Intelligent system and method for counting blast furnace slag tapping quantity

By setting up granulation towers and related equipment in the blast furnace system, using flowmeters and water slag coefficients, accurate statistics of blast furnace slag output is achieved, the problem of insufficient monitoring accuracy in the existing technology is solved, and the accuracy of statistics is improved and stability of the system.

CN118879958AActive Publication Date: 2024-11-01МААНЬШАНЬ АЙРОН ЭНД СТИЛ КО ЛТД
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410939809.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-01
Estimated Expiration
2044-07-15

AI Technical Summary

Technical Problem

In the prior art, the monitoring of blast furnace slag output is insufficient, manual measurement is dangerous and error is large, the existing equipment is costly and the process is complex, making it difficult to achieve efficient and stable slag output statistics.

Method used

By setting up granulation tower, inlet water pipe, outlet water pipe, accident water pipe, circulating cold water pool, cold water pump, hot water pump, computer CRT control system and display in the blast furnace system, use flow meter, pressure regulating valve, temperature meter and water slag Coefficient, real-time monitoring and calculation of water flow and water quenching slag water content, and accurately count the slag output.

Benefits of technology

Accurate statistics on blast furnace slag output is achieved, the risk of manual intervention is reduced, the increase of additional devices is avoided, the accuracy of statistics and the stability of the system is improved, and the water level alarm is issued in a timely manner to remind manual intervention.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118879958A_ABST
    Figure CN118879958A_ABST
Patent Text Reader

Abstract

The intelligent system comprises a granulation tower, a water inlet pipe, a water outlet pipe, an accident water pipe, a bottom filter tank, a circulating cold water tank, a cold water pump, a hot water pump, and a flow meter, a pressure regulating valve and a temperature instrument which are electrically connected with a computer CRT (cathode ray tube) control system and a display. The method provided by the invention comprises the following steps of: judging water inlet and outlet flow, measuring water density, measuring water content of water granulated slag, counting slag discharge quantity, and comparing and judging theoretical slag quantity and slag discharge quantity. The flow meters and the pressure regulating valves are arranged on the water inlet pipe and the water outlet pipe, so that the water flow can be controlled, the slag discharge quantity is quantified through the water content of the water-quenched slag and the water-granulated slag coefficient, the blast furnace slag discharge quantity is accurately counted, the whole working condition is not influenced by external environments such as vibration of a blast furnace tapping site and large smoke dust, and the service life of the blast furnace is prolonged. And the quantification accuracy is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of blast furnace ironmaking, and in particular to an intelligent system and method for counting blast furnace slag discharge. Background Art

[0002] Blast furnace ironmaking is the main method of modern ironmaking. The iron produced by this method accounts for more than 95% of the world's total iron production. The products produced by blast furnace ironmaking mainly include slag, iron and coal gas, among which slag is mainly used as industrial raw materials. The blast furnace slag treatment methods are mainly divided into dry slag and water-quenched slag. Since dry slag treatment is easy to pollute the environment and has low resource utilization, it is rarely used now. At present, blast furnaces at home and abroad mainly use water-quenched slag treatment methods. The blast furnace slag after water quenching is mainly transported by trucks or trains, and then measured.

[0003] During normal production, the high-temperature liquid slag of the blast furnace is layered and separated in the main ditch, and discharged from the iron ditch and the slag ditch respectively. Due to the low density and high temperature of the slag, it is in a foamy state in the blast furnace and occupies a large volume. Excessive slag storage will lead to a tense relationship between the pressure and volume of the blast furnace, which will have an adverse effect on the stability of the blast furnace. The monitoring of the slag discharge of the blast furnace has always been a shortcoming, but the slag discharge of the blast furnace is crucial to the high efficiency and stability of large blast furnaces. In the prior art, the means of obtaining this data are manual measurement in front of the furnace and the experience judgment of the blast furnace operator. The manual measurement method is not only very hard for the operator to work in a high temperature environment, but also has certain risks, and the experience judgment has a large error.

