Index prediction method and device for cascade industrial process, equipment and storage medium

By building a general mechanism model and expert rule base in industrial production, identifying working conditions and predicting indicators, the problem of high error rate of manual empirical identification is solved, and the stability and efficiency of the industrial process are improved.

CN118886304APending Publication Date: 2024-11-01PENG CHENG LAB
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410908105.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

In complex industrial production processes, the error rate is high when relying solely on manual experience to identify working conditions and index values ​​in the industrial process, which affects the stability of the system.

Method used

Based on the principle of cascade reaction material balance, the target data set is obtained through data processing, the working case sample set is divided according to the first principle, a specific mechanism model is constructed, a key variable is determined and an expert rule database is generated, and an expert rule database is used to obtain the target data set. Identify the working conditions of the industrial process and make indicator predictions.

Benefits of technology

The recognition accuracy and recognition rate are improved, the overall efficiency and stability of the cascading industrial process are improved, and the dependence on artificial experience is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886304A_ABST
    Figure CN118886304A_ABST
Patent Text Reader

Abstract

The invention discloses an index prediction method, device and equipment for a cascade industrial process and a storage medium, and relates to the technical field of cascade industries, and the method comprises the steps: constructing a universal mechanism model of a cascade reaction based on a cascade reaction material balance principle; performing data processing on the general mechanism operation data to obtain a target data set; based on the general mechanism model, performing working condition division on the target data set according to a first principle to obtain a working condition sample set; constructing a specific mechanism model based on the working condition sample set; based on the working condition sample set, key variables used for distinguishing working conditions are determined; generating an expert rule base based on the key variables; and identifying the working condition of the industrial process through the expert rule base, and determining an index prediction value in the industrial process according to the specific mechanism model corresponding to the working condition. According to the invention, the identification accuracy of index prediction of the industrial process can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of cascade industrial technology, and in particular to an indicator prediction method, device, equipment and storage medium for a cascade industrial process. Background Art

[0002] In modern industrial production, cascade industrial processes face many challenges and optimization needs due to their numerous processes and complex energy and information flows. Cascade industrial processes usually include multiple interconnected production steps, each of which may involve a variety of different processes and equipment. The energy and material transfer between the processes and the feedback control of information constitute a highly complex system, which not only increases the difficulty of industrial site management and control, but also puts higher requirements on the overall efficiency and stability of the system. For example, the numerous processes bring significant management difficulties. Each process may have different operating parameters, equipment requirements and process conditions, which require precise coordination and management. Due to the interdependence between processes, fluctuations in one process may trigger a chain reaction and affect the stable operation of the entire system. Modern industrial production relies on a large amount of real-time data and information feedback. Each process needs to transmit and process information in a timely and accurate manner in order to achieve precise control and optimized decision-making. However, the parameters of complex industrial production processes are complex and diverse, and the process point data is large and the amount of collected data is large. The error rate is high when relying solely on manual experience to identify the working conditions and indicator values ​​in the industrial process, which will not be conducive to ensuring the stability of the system.

[0003] The above contents are only used to assist in understanding the technical solution of the present application and do not constitute an admission that the above contents are prior art. Summary of the invention

[0004] The main purpose of this application is to provide an indicator prediction method, device, equipment and storage medium for a cascade industrial process, aiming to solve the technical problem that in complex industrial production processes, the error rate is high when relying solely on manual experience to identify the working conditions and indicator values ​​in the industrial process, which is not conducive to ensuring the stability of the system.

[0005] To achieve the above objectives, the present application proposes a method for predicting an index of a cascade industrial process, the method for predicting an index of a cascade industrial process comprising:

[0006] Construct a general mechanism model of cascade reaction based on the material balance principle of cascade reaction;

[0007] Perform data processing on the general mechanism operation data to obtain the target data set;

[0008] Based on the general mechanism model, the target data set is divided into working conditions according to first principles to obtain a working condition sample set;

[0009] Constructing a specific mechanism model based on the working condition sample set;

[0010] Based on the operating condition sample set, determining key variables for distinguishing operating conditions;

[0011] generating an expert rule base based on the key variables;

[0012] The working conditions of the industrial process are identified through the expert rule base, and the predicted values ​​of the indicators in the industrial process are determined according to the specific mechanism model corresponding to the working conditions.

[0013] In one embodiment, the data processing includes missing value filling processing, outlier processing, data smoothing processing and labeling processing; wherein,

[0014] The step of processing the general mechanism operation data to obtain the target data set includes:

[0015] The missing values ​​of the general mechanism operation data are filled to obtain the remaining data set;

[0016] Performing outlier processing on the remaining data set to obtain a second data set;

[0017] Performing data smoothing processing on the second data set to obtain a third data set;

[0018] The third data set is labeled to obtain a target data set.

[0019] In one embodiment, the step of dividing the target data set into operating conditions based on the general mechanism model and according to first principles to obtain an operating condition sample set includes:

[0020] S301, setting an accuracy threshold and a scale threshold;

[0021] S302, obtaining a general cascade reaction model after training the general mechanism model according to the target data set;

[0022] S303, based on the general cascade reaction model, determining the prediction accuracy of the sample data in the target data set, constructing the operating condition sample data based on the sample data in the target data set whose prediction accuracy is greater than the accuracy threshold, determining the remaining data set based on the sample data in the target data set whose prediction accuracy is less than or equal to the accuracy threshold, and adding the operating condition sample data to the operating condition sample set;

[0023] S304. After updating the target data set according to the remaining data set, steps S302-S304 are repeated until the size of the remaining data set is smaller than the size threshold, and the remaining data set is added to the operating condition sample set as operating condition sample data.

