Spot goods electric energy market clearing method and system considering climbing speed change
By improving the climbing rate and climbing capacity of units in the power system and optimizing the spot electricity energy market clearance model, the problems of high operating costs and poor adjustment capabilities in the existing technology are solved, and operating efficiency and new energy utilization are improved.
Patent Information
- Application Number
- CN202410919764.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-01
AI Technical Summary
The existing spot electricity energy market clearance method has the problems of high operating costs, poor adjustment capabilities, and how to effectively deal with load variability and uncertainty.
By improving the climbing rate of a single unit in the power system during the operation and exit of operation, combining the upward and downward climbing capabilities of the unit in different operating conditions, the climbing capacity is configured, and the climbing speed and climbing capacity are achieved through the climbing rate and climbing capacity. Constrained and optimized spot electricity energy market clearance model.
It reduces the power supply problems caused by untimely unit adjustments, improves overall operating efficiency and system flexibility, reduces the total operating costs, and improves the utilization rate of new energy.
Smart Images

Figure CN118886937A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system operation and optimization, and in particular to a spot electricity energy market clearing method taking into account changes in ramp rate. Background Art
[0002] With the establishment of the dual carbon goals, energy development as the lifeline of the economy has become increasingly important. However, the energy system is currently supported by fossil fuels and is therefore not suitable for development needs in terms of carbon intensity. From an economic perspective, electricity is a public product with the characteristics of non-exclusivity and non-competitiveness. One of the important issues to be addressed in public product economics is how to use limited resources to meet the needs of human society. In terms of electricity production, if the limited supply of non-renewable resources such as coal is insufficient to meet the needs of human society in the future, other resources must be sought to supplement and replace coal, such as renewable resources such as wind power and photovoltaics, to solve this problem. Therefore, the transformation of the energy structure is imperative, and the development of renewable energy has become the primary goal of achieving carbon peak and carbon neutrality goals. Further improving the electricity market, promoting renewable energy consumption, and reducing costs will be important factors for future development.
[0003] In the past two decades, renewable energy has made great progress. Renewable energy power generation technology has gradually matured and become an important resource. The scale of renewable energy has continued to expand, while the price has been declining. Data from the National Energy Administration show that as of the end of 2022, China's installed capacity of renewable energy power generation will be 1.213 billion kilowatts, accounting for about 47.3% of the total installed capacity, and the installed capacity of renewable energy power generation will reach 2.7 trillion kilowatt-hours, accounting for 31.6% of the total power generation. These statistics highlight the increasingly prominent role of renewable energy in clean energy substitution. In addition, the cost advantage of renewable energy power generation has become increasingly prominent. Since 2010, the costs of solar photovoltaic power generation, concentrated solar thermal power generation, onshore wind power generation and offshore wind power generation have fallen by 82%, 47%, 39% and 29%, respectively. In 2019, 56% of all available large-scale renewable energy generation capacity had a generation cost lower than the cheapest fossil fuel. Reducing fossil fuel consumption and promoting the use of renewable energy are the key directions for the development of the power industry. The proportion of renewable energy in power generation will continue to rise. Ensuring its effective use will be an important issue in the development of the power market and power grid. As the share of renewable energy in the power market increases, establishing a market trading mechanism involving large-scale renewable energy is necessary to accelerate its integration into the market process. However, challenges remain in addressing the uncertainty of renewable energy output and improving energy efficiency. Summary of the invention
[0004] In view of the above-mentioned problems, the present invention is proposed.
[0005] Therefore, the technical problem solved by the present invention is: the existing spot electricity energy market clearing method has high operating costs and poor regulation capabilities, as well as the optimization problem of how to effectively deal with the variability and uncertainty of loads.
[0006] To solve the above technical problems, the present invention provides the following technical solutions: a spot electricity energy market clearing method taking into account the change of climbing rate, including improving the climbing rate of a single unit in the power system during the process of being put into operation and exiting operation; configuring the climbing capacity in combination with the upward and downward climbing capabilities of the unit under different operating conditions; and optimizing the spot electricity energy market clearing model by combining the climbing rate and climbing capacity constraints.
