Pile foundation pore-forming quality detection method
Through the combination of laser pod and electronic compass, the accuracy and portability of pile foundation hole formation quality detection in the prior art is solved, and efficient and automated pile foundation hole formation quality detection is achieved, providing accurate hole wall shape and Roughness data.
Patent Information
- Application Number
- CN202410249445.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-11-01
AI Technical Summary
Existing pile foundation hole-forming quality detection methods such as the acoustic wave method have calculation errors, cannot measure dry holes and orifice horizontal parts where mud is not placed, and the equipment is bulky and portable, making it difficult to meet the requirements of fast and high-precision detection.
The laser pod is used to detect the quality of pile foundation holes. By determining the initial position, vertically lowering and scanning the shape of the inner wall, the bottoming depth and hole inclination are determined, and combined with electronic compass and lidar technology, point cloud data is generated to determine the shape of the inner wall. and roughness.
It realizes high-precision pile foundation hole-forming quality inspection, high data acquisition density, accurate measurement results, high degree of automation, improves detection efficiency, is suitable for various terrain conditions, has comprehensive functions and simple operation.
Smart Images

Figure CN118880947A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of rock and soil mechanics, and in particular to a method for detecting the quality of pile foundation hole formation. Background Art
[0002] At present, pile foundation is a common foundation treatment method in the construction, bridge, power grid construction and other industries. Its engineering quality is the basis for the long-term safe use of buildings. The hole quality of the pile foundation is an important part of construction quality control and engineering inspection, and its quality is related to the bearing capacity of the pile foundation and the safety of the overall structure. Summary of the invention
[0003] The present invention provides a method for detecting the quality of pile foundation drilling.
[0004] According to the present disclosure, a method for detecting the quality of pile foundation drilling is provided, which is implemented by using a laser pod, and the method includes: determining an initial position of the laser pod, wherein the initial position is located at the hole mouth of the pile foundation drilling; vertically lowering the laser pod from the initial position, and performing laser scanning at multiple specific depths to obtain the shape of the inner wall of the pile foundation drilling; determining whether the laser pod is lowered to the bottom of the pile foundation drilling; in response to determining that the laser pod is lowered to the bottom of the pile foundation drilling: determining the bottoming depth of the laser pod; vertically lifting the laser pod; determining whether the laser pod is lifted to the initial position; and in response to determining that the laser pod is lifted to the initial position, determining the hole inclination and the roughness of the inner wall of the pile foundation drilling based on the bottoming depth and the shape of the inner wall.
[0005] In some embodiments, the laser pod includes an electronic compass, and the method for detecting the quality of pile foundation drilling further includes: determining a current attitude angle of the laser pod by means of the electronic compass, wherein the shape of the inner wall of the pile foundation drilling at a plurality of specific depths is determined based on the attitude angle.
[0006] In some embodiments, laser scanning is performed at multiple specific depths to obtain the shape of the inner wall of the pile foundation hole, including: determining the distance between the laser pod and the inner wall in multiple specific directions at multiple specific depths; and generating point cloud data of the inner wall based on the distance to determine the shape of the inner wall of the pile foundation hole.
[0007] In some embodiments, determining the distance between the laser pod and the inner wall in multiple specific directions at multiple specific depths includes: emitting a first laser in multiple specific directions at multiple specific depths; receiving a second laser formed by reflection of the first laser at the inner wall of the pile foundation hole; and determining the distance between the laser pod and the inner wall in multiple specific directions at multiple specific depths based on a time difference between emitting the first laser and receiving the second laser corresponding to the first laser.
[0008] In some embodiments, determining whether the laser pod is lowered to the bottom of the pile foundation hole includes: determining a current inclination of the laser pod; in response to the current inclination being greater than or equal to 5 degrees, determining that the laser pod has been lowered to the bottom of the pile foundation hole; and in response to the current inclination being less than 5 degrees, determining that the laser pod has not been lowered to the bottom of the pile foundation hole.
