Multi-dimensional special-dimensional task automatic processing method and device for power grid equipment

By receiving and analyzing multi-dimensional information of power grid equipment, and automatically generating and publishing TV task tickets, the problem of inefficient TV task release process of power grid equipment is solved, fast, accurate and efficient TV task processing is achieved, and the reliability of the power grid is improved. sex.

CN118886887APending Publication Date: 2024-11-01GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411169306.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The TV task release process of existing power grid equipment is inefficient, resulting in the extension of the TV cycle, thereby reducing the reliability of the power grid.

Method used

By receiving information from the power grid dispatch automation system, the power grid dispatching operation management main station, the power supply guarantee platform and the meteorological system, the trigger conditions of the TVI task are determined, and the TVI task work tickets are automatically generated and sent to realize the automated processing and closed loop of the TVI task. manage.

Benefits of technology

It improves the release efficiency and closed-loop management of power grid equipment TV tasks, shortens the TV cycle, and improves the operation reliability and operation and maintenance real-time performance of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886887A_ABST
    Figure CN118886887A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-dimensional special-dimensional task automatic processing method and device for power grid equipment. The method comprises the following steps: receiving master station information sent by each master station and system information sent by each system; when it is determined that the master station information and / or the system information meet triggering conditions of power grid equipment special maintenance task release, target power grid equipment needing special maintenance is determined according to the triggering conditions, the master station information, the system information and information analysis results of the master station information and the system information; generating a special maintenance task work order according to the equipment information of the target power grid equipment; and sending each special maintenance task work order to the corresponding operation and maintenance object, so as to prompt the operation and maintenance object to execute maintenance work on the target power grid equipment according to the received special maintenance task work order. According to the invention, the technical problem of low reliability of a power grid caused by a long special maintenance period of the whole equipment due to low efficiency of a special maintenance task release process of the power grid equipment in related technologies is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent operation and maintenance technology, and in particular to a method and device for automatically processing multi-dimensional special-dimensional tasks of power grid equipment. Background Art

[0002] Generally, power grid operation and maintenance personnel need to issue specific special maintenance tasks based on power grid special maintenance equipment. There are many reasons why power grid equipment needs to carry out special maintenance work, including power grid mode conversion, load rate, load, power supply guarantee and meteorological warning. The existing special maintenance task release method is relatively traditional and inefficient. The specific content is as follows: the management personnel need to release the special maintenance work of specific equipment according to the above-mentioned special maintenance reasons of power grid equipment, and then the operation and maintenance personnel form a specific special maintenance equipment list based on the special maintenance equipment, so as to issue specific special maintenance inspection tasks on the workbench and arrange specific staff to carry out inspection work. The staff conducts inspections according to the specific special maintenance tasks of the workbench. The special maintenance inspection content includes checking the primary and secondary equipment of power transmission, substation and distribution, and the operating conditions of the main station system device. After the inspection, fill in the inspection results and close the special maintenance task. The operation and maintenance management personnel summarize the special maintenance status of the equipment according to the inspection results of the special maintenance task, and the professional equipment management personnel analyze the operating conditions of the equipment according to the special maintenance inspection results and formulate the next work plan.

[0003] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention

[0004] The embodiment of the present invention provides a method and device for automatically processing multi-dimensional special maintenance tasks of power grid equipment, so as to at least solve the technical problem in the related technology that the special maintenance task release process of power grid equipment is inefficient, resulting in a long special maintenance cycle of the entire equipment, and thus causing low power grid reliability.

[0005] According to one aspect of an embodiment of the present invention, a method for automatically processing multi-dimensional special maintenance tasks of power grid equipment is provided, comprising: receiving master station information sent by each master station and system information sent by each system, wherein the master station comprises: a power grid dispatching automation system master station and a power grid dispatching operation management master station, and the system comprises: a power supply guarantee platform for issuing power supply guarantee tasks and a meteorological system for issuing meteorological information; when it is determined that the master station information and / or the system information meet the triggering condition for issuing the special maintenance task of the power grid equipment, determining the target power grid equipment for which special maintenance needs to be carried out according to the triggering condition, the master station information, the system information and the information analysis result of the master station information and the system information; generating a special maintenance task work order according to the equipment information of the target power grid equipment, wherein the special maintenance task work order comprises: a work plan time, a work task name, a special maintenance equipment operation and maintenance team and a special maintenance work object; and sending each of the special maintenance task work orders to the corresponding operation and maintenance objects respectively to prompt the operation and maintenance objects to perform maintenance work on the target power grid equipment according to the special maintenance task work orders received by each of them.

[0006] Optionally, receiving master station information sent by each master station and system information sent by each system, including: receiving telemetry data of each power grid equipment in the power system sent by the power grid dispatching automation system master station; receiving risk data of each power grid equipment in the power system sent by the power grid dispatching operation management master station; receiving power supply guarantee tasks sent by the power supply guarantee platform, wherein the power supply guarantee tasks are tasks that require maintenance of specific power grid equipment; receiving meteorological data of the area where the power system is located sent by the meteorological system.

[0007] Optionally, the trigger condition includes at least one of the following: the line or main transformer load rate sent by the power grid dispatching automation system master station exceeds the set alarm value, the power grid dispatching operation management master station publishes the power grid operation mode risk, the power supply guarantee platform publishes the power supply guarantee task list, and the meteorological system publishes severe weather data.

[0008] Optionally, when it is determined that the master station information and / or the system information meets the triggering conditions for issuing special maintenance tasks for power grid equipment, the target power grid equipment on which special maintenance needs to be carried out is determined according to the triggering conditions, the master station information, the system information, and the information analysis results of the master station information and the system information, including: determining, according to the triggering conditions and the master station information, that the line or main transformer load rate of the line or main transformer sent by the master station of the power grid dispatching automation system exceeds 80% as the target power grid equipment; determining, according to the triggering conditions and the master station information, the equipment for which the power grid operation mode has changed as the target power grid equipment; determining, according to the triggering conditions and the power supply guarantee task in the system information, the power grid equipment within the scope of the power supply guarantee task as the target power grid equipment; determining, according to the triggering conditions and the severe weather data in the system information, the power grid equipment in the area corresponding to the severe weather data as the target power grid equipment.