[0007] As a preferred scheme of the spot electricity energy market clearing method taking into account the change of climbing rate described in the present invention, wherein: the improvement of the climbing rate of a single unit in the power system during the commissioning and exiting operation includes upward and downward climbing rate constraints. During the commissioning process of the unit, the operating state gradually transitions from a complete shutdown to an output state. The unit climbs upward, that is, the output level needs to be gradually increased to reach full load or a predetermined operating target. At this time, the unit only provides an upward climbing rate constraint. During the exit process of the unit, the operating state gradually decreases from the current output level to a complete shutdown. The unit climbs downward, that is, the output needs to be gradually reduced to avoid impact on the power system and the unit itself. At this time, the unit only provides a downward climbing rate constraint.
[0008] As a preferred solution of the spot electricity energy market clearing method taking into account the change of the ramp rate described in the present invention, wherein: the improvement of the ramp rate of a single unit in the power system during the operation and exit process also includes improving the traditional ramp rate constraint. If the unit is in the output state at both time t and t+1, the change in output during upward climbing is not greater than the upward climbing rate. If the unit is in the startup process from t to t+1, the change in output during upward climbing is not greater than the startup climbing rate. If the unit is in the output state at both time t and t+1, the change in output during downward climbing is not greater than the downward climbing rate. If the unit is in the shutdown process from t to t+1, the change in output during downward climbing is not greater than the shutdown climbing rate. The upward and downward flexible climbing rate constraints of a single unit are expressed as follows:
[0009]
[0010] Where, subscript i is the number of the i-th unit, subscripts t and t+1 are two adjacent moments with an interval of 15 minutes, I and T are the sets of units and total operating time, respectively, and P i,t and P i,t+1 are the planned outputs of unit i at time t and t+1 respectively, and are the upward and downward climbing rates of unit i every 15 minutes, and are the startup and shutdown ramp rates of unit i every 15 minutes, It is the minimum operating output of unit i.
[0011] As a preferred solution of the spot electricity energy market clearing method taking into account the change of the ramp rate described in the present invention, wherein: the upward and downward climbing capabilities of the combined unit under different operating conditions include upward and downward climbing capabilities mathematical expressions, and the flexible upward and downward climbing capacity reserved by the generator set is used to cope with various load changes. The upward or downward climbing capability provided by the unit in the output state and the climbing capability contributed by the unit when it is put into or out of operation are combined, and based on various operating states and climbing characteristics of the unit, the flexible climbing capability of the system is evaluated, and the upward and downward climbing capability provided by the unit at time t is expressed as:
[0012]
[0013] in, and are the upward and downward climbing capabilities provided by unit i at time t, is the maximum operating output of unit i, u i,t Whether the output of unit i at time t is greater than the minimum operating output.
[0014] As a preferred solution of the spot electricity market clearing method taking into account the change of the ramp rate described in the present invention, wherein: the upward and downward ramping capabilities of the combined unit under different operating conditions also include the system flexible ramping capability constraint. If the unit i is withdrawn or put into operation at the next moment, it has the ability to climb in a single direction downward or upward, but loses the ability to climb in both directions upward or downward. If the unit i is at the minimum operating output at time t, it is withdrawn from operation due to the day-ahead scheduling at time t+1. If the system needs the ability to climb upward, but the unit loses the ability to climb upward, the size of the lost upward climbing capability is expressed as:
[0015]
[0016] That is, unit i has a negative impact on the system's upward climbing ability at time t+1. If the unit does not exit operation, then If the system needs downward climbing capability, the unit loses the downward climbing capability, which has a negative impact on the system's downward climbing capability. The negative impact of the exited or put-in unit on the system's upward or downward climbing capability is expressed as:
[0017]
[0018] in, is the negative impact of the exit of unit i on the upward climbing capability at time t+1, is the negative impact of the unit i on the downward climbing capability when it is put into use at time t+1, u i,t+1 Is the output of unit i greater than the minimum operating output at time t+1?