[0024] In one embodiment, the step of obtaining a universal cascade reaction model after training the universal mechanism model according to the target data set comprises:

[0025] Determining predicted values ​​of sample data in a target data set based on the general mechanism model;

[0026] Constructing a target equation according to the predicted value and the actual value;

[0027] Based on the target equation, the general mechanism model is trained to identify key reaction parameters, and the general cascade reaction model is determined according to the key reaction parameters.

[0028] In one embodiment, the step of determining key variables for distinguishing operating conditions based on the operating condition sample set includes:

[0029] Using the working condition category as a label for the working condition sample data in the working condition sample set;

[0030] Determine discrete indicators and continuous variables of the working condition sample data in the working condition sample set as input features, wherein the discrete indicators include time indicators and operation shift indicators, and the continuous variables are continuous variables recorded by the distributed system;

[0031] Based on the classification model, determine the predicted category of the input feature;

[0032] Constructing an objective function based on the predicted categories and the total number of predicted categories, and training the classification model based on the objective function to obtain a target classification model;

[0033] Analyzing the target classification model to obtain key features and decision rules;

[0034] According to the key features and the decision rule, key variables for distinguishing operating conditions are determined.

[0035] In one embodiment, the step of identifying the working condition of the industrial process through the expert rule base and determining the predicted value of the indicator in the industrial process according to the specific mechanism model corresponding to the working condition includes:

[0036] determining target identification rules based on the operating data of the industrial process;

[0037] Based on the expert rule base, determining the operating condition corresponding to the target identification rule;

[0038] Determine the target-specific mechanism model corresponding to the operating condition, and input the operating data into the target-specific mechanism model to obtain the predicted value of the indicator in the industrial process.

[0039] In one embodiment, the step of determining the operating condition corresponding to the target recognition rule based on the expert rule base includes:

[0040] Based on the expert rule base, the operating condition corresponding to the target recognition rule is determined by conditional judgment of feature thresholds or logical expressions of feature relationships.

[0041] In addition, to achieve the above-mentioned purpose, the present application also proposes an index prediction device for a cascade industrial process, the index prediction device for a cascade industrial process comprising:

[0042] A construction module 10 is used to construct a general mechanism model of cascade reaction based on the material balance principle of cascade reaction;

[0043] The processing module 20 is used to process the general mechanism operation data to obtain a target data set;

[0044] A division module 30 is used to divide the target data set into working conditions based on the general mechanism model and according to first principles to obtain a working condition sample set;

[0045] The construction module 10 is also used to construct a specific mechanism model based on the operating condition sample set;

[0046] An extraction module 40, configured to determine key variables for distinguishing operating conditions based on the operating condition sample set;

[0047] A generating module 50, for generating an expert rule base based on the key variables;

[0048] The generating module 50 is used to identify the working conditions of the industrial process through the expert rule base, and determine the predicted values ​​of the indicators in the industrial process according to the specific mechanism model corresponding to the working conditions.

[0049] In addition, to achieve the above-mentioned purpose, the present application also proposes an indicator prediction device for a cascade industrial process, the device comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, the computer program being configured to implement the steps of the indicator prediction method for a cascade industrial process as described above.

[0050] In addition, to achieve the above-mentioned purpose, the present application also proposes a storage medium, which is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the indicator prediction method for the cascade industrial process as described above are implemented.

[0051] In addition, to achieve the above-mentioned purpose, the present application also provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, it implements the steps of the indicator prediction method for the cascade industrial process as described above.

[0052] One or more technical solutions proposed in this application have at least the following technical effects:

[0053] The index prediction method, device, equipment and storage medium of the cascade industrial process proposed in the present application construct a general mechanism model of cascade reaction based on the material balance principle of cascade reaction; process the general mechanism operation data to obtain a target data set; based on the general mechanism model, divide the target data set into operating conditions according to the first principles to obtain an operating condition sample set; construct a specific mechanism model based on the operating condition sample set; based on the operating condition sample set, determine the key variables for distinguishing the operating conditions; generate an expert rule base based on the key variables; identify the operating condition of the industrial process through the expert rule base, and determine the index prediction value in the industrial process according to the specific mechanism model corresponding to the operating condition. The invention solves the technical problem that the error rate is high and it is not conducive to ensuring the stability of the system when only relying on manual experience to identify the working conditions and index values ​​in the industrial process in the complex industrial production process. Compared with the prior art, the present application first constructs a general mechanism model based on the material balance principle, and then divides the target data set into working conditions based on the first principle to obtain a working condition sample set, and then constructs a specific mechanism model based on the working condition sample set, and extracts the key working condition information in the working condition sample set to form an expert rule base, and matches the specific mechanism model of the industrial process through the expert rule base to predict the key indicators of the industrial process. In this way, there is no need for manual experience to identify the working conditions and indicators in the industrial process, which can improve the recognition accuracy and recognition rate, thereby improving the overall efficiency and stability of the cascade industrial process. In addition, the present application not only considers the independent optimization of the process, but also focuses on the coordination and integration between processes, and is committed to finding the best solution in the complex energy flow and information flow management, so as to achieve efficient, stable and sustainable development of the industrial production process. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0055] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0056] Figure 1 A flow chart of the first embodiment of the index prediction method for the cascade industrial process of the present application;

[0057] Figure 2 A schematic diagram of a cascade reaction flow chart provided for Example 1 of an indicator prediction method for a cascade industrial process of the present application;

[0058] Figure 3 The particle swarm evolution algorithm parameter identification and optimization process provided in Example 1 of the index prediction method for the cascade industrial process of this application;

[0059] Figure 4 A flow chart of the second embodiment of the index prediction method for the cascade industrial process of the present application;

[0060] Figure 5 This is a schematic diagram of the module structure of the indicator prediction device for the cascade industrial process according to an embodiment of the present application;

[0061] Figure 6 Schematic diagram of the device structure of the hardware operating environment involved in the indicator prediction method of the cascade industrial process in the embodiment of the present application.

