Shell outfitting integrated modular construction method for deep sea resource exploration ship
Through the integrated modular construction method of the deep-sea resource exploration ship, segmentation and modular design, the problems of complex assembly and insufficient coating bonding in the existing technology are solved, and the assembly process is simplified and safety is improved.
Patent Information
- Application Number
- CN202411125928.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-01
AI Technical Summary
The existing construction methods used for deep-sea resource exploration ships are complicated and complex in assembly processes, extending the construction cycle, and insufficient binding force between the coating and the hull, which affects the safety of exploration projects.
The integrated modular construction method of shell coating is adopted to ensure a good combination of coating materials and hull through hull segmentation, software modeling, modular design and segmented coating, and reduce the complexity of later assembly and trial and error adjustments.
It simplifies the ship assembly process, shortens the construction cycle, enhances the combination of coating materials and hull, ensures the safety of ship exploration projects, and reduces the labor intensity of staff.
Smart Images

Figure CN118877147A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of shipbuilding, and in particular to a modular construction method for a hull, superstructure and coating integrated with a deep-sea resource exploration vessel. Background Art
[0002] Deep-sea resource exploration vessels are marine engineering vessels used for deep-sea geological exploration. They are specially designed for deep-sea geological exploration. They carry various exploration equipment, such as seismometers, magnetometers, gravimeters, etc., to detect the geological structure of the seabed, the distribution of mineral deposits and other information. These ships play a vital role in the exploration of marine oil, natural gas, polymetallic nodules, methane hydrate and other resources. During the exploration process, deep-sea resource exploration vessels usually have a variety of exploration methods, and can carry out seismic exploration, magnetic exploration, gravity exploration and other physical exploration methods simultaneously or separately to obtain comprehensive seabed geological information. Existing deep-sea resource exploration vessels are used for The construction method of resource exploration ships can basically meet daily construction needs, but the assembly process is completed centrally in the later stage of ship construction. The assembly process is cumbersome and complicated, which prolongs the construction period of the ship; at the same time, the interference problem of outfitting parts cannot be corrected before assembly, and trial and error improvement is required during the assembly process, which increases the workload of the staff; and the existing painting process for the hull in the construction process is single, the environment of deep-sea geological exploration is complex, and the reduced bonding force between the paint and the hull will affect the safety of the ship exploration project. Therefore, it is very necessary to design a modular construction method for hull and outfitting for deep-sea resource exploration ships. Summary of the invention
[0003] The object of the present invention is to provide a modular construction method for the integrated hull, superstructure and coating of a deep-sea resource exploration vessel, so as to solve the problems raised in the above-mentioned background technology.
[0004] To achieve the above object, the present invention provides the following technical solution: a modular construction method for the hull, outfitting and coating of a deep-sea resource exploration ship, comprising the following steps: step one, preliminary preparation; step two, hull division; step three, sample processing; step four, unit outfitting; step five, modeling and simulation; step six, section painting; step seven, whole outfitting repair; step eight, inspection and delivery;
[0005] In the above step 1, the functional structure of the exploration vessel is designed according to actual needs, and after the design drawings are determined, production preparations are carried out and materials are purchased;
[0006] In the above step 2, the hull is divided into sections according to the design drawings determined in the above step 1, and then software modeling is performed according to the divided structure, and after the size is determined, the lofting process is performed, and then the steel is called according to the lofting structure for pretreatment and processing to obtain the assembly panels of the hull for standby;
[0007] In the above step 3, the assembled panels prepared in the above step 2 are respectively marked, and then mechanically polished. After the mechanical polishing is completed, they are placed in a pickling tank for micro-etching. After the micro-etching, the panels are taken out and placed in clean water for continuous rinsing. After continuous rinsing, they are placed in a constant temperature room for static drying. After static drying, the panels to be coated are obtained for standby use;
[0008] In the above step 4, the outfitting parts on the ship are modularly designed according to functions or areas, and corresponding independent module drawings are drawn;
[0009] In the above step 5, separate modeling is performed according to the independent module drawings in the above step 4. After the modeling is completed, the design deviation is determined by pre-installation, and then the module drawings are adjusted according to the design deviation. After the adjustment, the modeling is performed again, and then the simulation assembly is performed. After the simulation assembly is completed, the corresponding modular pre-installation is performed in the outfitting assembly workshop according to the module drawings, and the pre-installed outfitting group is obtained after pre-installation for standby use;
[0010] In the above step 6, the plate to be painted prepared in the above step 3 is transported to the painting workshop for segmented painting;
[0011] In the above step 7, the pre-installed outfitting groups are assembled according to the design drawings, and the painted plates are installed, and repair treatment is performed after installation;
[0012] In the above step eight, the vessel is tested for water entry and delivered after the test is completed.