[0009] In some embodiments, the current tilt of the laser pod is determined by an electronic compass.
[0010] In some embodiments, during the process of vertically lifting the laser pod, laser scanning is performed again at a plurality of specific depths to correct the shape of the inner wall of the pile foundation hole.
[0011] According to one or more embodiments of the present disclosure, pile foundation hole quality detection can be accurately performed.
[0012] These and other aspects of the disclosure will be apparent from and elucidated with reference to the embodiments described hereinafter. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The accompanying drawings exemplarily illustrate the embodiments and constitute a part of the specification, and together with the text description of the specification, are used to explain the exemplary implementation of the embodiments. The embodiments shown are for illustrative purposes only and do not limit the scope of the claims. In all drawings, the same reference numerals refer to similar but not necessarily identical elements.
[0014] Figure 1 is a flow chart illustrating a method for detecting the quality of pile foundation hole formation according to an exemplary embodiment;
[0015] Figure 2 is a flow chart illustrating a method for detecting pile foundation hole quality according to another exemplary embodiment;
[0016] Figure 3 is a flow chart illustrating a process of obtaining the inner wall shape of a pile foundation hole according to an exemplary embodiment;
[0017] Figure 4 is a flow chart illustrating a process of determining a distance between a laser pod and an inner wall according to an exemplary embodiment;
[0018] Figure 5 is a flow chart illustrating a process of determining whether a laser pod has bottomed out according to an exemplary embodiment;
[0019] Figure 6 is a schematic diagram illustrating a process of calculating a pore quality parameter according to an exemplary embodiment. DETAILED DESCRIPTION
[0020] In the present disclosure, unless otherwise specified, the use of the terms "first", "second", etc. to describe various elements is not intended to limit the positional relationship, timing relationship, or importance relationship of these elements, and such terms are only used to distinguish one element from another element. In some examples, the first element and the second element may refer to the same instance of the element, and in some cases, based on the description of the context, they may also refer to different instances.
[0021] The terms used in the description of various examples described in this disclosure are only for the purpose of describing specific examples and are not intended to be limiting. Unless the context clearly indicates otherwise, if the number of elements is not specifically limited, the element can be one or more. As used herein, the term "plurality" means two or more, and the term "based on" should be interpreted as "based at least in part on". In addition, the terms "and / or" and "at least one of..." cover any one of the listed items and all possible combinations.
[0022] At present, pile foundation is a common foundation treatment method in the construction, bridge, power grid construction and other industries. Its engineering quality is the basis for the long-term safe use of buildings. The hole quality of the pile foundation is an important part of construction quality control and engineering inspection, and its quality is related to the bearing capacity of the pile foundation and the safety of the overall structure.
[0023] Generally speaking, hole quality refers to the process of evaluating indicators such as the diameter, depth, verticality, and sediment thickness of the pile hole after the hole is completed and before the steel cage is lowered during the pile foundation construction process. The hole quality inspection content mainly includes parameters such as hole position, hole diameter, hole depth, verticality (inclination) of the hole body, and sediment at the bottom of the hole. Commonly used inspection methods for hole diameter, hole depth and verticality include simple methods (such as measuring ropes, steel cages, hexagonal wooden hinges, calipers and other simple instruments), umbrella aperture gauge inspection methods, and sonic wave methods. Among them, the simple method and umbrella aperture gauge technology are relatively backward and difficult to meet the requirements of fast and high-precision inspection. The most commonly used method is the sonic wave method.
[0024] The sonic method usually uses ultrasonic waves for detection. The transmitting device actively emits ultrasonic waves at a certain frequency. The sound waves are transmitted through indefinite media and reflected by the object to be measured, and then captured by the receiving device. By analyzing the echo time and echo properties, the distance between the sensor and the object to be measured and other physical and chemical characteristics of the object to be measured can be obtained. When testing the pile foundation, the ultrasonic probe is placed near the center of the pile foundation hole, and is lowered at a certain speed from the hole level or mud surface to the bottom of the hole. The probe continuously emits ultrasonic pulses of a certain frequency on different sections in the hole, and at the same time receives and records the reflected signals from the hole wall. By analyzing the sound wave reflection signal, the hole wall position and frequency spectrum characteristics at different depths can be calculated, and then the hole parameters of the entire pile foundation can be obtained.