[0062] The purpose, features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0063] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.

[0064] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.

[0065] The main solution of the embodiment of the present application is: constructing a general mechanism model of cascade reaction based on the material balance principle of cascade reaction; performing data processing on the general mechanism operation data to obtain a target data set; based on the general mechanism model, dividing the target data set into operating conditions according to first principles to obtain an operating condition sample set; constructing a specific mechanism model based on the operating condition sample set; based on the operating condition sample set, determining key variables for distinguishing operating conditions; generating an expert rule base based on the key variables; identifying the operating condition of the industrial process through the expert rule base, and determining the predicted value of the indicator in the industrial process according to the specific mechanism model corresponding to the operating condition.

[0066] In this embodiment, for the convenience of description, the following description is made by taking the indicator prediction device for identifying the cascade industrial process as the execution subject.

[0067] Since the parameters of the complex industrial production process in the existing technology are complex and diverse, there are many process point data and a large amount of collected data, the error rate is high when relying solely on manual experience to identify the working conditions and indicator values ​​in the industrial process, which will be unfavorable to ensuring the stability of the system.

[0068] This application provides a solution that does not require manual experience to identify the working conditions and indicators in the industrial process, which can not only improve the recognition accuracy, but also effectively improve the recognition rate.

[0069] It can be seen from the above embodiments that the indicator prediction method, device, equipment and storage medium for cascade industrial processes proposed in the present application construct a general mechanism model of cascade reactions based on the material balance principle of cascade reactions; perform data processing on the general mechanism operation data to obtain a target data set; based on the general mechanism model, divide the target data set into operating conditions according to the first principles to obtain an operating condition sample set; construct a specific mechanism model based on the operating condition sample set; based on the operating condition sample set, determine the key variables for distinguishing the operating conditions; generate an expert rule base based on the key variables; identify the operating conditions of the industrial process through the expert rule base, and determine the indicator prediction value in the industrial process according to the specific mechanism model corresponding to the operating condition. The technical problem that the error rate is high and it is not conducive to ensuring the stability of the system when only relying on manual experience to identify the working conditions and index values ​​in the industrial process in the complex industrial production process is solved, compared with the prior art, the present application first constructs a general mechanism model based on the material balance principle, then divides the target data set into working conditions based on the first principle to obtain a working condition sample set, and then constructs a specific mechanism model based on the working condition sample set, and extracts the key working condition information in the working condition sample set to form an expert rule base, and matches the specific mechanism model of the industrial process through the expert rule base to predict the key indicators of the industrial process. In this way, there is no need for manual experience to identify the working conditions and indicators in the industrial process, which can not only improve the recognition accuracy, but also effectively improve the recognition rate, thereby improving the overall efficiency and stability of the cascade industrial process.

[0070] It should be noted that the execution subject of this embodiment can be a computing service device with data processing, network communication and program running functions, such as a tablet computer, a personal computer, a mobile phone, etc., or an electronic device capable of realizing the above functions, an indicator prediction device for a cascade industrial process, etc. The following takes the indicator prediction device for a cascade industrial process as an example to illustrate this embodiment and the following embodiments.

[0071] Based on this, the embodiment of the present application provides an indicator prediction method for a cascade industrial process, referring to Figure 1 , Figure 1 This is a flow chart of the first embodiment of the indicator prediction method for the cascade industrial process of the present application.

[0072] In this embodiment, the index prediction method of the cascade industrial process includes steps S10 to S40:

[0073] Step S10, constructing a general mechanism model of cascade reaction based on the material balance principle of cascade reaction;

[0074] It should be noted that if Figure 2 As shown in the figure, cascade industrial processes face many challenges and optimization requirements due to their numerous processes and complex energy and information flows. Cascade industrial processes usually include multiple interconnected production steps, each of which may involve a variety of different processes and equipment. The energy and material transfer between the processes and the feedback control of information constitute a highly complex system, which not only increases the difficulty of industrial site management and control, but also puts higher requirements on the overall efficiency and stability of the system.

[0075] In the specific implementation, the modeling of zinc smelting purification and cobalt removal process is used as an example for explanation. Since the modeling of purification and cobalt removal needs to be based on the chemical reaction relationship between the cobalt ion concentration at the outlet of each reaction tank, the cobalt ion concentration at the inlet, and the oxidation potential, the reaction parameters to be identified are sorted out in accordance with the steady-state stoichiometric equation and the material balance formula of the continuous stirred reactor, combined with the input parameters and the output results. The specific implementation steps are as follows:

[0076] Step 1: The chemical reaction mechanism of purification and removal of cobalt (i.e., the material balance principle of cascade reaction) can be summarized as essentially using zinc powder to carry out a replacement reaction of impurity ions.

[0077] Step 2: Based on the parallel electrode reaction kinetics and independence principle of antimony salt cobalt removal, a kinetic model of antimony salt cobalt removal with strong uncertainty information is constructed, as follows:

[0078]

[0079] In the formula, θ id =(A β ,E e ,α,e eq ) belongs to the parameters that need to be identified, θ m =(f out ,e orp ) is an online monitorable parameter.

