology, and update interval, which is more efficient than manual judgment or single deformation judgment.

[0095] Figure 2 The structure diagram of a device for updating a three-dimensional slope model according to an embodiment of the present application is schematically shown. Figure 2 As shown, an embodiment of the present application provides a device for updating a three-dimensional slope model, which may include:

[0096] An acquisition module 201 is used to acquire current data of multiple influencing factors of each area of ​​the slope, wherein the multiple influencing factors include deformation influencing factors, meteorological influencing factors and update interval influencing factors;

[0097] A normalization processing module 202, used to normalize the current data of multiple influencing factors according to a predetermined maximum threshold and a standard threshold of each influencing factor;

[0098] The impact factor update value determination module 203 is used to determine the update value of each impact factor based on a preset distance model, according to the result of normalization processing, the maximum threshold, the standard threshold and the preset weights of each impact factor;

[0099] The impact factor comprehensive update value determination module 204 is used to determine the impact factor comprehensive update value of each region according to the preset weights of various impact factors and the update values ​​of various impact factors through a preset impact factor comprehensive update value calculation model;

[0100] A judgment module 205 is used to judge whether any region is a target region according to the comprehensive updated value of the impact factor;

[0101] The updating module 206 is used to obtain the point cloud data of the target area and merge the point cloud data into the three-dimensional slope model to update the three-dimensional slope model.

[0102] An embodiment of the present application further provides a machine-readable storage medium having instructions stored thereon, the instructions being used to enable a machine to execute the above-mentioned method for updating a three-dimensional model of a slope.

[0103] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0104] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0105] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0106] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0107] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0108] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0109] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0110] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0111] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.

Claims

1. A method for updating a three-dimensional slope model, characterized in that: The method comprises: Acquire current data of multiple influencing factors of each area of ​​the slope, wherein the multiple influencing factors include deformation influencing factors, meteorological influencing factors and update interval influencing factors; Normalizing the current data of the multiple influencing factors according to the predetermined maximum threshold and standard threshold of each influencing factor; Based on a preset distance model, determining an updated value of each type of the influencing factor according to a result of normalization processing, the maximum threshold, the standard threshold, and preset weights of each type of the influencing factor; Determine the comprehensive updated value of the impact factor of each region according to the preset weights of each type of impact factor and the updated value of each type of impact factor through a preset comprehensive updated value calculation model of the impact factor; For any of the regions, judging whether the region is a target region according to the comprehensive updated value of the impact factor; The point cloud data of the target area is obtained, and the point cloud data is merged into the three-dimensional model of the slope to update the three-dimensional model of the slope.

2. The method according to claim 1, characterized in that: The method based on the preset distance model determines the update value of each type of the influencing factor according to the result of the normalization processing, the preset maximum threshold, the preset standard threshold and the preset weights of each type of the influencing factor, including formula (1): Among them, V i is the updated value of each type of impact factor, w ij is the weight of each of the above mentioned impact factors, z ij is the normalized processing result of the real-time data of each of the various influencing factors, y ij is the maximum threshold of each of the above mentioned impact factors, x ij is the standard threshold of each of the various influencing factors, x is the real-time data of each of the various influencing factors, MF is the distance from the maximum value, and MS is the distance from the standard value.

3. The method according to claim 1, characterized in that: The impact factor comprehensive update value calculation model includes a first calculation model and a second calculation model. The comprehensive update value of the impact factor of each region is determined according to the preset weights of each type of the impact factor and the update values ​​of each type of the impact factor by using the preset impact factor comprehensive update value calculation model, including: Determine the operating area and the non-operating area in each area of ​​the slope according to a preset ore allocation plan; Determine the comprehensive updated value of the influencing factors of each operation area according to the preset weights of each type of influencing factors and the updated values ​​of each type of influencing factors through the first calculation model; Determine the comprehensive updated value of the influencing factors of each non-operating area according to the preset weights of each type of influencing factors and the updated values ​​of each type of influencing factors through the second calculation model; The first calculation model includes formula (2): V=(V1*O1+V2*O2+V3*O3) / K (2) The second calculation model includes formula (3): V=(V1*O1+V2*O2+V3*O3) (3) Among them, V is the comprehensive update value of the impact factor, V1 is the update value of the deformation impact factor, V2 is the weight of the meteorological impact factor, V3 is the weight of the update interval impact factor, O1 is the weight of the deformation impact factor, O2 is the weight of the meteorological impact factor, O3 is the weight of the update interval impact factor, O1+O2+O3=1, K is the addition constant, K>1。 4. The method according to claim 1, characterized in that: For any of the regions, judging whether the region is a target region according to the comprehensive updated value of the impact factor includes: For any of the regions, determining whether the comprehensive update value of the impact factor is less than a preset update threshold; When it is determined that the comprehensive update value of the impact factor is less than a preset update threshold, the area is determined as a target area.

5. The method according to claim 1, characterized in that: The step of acquiring the point cloud data of the target area and merging the point cloud data into the three-dimensional model of the slope to update the three-dimensional model of the slope includes: For any of the target areas, determine whether there is a mining card within a preset range of the target area; In the case where it is determined that there is a mining truck within the preset range of the target area, upon receiving an end-of-operation signal from the mining truck, scheduling the mining truck to scan the target area to obtain first point cloud data; When it is determined that there is no mining truck within the preset range of the target area, dispatching a drone to scan the corresponding target area to obtain second point cloud data; The first point cloud data and the second point cloud data are merged into the three-dimensional model of the slope through the preset modeling software to update the three-dimensional model of the slope.

6. The method according to claim 1, characterized in that: Determination of the maximum threshold and the standard threshold of each of the influencing factors includes: Obtain historical data of a plurality of said influencing factors in all areas of the slope within a preset time range; The maximum threshold and the standard threshold of each of the influencing factors are determined respectively according to the historical data.

7. The method according to claim 6, characterized in that: The determining the maximum threshold and the standard threshold of each of the influencing factors respectively according to the historical data includes: For the deformation influencing factors and meteorological influencing factors, daily average data are determined based on historical data within the preset time range; Sort the daily average data in descending order; The average value of the daily average data of the first-ranked preset number is calculated to obtain the standard threshold value; The daily average data of the preset number of items ranked later are averaged to obtain the maximum threshold value.

8. A processor, characterized in that: The method is configured to execute the method for updating a three-dimensional slope model according to any one of claims 1 to 7.

9. A device for updating a three-dimensional slope model, characterized in that: include: An acquisition module, used for acquiring current data of multiple influencing factors of each area of ​​the slope, wherein the multiple influencing factors include deformation influencing factors, meteorological influencing factors and update interval influencing factors; A normalization processing module, used for normalizing the current data of the multiple influencing factors according to the predetermined maximum threshold and standard threshold of each influencing factor; An impact factor update value determination module, used to determine the update value of each type of impact factor based on a preset distance model, according to the result of normalization processing, the maximum threshold, the standard threshold and the preset weights of each type of impact factor; An impact factor comprehensive update value determination module, used to determine the impact factor comprehensive update value of each region according to the preset weights of each type of impact factor and the update value of each type of impact factor through a preset impact factor comprehensive update value calculation model; A judgment module, used for judging whether any of the regions is a target region according to the comprehensive updated value of the impact factor; The updating module is used to obtain the point cloud data of the target area and merge the point cloud data into the three-dimensional model of the slope to update the three-dimensional model of the slope.

10. A machine-readable storage medium, characterized in that: The machine-readable storage medium stores instructions for causing a machine to execute the method for updating a three-dimensional slope model according to any one of claims 1 to 7.