[0025] However, the acoustic wave method has several major defects: First, since the calculation of distance requires the known propagation speed of the sound wave in the mud, and the sound speed is greatly affected by the properties of the mud, the relevant technical specifications clearly stipulate the calibration clauses for the mud wave speed. However, in practical applications, only the mud at a certain depth is usually selected for wave speed correction, and this wave speed is used as the calculation basis for different hole depths. The mud density gradually changes with depth, causing the ultrasonic wave propagation speed to change accordingly, which in turn causes the calculation error of the overall hole diameter. Second, it is impossible to measure the hole data of the dry hole without mud and the part between the horizontal plane of the hole mouth and the mud surface. Third, the ultrasonic detector is generally bulky, with low portability and efficiency: the ultrasonic transducer component and winch are large in size, the imbalance caused by the asynchronous release of the double lines, and the limiting measures to prevent the asynchronous release make the mechanical structure more complicated.
[0026] In some scenarios, contact measurement methods are also used in hole quality inspection, such as using a single-row needle profilometer, a single-needle automatic profilometer, or a variable resistance three-dimensional structural surface morphology measurement device to measure roughness.
[0027] Contact measurement usually refers to using a single or multiple measuring probes to move along a straight line on the surface of the structure, and recording the position of the probe to obtain the coordinate data of the structure. Common acquisition methods can be further divided into two types according to the dimension of the acquired data: two-dimensional structure surface morphology data and three-dimensional structure surface morphology data. This method has the advantages of low cost, easy to carry, and can be carried out indoors and outdoors. However, factors such as the probe hardness, diameter and movement rate of the equipment during measurement have an impact on the measurement accuracy, and there are high requirements for the force and distance of the probe contacting the surface to be measured. Too loose will lead to inaccurate measurement, and too tight will cause measurement loss to the surface of the object to be measured, making it difficult to repeat the measurement.
[0028] In order to accurately detect the quality of pile foundation hole formation, the present disclosure provides a method for detecting the quality of pile foundation hole formation.
[0029] Exemplary embodiments of the present disclosure are described in detail below with reference to the accompanying drawings.
[0030] Figure 1 1 is a flow chart illustrating a method 100 for detecting the quality of pile foundation drilling according to an exemplary embodiment. The method 100 includes steps S110, S120, S130, S140, S150, and S160, wherein step S140 includes steps S141 and S142. The method 100 is implemented using a laser pod.
[0031] refer to Figure 1 In step S110, the initial position of the laser pod is determined, and the initial position is located at the hole opening of the pile foundation.
[0032] In step S120, the laser pod is lowered vertically from an initial position, and laser scanning is performed at a plurality of specific depths to obtain the shape of the inner wall of the pile foundation hole.
[0033] In step S130, it is determined whether the laser pod is lowered to the bottom of the pile foundation hole.
[0034] In step S140 , in response to determining that the laser pod is lowered to the bottom of the pile foundation hole, step S141 is executed to determine the bottoming depth of the laser pod; and step S142 is executed to vertically lift the laser pod.
[0035] In step S150, it is determined whether the laser pod is lifted to the initial position.
[0036] In step S160 , in response to determining that the laser pod is lifted to the initial position, the hole inclination of the pile foundation hole and the roughness of the inner wall are determined based on the bottoming depth and the shape of the inner wall.