[0013] As a further technical solution of the present invention, in the step 2, the lofting process is performed after the size is determined, and the accuracy and smoothness of the hull shape need to be ensured; and in the process of modeling using the software, preset splicing needs to be performed, and the strength of the plate needs to be pre-checked through finite element analysis.
[0014] As a further technical solution of the present invention, in the step 2, the hull is segmented according to geometric characteristics and structural parts, mainly divided into plane segments, curved surface segments, semi-stereoscopic segments and stereoscopic segments.
[0015] As a further technical solution of the present invention, in step three, the water-contacting surface and the built-in surface need to be marked on the plate during the marking process, wherein the water-contacting surface is the plane that contacts the water body after assembly, and the built-in surface is the internal surface facing the hull after assembly. The micro-etching treatment uses dilute hydrochloric acid with a concentration of 5% to 10% for immersion, and the micro-etching treatment time is 15 to 20 minutes. During the micro-etching treatment, a protective layer needs to be attached to the built-in surface.
[0016] As a further technical solution of the present invention, in the step three, the continuous rinsing time is 5 to 7 minutes, the temperature in the constant temperature chamber during the static drying process is 65 to 78° C., and the static drying time is 45 to 60 minutes.
[0017] As a further technical solution of the present invention, in the step 4, the outfitting on the ship includes hull outfitting, piping equipment outfitting, external outfitting, cabin outfitting and other special equipment, wherein the hull outfitting includes basic components such as doors, windows, ladders, covers, handrails, railings and mooring piles, and deck outfitting; the piping equipment outfitting includes various pipelines, valves, pipeline accessories and ventilation ducts and other piping outfitting, as well as equipment base structures; the external outfitting includes anchor equipment, rudder equipment, mooring and towing equipment, lifting equipment, life-saving and fire-fighting equipment, as well as hatch covers and roll-on / roll-off equipment; the cabin outfitting includes furniture such as beds, tables, chairs, lighting and ventilation equipment and sanitary equipment; other special equipment includes deep-sea exploration equipment, navigation and positioning systems and communication transmission equipment.
[0018] As a further technical solution of the present invention, in step five, it is necessary to ensure that the individual outfitting parts with the same functions are completely spliced during the pre-installation process, and on this basis, it is determined whether there is a design deviation based on whether there is design interference.
[0019] As a further technical solution of the present invention, in step six, the segmented coating treatment includes three processes: primer coating, intermediate coating and topcoat coating. Before primer coating, the plate should be subjected to steps such as rust removal, cleaning and polishing, and then the primer is sprayed to enhance the adhesion between the coating and the substrate; the intermediate coating is applied after the primer is dry to fill the minor defects in the primer and enhance the anti-corrosion performance of the coating; the topcoat is applied after the intermediate coating to provide a beautiful appearance and enhance the weather resistance and corrosion resistance of the coating.
[0020] As a further technical solution of the present invention, in step six, the primer coating uses iron red cathode electrophoretic primer, which adheres to the plate after spraying and has good adhesion and corrosion resistance; the segmented coating treatment uses epoxy intermediate paint raw materials, which are composed of epoxy resin and curing agent, and have excellent chemical resistance, water resistance and wear resistance; the topcoat coating uses epoxy micaceous iron intermediate paint with epoxy resin as the main film-forming substance and micaceous iron as the pigment, so that the prepared coating has excellent anti-corrosion performance and adhesion.
[0021] As a further technical solution of the present invention, in step eight, the ship entry detection includes hull detection, underwater engineering detection, size and mark inspection, tilt test and electromechanical equipment inspection.
