Convenient installation equipment for built-in bus

Through the convenient use of installation equipment, the problem of time-consuming and uneven measurement and marking of fixed-point measurement and marking in busbar trough installation is solved, and the efficient and accurate installation of busbar trough is achieved, ensuring the stability and operation safety of subsequent connections.

CN118889296AActive Publication Date: 2024-11-01HUANGGANG XINGHE ALUMINUM IND CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410940257.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-01
Estimated Expiration
2044-07-15

AI Technical Summary

Technical Problem

A large number of precise fixed-point measurements and markings are required in the installation of bus ducts, which take a long time and are susceptible to external factors, resulting in uneven bus ducts that have been installed and affect subsequent connections.

Method used

Using convenient installation equipment including connecting blocks, mounting blocks, mobile positioning components, movable plug-in blocks and boom installation components, the positioning and fixing of the busbar duct is achieved through the motor-driven walking wheels and pressure plates, reducing measurement and marking steps, and ensuring installation Accuracy and continuity.

Benefits of technology

It improves the convenience and accuracy of the installation of bus ducts, reduces the time for fixed-point measurement and marking, avoids the problem of uneven installation, ensures flush connection between bus ducts, and enhances operational safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889296A_ABST
    Figure CN118889296A_ABST
Patent Text Reader

Abstract

The invention relates to the field of bus duct installation, in particular to convenient installation equipment for a built-in bus, which comprises a connecting block, a third electric cylinder, an installation block, a mobile positioning component and the like, the inner left portion and the inner right portion of the connecting block are each provided with a third electric cylinder. The output end of each third electric cylinder is fixedly connected with a mounting block; and two movable positioning assemblies are mounted on each mounting block. The device walks and continuously works on the bus duct, so that the positioning and installation of the bus duct are simultaneously carried out, the convenience is improved, a large amount of time is not required to be consumed for fixed-point measurement and marking, and the situation that the installed bus ducts are not flush with one another due to deviation caused by external factors during measurement and marking is avoided; and the subsequent connection between the bus ducts is further influenced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of bus duct installation, and in particular to a convenient installation device for a built-in bus. Background Art

[0002] Bus duct, whose full name is bus duct system, is a highly efficient power distribution device, which consists of a series of closed or semi-closed metal troughs and busbars placed inside. It is used to carry and protect power cables or conductors from the external environment, and is easy to manage and maintain.

[0003] The bus duct is usually installed by hoisting, which involves installing symmetrical hangers on the ceiling. The lower sides of the hangers are connected to a supporting L-shaped iron sheet, and the bus duct is fixed to the L-shaped iron sheet. When the bus duct is installed over a large area, a large amount of precise point measurement and marking is required, which is time-consuming. In addition, the measurement and marking process is easily affected by external factors and causes deviations, which makes the installed bus ducts uneven, thus affecting the subsequent connection between the bus ducts. Summary of the invention

[0004] In order to overcome the shortcomings that the installation of bus ducts over a large area requires a large amount of precise fixed-point measurements and markings, which is time-consuming, and the measurements and markings are easily affected by external factors and lead to deviations, making the installed bus ducts uneven, the present invention provides a convenient installation device for built-in busbars.

[0005] The technical implementation scheme of the present invention is: a convenient installation device for built-in busbar, including a connecting block; also including a third electric cylinder, a mounting block, a movable positioning assembly, a movable plug-in block and a hanger mounting assembly; a third electric cylinder is installed on the left and right parts of the connecting block; each third electric cylinder output end is fixedly connected to a mounting block; the third electric cylinder is used to drive the mounting block to move; each mounting block is installed with two symmetrically arranged movable positioning assemblies, and the movable positioning assembly is used to drive the connecting block and the mounting block to move on the busbar trough; the right mounting block is plugged with two movable plug-in blocks, and a two-way push rod is arranged in the mounting block, and the two-way push rod is used to drive the two movable plug-in blocks to move toward each other; each movable plug-in block is installed with a hanger mounting assembly for installing a hanger.