[0037] Figure 2 2 is a flow chart illustrating a method 200 for detecting the quality of pile foundation drilling according to another exemplary embodiment. The method 200 may include steps S210, S220, S230, S240, S250, and S260, wherein step S240 may include steps S241 and S242. Steps S210, S220, S230, S240, S241, S242, S250, and S260 may be respectively similar to the following: Figure 1 The method 100 shown includes steps S110, S120, S130, S140, S141, S142, S150, and S160.
[0038] According to some embodiments, the laser pod may include an electronic compass, and the method 200 may further include step S270, determining the current attitude angle of the laser pod by the electronic compass. The shape of the inner wall of the pile foundation hole at multiple specific depths may be determined based on the attitude angle.
[0039] Figure 3 FIG. 3 is a flow chart illustrating a process 300 of obtaining the inner wall shape of a pile foundation hole according to an exemplary embodiment. The process 300 may include steps S310 and S320 . The process 300 may correspond to step S220 of the method 200 .
[0040] refer to Figure 3 In step S310, the distances between the laser pod and the inner wall in multiple specific directions at multiple specific depths may be determined.
[0041] In step S320 , point cloud data of the inner wall may be generated based on the distance to determine the shape of the inner wall of the pile foundation hole.
[0042] Figure 4 4 is a flow chart illustrating a process 400 of determining a distance between a laser pod and an inner wall according to an exemplary embodiment. The process 400 may include steps S410, S420, and S430. The process 400 may correspond to step S310 of the process 300.
[0043] refer to Figure 4 In step S410, a first laser may be emitted in multiple specific directions at multiple specific depths.
[0044] In step S420, a second laser generated by reflection of the first laser on the inner wall of the pile foundation hole may be received.
[0045] In step S430, the distances between the laser pod and the inner wall in multiple specific directions at multiple specific depths may be determined based on the time difference between emitting the first laser and receiving the second laser corresponding to the first laser.
[0046] Figure 5 is a flow chart illustrating a process 500 of determining whether a laser pod has hit bottom according to an exemplary embodiment. The process 500 may include steps S510, S520, and S530. The process 500 may correspond to step S230 of the method 200.
[0047] refer to Figure 5 , in step S510, the current inclination of the laser pod may be determined.
[0048] In step S520, in response to the current inclination being greater than or equal to 5 degrees, it may be determined that the laser pod has been lowered to the bottom of the pile foundation hole.
[0049] In step S530, in response to the current inclination being less than 5 degrees, it may be determined that the laser pod has not been lowered to the bottom of the pile foundation hole.
[0050] According to some embodiments, the current tilt of the laser pod may be determined by an electronic compass.
[0051] According to some embodiments, during the process of vertically lifting the laser pod, laser scanning is performed again at a plurality of specific depths to correct the shape of the inner wall of the pile foundation hole.
[0052] In an example, the method can be implemented by means of a device for pile foundation hole quality detection including a laser pod. The device can also include a control component, a depth feedback component, and a bracket. The laser pod can be used to collect point cloud data of the inner wall of the pile foundation hole at a specific depth for one week, and can include a laser component for emitting and receiving lasers, a data line, a steel cable, and a housing.
[0053] In some embodiments, the laser pod may further include an electronic compass for collecting attitude angle data of the data collection component.
[0054] In some embodiments, the laser assembly may include a laser scanning head, the housing may be cylindrical, the data line passes through one end of the housing, and the laser scanning head passes through the other end. The laser pod may collect point cloud data of the inner wall of the pile foundation hole in various directions at a specific depth by rotating the laser scanning head.
[0055] In some embodiments, a pulley may be provided on the bracket, and the depth feedback component may include a pulley encoder connected to the pulley for determining the number of rotations of the pulley.
[0056] In some embodiments, the bracket may include a plurality of adjustment holes for adjusting the position of the pulley on the bracket.
[0057] When using the above device to detect the quality of pile foundation holes, a bracket can be set up at the top of the hole, and a pulley encoder can be installed at a suitable position on the bracket based on half of the pile foundation hole diameter, and tightened with bolts to ensure that the laser pod is lowered near the hole center. After the above parts are connected, the laser pod should be at the starting position of the hole to be tested, and the laser pod should be stationary.
