Installation method of high-speed shaft system

By accurately positioning the main engine and gearbox on the hull, combined with the installation of laser instruments and elastic shafts, the problem of difficult installation accuracy of high-speed shaft systems is solved, and the high-precision installation of high-speed shaft systems is achieved to adapt to ship state and temperature changes.

CN118875700APending Publication Date: 2024-11-01CSSC HUANGPU WENCHONG SHIPBUILDING CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411007329.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

During the power transmission process, high-speed shaft systems are greatly affected by the ship's state and temperature, which makes it difficult for the installation accuracy to meet the high requirements, and the prior art is difficult to ensure the precise coordination and positioning accuracy of high-speed shaft systems.

Method used

By determining the installation positions of the main engine and gearbox on the hull, using laser centering instruments and rangefinders to determine the axis and bearing center positions, install axes one and two, and install elastic shafts on the axis, combining the height adjustment plate and Thermal expansion compensation ensures accurate installation of high-speed shaft systems.

Benefits of technology

It realizes the smooth installation of the high-speed shaft system, while ensuring the installation accuracy, meeting the high-precision requirements of the high-speed shaft system, and overcoming the impact of temperature and state changes on installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118875700A_ABST
    Figure CN118875700A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of ships, in particular to an installation method of a high-speed shaft system, which comprises the following steps of: centering a main engine; determining a head reference point and a tail reference point of a high-speed shaft system by taking an input flange of a gear box at the rear end of a main engine as a reference, determining an axis according to the head reference point and the tail reference point, and determining corresponding central positions of all high-speed bearings on the axis; high-speed bearings are installed on the first shaft and the second shaft, the first shaft is installed according to the axis and the center position, corresponding to the high-speed bearings, of the first shaft, the high-speed bearings of the first shaft are supported on a bearing seat, and one end of the first shaft is connected with an input flange of the gearbox; the second shaft is installed according to the axis and the center position of the high-speed bearing on the second shaft, and the distance between the second shaft and the first shaft is adjusted; an elastic shaft is installed between the second shaft and the first shaft and connected with the first shaft and the second shaft. According to the invention, the installation precision is ensured while the smooth installation of the high-speed shafting is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of ships, and in particular to an installation method of a high-speed shaft system. Background Art

[0002] The high-speed shafting of ships plays a very important role in the power transmission process. Therefore, the installation accuracy of the high-speed shafting of ships is crucial. The alignment of high-speed shafting is greatly affected by the state and temperature of the ship, and the position change of the main engine has a great impact on the alignment accuracy. Due to the high speed of the high-speed shafting, the high-speed shafting components require precise matching, complex installation, and high positioning accuracy, which is difficult to meet with existing technologies.

[0003] Therefore, a high-speed shaft system installation method is needed to solve the above problems. Summary of the invention

[0004] The object of the present invention is to provide a method for installing a high-speed shaft system, which can ensure smooth installation of the high-speed shaft system while ensuring installation accuracy.

[0005] To achieve this object, the present invention adopts the following technical solutions:

[0006] The installation method of the high-speed shaft system includes the following steps:

[0007] S1. Align the main engine and place the main engine and gearbox on the hull;

[0008] S2, determining the first reference point and the last reference point of the high-speed shaft system based on the input flange of the gear box at the rear end of the main engine, determining the axis based on the first reference point and the last reference point, and determining the corresponding center positions of all high-speed bearings on the axis;

[0009] S3, installing high-speed bearings on the No. 1 shaft and the No. 2 shaft, installing the No. 1 shaft according to the axis and the center position of the No. 1 shaft corresponding to the high-speed bearing, the high-speed bearing of the No. 1 shaft is supported on a bearing seat, and one end of the No. 1 shaft is connected to the input flange of the gear box;

[0010] S4, installing the second shaft according to the axis and the center position of the high-speed bearing on the second shaft, and adjusting the distance between the second shaft and the first shaft;

[0011] S5. Install an elastic shaft between the second shaft and the first shaft, wherein the elastic shaft is connected to the first shaft and the second shaft respectively.

[0012] Furthermore, in the step S1, the main engine is installed on a height adjustment plate, the height adjustment plate is arranged on the hull, and the height adjustment plate can adjust the height of the installation position of the main engine.