[0080] Step 3: Based on the antimony salt cobalt removal kinetic model, a purification and cobalt removal mechanism reaction model (i.e., a general mechanism model of cascade reaction) is constructed, as follows:

[0081]

[0082] In the formula, f in, T is the on-site monitoring parameter, V is the fixed volume of the reaction tank, and R represents the ideal gas constant.

[0083] Step S20, performing data processing on the general mechanism operation data to obtain a target data set;

[0084] It should be noted that in industrial systems, general mechanism models play an important role in data prediction. These models are based on the understanding of the inherent mechanisms of distributed systems and can better capture the characteristics of the system, so they have higher classification accuracy.

[0085] In a feasible implementation manner, the data processing includes missing value filling processing, outlier processing, data smoothing processing, and labeling processing; wherein, the step of performing data processing on the general mechanism operation data to obtain the target data set includes: performing missing value filling processing on the general mechanism operation data to obtain the remaining data set; performing outlier processing on the remaining data set to obtain the second data set; performing data smoothing processing on the second data set to obtain the third data set; and performing labeling processing on the third data set to obtain the target data set.

[0086] It should be noted that the general mechanism operation data refers to the data collected from the distributed system. The general mechanism operation data can cover various operating conditions in the actual process and can be used to construct the target data set, such as filling missing values ​​and cleaning the general mechanism operation data, performing feature engineering on the corresponding data in the model, and unifying the units corresponding to the variables and each field of the data set to obtain the target data set.

[0087] In the specific implementation, the specific steps of the missing value filling process are: the monitoring data is time series data, and the missing values ​​can be filled in by forward filling, where represents the missing data and represents the data before the missing time.

[0088] In the specific implementation, the specific steps of outlier processing are: the standard for determining whether it is a missing value is to use a score, such as Z>3 or Z<-3, which means that the data point deviates from the mean by more than 3 standard deviations and is considered an outlier. The outlier is processed as a missing value. The calculation formula of the Z score is as follows:

[0089]

[0090] Where X is the value of the monitoring data within the sampling period, μ is the average value of the monitoring data within the sampling period, and σ is the standard deviation of the monitoring data within the sampling period.

[0091] In the specific implementation, the specific steps of data smoothing are to use simple moving average to smooth the data, thereby reducing the noise or irregular fluctuations in the data, as follows:

[0092]

[0093] In the formula, represents the original data at time t (i.e., the general mechanism operation data), and w represents the window size.

[0094] Step S30, based on the general mechanism model, dividing the target data set into working conditions according to first principles to obtain a working condition sample set;

[0095] It should be noted that due to the extremely high complexity of the cascade industry, the data distribution under different working conditions is different, and the historical operation and classification experience often become invalid with the fluctuation of raw materials, reaction environment and other factors. Therefore, the working conditions can be divided for the target data set based on the first principles.

[0096] In a feasible implementation manner, the step of dividing the target data set into operating conditions based on the general mechanism model and according to first principles to obtain an operating condition sample set includes:

[0097] S301, setting an accuracy threshold and a scale threshold;

[0098] It should be noted that the accuracy threshold and the scale threshold can be adjusted according to actual operations, and can also be adjusted according to changes in the distribution of the data set.

[0099] S302, obtaining a general cascade reaction model after training the general mechanism model according to the target data set;

[0100] In a feasible implementation, the step of obtaining a universal cascade reaction model after training the universal mechanism model according to the target data set includes: determining the predicted value of the sample data in the target data set based on the universal mechanism model; constructing a target equation based on the predicted value and the actual value; based on the target equation, identifying key reaction parameters after training the universal mechanism model, and determining the universal cascade reaction model according to the key reaction parameters.

[0101] It should be noted that the predicted value refers to the predicted value obtained by predicting the sample data using the mechanism model, and the actual value refers to the real-time value of the sample data.

[0102] It is understandable that, since there are several unknown key reaction parameters in the general mechanism model, a parameter identification algorithm can be used to identify the specific values ​​of these key reaction parameters in the general mechanism model.

[0103] In the specific implementation, the specific calculation formula of the target equation is as follows:

[0104]

[0105] In the formula, is the predicted value of the model for the indicator (that is, the predicted value of the sample data), is the real-time value of the monitoring indicator (that is, the actual value of the sample data), J err (θ id ) is the sum of squares of the differences between the predicted value and the actual value.

[0106] It can be understood that after constructing the target equation, a parameter identification algorithm (which may be a particle swarm evolutionary optimization algorithm) can be used to train the identification parameter model on the data set of all working conditions (i.e., the target data set) to obtain the specific values ​​of the key reaction parameters, and then a general cascade reaction model based on all working conditions can be constructed based on the specific values ​​of the key reaction parameters.

[0107] It should be noted that different parameter identification algorithms can be selected, including various particle swarm optimization algorithms, and Figure 3 The particle swarm evolution optimization algorithm shown in the figure can realize the parameter update of the general mechanism model based on inverse kinematics theory, inverse kinematics identification, parameter identification equations and conditional constraints. The particle swarm evolution optimization algorithm can be replaced by group intelligence algorithms represented by ant colony algorithm, statistical algorithms such as maximum likelihood estimation, and algorithms such as neural networks.