[0019] Combining the upward and downward climbing capabilities and negative impacts, the comprehensive upward or downward climbing capability provided is obtained. The system flexible climbing capability constraint is expressed as:
[0020]
[0021] Where N is the total number of units, and are the upward and downward flexible ramping capacity requirements of the system at time t, respectively, including variability and uncertainty. The variability is the difference between the predicted net loads at the previous and next moments, indicating the variability of the net load. The uncertainty is the net load uncertainty caused by the wind power prediction deviation, expressed as:
[0022]
[0023] in, and are the predicted values of total load at time t+1 and time t, and are the predicted outputs of all wind farms at time t+1 and t, is the wind power forecast deviation at time t+1, β w is the maximum value of wind power prediction error.
[0024] As a preferred solution of the spot electricity market clearing method taking into account the change of ramp rate described in the present invention, the optimized spot electricity market clearing model includes the SCUC model, the spot electricity market clearing model is composed of the SCUC, SCED, and LPC models, and the objective function of the SCUC model to minimize the operation and startup costs of power generation resources is expressed as:
[0025]
[0026] Among them, C i,t (P i,t )and are the operating cost and startup cost of unit i in period t, respectively, expressed as:
[0027]
[0028] in, and P i,k,t are the declared electricity price and declared output of the kth section of unit i in time period t, is the startup cost of unit i, and the output constraints of each section of the unit are expressed as:
[0029]
[0030] Among them, P i,k,t and The winning bid output and declared output of the kth section of unit i in time period t, the total winning bid output of the unit is calculated as:
[0031]
[0032] Among them, P s,i,t is the total winning bid output of unit i in period t, and the total winning bid output constraint calculation of unit is expressed as:
[0033]
[0034] in, and are the minimum and maximum outputs of unit i in period t, respectively. The system load balance constraint is expressed as:
[0035]
[0036] Among them, P t D is the system load in period t, and the system planned reserve constraint is expressed as:
[0037]
[0038] Among them, r SR The planned reserve ratio of the system and the minimum startup or shutdown time constraint of the unit are expressed as:
[0039]
[0040] in, and are the start-up time and shutdown time of unit i in period t, T i U and T i D are the minimum startup and shutdown time requirements of unit i respectively, and the line power flow constraint is expressed as:
[0041]
[0042] Among them, P bd,t , x bd are the line power flow, power flow transmission limit, and reactance between node b and node d, respectively. b,t and δ d,t is the phase angle between node b and node d in time period t.
[0043] As a preferred solution of the spot electricity market clearing method taking into account the change of ramp rate described in the present invention, the optimization spot electricity market clearing model also includes calculating the node electricity price. After the SCUC model determines the startup mode, the power generation plan is determined by the SCED model, and the node electricity price is calculated by the LPC model. The objective function is expressed as:
[0044]
[0045] Establish node power balance constraints to calculate node electricity prices, expressed as:
[0046]
[0047] in, is the load of node b in period t, λ b,t is the constrained shadow price, which serves as the electricity price of node b.
[0048] Another object of the present invention is to provide a spot electricity market clearing system that takes into account changes in ramp rate, which can optimize the spot electricity market clearing model by combining the ramp rate and ramp capacity constraints through the optimization model module, thereby solving the current problems of high total system operating costs and low utilization rate of new energy.
[0049] As a preferred solution of the spot electricity energy market clearing system taking into account the change of climbing rate described in the present invention, it includes: a climbing rate module, a climbing capacity module, and an optimization model module; the climbing rate module is used to improve the climbing rate of a single unit in the power system during the process of being put into operation and exiting operation; the climbing capacity module is used to configure the climbing capacity in combination with the upward and downward climbing capabilities of the unit under different operating conditions; the optimization model module is used to optimize the spot electricity energy market clearing model by combining the climbing rate and climbing capacity constraints.
[0050] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and wherein the processor executes the computer program to implement a step of a spot electricity energy market clearing method taking into account changes in ramp rate.
[0051] A computer-readable storage medium having a computer program stored thereon, characterized in that when the computer program is executed by a processor, the steps of a spot electricity energy market clearing method taking into account changes in ramp rate are implemented.