[0013] Furthermore, in the step S1, the main engine is aligned using a laser alignment instrument, and the installation position of the main engine in the axial direction of the high-speed shaft system is determined using a laser rangefinder.

[0014] Furthermore, in the step S2, the positions of the head reference point and the tail reference point of the high-speed shaft system are compensated according to the thermal expansion of the main engine and the gear box.

[0015] Furthermore, in the step S2, a laser centering instrument is arranged at the front end of the input flange of the gear box to determine the head reference point, the tail reference point and the axis.

[0016] Furthermore, in the step S2, a light target concentric with the high-speed bearing is manufactured, and the position of the light target is adjusted to determine the center position of the high-speed bearing.

[0017] Furthermore, in step S3, the flange at the end of the first shaft is opposite to the input flange of the gear box, and bolts are passed through the flange and the input flange for fixing.

[0018] Furthermore, in the step S5, couplings are fixedly installed at both ends of the elastic shaft, and the elastic shaft is connected to the first shaft and the second shaft through the couplings.

[0019] Furthermore, it also includes step S6, weighing the high-speed shaft system, setting force measuring support devices at the positions where the high-speed bearings are installed on the No. 1 shaft and the No. 2 shaft, rotating the No. 1 shaft, detecting the change in the supporting force of each of the force measuring support devices, and adjusting the height of the high-speed bearings as needed until the high-speed shaft system meets the installation requirements.

[0020] Furthermore, the method further comprises step S7 of installing the main engine, the gear box and the high-speed shaft system on the hull.

[0021] Beneficial effects of the present invention:

[0022] The present invention provides a method for installing a high-speed shaft system. First, the main engine is centered, and the main engine and the gearbox are set on the hull. The head reference point and the tail reference point of the high-speed shaft system are determined based on the input flange of the gearbox at the rear end of the main engine, the axis is determined based on the head reference point and the tail reference point, and the corresponding center positions of all high-speed bearings are determined on the axis. High-speed bearings are installed on the No. 1 shaft and the No. 2 shaft, and the No. 1 shaft is installed based on the axis and the center position of the high-speed bearing corresponding to the No. 1 shaft. The high-speed bearing of the No. 1 shaft is supported on the bearing seat, and one end of the No. 1 shaft is connected to the input flange of the gearbox. The No. 2 shaft is installed based on the axis and the center position of the high-speed bearing on the No. 2 shaft, and the distance between the No. 2 shaft and the No. 1 shaft is adjusted. Finally, an elastic shaft is installed between the No. 2 shaft and the No. 1 shaft, and the elastic shaft is connected to the No. 1 shaft and the No. 2 shaft respectively. By first determining the installation position of the main engine and the gearbox on the hull, then determining the head reference point and the tail reference point of the high-speed shaft system based on the input flange of the gearbox, and determining the corresponding center position of the high-speed bearing on the axis between the head reference point and the tail reference point. The No. 1 and No. 2 shafts are installed according to the axis and the center position of the No. 1 shaft corresponding to the high-speed bearing, and the elastic shaft is installed between the No. 1 and No. 2 shafts, so as to realize the installation of the high-speed shaft system. This can ensure the smooth installation of the high-speed shaft system and the installation accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments of the present invention. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the contents of the embodiments of the present invention and these drawings without paying any creative work.

[0024] Figure 1 It is a schematic diagram for determining the installation position of the high-speed bearing in the present invention;

[0025] Figure 2 It is a schematic diagram of the installation of the high-speed shaft system in the present invention.

[0026] In the figure:

[0027] 1. Main machine; 2. Input flange; 3. Laser centering instrument; 4. Light target; 5. High-speed bearing; 6. Shaft No. 1; 7. Shaft No. 2; 8. Elastic shaft; 81. Coupling. DETAILED DESCRIPTION

[0028] Before any embodiments of the application are explained in detail, it is to be understood that the application is not limited in its application to the details of construction and the arrangement of components set forth in the following description or illustrated in the above drawings.

[0029] In this application, the terms "comprises", "includes", "has" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device that includes a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of more restrictions, an element defined by the sentence "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or device that includes the element.

