Cold machine operation sequence optimizing method and system, storage medium and product
By constructing a load prediction model and a chiller operation model, and combining them with energy consumption calculations, the optimal chiller operation sequence is determined, which solves the problem that the chiller operation sequence in the existing technology fails to achieve optimal energy consumption, and realizes high efficiency and energy saving in chiller operation.
Patent Information
- Application Number
- CN202410909230.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-11-01
AI Technical Summary
Existing methods for optimizing chiller operating sequences rely solely on load change rate predictions to determine start-up and shutdown operations, without considering whether the current chiller operating sequence is the energy-optimal solution, thus failing to obtain the optimal chiller operating sequence.
By constructing a load forecasting model and a chiller operation model, and combining the load forecasting results and the chiller operation model, the energy consumption of feasible chiller operation sequences is calculated, and the target chiller operation sequence is determined based on the energy consumption, considering the optimal energy consumption solution of the current chiller operation sequence.
It achieves accurate start-up and shutdown operation of the chiller, ensures optimal energy consumption of the chiller under the current load, and improves the efficiency and energy-saving effect of the chiller operation.
Smart Images

Figure CN118882286A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of refrigeration technology, and in particular to a method, system, storage medium and product for optimizing the operation sequence of a refrigeration machine. Background Art
[0002] The existing method for optimizing the chiller operation sequence mainly uses an auto-regressive with extra inputs (ARX) model to predict the chiller load in the next two steps, and determines the chiller start and stop action at the current control moment according to the change in the chiller load in the next two steps. This method reduces the number of chiller starts and stops under the original rule control of the system through the load prediction method, prolongs the time that the chiller is in the efficient operation range, and thus achieves the purpose of energy saving. However, it only uses the prediction result of the load change rate to decide whether to start and stop the chiller, and does not consider whether the current chiller operation sequence is the optimal solution for energy consumption under the current load, so the result is not the optimal chiller operation sequence. Summary of the invention
[0003] Based on this, it is necessary to provide a method, system, storage medium and product for optimizing the operation sequence of a cold machine in response to the above technical problems.
[0004] In a first aspect, a method for optimizing a cold machine operation sequence is provided, the method comprising:
[0005] Based on the load forecasting model, output the load forecasting results for the target period;
[0006] Based on the cooling machine operation model, output a feasible cooling machine operation sequence;
[0007] Calculating the energy consumption of the feasible chiller operation sequence based on the chiller operation model and the load forecast result;
[0008] A target chiller operation sequence is determined based on the energy consumption.
[0009] In a second aspect, a system for optimizing a cold machine operation sequence is provided, the system comprising:
[0010] A load forecasting module is used to output the load forecasting result of the target period based on the load forecasting model;
[0011] A cooling machine operation sequence determination module is used to output a feasible cooling machine operation sequence based on a cooling machine operation model;
[0012] An energy consumption determination module, used to calculate the energy consumption of the feasible chiller operation sequence based on the chiller operation model and the load prediction result;
[0013] A target sequence determination module is used to determine a target chiller operation sequence based on the energy consumption.
[0014] In a third aspect, a computer device is provided, comprising: a memory, a processor, and a cold machine operation sequence optimization program stored in the memory and executable on the processor, wherein the cold machine operation sequence optimization program, when executed by the processor, implements the cold machine operation sequence optimization method as described in the first aspect.
[0015] In a fourth aspect, a computer-readable storage medium is provided, wherein a cold machine operation sequence optimization program is stored on the computer-readable storage medium, and when the cold machine operation sequence optimization program is executed by a processor, the cold machine operation sequence optimization method described in the first aspect is implemented.
[0016] In the first aspect, a computer program product is provided, the computer program product comprising a cold machine operation sequence optimization program, and when the cold machine operation sequence optimization program is executed by a processor, the cold machine operation sequence optimization method as described in the first aspect is implemented.