[0022] Compared with the prior art, the beneficial effects of the present invention are as follows: the modular construction method for the hull, outfitting and coating of a deep-sea resource exploration ship divides the hull into sections, performs software modeling according to the divided structure, and determines the hull panels in sections, then modularizes the outfitting parts on the ship according to functions or regions, draws corresponding independent module drawings, and performs modular pre-installation after simulated assembly, thereby realizing the modular construction process of the hull, outfitting and coating of the exploration ship, simplifying the later ship assembly process, and shortening the ship construction period; the surface structure of the panel is refined by mechanically grinding and micro-etching the assembled panels in sequence, the bonding strength between the coating material and the hull is increased, the coating is prevented from falling off, and the safety of the ship exploration project is ensured; independent module drawings are used for separate modeling, and after the modeling is completed, the design deviation is determined by pre-installation, and then the module drawings are adjusted according to the design deviation, so that the design interference problem of the structure can be found before assembly, without trial and error adjustment on site, reducing the labor intensity of the staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a flow chart of the construction method of the present invention. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] Please see attached Figure 1 The present invention provides an embodiment: a modular construction method for the hull, outfitting and coating of a deep-sea resource exploration ship, comprising the following steps: step one, preliminary preparation; step two, hull division; step three, sample processing; step four, unit outfitting; step five, modeling and simulation; step six, section painting; step seven, whole outfitting repair; step eight, inspection and delivery;
[0026] In the above step 1, the functional structure of the exploration vessel is designed according to actual needs, and after the design drawings are determined, production preparations are carried out and materials are purchased;
[0027] In the above step 2, the hull is divided into sections according to the design drawings determined in the above step 1, and then software modeling is performed according to the divided structure. After the size is determined, the lofting process is performed, and then the steel is called according to the lofting structure for pre-processing and processing to obtain the assembled panels of the hull for standby use; after the size is determined, the lofting process is performed to ensure the accuracy and smoothness of the hull shape; and in the process of modeling using the software, preset splicing is required, and the strength of the plate is pre-checked through finite element analysis; the hull is divided into sections according to the geometric characteristics and the parts to which the structure belongs, mainly divided into plane sections, curved surface sections, semi-stereoscopic sections and stereoscopic sections;
[0028] In the above step three, the assembled panels prepared in the above step two are marked respectively, and then mechanically polished after marking. After mechanical polishing, they are placed in a pickling tank for micro-etching. After micro-etching, the panels are taken out and placed in clean water for continuous rinsing. After continuous rinsing, they are placed in a constant temperature chamber for static drying. After static drying, the panels to be coated are obtained for standby use; during the marking process, the water-touching surface and the built-in surface need to be marked on the panels, wherein the water-touching surface is the plane that contacts the water body after assembly, and the built-in surface is the inner surface facing the hull after assembly. The micro-etching is carried out by soaking in dilute hydrochloric acid with a concentration of 5% to 10%, and the micro-etching time is 15 to 20 minutes. During the micro-etching process, a protective layer needs to be attached to the built-in surface; the continuous rinsing time is 5 to 7 minutes, the temperature in the constant temperature chamber during the static drying process is 65 to 78°C, and the static drying time is 45 to 60 minutes;
[0029] In the above step 4, the outfitting parts on the ship are modularly designed according to functions or areas, and the corresponding independent module drawings are drawn; the outfitting parts on the ship include hull outfitting parts, piping equipment outfitting parts, external outfitting equipment, cabin outfitting parts and other special equipment, among which hull outfitting parts include basic components such as doors, windows, ladders, covers, handrails, railings and mooring piles, and deck outfitting parts; piping equipment outfitting parts include various pipelines, valves, pipeline accessories and ventilation ducts and other piping outfitting parts, as well as equipment base structures; external outfitting equipment includes anchor equipment, rudder equipment, mooring and towing equipment, lifting equipment, life-saving and fire-fighting equipment, hatch covers and roll-on / roll-off equipment; cabin outfitting parts include furniture such as beds, tables, chairs, lighting and ventilation equipment and sanitary equipment; other special equipment includes deep-sea exploration equipment, navigation and positioning systems and communication transmission equipment;
[0030] In the above step 5, separate modeling is performed according to the independent module drawings in the above step 4. After the modeling is completed, the design deviation is determined by pre-installation. Then, the module drawings are adjusted according to the design deviation. After the adjustment, the modeling is performed again. Then, simulation assembly is performed. After the simulation assembly is completed, the corresponding modular pre-installation is performed in the outfitting assembly workshop according to the module drawings. After pre-installation, a pre-installed outfitting group is obtained for standby use. During the pre-installation process, it is necessary to ensure that the separate outfitting parts with the same function are completely spliced. On this basis, whether there is a design deviation is determined based on whether there is design interference.
