Reinforcing waterproof structure for deep foundation pit in water-rich stratum

By adopting multi-layer solid soil nets, anchor piles, compacted base soil layer and reinforcement rib structures in deep foundation pits, combined with optimized construction methods and drainage systems, the stability and waterproof performance of traditional reinforced structures in water-rich formations are solved. and construction safety issues have achieved higher overall performance and construction efficiency of foundation pits.

CN118880903APending Publication Date: 2024-11-01SOUTHWEAT UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411069020.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The traditional deep foundation pit reinforced structure has problems such as insufficient stability, limited waterproofing performance, low construction safety, poor structural durability and low drainage efficiency in water-rich formations, and cannot effectively cope with groundwater penetration and high water pressure.

Method used

Using multi-layer solid soil nets, bottom and side wall anchor piles, compacted base soil layer, water barrier layer, concrete layer and reinforcement structure, combined with layered excavation and segmented construction methods, the top slope and optimized drainage system are set up to form a comprehensive Reinforced waterproof structure.

Benefits of technology

It significantly improves the stability, waterproof performance and construction safety of the foundation pit, extends the service life of the structure, and improves the drainage efficiency, ensuring the reliability and durability of the foundation pit in water-rich formations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880903A_ABST
    Figure CN118880903A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of foundation pit reinforcement, and provides a water-rich stratum deep foundation pit reinforcement waterproof structure which comprises the ground, a foundation pit is dug in the ground, a foundation pit inner enclosure structure is arranged in the foundation pit, and multiple layers of soil fixing nets are arranged in soil bodies on the front side, the rear side, the left side and the right side of the foundation pit in the ground. Top slopes are arranged at the positions, on the front side, the rear side, the left side and the right side of a top pithead of the foundation pit, of the top of the ground, a plurality of bottom anchoring piles are arranged at the bottom in the foundation pit inner enclosure structure, and a plurality of side anchoring piles are arranged in the front side wall, the rear side wall, the left side wall and the right side wall of the foundation pit inner enclosure structure. Through the innovative structural design and construction method, the stability, waterproof performance and construction safety of the foundation pit are remarkably improved. The beneficial effects not only ensure the reliability and durability of the foundation pit in the water-rich stratum, but also provide precious experience and reference for similar projects. By comprehensively applying various technologies and methods, all-directional reinforcement and optimization of the foundation pit structure are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation pit reinforcement, and in particular to a waterproof structure for reinforcing a deep foundation pit in a water-rich stratum. Background Art

[0002] In the field of underground engineering, there are many challenges, especially when constructing deep foundation pits in water-rich strata. Water-rich strata usually refer to strata with high groundwater levels and active groundwater flow, which puts higher requirements on the stability, waterproof performance and construction safety of the foundation pit. Traditional deep foundation pit reinforcement and waterproofing structures often have some shortcomings in dealing with these challenges.

[0003] Disadvantages of existing technology

[0004] Insufficient foundation pit stability: Traditional foundation pit reinforcement structures often rely on a single support or anchoring system, such as using only anchor rods or steel supports. These methods may not provide sufficient stability in water-rich formations and may easily lead to soil slippage or collapse.

[0005] Limited waterproofing performance: Existing waterproof structures usually use a single waterproof layer, such as waterproof membrane or coating, which is prone to leakage under long-term water pressure and cannot effectively prevent groundwater infiltration.

[0006] Low construction safety: When constructing deep foundation pits in water-rich strata, traditional construction methods such as large excavation can easily lead to soil instability and groundwater influx, increasing construction risks and difficulties.

[0007] Poor structural durability: Traditional concrete structures are susceptible to groundwater erosion in water-rich strata, resulting in reduced structural strength and durability. In addition, the lack of effective reinforcement and anchor bar design makes the structure prone to cracks or deformation when subjected to external loads.

[0008] Low drainage efficiency: Existing drainage systems are often simply designed and cannot effectively cope with the high water pressure and large amounts of groundwater flow in water-rich strata, resulting in water accumulation inside the foundation pit, affecting the construction progress and the efficiency of the foundation pit.