[0052] Beneficial effects of the present invention: The spot electricity energy market clearing method taking into account the change of climbing rate provided by the present invention reduces the power supply problem caused by untimely adjustment of the unit by subdividing the climbing rate into the startup climbing rate and the shutdown climbing rate, and improves the overall operating efficiency. The system reserves a certain upward and downward climbing capacity during the scheduling process, enhances the flexibility and stability of the power system, reduces the power supply risk caused by load changes, optimizes the system resource allocation, and reasonably allocates the unit output through the improved market clearing model, reduces the reserved amount of spare capacity, reduces the total operating cost of the system, and improves the utilization rate of new energy such as wind power. The present invention achieves better results in terms of flexibility, operating efficiency and operating cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:
[0054] Figure 1 An overall flow chart of a spot electricity market clearing method taking into account ramp rate changes provided in the first embodiment of the present invention.
[0055] Figure 2 A planned output accumulation diagram of each unit in a spot electricity market clearing method taking into account ramp rate changes provided in the second embodiment of the present invention.
[0056] Figure 3 A reserve cost diagram of two models under different wind power forecast errors of a spot electricity market clearing method taking into account ramp rate changes provided in the second embodiment of the present invention.
[0057] Figure 4 A ramp cost diagram of two models under different wind power prediction errors of a spot electricity market clearing method taking into account ramp rate changes provided in a second embodiment of the present invention.
[0058] Figure 5 A total cost diagram of two models under different wind power forecast errors for a spot electricity market clearing method taking into account ramp rate changes provided in a second embodiment of the present invention.
[0059] Figure 6 An overall module diagram of a spot electricity market clearing system taking into account ramp rate changes provided in the third embodiment of the present invention. DETAILED DESCRIPTION
[0060] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0061] Example 1
[0062] Reference Figure 1 , which is an embodiment of the present invention, provides a spot electricity energy market clearing method taking into account the change of ramp rate, including:
[0063] S1: Improve the ramp rate of a single unit in the power system during operation and shutdown.
[0064] Furthermore, the ramp rate of a single unit in the power system during operation and de-operation is improved including upward and downward ramp rate constraints.
[0065] It should be noted that during the commissioning process of the unit, the operating status gradually transitions from a complete shutdown to an output status. The unit climbs upward, that is, the output level needs to be gradually increased to reach full load or a predetermined operating target. At this time, the unit only provides an upward climbing rate constraint. During the unit exit process, the operating status gradually decreases from the current output level to a complete shutdown. The unit climbs downward, that is, the output needs to be gradually reduced to avoid impact on the power system and the unit itself. At this time, the unit only provides a downward climbing rate constraint.
[0066] Furthermore, improving the ramp rate of a single unit in a power system during operation and de-operation also includes improving traditional ramp rate constraints.
[0067] It should be noted that if the unit is in the output state at both time t and t+1, the change in output during upward climbing is not greater than the upward climbing rate; if the unit is in the startup process from t to t+1, the change in output during upward climbing is not greater than the startup climbing rate; if the unit is in the output state at both time t and t+1, the change in output during downward climbing is not greater than the downward climbing rate; if the unit is in the shutdown process from t to t+1, the change in output during downward climbing is not greater than the shutdown climbing rate. The upward and downward flexible climbing rate constraints of a single unit are expressed as:
[0068]
[0069] Where, subscript i is the number of the i-th unit, subscripts t and t+1 are two adjacent moments with an interval of 15 minutes, I and T are the sets of units and total operating time, respectively, and Pi,t and P i,t+1 are the planned outputs of unit i at time t and t+1 respectively, and are the upward and downward climbing rates of unit i every 15 minutes, and are the startup and shutdown ramp rates of unit i every 15 minutes, It is the minimum operating output of unit i.
[0070] S2: Configure the climbing capacity based on the upward and downward climbing capabilities of the unit under different operating conditions.
[0071] Furthermore, the upward and downward climbing capabilities of the unit under different operating conditions are combined to include mathematical expressions of the upward and downward climbing capabilities.
[0072] It should be noted that the flexible upward and downward climbing capacity reserved by the generator set is used to cope with various load changes. The upward or downward climbing capacity provided by the unit in the output state and the climbing capacity contributed by the unit when it is put into operation or out of operation are combined, and based on the various operating states and climbing characteristics of the unit, the flexible climbing capacity of the system is evaluated. The upward and downward climbing capacity provided by the unit at time t is expressed as:
[0073]
[0074] in, and are the upward and downward climbing capabilities provided by unit i at time t, P i max is the maximum operating output of unit i, u i,t Whether the output of unit i at time t is greater than the minimum operating output.