[0006] Furthermore, the mobile positioning assembly includes a first electric cylinder, a connecting frame, a motor, a walking wheel, a second electric cylinder and a pressure plate; the first electric cylinder is installed inside the mounting block; the output end of the first electric cylinder is fixedly connected to the connecting frame; the connecting frame is installed with the motor; a walking wheel is fixedly connected to the output shaft of the motor; the connecting frame is connected to the second electric cylinder; and the output end of the second electric cylinder is fixedly connected to the pressure plate.

[0007] Furthermore, a rubber layer is provided on a side of the pressing plate away from the second electric cylinder.

[0008] Furthermore, a plurality of balls are arranged on the lower side of the mounting block.

[0009] Furthermore, the boom installation assembly includes an electric rotating drum, an electric push rod and an electric drill; an electric telescopic rod is installed on the movable plug-in block; the telescopic end of the electric telescopic rod is installed with an electric rotating drum; an electric push rod is installed on the rotating part of the electric rotating drum; and an electric drill is installed at the output end of the electric push rod.

[0010] Furthermore, the boom mounting assembly also includes a placement ring; a second electric push rod is installed on the rotating part of the electric drum; a placement ring is installed at the output end of the second electric push rod; and a funnel-shaped rubber ring is arranged on the upper side of the placement ring.

[0011] Furthermore, the boom mounting assembly also includes a mounting frame, a clamping plate and an electric base; a third electric push rod is installed on the rotating part of the electric drum; a mounting frame is installed on the output end of the third electric push rod; a number of clamping plates are arranged on the mounting frame through the electric rotating shaft; and an electric base is installed on the lower side of the mounting frame.

[0012] Furthermore, a protective cover is installed on the electric drill, and the protective cover is made of flexible material.

[0013] Furthermore, a plurality of vertically arranged rubber rollers are rotatably connected to the opposite sides of the clamping plates on the same mounting frame.

[0014] Furthermore, it also includes a placement plate; a placement plate for placing installation parts is commonly installed on all installation blocks; and a connecting net is arranged in the middle of the placement plate.

[0015] Compared with the prior art, the present invention has the following advantages: the present invention realizes continuous work by walking on the bus duct, so that the positioning and installation of the bus duct can be carried out simultaneously, which improves convenience, does not need to spend a lot of time on fixed-point measurement and marking, and avoids deviation caused by external factors during measurement and marking, so that the installed bus ducts are not flush with each other, thereby affecting the connection between subsequent bus ducts;

[0016] The bus duct is moved and positioned by the connection frame, walking wheels and pressure plate. At the same time, the pressure plate supports the bus duct to prevent the bus duct from being too heavy and inconvenient for workers to operate when the bus duct is precisely aligned with the screw holes of the L-shaped iron sheet for connection and fixing. It may even drop out of the hands and cause safety problems.

[0017] The boom is installed through the boom installation assembly to ensure the accuracy and continuity of the boom installation, avoiding a series of operations such as drilling holes, inserting expansion screws into holes, and installing the boom. This requires repeated use and removal of multiple parts and tools, which is extremely inconvenient for workers at high places to operate.

[0018] The parts required for installation are placed on the placement plate and moved along with the present invention to perform installation work, thereby improving the mobility of installation; meanwhile, the placement plate can prevent sundries on the ceiling from falling onto the surface of the present invention and affecting the movement of the parts. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a three-dimensional structural schematic diagram of the initial installation position of the present invention;

[0020] Figure 2 It is a schematic diagram of the three-dimensional structure of the combination of the mounting block and the connecting frame of the present invention;

[0021] Figure 3 It is a three-dimensional structural schematic diagram of the mounting block, the connecting frame and the traveling wheel combination of the present invention;

[0022] Figure 4 It is a schematic diagram of the three-dimensional structure of the convenient installation device for the built-in busbar of the present invention;