[0009] In summary, the existing deep foundation pit reinforcement and waterproofing structures in water-rich strata have obvious deficiencies in stability, waterproofing performance, construction safety, structural durability and drainage efficiency, and an innovative technical solution is urgently needed to solve these problems. The present invention is aimed at these deficiencies and proposes a comprehensive reinforcement and waterproofing structure and construction method to improve the overall performance and construction efficiency of the foundation pit in the water-rich stratum.

[0010] Therefore, this invention proposes a waterproof structure for reinforcing deep foundation pit in water-rich stratum to solve the above problems. Summary of the invention

[0011] In order to overcome the defects of the prior art, the object of the present invention is to provide a reinforced waterproof structure for deep foundation pit in water-rich strata.

[0012] To achieve the above-mentioned purpose, the technical solution of the present invention is implemented as follows: a water-rich stratum deep foundation pit reinforcement waterproof structure, comprising a ground, a foundation pit is dug on the ground, a foundation pit inner retaining structure is arranged inside the foundation pit, a multi-layer soil-fixing net is arranged inside the soil body on the four sides of the front, back, left, and right of the foundation pit inside the ground, a top slope is arranged on the four sides of the front, back, left, and right of the pit top opening of the foundation pit on the top of the ground, a plurality of bottom anchor piles are arranged on the bottom of the inner retaining structure of the foundation pit, and a plurality of side anchor piles are arranged inside the side walls of the front, back, left, and right of the inner retaining structure of the foundation pit;

[0013] The inner retaining structure of the foundation pit specifically includes the following structures:

[0014] The compacted soil layer in direct contact with the inner wall of the foundation pit;

[0015] A water-proof layer arranged inside the compacted base soil layer;

[0016] A first concrete layer disposed inside the waterproof layer;

[0017] A second concrete layer is disposed inside the first concrete layer.

[0018] As a preferred technical solution of the invention, the soil-fixing net is specifically composed of steel bars obliquely inserted into the internal holes of the ground and solidified cement slurry, and the soil-fixing net forms an angle of 15° with the vertical plane.

[0019] As a preferred technical solution of the invention, a plurality of the bottom anchor piles are distributed in a matrix shape, and the bottom ends of a plurality of the bottom anchor piles are vertically anchored into the bottom of the foundation pit at a depth of 2 meters.

[0020] As a preferred technical solution of the invention, the angle between the line connecting the outer end of several side anchor piles and the anchoring end and the horizontal plane is set to 15°, and several side anchor piles are anchored 2.5 meters deep into the side wall of the foundation pit.

[0021] As a preferred technical solution of the invention, a plurality of anchor bars perpendicular to the inner surface are provided on the first concrete layer, and one end of the outer side of the plurality of anchor bars is anchored inside the second concrete layer.

[0022] As a preferred technical solution of the invention, a mesh reinforcement structure composed of a plurality of reinforcing ribs is arranged inside the first concrete layer.

[0023] As a preferred technical solution of the invention, the construction steps include:

[0024] a. Mark the location of the foundation pit on the ground and conduct preliminary excavation to the predetermined depth;

[0025] b. Drill holes that are interlaced and mesh-like around the foundation pit, and inject cement slurry to solidify it, thereby forming a soil-fixing net;

[0026] c. Set up a top slope around the pit opening at the top of the foundation pit to ensure the stability and drainage function of the slope;

[0027] d. Install the inner retaining structure of the foundation pit inside the foundation pit, including the compacted base soil layer, the waterproof layer, the first concrete layer and the second concrete layer;

[0028] e. Install bottom anchor piles and side anchor piles at the bottom and surrounding side walls of the retaining structure in the foundation pit, ensuring that the depth and angle of the anchor piles meet the design requirements;

[0029] f. Anchor bars are arranged on the first concrete layer and ensured to be anchored inside the second concrete layer;

[0030] g. Arrange reinforcing ribs inside the first concrete layer to form a mesh reinforcement structure;

[0031] h. Install the drainage system inside the foundation pit to ensure that the moisture inside the foundation pit can be effectively discharged;

[0032] i. Carry out final inspection and acceptance of foundation pit reinforcement and waterproofing structure.