[0075] Furthermore, the upward and downward climbing capabilities of the unit under different operating conditions also include system flexible climbing capability constraints.
[0076] It should be noted that if unit i is shut down or put into operation at the next moment, it has the ability to climb in a single direction downward or upward, but loses the ability to climb in both directions upward or downward. If unit i is at the minimum operating output at time t, and is shut down at time t+1 due to the day-ahead scheduling, if the system requires the ability to climb upward, but the unit loses the ability to climb upward, the size of the lost upward climbing ability is expressed as:
[0077]
[0078] That is, unit i has a negative impact on the system's upward climbing ability at time t+1. If the unit does not exit operation, then If the system needs downward climbing capability, the unit loses the downward climbing capability, which has a negative impact on the system's downward climbing capability. The negative impact of the exited or put-in unit on the system's upward or downward climbing capability is expressed as:
[0079]
[0080] in, is the negative impact of the exit of unit i on the upward climbing capability at time t+1, is the negative impact of the unit i on the downward climbing capability when it is put into use at time t+1, u i,t+1 Is the output of unit i greater than the minimum operating output at time t+1?
[0081] Combining the upward and downward climbing capabilities and negative impacts, the comprehensive upward or downward climbing capability provided is obtained. The system flexible climbing capability constraint is expressed as:
[0082]
[0083] Where N is the total number of units, and are the upward and downward flexible ramping capacity requirements of the system at time t, respectively, including variability and uncertainty. The variability is the difference between the predicted net loads at the previous and next moments, indicating the variability of the net load. The uncertainty is the net load uncertainty caused by the wind power prediction deviation, expressed as:
[0084]
[0085] in, and are the predicted values of total load at time t+1 and time t, and are the predicted outputs of all wind farms at time t+1 and t, is the wind power forecast deviation at time t+1, β w is the maximum value of wind power prediction error.
[0086] S3: Optimize the spot electricity market clearing model by combining ramp rate and ramp capacity constraints.
[0087] Furthermore, the optimization of spot electricity market clearing models includes the SCUC model.
[0088] It should be noted that the spot electricity market clearing model consists of SCUC, SCED, and LPC models. The objective function of the SCUC model to minimize the operation and startup costs of power generation resources is expressed as:
[0089]
[0090] Among them, C i,t (P i,t )and are the operating cost and startup cost of unit i in period t, respectively, expressed as:
[0091]
[0092] in, and P i,k,t are the declared electricity price and declared output of the kth section of unit i in time period t, is the startup cost of unit i, and the output constraints of each section of the unit are expressed as:
[0093]
[0094] Among them, P i,k,t and The winning bid output and declared output of the kth section of unit i in time period t, the total winning bid output of the unit is calculated as:
[0095]
[0096] Among them, P s,i,t is the total winning bid output of unit i in period t, and the total winning bid output constraint calculation of unit is expressed as:
[0097]
[0098] in, and are the minimum and maximum outputs of unit i in period t, respectively. The system load balance constraint is expressed as:
[0099]
[0100] Among them, P t D is the system load in period t, and the system planned reserve constraint is expressed as:
[0101]
[0102] Among them, r SR The planned reserve ratio of the system and the minimum startup or shutdown time constraint of the unit are expressed as:
[0103]
[0104] in, and are the start-up time and shutdown time of unit i in period t, T i U and T i Dare the minimum startup and shutdown time requirements of unit i respectively, and the line power flow constraint is expressed as:
[0105]
[0106] Among them, P bd,t , x bd are the line power flow, power flow transmission limit, and reactance between node b and node d, respectively. b,t and δ d,t is the phase angle between node b and node d in time period t.
[0107] Furthermore, optimizing the spot electricity market clearing model also includes calculating node electricity prices.
[0108] It should be noted that after the SCUC model determines the startup mode, the SCED model is used to determine the power generation plan, and the node electricity price is calculated by the LPC model. The objective function is expressed as:
[0109]
[0110] Establish node power balance constraints to calculate node electricity prices, expressed as:
[0111]
[0112] in, is the load of node b in period t, λ b,t is the constrained shadow price, which serves as the electricity price of node b.
