Safety guarantee system for operation and maintenance of tower crane group
By using a monitoring system of three-dimensional laser scanner and wire-pull displacement meter in the tower crane group, combined with adjustable damping device and control system, real-time monitoring and collaborative management of the tower crane group is achieved, solving the difficulty of comprehensiveness of traditional systems. The monitoring and management issues have improved security and operation and maintenance efficiency.
Patent Information
- Application Number
- CN202411301442.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-01
AI Technical Summary
It is difficult for traditional tower crane group operation and maintenance safety guarantee systems to achieve comprehensive monitoring and management of the entire construction site, especially in terms of coordinated operations and mutual influence between tower crane groups, and it is impossible to detect and deal with potential safety hazards in a timely manner.
The tower crane group operation and maintenance safety guarantee system is adopted, which includes adjustable damping devices, monitoring systems and control systems, and the working status of the tower crane is monitored in real time through a three-dimensional laser scanner and a wire-pull displacement meter, predicts potential collision or entanglement risks, and The rotation speed of the tower crane is controlled through the control system to ensure safety.
It significantly improves the safety of the tower crane group, reduces downtime due to equipment failure, improves operation and maintenance efficiency, and avoids the risk of locking and collapse caused by contact energy consumption.
Smart Images

Figure CN118877778A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of crane group operation and maintenance, and in particular to a safety assurance system for tower crane group operation and maintenance. Background Art
[0002] In the modern construction industry, tower cranes, as large-scale construction equipment, play a vital role. With the acceleration of urbanization and the increase in high-rise buildings, the frequency and number of tower cranes have also shown a significant growth trend. However, this has brought with it a series of safety issues, especially in complex construction site environments. The operation and maintenance safety of tower crane groups faces huge challenges.
[0003] Traditional tower crane safety assurance methods mainly rely on the operator's experience and skills, as well as regular maintenance and inspections. However, this method has obvious limitations. First, human factors often become hidden dangers of safety accidents, and operational errors or negligence may lead to serious consequences. Second, traditional maintenance and inspection methods make it difficult to achieve real-time monitoring and early warning of tower crane groups, and are unable to promptly discover and deal with potential safety hazards before accidents occur.
[0004] In order to ensure the service safety of tower cranes, safety monitoring systems have been installed for tower cranes, which usually include functions such as load monitoring, height monitoring, amplitude monitoring, and tilt monitoring. They can realize real-time monitoring and early warning of single tower crane equipment. However, these systems still have some limitations for the safety of tower crane groups. For example, there is a lack of consideration for the collaborative operation and mutual influence between tower crane groups, making it difficult to achieve comprehensive monitoring and management of the entire construction site tower crane group. Summary of the invention
[0005] The purpose of the present invention is to provide a tower crane group operation and maintenance safety assurance system, aiming to solve the problem that the tower crane group operation and maintenance safety assurance system in general technology is difficult to achieve comprehensive monitoring and management of the entire construction site tower crane group.
[0006] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: the safety guarantee system for the operation and maintenance of a group of tower cranes includes: an adjustable damping device, a monitoring system and a control system, wherein the adjustable damping device is used to control the rotation speed of the crane; the monitoring system has a three-dimensional laser scanner and a pull-wire displacement meter, the three-dimensional laser scanner is installed on the top of the crane cab, and is used to sense the spatial conditions within the working range of the boom, and to perform three-dimensional modeling of the plane in the area to determine whether there are obstacles within the working range of the boom, the pull-wire displacement meter senses the operating status of the joystick, and provides real-time data support for the coordinated management of the tower crane group; the control system is electrically connected to the adjustable damping device and the monitoring system, the monitoring system transmits the monitored digital signal to the control system, the control system identifies the working status of the tower crane, and sends a control signal, and the control system controls the adjustable damping device to control the speed of the tower crane.
[0007] The beneficial effects are: by setting up a three-dimensional laser scanner to perceive the spatial conditions within the working range of the crane arm in real time, it is possible to accurately determine whether there are obstacles entering the dangerous area, thereby preventing potential collision risks in advance and significantly improving the safety of tower crane operations; the application of wire-type displacement meters can monitor the working status of tower cranes in real time, discover and solve problems in a timely manner, reduce downtime caused by equipment failure, and improve operation and maintenance efficiency.
[0008] A further technical solution of the present invention is that the adjustable damping device comprises a lower mounting base plate mounted on the tower and an upper mounting base plate mounted on the boom.
[0009] A further technical solution of the present invention is that a plurality of iron plates evenly distributed in a circular array are fixedly mounted on the lower mounting base plate, and a copper plate is fixedly mounted on the upper surface of each of the iron plates.