[0017] The above-mentioned method, system, computer equipment, storage medium and product for optimizing the operation sequence of a chiller, the method for optimizing the operation sequence of a chiller includes: outputting the load forecast result of the target time period based on the load forecast model; outputting a feasible chiller operation sequence based on the chiller operation model; calculating the energy consumption of the feasible chiller operation sequence based on the chiller operation model and the load forecast result; and determining the target chiller operation sequence based on the energy consumption. Not only is it determined whether to start and stop the chiller based on the prediction result of the load change rate (i.e., the load forecast result), but it is also considered whether the current chiller operation sequence is the optimal solution for energy consumption under the current load. The optimal chiller operation sequence can be obtained, thereby making the start and stop operation of the chiller more accurate. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A flowchart of a method for optimizing a cooling machine operation sequence in one embodiment;
[0019] Figure 2 A schematic diagram of an optimal interval for searching a feasible cooling machine operation sequence in one embodiment;
[0020] Figure 3 Schematic diagram of probability density distribution function of PLR in one embodiment;
[0021] Figure 4 A Gaussian distribution diagram of a chilled water supply and return temperature difference and a cooling water supply temperature difference as dual variables in one embodiment;
[0022] Figure 5 A structural diagram of a cooling machine operation sequence optimization system in one embodiment;
[0023] Figure 6FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0025] Before explaining the solution in detail, let's first introduce the concepts of chillers.
[0026] A refrigeration system refers to a system that removes heat from an object or space through refrigeration equipment to achieve the purpose of lowering the temperature. Refrigeration systems are usually used in places where a low temperature environment needs to be maintained, such as data center computer rooms, office buildings, etc. The main components of a refrigeration system include refrigeration units, cooling water pumps, chilled water pumps, cooling towers, condensers, evaporators and other components. The core component of a refrigeration system is a refrigeration unit (i.e., a refrigeration machine or refrigeration machine combination in the present invention), which absorbs heat by circulating refrigerant and then discharges the heat to achieve a cooling effect. The design and use of a refrigeration system need to take into account multiple factors, such as the required cooling capacity, ambient temperature, efficiency and energy efficiency of the refrigeration unit, etc. Among them, the efficiency and energy efficiency of the refrigeration system are also the focus of the refrigeration industry. In order to improve the efficiency of the system and reduce energy consumption, some new technologies and materials have also been applied to the design and manufacture of refrigeration systems, such as renewable energy, high-efficiency refrigerants, and intelligent control.
[0027] In one embodiment, Figure 1 As shown, a method for optimizing a cooling machine operation sequence is provided, the method comprising:
[0028] Step S101: outputting the load forecast result of the target period based on the load forecast model.
[0029] Optionally, the time information of the target time period, the weather forecast data of the target time period, and the refrigeration machine operation data at the current moment are input into the load forecasting model, and the load forecasting result is output.
[0030] In the embodiment of the present invention, a load forecasting model needs to be constructed first. The input of the load forecasting model is the time information of the target period (also referred to as the period to be predicted, such as time t+1 to time t+i, where t is a positive integer), the weather forecast data of the target period, and the chiller operation data at the current time, and the output is the load forecast result of the target period (also referred to as the chiller load demand curve).
[0031] Step S102: outputting a feasible cooling machine operation sequence based on the cooling machine operation model.
[0032] In the embodiment of the present invention, a cold machine operation model needs to be constructed in advance.
[0033] Optionally, the input of the refrigeration machine operation model is the current refrigeration machine operation state and the partial load ratio (PLR) of the refrigeration machine, and the output is the energy consumption and the coefficient of performance (COP) of the refrigeration machine under given input conditions (the refrigeration machine operation state and the partial load ratio of the refrigeration machine).
[0034] The partial load rate PLR of the chiller can also be called the load percentage of the chiller operation.
[0035] Chiller performance coefficient COP = chiller cooling capacity / chiller power.
[0036] In an optional embodiment, the constraints of the refrigeration machine operation model include: refrigeration machine operation time limit, refrigeration machine load rate limit, refrigeration machine simultaneous start limit and confidence interval limit;
[0037] The outputting of a feasible chiller operation sequence based on the chiller operation model comprises: determining a feasible chiller combination based on the chiller operation time limit; determining the feasible chiller operation sequence based on the feasible chiller combination in combination with the chiller load rate limit, the chiller simultaneous start-up limit and the confidence interval limit.
[0038] Among them, the cooling machine operation time limit means that the feasible cooling machine operation combination needs to meet the continuous operation time MUT limit value and the continuous shutdown time MDT limit value of the refrigeration system. Among them, MUT is minimal up time, that is, the shortest continuous operation time required after the cooling machine is turned on. MDT is minimal down time, that is, the shortest continuous shutdown time required after the cooling machine is turned off.