[0113] Example 2
[0114] Reference Figure 2-Figure 5 , which is an embodiment of the present invention, provides a spot electricity energy market clearing method taking into account the change of ramp rate. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments.
[0115] Two models are set up and compared and analyzed in the test system. Model 1 is a spot electricity market clearing model without flexible ramping products, and Model 2 is a spot electricity market clearing model considering flexible ramping products. The line loss rate is 3.7%, and the power generation reserve coefficient β of the thermal power unit is c =0.05, the wind farm's power reserve factor β a =0.2 (i.e. the maximum wind power prediction error β w The cost quotation data are shown in Table 1. The simulation results are obtained by running the Yalmip optimization software package on a PC platform with Intel Corei5-11400 and 16GB memory.
[0116] Table 1 Cost quotation data table
[0117] name Numeric Power generation costs 350 yuan / MWh Wind power penalty costs 200 yuan / MWh Positive reserve cost 200 yuan / MWh Negative standby cost 120 yuan / MWh Ramp Capacity Price Cap 100 yuan / MWh
[0118] The system contains 4 thermal power units and 1 wind power unit, among which unit 1 is a constant output generator, ignoring its various costs and the process of switching on and off. The other units are fast start units. The rated power of the wind power unit is 100MW. Table 2 is the data table of each thermal power unit. Table 3 is the wind power generation forecast data and load forecast data for 12 clearing times between 11:00 and 14:00 a day ago. The wind power penetration rate is about 10%. Assuming that the initial state is that all 4 units are in operation, that is, u i,0 =1, i = 1, 2, 3, 4, the subscript 0 indicates the initial moment, and the initial value of wind turbine power generation is 40MW.
[0119] Table 2 Data of thermal power units in simple test system
[0120]
[0121]
[0122] Table 3 Wind power forecast data and load forecast data
[0123] time Wind power Load power Wind power forecast error 11:00 66 660 13.2 11:15 68 636 13.6 11:30 68 612 13.6 11:45 66 588 13.2 12:00 68 552 13.6 12:15 69 553 13.8 12:30 75 588 15.0 12:45 77 624 15.4 13:00 78 660 15.6 13:15 51 696 10.2 13:30 41 732 8.2 13:45 42 768 8.4
[0124] like Figure 2 As shown in the figure, in the first three clearing moments, units 2-4 in model 1 are all in the climbing state, while in model 2, unit 3 is in the climbing state, and units 2 and 4 are in full operation and shutdown at the last two moments. Compared with model 1, the use of improved flexible climbing auxiliary products in model 2 reduces the climbing cost and no-load cost. Table 4 gives the comparison results of the total cost and each sub-item cost under the two models. It can be seen from Table 4 that compared with model 1, the no-load cost, standby cost and climbing cost of model 2 are reduced by 4.43%, 32.37%, 3.79% and 22.89% respectively, and the total cost is reduced by 2.41%.
[0125] Table 4 Economic comparison of simple test system
[0126] Fee Type Model 1 Model 2 Total cost 128.5 125.41 Thermal power costs 42.35 42.29 No-load charges 38.4 36.7 Switching costs 0.93 0.93 Backup Fee 1.73 1.17 Climbing costs 20.03 19.27
[0127] like Figure 3-Figure 5 As shown, the reserve costs of Model 1 and Model 2 basically increase linearly with the wind power prediction error, but Model 2 is lower than Model 1. The climbing costs of each model are basically unchanged, but the climbing cost of Model 1 is higher than that of Model 2. The total cost of Model 1 increases linearly with the wind power prediction error, and the total cost of Model 2 hardly changes with the wind power prediction error. Under different wind power prediction errors, the method of the present invention greatly reduces the reserve capacity reserved due to wind power uncertainty, thereby reducing the total operating cost of the system.
[0128] Example 3
[0129] Reference Figure 6 , which is an embodiment of the present invention, provides a spot electricity energy market clearing system that takes into account changes in ramp rate, including: a ramp rate module, a ramp capacity module, and an optimization model module.