[0058] After the laser pod is stable and does not shake, the control component can be started. The parameters such as the lowering speed, scanning speed, and scanning accuracy of the laser pod can be pre-set on the control component. After the control component inputs the start detection command, the laser pod and the pulley encoder will be started first. At this time, the ground coordinate system and the initial vehicle coordinate system can be established based on the position of the laser pod. Then start lowering the laser pod for detection.
[0059] During the lowering process of the laser pod, the pulley encoder can be driven by the steel cable to start counting, and the electronic compass can measure and send the laser pod's attitude data, heading angle, roll angle, and pitch angle in real time. At the same time, the laser scanning head can start emitting laser beams and receive the reflected and scattered signals from the hole wall, and continuously rotate to scan, and record the time difference and rotation angle in real time. After the electronic compass and laser radar data are encoded by the single-chip microcomputer, the hole wall data can be sent to the control component on the ground.
[0060] If the detection parameters need to be changed or an unexpected situation occurs, the control component can be used to control the lowering, lifting, stopping, scanning mode and status of the laser pod in real time. The control component can have analysis and calculation software to display, store and process the data of the pulley encoder, electronic compass, and laser component, calculate the time difference between the laser emission time and the time difference between the received hole wall reflection signal, and calculate the aperture of a certain cross section. After arranging the point clouds of multiple cross sections in sequence according to depth, the three-dimensional shape surface of the hole wall can be obtained.
[0061] When the inclination of the electronic compass reaches 5°, it can be considered that the laser pod has reached the bottom of the hole, triggering the stop condition, sending a stop signal to the control component through the data line, and recording the maximum recorded value of the pulley encoder to determine the hole depth.
[0062] Next, the control component can send a reverse command to lift the laser pod upward. During the lifting process, the hole wall can be scanned again to obtain repeated observation data. This data can be averaged with the data from the descent measurement to reduce errors and missed scans and improve the accuracy and completeness of the data.
[0063] After the laser pod is lifted to the hole mouth, the control component can send an end signal to stop recording data, and each device stops working, ending the entire scanning work. After obtaining the entire hole data, further analysis can be performed to obtain the hole diameter, verticality, shape defect location, etc.
[0064] Establish the vehicle coordinate system (OX b Y b Z b ) process can be started with the center of the laser scanning head as the origin O, and the X direction and Y direction marked by the electronic compass are respectively X b Axis, Y b Axis, the pod center axis is downward Z b Axis. Due to the effect of gravity, the direction of the pod center axis is very close to the vertical direction of gravity and can be considered to be approximately the same. b Y b The plane is approximately horizontal, and the roll angle and pitch angle are both zero. After the pod is stable, the initial vehicle coordinates can be used as the ground coordinate system (OX n Y n Z n ).
[0065] In the example, the working recording mode of the laser assembly can be a polar coordinate system, with the center of the laser scanning head as the pole, the polar axis as the nominal X direction of the pre-set electronic compass, and the clockwise direction as positive. When the laser scanning head rotates at any angle α, the coordinates of a point on the hole wall relative to the center of the laser scanning head can be expressed as (ρ, α), where ρ = 1 / 2ct, and c is the speed of light.
[0066] When converting the position calculation of a certain point on the hole wall, the polar coordinates of the laser scanning head can be converted to the carrier coordinate system:
[0067]
[0068] Then transform from the vehicle coordinate system to the ground coordinate system:
[0069]
[0070]
[0071]
[0072] In the above formula, is the direction cosine matrix of coordinate transformation, is the depth bias term. Ψ, θ, γ are the heading angle, pitch angle, and roll angle of the electronic compass, respectively, and ψ∈(0°,360°), θ∈(-90°,90°), γ∈(-180°,180°), k is the encoder count, and r is the pulley radius.