[0039] The chiller load rate limit means that the chiller operation combination at each time step needs to meet the load rate limit, that is, the load rate of all chillers needs to be within the preset range. The preset area is the partial load rate range allowed for the chiller to operate, which is determined by the chiller design. It is preferably 0.4-1.1.
[0040] The load rate of each chiller can be determined by the load prediction value of the time step and the rated power of each chiller. The load prediction value can be obtained from the load prediction result in step S101.
[0041] The restriction on simultaneous start-up of chillers means that at each time step, the first type of chiller cannot be started at the same time as the second type of chiller (this restriction is mainly for different chillers with large differences in rated loads. Starting large and small chillers at the same time may cause uneven water pressure). Among them, the first type of chiller can be a centrifuge and the second type of chiller can be a screw machine. If the centrifuge uses a high-pressure water pump and the screw machine uses a low-pressure water pump, then the centrifuge and the screw machine cannot be started at the same time due to water pressure problems. Alternatively, running two different types of chillers at the same time may cause complexity to the control system, increase the difficulty of operation, or pose potential safety risks, so the two types of chillers cannot be started at the same time. Alternatively, the two chillers may interfere with each other during operation, such as vibration, noise or heat island effect, so they need to be operated separately.
[0042] Regarding the confidence interval limit, since the chiller operation model is trained by historical data, data with high enough confidence in the historical data is needed to obtain the confidence interval of the chiller operation model. Only data falling within the confidence interval of the chiller operation model can be considered as a reasonable result of the chiller operation model calculation. For example, if you need to obtain the confidence interval of the chilled water inlet and outlet water temperatures and the cooling water inlet and outlet water temperatures, you need to draw a binary Gaussian distribution for these two variables. In the process of optimizing the chiller energy consumption, only the results of the chilled water and cooling water inlet and outlet water temperatures falling within the confidence ellipse are considered.
[0043] In the embodiment of the present invention, a feasible chiller combination is first determined based on the chiller operation time limit, and then a feasible chiller operation sequence is determined according to the chiller load rate limit, the chiller simultaneous start limit and the confidence interval limit.
[0044] In the embodiment of the present invention, for the relevant decision variables of the refrigeration machine operation sequence, a confidence interval can be selected through the historical operation data and the model fitting results, so that the error of the refrigeration machine operation model is less than a certain threshold or the probability density function is greater than a certain threshold. The following is a possible method:
[0045] Data collection and model fitting: First, it is necessary to collect the historical operation data of the chiller, including relevant decision variables and corresponding operation results. Then, use this data to train an appropriate model, such as a regression model or a neural network model, to predict the relevant decision variables of the chiller operation sequence.
[0046] Model evaluation and error analysis: Use a portion of the historical run data as a validation set to evaluate the trained model. Calculate the error between the model prediction and the actual observation, such as the root mean square error (RMSE) or mean absolute error (MAE). Compare these errors with the set threshold to determine the accuracy of the model.
[0047] Confidence interval determination: Based on the error distribution or probability density function of the model, statistical methods can be used to determine the confidence interval. For example, if the model error follows a normal distribution, the mean and standard deviation can be calculated, and the confidence interval can be determined using the confidence level and sample size. If there is enough historical data, non-parametric methods such as kernel density estimation can also be used to estimate the probability density function of the error and select a confidence interval greater than a certain threshold.
[0048] Determine whether the decision variable is within the confidence interval: For a new chiller operation sequence, use the trained model to make predictions and calculate the prediction error of the relevant decision variable. Then, compare this error with the previously determined confidence interval. If the error is less than the threshold or the probability density is greater than the threshold, the relevant decision variable can be considered to be within the confidence interval.
[0049] Based on the above confidence interval limits, a feasible chiller operation sequence can be determined.
[0050] In the embodiment of the present invention, based on the above-mentioned restriction conditions, not only the restriction of the cooling machine load rate is considered, but also the restriction effect of the cooling machine operation time restriction such as the continuous operation time MUT or the continuous shutdown time MDT is considered.
[0051] In addition, considering that the data fitting model has a certain degree of confidence interval, the accuracy of the model fitting can be ensured within the confidence interval. The optimal solution outside the confidence interval may not guarantee the efficient operation of the system. This application considers the confidence interval limit to ensure the accuracy of the model fitting.