[0010] A further technical solution of the present invention is that a plurality of permanent magnets are installed at the bottom of the upper mounting base plate, the plurality of permanent magnets correspond one-to-one to a plurality of copper plates, and a driver is installed between the permanent magnets and the upper mounting base plate, and the driver drives the permanent magnets to approach or move away from the copper plates.
[0011] The beneficial effects are: adopting a non-contact method to dissipate energy, slowing down the rotation speed of the tower crane, and avoiding the situation in which locking due to the contact method of dissipating energy causes the tower crane to collapse.
[0012] A further technical solution of the present invention is that the monitoring system predicts whether each crane in the tower crane group will be in danger of collision or entanglement, and when a collision or entanglement is about to occur, an alarm is issued and the tower crane is controlled to stop rotating through the control system.
[0013] A method for using a tower crane group operation and maintenance safety assurance system, characterized in that it comprises the following steps: S1. Draw a tower crane group layout diagram based on the tower crane layout plan at the project site and the working radius r of each tower crane; S2. Draw the working range of each tower crane according to the tower crane group layout diagram, and mark the overlapping range in red; S3. During the operation of the tower crane, after each lifting, the 3D laser scanner scans the working environment at that height, establishes a 3D laser model at that height, and transmits the relevant data to the control system for determining whether there are obstacles within the working range of the crane arm; S4. If there are no other obstacles within the service radius of the tower crane, the monitoring system switches to static operation; if there are obstacles around the tower crane, the dynamic state of the 3D laser scanner is activated, and the rotation orientation of the 3D laser scanner is determined according to the orientation of the obstacle, that is, the 3D laser scanner is used to focus on scanning the direction of the obstacle; S5. The wire displacement meter records the operating state of the operating lever, i.e., the operating amplitude of the operating lever, and transmits the relevant data to the control system by recording the motion state of the operating lever. Through the driver's simulated driving, the driver's operating habits are captured, and a relationship model between the driver's operating state of the operating lever and the rotation amplitude of the tower crane is established, and the model is stored in the control system. The control system predicts the motion state of the crane boom; S6. If a tower crane may collide or the cable may be entangled, an early warning will be issued to remind the driver in time. At the same time, the control system controls the extension of the driver, adjusts the distance between the permanent magnet and the copper plate, increases the energy dissipation capacity of the adjustable damping device, controls the tower crane to decelerate, and ensures that each tower crane avoids collision, thereby ensuring the working safety of the entire tower crane group.
[0014] A further technical solution of the present invention is that in S1, the working radius of the tower crane can be extended to r+0.05h according to the lifting height h of the tower crane to avoid cable entanglement caused by cargo swing.
[0015] A further technical solution of the present invention is that, in S2, when drawing the working range of each tower crane, the extended working radius of the tower crane is added therein.
[0016] A further technical solution of the present invention is that in S4, when the monitoring system is in static operation, the scanning frequency of the three-dimensional laser scanner is once per day. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the installation position of the three-dimensional laser scanner in a specific embodiment of the present invention.
[0018] Figure 2 It is a schematic diagram of the installation position of the wire-drawing displacement meter in a specific embodiment of the present invention.
[0019] Figure 3 It is a structural schematic diagram of an adjustable damping device in a specific embodiment of the present invention.
[0020] Figure 4 It is a structural schematic diagram of the lower mounting base plate in a specific embodiment of the present invention.
[0021] Figure 5 It is a structural schematic diagram of an upper mounting base plate in a specific embodiment of the present invention.
[0022] In the figure: 1-lower mounting base plate, 2-upper mounting base plate, 3-copper plate, 4-permanent magnet, 5-iron plate, 6-driver, 7-three-dimensional laser scanner, 8-wire displacement meter. DETAILED DESCRIPTION
[0023] The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings.
[0024] like Figure 1-Figure 5 As shown, a safety assurance system for the operation and maintenance of a tower crane group includes a monitoring system, a control system and an adjustable damping device.
[0025] like Figure 3-Figure 5 As shown, the adjustable damping device includes a lower mounting base plate 1, an upper mounting base plate 2, a copper plate 3, a permanent magnet 4, an iron plate 5 and a driver 6. The lower mounting base plate 1 is fixedly mounted on the tower, the upper mounting base plate 2 is fixedly mounted on the lifting arm, the number of the iron plates 5 is multiple, and the multiple iron plates 5 are evenly distributed on the lower mounting base plate 1 in a circular array, and the upper surface of each iron plate 5 is fixedly mounted with a copper plate 3. The number of permanent magnets 4 is the same as the number of iron plates 5 and is mounted on the upper mounting base plate 2 in a one-to-one correspondence with the iron plates 5, and the upper end surfaces of two adjacent permanent magnets 4 are opposite poles to each other. The permanent magnet 4 is connected to the upper mounting base plate 2 through the driver 6. The driver 6 can adjust the length to adjust the distance between the permanent magnet 4 and the copper plate 3, thereby adjusting the energy consumption capacity of the damping device. The present invention adopts a non-contact method to consume energy, slows down the rotation speed of the tower crane, and avoids locking caused by a contact energy consumption method, thereby causing the tower crane to collapse.