[0023] Figure 5 It is a three-dimensional structural schematic diagram of the third electric cylinder of the present invention in an extended state;

[0024] Figure 6 It is a three-dimensional structural schematic diagram of the mobile positioning assembly of the present invention;

[0025] Figure 7 It is a three-dimensional structural schematic diagram of the position of the electric drill of the present invention when working;

[0026] Figure 8 It is a three-dimensional structural schematic diagram of the position of the placement ring of the present invention when it is working;

[0027] Fig. 9 It is a three-dimensional structural schematic diagram of the installation frame of the present invention when it is in working position;

[0028] Fig.10 For the present invention Figure 8 The enlarged view of point A in the middle;

[0029] Fig.11 It is a schematic diagram of the three-dimensional structure of the right side mounting block of the present invention in a suspended state;

[0030] Fig.12 It is a three-dimensional structural schematic diagram of the combination of the mounting block, the movable plug-in block and the mounting frame of the present invention;

[0031] Fig.13 It is a schematic diagram of the three-dimensional structure when the present invention moves to the next bus duct.

[0032] The meanings of the reference numerals in the figure are: 1-connecting block, 2-mounting block, 3-connecting frame, 4-travel wheel, 5-pressing plate, 6-movable plug-in block, 6001-electric telescopic rod, 7-power supply, 101-first electric cylinder, 102-motor, 103-second electric cylinder, 104-third electric cylinder, 21-electric rotating drum, 22-electric push rod, 23-electric drill, 2301-protective cover, 24-placing ring, 2401-rubber ring, 25-mounting frame, 26-clamping plate, 2601-rubber roller, 27-electric base, 31-placing plate, 3101-connecting net, 1111-bus duct, 2222-ceiling, 1a-drilling center line. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] Example 1

[0035] like Figure 1-Figure 13 As shown, a convenient installation device for a built-in busbar includes a connection block 1;

[0036] It also includes a third electric cylinder 104, a mounting block 2, a mobile positioning component, a movable plug-in block 6, a power supply 7 and a boom mounting component; a third electric cylinder 104 is installed on the left and right parts of the connecting block 1; each output end of the third electric cylinder 104 is fixedly connected to a mounting block 2; the third electric cylinder 104 is used to drive the mounting block 2 to move; each mounting block 2 is provided with two mobile positioning components symmetrically arranged front to back; two movable plug-in blocks 6 symmetrically arranged front to back are plugged into the right part of the right mounting block 2, and the movable plug-in block 6 can actively move in the right mounting block 2; each movable plug-in block 6 is installed with a boom mounting component; each mounting block 2 is connected to a power supply 7.

[0037] The mobile positioning assembly includes a first electric cylinder 101, a connecting frame 3, a motor 102, a walking wheel 4, a second electric cylinder 103 and a pressure plate 5; the first electric cylinder 101 is installed inside the mounting block 2; the connecting frame 3 is fixedly connected to the output end of the first electric cylinder 101; the motor 102 is installed on the upper side of the connecting frame 3; the output shaft of the motor 102 is arranged downward and passes through the connecting frame 3; the output shaft of the motor 102 is fixedly connected to a walking wheel 4, and the inner edge of the walking wheel 4 is provided with an angle so that it can be better stuck on the bus duct 1111; the second electric cylinder 103 is connected to the lower side of the connecting frame 3; the second electric cylinder 103 is located on the lower side of the corresponding walking wheel 4; the output end of the second electric cylinder 103 is fixedly connected to the pressure plate 5.

[0038] A rubber layer is provided on one side of the pressing plate 5 away from the second electric cylinder 103 to increase the tightness during squeezing.

[0039] A plurality of balls are arranged on the lower side of the mounting block 2 to facilitate the movement of the mounting block 2 on the busbar slot 1111 and reduce friction.