[0052] Step S103: calculating the energy consumption of the feasible chiller operation sequence based on the chiller operation model and the load prediction result.
[0053] For ease of understanding, an example is given here. If the operating status of all chillers is [0,0,1,1], this means that chillers 1 and 2 are turned off, and chillers 3 and 4 are turned on. When calculating the predicted partial load rate PLR, the load prediction result can be divided by the total rated cooling capacity of chillers 3 and 4 to obtain the predicted partial load rate PLR.
[0054] In the embodiment of the present invention, for each feasible chiller operation sequence, the chiller operation model is used to calculate the energy consumption. The chiller operation state and the chiller partial load rate PLR at each time step are input into the chiller operation model to obtain the corresponding energy consumption.
[0055] Step S104: determining a target chiller operation sequence based on the energy consumption.
[0056] In the embodiment of the present invention, the chiller operation sequence corresponding to the minimum energy consumption is determined as the target chiller operation sequence. The target chiller operation sequence is the optimal feasible chiller operation sequence. The corresponding control action for executing the target chiller operation sequence is X t+1 To X t+k , so as to accurately realize the start and stop operation of the cold machine.
[0057] The above optimization steps are repeated at each time step node, so that the optimal feasible chiller operation sequence at each time point can be continuously obtained.
[0058] In an optional embodiment, the constraints of the refrigeration machine operation model include: refrigeration machine operation time limit, refrigeration machine load rate limit, refrigeration machine simultaneous start limit and confidence interval limit; the method further includes: calculating the refrigeration machine performance coefficient COP based on the refrigeration machine operation model and the load prediction result;
[0059] Then, based on the chiller operation model, the feasible chiller operation sequence is output, including: determining a feasible chiller combination based on the chiller operation time limit; determining a feasible chiller operation sequence optimization interval based on the relationship between the chiller coefficient of performance COP and the chiller partial load rate PLR, or based on the relationship between the chiller coefficient of performance COP and the chilled water inlet and outlet temperature difference; within the feasible chiller operation sequence optimization interval, searching for the feasible chiller operation sequence from the feasible chiller combination; if the feasible chiller operation sequence is empty, determining the feasible chiller operation sequence based on the feasible chiller combination, combined with the chiller load rate limit, the chiller simultaneous start-up limit and the confidence interval limit, and saving the feasible chiller operation sequence; if the feasible chiller operation sequence is not empty, saving the feasible chiller operation sequence.
[0060] Among them, the feasible chiller operation sequence is empty, which means that no feasible solution is found in the feasible chiller operation sequence optimization interval, and the feasible chiller operation sequence is not empty, which means that a feasible solution is found in the feasible chiller operation sequence optimization interval.
[0061] In the embodiment of the present invention, a feasible chiller operation sequence is found within the feasible chiller operation sequence optimization interval of the chiller performance coefficient COP, and the range of the PLR (Part Load Ratio) or the temperature difference between the inlet and outlet of the chilled water is limited to narrow the range of the feasible chiller operation sequence. Figure 2 As shown in the figure, the optimal interval for the feasible chiller operation sequence is Figure 2The optimal range of the COP of the chiller in the process is obtained. The scope of the optimization process is reduced by adopting a two-step optimization method. In the two-step optimization process, the PLR feasible range is first limited to a relatively small interval (i.e., the feasible chiller operation sequence optimization interval) to find a feasible solution. If no feasible solution is found in this interval, the PLR range is further expanded to the PLR feasible domain of the chiller (i.e., the PLR feasible domain composed of the chiller load rate limit, the chiller simultaneous start limit and the confidence interval limit) to find the optimal feasible solution.
[0062] Specifically, in an optional embodiment, in the process of searching for a feasible chiller operation sequence with the lowest energy consumption, the following method is used for optimization, thereby shortening the required calculation time. First, the range of the partial load rate PLR is further restricted, and a feasible chiller operation sequence is first searched within the feasible chiller operation sequence optimization interval of the chiller performance coefficient COP to narrow the range of the feasible chiller operation sequence. The restriction method is shown in the figure, and the specific steps include:
[0063] Step a, for different chillers, plot the relationship between COP and PLR, or COP and the chilled water inlet and outlet temperature difference. Different chillers may have differences in their performance characteristics, including the PLR corresponding to the highest (also called the optimal) COP, or the chilled water inlet and outlet temperature difference corresponding to the highest (also called the optimal) COP. This can help understand the performance characteristics of different chillers and determine the PLR corresponding to the highest COP of each chiller, or determine the chilled water inlet and outlet temperature difference corresponding to the highest COP of each chiller.