[0026] like Figure 1-Figure 2As shown, the monitoring system has a three-dimensional laser scanner 7 and a wire-drawn displacement meter 8. The three-dimensional laser scanner is installed on the top of the crane cab to sense the spatial situation within the working range of the crane arm, and to perform three-dimensional modeling of the plane in the area to determine whether there are obstacles within the working range of the crane arm; at the same time, the wire-drawn displacement meter 8 is used to sense the operating status of the joystick, provide real-time data support for the coordinated management of the tower crane group, ensure the operation and maintenance safety of the tower crane group, thereby achieving precise coordination between multiple cranes and improving work efficiency.
[0027] The monitoring system and the adjustable damping device are both electrically connected to the control system. The monitoring system transmits the monitored digital signal to the control system. The control system identifies the working status of the tower crane and sends a control signal. The control system controls the adjustable damping device to control the deceleration of the tower crane to avoid collisions between the tower cranes, thereby ensuring the working safety of the entire tower crane group. The monitoring system predicts whether there is a risk of collision or entanglement between the cranes in the tower crane group. When a collision or entanglement is about to occur, an alarm is issued and the adjustable damping device is controlled through the control system to control the tower crane to stop rotating.
[0028] A method for using a tower crane group operation and maintenance safety assurance system is: S1. According to the tower crane layout plan at the project site, draw a tower crane group layout diagram based on the working radius r of each tower crane. At the same time, according to the lifting height h of the tower crane, the working radius of the tower crane is expanded to r+0.05h to avoid cable entanglement caused by cargo swing; S2. Draw the working range of each tower crane according to the tower crane group layout diagram and the extended working radius of the tower crane, and mark the overlapping range in red; S3. During the operation of the tower crane, after each lifting, the three-dimensional laser scanner 7 scans the working environment at that height, establishes a three-dimensional laser model at that height, and transmits relevant data to the control system for determining whether there are obstacles within the working range of the crane arm; S4. If there are no other obstacles within the service radius of the tower crane, the monitoring system switches to static operation, i.e. the scanning frequency of the 3D laser scanner 7 is reduced to once a day. If there are obstacles around the tower crane, the dynamic state of the 3D laser scanner is activated, and the rotation orientation of the 3D laser scanner is determined according to the orientation of the obstacle, i.e. the 3D laser scanner is used to focus on scanning the direction of the obstacle; S5, the wire displacement meter 8 records the operating state of the operating lever, that is, the operating amplitude of the operating lever, and transmits the relevant data to the control system by recording the motion state of the operating lever. Through the driver's simulated driving, the driver's operating habits are captured, and a relationship model between the driver's operating state of the operating lever and the rotation amplitude of the tower crane is established, and the model is stored in the control system. The control system predicts the motion state of the crane boom; S6. If the tower crane may collide or the cable may be entangled, an early warning is issued to remind the driver in time. At the same time, the control system controls the driver 6 to extend, adjusts the distance between the permanent magnet 4 and the copper plate 3, increases the energy dissipation capacity of the adjustable damping device, controls the tower crane to decelerate, and ensures that each tower crane avoids collision, thereby ensuring the working safety of the entire tower crane group.
[0029] The following aspects should be noted in this implementation plan: 1. 3D laser scanners and wire displacement meters need to be calibrated and maintained regularly to ensure the accuracy and reliability of their measurement data.
[0030] 2. The collected data involves the operating status and working environment of the crane and should be kept strictly confidential to prevent data leakage or illegal use.
[0031] 3. Under different working environments and weather conditions, the stability and reliability of the 3D laser scanner and wire displacement meter should be ensured to avoid misjudgment or failure caused by environmental factors.
[0032] 4. Although the present invention can improve safety and response speed, it is still necessary to formulate a detailed emergency plan to deal with possible special situations and ensure the operation and maintenance safety of the tower crane group.
[0033] In this specific embodiment, by setting up a three-dimensional laser scanner to sense the spatial conditions within the working range of the crane arm in real time, it is possible to accurately determine whether there are obstacles entering the danger zone, thereby preventing potential collision risks in advance and significantly improving the safety of tower crane group operations; the application of the pull-wire displacement meter 8 can monitor the working status of the tower crane group in real time, discover and solve problems in a timely manner, reduce downtime caused by equipment failure, and improve operation and maintenance efficiency.