[0030] In the present application, the terms "connect", "combine", "couple", and "install" may refer to direct connection, combination, coupling, or installation, or indirect connection, combination, coupling, or installation. For example, direct connection refers to two parts or components being connected together without the need for an intermediary, and indirect connection refers to two parts or components being connected to at least one intermediary respectively, and the two parts or components being connected via the intermediary. In addition, "connect" and "couple" are not limited to physical or mechanical connections or couplings, and may include electrical connections or couplings.

[0031] In this application, it will be understood by those skilled in the art that the function performed by a component can be performed by one component, multiple components, one part, or multiple parts. Similarly, the function performed by a part can also be performed by one part, one component, or a combination of multiple parts.

[0032] In the present application, the terms "upper", "lower", "left", "right", "front", "back" and other directional words are described based on the orientation and positional relationship shown in the accompanying drawings, and should not be understood as limiting the embodiments of the present application. In addition, in the context, it is also necessary to understand that when it is mentioned that an element is connected to another element "upper" or "lower", it can not only be directly connected to another element "upper" or "lower", but also indirectly connected to another element "upper" or "lower" through an intermediate element. It should also be understood that directional words such as upper side, lower side, left side, right side, front side, back side, etc. not only represent the positive orientation, but can also be understood as the lateral orientation. For example, the bottom can include directly below, lower left, lower right, lower front, and lower back, etc.

[0033] When installing high-speed shafting on a ship, in order to ensure smooth installation of the high-speed shafting and installation accuracy, Figure 1-Figure 2 As shown, the present invention provides a method for installing a high-speed shaft system. The method for installing a high-speed shaft system comprises the following steps:

[0034] S1, align the main engine 1, and set the main engine 1 and the gearbox on the hull;

[0035] S2. Determine the first reference point and the last reference point of the high-speed shaft system based on the input flange 2 of the gear box at the rear end of the main engine 1, determine the axis based on the first reference point and the last reference point, and determine the corresponding center positions of all high-speed bearings 5 ​​on the axis;

[0036] S3, install the high-speed bearing 5 on the No. 1 shaft 6 and the No. 2 shaft 7, install the No. 1 shaft 6 according to the axis and the center position of the No. 1 shaft 6 corresponding to the high-speed bearing 5, the high-speed bearing 5 of the No. 1 shaft 6 is supported on the bearing seat, and one end of the No. 1 shaft 6 is connected to the input flange 2 of the gear box;

[0037] S4, installing the No. 2 shaft 7 according to the axis and the center position of the high-speed bearing 5 on the No. 2 shaft 7, and adjusting the distance between the No. 2 shaft 7 and the No. 1 shaft 6;

[0038] S5. Install the elastic shaft 8 between the second shaft 7 and the first shaft 6. The elastic shaft 8 is connected to the first shaft 6 and the second shaft 7 respectively.

[0039] The installation positions of the main engine 1 and the gearbox are first determined on the hull, and then the fore and aft reference points of the high-speed shafting are determined based on the input flange 2 of the gearbox, and the corresponding center position of the high-speed bearing 5 is determined on the axis between the fore and aft reference points. The No. 1 shaft 6 and the No. 2 shaft 7 are installed based on the axis and the center position of the No. 1 shaft 6 corresponding to the high-speed bearing 5, and the elastic shaft 8 is installed between the No. 1 shaft 6 and the No. 2 shaft 7, so as to realize the installation of the high-speed shafting. The high-speed shafting can be smoothly installed while ensuring the installation accuracy.

[0040] Furthermore, in step S1, the host 1 is installed on a height adjustment plate, which is arranged on the hull, and the height adjustment plate can adjust the height of the installation position of the host 1. Since the host 1 is installed on the shock absorber of the host 1 when it is installed on the hull, the shock absorber has a certain elastic floating amount. Therefore, in this embodiment, the rigid centering is first performed and then the elastic centering is performed. By making a height adjustment plate, the rigid adjustment position and the elastic adjustment position of the host 1 are formulated, the unstable state of the centering data of the host 1 is overcome, the compression amount of the shock absorber of the host 1 is adjusted, and the centering adjustment of the host 1 is achieved.