[0130] The ramp rate module is used to improve the ramp rate of a single unit in the power system during the process of being put into operation and exiting operation; the climbing capacity module is used to configure the climbing capacity based on the upward and downward climbing capabilities of the unit under different operating conditions; the optimization model module is used to optimize the spot electricity market clearing model by combining the climbing rate and climbing capacity constraints.
[0131] If the function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.
[0132] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.
[0133] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering, or processing in another suitable manner as necessary, and then stored in a computer memory.
[0134] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc. It should be noted that the above embodiments are only used to illustrate the technical solution of the present invention and are not limited. Although the present invention is described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.
[0135] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. Clearing method of spot electricity market taking into account the change of ramp rate, It is characterized in that include: Improve the ramp rate of a single unit in the power system during operation and shutdown; Configure the ramp capacity based on the upward and downward ramp capabilities of the unit under different operating conditions; The spot electricity market clearing model is optimized by combining ramp rate and ramp capacity constraints.
2. The spot electricity energy market clearing method taking into account the ramp rate change as claimed in claim 1, Features: The improvement of the climbing rate of a single unit in the power system during the process of being put into operation and being taken out of operation includes upward and downward climbing rate constraints. During the process of putting the unit into operation, the operating state gradually transitions from a complete shutdown state to an output state. The unit climbs upward, that is, it needs to gradually increase the output level to reach the full load or the predetermined operating target. At this time, the unit only provides an upward climbing rate constraint. During the process of taking the unit out of operation, the operating state gradually decreases from the current output level to a complete shutdown. The unit climbs downward, that is, it needs to gradually reduce the output to avoid causing an impact on the power system and the unit itself. At this time, the unit only provides a downward climbing rate constraint.
3. The spot electricity energy market clearing method taking into account the change of ramp rate as claimed in claim 2, Features: The improvement of the ramp rate of a single unit in the power system during the process of being put into operation and exiting operation also includes improving the traditional ramp rate constraint. If the unit is in the output state at both time t and t+1, the change in output during upward climbing is not greater than the upward climbing rate. If the unit is in the startup process from t to t+1, the change in output during upward climbing is not greater than the startup climbing rate. If the unit is in the output state at both time t and t+1, the change in output during downward climbing is not greater than the downward climbing rate. If the unit is in the shutdown process from t to t+1, the change in output during downward climbing is not greater than the shutdown climbing rate. The upward and downward flexible ramp rate constraints of a single unit are expressed as: Where, subscript i is the number of the i-th unit, subscripts t and t+1 are two adjacent moments with an interval of 15 minutes, I and T are the sets of units and total operating time, respectively, and P i , t and P i ,t +1 are the planned outputs of unit i at time t and t+1 respectively, and are the upward and downward climbing rates of unit i every 15 minutes, and are the startup and shutdown ramp rates of unit i every 15 minutes, It is the minimum operating output of unit i.
4. The spot electricity energy market clearing method taking into account the ramp rate change as claimed in claim 3, Features: The upward and downward climbing capabilities of the combined unit under different operating conditions include mathematical expressions of the upward and downward climbing capabilities. The flexible upward and downward climbing capacity reserved by the generator set is used to cope with various load changes. The upward or downward climbing capabilities provided by the unit in the output state and the climbing capabilities contributed by the unit when it is put into operation or out of operation are combined, and based on various operating states and climbing characteristics of the unit, the flexible climbing capability of the system is evaluated. The upward and downward climbing capabilities provided by the unit at time t are expressed as: in, and are the upward and downward climbing capabilities provided by unit i at time t, P i max is the maximum operating output of unit i, u i,t Whether the output of unit i at time t is greater than the minimum operating output.
