Soft soil roadbed structure and construction method thereof

By using a combination of clay backfill and water barriers in soft soil roadbed structures and combined with electroosmotic consolidation technology, the problems of insufficient bearing capacity and high engineering costs in infrastructure construction in soft soil areas are solved, and stability and Economical roadbed construction.

CN118880686AActive Publication Date: 2024-11-01WUHAN UNIV

Patent Information

Application Number
CN202411138585.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-01
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

In the construction of transportation infrastructure in soft soil areas, insufficient bearing capacity, excessive settlement and prominent risks of instability are needed. The existing technology requires a large amount of sand and gravel materials for excavation and filling, resulting in high engineering costs.

Method used

A soft soil roadbed structure is adopted, including the first sheet pile wall, the second sheet pile wall, the reinforcement layer, the backfill layer and the drainage maintenance system. The clay backfill soil is used to reduce the amount of sand and gravel, the water barrier keeps the clay dry, the hollow steel pipe and Electrode rods are used for electroosmotic consolidation to improve structural stability.

Benefits of technology

It reduces engineering costs, improves the structural strength and stability of soft soil roadbeds, reduces the amount of sand and gravel backfill, and ensures the long-term reliability and deformation resistance of the roadbed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880686A_ABST
    Figure CN118880686A_ABST
Patent Text Reader

Abstract

The invention discloses a soft soil roadbed structure and a construction method thereof. Belongs to the technical field of roadbed construction, the soft soil roadbed structure comprises a first sheet-pile wall, a second sheet-pile wall, a reinforcing layer, a backfill layer, a pavement layer and a drainage maintenance system, the backfill layer comprises second gravel backfill soil, a water retaining piece and clay backfill soil which are sequentially arranged from top to bottom, and the backfill layer uses the clay backfill soil as a part of filling materials. The use amount of the first gravel backfill soil in the backfill layer can be reduced, so that the engineering cost is saved, the water retaining piece can prevent water from falling into the clay backfill soil, the clay backfill soil is kept dry, the structural strength of the backfill layer is guaranteed, and the stability of the soft soil roadbed structure is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of roadbed construction, and in particular to a soft soil roadbed structure and a construction method thereof. Background Art

[0002] In recent years, under the strategic background of building a strong transportation nation, my country has vigorously developed the construction of transportation infrastructure such as roads and railways. Geosynthetics reinforced soil structure materials have outstanding advantages such as low carbon and environmental protection, fast construction, and strong deformation coordination ability, and have attracted much attention from engineers in the construction of transportation infrastructure.

[0003] my country's Beijing-Tianjin-Hebei, Yangtze River Delta, and Pearl River Delta urban agglomerations, which have huge demands for transportation facilities, all have large areas of soft soil. Soft soil has the characteristics of high water content, high porosity, and high compressibility. The construction of transportation infrastructure in soft soil areas usually has prominent problems such as insufficient bearing capacity, excessive settlement, and high risk of instability.

[0004] In the relevant technology, in order to ensure the stability of the roadbed on soft soil, excavation and filling are required during construction, that is, the soft soil is excavated and then filled with sand and gravel. Sand and gravel are generally loose materials of rock and soil, which need to be transported from the outside to the construction site. The amount of sand and gravel filling is large and the project cost is high. Summary of the invention

[0005] The present invention aims to solve at least one of the above-mentioned technical problems in the prior art to a certain extent. To this end, the present invention proposes a soft soil roadbed structure, which is conducive to reducing engineering costs.

[0006] The invention also provides a construction method for the soft soil roadbed structure.

[0007] According to the soft soil roadbed structure of the embodiment of the present invention, the soft soil roadbed structure is arranged on a soft soil foundation, and the soft soil roadbed structure includes: a first sheet pile wall, a second sheet pile wall, a reinforcement layer, a backfill layer, a road surface layer and a drainage maintenance system, the first sheet pile wall and the second sheet pile wall are arranged opposite to each other, a part of the first sheet pile wall and a part of the second sheet pile wall are both buried in the soft soil foundation, and a backfill space is formed between the first sheet pile wall and the second sheet pile wall; the reinforcement layer is arranged in the backfill space, and at least a part of the reinforcement layer is located below the surface of the soft soil foundation, and the reinforcement layer includes a first sand and gravel backfill soil; the backfill layer is arranged in the backfill space and above the reinforcement layer, and the backfill layer includes The second gravel backfill, water retaining member and clay backfill; the pavement layer is arranged above the backfill layer; the drainage maintenance system includes a hollow steel pipe, a drainage trough and an electrode rod, the drainage trough is arranged below the reinforcement layer and extends to the outside of the first sheet pile wall and the second sheet pile wall, the hollow steel pipe is penetrated through the reinforcement layer and the backfill layer, the hollow steel pipe has a water inlet hole and a drainage hole, the water inlet hole is connected to the water retaining member, the drainage hole is connected to the drainage trough, at least part of the electrode rod is buried in the soft soil foundation outside the backfill space, the electrode rod is suitable for connecting to the positive pole of the power supply, the hollow steel pipe is suitable for connecting to the negative pole of the power supply, or the first sheet pile wall and the second sheet pile wall are suitable for connecting to the negative pole of the power supply.

[0008] According to the soft soil roadbed structure of the embodiment of the present invention, the backfill layer includes a second sand and gravel backfill, a water retaining member and a clay backfill arranged in sequence from top to bottom. The backfill layer uses clay backfill as a part of the filling material, which can reduce the amount of the first sand and gravel backfill in the backfill layer, thereby helping to save engineering costs. The water retaining member can prevent water from falling into the clay backfill, which is helpful to keep the clay backfill dry, thereby ensuring the structural strength of the backfill layer and ensuring the stability of the soft soil roadbed structure.

[0009] According to some embodiments of the present invention, both the first sheet pile wall and the second sheet pile wall are connected to the hollow steel pipe via the water retaining member.