[0004] After searching, Chinese patent CN109852746A discloses a blast furnace slag processing device and slag flushing method. The slag flow detection device is arranged at the end of the blast furnace slag ditch, and is used to detect the slag flow output from the blast furnace in real time online. According to the change of the slag flow, the amount of water for blast furnace slag flushing is adjusted, which can not only ensure the stability of the water slag quality, but also reduce the energy consumption of the water slag system. The slag flow detection device is realized by weighing the slag amount through a gravity sensor arranged at the end of the blast furnace slag ditch. Since the blast furnace slag flows in real time and the flow rate is unstable, the weighing accuracy is easily disturbed, and there is a problem of insufficient accuracy. Chinese patent CN112862769A discloses an online intelligent monitoring method and system for blast furnace slag-iron ratio, which processes the slag flow image of the blast furnace tapping hole through a camera, obtains the diameter of the slag flow strand at the tapping hole, obtains the slag flow rate at the tapping hole according to the longitudinal velocity distribution characteristics of the fluid, and calculates the real-time change rate of slag mass through the real-time weight gain rate of the torpedo tank car, thereby obtaining the real-time slag-iron ratio of blast furnace tapping, forming a complete set of intelligent methods for real-time calculation of slag-iron ratio in the blast furnace tapping process. However, when the blast furnace tapping hole is tapping, the smoke is large and the slag flow diameter changes in real time, which can easily affect the camera working condition and thus affect the image processing. For another example, Chinese patent CN109439812A provides a method for measuring blast furnace slag discharge and blast furnace slag defoaming, which can accurately calculate the blast furnace slag discharge without adding a weighing device. This patent requires the addition of a slag pot and the calibration of the slag density, which is not only costly, but also increases the complexity of the process and the intensity of the operation. Summary of the invention

[0005] The object of the present invention is to provide an intelligent system and method for counting the slag discharge amount of a blast furnace, which can quantify the slag discharge amount by water flow, water content of water-quenched slag and water-slag coefficient, and can accurately count the slag discharge amount to solve the problems raised in the above background technology.

[0006] To achieve the above object, the present invention provides the following technical solutions:

[0007] An intelligent system for counting the slag discharge amount of a blast furnace comprises a granulating tower, an inlet water pipe, an outlet water pipe, an emergency water pipe, a bottom filter tank, a circulating cold water tank, a cold water pump, a hot water pump, a computer CRT control system and a display; symmetrical positions on both sides of the granulating tower are provided with a punching box, a slag groove is provided on the top of the punching box, an emergency water pipe is added on the top of the slag groove, and pressure regulating valves are provided on the emergency water pipe, the inlet water pipe and the outlet water pipe; one end of the inlet water pipe is connected to the punching box, and the other end is connected to three cold water pumps in parallel through a branch pipeline; one end of the outlet water pipe is connected to the circulating cold water tank, and the other end is connected to three hot water pumps in parallel through a branch pipeline, and the other ends of the three hot water pumps are connected to three bottom filter tanks correspondingly, and the three bottom filter tanks are connected to the granulating tower in parallel through pipelines; a temperature meter is provided on the outlet water pipe, and flow meters are installed on the outlet water pipe and the inlet water pipe; signal interfaces of the flow meter, the pressure regulating valve, the temperature meter, the hot water pump and the cold water pump are all electrically connected to the computer CRT control system and the display.

[0008] Furthermore, the circulating cold water pool is respectively connected with a drainage pipe and a water supply pipe.

[0009] Furthermore, a water level meter is provided in the circulating cold water pool. When the water level in the circulating cold water pool is H≤3.5m or H≥7.5m, the computer CRT control system and display will issue an alarm to remind manual intervention. The computer CRT control system and display will open the water supply network or the drainage network to control the water level of the circulating cold water pool.

[0010] Furthermore, the three hot water pumps are set up in a working state of two in use and one in standby, and can be selectively turned on according to production needs.

[0011] Furthermore, the computer CRT control system and display are used to detect the current of the hot water pump and the cold water pump, as well as the real-time flow values ​​of the flow meter inlet and outlet on the outlet pipe, inlet pipe and emergency water pipe, the values ​​of the pressure regulating valve and the temperature meter.