[0040] The boom installation assembly includes an electric drum 21, an electric push rod 22 and an electric drill 23; an electric telescopic rod 6001 is installed on the movable plug-in block 6; the electric drum 21 is installed on the telescopic end of the electric telescopic rod 6001; an electric push rod 22 is installed on the rotating part of the electric drum 21; and the electric drill 23 is installed on the output end of the electric push rod 22.

[0041] The suspension rod installation assembly also includes a placement ring 24; a second electric push rod 22 is installed on the rotating part of the electric drum 21; a placement ring 24 is installed at the output end of the second electric push rod 22; and a funnel-shaped rubber ring 2401 is arranged in the middle of the placement ring 24.

[0042] The boom mounting assembly also includes a mounting frame 25, a clamping plate 26 and an electric base 27; a third electric push rod 22 is mounted on the rotating part of the electric drum 21; the electric push rods 22 are distributed at an angle of ninety degrees; a mounting frame 25 is mounted on the output end of the third electric push rod 22; two clamping plates 26 are arranged on the mounting frame 25 through the electric rotating shaft; an electric base 27 is mounted on the lower side of the mounting frame 25; a clamping structure is arranged inside the electric base 27.

[0043] A protective cover 2301 is installed on the electric drill 23, and the protective cover 2301 is made of a flexible material to prevent dust from flying when drilling.

[0044] A plurality of vertically arranged rubber rollers 2601 are rotatably connected to the opposite sides of the clamping plates 26 on the same mounting frame 25 to reduce the rotational friction with the suspension rod while ensuring the vertical friction.

[0045] The bus duct 1111 has a protruding edge on both the upper and lower sides, which are hereinafter referred to as the upper edge and the lower edge.

[0046] Before using the convenient installation device for the built-in bus, install the fully charged power supply 7 on the installation block 2 for power supply, and then carry out the large-area hoisting work of the bus duct 1111. The worker first manually installs the first bus duct 1111 as the initial starting point and positioning reference of the present invention, and then controls the output end of the first electric cylinder 101 to push out and drive the connecting frame 3 to move outward, so that the four running wheels 4 expand outward, and then places the present invention on the top of the first bus duct 1111, and then controls the output end of the first electric cylinder 101 to contract, so that the four running wheels 4 are stuck on the upper edge of the bus duct 1111. At this time, the state is as follows Figure 1 shown.

[0047] Then, the motor 102 is controlled to work, driving the walking wheel 4 to rotate, driving the present invention to move rightward on the bus duct 1111. When the right side mounting block 2 and the parts thereon are suspended, as shown in FIG. Fig.11 As shown, the mounting block 2 on the left and the parts thereon are still located on the bus duct 1111; then the second electric cylinder 103 on the left is controlled to push out and drive the pressure plate 5 to move toward the bus duct 1111 until the pressure plate 5 fits the bus duct 1111, and the two pressure plates 5 on the left clamp the bus duct 1111, thereby supporting and fixing the mounting block 2 on the right side of the present invention and the parts thereon on the bus duct 1111; it should be noted that, based on the direction of travel, a counterweight is provided on the mounting block 2 at the rear to prevent the mounting block 2 at the front and the parts thereon from deflecting after being suspended in the air.

[0048] At this time, the two boom installation assemblies move to the predetermined positions; then, the boom installation assemblies are used to drill holes, install expansion bolts and install booms. The detailed process is as follows: workers control the movement of the two movable plug-in blocks 6 on the right mounting block 2 according to the specifications of the front and rear spacing of the boom installation, adjust the front and rear spacing of the boom installation assembly to the same as the required front and rear spacing specifications of the boom, and then control the electric telescopic rod 6001 to adjust the upper and lower positions of the parts thereon, and then the workers insert an expansion screw into all the placement rings 24 from bottom to top; in particular, the rubber ring 2401 is funnel-shaped, which can ensure that the expansion screw does not fall off downward; then place a boom at all the electric bases 27, and control the clamping plate 26 to clamp the upper side of the boom.