[0073] If you need to convert to the geodetic coordinate system, you can query the local magnetic declination Ψ0 and replace the magnetic declination Ψ in the formula with the true north azimuth Ψ', where Ψ'=Ψ+Ψ0.
[0074] Figure 6 is a schematic diagram illustrating a process of calculating a pore quality parameter according to an exemplary embodiment.
[0075] refer to Figure 6 The circle with O as the center can represent the cross section when the hole construction is not tilted, the circle with O′ as the center can represent the cross section of the actual hole detection, O″ can represent the position of the laser scanning head, and the distance from O″ to A, B, C, and D can be recorded as L O″A , L O″B , L O″C and L O″D According to the geometric relationship, the aperture cross-section radius R and the distance D from the laser scanning head to the center of the measurement cross section O′O″ It can be calculated that:
[0076]
[0077]
[0078] The offset between the laser scanning head and the center of the top horizontal plane of the hole can be recorded as d t , the offset of the laser scanning head between the bottom and the center of the hole can be recorded as d b , the hole depth can be recorded as H, and the hole inclination S can be calculated as:
[0079] H=2πrk max ,
[0080] S=(d t -d b ) / H×100%.
[0081] After obtaining the three-dimensional coordinates of certain precision points on the hole wall surface, a continuous surface shape can be obtained after interpolation and smoothing, and the undulation data of the surface coordinates can be used as the basis for characterizing the roughness. The roughness characteristics mainly need to describe the concave-convex distance distribution, the number of peak points, and the slope and slope direction of the concave-convex surface of the hole wall morphology. The rock structure surface roughness coefficient JRC, amplitude parameters, spatial parameters, and micro-surface roughness can be used for evaluation, and user-defined calculation methods can also be used.
[0082] Since the surface of the pile foundation hole is quasi-cylindrical, the reference for describing the roughness and undulation below is a cylinder formed with the initial center O and the radius being the average radius R of each cross section. The undulation distance refers to the difference between the distance ρ from the center O to a certain point (sampling point) on the actual hole wall and the average radius R on the same cross section.
[0083] First, we can calculate the two-dimensional JCR (Joint Roughness Coefficient):
[0084] JRC=64.28tan(ρ2)-5.06,
[0085]
[0086]
[0087] In the above formula, ρ2 can be the root mean square of the slope, y i It can be the height of the i-th point on the structural surface contour line, L can be the projection length of the structural surface contour line, and N can be the number of points on the structural surface contour line.
[0088] In the example, a two-dimensional single contour line sampling method can be used to calculate the JCR coefficient by sampling at a certain interval along the vertical or horizontal direction, that is, only one two-dimensional structural surface contour line is measured in the same direction, and the obtained JRC data is used as the representative value in the research direction.
[0089] Then the three-dimensional roughness characterization parameter, the amplitude parameter, can be calculated. The amplitude parameter can reflect the uneven distribution of the undulation of the hole wall surface in the horizontal direction, and can also reflect the possible conversion of potential energy in the shear process under the action of side friction. It is one of the important criteria for measuring the degree of locking effect of large and small protrusions (pits).
[0090] The degree of dispersion of the concave-convex distribution of the hole wall surface morphology can be expressed using the distance mean μ ρ and the mean square error σ ρ express:
[0091]
[0092]
[0093] In the above formula, ρ i It can be the distance from each sampling point to the reference cross-sectional circle, and n can be the number of sampling points.
[0094] The undulation of the naturally formed structural surface is close to the normal distribution, while the hole wall of the artificially excavated pile foundation is affected by the construction quality and construction technology, and there may be deviations from the normal distribution. Therefore, skewness and kurtosis can be used to measure the degree of deviation of the actual distribution from the normal distribution. Skewness refers to the amount of the degree of skewness of the frequency distribution. It not only reflects the degree of skewness of the frequency distribution, but also explains the direction of the skewness. Kurtosis describes the degree of sharpness of the frequency distribution or the presence or absence. Taking the normal distribution as the reference standard, the frequency distribution that is sharper than the normal distribution is the peak distribution, and the frequency distribution that is flatter than the normal distribution is the flat-top distribution.