[0009] Optionally, a special task work order is generated according to the equipment information of the target power grid equipment, including: obtaining the equipment information of each target power grid equipment; determining the equipment ownership information of each target power grid equipment according to the equipment information of each target power grid equipment; classifying each target power grid equipment according to the equipment ownership information of each target power grid equipment to obtain a power grid equipment classification result; and generating the special task work order according to the power grid equipment classification result.

[0010] Optionally, after generating a special task work order according to the equipment information of the target power grid equipment, the multi-dimensional special task automatic processing method of the power grid equipment also includes: sending each of the special task work orders to the power grid management platform, so as to use the power grid management platform to publish each of the special task work orders.

[0011] Optionally, after each of the special maintenance task work orders is sent to the corresponding operation and maintenance objects respectively to prompt the operation and maintenance objects to perform maintenance work on the target power grid equipment according to the special maintenance task work orders received respectively, the multi-dimensional special maintenance task automatic processing method of the power grid equipment also includes: when the work plan end time corresponding to the work plan time recorded in each of the special maintenance task work orders arrives, collecting the completion results recorded in each of the special maintenance task work orders in the power grid management platform; generating an equipment special maintenance result list based on the completion results; and publishing the equipment special maintenance result list.

[0012] According to another aspect of an embodiment of the present invention, a multi-dimensional special maintenance task automatic processing device for power grid equipment is also provided, including: a receiving module, used to receive master station information sent by each master station and system information sent by each system, wherein the master station includes: a power grid dispatching automation system master station, a power grid dispatching operation management master station, and the system includes: a power supply guarantee platform for issuing power supply guarantee tasks, and a meteorological system for issuing meteorological information; a determination module, used to determine the target power grid equipment that needs to carry out special maintenance according to the triggering condition, the master station information, the system information and the information analysis result of the master station information and the system information when determining that the master station information and / or the system information meet the triggering condition for issuing the special maintenance task of the power grid equipment; a first generation module, used to generate a special maintenance task work order according to the equipment information of the target power grid equipment, wherein the special maintenance task work order includes: work plan time, work task name, special maintenance equipment operation and maintenance team and special maintenance work object; a first sending module, used to send each of the special maintenance task work orders to the corresponding operation and maintenance object respectively, so as to prompt the operation and maintenance object to perform maintenance work on the target power grid equipment according to the special maintenance task work order received by each.

[0013] Optionally, the receiving module includes: a first receiving unit, used to receive telemetry data of each power grid equipment in the power system sent by the power grid dispatching automation system master station; a second receiving unit, used to receive risk data of each power grid equipment in the power system sent by the power grid dispatching operation management master station; a third receiving unit, used to receive power supply guarantee tasks sent by the power supply guarantee platform, wherein the power supply guarantee tasks are tasks that require maintenance of specific power grid equipment; and a fourth receiving unit, used to receive meteorological data of the area where the power system is located sent by the meteorological system.

[0014] Optionally, the trigger condition includes at least one of the following: the line or main transformer load rate sent by the power grid dispatching automation system master station exceeds the set alarm value, the power grid dispatching operation management master station publishes the power grid operation mode risk, the power supply guarantee platform publishes the power supply guarantee task list, and the meteorological system publishes severe weather data.

[0015] Optionally, the determination module includes: a first determination unit, used to determine, based on the trigger condition and the master station information, that the line or main transformer load rate sent by the master station of the power grid dispatching automation system exceeds 80%, as the target power grid equipment; a second determination unit, used to determine, based on the trigger condition and the master station information, that the power grid operation mode change device is the target power grid equipment; a third determination unit, used to determine, based on the trigger condition and the power supply guarantee task in the system information, that the power grid equipment within the scope of the power supply guarantee task is the target power grid equipment; and a fourth determination unit, used to determine, based on the trigger condition and the severe weather data in the system information, that the power grid equipment within the area corresponding to the severe weather data is the target power grid equipment.

[0016] Optionally, the first generation module includes: an acquisition unit, used to acquire the equipment information of each of the target power grid devices; a fifth determination unit, used to determine the equipment affiliation information of each of the target power grid devices based on the equipment information of each of the target power grid devices; a classification unit, used to classify each of the target power grid devices according to the equipment affiliation information of each of the target power grid devices to obtain a power grid equipment classification result; and a generation unit, used to generate the special task work order according to the power grid equipment classification result.

[0017] Optionally, the multi-dimensional special-purpose task automatic processing device of the power grid equipment also includes: a second sending module, which is used to send each special-purpose task work order to the power grid management platform after generating the special-purpose task work order according to the equipment information of the target power grid equipment, so as to use the power grid management platform to publish each special-purpose task work order.

[0018] Optionally, the multi-dimensional special maintenance task automatic processing device of the power grid equipment also includes: a collection module, which is used to collect the completion results recorded in each of the special maintenance task work orders in the power grid management platform when the work plan end time corresponding to the work plan time recorded in each of the special maintenance task work orders arrives after each of the special maintenance task work orders is sent to the corresponding operation and maintenance objects respectively to prompt the operation and maintenance objects to perform maintenance work on the target power grid equipment according to the received special maintenance task work orders; a second generation module, which is used to generate a list of equipment special maintenance results according to the completion results; and a publishing module, which is used to publish the list of equipment special maintenance results.

[0019] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is further provided, wherein the computer-readable storage medium includes a stored program, wherein the program executes the method for automatically processing multi-dimensional special-dimensional tasks of power grid equipment as described in any one of the above.