[0064] Step b: Determine the optimal interval of feasible chiller operation sequence for each chiller based on the relationship diagram. This interval should include the PLR corresponding to the highest COP, or the chilled water inlet and outlet temperature difference corresponding to the highest COP, and the optimal interval can be further adjusted as needed.
[0065] Step c: for a given load forecast result and constraint conditions, the feasible cooling machine operation sequence optimization interval is used as the constraint condition, and the cooling machine operation sequence is optimized within this interval.
[0066] Step d: If there is no feasible solution during the optimization process, it means that the constraints are too strict. In this case, the constraints can be relaxed to expand the PLR or chilled water inlet and outlet temperature difference to the feasible operating range of the chiller. Then, continue to search for the optimal feasible solution within this range.
[0067] In an optional embodiment, a dynamic programming method may be used to calculate the energy consumption of the feasible chiller operation sequence based on the chiller operation model and the load forecast result. Specifically:
[0068] For any feasible refrigeration machine operation sequence, calculate the operation energy consumption of the current step in each feasible refrigeration machine operation sequence; wherein each step corresponds to an operating condition, and each step and the corresponding operating condition constitute a step and operating condition combination; determine whether the current step and operating condition combination exists; if not, store the operation energy consumption corresponding to the current step and operating condition combination in a memory pool; if it exists, search the operation energy consumption corresponding to the current step and operating condition combination from the memory pool; based on the operation energy consumption corresponding to all step and operating condition combinations in each feasible refrigeration machine operation sequence, determine the energy consumption of each feasible refrigeration machine operation sequence.
[0069] In an embodiment of the present invention, a dynamic programming method can be used to find the optimal solution within a restricted range (i.e., all the restrictions mentioned above) and reduce the calculation time. By saving and reusing the calculated results, the same steps can be avoided from being repeated, thereby improving the calculation efficiency. When calculating, the dynamic programming method divides each cold machine operation sequence into several sub-problems. The length of each cold machine operation sequence is equal to the control time domain, and the interval is the control time interval (such as the control time domain is 1 hour, and the control interval is 20 minutes, then the length of the cold machine sequence is 3, which can be decomposed into 3 sub-problems). When calculating different cold machine sequences, some sub-problems will overlap. Dynamic programming stores the solutions of each inconsistent sub-problem, avoiding repeated calculation of these overlapping sub-problems, and improving the overall calculation efficiency of the optimization process. For ease of understanding, an example is given here: if there are three feasible cold machine operation sequences in the feasible solution (each sub-list in the sequence represents the cold machine start combination corresponding to the moment, 0 represents on, and 1 represents off).
[0070] Feasible chiller operation sequence 1: [[0,0,1], [0,0,1]. [0,1,1]], feasible chiller operation sequence 2: [[0,0,1], [0,1,1], [0,1,1]], feasible chiller operation sequence 3: [[0,0,1], [0,1,0], [0,1,1]]. Although these three feasible chiller operation sequences are three different sequences, during the calculation process, the calculation results can be saved when calculating sequence 1, and when calculating the energy consumption of the feasible chiller operation sequences of sequences 2 and 3 (based on the energy consumption calculated in step S101 and step S103), the energy consumption calculation results of step S101 and step S103 when calculating sequence 1 are directly called, thereby reducing the number of required calculations from 9 times to 5 times. By adopting this method, the time for calculating the expected energy consumption of different sequences can be greatly reduced, so as to find the optimal solution more quickly.
[0071] The following two refrigeration machine operation models are provided for the refrigeration machine operation sequence optimization method of the present invention. It should be understood that models similar to the present invention or simple variations should be considered to be within the scope of this specification.
[0072] The cooling machine operation model 1 is used to realize the optimization of cooling machine operation sequence. Specifically:
[0073]
[0074] In this embodiment, the cold machine operation model of Formula 1 is used for modeling.
[0075] Among them, COP i represents the coefficient of performance of the ith refrigerator; i represents the ith refrigerator, i is a positive integer; PLR i is the partial load rate of the ith chiller; a i , b i , c i are all fitting coefficients.