[0095] Skewness T sk and Kurtosis T ku The calculation formula is as follows:
[0096]
[0097]
[0098] In the above formula, m2, m3, and m4 are the center distances of the second-order, third-order, and fourth-order samples, respectively, and ρ i is the distance from each sampling point to the reference cross-sectional circle, μ ρ is the mean distance, n is the number of sampling points, and k is the calibration factor.
[0099] On the one hand, whether there are high convex parts, deep concave parts and cracks on the surface of the hole wall is an important part of hole wall defect detection. On the other hand, higher convex parts and deeper pits play a major role in locking in the joint shear process. Therefore, the fluctuation range can be used to measure the difference between the highest convex part and the lowest pit. The distance values are arranged from large to small, and the first 2m larger convex parts and the last 2m deeper pits are used to calculate the range. If m is 1 and 5, the fluctuation range is calculated. for:
[0100]
[0101]
[0102] In the above formula, ρ max 、|ρ min | are the distance values of the highest vertex and deep pit, respectively, j , i (i, j = 1, 2, ..., 5) are the 5 highest vertices and 5 deep pit distance values respectively.
[0103] In the example, three-dimensional spatial parameters can also be calculated. The spatial parameters can involve the spatiality of the morphological features, reflecting the differences in the spatial distribution of the surface protrusions (pits). Considering its strong randomness and anisotropy, the three-dimensional characteristic parameters of the spatial characteristics of the hole wall can be described as: the surface superior dip (ASD), the shear superior dip (SSD), the dip direction containing a large number of steep dips (cragdip), and the peak point density T ds .
[0104] Among them, ASD can be directly obtained from the frequency distribution histogram of the tilt direction, and the Theil index T is used to evaluate the unevenness of the distribution. SSD takes into account the assumption of the tilt direction related to the shear resistance during the shear process and can be obtained from the frequency distribution histogram of the tilt surface related to the shear resistance.
[0105] In the example, the Theil index T is related to the peak density T ds The calculation formula can be as follows:
[0106]
[0107]
[0108] In the above formula, P may be the statistical frequency of eight tilt directions obtained by dividing the plane into eight equal parts, N may be the number of peak points, and A′ may be the projection area of the surface on the reference plane.
[0109] In the example, the micro surface roughness can also be calculated.
[0110] According to the microplane theory, at the microscopic scale, any surface is composed of several small planes. The microsurface roughness α can be expressed as:
[0111]
[0112] In the above formula, m can be the number of sampling points, y i It can be the difference between the sampling point and the average height of the microplane.
[0113] In the example, the area ratio PAP and volume ratio VAV can also be calculated:
[0114]
[0115]
[0116] In the above formula, S t , S r They can be the real concave-convex cylinder and the reference cylinder, V t 、Vr They can be the real concave-convex cylinder and the reference cylinder respectively. R(z) can be the hole diameter of the cross section, which changes with the hole depth and can be regarded as a function of the depth z. H can be the hole depth.
[0117] The method for pile foundation hole quality detection according to the embodiment of the present invention realizes data collection and hole quality evaluation of pile foundation drilling morphology by adopting high-precision laser ranging technology, solves the problems of low data collection density and insufficient accuracy of three-dimensional drilling model, and has high measurement result accuracy and complete data collection; the degree of automation is high, the detection process is controllable, and the embedded development control technology is used to realize the automated and efficient operation of pile foundation hole quality detection, thereby improving the work efficiency of construction and management hole detection; the modular structure design reduces the weight of a single piece, and the structure is simple to use, suitable for transportation under various terrain conditions, and easy to transport and move; it has comprehensive functions and is easy to operate It is simple and can realize functions such as large-diameter drilling cross-section measurement, hole verticality detection, hole wall defect detection, and hole wall roughness measurement. The host computer can use a simple graphical interface, and the operation is simple and easy to understand; the positioning accuracy is high and the results are stable. The electronic compass and heavy weights are used to obtain and maintain the center position and posture of the lidar, which ensures the accuracy and stability of the center position when calculating the aperture, and accurately determines the orientation and depth of the hole wall defects; the degree of customization is high and the use is flexible. It can adapt to the quality inspection of holes of different sizes. Technical personnel can set and adjust the working parameters according to the actual situation on site and the design plan, and control the acquisition process in time.