[0108] S303, based on the general cascade reaction model, determining the prediction accuracy of the sample data in the target data set, constructing the operating condition sample data based on the sample data in the target data set whose prediction accuracy is greater than the accuracy threshold, determining the remaining data set based on the sample data in the target data set whose prediction accuracy is less than or equal to the accuracy threshold, and adding the operating condition sample data to the operating condition sample set;

[0109] It should be noted that the sample data of the target data set can be input into the general cascade reaction model to obtain the predicted value of the sample data, and then the prediction accuracy of the sample data can be determined based on the predicted value. For example, the prediction accuracy of the sample data can be determined based on the comparison result between the predicted value and the actual value of the sample data.

[0110] S304. After updating the target data set according to the remaining data set, steps S302-S304 are repeated until the size of the remaining data set is smaller than the size threshold, and the remaining data set is added to the operating condition sample set as operating condition sample data.

[0111] It should be noted that updating the target data set according to the remaining data set refers to replacing the target data set with the remaining data set.

[0112] It can be understood that after obtaining the remaining data sets, it is necessary to retrain the general mechanism model based on the current remaining data sets as the target data sets to obtain the general cascade reaction model, and then filter out a category of working condition sample data (that is, the remaining data sets) from the current target data sets based on the general cascade reaction model obtained by the current training; each category of working condition sample data filtered out needs to be added to the working condition sample set; when the scale (that is, the number) of the remaining data sets is less than the scale threshold, there is no need to filter the working condition sample data again, and the remaining data set can be directly added to the working condition sample set as the last category of working condition sample data.

[0113] In the specific implementation, the specific steps of the working condition sample collection are as follows:

[0114] Step 1: Set the model prediction accuracy threshold and the working condition scale threshold;

[0115] Step 2, each sample data in (i.e., the target data set) is tested using a general cascade reaction model to predict key indicators (i.e., obtain predicted values), and after determining the prediction accuracy of the sample data according to the predicted values, the sample data with a prediction accuracy higher than is screened out to form the first type of working condition samples (i.e., working condition sample data), of which represents the number of internal samples, and the remaining samples form a sample set (i.e., the remaining data set);

[0116] Step 3: Use the data to train the general mechanism model to form a general cascade reaction model, and use the general cascade reaction model to predict the key prediction indicators (i.e., prediction values) of the sample data in the data, and filter out the sample data with a prediction accuracy higher than to form the second type of working condition samples, among which the number of internal samples represented by , and the remaining samples form a sample set;

[0117] Step 4: Determine whether the size of the sample set is less than the size threshold. If not, we repeat step 3 to obtain various working condition samples until the size of the remaining sample set is less than the size threshold. When the size of the remaining sample set is less than , we stop the working condition division and take the remaining sample set as the last type of working condition sample data.

[0118] In the specific implementation, the working condition sample set {S1, S2, …, S K After that, the smaller working condition sample data in the working condition sample set can be synthesized into a sample balanced working condition scale through the SMOTE algorithm, so that the scale of each type of working condition sample data in the working condition sample set is balanced, and K represents the number of working condition sample data.

[0119] Step S40, constructing a specific mechanism model based on the operating condition sample set;

[0120] It should be noted that after obtaining the operating condition sample set, it is necessary to train the corresponding general cascade reaction model based on the operating condition sample data under the operating condition sample set to obtain the specific mechanism model of the operating condition sample data (that is, the general cascade reaction model used to screen out the operating condition sample data).

[0121] Step S50, determining key variables for distinguishing operating conditions based on the operating condition sample set;

[0122] It should be noted that the key variables refer to the variables used to explain the influence of various characteristics on the specific model under different working condition sample data.

[0123] Step S60, generating an expert rule base based on the key variables;

[0124] A set of expert rules that are easy to understand and explain can be generated based on key variables, that is, each set of working condition sample data has its corresponding expert rules.

[0125] It should be noted that in industrial intelligent systems, the expert rule base is an important knowledge representation and reasoning method, which expresses the expert's experiential knowledge in the form of rules to assist decision-making and problem solving. It is constantly updated and optimized as the production environment changes and knowledge continues to accumulate to adapt to new needs and challenges.

[0126] In the specific implementation, XGBoost can be used to generate expert rules through feature importance, and other classification tree algorithms can also be selected.

[0127] Step S70, identifying the operating conditions of the industrial process through the expert rule base, and determining the predicted values ​​of the indicators in the industrial process according to the specific mechanism model corresponding to the operating conditions.

[0128] In a feasible implementation, the step of identifying the operating conditions of the industrial process through the expert rule base and determining the predicted values ​​of indicators in the industrial process according to the specific mechanism model corresponding to the operating conditions includes: determining the target identification rule according to the operating data of the industrial process; determining the operating conditions corresponding to the target identification rule based on the expert rule base; determining the target-specific mechanism model corresponding to the operating conditions, and inputting the operating data into the target-specific mechanism model to obtain the predicted values ​​of indicators in the industrial process.

[0129] In the specific implementation, when identifying an industrial process, it is necessary to first determine the target identification rule corresponding to the industrial project, and then determine the operating condition category (i.e. the operating condition) corresponding to the target identification rule through the expert rule base, and then predict the indicator value (i.e. the indicator prediction value) in the industrial process based on the specific mechanism model corresponding to the operating condition.

[0130] In a feasible implementation, the step of determining the operating condition to which the target identification rule corresponds based on the expert rule base includes: determining the operating condition to which the target identification rule corresponds based on the expert rule base through conditional judgment of feature thresholds or logical expressions of feature relationships.