[0076] Step 11: The load forecasting model uses the time information of the forecast period, weather forecast information and the chilled water return temperature in a historical period to forecast the load. The chiller operation model uses historical operation data for calculation, where PLR = chilled water flow rate * chilled water enthalpy difference / chiller rated cooling capacity.
[0077] Step 12, obtain a feasible chiller operation sequence. 1. MUT / MDT = 60 min; 2. PLR∈[0.4,1.0], and the PLR values of each chiller are equal; 3. Chillers with different rated loads cannot be turned on at the same time.
[0078] Step 13, draw the probability density distribution function of PLR according to the historical PLR distribution, such as Figure 3 As shown. The probability density distribution function value is greater than P min as the confidence interval of the PLR.
[0079] Step 14, obtain the optimal chiller operation sequence. Under the premise of satisfying the restrictions mentioned in steps 12 and 13, the energy consumption of each feasible chiller operation sequence in this time period is obtained through the load forecast results from time t+1 to time t+k and the chiller operation model, and the feasible chiller operation sequence with the minimum energy consumption is output as the optimal solution, and the corresponding control action is X t+1 To X t+k .
[0080] Step 15, perform optimal control. At time t+1, perform Xt+1.
[0081] The cooling machine operation model 2 is used to realize the optimization of cooling machine operation sequence. Specifically:
[0082]
[0083]
[0084] EIRPLR=c1+c2×PLR+c3×PLR (Formula 25)
[0085]
[0086] In this embodiment, the cooling machine modeling is performed using the cooling machine operation model of equations 21-26.
[0087] Where, Q supply represents the cooling capacity, P chiller represents the chiller operating power, COP represents the coefficient of performance of the chiller, mcw represents the mass flow rate of chilled water, Cp represents the specific heat capacity of chilled water, x5-x4 represents the inlet and outlet temperature difference of chilled water, Qref represents the rated cooling capacity of the chiller, COP ref represents the rated COP of the chiller, EIRFT represents the power consumption curve of the chiller, CARFT represents the cooling capacity curve of the chiller, EIRPLR represents the efficiency curve of the chiller, Tcw,l represents the supply temperature of chilled water (i.e. the temperature leaving the evaporator), T cond,e is the supply temperature of cooling water (i.e. the water temperature entering the condenser), a1-a6, b1-b6, c1-c3 are all fitting coefficients, CyclingRatio is the power consumption correction coefficient under low load, PLR min It is the minimum PLR at which the chiller is allowed to operate.
[0088] Step 21, the load forecasting model uses the time information of the forecast period, weather forecast information and the chilled water return temperature within a period of history to forecast the load. The input of the chiller operation model is the chilled water flow rate (mcw), the cooling water supply temperature (tcond,e), the chilled water supply temperature (tcw,l,x4) and the chilled water return temperature (tcw,e,x5). Among them, the chilled water flow rate is the rated flow rate corresponding to the refrigeration pump, the cooling water supply temperature is the actual value at the current moment (it can also be considered to use the external ambient wet-bulb temperature for fitting), and the chilled water supply temperature is the chiller set supply temperature. After this transformation, the input of the chiller operation model can be simplified to PLR and the chiller start and stop status. (Calculation order: Formula 23-26 → Formula 22 → Formula 21)
[0089] Step 22, obtain a feasible chiller sequence. 1. MUT / MDT = 60 min; 2. PLR∈[0.4,1.0], and the PLR values of each chiller are equal; 3. Chillers with different rated loads cannot be turned on at the same time.
[0090] Step 23, obtain the confidence interval of the chiller operation model. Take the chilled water supply and return temperature difference and the cooling water supply temperature difference as double variables and draw a Gaussian distribution diagram, such as Figure 4 As shown in the figure, the two variables calculated in the cooling machine operation sequence are considered as feasible solutions only when they are within the 3σ interval.
[0091] The present invention mainly solves the problem of using model predictive control to optimize the chiller operation sequence in large commercial buildings. First, the method only uses common chiller sensor points (chilled water supply and return water temperature, flow, cooling water supply and return water temperature, chiller power), and no additional sensors need to be installed, ensuring the large-scale deployment of the algorithm. Secondly, the chiller operation model parameters are obtained through parameter identification, and the model confidence interval is introduced to simplify the modeling process while enhancing the model accuracy and adaptability. Third, the model predictive control and rolling time domain optimization methods are used to ensure that the global optimum rather than the local optimum is obtained. Finally, in the optimization process of the chiller operation sequence, the two-step optimization and dynamic programming methods are used to reduce the time required for the optimization process, and realize the operability of finding the optimal control solution within a longer prediction time in the future within the limited operable time in the actual control process.