[0010] According to some embodiments of the present invention, the water retaining member includes a first sub-water retaining member and a second sub-water retaining member of the same structure, and the first sub-water retaining member and the second sub-water retaining member both include a first geogrid, a water retaining plate and a second geogrid that are stacked; wherein the first geogrid and the second geogrid of the first sub-water retaining member are both connected between the first sheet pile wall and the hollow steel pipe; and the first geogrid and the second geogrid of the second sub-water retaining member are both connected between the second sheet pile wall and the hollow steel pipe.

[0011] According to some embodiments of the present invention, there are multiple backfill layers, a third geogrid is provided between two adjacent backfill layers, and at least one of the first sheet pile wall and the second sheet pile wall is connected to the third geogrid.

[0012] According to some embodiments of the present invention, a distance between the water retaining member and the third geogrid in the up-down direction is H1, satisfying the relationship: 0.4m≤H1≤0.6m.

[0013] According to some embodiments of the present invention, the distance between the hollow steel pipe and the first sheet pile wall is the same as the distance between the hollow steel pipe and the second sheet pile wall.

[0014] According to some embodiments of the present invention, the hollow steel pipe includes a plurality of detachably connected hollow sub-steel pipes.

[0015] According to some embodiments of the present invention, the drainage maintenance system further includes a water collection well, which is disposed in the soft soil foundation outside the backfill space, and the water collection well is communicated with the drainage trough.

[0016] According to a construction method for a soft soil roadbed structure of another embodiment of the present invention, the soft soil roadbed structure is the soft soil roadbed structure mentioned above, and the construction method includes: constructing the drainage maintenance system; connecting the electrode rod to the positive electrode of the power supply and the hollow steel pipe to the negative electrode of the power supply to perform electro-osmosis consolidation on the soft soil foundation; constructing a first sheet pile wall and a second sheet pile wall; and sequentially arranging a reinforcement layer, a backfill layer and a pavement layer.

[0017] According to the construction method of the soft soil roadbed structure of the embodiment of the present invention, the backfill layer includes a second gravel backfill, a water retaining member and a clay backfill arranged in sequence from top to bottom. The backfill layer uses clay backfill as a part of the filling material, which can reduce the amount of the first gravel backfill in the backfill layer, thereby helping to save engineering costs. The water retaining member can prevent water from falling into the clay backfill, which is helpful to keep the clay backfill dry, thereby ensuring the structural strength of the backfill layer and ensuring the stability of the soft soil roadbed structure.

[0018] According to some embodiments of the present invention, the construction method further comprises: digging out soft soil on the soft soil foundation outside the soft soil roadbed structure, and drying the soft soil to obtain the clay backfill soil.

[0019] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 is a schematic diagram of a soft soil roadbed structure and a soft soil foundation according to an embodiment of the present invention;

[0021] Figure 2 is a schematic diagram of the connection between the hollow steel pipe and the second sheet pile wall according to an embodiment of the present invention;

[0022] Figure 3 is a schematic diagram of the connection between the first sub-water retaining member and the third geogrid and the second sheet pile wall according to an embodiment of the present invention;

[0023] Figure 4 is a schematic diagram of a hollow sub-steel pipe according to an embodiment of the present invention;

[0024] Figure 5 Detailed description of the invention The invention is a flowchart of a construction method of a soft soil roadbed structure according to an embodiment of the present invention.

[0025] Reference numerals:

[0026] First sheet pile wall 1; second sheet pile wall 2;

[0027] Reinforcement layer 3; first gravel backfill 31; third geotextile 32;

[0028] Backfill layer 4; second gravel backfill soil 41; water retaining member 42; first sub-water retaining member 42a; second sub-water retaining member 42b; clay backfill soil 43;

[0029] Pavement layer 5;

[0030] Drainage maintenance system 6; hollow steel pipe 61; water inlet hole 611; drainage hole 612; hollow sub-steel pipe 613; joint 6131; drainage trough 62; electrode rod 63; water collection well 64;

[0031] First reinforcement hook 71; second reinforcement hook 72; second reinforcement clamp 73; third geogrid 74; first sub-geogrid 74a; second sub-geogrid 74b; third gravel backfill 75; fourth reinforcement clamp 76; square plastic blind tube 77;

[0032] Sheet pile wall pile cap 8;

[0033] Soft soil roadbed structure 10;

[0034] Soft soil foundation20. DETAILED DESCRIPTION

[0035] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0036] In the description of the present invention, it is necessary to understand that the terms "thickness", "up", "down", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0037] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0038] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or can communicate with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0039] Combine the following Figure 1-Figure 5 The soft soil roadbed structure 10 and the construction method thereof according to an embodiment of the present invention are described in detail.

[0040] Reference Figure 1As shown, according to the soft soil roadbed structure 10 of the embodiment of the present invention, the soft soil roadbed structure 10 is arranged on the soft soil foundation 20, and the soft soil roadbed structure 10 includes a first sheet pile wall 1, a second sheet pile wall 2, a reinforcement layer 3, a backfill layer 4, a road surface layer 5 and a drainage maintenance system 6. The first sheet pile wall 1 and the second sheet pile wall 2 are arranged opposite to each other, and a part of the first sheet pile wall 1 and a part of the second sheet pile wall 2 are both buried in the soft soil foundation 20. A backfill space is formed between the first sheet pile wall 1 and the second sheet pile wall 2. The reinforcement layer 3 is arranged in the backfill space, and at least a part of the reinforcement layer 3 is located below the surface of the soft soil foundation 20. The reinforcement layer 3 includes a first sand and gravel backfill 31. The backfill layer 4 is arranged in the backfill space and above the reinforcement layer 3. The backfill layer 4 includes a second sand and gravel backfill arranged in sequence from top to bottom. Backfill 41, water retaining member 42 and clay backfill 43, the pavement layer 5 is arranged above the backfill layer 4, the drainage maintenance system 6 includes a hollow steel pipe 61, a drainage trough 62 and an electrode rod 63, the drainage trough 62 is arranged below the reinforcement layer 3 and extends to the outside of the first sheet pile wall 1 and the second sheet pile wall 2, the hollow steel pipe 61 is penetrated through the reinforcement layer 3 and the backfill layer 4, the hollow steel pipe 61 has a water inlet hole 611 and a drainage hole 612, the water inlet hole 611 is connected to the water retaining member 42, the drainage hole 612 is connected to the drainage trough 62, at least part of the electrode rod 63 is buried in the soft soil foundation 20 outside the backfill space, the electrode rod 63 is suitable for connecting to the positive pole of the power supply, the hollow steel pipe 61 is suitable for connecting to the negative pole of the power supply, or, the first sheet pile wall 1 and the second sheet pile wall 2 are suitable for connecting to the negative pole of the power supply.