[0131] It should be noted that the expert rule base is a mapping relationship table between working condition categories and identification rules, as shown in Table 1 below:

[0132] Working conditions Identification rules Condition 1 Rule 1 Condition 2 Rule 2 … … Working condition K RuleK

[0133] Table 1

[0134] It can be understood that the target recognition rule can be compared one by one with the recognition rules in the expert rule base to determine which recognition rule in the expert rule base the target recognition rule corresponds to, and then the comparison can be made, for example, through conditional judgment of feature thresholds or logical expressions of feature relationships.

[0135] It should be noted that the prediction accuracy of the key indicators of this solution has been greatly improved compared with the general mechanism model and the traditional machine learning model classification, as shown in Table 2 below:

[0136]

[0137] Table 2

[0138] It should be noted that in Table 2, General_KM represents the prediction accuracy under the general mechanism model; KM_Kmeans represents the weighted prediction accuracy in each working condition after Kmeans division; KM_FP represents the weighted prediction accuracy in each module after the first principle division of the mechanism model; KM_FP_matched represents the weighted prediction accuracy in each module after xgb matching after the first principle division. It can be seen that the use of this scheme to divide the working conditions based on the first principles and then use the specific model to realize the prediction of key indicators can improve the rationality of the working condition division and the accuracy of the indicator prediction.

[0139] This embodiment constructs a general mechanism model of cascade reaction based on the material balance principle of cascade reaction; performs data processing on the general mechanism operation data to obtain a target data set; based on the general mechanism model, divides the target data set into operating conditions according to first principles to obtain an operating condition sample set; constructs a specific mechanism model based on the operating condition sample set; based on the operating condition sample set, determines key variables for distinguishing operating conditions; generates an expert rule base based on the key variables; identifies the operating condition of the industrial process through the expert rule base, and determines the predicted value of the indicator in the industrial process according to the specific mechanism model corresponding to the operating condition. The technical problem that the error rate is high and it is not conducive to ensuring the stability of the system when only relying on manual experience to identify the working conditions and index values ​​in the industrial process in the complex industrial production process is solved, compared with the prior art, the present application first constructs a general mechanism model based on the material balance principle, then divides the target data set into working conditions based on the first principle to obtain a working condition sample set, and then constructs a specific mechanism model based on the working condition sample set, and extracts the key working condition information in the working condition sample set to form an expert rule base, and matches the specific mechanism model of the industrial process through the expert rule base to predict the key indicators of the industrial process. In this way, there is no need for manual experience to identify the working conditions and indicators in the industrial process, which can not only improve the recognition accuracy, but also effectively improve the recognition rate, thereby improving the overall efficiency and stability of the cascade industrial process.

[0140] Based on the first embodiment of the present application, in the second embodiment of the present application, the same or similar contents as those in the above-mentioned embodiment 1 can be referred to the above introduction, and will not be repeated in the following. Figure 4 , step S50 includes steps S501 to S506:

[0141] Step S501, using the operating condition category as a label for the operating condition sample data in the operating condition sample set;

[0142] Step S502, determining the discrete index and continuous variable of the working condition sample data in the working condition sample set as input features, the discrete index includes a time index and an operation shift index, and the continuous variable is a continuous variable recorded by the distributed system;

[0143] It should be noted that the sample set of different working conditions is labeled with the working condition category to which it belongs, and the discrete indicators including time labels and operating shifts and the continuous variables recorded and cleaned by the DCS system are used as input data features.

[0144] It should be noted that the input features incorporate discrete variables such as time that are not included in the DCS system. In prediction and control tasks, integrating these discrete variables that are not included in the DCS system is of great significance for improving prediction accuracy and control effects.

[0145] Step S503, determining the prediction category of the input feature based on the classification model;

[0146] Step S504, constructing an objective function based on the predicted categories and the total number of predicted categories, and training the classification model based on the objective function to obtain a target classification model;

[0147] It should be noted that a classification model (XGBoost is used as an example here) is used for a set of working condition samples labeled with working condition categories.

[0148] It should be noted that during the training process, the performance of the classification model is gradually optimized according to the set objective function until the optimal prediction effect is achieved. The objective function can be expressed as:

[0149]

[0150] Among them, x i represents the i-th data point, y i represents the predicted category, and K represents the total number of predicted categories.

[0151] Step S505, analyzing the target classification model to obtain key features and decision rules;

[0152] It should be noted that various explanatory techniques, such as feature importance analysis and SHAP (SHapley Additive exPlanations) value, can be used to interpret and analyze the trained XGBoost model to understand the influence of each feature on the prediction results under different working conditions, so as to extract the key features and decision rules in the XGBoost model (that is, the key variables used to interpret the model).

[0153] Step S506: determining key variables for distinguishing operating conditions according to the key features and the decision rules.

[0154] It should be noted that the key features and decision rules can be directly used as key variables for distinguishing working conditions.

[0155] This embodiment uses the working condition category as the label of the working condition sample data in the working condition sample set; determines the discrete indicators and continuous variables of the working condition sample data in the working condition sample set as input features, the discrete indicators include time indicators and operation shift indicators, and the continuous variables are continuous variables recorded by the distributed system; based on the classification model, determines the prediction category of the input feature; constructs an objective function based on the prediction category and the total number of prediction categories, and trains the classification model based on the objective function to obtain a target classification model; analyzes the target classification model to obtain key features and decision rules; and determines the key variables used to distinguish working conditions based on the key features and the decision rules. This embodiment quickly generates an expert rule base by adopting the feature importance of the classification model.

[0156] It should be noted that the above examples are only used to understand the present application and do not constitute a limitation on the indicator prediction method for the cascade industrial process of the present application. More simple transformations based on this technical concept are all within the scope of protection of the present application.