[0031] In the above step six, the plate to be painted prepared in the above step three is transferred to the painting workshop for segmented painting treatment; the segmented painting treatment includes three processes of primer painting, intermediate paint painting and topcoat painting, wherein the plate is subjected to rust removal, cleaning and polishing before primer painting, and then the primer is sprayed to enhance the adhesion between the coating and the substrate; the intermediate paint is applied after the primer is dried to fill the minor defects in the primer and enhance the anti-corrosion performance of the coating; the topcoat is applied after the intermediate paint is applied to provide a beautiful appearance and enhance the weather resistance and corrosion resistance of the coating; the primer is applied with iron red cathode electrophoretic primer, which adheres to the plate after spraying and has good adhesion and corrosion resistance; the segmented painting treatment uses epoxy intermediate paint raw materials, which are composed of epoxy resin and curing agent and have excellent chemical resistance, water resistance and wear resistance; the topcoat uses epoxy micaceous iron intermediate paint with epoxy resin as the main film-forming substance and micaceous iron as the pigment, so that the prepared coating has excellent anti-corrosion performance and adhesion;
[0032] In the above step 7, the pre-installed outfitting groups are assembled according to the design drawings, and the painted plates are installed, and repair treatment is performed after installation;
[0033] In the above step eight, the ship is tested for water entry, which includes hull inspection, underwater engineering inspection, size and mark inspection, tilt test and electromechanical equipment inspection. The ship will be delivered after the inspection.
[0034] Based on the above, the advantage of the present invention is that when the present invention is used, the hull is divided into sections, and software modeling is performed according to the divided structure to determine the hull panels in sections, and then the outfitting on the ship is modularly designed according to function or area, and the corresponding independent module drawings are drawn, and modular pre-installation is performed after simulated assembly, thereby realizing the modular construction process of the hull, outfitting and coating of the exploration ship, simplifying the later ship assembly process, and shortening the ship construction period; the surface structure of the panel is refined by mechanical grinding and micro-etching treatment of the assembled panels in sequence, the bonding strength between the coating material and the hull is increased, the coating is prevented from falling off, and the safety of the ship exploration project is ensured; by using independent module drawings for separate modeling, after the modeling is completed, the design deviation is determined by pre-installation, and then the module drawings are adjusted according to the design deviation, so that the design interference problem of the structure can be discovered before assembly, without the need for trial and error adjustment on site, thereby reducing the labor intensity of the staff.
[0035] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. A modular construction method for a hull, outfitting and coating integrated device for a deep-sea resource exploration vessel, comprising the following steps: Step 1: Preliminary preparation; Step 2: Hull division; Step 3: Sample processing; Step 4: Unit outfitting; Step 5: Modeling and simulation; Step 6: Section painting; Step 7: Whole-body repair; Step 8: Detection and delivery; it is characterized by: In the above step 1, the functional structure of the exploration vessel is designed according to actual needs, and after the design drawings are determined, production preparations are carried out and materials are purchased; In the above step 2, the hull is divided into sections according to the design drawings determined in the above step 1, and then software modeling is performed according to the divided structure, and after the size is determined, the lofting process is performed, and then the steel is called according to the lofting structure for pretreatment and processing to obtain the assembly panels of the hull for standby; In the above step 3, the assembled panels prepared in the above step 2 are respectively marked, and then mechanically polished. After the mechanical polishing is completed, they are placed in a pickling tank for micro-etching. After the micro-etching, the panels are taken out and placed in clean water for continuous rinsing. After continuous rinsing, they are placed in a constant temperature room for static drying. After static drying, the panels to be coated are obtained for standby use; In the above step 4, the outfitting parts on the ship are modularly designed according to functions or areas, and corresponding independent module drawings are drawn; In the above step 5, separate modeling is performed according to the independent module drawings in the above step 4. After the modeling is completed, the design deviation is determined by pre-installation, and then the module drawings are adjusted according to the design deviation. After the adjustment, the modeling is performed again, and then the simulation assembly is performed. After the simulation assembly is completed, the corresponding modular pre-installation is performed in the outfitting assembly workshop according to the module drawings, and the pre-installed outfitting group is obtained after pre-installation for standby use; In the above step 6, the plate to be painted prepared in the above step 3 is transported to the painting workshop for segmented painting; In the above step 7, the pre-installed outfitting groups are assembled according to the design drawings, and the painted plates are installed, and repair treatment is performed after installation; In the above step eight, the vessel is tested for water entry and delivered after the test is completed.