[0092] In an optional embodiment, during the modeling phase, it is also possible to consider adding a completely physically based modeling method. The purpose is to solve the problem of less historical operating data and low accuracy of data-driven models in the early stages of building operation. The load forecasting part uses a building thermal model based on building design information + weather forecast information + human comfort temperature range information, and the refrigeration machine modeling part uses the operating curve provided by the refrigeration machine manufacturer. The final model output is a combination of physical methods + data-driven methods. As the amount of data increases, the proportion of data-driven model output gradually increases.
[0093] It should be understood that although Figure 1 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 1 At least part of the steps may include multiple steps or multiple stages. These steps or stages are not necessarily performed at the same time, but can be performed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed in turn or alternately with other steps or at least part of the steps or stages in other steps.
[0094] In one embodiment, Figure 5 As shown, a system for optimizing the operation sequence of a cold machine is provided, comprising:
[0095] A load forecasting module is used to output the load forecasting result of the target period based on the load forecasting model;
[0096] A cooling machine operation sequence determination module is used to output a feasible cooling machine operation sequence based on a cooling machine operation model;
[0097] An energy consumption determination module, used to calculate the energy consumption of the feasible chiller operation sequence based on the chiller operation model and the load prediction result;
[0098] A target sequence determination module is used to determine a target chiller operation sequence based on the energy consumption.
[0099] In an optional embodiment, the load forecasting module is used to: input the time information of the target time period, the weather forecast data of the target time period, and the refrigeration machine operation data at the current moment into the load forecasting model, and output the load forecasting result.
[0100] In an optional embodiment, the constraints of the refrigeration machine operation model include: refrigeration machine operation time limit, refrigeration machine load rate limit, refrigeration machine simultaneous start-up limit and confidence interval limit; the refrigeration machine operation sequence determination module is used to: determine a feasible refrigeration machine combination based on the refrigeration machine operation time limit; determine the feasible refrigeration machine operation sequence based on the feasible refrigeration machine combination, combined with the refrigeration machine load rate limit, the refrigeration machine simultaneous start-up limit and the confidence interval limit.
[0101] In the embodiment of the present invention, the description of related features in the above system is consistent with the related description in the method, and will not be repeated here.
[0102] The refrigerator operation sequence optimization system of the present invention includes the above-mentioned functional modules, and each functional module can be set and combined according to actual needs.
[0103] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 6 As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for optimizing the operation sequence of a cold machine is implemented.
[0104] Those skilled in the art will understand that Figure 6 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0105] In one embodiment, a computer device is provided, which includes: a memory, a processor, and a cold machine operation sequence optimization program stored in the memory and executable on the processor, wherein the cold machine operation sequence optimization program, when executed by the processor, implements the steps of the cold machine operation sequence optimization method described in any of the above embodiments.
[0106] In one embodiment, a computer-readable storage medium is provided, on which a cold machine operation sequence optimization program is stored. When the cold machine operation sequence optimization program is executed by a processor, the steps of the cold machine operation sequence optimization method described in any of the above embodiments are implemented.
[0107] In one embodiment, a computer program product is provided, which includes a cooling machine operation sequence optimization program. When the cooling machine operation sequence optimization program is executed by a processor, the steps of the cooling machine operation sequence optimization method described in any of the above embodiments are implemented.
[0108] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0109] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0110] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.
Claims
1. A method for optimizing the operation sequence of a cooling machine, characterized in that: The method comprises: Based on the load forecasting model, output the load forecasting results for the target period; Based on the cooling machine operation model, output a feasible cooling machine operation sequence; Calculating the energy consumption of the feasible chiller operation sequence based on the chiller operation model and the load forecast result; A target chiller operation sequence is determined based on the energy consumption.
2. The method for optimizing the operation sequence of a cold machine according to claim 1, characterized in that: The outputting of the load forecasting result of the target period based on the load forecasting model includes: The time information of the target time period, the weather forecast data of the target time period, and the cooling machine operation data at the current moment are input into the load forecasting model, and the load forecasting result is output.