[0020] According to another aspect of an embodiment of the present invention, a computer program product is also provided, including computer instructions, which, when executed by a processor, perform any one of the above-mentioned methods for automatically processing multi-dimensional special-dimensional tasks of power grid equipment.

[0021] According to another aspect of an embodiment of the present invention, a processor is further provided, wherein the processor is used to run a program, wherein when the program is run, the method for automatically processing multi-dimensional special-dimensional tasks of power grid equipment described in any one of the above is executed.

[0022] According to another aspect of an embodiment of the present invention, a system for automatically processing multi-dimensional special-dimensional tasks of power grid equipment is also provided, and the system for automatically processing multi-dimensional special-dimensional tasks of power grid equipment uses any one of the above-mentioned methods for automatically processing multi-dimensional special-dimensional tasks of power grid equipment.

[0023] In an embodiment of the present invention, master station information sent by each master station and system information sent by each system are received, wherein the master station includes: a power grid dispatching automation system master station and a power grid dispatching operation management master station, and the system includes: a power supply guarantee platform for issuing power supply guarantee tasks and a meteorological system for issuing meteorological information; when it is determined that the master station information and / or system information meets the triggering conditions for issuing special maintenance tasks of power grid equipment, the target power grid equipment that needs to be maintained is determined according to the triggering conditions, the master station information, the system information and the information analysis results of the master station information and the system information; a special maintenance task work order is generated according to the equipment information of the target power grid equipment, wherein the special maintenance task work order includes: work plan time, work task name, special maintenance equipment operation and maintenance team and special maintenance work object; each special maintenance task work order is sent to the corresponding operation and maintenance object respectively to prompt the operation and maintenance object to perform maintenance work on the target power grid equipment according to the special maintenance task work order received by each. Through the technical solution provided by the present invention, the purpose of publishing information through a multi-dimensional platform, intelligently analyzing special maintenance information, and automatically processing and publishing special maintenance tasks for closed-loop power grid equipment is achieved, thereby achieving the technical effect of quickly, accurately and efficiently publishing special maintenance tasks for closed-loop power grid equipment, improving the operating reliability and real-time operation and maintenance of power grid special maintenance equipment, and thus solving the technical problem that the power grid equipment special maintenance task publishing process in the related technology is inefficient, resulting in a long special maintenance cycle for the entire equipment, and thus making the power grid reliability low. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0025] Figure 1 It is a hardware structure block diagram of a mobile terminal of a method for automatically processing multi-dimensional special-dimensional tasks of a power grid device according to an embodiment of the present invention;

[0026] Figure 2 is a flow chart of automatic processing of multi-dimensional special-dimensional tasks of power grid equipment according to an embodiment of the present invention;

[0027] Figure 3 is a flow chart of automatic processing of multi-dimensional special-dimensional tasks of optional power grid equipment according to an embodiment of the present invention;

[0028] Figure 4 is a system structure diagram for automatic processing of multi-dimensional special-dimensional tasks of power grid equipment according to an embodiment of the present invention;

[0029] Figure 5 2 is a schematic diagram of a device for automatically processing multi-dimensional special-dimensional tasks of a power grid device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0030] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0031] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0032] As introduced in the background technology, the process of issuing special maintenance tasks for power grid equipment in the related technology is inefficient, resulting in a long special maintenance cycle for the entire equipment, which in turn leads to a technical problem of low power grid reliability. In view of the above defects, in an embodiment of the present invention, a method and device for automatically processing multi-dimensional special maintenance tasks for power grid equipment, a system for automatically processing multi-dimensional special maintenance tasks for power grid equipment, a computer-readable storage medium, a processor, and a computer program product are provided.

[0033] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0034] The method embodiments provided in the embodiments of the present invention can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal of a method for automatically processing multi-dimensional special-dimensional tasks of a power grid device according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.

[0035] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the multi-dimensional special-dimensional task automatic processing method of the power grid equipment in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is realized. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above-mentioned network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific examples of the network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Control, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.

[0036] According to an embodiment of the present invention, a method embodiment of a method for automatically processing multi-dimensional special-dimensional tasks of power grid equipment is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0037] Figure 2 is a flow chart of automatic processing of multi-dimensional special-dimensional tasks of power grid equipment according to an embodiment of the present invention, such as Figure 2 As shown, the method comprises the following steps:

[0038] Step S202, receiving the master station information sent by each master station and the system information sent by each system, wherein the master station includes: a power grid dispatching automation system master station, a power grid dispatching operation management master station, and the system includes: a power supply guarantee platform for issuing power supply guarantee tasks, and a meteorological system for issuing meteorological information.

[0039] In this embodiment, the master station information sent by each master station and the system information sent by each system can be received, which can help the equipment master station to timely understand information on power grid dispatching, operation management, power supply and meteorology, and can timely adjust the equipment operation strategy.

[0040] Step S204, when it is determined that the master station information and / or system information meets the triggering condition for issuing the special maintenance task of the power grid equipment, the target power grid equipment requiring special maintenance is determined according to the triggering condition, the master station information, the system information and the information analysis result of the master station information and the system information.

[0041] In this embodiment, when the data or information published by the power supply guarantee publishing platform or system meets the triggering conditions for the release of the equipment special maintenance task, the equipment special maintenance master station can confirm the power grid equipment that needs to be special maintenance based on the special maintenance triggering conditions, the actual received information and the information analysis, and can timely discover the problems or potential faults in the power grid equipment, so as to take timely measures to maintain and repair it, ensure the normal operation of the power grid equipment, and more accurately determine the special maintenance objects by analyzing the information, thereby improving the efficiency of special maintenance.

[0042] Optionally, the above-mentioned actually received information may include: master station information, system information and master station information.

[0043] It should be noted that the above information analysis refers to analyzing the above trigger conditions according to the information analysis strategy to confirm the TWEI device object.

[0044] Step S206, generating a special maintenance task work order according to the equipment information of the target power grid equipment, wherein the special maintenance task work order includes: work plan time, work task name, special maintenance equipment operation and maintenance team and special maintenance work object.