[0012] The present invention provides another technical solution: an intelligent method for counting the slag discharge amount of a blast furnace, comprising the following steps:

[0013] Step 1: The production values ​​of flow meter, pressure regulating valve, temperature meter, hot water pump and cold water pump are summarized in real time by computer CRT control system and display;

[0014] Step 2: Determination of inlet and outlet flow: Read the real-time inlet and outlet flow values ​​through the flow meter installed on the pipeline, and calculate the flow rate V of the two flow meters in the corresponding time 进 、V 出 ; If V 事故水 , P 事故水 are all zero, and |V 实时进 -V 进i | / |V实时进 |≤5%, then select V 实时进i Otherwise, it is determined to be abnormal data, check the cause and calibrate the meter; similarly, measure the hot water pump and select V 实时出i Otherwise, it is considered as data abnormality, check the cause and calibrate the meter; at the same time, record the start and stop time t1, t2 and t3, t4 of the cold water pump and hot water pump. V=V 进 -V 出 , V is the total water consumption during the iron-making time;

[0015] Step 3: Determination of water density: Read the temperature of the discharged water through the set thermometer, and use the relationship between the density and temperature of the mixed water ρ 出 =ρ 标定 α×(T-T标定) Calculate the density of mixed water, where ρ 出 is the density of the mixed water at the measured temperature T, ρ 标定 is the density of the mixed water at the calibration temperature T, α is a constant determined by the experiment, T is the measured temperature, T 标定 is the preset calibration temperature;

[0016] Step 4: Determination of water content of water slag: After the hot water in the bottom filter tank is drained, the bottom filter tank is divided into ten grids, and water slag samples are taken from different grids, and weighed to take the average value as m1. After drying, weighed to take the average value as m2, and the water content of water slag is obtained as η = (m1-m2) / m1;

[0017] Step 5: Statistics of slag discharge: According to the total water consumption V, the density of mixed water, the water content of water slag and the water slag coefficient β, the slag discharge M can be calculated. 出渣 =Vρ 出 / η Among them, the water-slag coefficient β is an empirical value, which is taken as 1.2.

[0018] Furthermore, in step 2, when the water inlet pipe is cut off, the computer CRT control system and display will sound an alarm to remind manual intervention. The computer CRT control system and display will open the valve of the accident water pipe by detecting the pressure regulating valve.

[0019] Furthermore, the specific statistical method of the flow value in step 2 is as follows:

[0020] Start the first hot water pump and keep it running for 3 hours, count the average flow value when the hot water pump is running, then start the second and third hot water pumps, record the real-time flow values, and calculate the average flow value corresponding to starting a single cold water pump as V 进1 ;

[0021] Then start two of the three cold water pumps and keep them running for 3 hours. Record the real-time flow value and calculate the average flow rate corresponding to starting the two hot water pumps as V. 进2 ;

[0022] Start the three cold water pumps again and keep them running for 3 hours. Record the real-time flow rate and calculate the average flow rate corresponding to starting the three hot water pumps as V. 进3 .

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] 1. The intelligent system and method for counting the blast furnace slag amount of the present invention can quantify the slag amount through water flow, water content of water-quenched slag and water-slag coefficient, and can accurately count the slag amount without adding additional devices such as slag pots.

[0025] 2. The intelligent system and method for counting the slag discharge of a blast furnace of the present invention has a water level meter in the circulating cold water pool. When the water level abnormally reaches the warning value, the system sends out an alarm to remind humans to find the cause in time and open the water supply network or the drainage network.

[0026] 3. The intelligent system and method for counting the slag discharge amount of a blast furnace of the present invention can generate an alarm when the water inlet pipe is cut off during the iron-discharging operation to remind people to find the cause in time. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 is a system structure block diagram of the present invention;

[0028] Figure 2 It is an alarm flow chart of the circulating cold water pool of the present invention;

[0029] Figure 3 The present invention is a control flow chart for counting the slag discharge amount of a blast furnace.