3. The method for optimizing the operation sequence of a cold machine according to claim 1, characterized in that: The constraints of the cooling machine operation model include: cooling machine operation time limit, cooling machine load rate limit, cooling machine simultaneous start limit and confidence interval limit; The outputting of a feasible chiller operation sequence based on the chiller operation model comprises: Determining a feasible chiller combination based on the chiller operation time limit; The feasible chiller operation sequence is determined based on the feasible chiller combination, in combination with the chiller load rate limit, the chiller simultaneous start-up limit and the confidence interval limit.
4. The method for optimizing the operation sequence of a cold machine according to claim 1, characterized in that: The constraints of the refrigeration machine operation model include: refrigeration machine operation time limit, refrigeration machine load rate limit, refrigeration machine simultaneous start limit and confidence interval limit; the method further includes: calculating the refrigeration machine performance coefficient COP based on the refrigeration machine operation model and the load prediction result; Then, outputting a feasible chiller operation sequence based on the chiller operation model includes: Determining a feasible chiller combination based on the chiller operation time limit; Based on the relationship between the coefficient of performance COP of the chiller and the partial load rate PLR of the chiller, or based on the relationship between the coefficient of performance COP of the chiller and the temperature difference between the inlet and outlet water of the chilled water, determining the optimal interval for the feasible chiller operation sequence; In the feasible refrigeration machine operation sequence optimization interval, searching for the feasible refrigeration machine operation sequence from the feasible refrigeration machine combinations; If the feasible chiller operation sequence is empty, determining the feasible chiller operation sequence based on the feasible chiller combination, in combination with the chiller load rate limit, the chiller simultaneous start limit and the confidence interval limit; If the feasible cooling machine operation sequence is not empty, the feasible cooling machine operation sequence is saved.
5. The method for optimizing the operation sequence of a cold machine according to any one of claims 1 to 4, characterized in that: The calculating the energy consumption of the feasible chiller operation sequence based on the chiller operation model and the load prediction result includes: For any feasible chiller operation sequence, calculate the operation energy consumption of the current step in each feasible chiller operation sequence; wherein each step corresponds to a working condition, and each step and the corresponding working condition constitute a step and working condition combination; Determine whether the current step and working condition combination exists; If it does not exist, the operating energy consumption corresponding to the current step and working condition combination is stored in the memory pool; If it exists, searching the memory pool for the operating energy consumption corresponding to the current step and working condition combination; Based on the operating energy consumptions corresponding to all steps and operating condition combinations in each feasible chiller operating sequence, the energy consumption of each feasible chiller operating sequence is determined.
6. The method for optimizing the operation sequence of a cold machine according to claim 1, characterized in that: Determining a target chiller operation sequence based on the energy consumption includes: The refrigeration machine operation sequence corresponding to the minimum energy consumption is determined as the target refrigeration machine operation sequence.
7. A cooling machine operation sequence optimization system, characterized in that: The system comprises: A load forecasting module is used to output the load forecasting result of the target period based on the load forecasting model; A cooling machine operation sequence determination module is used to output a feasible cooling machine operation sequence based on a cooling machine operation model; An energy consumption determination module, used to calculate the energy consumption of the feasible chiller operation sequence based on the chiller operation model and the load prediction result; A target sequence determination module is used to determine a target chiller operation sequence based on the energy consumption.
8. A computer device, characterized in that: The computer device includes: a memory, a processor, and a cold machine operation sequence optimization program stored in the memory and executable on the processor. When the cold machine operation sequence optimization program is executed by the processor, the cold machine operation sequence optimization method according to any one of claims 1 to 6 is implemented.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a cold machine operation sequence optimization program, and when the cold machine operation sequence optimization program is executed by the processor, the cold machine operation sequence optimization method according to any one of claims 1 to 6 is implemented.
10. A computer program product, characterized in that The computer program product comprises a cold machine operation sequence optimization program, and when the cold machine operation sequence optimization program is executed by a processor, the cold machine operation sequence optimization method according to any one of claims 1 to 6 is implemented.
Citation Information
Cited By
Refrigerating system optimization method and device based on error correction
CN119713701A
A refrigeration system optimization method and device based on error correction
CN119713701B
Intelligent cold supply control method for refrigeration house based on phase change cold storage
CN120368668A