[0157] This application also provides an indicator prediction device for a cascade industrial process, please refer to Figure 5 , the index prediction device of the cascade industrial process comprises:

[0158] A construction module 10 is used to construct a general mechanism model of cascade reaction based on the material balance principle of cascade reaction;

[0159] The processing module 20 is used to process the general mechanism operation data to obtain a target data set;

[0160] A division module 30 is used to divide the target data set into working conditions based on the general mechanism model and according to first principles to obtain a working condition sample set;

[0161] The construction module 10 is also used to construct a specific mechanism model based on the operating condition sample set;

[0162] An extraction module 40, configured to determine key variables for distinguishing operating conditions based on the operating condition sample set;

[0163] A generating module 50, for generating an expert rule base based on the key variables;

[0164] The generation module 50 is further used to identify the working conditions of the industrial process through the expert rule base, and determine the predicted values ​​of the indicators in the industrial process according to the specific mechanism model corresponding to the working conditions.

[0165] The index prediction device for cascade industrial processes provided by the present application adopts the index prediction method for cascade industrial processes in the above-mentioned embodiments, which can solve the technical problem that the error rate is high and is not conducive to ensuring the stability of the system when only relying on manual experience to identify the working conditions and index values ​​in the industrial process during complex industrial production processes. Compared with the prior art, the beneficial effects of the index prediction device for cascade industrial processes provided by the present application are the same as the beneficial effects of the index prediction method for cascade industrial processes provided by the above-mentioned embodiments, and the other technical features in the index prediction device for cascade industrial processes are the same as the features disclosed in the above-mentioned embodiment methods, which will not be repeated here.

[0166] The present application provides an indicator prediction device for a cascade industrial process, the indicator prediction device for a cascade industrial process comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the indicator prediction method for the cascade industrial process in the above-mentioned embodiment one.

[0167] Reference below Figure 6 , which shows a schematic diagram of the structure of an index prediction device for a cascaded industrial process suitable for implementing an embodiment of the present application. The index prediction device for a cascaded industrial process in the embodiment of the present application may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Descriptions), PMPs (Portable Media Players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 6 The index prediction device for the cascade industrial process shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0168] like Figure 6As shown, the index prediction device for the cascade industrial process may include a processing device 1001 (e.g., a central processing unit, a graphics processing unit, etc.), which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM: Read Only Memory) 1002 or a program loaded from a storage device 1003 to a random access memory (RAM: Random Access Memory) 1004. In RAM1004, various programs and data required for the operation of the index prediction device for the cascade industrial process are also stored. The processing device 1001, ROM1002, and RAM1004 are connected to each other via a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Typically, the following systems can be connected to the I / O interface 1006: input devices 1007 including, for example, a touch screen, a touchpad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; output devices 1008 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 1003 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 1009. The communication device 1009 can allow the indicator prediction device for the cascade industrial process to communicate wirelessly or wired with other devices to exchange data. Although the figure shows an indicator prediction device for the cascade industrial process with various systems, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems may be implemented or have instead.

[0169] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.

[0170] The index prediction device for the cascade industrial process provided by the present application adopts the index prediction method for the cascade industrial process in the above embodiment, which can solve the technical problem that the error rate is high when only relying on manual experience to identify the working conditions and index values ​​in the industrial process in a complex industrial production process, which is not conducive to ensuring the stability of the system. Compared with the prior art, the beneficial effects of the index prediction device for the cascade industrial process provided by the present application are the same as the beneficial effects of the index prediction method for the cascade industrial process provided by the above embodiment, and the other technical features in the index prediction device for the cascade industrial process are the same as the features disclosed in the method of the previous embodiment, which will not be repeated here.

[0171] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.

[0172] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0173] The present application provides a computer-readable storage medium having computer-readable program instructions (ie, computer programs) stored thereon, and the computer-readable program instructions are used to execute the index prediction method for the cascade industrial process in the above-mentioned embodiment.

[0174] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency), etc., or any suitable combination of the above.

[0175] The computer-readable storage medium may be included in the indicator prediction device for the cascade industrial process; or may exist independently without being assembled into the indicator prediction device for the cascade industrial process.

[0176] The above-mentioned computer-readable storage medium carries one or more programs. When the above-mentioned one or more programs are executed by the indicator prediction device of the cascade industrial process, the indicator prediction device of the cascade industrial process: constructs a general mechanism model of cascade reaction based on the material balance principle of cascade reaction; performs data processing on the general mechanism operation data to obtain a target data set; based on the general mechanism model, divides the target data set into operating conditions according to the first principles to obtain an operating condition sample set; constructs a specific mechanism model based on the operating condition sample set; based on the operating condition sample set, determines the key variables for distinguishing the operating conditions; generates an expert rule base based on the key variables; identifies the operating condition of the industrial process through the expert rule base, and determines the indicator prediction value in the industrial process according to the specific mechanism model corresponding to the operating condition.

[0177] Computer program code for performing the operations of the present application may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0178] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0179] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.

[0180] The readable storage medium provided by the present application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned index prediction method for the cascade industrial process, and can solve the technical problem that the error rate is high when only relying on manual experience to identify the working conditions and index values ​​in the industrial process in a complex industrial production process, which is not conducive to ensuring the stability of the system. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided by the present application are the same as the beneficial effects of the index prediction method for the cascade industrial process provided by the above-mentioned embodiment, and will not be repeated here.

[0181] The present application also provides a computer program product, including a computer program, which implements the steps of the above-mentioned indicator prediction method for the cascade industrial process when executed by a processor.