[0041] Among them, the first gravel backfill 31 can be made of quartz sand with good gradation and internal friction angle greater than 40°. During construction, the first gravel backfill 31 needs to be compacted to a relative density of more than 90% to achieve foundation reinforcement. The second gravel backfill 41 can be made of quartz sand with an internal friction angle greater than 38°. During construction, the second gravel backfill 41 needs to be compacted to a relative density of more than 95%, which is beneficial to improving the structural strength of the soft soil roadbed structure 10, thereby ensuring the service performance and stability of the soft soil roadbed structure 10. The clay backfill 43 can be the soft soil foundation 20 outside the soft soil roadbed structure 10. The soft soil is dug out and dried, which can reduce the amount of the second gravel backfill 41 in the backfill layer 4, which is beneficial to saving engineering costs. The pavement layer 5 can be stone asphalt concrete with strong deformation resistance, and its thickness can be 0.2m~0.3m. The drainage ditch 62 can be a "U"-shaped ditch cast by concrete, and the strength grade of the concrete is not less than C30. The drainage ditch 62 can be covered with square plastic blind pipes 77, and two layers of the first geotextile can be laid on the top of the drainage ditch 62 to prevent the first gravel backfill 31 in the reinforcement layer 3 from entering the drainage ditch 62, so as to prevent the drainage ditch 62 from being blocked.

[0042] It can be understood that the second gravel backfill 41, the water retaining member 42 and the clay backfill 43 of the backfill layer 4 are arranged in sequence from top to bottom, and the water retaining member 42 is located above the clay backfill 43. When there is rainfall or river water scouring, the water retaining member 42 can prevent water from flowing into the clay backfill 43 to keep the clay backfill 43 dry, thereby ensuring the structural strength of the backfill layer 4. In addition, the water blocked by the water retaining member 42 can flow into the hollow steel pipe 61 through the water inlet hole 611 connected to the water retaining member 42, and then flow to the drainage groove 62 through the drainage hole 612 of the hollow steel pipe 61 under the action of gravity, and be discharged from the drainage groove 62, thereby avoiding water accumulation in the soft soil roadbed structure 10, preventing water from affecting the strength of the soil, and thus helping to reduce the risk of structural instability and damage of the soft soil roadbed structure 10.

[0043] When constructing the drainage maintenance system 6, the electrode rod 63 can be connected to the positive pole of the power supply and the hollow steel pipe 61 can be connected to the negative pole of the power supply. The electrode rod 63 can be used as an anode and the hollow steel pipe 61 can be used as a cathode to guide the water in the soft soil foundation 20 to flow toward the cathode. The water can flow into the hollow steel pipe 61 through the water inlet hole 611 of the hollow steel pipe 61, and flow to the drainage trough 62 through the drainage hole 612 of the hollow steel pipe 61 to discharge the water in the soft soil foundation 20, thereby realizing electro-osmotic consolidation of the soft soil foundation 20, thereby improving the structural strength of the soft soil foundation 20. When the first sheet pile wall 1 and the second sheet pile wall 2 are buried in the soft soil foundation 20, the soft soil foundation 20 after electro-osmotic consolidation can stably and reliably support the first sheet pile wall 1 and the second sheet pile wall 2, which is beneficial to reduce the risk of overturning of the first sheet pile wall 1 and the second sheet pile wall 2.

[0044] When the drainage maintenance system 6 is constructed, the electrode rod 63 can be connected to the positive pole of the power supply, and the first sheet pile wall 1 and the second sheet pile wall 2 can be connected to the negative pole of the power supply, with the electrode rod 63 as the anode and the first sheet pile wall 1 and the second sheet pile wall 2 as the cathode to prevent the first sheet pile wall 1 and the second sheet pile wall 2 from corrosion and rust, which is beneficial to improve the service life of the first sheet pile wall 1 and the second sheet pile wall 2.

[0045] According to the soft soil roadbed structure 10 of the embodiment of the present invention, the backfill layer 4 includes a second gravel backfill 41, a water retaining member 42 and a clay backfill 43 arranged in sequence from top to bottom. The backfill layer 4 uses the clay backfill 43 as a part of the filling material, which can reduce the amount of the first gravel backfill 31 in the backfill layer 4, thereby helping to save engineering costs. The water retaining member 42 can prevent water from falling into the clay backfill 43, which is helpful to keep the clay backfill 43 dry, thereby ensuring the structural strength of the backfill layer 4 and ensuring the stability of the soft soil roadbed structure 10.

[0046] In some embodiments of the present invention, reference Figure 1As shown, the first sheet pile wall 1 and the second sheet pile wall 2 are both connected to the hollow steel pipe 61 through the water retaining member 42. The hollow steel pipe 61 can pull the first sheet pile wall 1 and the second sheet pile wall 2 through the water retaining member 42 to reduce the risk of overturning of the first sheet pile wall 1 and the second sheet pile wall 2, which is beneficial to improving the stability and reliability of the soft soil roadbed structure 10.