[0049] It should be noted that before the installation work begins, the worker can control the two third electric cylinders 104 to push out and adjust the left-right spacing of the two mounting blocks 2 to adapt to different left-right installation spacing specifications of the suspension rod.

[0050] When installing the boom, the boom installation components are as follows: Figure 7 As shown, looking from top to bottom is used as a reference, at this time, the electric drill 23 is located directly below the drilling position, the electric drill 23 is controlled to work, and at the same time, the corresponding electric push rod 22 is controlled to push out and drive the electric drill 23 to move upward to drill holes in the ceiling 2222. After the drilling is completed, the electric push rod 22 is controlled to drive the electric drill 23 to reset downward; it should be noted that during the drilling process of the electric drill 23, the upper side of the flexible protective cover 2301 is in contact with the ceiling 2222 and is gradually compressed, surrounding the drilling position to prevent dust from flying during drilling.

[0051] Then, the electric rotary drum 21 is controlled to rotate 180 degrees clockwise, so that the placement ring 24 drives the expansion screw thereon to be located directly below the drilling position, and then the corresponding electric push rod 22 is controlled to be pushed out to drive the placement ring 24 to move upward, and the upper side of the expansion screw on the placement ring 24 gradually enters the drilled hole, and then the worker drives the expansion screw into the hole thoroughly from bottom to top to fix it; it should be noted that the rubber ring 2401 is funnel-shaped and the expansion screw can move upward normally. After the expansion screw is fixed, the electric push rod 22 is controlled to drive the placement ring 24 to reset downward. At this time, part of the expansion screw is still located in the rubber ring 2401, but when the rubber ring 2401 moves downward, it is subjected to the contact friction from bottom to top to produce an enlarged deformation, and then the rubber ring 2401 can move downward normally and completely separate from the expansion screw.

[0052] Finally, the electric drum 21 is controlled to rotate counterclockwise by 90 degrees so that the hanger on the electric base 27 is aligned with the expansion screw. Then the corresponding electric push rod 22 is controlled to push out and drive the mounting frame 25 to move upward, so that the screw hole on the upper side of the hanger is close to the expansion bolt. At the same time, the electric base 27 is controlled to work and drive the hanger to rotate. The electric push rod 22 continues to drive the mounting frame 25 to move upward, so that the hanger is tightened to the expansion bolt to complete the installation. During the rotation of the hanger, the rubber roller 2601 on the contact surface of the splint 26 and the hanger reduces the rotational friction with the hanger, but ensures the friction in the vertical direction, so that the hanger does not deviate during installation; then the electric push rod 22 is controlled to drive the mounting frame 25 to reset downward, so that the electric base 27 is separated from the lower side of the hanger, and the hanger installation work is completed.

[0053] It should be noted that, after the electric drum 21 rotates multiple times, the electric drill 23, the expansion screws on the placement ring 24 and the suspension rod on the electric base 27 are aligned with the drilling center line 1a one by one to achieve precise positioning.

[0054] The boom is installed by using the boom installation assembly to ensure the accuracy and continuity of the boom installation, avoiding a series of operations such as drilling holes, inserting expansion screws into the holes, and installing the boom. The operations require repeated use and removal of multiple parts and tools, which is extremely inconvenient for workers at heights to operate.

[0055] like Fig.11 As shown, after the suspension rod at this position is installed, the first electric cylinder 101 on the right mounting block 2 is controlled to push out and drive the connecting frames 3 on both sides to move back to each other, so that the gap between the two connecting frames 3 can accommodate the width of the bus duct 1111, and then two workers lift the next bus duct 1111 to the position shown in FIG. Fig.12The preset position is shown, at this time, the left side of the bus duct 1111 is located between the right connecting frame 3, and then the second electric cylinder 103 on the right is controlled to push out and drive the pressure plate 5 to move toward the bus duct 1111, until the two pressure plates 5 on the right are attached to the next bus duct 1111 to form a front and rear clamping, thereby achieving the support and fixation of the next bus duct 1111. In addition, the right walking wheel 4 is clamped on the upper edge of the next bus duct 1111 for support and fixation, thereby moving and positioning the connecting frame 3, the walking wheel 4 and the pressure plate 5, so that the next bus duct 1111 is positioned and aligned with the first bus duct 1111.