[0182] The computer program product provided by the present application can solve the technical problem that the error rate is high when only relying on manual experience to identify the working conditions and index values ​​in the industrial process in a complex industrial production process, which is not conducive to ensuring the stability of the system. Compared with the prior art, the beneficial effects of the computer program product provided by the present application are the same as the beneficial effects of the index prediction method for the cascade industrial process provided by the above embodiment, and will not be repeated here.

[0183] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.

Claims

1. A method for predicting an index of a cascade industrial process, characterized in that: The method comprises: Construct a general mechanism model of cascade reaction based on the material balance principle of cascade reaction; Perform data processing on the general mechanism operation data to obtain the target data set; Based on the general mechanism model, the target data set is divided into working conditions according to first principles to obtain a working condition sample set; Constructing a specific mechanism model based on the working condition sample set; Based on the operating condition sample set, determining key variables for distinguishing operating conditions; generating an expert rule base based on the key variables; The working conditions of the industrial process are identified through the expert rule base, and the predicted values ​​of the indicators in the industrial process are determined according to the specific mechanism model corresponding to the working conditions.

2. The method according to claim 1, characterized in that The data processing includes missing value filling processing, outlier processing, data smoothing processing and labeling processing; The step of processing the general mechanism operation data to obtain the target data set includes: The missing values ​​of the general mechanism operation data are filled to obtain the remaining data set; Performing outlier processing on the remaining data set to obtain a second data set; Performing data smoothing processing on the second data set to obtain a third data set; The third data set is labeled to obtain a target data set.

3. The method according to claim 1, characterized in that The step of dividing the target data set into working conditions based on the general mechanism model and according to first principles to obtain a working condition sample set comprises: S301, setting an accuracy threshold and a scale threshold; S302, obtaining a general cascade reaction model after training the general mechanism model according to the target data set; S303, based on the general cascade reaction model, determining the prediction accuracy of the sample data in the target data set, constructing the operating condition sample data based on the sample data in the target data set whose prediction accuracy is greater than the accuracy threshold, determining the remaining data set based on the sample data in the target data set whose prediction accuracy is less than or equal to the accuracy threshold, and adding the operating condition sample data to the operating condition sample set; S304. After updating the target data set according to the remaining data set, steps S302-S304 are repeated until the size of the remaining data set is smaller than the size threshold, and the remaining data set is added to the operating condition sample set as operating condition sample data.

4. The method according to claim 3, characterized in that The step of obtaining a universal cascade reaction model after training the universal mechanism model according to the target data set comprises: Determining predicted values ​​of sample data in a target data set based on the general mechanism model; Constructing a target equation according to the predicted value and the actual value; Based on the target equation, the general mechanism model is trained to identify key reaction parameters, and the general cascade reaction model is determined according to the key reaction parameters.

5. The method according to claim 1, characterized in that The step of determining key variables for distinguishing operating conditions based on the operating condition sample set comprises: Using the working condition category as a label for the working condition sample data in the working condition sample set; Determine discrete indicators and continuous variables of the working condition sample data in the working condition sample set as input features, wherein the discrete indicators include time indicators and operation shift indicators, and the continuous variables are continuous variables recorded by the distributed system; Based on the classification model, determine the predicted category of the input feature; Constructing an objective function based on the predicted categories and the total number of predicted categories, and training the classification model based on the objective function to obtain a target classification model; Analyzing the target classification model to obtain key features and decision rules; According to the key features and the decision rule, key variables for distinguishing operating conditions are determined.

6. The method according to claim 1, characterized in that The step of identifying the working condition of the industrial process through the expert rule base and determining the predicted value of the indicator in the industrial process according to the specific mechanism model corresponding to the working condition includes: determining target identification rules based on the operating data of the industrial process; Based on the expert rule base, determining the operating condition corresponding to the target identification rule; Determine the target-specific mechanism model corresponding to the operating condition, and input the operating data into the target-specific mechanism model to obtain the predicted value of the indicator in the industrial process.

7. The method according to claim 6, characterized in that The step of determining the operating condition corresponding to the target recognition rule based on the expert rule base includes: Based on the expert rule base, the operating condition corresponding to the target recognition rule is determined by conditional judgment of feature thresholds or logical expressions of feature relationships.

8. An indicator prediction device for a cascade industrial process, characterized in that: The device comprises: A building block for constructing a general mechanism model of cascade reactions based on the material balance principle of cascade reactions; A processing module is used to process the general mechanism operation data to obtain a target data set; A partitioning module, used for partitioning the target data set into working conditions based on the general mechanism model and according to first principles to obtain a working condition sample set; The construction module is further used to construct a specific mechanism model based on the operating condition sample set; An extraction module, configured to determine key variables for distinguishing operating conditions based on the operating condition sample set; A generating module, used for generating an expert rule base based on the key variables; The identification module is used to identify the working conditions of the industrial process through the expert rule base, and determine the predicted values ​​of the indicators in the industrial process according to the specific mechanism model corresponding to the working conditions.

9. An indicator prediction device for a cascade industrial process, characterized in that: The device comprises: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program is configured to implement the steps of the index prediction method for a cascade industrial process according to any one of claims 1 to 7.

10. A storage medium, characterized in that: The storage medium is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the indicator prediction method for a cascade industrial process according to any one of claims 1 to 7 are implemented.

Citation Information

Cited By

  • System control method and device

    CN121411382A

  • Process index soft measurement method based on structured full-perception deep learning

    CN121543638A

  • A Soft Measurement Method for Process Indicators Based on Structured Full-Perception Deep Learning

    CN121543638B