[0041] Furthermore, in step S1, the main engine 1 is aligned using a laser alignment instrument 3, and the installation position of the main engine 1 in the axial direction of the high-speed shaft system is determined using a laser rangefinder. In this way, it can be ensured that within the length range of the high-speed shaft system, the input flange 2 of the gearbox and the flange opening of the main engine 1 meet the tolerance requirements.

[0042] Furthermore, in step S2, the positions of the head reference point and the tail reference point of the high-speed shaft system are compensated according to the thermal expansion of the main engine 1 and the gear box. Since the main engine 1 and the gear box are affected by thermal expansion during operation, there is a deviation in the centering. By performing compensation, it can be ensured that the installation of the high-speed shaft system is more in line with the actual working conditions and that the installation of the high-speed shaft system meets the operating requirements.

[0043] Furthermore, in step S2, a laser alignment instrument 3 is set at the front end of the input flange 2 of the gearbox to determine the first reference point, the last reference point and the axis. By using the laser alignment instrument 3, a laser can be emitted to simulate the axis, which is convenient for the subsequent reference alignment of the high-speed bearing 5.

[0044] Furthermore, in step S2, a light target 4 is made concentric with the high-speed bearing 5, and the position of the light target 4 is adjusted to determine the center position of the high-speed bearing 5. Specifically, the light is illuminated through the head reference point and the tail reference point, and the center position of each high-speed bearing 5 is adjusted and determined according to the compensation value of the thermal expansion of the host 1 and the gear box to ensure the accuracy of the center position of the high-speed bearing 5 installed.

[0045] Furthermore, when the inner sleeve of the high-speed bearing 5 is press-fitted, the inner sleeve of the bearing on the No. 1 shaft 6 is press-fitted first, and then the inner sleeve of the high-speed bearing 5 on the No. 2 shaft 7 is press-fitted. When press-fitting, pay attention to the cleanliness of the installation position of the high-speed bearing 5 and the cleanliness of the high-speed bearing 5. And according to the arrangement of the high-speed bearing 5, measure the position of the high-speed bearing 5 on the No. 1 shaft 6 and the No. 2 shaft 7, and draw the press-fitting position. When press-fitting, use a hydraulic cylinder to press-fit. The initial press-fitting pressure and press-fitting depth should meet the requirements of the drawing documents. After the press-fitting is in place, record the final pressure, and install the locking nut and retaining ring.

[0046] Furthermore, in step S3, the flange at the end of the first shaft 6 is opposite to the input flange 2 of the gearbox, and bolts are passed through the flange and the input flange 2 for fixing. In this way, the first shaft 6 can be accurately connected to the gearbox.

[0047] Furthermore, in step S5, couplings 81 are fixedly installed at both ends of the elastic shaft 8, and the elastic shaft 8 is connected to the first shaft 6 and the second shaft 7 through the couplings 81. Specifically, the coupling 81 is pressed onto the shaft end of the elastic shaft 8 by cold pressing with a tool, and the coupling 81 is radially expanded and axially pressed with a hydraulic jack and a press tool plate until it is in place. Then, the elastic shaft 8 is docked with the first shaft 6 and the second shaft 7 through the flange at the end of the coupling 81.

[0048] Furthermore, the installation method of the high-speed shaft system also includes step S6, weighing the high-speed shaft system, setting force measuring support devices at the positions where the high-speed bearings 5 ​​are installed on the No. 1 shaft 6 and the No. 2 shaft 7, rotating the No. 1 shaft 6, detecting the change in the supporting force of each force measuring support device, and adjusting the height of the high-speed bearing 5 as needed until the high-speed shaft system meets the installation requirements. In the above manner, the force of each high-speed bearing 5 can be detected, so as to determine whether the installation of the high-speed shaft system is appropriate, and by adjusting the position of the high-speed bearing 5, it can be ensured that the installation of the high-speed shaft system meets the requirements.

[0049] Furthermore, the installation method of the high-speed shaft system also includes step S7, installing the main engine 1, the gearbox and the high-speed shaft system on the hull. Specifically, the epoxy pads of the main engine 1 are cast, the pads of the high-speed bearing 5 are brushed, and the anchor bolts of the main engine 1 and the gearbox are installed. The bulkhead stuffing box is positioned and installed, and the movable gasket of the high-speed bearing 5 is brushed, etc. After completion, the high-speed shaft system is weighed and the inappropriate positions are adjusted again until the installation requirements are met.