[0047] Reference Figure 1 As shown, the interior of the hollow steel pipe 61 is a hollow structure, which can form a water channel connecting the water inlet hole 611 and the drainage hole 612. The interior of the hollow steel pipe 61 can be filled with a third sand and gravel backfill soil 75. The third sand and gravel backfill soil 75 can support the inner wall of the hollow steel pipe 61, and can prevent the hollow steel pipe 5 from being squeezed and deformed to block the water channel connected to the water inlet hole 611, thereby avoiding affecting the drainage function of the hollow steel pipe 61. In addition, the third sand and gravel backfill soil 75 will not affect the drainage function of the hollow steel pipe 61, and the water blocked by the water retaining member 42 can be smoothly discharged to the drainage trough 62 through the hollow steel pipe 61.

[0048] In some embodiments, the diameter of the water inlet hole 611 of the hollow steel pipe 61 may be less than 1 cm to prevent the second sand and gravel backfill soil 41 in the backfill layer 4 from entering the hollow steel pipe 61 through the water inlet hole 611 , which is beneficial to ensure the structural stability of the backfill layer 4 .

[0049] In other embodiments, a metal mesh may be welded to the hollow steel pipe 61 at the water inlet hole 611, and two layers of the second geotextile may be wrapped around the outside of the metal mesh to prevent the second sand and gravel backfill soil 41 in the backfill layer 4 from entering the hollow steel pipe 61 through the water inlet hole 611, thereby facilitating the structural stability of the backfill layer 4. At the same time, the second geotextile has good water permeability, and water can pass through the second geotextile and enter the hollow steel pipe 61 through the water inlet hole 611 without affecting the drainage function of the drainage maintenance system 6.

[0050] In some embodiments of the present invention, reference Figure 1-Figure 3 As shown, the water retaining member 42 includes a first sub-water retaining member 42a and a second sub-water retaining member 42b of the same structure, and the first sub-water retaining member 42a and the second sub-water retaining member 42b both include a first geogrid, a water retaining plate and a second geogrid that are stacked, wherein the first geogrid and the second geogrid of the first sub-water retaining member 42a are both connected between the first sheet pile wall 1 and the hollow steel pipe 61, and the first geogrid and the second geogrid of the second sub-water retaining member 42b are both connected between the second sheet pile wall 2 and the hollow steel pipe 61.

[0051] It can be understood that the hollow steel pipe 61 can jointly pull the first sheet pile wall 1 through the first geogrid and the second geogrid of the first sub-water retaining member 42a to reduce the risk of the first sheet pile wall 1 overturning, and the hollow steel pipe 61 can jointly pull the second sheet pile wall 2 through the first geogrid and the second geogrid of the second sub-water retaining member 42b to reduce the risk of the second sheet pile wall 2 overturning, and the water retaining plate can be a waterproof plastic plate, which can prevent water from falling into the clay backfill soil 43 of the backfill layer 4 to ensure the structural strength of the backfill layer 4, which is beneficial to ensure the stability and reliability of the soft soil roadbed structure 10.

[0052] Reference Figure 2-4 As shown, in the left and right directions, the left and right sides of the hollow steel pipe 61 are symmetrically provided with the first reinforcement hook 71 and the second reinforcement hook 72, the first sheet pile wall 1 is provided with a first reinforcement clamp on the side close to the hollow steel pipe 61, and the second sheet pile wall 2 is provided with a second reinforcement clamp 73 on the side close to the hollow steel pipe 61, the first reinforcement hook 71 is suitable for being connected to the right ends of the first geogrid and the second geogrid of the first sub-water retaining member 42a, the first reinforcement clamp is suitable for being connected to the left ends of the first geogrid and the second geogrid of the first sub-water retaining member 42a, so that the first sub-water retaining member 42a is connected between the first sheet pile wall 1 and the hollow steel pipe 61, the second reinforcement hook 72 is suitable for being connected to the left ends of the first geogrid and the second geogrid of the second sub-water retaining member 42b, and the second reinforcement clamp 73 is suitable for being connected to the right ends of the first geogrid and the second geogrid of the second sub-water retaining member 42b, so that the second sub-water retaining member 42b is connected between the second sheet pile wall 2 and the hollow steel pipe 61.

[0053] The first reinforcement clamp and the second reinforcement clamp 73 can be constructed as a box with reserved pores, and the first geogrid and the second geogrid of the first sub-water retaining member 42a can be inserted into the pores of the first reinforcement clamp and mechanically connected by tightening screws and nuts to clamp the first geogrid and the second geogrid of the first sub-water retaining member 42a in the up and down directions, so that the water retaining member 42 of the first sub-water retaining member 42a can be clamped by the first geogrid and the second geogrid, and the first geogrid and the second geogrid of the second sub-water retaining member 42b can be clamped by the first geogrid and the second geogrid. The grid can be inserted into the pores of the second reinforcement clamp 73 and mechanically connected by tightening screws and nuts to clamp the first geogrid and the second geogrid of the second sub-water retaining member 42b in the up and down directions, so that the water retaining member 42 of the second sub-water retaining member 42b is clamped by the first geogrid and the second geogrid, thereby preventing the water retaining member 42 of the first sub-water retaining member 42a and the water retaining member 42 of the second sub-water retaining member 42b from moving, avoiding the drainage board from sinking into the clay backfill 43, and effectively preventing water from entering the clay backfill 43.