[0045] In this embodiment, the Tevi master station can form a Tevi task work order based on the Tevi equipment list (i.e., the equipment information of the target power grid equipment), which can clearly record the maintenance history and working status of the target power grid equipment, provide reference and basis for subsequent work, and help the formulation and implementation of maintenance plans.

[0046] Step S208: Send each special maintenance task work order to the corresponding operation and maintenance object to prompt the operation and maintenance object to perform maintenance work on the target power grid equipment according to the special maintenance task work order received by each of them.

[0047] In this embodiment, each special maintenance task work order is sent to the corresponding operation and maintenance personnel (i.e., the operation and maintenance object), and the operation and maintenance personnel carry out inspection and maintenance work of specific primary equipment and secondary equipment (i.e., the target power grid equipment) according to the special maintenance task work order, and record the inspection results in the form of text, photos, etc., fill in the results in the corresponding special maintenance task work order on the power grid management platform and complete the work.

[0048] Optionally, the above-mentioned equipment inspection items include but are not limited to the following items: 1) Equipment temperature, real-time temperature, ABC three-phase temperature difference, historical temperature difference and local temperature difference, etc.; 2) Equipment meter conditions, SF6 pressure, oil level, oil pressure and lightning arrester leakage current, etc.; 3) Equipment appearance, lines, poles, switches, knife switches, transformers, insulators, cable heads, etc., for dirt, cracks, discharge marks and oil leakage; 4) GIS equipment local discharge online monitoring data; 5) Temperature and humidity of the auxiliary box of outdoor equipment.

[0049] It should be noted that the above-mentioned production monitoring master station is used to remotely control drones, smart cameras and patrol robots to carry out automatic patrols, receive and process patrol photos and results sent back for archiving, and give the results of a single equipment patrol involving power grid risks.

[0050] Optionally, the above-mentioned secondary equipment inspection items include but are not limited to the following items: protection device information and substation automation information, among which the protection device information may include: protection communication status, correctness of set value equipment, correctness of pressure plate insertion and withdrawal, real-time alarm and historical alarm records for one week, analog quantity, input quantity and wave recording, etc. The substation automation information may include: equipment load data, equipment switch quantity, equipment real-time and historical alarm signals for one week, and substation equipment communication conditions, etc.

[0051] Figure 3 is a flowchart of automatic processing of multi-dimensional special-dimensional tasks of optional power grid equipment according to an embodiment of the present invention, such as Figure 3As shown, the specific steps are as follows: 1) Real-time monitoring of equipment special maintenance task information; 2) Analysis of special maintenance task trigger information and confirmation of specific special maintenance objects; 3) Release of special maintenance task work orders; 4) Operation and maintenance personnel perform special maintenance tasks; 5) Summarize equipment special maintenance results, archive records and release them.

[0052] As can be seen from the above, in an embodiment of the present invention, the master station information sent by each master station and the system information sent by each system are received, wherein the master station includes: a power grid dispatching automation system master station, a power grid dispatching operation management master station, and the system includes: a power supply guarantee platform for issuing power supply guarantee tasks, and a meteorological system for issuing meteorological information; when it is determined that the master station information and / or system information meets the triggering conditions for issuing special maintenance tasks of power grid equipment, the target power grid equipment that needs to be maintained is determined according to the triggering conditions, the master station information, the system information, and the information analysis results of the master station information and the system information; a special maintenance task work order is generated according to the equipment information of the target power grid equipment, wherein the special maintenance task work order includes: work plan time, work task name, special maintenance equipment operation and maintenance team, and special maintenance work object; each special maintenance task work order is sent to the corresponding operation and maintenance object respectively to prompt the operation and maintenance object to perform maintenance work on the target power grid equipment according to the special maintenance task work order received by each. The purpose of publishing information through a multi-dimensional platform, intelligently analyzing special maintenance information, and automatically processing and publishing special maintenance tasks related to closed-loop power grid equipment is achieved, thereby achieving the technical effect of quickly, accurately and efficiently publishing special maintenance tasks related to closed-loop power grid equipment, and improving the operating reliability and real-time operation and maintenance of power grid special maintenance equipment.

[0053] The technical solution provided by the embodiment of the present invention solves the technical problem in the related art that the special maintenance task release process of power grid equipment is inefficient, resulting in a long special maintenance cycle of the entire equipment and thus low power grid reliability.

[0054] According to the above-mentioned embodiment of the present invention, the master station information sent by each master station and the system information sent by each system are received, including: receiving the telemetry data of each power grid equipment in the power system sent by the power grid dispatching automation system master station; receiving the risk data of each power grid equipment in the power system sent by the power grid dispatching operation management master station; receiving the power supply guarantee task sent by the power supply guarantee platform, wherein the power supply guarantee task is a task that requires maintenance of specific power grid equipment; receiving the meteorological data of the area where the power system is located sent by the meteorological system.

[0055] In this embodiment, the device Tevi master station can receive information from the OCS automation master station (i.e., the power grid dispatching automation system master station), the OMS master station (i.e., the power grid dispatching operation management master station), the power supply release platform and the meteorological system in real time.

[0056] Figure 4 is a system structure diagram of automatic processing of multi-dimensional special-dimensional tasks of power grid equipment according to an embodiment of the present invention, such as Figure 4 As shown, the above-mentioned equipment T-type main station refers to the main station system used for receiving T-type information of power grid equipment, issuing T-type tasks and analyzing T-type work execution results, and can intelligently process T-type information of power grid equipment; the above-mentioned OCS automation main station refers to the main station of the power grid dispatching automation system. The OCS master station can receive telemetry data of power grid equipment such as lines and main transformers, and transmit the telemetry data to the equipment T-type main station for analysis; the above-mentioned OMS master station refers to the power grid dispatching operation management main station. Its function in this system is to publish power grid operation risks, connect with the equipment T-type main station server through a firewall, and send power grid risks to the T-type main station for analysis; the above-mentioned power supply guarantee release platform refers to a platform for publishing power supply guarantee tasks, which can publish power supply guarantee tasks to the equipment T-type main station, among which the power supply guarantee task refers to the work of patrolling and maintaining specific power grid equipment due to special holidays and major social activities; the above-mentioned meteorological system refers to the platform system used by the meteorological department to publish regional meteorological information. The T-type main station receives meteorological information for confirming the relevant power grid equipment of the severe meteorological information released by the meteorological department.