[0056] Finally, the worker fixes an L-shaped iron sheet under the above-installed suspension rod to support the lower left side of the next bus duct 1111, and fixes the left side of the next bus duct 1111 to the L-shaped iron sheet by bolts.

[0057] It should be noted that before installing the L-shaped iron sheet, Fig.12 As shown, the two movable plug-in blocks 6 are controlled to move toward each other, so that the two boom mounting assemblies approach the mounting block 2, and then the mounting frame 25 moves away from the installed boom, and then the corresponding electric push rod 22 is controlled to extend to the extreme position, driving the mounting frame 25 to move upward, so that the lower side of the mounting frame 25 is higher than the upper side of the L-shaped iron sheet, avoiding the lower side of the mounting frame 25 from colliding with the subsequently installed L-shaped iron sheet.

[0058] Therefore, the next bus duct 1111 is moved and positioned through the cooperation of the connecting frame 3, the walking wheel 4 and the pressing plate 5, and at the same time the pressing plate 5 fixes and supports the bus duct 1111 to avoid precisely aligning the bus duct 1111 with the screw holes of the L-shaped iron sheet for connection and fixation. Since the bus duct 1111 has a large weight, it is inconvenient for workers to operate it, and the bus duct 1111 may even fall out of their hands, causing safety problems.

[0059] After the left side of the next bus duct 1111 is fixed to the L-shaped iron sheet, all the pressing plates 5 are controlled to reset, and the clamping of the two bus ducts 1111 is released. The present invention continues to move to the right through the walking wheel 4. Fig.13 , move the left mounting block 2 to the original right mounting block 2, that is, the position of the newly installed hanger, and move the right mounting block 2 to the position where the hanger is to be installed on the right side of the next bus duct 1111. Perform the left support and fixation, right hanger installation and related positioning work through the same operations as above, and also install the hanger and L-shaped iron sheet on the right side of the next bus duct 1111 to complete the installation.

[0060] The present invention works continuously by walking on the bus duct 1111, so that the positioning work and the installation work of the bus duct 1111 can be carried out simultaneously, thereby improving convenience and eliminating the need to spend a lot of time on fixed-point measurement and marking, thereby avoiding deviations caused by external factors during measurement and marking, resulting in unevenness between the installed bus ducts 1111, thereby affecting the subsequent connection between the bus ducts 1111.

[0061] Example 2

[0062] On the basis of Example 1, Figure 4-Figure 5 As shown, a placement plate 31 is also included; a placement plate 31 is commonly installed on all the mounting blocks 2; and a connecting net 3101 is arranged in the middle of the placement plate 31.

[0063] When laying the bus duct 1111 over a large area, a large number of installation parts are required. Workers at high places need to carry the installation parts as they move along with the installation position. Carrying a large number of installation parts is extremely inconvenient for movement. Therefore, before starting work, the workers connect the placement plate 31 to the installation block 2, place the parts required for installation on the placement plate 31, and move with the present invention to perform installation work, thereby improving installation mobility. In addition, when the third electric cylinder 104 extends to expand the gap between the two installation blocks 2, the connecting net 3101 in the middle of the placement plate 31 is unfolded to maintain the connection between the two ends of the placement plate 31.

[0064] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit the scope of protection of the present invention. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the essence and scope of the technical solution of the present invention.