2. The modular construction method for the hull, superstructure and coating of a deep-sea resource exploration vessel according to claim 1, characterized in that: In the step 2, the lofting process is performed after the size is determined, and the accuracy and smoothness of the hull shape need to be ensured; and in the process of modeling using the software, preset splicing needs to be performed, and the strength of the plate needs to be pre-checked through finite element analysis.
3. The modular construction method for the hull, superstructure and coating integrated with a deep-sea resource exploration vessel according to claim 1, characterized in that: In the step 2, the hull is segmented according to geometric features and structural parts, mainly into plane segments, curved segments, semi-stereoscopic segments and stereoscopic segments.
4. The modular construction method for the hull, superstructure and coating integrated with a deep-sea resource exploration vessel according to claim 1, characterized in that: In step three, the water-touching surface and the built-in surface need to be marked on the plate during the marking process, wherein the water-touching surface is the plane that contacts the water body after assembly, and the built-in surface is the inner surface facing the hull after assembly. The micro-etching treatment uses 5% to 10% dilute hydrochloric acid for immersion, and the micro-etching time is 15 to 20 minutes. During the micro-etching process, a protective layer needs to be attached to the built-in surface.
5. The modular construction method for the integrated hull, superstructure and coating of a deep-sea resource exploration vessel according to claim 1, characterized in that: In the step three, the continuous rinsing time is 5 to 7 minutes, the temperature in the constant temperature chamber during the static drying process is 65 to 78° C., and the static drying time is 45 to 60 minutes.
6. The modular construction method for the hull, superstructure and coating integrated with a deep-sea resource exploration vessel according to claim 1, characterized in that: In the step 4, the outfitting on the ship includes hull outfitting, piping equipment outfitting, external outfitting, cabin outfitting and other special equipment, wherein the hull outfitting includes basic components such as doors, windows, ladders, covers, handrails, railings and mooring bollards, and deck outfitting; the piping equipment outfitting includes various pipelines, valves, pipeline accessories and ventilation ducts and other piping outfitting, as well as equipment base structures; the external outfitting includes anchor equipment, rudder equipment, mooring and towing equipment, lifting equipment, life-saving and fire-fighting equipment, as well as hatch covers and roll-on / roll-off equipment; the cabin outfitting includes furniture such as beds, tables, chairs, lighting and ventilation equipment and sanitary equipment; other special equipment includes deep-sea exploration equipment, navigation and positioning systems and communication transmission equipment.
7. The modular construction method for the integrated hull, superstructure and coating of a deep-sea resource exploration vessel according to claim 1, characterized in that: In step five, it is necessary to ensure that the individual outfitting parts with the same functions are completely spliced during the pre-installation process, and on this basis, determine whether there is a design deviation based on whether there is design interference.
8. The modular construction method for hull, superstructure and coating integration for deep-sea resource exploration vessels according to claim 1, characterized in that: In step 6, the segmented coating process includes three processes: primer coating, intermediate coating and topcoat coating. Before primer coating, the plate is subjected to rust removal, cleaning and polishing, and then the primer is sprayed to enhance the adhesion between the coating and the substrate. The intermediate paint is applied after the primer has dried to fill in the minor defects in the primer and enhance the anti-corrosion performance of the coating; the topcoat is applied after the intermediate paint to provide a beautiful appearance and enhance the weather resistance and corrosion resistance of the coating.
9. The modular construction method for the hull, superstructure and coating integrated with a deep-sea resource exploration vessel according to claim 8, characterized in that: In the step six, the primer coating uses iron red cathode electrophoretic primer, which adheres to the plate after spraying and has good adhesion and corrosion resistance; the segmented coating treatment uses epoxy intermediate paint raw materials, which are composed of epoxy resin and curing agent and have excellent chemical resistance, water resistance and wear resistance; the topcoat coating uses epoxy micaceous iron intermediate paint with epoxy resin as the main film-forming substance and micaceous iron as the pigment, so that the prepared coating has excellent anti-corrosion performance and adhesion.
10. The modular construction method for hull, superstructure and coating integration for deep-sea resource exploration vessels according to claim 1, characterized in that: In step eight, the ship entry inspection includes hull inspection, underwater engineering inspection, size and mark inspection, tilt test and electromechanical equipment inspection.
Citation Information
Cited By
Modular division method for constructing heavy lift vessel
CN120716894A
Modular division method for building a heavy lift vessel
CN120716894B