[0057] According to the above-mentioned embodiments of the present invention, the triggering conditions include at least one of the following: the line or main transformer load rate sent by the power grid dispatching automation system master station exceeds the set alarm value, the power grid dispatching operation management master station releases the power grid operation mode risk, the power supply guarantee platform releases the power supply guarantee task list, and the meteorological system releases severe weather data.

[0058] It should be noted that when the data or information released by the above-mentioned platform or system meets the triggering conditions for the release of the device special maintenance task, the device special maintenance main station automatically analyzes the data or information.

[0059] Optionally, the above trigger conditions may include: the line or main transformer load rate transmitted from the OCS automation master station to the equipment Tevi master station exceeds the set alarm value, the OMS master station releases the power grid operation mode risk, the power supply guarantee release platform releases the power supply guarantee task list, and the meteorological system releases regional severe weather information.

[0060] According to the above embodiment of the present invention, when it is determined that the master station information and / or system information meets the triggering conditions for issuing the special maintenance task of the power grid equipment, the target power grid equipment that needs to carry out special maintenance is determined according to the triggering conditions, the master station information, the system information, and the information analysis results of the master station information and the system information, including: determining the line or main transformer load rate of the line or main transformer sent by the master station of the power grid dispatching automation system exceeding 80% as the target power grid equipment according to the triggering conditions and the master station information; determining the power grid operation mode change device as the target power grid equipment according to the triggering conditions and the master station information; determining the power grid equipment within the scope of the power supply guarantee task as the target power grid equipment according to the triggering conditions and the power supply guarantee task in the system information; determining the power grid equipment in the area corresponding to the severe weather data as the target power grid equipment according to the triggering conditions and the severe weather data in the system information.

[0061] In this embodiment, the above information analysis strategy corresponds to four trigger conditions, namely, confirming that the line or main transformer equipment with a load rate exceeding 80% will include the corresponding primary and secondary equipment in the special maintenance equipment list according to the equipment tree; confirming the equipment with a change in the grid operation mode, and including the primary and secondary equipment at the same voltage node in the area in the special maintenance equipment list according to the equipment tree; confirming the area scope involved in the power supply guarantee task, and including the primary and secondary equipment within the area in the special maintenance equipment list according to the equipment tree; confirming the area scope involved in severe weather, and including the primary and secondary equipment within the area in the special maintenance equipment list according to the equipment tree.

[0062] It should be noted that the above-mentioned equipment tree refers to a ledger system in which equipment is hierarchical according to its affiliation, and is composed of transmission equipment, substation equipment, etc. The lower-level terminals correspond to specific transmission line cables, overhead lines, poles and towers, transformers, switches, circuit breakers, busbars and other primary equipment of substations and their corresponding secondary protection and measurement and control equipment.

[0063] According to the above-mentioned embodiment of the present invention, a special task work order is generated according to the equipment information of the target power grid equipment, including: obtaining the equipment information of each target power grid equipment; determining the equipment ownership information of each target power grid equipment according to the equipment information of each target power grid equipment; classifying each target power grid equipment according to the equipment ownership information of each target power grid equipment to obtain a power grid equipment classification result; and generating a special task work order according to the power grid equipment classification result.

[0064] In this embodiment, the equipment information of the target power grid equipment, such as the equipment model and maintenance record, is first obtained, and the equipment ownership information, such as the department to which it belongs and the person in charge, is determined based on the equipment information. The equipment is classified according to factors such as equipment type, department to which it belongs, and installation location. After that, a special task work order is generated, which helps to organize and arrange equipment maintenance work.

[0065] According to the above-mentioned embodiment of the present invention, after generating a special task work order according to the equipment information of the target power grid equipment, the multi-dimensional special task automatic processing method of the power grid equipment also includes: sending each special task work order to the power grid management platform, so as to use the power grid management platform to publish each special task work order.

[0066] In this embodiment, the special task work order can be sent to the power grid management platform and published, and the specific task work order information can be sent to the operation and maintenance responsible person through the E link office system at the same time.

[0067] like Figure 4As shown, the above-mentioned E l ink office system refers to a power grid-specific office information transmission system, which is used by the Twei master station to publish Twei tasks and results to operation and maintenance personnel, management personnel, etc. for online interactive confirmation of the results. The master station automatically summarizes the closed-loop results of specific Twei tasks and publishes them to the operation and maintenance responsible persons in the form of documents; the above-mentioned power grid management platform refers to a platform system for the release, execution and completion of work tasks by power grid operators, and has full-process information on work tasks.

[0068] According to the above-mentioned embodiment of the present invention, after each special maintenance task work order is sent to the corresponding operation and maintenance object respectively to prompt the operation and maintenance object to perform maintenance work on the target power grid equipment according to the special maintenance task work order received by each of them, the multi-dimensional special maintenance task automatic processing method of the power grid equipment also includes: when the work plan end time corresponding to the work plan time recorded in each special maintenance task work order arrives, collecting the completion results recorded in each special maintenance task work order in the power grid management platform; generating an equipment special maintenance result list according to the completion results; and publishing the equipment special maintenance result list.

[0069] In this embodiment, the equipment maintenance master station collects the completion results of the maintenance task work orders in the power grid management platform during the end time period of the maintenance work plan, forms an equipment maintenance result list, and publishes it to the equipment maintenance Web user terminal and E link office system after archiving to display the equipment maintenance work results.