[0050] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. The installation method of high-speed shaft system is characterized in that: The steps include: S1, aligning the main engine (1), and placing the main engine (1) and the gearbox on the hull; S2, determining the first reference point and the last reference point of the high-speed shaft system based on the input flange (2) of the gear box at the rear end of the main engine (1), determining the axis based on the first reference point and the last reference point, and determining the corresponding center positions of all high-speed bearings (5) on the axis; S3, installing a high-speed bearing (5) on the No. 1 shaft (6) and the No. 2 shaft (7), installing the No. 1 shaft (6) according to the axis and the center position of the No. 1 shaft (6) corresponding to the high-speed bearing (5), the high-speed bearing (5) of the No. 1 shaft (6) is supported on a bearing seat, and one end of the No. 1 shaft (6) is connected to the input flange (2) of the gear box; S4, installing the second shaft (7) according to the axis and the center position of the high-speed bearing (5) on the second shaft (7), and adjusting the distance between the second shaft (7) and the first shaft (6); S5. Install an elastic shaft (8) between the second shaft (7) and the first shaft (6), wherein the elastic shaft (8) is connected to the first shaft (6) and the second shaft (7) respectively.

2. The method for installing a high-speed shaft system according to claim 1, characterized in that: In the step S1, the main engine (1) is installed on a height adjustment plate, the height adjustment plate is arranged on the hull, and the height adjustment plate can adjust the height of the installation position of the main engine (1).

3. The method for installing a high-speed shaft system according to claim 1, characterized in that: In the step S1, the main engine (1) is aligned using a laser alignment instrument (3), and the installation position of the main engine (1) in the axial direction of the high-speed shaft system is determined using a laser rangefinder.

4. The method for installing a high-speed shaft system according to claim 1, characterized in that: In the step S2, the positions of the head reference point and the tail reference point of the high-speed shaft system are compensated according to the thermal expansion of the main engine (1) and the gear box.

5. The method for installing a high-speed shaft system according to claim 1, characterized in that: In the step S2, a laser centering instrument (3) is arranged at the front end of the input flange (2) of the gear box to determine the first reference point, the last reference point and the axis.

6. The method for installing a high-speed shaft system according to claim 1, characterized in that: In the step S2, a light target (4) is manufactured which is concentric with the high-speed bearing (5), and the position of the light target (4) is adjusted to determine the center position of the high-speed bearing (5).

7. The method for installing a high-speed shaft system according to claim 1, characterized in that: In the step S3, the flange at the end of the first shaft (6) is opposite to the input flange (2) of the gear box, and bolts are passed through the flange and the input flange (2) for fixing.

8. The method for installing a high-speed shaft system according to claim 1, characterized in that: In the step S5, couplings (81) are fixedly installed at both ends of the elastic shaft (8), and the elastic shaft (8) is connected to the first shaft (6) and the second shaft (7) through the couplings (81).

9. The method for installing a high-speed shaft system according to claim 1, characterized in that: The method further includes step S6, weighing the high-speed shaft system, arranging force measuring support devices at the positions where the high-speed bearings (5) are installed on the No. 1 shaft (6) and the No. 2 shaft (7), rotating the No. 1 shaft (6), detecting changes in the supporting force of each of the force measuring support devices, and adjusting the height of the high-speed bearings (5) as needed until the high-speed shaft system meets the installation requirements.

10. The method for installing a high-speed shaft system according to claim 1, characterized in that: The method further comprises step S7 of installing the main engine (1), the gear box and the high-speed shaft system on the hull.

Citation Information

Patent Citations

  • Alignment and mounting method for reamer suction dredger cutter shafting

    CN108915011A

  • Ship propulsion shaftingalignment method

    CN109764832A

  • Ship shafting centering method and related equipment

    CN115464387A

  • Method for installing host with elastic support

    CN115593583A

  • Installation Method of Drive Shafting for Special Ship

    KR1020110126906A