Claims
1. A tower crane group operation and maintenance safety assurance system, characterized in that: include: Adjustable damping device to control the rotation speed of the crane; The monitoring system comprises a three-dimensional laser scanner (7) and a cable displacement meter (8), wherein the three-dimensional laser scanner is installed on the top of the crane cab and is used to sense the spatial situation within the working range of the crane arm and to perform three-dimensional modeling of the plane within the area to determine whether there are obstacles within the working range of the crane arm; the cable displacement meter (8) senses the operating state of the joystick and provides real-time data support for the coordinated management of the tower crane group; A control system is electrically connected to the adjustable damping device and the monitoring system. The monitoring system transmits the monitored digital signal to the control system. The control system identifies the working state of the tower crane and sends a control signal. The control system controls the adjustable damping device to control the speed of the tower crane.
2. A tower crane group operation and maintenance safety assurance system according to claim 1, characterized in that: The adjustable damping device comprises a lower mounting base plate (1) mounted on a tower frame and an upper mounting base plate (2) mounted on a lifting arm.
3. The tower crane group operation and maintenance safety assurance system according to claim 2 is characterized in that: A plurality of iron plates (5) evenly distributed in a circular array are fixedly mounted on the lower mounting base plate (1), and a copper plate (3) is fixedly mounted on the upper surface of each of the iron plates (5).
4. The tower crane group operation and maintenance safety assurance system according to claim 3 is characterized in that: A plurality of permanent magnets (4) are mounted on the bottom of the upper mounting base plate (2), the plurality of permanent magnets (4) corresponding one-to-one to the plurality of copper plates (3), and a driver (6) is mounted between the permanent magnets (4) and the upper mounting base plate (2), the driver (6) driving the permanent magnets (4) to move closer to or farther from the copper plates (3).
5. The tower crane group operation and maintenance safety assurance system according to claim 1 is characterized in that: The monitoring system predicts whether each crane in the tower crane group will be in danger of collision or entanglement, and when a collision or entanglement is about to occur, an alarm is issued and the tower crane is controlled to stop rotating through the control system.
6. A method for using a tower crane group operation and maintenance safety assurance system according to any one of claims 1 to 5, characterized in that: The following steps are involved: S1. Draw a tower crane group layout diagram based on the tower crane layout plan at the project site and the working radius r of each tower crane; S2. Draw the working range of each tower crane according to the tower crane group layout diagram, and mark the overlapping range in red; S3. During the operation of the tower crane, after each lifting, the three-dimensional laser scanner (7) scans the working environment at that height, establishes a three-dimensional laser model at that height, and transmits relevant data to the control system for determining whether there are obstacles within the working range of the crane arm; S4. If there are no other obstacles within the service radius of the tower crane, the monitoring system switches to static operation; if there are obstacles around the tower crane, the dynamic state of the 3D laser scanner is activated, and the rotation orientation of the 3D laser scanner is determined according to the orientation of the obstacle, that is, the 3D laser scanner is used to focus on scanning the direction of the obstacle; S5, the cable displacement meter (8) records the operating state of the operating lever, that is, the operating amplitude of the operating lever, records the motion state of the operating lever, and transmits the relevant data to the control system, captures the driver's operating habits through driver simulation driving, establishes a relationship model between the driver's operating state of the operating lever and the rotation amplitude of the tower crane, and stores the model in the control system, so that the control system predicts the motion state of the crane boom; S6. If the tower cranes are likely to collide, or the cables are likely to become entangled, an early warning is issued to promptly alert the driver. At the same time, the control system controls the driver (6) to extend, adjusts the distance between the permanent magnet (4) and the copper plate (3), increases the energy dissipation capacity of the adjustable damping device, controls the tower crane to decelerate, and ensures that the tower cranes avoid collisions, thereby ensuring the working safety of the entire tower crane group.
7. A tower crane group operation and maintenance safety guarantee system according to claim 6, characterized in that In S1, the working radius of the tower crane can be extended to r+0.05h according to the lifting height h of the tower crane to avoid cable entanglement caused by cargo swing.
8. A tower crane group operation and maintenance safety assurance system according to claim 7, characterized in that: In S2, when drawing the working range of each tower crane, the extended working radius of the tower crane is included.
9. The tower crane group operation and maintenance safety guarantee system according to claim 6 is characterized in that: In S4, when the monitoring system is in static operation, the scanning frequency of the three-dimensional laser scanner (7) is once per day.