[0070] like Figure 4 As shown, the above-mentioned device T-Net Web client refers to a user terminal that realizes visual viewing of device T-Net information through the Web, and the Web terminal database is automatically associated with the device T-Net main station database.

[0071] Through the technical solution provided by the above embodiment of the present invention, the OMS dispatching and operation management master station, OCS dispatching automation master station, power supply guarantee release platform, meteorological warning system power grid management master station and office interconnection platform are linked through the power grid equipment special maintenance master station. The information released by the above master station or platform is captured in real time, so as to intelligently analyze and determine the special maintenance objects of power grid equipment, release the special maintenance tasks of power grid equipment, carry out automatic inspection and analysis of primary and secondary equipment with high timeliness and quality, summarize the inspection and analysis report to the intelligent operation and maintenance system and publish it on the Web end to provide user visualization, and remind the operation and maintenance responsible persons at all levels in real time through elink.

[0072] That is, the above-mentioned technical scheme provided by the embodiment of the present invention comprehensively considers various factors, adopts a suitable task processing method, and an advanced intelligent analysis method, which solves the problems of low efficiency and high labor cost in the existing power grid equipment special maintenance task release process, and can effectively improve the timeliness and quality of the power grid equipment special maintenance work.

[0073] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0074] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, computer, server, or network device, etc.) to execute the methods of each embodiment of the present application.

[0075] According to an embodiment of the present invention, there is also provided a multi-dimensional special-dimensional task automatic processing device for a power grid device for implementing the multi-dimensional special-dimensional task automatic processing method for the power grid device. Figure 5 is a schematic diagram of a multi-dimensional special-dimensional task automatic processing device for a power grid device according to an embodiment of the present invention, such as Figure 5 As shown, the device includes: a receiving module 501, a determining module 503, a first generating module 505 and a first sending module 507. The risk analysis device in the operation process of the power grid is described below.

[0076] The receiving module 501 is used to receive the master station information sent by each master station and the system information sent by each system, wherein the master station includes: the power grid dispatching automation system master station, the power grid dispatching operation management master station, and the system includes: the power supply guarantee platform for issuing power supply guarantee tasks, and the meteorological system for issuing meteorological information.

[0077] The determination module 503 is used to determine the target power grid equipment that needs to carry out special maintenance according to the triggering conditions, the master station information, the system information and the information analysis results of the master station information and the system information when it is determined that the master station information and / or the system information meet the triggering conditions for issuing the special maintenance task of the power grid equipment.

[0078] The first generating module 505 is used to generate a special maintenance task work order according to the equipment information of the target power grid equipment, wherein the special maintenance task work order includes: work plan time, work task name, special maintenance equipment operation and maintenance team and special maintenance work object.

[0079] The first sending module 507 is used to send each special maintenance task work order to the corresponding operation and maintenance object, so as to prompt the operation and maintenance object to perform maintenance work on the target power grid equipment according to the special maintenance task work order received by each of them.

[0080] It should be noted here that the above-mentioned receiving module 501, determination module 503, first generation module 505 and first sending module 507 correspond to steps S202 to S208 in the above-mentioned embodiments, and the four modules and the corresponding steps implement the same instances and application scenarios, but are not limited to the contents disclosed in the above-mentioned embodiments.

[0081] As can be seen from the above, in the scheme recorded in the above-mentioned embodiment of the present invention, firstly, a receiving module can be used to receive the master station information sent by each master station and the system information sent by each system, wherein the master station includes: a power grid dispatching automation system master station, a power grid dispatching operation management master station, and the system includes: a power supply guarantee platform for issuing power supply guarantee tasks, and a meteorological system for issuing meteorological information; then, when determining that the master station information and / or system information meet the triggering conditions for issuing the special maintenance task of the power grid equipment, the determination module can be used to determine the target power grid equipment that needs to be special maintenance according to the triggering conditions, the master station information, the system information, and the information analysis results of the master station information and the system information; secondly, the first generation module can be used according to The equipment information of the target power grid equipment generates a special maintenance task work order, wherein the special maintenance task work order includes: work plan time, work task name, special maintenance equipment operation and maintenance team and special maintenance work object; finally, the first sending module can be used to send each special maintenance task work order to the corresponding operation and maintenance object, so as to prompt the operation and maintenance object to perform maintenance work on the target power grid equipment according to the special maintenance task work order received by each of them, thereby achieving the purpose of publishing information through a multi-dimensional platform, intelligently analyzing special maintenance information, and automatically processing and publishing special maintenance tasks for closed-loop power grid equipment, thereby achieving the technical effect of quickly, accurately and efficiently publishing special maintenance tasks for closed-loop power grid equipment, and improving the operating reliability and real-time operation and maintenance of power grid special maintenance equipment.

[0082] The technical solution provided by the embodiment of the present invention solves the technical problem in the related art that the special maintenance task release process of power grid equipment is inefficient, resulting in a long special maintenance cycle of the entire equipment and thus low power grid reliability.

[0083] In an optional embodiment, the receiving module includes: a first receiving unit, used to receive telemetry data of each power grid device in the power system sent by the power grid dispatching automation system master station; a second receiving unit, used to receive risk data of each power grid device in the power system sent by the power grid dispatching operation management master station; a third receiving unit, used to receive power supply guarantee tasks sent by the power supply guarantee platform, wherein the power supply guarantee tasks are tasks that require maintenance of specific power grid equipment; and a fourth receiving unit, used to receive meteorological data of the area where the power system is located sent by the meteorological system.

[0084] In an optional embodiment, the triggering conditions include at least one of the following: the line or main transformer load rate sent by the power grid dispatching automation system master station exceeds the set alarm value, the power grid dispatching operation management master station releases the power grid operation mode risk, the power supply guarantee platform releases the power supply guarantee task list, and the meteorological system releases severe weather data.