[0030] In the figure: 1. Punching box; 2. Granulating tower; 3. Slag ditch; 4. Flow meter; 5. Pressure regulating valve; 6. Water inlet pipe; 7. Bottom filter tank; 12. Temperature meter; 13. Hot water pump; 16. Water outlet pipe; 17. Circulating cold water tank; 18. Cold water pump; 21. Emergency water pipe; 22. Computer CRT control system and display; 23. Drainage pipe; 24. Make-up water pipe. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] See also Figure 1 In an embodiment of the present invention, an intelligent system for counting the slag discharge amount of a blast furnace is provided, comprising a granulating tower 2, an inlet pipe 6, an outlet pipe 16, an emergency water pipe 21, a bottom filter tank 7, a circulating cold water tank 17, a cold water pump 18, a hot water pump 13, a computer CRT control system and a display 22; a sluicing box 1 is symmetrically arranged on both sides of the granulating tower 2, a slag ditch 3 is arranged on the upper part of the sluicing box 1, and an emergency water pipe 21 is added on the upper part of the slag ditch 3. The emergency water pipe 21 is mainly used to open when the system detects that the inlet pipe 6 is cut off, and a pressure regulating valve 5 is arranged on the emergency water pipe 21, the inlet pipe 6 and the outlet pipe 16; one end of the inlet pipe 6 is connected to the sluicing box 1, and the other end is connected to three cold water pumps 18 in parallel through a branch pipe; one end of the outlet pipe 16 is connected to the circulating cold water tank 17, and the other end is connected to three hot water pumps 13 in parallel through a branch pipe. The other end of 13 is connected to three bottom filter tanks 7, among which three hot water pumps 13 are provided, and their working state is two for one standby, and they can be selectively opened according to production needs; there are three bottom filter tanks 7, which are used for precipitation and temporary storage of water slag. When a tank is full, it is convenient to switch to other tanks. The three bottom filter tanks 7 are connected in parallel to the granulation tower 2 through pipelines; a thermometer 12 is provided on the outlet water pipe 16, and flow meters 4 are installed on the outlet water pipe 16 and the inlet water pipe 6; the signal interfaces of the flow meter 4, the pressure regulating valve 5, the thermometer 12, the hot water pump 13 and the cold water pump 18 are all electrically connected to the computer CRT control system and the display 22, and the computer CRT control system and the display 22 are used to detect the current of the hot water pump 13 and the cold water pump 18, as well as to detect the real-time flow values ​​of the inlet and outlet water of the flowmeter 4 on the outlet water pipe 16, the inlet water pipe 6 and the accident water pipe 21, and the values ​​of the pressure regulating valve 5 and the thermometer 12.

[0033] See also Figure 2 In the above embodiment, a water level meter is provided in the circulating cold water pool 17, and a drainage water pipe 23 and a water supply water pipe 24 are respectively connected to the circulating cold water pool 17, so that the water level in the pool can be monitored in real time, and the water can be replenished and discharged in time to prevent the water level from dropping too much; when the water level of the circulating cold water pool 17 is H≤3.5m or H≥7.5m, the computer CRT control system and the display 22 will issue an alarm to remind manual intervention, and the computer CRT control system and the display 22 will open the water supply pipe network 24 or the drainage pipe network 23 to control the water level of the circulating cold water pool 17.

[0034] See also Figure 3 In order to further better explain the embodiment of the present invention, an intelligent method for counting the slag amount of a blast furnace is also provided, comprising the following steps:

[0035] Step 1: The production values ​​of the flow meter 4, the pressure regulating valve 5, the temperature meter 12, the hot water pump 13, and the cold water pump 18 are summarized in real time by the computer CRT control system and the display 22;

[0036] Step 2: Determination of inlet and outlet flow: Read the real-time inlet and outlet flow values ​​through the flow meter 4 installed on the pipeline, and calculate the flow V of the two flow meters in the corresponding time 进 、V 出 ; Among them, since the processes of each hot water pump 13 and cold water pump 18 are different, the relationship between the pump and the flow rate needs to be calibrated; start the first hot water pump 13, maintain operation for 3 hours, calculate the average flow value of the hot water pump 13 during operation, then start the second and third hot water pumps 13, record the real-time flow value, and calculate the average flow rate corresponding to starting a single cold water pump 18 as V 进1 Simultaneously start two of the three cold water pumps 18, maintain operation for 3h, record the real-time flow value, and calculate the average flow corresponding to starting the two hot water pumps 13 as V 进2 Then, start three cold water pumps 18 at the same time, maintain operation for 3h, record the real-time flow value, and calculate the average flow rate corresponding to starting the three hot water pumps 13 as V 进3 ; In the slag discharge work, when the water inlet pipe 6 is cut off, the computer CRT control system and the display 22 will sound an alarm to remind manual intervention. The computer CRT control system and the display 22 will open the valve of the accident water pipe 21 by detecting the pressure regulating valve 5;

[0037] If V 事故水 , P 事故水 are all zero, and |V 实时进 -V i | / V 实时进 ≤5%, then select V 实时进i Otherwise, it is determined to be abnormal data, check the cause and calibrate the meter; similarly, the hot water pump 13 is measured, and the corresponding flow averages are V 出1 、V 出2 and V 出3 ; such as |V 实时出 -V 出i | / |V 实时出 |≤5%, then select V 实时出i Otherwise, it is determined that the data is abnormal, check the cause and calibrate the table. Otherwise, it is determined that the data is abnormal, check the cause and calibrate the table;