[0118] Although the present disclosure has been illustrated and described in detail in the drawings and the foregoing description, such illustration and description should be considered illustrative and schematic, not restrictive; the present disclosure is not limited to the disclosed embodiments. By studying the drawings, the disclosure and the appended claims, those skilled in the art will be able to understand and implement variations to the disclosed embodiments when practicing the claimed subject matter. In the claims, the word "comprising" does not exclude other elements or steps that are not listed, the indefinite article "a" or "an" does not exclude a plurality, the term "plurality" means two or more, and the term "based on" should be interpreted as "based at least in part on". The mere fact that certain measures are recorded in mutually different dependent claims does not indicate that a combination of these measures cannot be used to advantage.
Claims
1. A method for detecting the quality of pile foundation drilling, characterized in that: The method is implemented using a laser pod, and the method includes: Determining an initial position of the laser pod, wherein the initial position is located at the opening of the pile foundation hole; The laser pod is lowered vertically from the initial position, and laser scanning is performed at a plurality of specific depths to obtain the shape of the inner wall of the pile foundation hole; Determining whether the laser pod is lowered to the bottom of the pile foundation hole; In response to determining that the laser pod is lowered to the bottom of the pile foundation hole: determining a bottoming depth of the laser pod; vertically lifting the laser pod; determining whether the laser pod is lifted to the initial position; and In response to determining that the laser pod is lifted to the initial position, a hole inclination of the pile foundation hole and a roughness of the inner wall are determined based on the bottoming depth and the shape of the inner wall.
2. The method according to claim 1, characterized in that The laser pod includes an electronic compass, and the method further includes: The current attitude angle of the laser pod is determined by the electronic compass, wherein the shapes of the inner wall of the pile foundation hole at the multiple specific depths are determined based on the attitude angle.
3. The method according to claim 2, characterized in that The laser scanning is performed at a plurality of specific depths to obtain the shape of the inner wall of the pile foundation hole, including: determining the distances between the laser pod and the inner wall in the multiple specific directions at the multiple specific depths; and Point cloud data of the inner wall is generated based on the distance to determine the shape of the inner wall of the pile foundation hole.
4. The method according to claim 3, characterized in that Determining the distances between the laser pod and the inner wall in the multiple specific directions at the multiple specific depths includes: emitting a first laser at the plurality of specific depths and in the plurality of specific directions; receiving a second laser beam generated by the reflection of the first laser beam at the inner wall of the pile foundation hole; and Based on a time difference between emitting the first laser and receiving the second laser corresponding to the first laser, distances between the laser pod and the inner wall at the specific directions at the specific depths are determined.
5. The method according to claim 2, characterized in that The determining whether the laser pod is lowered to the bottom of the pile foundation hole includes: determining a current tilt of the laser pod; In response to the current inclination being greater than or equal to 5 degrees, determining that the laser pod has been lowered to the bottom of the pile foundation hole; and In response to the current inclination being less than 5 degrees, it is determined that the laser pod has not been lowered to the bottom of the pile foundation hole.
6. The method according to claim 5, characterized in that The current tilt of the laser pod is determined by the electronic compass.
7. The method according to claim 1, characterized in that During the process of vertically lifting the laser pod, laser scanning is performed again at the multiple specific depths to correct the shape of the inner wall of the pile foundation hole.