[0085] In an optional embodiment, the determination module includes: a first determination unit, used to determine, according to the trigger conditions and the master station information, that the line or main transformer load rate sent by the master station of the power grid dispatching automation system exceeds 80%, and the line or main transformer equipment is the target power grid equipment; a second determination unit, used to determine, according to the trigger conditions and the master station information, the power grid operation mode change equipment as the target power grid equipment; a third determination unit, used to determine, according to the trigger conditions and the power supply guarantee task in the system information, the power grid equipment within the scope of the power supply guarantee task as the target power grid equipment; a fourth determination unit, used to determine, according to the trigger conditions and the severe weather data in the system information, the power grid equipment in the area corresponding to the severe weather data as the target power grid equipment.

[0086] In an optional embodiment, the first generation module includes: an acquisition unit, used to acquire equipment information of each target power grid device; a fifth determination unit, used to determine the equipment ownership information of each target power grid device based on the equipment information of each target power grid device; a classification unit, used to classify each target power grid device according to the equipment ownership information of each target power grid device to obtain a power grid equipment classification result; and a generation unit, used to generate a special task work order based on the power grid equipment classification result.

[0087] In an optional embodiment, the multi-dimensional special task automatic processing device of the power grid equipment also includes: a second sending module, which is used to send each special task work order to the power grid management platform after generating the special task work order according to the equipment information of the target power grid equipment, so as to use the power grid management platform to publish each special task work order.

[0088] In an optional embodiment, the multi-dimensional special maintenance task automatic processing device of the power grid equipment also includes: a collection module, which is used to collect the completion results recorded in each special maintenance task work order in the power grid management platform when the work plan end time corresponding to the work plan time recorded in each special maintenance task work order arrives after sending each special maintenance task work order to the corresponding operation and maintenance object respectively to prompt the operation and maintenance object to perform maintenance work on the target power grid equipment according to the received special maintenance task work order; a second generation module, which is used to generate an equipment special maintenance result list according to the completion result; and a publishing module, which is used to publish the equipment special maintenance result list.

[0089] According to another aspect of an embodiment of the present invention, a computer program product is also provided, including computer instructions, which, when executed by a processor, perform any of the above-mentioned methods for automatically processing multi-dimensional special-dimensional tasks of power grid equipment.

[0090] According to another aspect of an embodiment of the present invention, a processor is further provided, and the processor is used to run a program, wherein when the program is run, any one of the above-mentioned methods for automatically processing multi-dimensional special-dimensional tasks of power grid equipment is executed.

[0091] According to another aspect of an embodiment of the present invention, a system for automatically processing multi-dimensional special-dimensional tasks of a power grid device is also provided. The system for automatically processing multi-dimensional special-dimensional tasks of a power grid device uses any of the above-mentioned methods for automatically processing multi-dimensional special-dimensional tasks of a power grid device.

[0092] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is further provided, the computer-readable storage medium comprising a stored program, wherein the program executes any one of the above-mentioned methods for automatically processing multi-dimensional special-dimensional tasks of power grid equipment.

[0093] Optionally, in this embodiment, the computer-readable storage medium may be located in any one of the computer terminals in a computer terminal group in a computer network, or in any one of the communication devices in a communication device group.

[0094] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: receiving master station information sent by each master station and system information sent by each system, wherein the master station includes: a power grid dispatching automation system master station and a power grid dispatching operation management master station, and the system includes: a power supply guarantee platform for issuing power supply guarantee tasks and a meteorological system for issuing meteorological information; when it is determined that the master station information and / or system information meet the triggering conditions for issuing special maintenance tasks of power grid equipment, determining the target power grid equipment that needs to be maintained according to the triggering conditions, master station information, system information and information analysis results of the master station information and system information; generating a special maintenance task work order according to the equipment information of the target power grid equipment, wherein the special maintenance task work order includes: work plan time, work task name, special maintenance equipment operation and maintenance team and special maintenance work object; sending each special maintenance task work order to the corresponding operation and maintenance object respectively to prompt the operation and maintenance object to perform maintenance work on the target power grid equipment according to the special maintenance task work order received by each of them.

[0095] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for executing the following steps: receiving telemetry data of each power grid device in the power system sent by the power grid dispatching automation system master station; receiving risk data of each power grid device in the power system sent by the power grid dispatching operation management master station; receiving power supply guarantee tasks sent by the power supply guarantee platform, wherein the power supply guarantee tasks are tasks that require maintenance of specific power grid equipment; receiving meteorological data of the area where the power system is located sent by the meteorological system.

[0096] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: the line or main transformer load rate sent by the power grid dispatching automation system master station exceeds the set alarm value, the power grid dispatching operation management master station publishes the power grid operation mode risk, the power supply guarantee platform publishes the power supply guarantee task list, and the meteorological system publishes severe weather data.

[0097] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for executing the following steps: determining, based on the trigger conditions and the master station information, the line or main transformer equipment whose load rate exceeds 80% sent by the master station of the power grid dispatching automation system as the target power grid equipment; determining, based on the trigger conditions and the master station information, the equipment whose power grid operation mode has changed as the target power grid equipment; determining, based on the trigger conditions and the power supply guarantee task in the system information, the power grid equipment within the scope of the power supply guarantee task as the target power grid equipment; determining, based on the trigger conditions and the severe weather data in the system information, the power grid equipment in the area corresponding to the severe weather data as the target power grid equipment.

[0098] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: obtaining equipment information of each target power grid device; determining equipment ownership information of each target power grid device based on the equipment information of each target power grid device; classifying each target power grid device based on the equipment ownership information of each target power grid device to obtain a power grid device classification result; and generating a special task work order based on the power grid equipment classification result.

[0099] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for executing the following steps: sending each special task work order to the power grid management platform, so as to publish each special task work order using the power grid management platform.

[0100] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for executing the following steps: when the work plan end time corresponding to the work plan time recorded in each special maintenance task work order arrives, collect the completion results recorded in each special maintenance task work order in the power grid management platform; generate an equipment special maintenance result list based on the completion results; and publish the equipment special maintenance result list.