[0038] In this step, Where i is 1, 2, 3, representing the number of pumps started, t1, t2 are the start and end time of the cold water pump 18, t3, t4 are the start and end time of the hot water pump 13, V 进 is the total water flow rate of the water inlet main during this period, V出 is the total return flow of the siphon pipe during this period of time, V is the total water consumption during this period of time, V = V 进 -V 出 ;

[0039] Step 3: Determination of water density: Generally, the density of water changes with temperature. The higher the temperature, the smaller the density, and the lower the temperature, the greater the density. To improve the accuracy of statistics, it is necessary to calibrate the density of inlet and outlet water at different temperatures on site to obtain the relationship between water density and temperature. Since the inlet water is relatively pure, ρ 进 Without calibration, the discharged water after slag flushing is in a mixed water state, and the density ρ 排 The change is large and needs to be recalibrated;

[0040] Specifically, the temperature of the discharged water is read by the set temperature meter 12, and the relationship between the density of the mixed water and the temperature is calculated using the equation ρ 出 =ρ 标定 α×(T-T标定) Calculate the density of mixed water, where ρ 出 is the density of the mixed water at the measured temperature T, ρ 标定 is the density of the mixed water at the calibration temperature T, α is a constant determined by the experiment, T is the measured temperature, T 标定 is the preset calibration temperature;

[0041] Step 4: Determination of water content of water slag: After the hot water in the bottom filter tank 7 is drained, the bottom filter tank 7 is divided into ten grids, and water slag samples are taken at different grids, and weighed to take the average value as m1. After drying, weighed to take the average value as m2, and the water content of water slag η = (m1-m2) / m1 is obtained;

[0042] Step 5: Statistics of slag discharge: According to the total water consumption V, the density of mixed water, the water content of water slag and the water slag coefficient β, the slag discharge M can be calculated. 出渣 =Vρ 出 / η Among them, the water-slag coefficient β is an empirical value, which is 1.2. It is the weight coefficient of blast furnace slag increased after quenching with high-pressure water.

[0043] In the above steps, the comparison and determination method between the theoretical slag amount and the slag amount is as follows: the system collects the iron content of each ore type in the current charge structure ore batch, and calculates the theoretical batch iron amount of each batch as W Fe t / ch, the theoretical slag ratio is W 渣 kg / .Fe, record the number of batches running during the tapping time X, then the theoretical slag amount is W 理论 =W Fe* W 渣kg* X 料批数 ; If |W 理论 -M 出渣 | / |W理论 |≤5%, then the value is judged to be reasonable, otherwise, find the reason.

[0044] In order to further better explain the calculation process of the embodiment of the present invention, the following specific examples are provided:

[0045] Step 1: Start the computer CRT control system and display 22, detect the real-time flow values ​​of the flow meter 4 inlet and outlet and the temperature meter 12 on the water inlet pipe 6, the water outlet pipe 16 and the accident water pipe 21, and the average values ​​are V 实时进 =2400m 3 / h,V 进2 =2350m 3 / h,V 实时出 =2201m 3 / h,V 出2 =2175m 3 / h, T = 88 ° C, V of the accident water pipe 21 事故水= 0m 3 / h、P 事故水 =0MPa.

[0046] Step 2: Determination of inlet and outlet water flow:

[0047] V 事故水 , P 事故水 are all zero, and |V 实时进 -V 进2 | / V 实时进 =2.08%<5%, |V 实时出 -V 出2 | / V

[0048] 实时出 1.18%<5%, then select V 实时进2 Similarly, the hot water pump 13 is measured and V is selected. 实时出2 .

[0049] Step 3: Select an open iron hole on the granulation tower 2, record the tapping time as 2h30min, record the start time of the cold water pump 18 and the hot water pump 13 as 8:30 and 8:40, and the shut-down time as 11:30 and 10:55, and calculate the running time as 3h and 3.25h respectively. V=V 进 -V 出 =2400*3h-2201*3.25h=46.75m 3 .

[0050] Step 4: Determination of water density:

[0051] The temperature of the discharged water is read as 88°C by the set temperature meter 12. Using the relationship between the density of mixed water and the temperature, ρ 出 =ρ 标定 -α×(T-T标定) Calculate the mixed water density, T 标定 =4℃, corresponding to ρ=1g / cm 3 , α is the experimental constant = -0.002, ρ 出 =0.84g / cm 3 .