5. The spot electricity energy market clearing method taking into account the ramp rate change as claimed in claim 4, Features: The combination of the upward and downward climbing capabilities of the unit under different operating conditions also includes the system flexible climbing capability constraint. If unit i is withdrawn or put into operation at the next moment, it has the climbing capability in a single direction downward or upward, but loses the climbing capability in both directions upward or downward. If unit i is at the minimum operating output at time t, it is withdrawn from operation due to the day-ahead scheduling at time t+1. If the system needs the upward climbing capability, but the unit loses the upward climbing capability, the size of the lost upward climbing capability is expressed as: That is, unit i has a negative impact on the system's upward climbing ability at time t+1. If the unit does not exit operation, then If the system needs downward climbing capability, the unit loses the downward climbing capability, which has a negative impact on the system's downward climbing capability. The negative impact of the exited or put-in unit on the system's upward or downward climbing capability is expressed as: in, is the negative impact of the exit of unit i on the upward climbing capability at time t+1, is the negative impact of the unit i on the downward climbing capability when it is put into use at time t+1, u i,t+1 Is the output of unit i greater than the minimum operating output at time t+1? Combining the upward and downward climbing capabilities and negative impacts, the comprehensive upward or downward climbing capability provided is obtained. The system flexible climbing capability constraint is expressed as: Where N is the total number of units, and are the upward and downward flexible ramping capacity requirements of the system at time t, respectively, including variability and uncertainty. The variability is the difference between the predicted net loads at the previous and next moments, indicating the variability of the net load. The uncertainty is the net load uncertainty caused by the wind power prediction deviation, expressed as: in, and P t A are the predicted values of total load at time t+1 and time t, and P t WD are the predicted outputs of all wind farms at time t+1 and t, is the wind power forecast deviation at time t+1, β w is the maximum value of wind power prediction error.
6. The spot electricity energy market clearing method taking into account the ramp rate change as claimed in claim 5, Features: The optimized spot electricity market clearing model includes the SCUC model, which is composed of the SCUC, SCED, and LPC models. The objective function of the SCUC model to minimize the operation and startup costs of power generation resources is expressed as: Among them, C i,t (P i,t )and are the operating cost and startup cost of unit i in period t, respectively, expressed as: in, and P i,k,t are the declared electricity price and declared output of the kth section of unit i in time period t, is the startup cost of unit i, and the output constraints of each section of the unit are expressed as: Among them, P i,k,t and The winning bid output and declared output of the kth section of unit i in time period t, the total winning bid output of the unit is calculated as: Among them, P s,i,t is the total winning bid output of unit i in period t, and the total winning bid output constraint calculation of unit is expressed as: in, and are the minimum and maximum outputs of unit i in period t, respectively. The system load balance constraint is expressed as: Among them, P t D is the system load in period t, and the system planned reserve constraint is expressed as: Among them, r SR The planned reserve ratio of the system and the minimum startup or shutdown time constraint of the unit are expressed as: in, and are the start-up time and shutdown time of unit i in period t, T i U and T i D are the minimum startup and shutdown time requirements of unit i respectively, and the line power flow constraint is expressed as: Among them, P bd,t , x bd are the line power flow, power flow transmission limit, and reactance between node b and node d, respectively. b,t and δ d,t is the phase angle between node b and node d in time period t.
7. The spot electricity energy market clearing method taking into account the ramp rate change as claimed in claim 6, Features: The optimization spot electricity market clearing model also includes calculating node electricity prices. After the SCUC model determines the startup mode, the SCED model is used to determine the power generation plan, and the LPC model is used to calculate the node electricity prices. The objective function is expressed as: Establish node power balance constraints to calculate node electricity prices, expressed as: in, is the load of node b in period t, λ b,t is the constrained shadow price, which serves as the electricity price of node b.
8. A system using the spot electricity energy market clearing method taking into account the ramp rate change as claimed in any one of claims 1 to 7, Features: Including climbing rate module, climbing ability module and optimization model module; The ramp rate module is used to improve the ramp rate of a single unit in the power system during the process of being put into operation and being taken out of operation; The climbing capacity module is used to configure the climbing capacity by combining the upward and downward climbing capabilities of the unit under different operating conditions; The optimization model module is used to optimize the spot electricity energy market clearing model by combining the ramp rate and ramp capacity constraints.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program. It is characterized in that When the processor executes the computer program, the steps of the spot electricity energy market clearing method taking into account the change of ramp rate as described in any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the spot electricity energy market clearing method taking into account the change of the ramp rate as described in any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Clearing modeling method and system considering segmented gradeability of thermal power generating unit
CN122242066A