[0054] In some embodiments of the present invention, reference Figure 1-Figure 3As shown, there are multiple backfill layers 4, and a third geogrid 74 is provided between two adjacent backfill layers 4. At least one of the first sheet pile wall 1 and the second sheet pile wall 2 is connected to the third geogrid 74, that is, the first sheet pile wall 1 can be connected to the third geogrid 74, or the second sheet pile wall 2 can be connected to the third geogrid 74, or both the first sheet pile wall 1 and the second sheet pile wall 2 can be connected to the third geogrid 74 to fix the third geogrid 74. The third geogrid 74 can prevent the clay backfill soil 43 in the backfill layer 4 from moving, which is beneficial to ensure the structural stability of the backfill layer 4.

[0055] It can be understood that there are multiple backfill layers 4, and the multiple water retaining parts 42 of the multiple backfill layers 4 can stably and reliably hold the first sheet pile wall 1 and the second sheet pile wall 2, reducing the risk of overturning of the first sheet pile wall 1 and the second sheet pile wall 2, which is beneficial to improving the stability and reliability of the soft soil roadbed structure 10, and the multiple water retaining parts 42 of the multiple backfill layers 4 can retain water layer by layer to form a multi-layer water retaining effect, which can effectively reduce the risk of water entering the clay backfill 43, thereby reducing the risk of structural instability of the clay backfill 43. In addition, there are multiple backfill layers 4, which can reduce the thickness of the clay backfill 43 in a single backfill layer 4 to reduce the risk of structural instability of the clay backfill 43, which is beneficial to improving the structural strength of the backfill layer 4.

[0056] In this embodiment, refer to Figure 1 and Figure 2 As shown, in the up and down directions, the top surface of the reinforcement layer 3 is flush with the surface of the soft soil foundation 20, and the overall height of the multiple backfill layers 4 plus the height of the pavement layer 5 is the net height of the soft soil roadbed structure 10, wherein the tensile strength of the third geogrid 74 is greater than or equal to 100 kN / m, the length of the third geogrid 74 is L1, the net height of the soft soil roadbed structure 10 is L2, and L1 and L2 satisfy the following relationship: L1: L2 = 0.7, that is, the length of the third geogrid 74 is 0.7 times the net height of the soft soil roadbed structure 10, which can avoid the movement of the clay backfill soil 43 in the backfill layer 4, which is beneficial to ensure the structural stability of the backfill layer 4.

[0057] Reference Figure 1-Figure 3As shown, the third geogrid 74 may include a first sub-geogrid 74a and a second sub-geogrid 74b. The first sub-geogrid 74a may be connected to the first sheet pile wall 1 and located between the first sheet pile wall 1 and the hollow steel pipe 61. The second sub-geogrid 74b may be connected to the second sheet pile wall 2 and located between the second sheet pile wall 2 and the hollow steel pipe 61. Specifically, the first sheet pile wall 1 may be provided with a third reinforcement clamp, and the second sheet pile wall 2 may be provided with a fourth reinforcement clamp 76. The third reinforcement clamp is suitable for clamping the first sub-geogrid 74a, and the fourth reinforcement clamp 76 is suitable for clamping the second sub-geogrid 74b, thereby achieving clamping and fixing of the third geogrid 74. The third reinforcement clamp and the fourth reinforcement clamp 76 may have the same structure as the first reinforcement clamp and the second reinforcement clamp 73.

[0058] In some embodiments of the present invention, reference Figure 1 As shown, the distance between the water retaining member 42 and the third geogrid 74 in the up and down directions is H1, satisfying the relationship: 0.4m≤H1≤0.6m. For example, H1 can be 0.4m, 0.5m, 0.6m, etc., which is beneficial to ensure the structural strength of the backfill layer 4, simplify the structure of the backfill layer 4, and reduce the engineering cost of the soft soil roadbed 20.

[0059] It is understandable that if H1 is less than 0.4m, the distance between the water retaining member 42 and the third geogrid 74 is small, and the backfill layer 4 needs to be provided with more water retaining members 42 and the third geogrid 74, the engineering cost is high, and the structure of the backfill layer 4 is relatively complex. If H1 is greater than 0.6m, the distance between the water retaining member 42 and the third geogrid 74 is large, the thickness of the clay backfill 43 is large, and the risk of structural instability of the clay backfill 43 is high, and it is difficult to ensure the structural strength of the clay backfill 43. In this embodiment, H1 is within the range of 0.4m to 0.6m, and the distance between the water retaining member 42 and the third geogrid 74 is moderate, which can simplify the structure of the backfill layer 4 while ensuring the structural strength of the backfill layer 4, thereby reducing the engineering cost.

[0060] In some embodiments of the present invention, the spacing between the hollow steel pipe 61 and the first sheet pile wall 1 is the same as the spacing between the hollow steel pipe 61 and the second sheet pile wall 2, which is beneficial to uniform force on the left and right sides of the hollow steel pipe 61 and reduces the risk of local deformation of the hollow steel pipe 61, thereby facilitating the improvement of the stability and reliability of the soft soil roadbed structure 10. The hollow steel pipe 61 is located in the middle of the first sheet pile wall 1 and the second sheet pile wall 2, which can ensure that the spacing between the hollow steel pipe 61 and the first sheet pile wall 1 and the spacing between the hollow steel pipe 61 and the second sheet pile wall 2 are both short, thereby avoiding a longer spacing between the hollow steel pipe 61 and one of the first sheet pile wall 1 and the second sheet pile wall 2, thereby preventing the drainage path from being too long, preventing water from being unable to be discharged in time and accumulating in the backfill layer 4, and thereby reducing the risk of structural instability of the backfill layer 4.

[0061] In some embodiments of the present invention, reference Figure 4 As shown, the hollow steel pipe 61 includes a plurality of detachably connected hollow sub-steel pipes 613 for easy construction. A corresponding number of hollow steel pipes 61 can be arranged according to the height of the soft soil roadbed structure 10 to be constructed, so as to facilitate the construction of soft soil roadbed structures 10 of different heights. The hollow steel pipe 61 has good versatility.