[0033] As a preferred technical solution of the invention, in step a, a layered excavation method is used during the initial excavation, and the excavation depth of each layer does not exceed 2 meters to ensure stability and safety during the excavation process;

[0034] In step b, when installing the soil-fixing net, mechanical drilling and manual assistance are used to ensure that the inclination angle and position of the soil-fixing net are accurate;

[0035] In step d, when installing the retaining structure in the foundation pit, a segmented construction method is adopted, and a quality inspection is carried out after each segment is completed to ensure the density and waterproof performance of each layer of the structure;

[0036] In step e, when installing the bottom anchor piles and the side anchor piles, a vibration pile sinking method is used to ensure the verticality and stability of the anchor piles;

[0037] In step h, when installing the drainage system, a combination of underground drainage pipes and surface drainage ditches is used to ensure that the moisture inside the foundation pit can be quickly drained to avoid water accumulation;

[0038] In step i, during the final inspection and acceptance, non-destructive testing methods such as ultrasonic testing and infrared testing are used to ensure the integrity and reliability of the foundation pit reinforcement and waterproofing structure.

[0039] The beneficial effects of the present invention are embodied in:

[0040] Enhance the stability of the foundation pit: By setting up multiple layers of soil-fixing nets around the foundation pit and installing bottom anchor piles and side anchor piles at the bottom and surrounding side walls of the retaining structure inside the foundation pit, the overall stability of the foundation pit is significantly enhanced, effectively preventing soil slippage and collapse.

[0041] Improve waterproof performance: The retaining structure inside the foundation pit includes a compacted base soil layer, a waterproof layer, a first concrete layer and a second concrete layer. These structural layers work together to provide excellent waterproof performance and effectively prevent the infiltration of groundwater.

[0042] Optimize construction safety: The layered excavation method and segmented construction method are adopted to ensure soil stability and construction safety during the construction process. At the same time, the setting of the top slope and the installation of the drainage system further improve the safety of the construction site.

[0043] Improve structural durability: By setting anchor bars on the first concrete layer and arranging reinforcing bars inside, the shear strength and overall stiffness of the structure are enhanced, thereby improving the durability and service life of the structure.

[0044] Enhanced drainage efficiency: The optimized design of the drainage system ensures that the moisture inside the foundation pit can be quickly discharged, effectively avoiding the problem of water accumulation and improving the efficiency and safety of the foundation pit.

[0045] The present invention provides a deep foundation pit reinforcement waterproof structure in a water-rich stratum, which significantly improves the stability, waterproof performance and construction safety of the foundation pit through innovative structural design and construction methods. These beneficial effects not only ensure the reliability and durability of the foundation pit in the water-rich stratum, but also provide valuable experience and reference for similar projects. By comprehensively applying a variety of technologies and methods, the present invention achieves all-round reinforcement and optimization of the foundation pit structure, laying a solid foundation for the safe construction and efficient operation of underground projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In the attached picture:

[0047] Figure 1 It is a half-cut structure schematic diagram of the present invention;

[0048] Figure 2 It is a schematic diagram of a half-cut structure of the present invention in a state without a top slope;

[0049] Figure 3 It is a schematic cross-sectional view of the enclosure structure in the foundation pit of the present invention;

[0050] Figure 4 It is a structural schematic diagram of the soil-fixing net of the present invention;

[0051] Description of reference numerals:

[0052] 1. Ground; 2. Retaining structure inside the foundation pit; 3. Bottom anchor piles; 4. Side anchor piles; 5. Soil fixing net; 6. Top slope;

[0053] 21. Compact the base soil layer; 22. Waterproof layer; 23. First concrete layer; 24. Second concrete layer;

[0054] 231, reinforcement;

[0055] 241. Anchor reinforcement. DETAILED DESCRIPTION

[0056] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. Obviously, the described embodiments are only part of the embodiments of the invention, rather than all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the invention.

[0057] It should be noted that if the embodiments of the invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0058] In addition, "multiple" means more than two. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such combination of technical solutions does not exist and is not within the scope of protection required by the invention.

[0059] Please refer to the instruction manual Figure 1-Figure 4 The present invention provides a water-rich stratum deep foundation pit reinforcement waterproof structure:

[0060] Foundation pit location calibration and preliminary excavation:

[0061] The specific position and depth of the foundation pit are calibrated on the ground 1 using measuring tools such as a total station and a level.

[0062] The initial excavation is carried out by layered excavation method, with each layer excavation depth not exceeding 2 meters to ensure soil stability and construction safety during the excavation process. During the excavation process, support structures and temporary drainage measures are used to prevent soil collapse and water infiltration.