[0052] Step 5: Determination of moisture content of slag:

[0053] After the hot water in the bottom filter tank 7 is drained, the bottom filter tank 7 is divided into 10 grids, and 5 groups of 500g water slag samples are taken from different grids. The weighing values ​​after drying are 450g, 466g, 445g, 452g, and 451g. The average value is 452.8g, and the water content of the water slag is η=(500-452.8) / 500=9.43%.

[0054] Step 6: Statistics of slag discharge:

[0055] According to the total water consumption flow V, the density of the discharged water, the water content of the slag and the water-slag coefficient β = 1.2, the slag discharge volume M can be calculated. 出渣 =Vρ 出 / ηβ=46.75*0.84*10 3 * / 1.2*9.43%=347.03t.

[0056] Step 7: Comparison and determination of theoretical slag volume and discharged slag volume:

[0057] According to the real-time summary of blast furnace production data, the current charge structure is 125t / ch, sintered ore 76.05%, pelletized ore 6%, Newmanite 17.95%, and silica 0.3t (auxiliary material). The sintered ore TFe is 56.59%, the pelletized ore TFe is 63.07%, and the Newmanite TFe is 63.0%. The theoretical iron content of each batch is 77.42t / ch, the theoretical slag ratio is 320kg / .Fe, and the number of batches within the slag discharge time of 2h30min is 14 batches. The theoretical slag volume is W 理论 =77.42*320 * 14 / 1000=346.8t.

[0058] Step 8: Calculate |W 理论 -M 出渣 | / |W 理论 |=0.66%≤5%, then the value is judged to be reasonable.

[0059] In summary: the present invention provides an intelligent system and method for counting the slag discharge amount of a blast furnace. By arranging a flow meter 4 and a pressure regulating valve 5 on the water inlet pipe 6 and the water outlet pipe 16, the water flow rate can be controlled, and the slag discharge amount is quantified by the water content of the water-quenched slag and the water-slag coefficient, thereby realizing accurate statistics of the slag discharge amount of the blast furnace. The entire working condition is not affected by external environments such as vibration and large smoke dust at the blast furnace iron-discharging site, and the quantification accuracy is high.

[0060] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An intelligent system for counting blast furnace slag discharge, characterized in that: The invention comprises a granulating tower (2), an inlet pipe (6), an outlet pipe (16), an emergency water pipe (21), a bottom filter tank (7), a circulating cold water tank (17), a cold water pump (18), a hot water pump (13), a computer CRT control system and a display (22); a slag ditch (3) is arranged on the upper part of the granulating tower (2); an emergency water pipe (21) is additionally arranged on the upper part of the slag ditch (3); and a pressure regulating valve (5) is arranged on the emergency water pipe (21), the inlet pipe (6) and the outlet pipe (16); one end of the inlet pipe (6) is connected to the slag ditch (1), and the other end is connected to three cold water tanks (17) in parallel through a branch pipe. A water pump (18); one end of the outlet water pipe (16) is connected to a circulating cold water tank (17), and the other end is connected to three hot water pumps (13) in parallel through a branch pipeline; the other ends of the three hot water pumps (13) are connected to three bottom filter tanks (7) respectively, and the three bottom filter tanks (7) are connected to the granulation tower (2) in parallel through pipelines; a temperature meter (12) is provided on the outlet water pipe (16), and flow meters (4) are installed on the outlet water pipe (16) and the inlet water pipe (6); the signal interfaces of the flow meter (4), the pressure regulating valve (5), the temperature meter (12), the hot water pump (13) and the cold water pump (18) are all electrically connected to a computer CRT control system and a display (22).

2. The intelligent system for counting blast furnace slag discharge as claimed in claim 1, characterized in that: The circulating cold water pool (17) is respectively connected to a drainage pipe (23) and a water replenishment pipe (24).

3. An intelligent system for counting blast furnace slag discharge as claimed in claim 2, characterized in that: The circulating cold water pool (17) is provided with a water level meter. When the water level of the circulating cold water pool (17) is H≤3.5m or H≥7.5m, the computer CRT control system and the display (22) issue an alarm to remind manual intervention. The computer CRT control system and the display (22) open the water supply pipe network (24) or the drainage pipe network (23) to control the water level of the circulating cold water pool (17).