[0062] Reference Figure 4 As shown, the hollow sub-steel pipe 613 may have a joint 6131 and multiple water inlet holes 611. The multiple hollow sub-steel pipes 613 can be nested and limited with each other through the joints 6131 to achieve detachable connection. The multiple water inlet holes 611 can be arranged at intervals along the circumferential direction of the hollow sub-steel pipe 613. The water blocked by the water retaining member 42 can flow smoothly into the hollow sub-steel pipe 613 through the multiple water inlet holes 611.

[0063] In some embodiments of the present invention, reference Figure 1 As shown, the drainage maintenance system 6 also includes a water collection well 64, which is arranged in the soft soil foundation 20 outside the backfill space. The water collection well 64 is connected to the drainage trough 62, and the water collection well 64 is suitable for collecting water discharged from the drainage trough 62.

[0064] Reference Figure 1 As shown, in the left and right directions, both ends of the drainage ditch 62 are provided with a collection well 64, and the collection well 64 can be cast with reinforced concrete, and the strength grade of the concrete used for casting is greater than or equal to C25, and the depth of the bottom of the collection well 64 is greater than the location of the drainage ditch 62 by 6m to 8m, and the depth of the bottom of the collection well 64 from the ground surface can be 8m to 10m to ensure the capacity of the collection well 64. After the soft soil roadbed structure 10 is put into service, the engineering personnel can regularly pump out the water collected in the collection well 64 with a pump.

[0065] In some embodiments of the present invention, reference Figure 1 As shown, the reinforcement layer 3 may also include a third geotextile 32, a portion of the third geotextile 32 is arranged below the first gravel backfill 31, and another portion of the third geotextile 32 is located on the left and right sides of the first gravel backfill 31, and is reversed to the upper surface of the first gravel backfill 31. The number of reinforcement layers 3 may be multiple. During construction, the first gravel backfill 31 is wrapped by reversely wrapping the third geotextile 32 on both sides, so as to replace the poor soft soil foundation 20 and increase the base contact width to improve the bearing capacity of the soft soil roadbed structure 10. Among them, the tensile strength of the third geotextile 32 is not less than 60kN / m, and the spacing between the third geotextiles 32 of two adjacent reinforcement layers 3 may be 0.5m to 0.8m.

[0066] In some embodiments of the present invention, the top end of the electrode rod 63 protrudes 1m to 2m above the ground surface, so that the electrode rod 63 can be connected to a power source and it is also convenient for engineers to replace the electrode rod 63. The bottom of the electrode rod 63 is flush with the bottom of the first sheet pile wall 1 and the second sheet pile wall 2, so as to protect the first sheet pile wall 1 and the second sheet pile wall 2 from corrosion. The electrode rod 63 can be made of anode materials such as aluminum alloy and magnesium alloy.

[0067] In some embodiments of the present invention, in the up and down directions, the spacing between any adjacent first reinforcement hooks 71 may be 0.8m to 1.2m, and the spacing between any adjacent second reinforcement hooks 72 may be 0.8m to 1.2m, that is, the spacing between any two adjacent first sub-water retaining members 42a is 0.8m to 1.2m, and the spacing between any two adjacent second sub-water retaining members 42b is 0.8m to 1.2m, the spacing between any adjacent first reinforcement clamps and third reinforcement clamps may be 0.4m to 0.6m, and the spacing between any adjacent second reinforcement clamps 73 and fourth reinforcement clamps may be 0.4m to 0.6m.

[0068] In some embodiments of the present invention, both the first sheet pile wall 1 and the second sheet pile wall 2 can adopt U-shaped steel sheet piles (Larsen steel sheet piles), which can play the role of wall protection during the construction of the soft soil roadbed structure 10 to prevent the soft soil foundation 20 from collapsing. In addition, the U-shaped steel sheet piles have strong durability. After the construction of the soft soil roadbed structure 10 is completed, the U-shaped steel sheet piles can be used as wall surfaces and prevent the first gravel backfill 31, the second gravel backfill 41, and the clay backfill 43 in the soft soil roadbed structure 10 from collapsing.

[0069] In some embodiments of the present invention, reference Figure 1 As shown, the soft soil roadbed structure 10 also includes a sheet pile wall pile cap 8, which is arranged on the top of the first sheet pile wall 1 and the second sheet pile wall 2 to protect the first sheet pile wall 1 and the second sheet pile wall, wherein the sheet pile wall pile cap 8 and the top of the first sheet pile wall 1 and the second sheet pile wall 2 can be fixedly connected by welding.

[0070] According to the soft soil roadbed structure 10 of the embodiment of the present invention, a double-sided reinforced soft soil roadbed structure 10 can be formed by alternately filling clay backfill 43 and second sand and gravel backfill 41 in multiple layers on the reinforcement layer 3, and alternately laying water retaining members 42 and third geogrids 74. The multiple water retaining members 42, hollow steel pipes 61 and drainage grooves 62 in the soft soil roadbed structure 10 are connected in sequence to form a variety of drainage channels, which is beneficial to ensure the drying of the clay backfill 43 inside the soft soil roadbed structure 10 and the rapid drainage and consolidation of the soft soil foundation 20.

[0071] Reference Figure 5As shown, according to another aspect of the present invention, a construction method of a soft soil roadbed structure, the soft soil roadbed structure is the above-mentioned soft soil roadbed structure, and the construction method comprises:

[0072] Step S1: Construct a drainage maintenance system.