[0063] Installation of soil-fixing net:

[0064] A drilling rig is used to mechanically drill holes around the foundation pit to create interlaced and mesh-like channels, which will serve as the supporting frame for the soil-fixing net.

[0065] With manual assistance, the steel bars are inserted into the internal holes of the ground at an angle, and high-strength cement slurry is injected to solidify it to form a soil-fixing net 5. The soil-fixing net is designed to form an angle of 15° with the vertical plane to enhance the anchoring effect on the surrounding soil and improve the stability of the overall structure.

[0066] Top slope settings:

[0067] A top slope 6 is set around the pit top of the foundation pit. The design of the slope takes into account the slope and material selection to ensure the stability and drainage function of the slope. The surface of the slope is treated with anti-skid materials to prevent rain erosion and personnel slipping.

[0068] Installation of retaining structure in foundation pit:

[0069] The inner retaining structure 2 is installed inside the foundation pit, including a compacted soil layer 21, a waterproof layer 22, a first concrete layer 23 and a second concrete layer 24. The compacted soil layer provides foundation support, the waterproof layer prevents groundwater from penetrating, and the first and second concrete layers provide structural strength and waterproof performance.

[0070] The construction method is segmented, and quality inspection is carried out after each segment is completed to ensure the density and waterproof performance of each layer. When pouring concrete, vibrating rods and trowels are used to ensure the uniformity and density of the concrete.

[0071] Installation of anchor piles:

[0072] Bottom anchor piles 3 are installed at the bottom of the retaining structure 2 in the foundation pit. Vibration pile sinking method is adopted to ensure the verticality and stability of the anchor piles. The bottom anchor piles are distributed in a matrix shape, and the bottom ends are vertically anchored 2 meters deep into the bottom of the foundation pit to provide strong bottom support.

[0073] Side anchor piles 4 are installed on the side walls around the retaining structure 2 in the foundation pit, ensuring that the angle between the line connecting the outer end of the anchor pile and the anchor end and the horizontal plane is 15°, and anchored 2.5 meters deep into the side wall of the foundation pit to enhance the side wall's ability to resist lateral pressure.

[0074] Anchor bar settings:

[0075] A plurality of anchoring bars 241 perpendicular to the inner surface are arranged on the first concrete layer 23 and ensured to be anchored inside the second concrete layer 24. The design of the anchoring bars strengthens the interlayer connection and improves the shear strength and stability of the overall structure.

[0076] Layout of reinforcement:

[0077] A mesh reinforcement structure composed of a plurality of reinforcing ribs 231 is arranged inside the first concrete layer 23. The arrangement of the reinforcing ribs enhances the tensile strength and overall rigidity of the concrete layer, ensuring that no cracks or deformations occur when subjected to external loads.

[0078] Installation of drainage system:

[0079] A drainage system is installed inside the foundation pit, using a combination of underground drainage pipes and surface drainage ditches to ensure that the moisture inside the foundation pit can be quickly drained away to avoid water accumulation. The design of the drainage system takes into account the flow rate and flow velocity to ensure effective drainage even in extreme weather conditions such as heavy rain.

[0080] Final inspection and acceptance:

[0081] Conduct final inspection and acceptance of the foundation pit reinforcement waterproofing structure, using non-destructive testing methods such as ultrasonic testing and infrared testing to ensure the integrity and reliability of the foundation pit reinforcement waterproofing structure. The test results will be used to evaluate the actual performance of the structure to ensure that it meets the design requirements and safety standards.

[0082] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

[0083] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0084] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A water-rich stratum deep foundation pit reinforcement waterproof structure, comprising a ground surface (1), characterized in that: A foundation pit is excavated on the ground (1), a foundation pit inner retaining structure (2) is arranged inside the foundation pit, multiple layers of soil fixing nets (5) are arranged inside the ground (1) on the four sides of the foundation pit, a top slope (6) is arranged on the top of the ground (1) on the four sides of the pit opening, a plurality of bottom anchor piles (3) are arranged on the bottom of the foundation pit inner retaining structure (2), and a plurality of side anchor piles (4) are arranged on the four sides of the side walls of the foundation pit inner retaining structure (2) on the four sides; The foundation pit inner retaining structure (2) specifically comprises the following structures: A compacted foundation soil layer (21) in direct contact with the inner wall of the foundation pit; A water-proof layer (22) disposed inside the compacted base soil layer (21); A first concrete layer (23) disposed inside the waterproof layer (22); A second concrete layer (24) is arranged inside the first concrete layer (23).