4. The intelligent system for counting blast furnace slag discharge according to claim 1, characterized in that: The three hot water pumps (13) are in working state of two in use and one in standby, and can be selectively turned on according to production needs.

5. The intelligent system for counting blast furnace slag discharge as claimed in claim 1, characterized in that: The computer CRT control system and display (22) are used to detect the current of the hot water pump (13) and the cold water pump (18), as well as to detect the real-time flow values ​​of the inlet and outlet water of the flow meter (4) on the outlet water pipe (16), the inlet water pipe (6) and the emergency water pipe (21), the values ​​of the pressure regulating valve (5) and the temperature meter (12).

6. An intelligent method for counting the amount of slag discharged from a blast furnace, implemented based on the intelligent system for counting the amount of slag discharged from a blast furnace according to claim 1, characterized in that: The following steps are involved: Step 1: The production values ​​of the flow meter (4), the pressure regulating valve (5), the temperature meter (12), the hot water pump (13), and the cold water pump (18) are summarized in real time by a computer CRT control system and a display (22); Step 2: Determination of inlet and outlet flow: Read the real-time inlet and outlet flow values ​​through the flow meter (4) installed on the pipeline, and calculate the flow rate V of the two flow meters in the corresponding time. 进 、V 出 ; If V 事故水 , P 事故水 are all zero, and |V 实时进 -V 进i | / |V 实时进 |≤5%, then select V 实时进i Otherwise, it is determined that the data is abnormal, check the cause and calibrate the meter; similarly, measure the hot water pump (13) and select V 实时出i Otherwise, it is determined that the data is abnormal, the cause is checked and the meter is calibrated; at the same time, the opening and closing times t1, t2 and t3, t4 of the cold water pump (18) and the hot water pump (13) are recorded. V=V 进 -V 出 , V is the total water consumption during the iron-making time; Step 3: Determination of water density: Read the temperature of the discharged water through the set temperature meter (12), and use the relationship between the density of mixed water and the temperature ρ 出 =ρ 标定 α×(T-T标定) Calculate the density of mixed water, where ρ 出 is the density of the mixed water at the measured temperature T, ρ 标定 is the density of the mixed water at the calibration temperature T, α is a constant determined by the experiment, T is the measured temperature, T 标定 is the preset calibration temperature; Step 4: Determination of water content of water slag: After the hot water in the bottom filter tank (7) is drained, the bottom filter tank (7) is divided into ten grids, and water slag samples are taken at different grids, and weighed to obtain an average value m1. After drying, the average value is weighed to obtain m2, and the water content of the water slag is obtained as η = (m1-m2) / m1; Step 5: Statistics of slag discharge: According to the total water consumption V, the density of mixed water, the water content of water slag and the water slag coefficient β, the slag discharge M can be calculated. 出渣 =Vρ 出 / η Among them, the water-slag coefficient β is an empirical value, which is taken as 1.

2.

7. An intelligent method for counting blast furnace slag discharge as claimed in claim 6, characterized in that: In step 2, when the water inlet pipe (6) is cut off, the computer CRT control system and display (22) sound an alarm to remind manual intervention. The computer CRT control system and display (22) open the valve of the emergency water pipe (21) by detecting the pressure regulating valve (5).

8. An intelligent method for counting blast furnace slag discharge as claimed in claim 6, characterized in that: The specific statistical method of the flow value in step 2 is as follows: The first hot water pump (13) is started and maintained in operation for 3 hours, and the average flow value of the hot water pump (13) is calculated. Then, the second and third hot water pumps (13) are started, and the real-time flow values ​​are recorded. The average flow value corresponding to starting a single cold water pump (18) is calculated as V. 进1 ; Then start two of the three cold water pumps (18) and keep them running for 3 hours. Record the real-time flow rate and calculate the average flow rate corresponding to starting the two hot water pumps (13) as V. 进2 ; Then start the three cold water pumps (18) and keep them running for 3 hours. Record the real-time flow rate and calculate the average flow rate corresponding to starting the three hot water pumps (13) as V. 进3 .

Citation Information

Patent Citations

  • Blast-furnace slag treatment device and slag flushing method

    CN109852746A

  • Explosion suppression method slag treatment process method and device

    CN115109874A

  • Method for automatically starting and stopping blast furnace stokehole slag flushing equipment

    CN115198046A

  • Scrubber tower spray water filtering system using silicomanganese water slag as filter material

    CN218221227U

  • Liquid slag waste heat recovery system

    WO2021109328A1