[0073] Among them, positioning and laying out can be carried out in the construction site according to the design plan, trenches can be excavated in the soft soil foundation, wooden boards or mud can be used for wall protection, steel cages can be laid out and concrete can be poured to form drainage troughs and water collection wells on the left and right sides of the drainage troughs. After maintenance, the drainage troughs can be filled with square plastic blind pipes, and the top surface of the drainage troughs can be covered with two layers of the first geotextile. Metal meshes can be welded on the left and right sides of the hollow steel pipes, and two layers of the second geotextile can be wrapped at the water inlet. Two to three sections of hollow steel pipes can be inserted perpendicular to the soft soil foundation at the set position, and the bottom of the hollow steel pipes can be in contact with the top of the drainage trough. The top of the hollow steel pipe can exceed the surface of the soft soil foundation by 1.5m to 2m, and the inside of the hollow steel pipes can be filled with the third sand and gravel backfill soil, and then electrode rods can be injected on the left and right sides of the hollow steel pipes at a distance of 9.5m to 14.5m from the hollow steel pipes, and the bottom of the electrode rods can be in contact with the top of the drainage trough, thereby completing the construction of the drainage maintenance system.

[0074] Step S2: Connect the electrode rod to the positive electrode of the power supply and the hollow steel pipe to the negative electrode of the power supply to perform electroosmotic consolidation on the soft soil foundation.

[0075] The water in the soft soil foundation between the two electrode rods can flow to the hollow steel pipe under the action of the potential difference, and can be introduced into the drainage trough through the hollow steel pipe to discharge the water in the soft soil foundation. The power supply can be a DC power supply, and the voltage of the DC power supply can be controlled within the range of 150V to 200V. The current density of the construction site is 0.2A / m 2 ~0.8A / m 2 Within the range, the current density of the construction site can be adjusted according to the structural strength of the soft soil foundation. The current density of the construction site is positively correlated with the voltage of the DC power supply. The expected electroosmosis consolidation time is generally not less than three weeks and can be adjusted according to the strength requirements of the project.

[0076] Step S3: constructing a first sheet pile wall and a second sheet pile wall.

[0077] Among them, in the left and right directions, the horizontal spacing between the first sheet pile wall and the second sheet pile wall can be 15m to 22.5m, and the specific spacing can be determined according to the width requirement of the engineering roadbed. After determining the horizontal spacing between the first sheet pile wall and the second sheet pile wall, the first sheet pile wall and the second sheet pile wall are driven to 2m to 3m below the surface of the soft soil foundation, and the depth of the first sheet pile wall and the second sheet pile wall in the soft soil foundation is consistent with the depth of the electrode rod in the soft soil foundation. The upper ends of the first sheet pile wall and the second sheet pile wall can exceed the surface of the soft soil foundation by 6m to 8m, and then the sheet pile wall caps can be welded on the top of the first sheet pile wall and the second sheet pile wall, thereby completing the construction of the first sheet pile wall and the second sheet pile wall.

[0078] Step S4: Lay out the reinforcement layer, backfill layer and pavement layer in sequence.

[0079] Among them, before laying the reinforcement layer, backfill layer and pavement layer, the hollow steel pipe can be added to the designed height first, and then the soft soil foundation below the ground surface between the hollow steel pipe and the first sheet pile wall and the soft soil foundation below the ground surface between the hollow steel pipe and the second sheet pile wall are excavated and leveled.

[0080] Laying out the reinforcement layer may include: constructing 3 to 4 reinforcement layers. During the construction of each layer, the third geotextile reinforcement material is laid flat on the bottom surface of the backfill space, leaving a length of 120 cm at both ends, and then the first sand and gravel backfill soil is filled on the third geotextile, leveled and compacted to a relative density greater than 90%, and then the third geotextile reserved at the left and right ends is reversed, and the above arrangement is repeated until the top surface of the reinforcement layer is flush with the surface of the soft soil foundation.

[0081] Laying out the backfill layer may include: alternately filling clay backfill and second sand and gravel backfill in multiple layers on the reinforcement layer, and alternately laying water retaining members and third geogrids between the clay backfill and the second sand and gravel backfill. Specifically, after the clay backfill is compacted and leveled, water retaining members are laid on the upper surface of the clay backfill, and then the second sand and gravel backfill is filled above the water retaining members, and compaction equipment is used to compact the second sand and gravel backfill to a degree of 95%. After compaction and leveling, the third geogrid is laid above the second sand and gravel backfill, and the above steps are repeated until the backfill layer as a whole reaches the designed height.

[0082] Laying out the pavement layer may include: pouring asphalt concrete pavement on the upper surface of the last backfill layer, and checking whether the asphalt concrete pavement meets the design elevation requirements. After completing the setting of traffic markings on the pavement, it can be put into service.

[0083] According to the construction method of the soft soil roadbed structure of the embodiment of the present invention, the backfill layer includes a second gravel backfill, a water retaining member and a clay backfill arranged in sequence from top to bottom. The backfill layer uses clay backfill as a part of the filling material, which can reduce the amount of the first gravel backfill in the backfill layer, thereby helping to save engineering costs. The water retaining member can prevent water from falling into the clay backfill, which is helpful to keep the clay backfill dry, thereby ensuring the structural strength of the backfill layer and ensuring the stability of the soft soil roadbed structure.

[0084] In some embodiments of the present invention, the construction method also includes: digging out soft soil on the soft soil foundation outside the soft soil roadbed structure, drying the soft soil to obtain clay backfill, and using clay backfill in the backfill layer to reduce the amount of the second sand and gravel backfill, thereby helping to save engineering costs.

[0085] Among them, the calculated amount of earth can be excavated first, and the soft soil can be mixed by a large mixer. After the mixing is completed, it can be sieved to remove large particles. A shed can be built in a site not affected by electro-osmosis, and an impermeable geomembrane can be laid on the ground. The sieved soft soil can be laid on the geomembrane. Fans and other equipment can be used to speed up the soft soil laid on the geomembrane, so that the soft soil can be air-dried, and the moisture content of the air-dried soft soil can be reduced to below the plastic limit moisture content, thereby obtaining clay backfill soil.