Claims

1. A convenient installation device for a built-in busbar, comprising a connection block (1); wherein: It also includes a third electric cylinder (104), a mounting block (2), a movable positioning assembly, a movable plug-in block (6) and a boom mounting assembly; a third electric cylinder (104) is respectively installed on the left and right inner parts of the connecting block (1); each output end of the third electric cylinder (104) is fixedly connected to a mounting block (2); the third electric cylinder (104) is used to drive the mounting block (2) to move; each mounting block (2) is installed with two symmetrically arranged movable positioning assemblies, and the movable positioning assemblies are used to drive the connecting block (1) and the mounting block (2) to move on the bus duct (1111); the right mounting block (2) is plugged with two movable plug-in blocks (6), and a bidirectional push rod is arranged in the mounting block (2), and the bidirectional push rod is used to drive the two movable plug-in blocks (6) to move towards each other; each movable plug-in block (6) is installed with a boom mounting assembly for installing a boom.

2. A convenient installation device for a built-in busbar according to claim 1, characterized in that: The mobile positioning assembly comprises a first electric cylinder (101), a connecting frame (3), a motor (102), a running wheel (4), a second electric cylinder (103) and a pressing plate (5); the first electric cylinder (101) is installed inside the mounting block (2); the output end of the first electric cylinder (101) is fixedly connected to the connecting frame (3); the connecting frame (3) is installed with the motor (102); the output shaft of the motor (102) is fixedly connected to a running wheel (4); the connecting frame (3) is connected to the second electric cylinder (103); The output end of the second electric cylinder (103) is fixedly connected with a pressing plate (5).

3. A convenient installation device for a built-in busbar according to claim 2, characterized in that: A rubber layer is provided on the side of the pressing plate (5) away from the second electric cylinder (103).

4. A convenient installation device for a built-in busbar according to claim 1, characterized in that: A plurality of balls are arranged on the lower side of the mounting block (2).

5. A convenient installation device for a built-in busbar according to claim 1, characterized in that: The boom installation assembly comprises an electric rotary drum (21), an electric push rod (22) and an electric drill (23); an electric telescopic rod (6001) is installed on the movable plug-in block (6); the electric rotary drum (21) is installed at the telescopic end of the electric telescopic rod (6001); an electric push rod (22) is installed on the rotating part of the electric rotary drum (21); and the electric drill (23) is installed at the output end of the electric push rod (22).

6. A convenient installation device for a built-in busbar according to claim 5, characterized in that: The suspension rod installation assembly also includes a placement ring (24); a second electric push rod (22) is installed on the rotating part of the electric rotary drum (21); a placement ring (24) is installed on the output end of the second electric push rod (22); and a funnel-shaped rubber ring (2401) is arranged on the upper side of the placement ring (24).

7. A convenient installation device for a built-in busbar according to claim 6, characterized in that: The boom mounting assembly also includes a mounting frame (25), a clamping plate (26) and an electric base (27); a third electric push rod (22) is mounted on the rotating part of the electric rotary drum (21); the output end of the third electric push rod (22) is mounted with a mounting frame (25); a plurality of clamping plates (26) are arranged on the mounting frame (25) via an electric rotating shaft; and an electric base (27) is mounted on the lower side of the mounting frame (25).

8. A convenient installation device for a built-in busbar according to claim 5, characterized in that: A protective cover (2301) is installed on the electric drill (23), and the protective cover (2301) is made of a flexible material.

9. A convenient installation device for a built-in busbar according to claim 7, characterized in that: A plurality of rubber rollers (2601) arranged vertically are rotatably connected on opposite sides of the clamping plates (26) on the same mounting frame (25).

10. A convenient installation device for a built-in busbar according to claim 9, characterized in that: It also includes a placement plate (31); all the installation blocks (2) are commonly mounted with a placement plate (31) for placing installation parts; a connection net (3101) is arranged in the middle of the placement plate (31).

Citation Information

Patent Citations

  • Pipe material drilling device for erecting communication tower

    CN107552837A

  • Bus duct assembly equipment

    CN112809377A

  • Insulation bus duct positioning installation equipment

    CN118100056A

  • Bus bar pulling mechanism

    CN211728282U

  • Rapid installation structure of bus duct

    CN217692553U