2. A water-rich stratum deep foundation pit reinforcement waterproof structure according to claim 1, characterized in that: The soil-fixing net (5) is specifically formed by steel bars obliquely inserted into the internal holes of the ground and cement slurry solidified together, and the soil-fixing net (5) forms an angle of 15° with the vertical plane.

3. The waterproof reinforcement structure for deep foundation pit in water-rich strata according to claim 1 is characterized in that: The plurality of bottom anchor piles (3) are distributed in a matrix shape, and the bottom ends of the plurality of bottom anchor piles (3) are vertically anchored into the bottom of the foundation pit at a depth of 2 meters.

4. The waterproof reinforcement structure for deep foundation pit in water-rich strata according to claim 1 is characterized in that: The angle between the connecting line between the outer end of the plurality of side anchor piles (4) and the anchoring end and the horizontal plane is set to 15°, and the plurality of side anchor piles (4) are anchored into the side wall of the foundation pit at a depth of 2.5 meters.

5. The waterproof reinforcement structure for deep foundation pit in water-rich strata according to claim 1 is characterized in that: A plurality of anchoring bars (241) perpendicular to the inner surface are arranged on the first concrete layer (23), and one outer end of the plurality of anchoring bars (241) is anchored inside the second concrete layer (24).

6. The waterproof reinforcement structure for deep foundation pit in water-rich strata according to claim 1 is characterized in that: A mesh reinforcement structure composed of a plurality of reinforcement ribs (231) is arranged inside the first concrete layer (23).

7. The waterproof reinforcement structure for deep foundation pit in water-rich strata according to claim 1 is characterized in that: The construction steps include: a. Mark the location of the foundation pit on the ground (1) and conduct preliminary excavation to a predetermined depth; b. Drill holes that are interlaced and mesh-like around the foundation pit, and inject cement slurry to solidify it, thereby forming a soil-fixing net; c. Setting a top slope (6) around the top of the foundation pit to ensure the stability and drainage function of the slope; d. Installing a retaining structure (2) inside the foundation pit, including a compacted soil layer (21), a waterproof layer (22), a first concrete layer (23) and a second concrete layer (24); e. Install bottom anchor piles (3) and side anchor piles (4) at the bottom and surrounding side walls of the retaining structure (2) in the foundation pit, ensuring that the depth and angle of the anchor piles meet the design requirements; f. Anchor bars (241) are provided on the first concrete layer (23) and are ensured to be anchored inside the second concrete layer (24); g. Arrange reinforcing ribs (231) inside the first concrete layer (23) to form a mesh reinforcement structure; h. Install the drainage system inside the foundation pit to ensure that the moisture inside the foundation pit can be effectively discharged; i. Carry out final inspection and acceptance of foundation pit reinforcement and waterproofing structure.

8. The waterproof reinforcement structure for deep foundation pit in water-rich strata according to claim 1 is characterized in that: In step a, the initial excavation is carried out by using a layered excavation method, with each layer excavation depth not exceeding 2 meters to ensure stability and safety during the excavation process; In step b, when installing the soil-fixing net (5), mechanical drilling and manual assistance are used to ensure that the tilt angle and position of the soil-fixing net (5) are accurate; In step d, when installing the retaining structure (2) in the foundation pit, a segmented construction method is adopted, and a quality inspection is carried out after each segment is completed to ensure the density and waterproof performance of each layer structure; In step e, when installing the bottom anchor piles (3) and the side anchor piles (4), a vibration pile sinking method is used to ensure the verticality and stability of the anchor piles; In step h, when installing the drainage system, a combination of underground drainage pipes and surface drainage ditches is used to ensure that the moisture inside the foundation pit can be quickly drained to avoid water accumulation; In step i, during the final inspection and acceptance, non-destructive testing methods such as ultrasonic testing and infrared testing are used to ensure the integrity and reliability of the foundation pit reinforcement and waterproofing structure.