[0086] In some embodiments of the present invention, after the soft soil roadbed structure is put into service, the first sheet pile wall and the second sheet pile wall are connected to the negative pole of the DC power supply, and the electrode rod is connected to the positive pole of the DC power supply. The voltage of the DC power supply is not greater than 30V, so as to protect the first sheet pile wall and the second sheet pile wall from corrosion. In addition, solar panels can be installed at the first sheet pile wall and the second sheet pile wall to supply energy to reduce energy consumption.

[0087] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification.

[0088] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A soft soil roadbed structure, characterized in that: The soft soil roadbed structure is arranged on a soft soil foundation (20), and the soft soil roadbed structure comprises: A first sheet pile wall (1) and a second sheet pile wall (2), wherein the first sheet pile wall (1) and the second sheet pile wall (2) are arranged opposite to each other, a portion of the first sheet pile wall (1) and a portion of the second sheet pile wall (2) are both buried in the soft soil foundation (20), and a backfill space is formed between the first sheet pile wall (1) and the second sheet pile wall (2); A reinforcement layer (3), the reinforcement layer (3) being arranged in the backfill space, and at least a portion of the reinforcement layer (3) being located below the surface of the soft soil foundation (20), the reinforcement layer (3) comprising a first sand and gravel backfill soil (31); A backfill layer (4), the backfill layer (4) being arranged in the backfill space and above the reinforcement layer (3), the backfill layer (4) comprising a second sand and gravel backfill (41), a water retaining member (42) and a clay backfill (43) arranged in sequence from top to bottom; A pavement layer (5), the pavement layer (5) being arranged above the backfill layer (4); A drainage maintenance system (6), the drainage maintenance system (6) comprising a hollow steel pipe (61), a drainage trough (62) and an electrode rod (63), the drainage trough (62) being arranged below the reinforcement layer (3) and extending to the outside of the first sheet pile wall (1) and the second sheet pile wall (2), the hollow steel pipe (61) being arranged through the reinforcement layer (3) and the backfill layer (4), the hollow steel pipe (61) having a water inlet hole (611) and a drainage hole (612). 12), the water inlet hole (611) is connected to the water retaining member (42), the drainage hole (612) is connected to the drainage trough (62), at least part of the electrode rod (63) is buried in the soft soil foundation (20) outside the backfill space, the electrode rod (63) is suitable for connecting to the positive pole of the power supply, the hollow steel pipe (61) is suitable for connecting to the negative pole of the power supply, or the first sheet pile wall (1) and the second sheet pile wall (2) are suitable for connecting to the negative pole of the power supply.

2. The soft soil roadbed structure according to claim 1, characterized in that: The first sheet pile wall (1) and the second sheet pile wall (2) are both connected to the hollow steel pipe (61) via the water retaining member (42).

3. The soft soil roadbed structure according to claim 2, characterized in that: The water retaining member (42) comprises a first sub-water retaining member (42a) and a second sub-water retaining member (42b) of the same structure, wherein the first sub-water retaining member (42a) and the second sub-water retaining member (42b) both comprise a first geogrid, a water retaining plate and a second geogrid which are stacked; Wherein, the first geogrid and the second geogrid of the first sub-water retaining member (42a) are both connected between the first sheet pile wall (1) and the hollow steel pipe (61); The first geogrid and the second geogrid of the second sub-water retaining member (42b) are both connected between the second sheet pile wall (2) and the hollow steel pipe (61).

4. The soft soil roadbed structure according to claim 3, characterized in that: The number of the backfill layers (4) is multiple, a third geogrid (74) is provided between two adjacent backfill layers (4), and at least one of the first sheet pile wall (1) and the second sheet pile wall (2) is connected to the third geogrid (74).

5. The soft soil roadbed structure according to claim 4, characterized in that: The distance between the water retaining member (42) and the third geogrid (74) in the vertical direction is H1, which satisfies the relationship: 0.4m≤H1≤0.6m.

6. The soft soil roadbed structure according to any one of claims 1 to 5, characterized in that: The distance between the hollow steel pipe (61) and the first sheet pile wall (1) is the same as the distance between the hollow steel pipe (61) and the second sheet pile wall (2).

7. The soft soil roadbed structure according to claim 6, characterized in that: The hollow steel pipe (61) comprises a plurality of detachably connected hollow sub-steel pipes (613).

8. The soft soil roadbed structure according to claim 1, characterized in that: The drainage maintenance system (6) further comprises a water collection well (64), wherein the water collection well (64) is arranged in the soft soil foundation (20) outside the backfill space, and the water collection well (64) is connected to the drainage trough (62).

9. A construction method for a soft soil roadbed structure, characterized in that: The soft soil roadbed structure is a soft soil roadbed structure according to any one of claims 1 to 8, and the construction method comprises: constructing said drainage maintenance system; Connecting the electrode rod to the positive electrode of a power source and the hollow steel pipe to the negative electrode of a power source to perform electroosmotic consolidation on the soft soil foundation; constructing a first sheet pile wall and a second sheet pile wall; The reinforcement layer, backfill layer and pavement layer are laid out in sequence.

10. The construction method of the soft soil roadbed structure according to claim 9, characterized in that: The construction method also includes: Soft soil is excavated from the soft soil foundation outside the soft soil roadbed structure, and the soft soil is dried to obtain the clay backfill soil.

Citation Information

Patent Citations

  • Prefabricated slab oppositely-pulling vertical type non-slope embankment and construction method

    CN105780618A

  • Construction method of upright slope-free lightweight ecological embankment structure

    CN107700298A

  • High embankment retaining structure for soft soil area

    CN108560349A

  • Lightweight foam concrete composite embankment structure based on FRP bars and construction method

    CN114635323A

  • River high slope two-stage reinforced soil flexible abutment composite structure and construction method thereof

    CN118087367A

Cited By

  • Tailing pond electroosmosis drainage model test system

    CN120405088A