[0101] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0102] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0103] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0104] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0105] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0106] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.

[0107] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for automatically processing multi-dimensional special-dimensional tasks of power grid equipment, characterized in that: include: Receive the master station information sent by each master station and the system information sent by each system, wherein the master station includes: a power grid dispatching automation system master station, a power grid dispatching operation management master station, and the system includes: a power supply guarantee platform for issuing power supply guarantee tasks, and a meteorological system for issuing meteorological information; When it is determined that the master station information and / or the system information meets the triggering condition for issuing the special maintenance task of the power grid equipment, the target power grid equipment for which special maintenance needs to be carried out is determined according to the triggering condition, the master station information, the system information, and the information analysis result of the master station information and the system information; Generate a special maintenance task work order according to the equipment information of the target power grid equipment, wherein the special maintenance task work order includes: work plan time, work task name, special maintenance equipment operation and maintenance team and special maintenance work object; Each of the special maintenance task work orders is sent to the corresponding operation and maintenance object to prompt the operation and maintenance object to perform maintenance work on the target power grid equipment according to the special maintenance task work order received by each of them.

2. The multi-dimensional special-dimensional task automatic processing method of power grid equipment according to claim 1 is characterized in that: Receive the master station information sent by each master station and the system information sent by each system, including: Receiving telemetry data of each power grid device in the power system sent by the master station of the power grid dispatching automation system; Receiving risk data of each power grid device in the power system sent by the power grid dispatching operation management master station; Receiving a power supply guarantee task sent by the power supply guarantee platform, wherein the power supply guarantee task is a task requiring maintenance of specific power grid equipment; Receive meteorological data of the area where the power system is located, which is sent by the meteorological system.

3. The multi-dimensional special-dimensional task automatic processing method of power grid equipment according to claim 1 is characterized in that: The trigger condition includes at least one of the following: the line or main transformer load rate sent by the power grid dispatching automation system master station exceeds the set alarm value, the power grid dispatching operation management master station publishes the power grid operation mode risk, the power supply guarantee platform publishes the power supply guarantee task list, and the meteorological system publishes severe weather data.

4. The multi-dimensional special-dimensional task automatic processing method of power grid equipment according to claim 1 is characterized in that: When it is determined that the master station information and / or the system information meets the triggering condition for issuing the special maintenance task of the power grid equipment, the target power grid equipment for which special maintenance needs to be carried out is determined according to the triggering condition, the master station information, the system information, and the information analysis result of the master station information and the system information, including: According to the trigger condition and the master station information, determine that the line or main transformer load rate of the line or main transformer sent by the master station of the power grid dispatching automation system exceeds 80% as the target power grid equipment; Determine, according to the trigger condition and the master station information, that the device whose power grid operation mode has changed is the target power grid device; Determine, according to the trigger condition and the power supply guarantee task in the system information, that the power grid equipment within the power supply guarantee task range is the target power grid equipment; According to the trigger condition and the severe weather data in the system information, the power grid equipment in the area corresponding to the severe weather data is determined as the target power grid equipment.

5. The multi-dimensional special-dimensional task automatic processing method of power grid equipment according to claim 1 is characterized in that: Generate a special task work order according to the device information of the target power grid device, including: Acquire the device information of each of the target power grid devices; Determine device ownership information of each target power grid device according to the device information of each target power grid device; Classify each of the target power grid devices according to the device attribution information of each of the target power grid devices to obtain a power grid device classification result; The special task work order is generated according to the power grid equipment classification result.

6. The multi-dimensional special-dimensional task automatic processing method of power grid equipment according to claim 1 is characterized in that: After generating a special task work order according to the device information of the target power grid device, the method further includes: Each of the special task work orders is sent to the power grid management platform, so as to use the power grid management platform to publish each of the special task work orders.

7. The method for automatically processing multi-dimensional special-dimensional tasks of power grid equipment according to any one of claims 1 to 6, characterized in that: After each of the special maintenance task work orders is sent to a corresponding operation and maintenance object to prompt the operation and maintenance object to perform maintenance work on the target power grid equipment according to the special maintenance task work order received by each of them, the method further includes: When the work plan end time corresponding to the work plan time recorded in each of the special task work orders arrives, collecting the completion results recorded in each of the special task work orders in the power grid management platform; Generate a list of equipment special results based on the completion results; Publish the Tweet results list for said device.

8. A multi-dimensional special task automatic processing device for power grid equipment, characterized in that: include: A receiving module, used for receiving the master station information sent by each master station and the system information sent by each system, wherein the master station includes: a power grid dispatching automation system master station, a power grid dispatching operation management master station, and the system includes: a power supply guarantee platform for issuing power supply guarantee tasks, and a meteorological system for issuing meteorological information; A determination module, configured to determine, when it is determined that the master station information and / or the system information meets the triggering condition for issuing a special maintenance task for a power grid device, determine the target power grid device for which special maintenance needs to be carried out according to the triggering condition, the master station information, the system information, and the information analysis result of the master station information and the system information; A first generating module is used to generate a special maintenance task work order according to the equipment information of the target power grid equipment, wherein the special maintenance task work order includes: work plan time, work task name, special maintenance equipment operation and maintenance team and special maintenance work object; The first sending module is used to send each of the special maintenance task work orders to the corresponding operation and maintenance objects respectively, so as to prompt the operation and maintenance objects to perform maintenance work on the target power grid equipment according to the special maintenance task work orders received by each of them.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein the program executes the method for automatically processing multi-dimensional special-dimensional tasks of a power grid device as described in any one of claims 1 to 7.

10. A computer program product comprising computer instructions, characterized in that: When the computer instructions are executed by the processor, the method for automatically processing multi-dimensional special-dimensional tasks of power grid equipment described in any one of claims 1 to 7 is performed.