Electrical load uninterrupted switching system and cross-region power transmission charging method and device

Through the uninterrupted electrical load switching system and cross-regional transmission billing method, the power consumption interruption caused by weak power infrastructure in the power supply area is solved, and uninterrupted power supply and economical cross-regional billing are achieved.

CN118889413APending Publication Date: 2024-11-01HEPU ENERGY ENVIRONMENTAL TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411190265.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The weak power infrastructure between different power supply areas leads to planned power outages during maintenance and maintenance, resulting in interruption of power consumption and economic losses, and it is difficult for the existing technology to achieve uninterrupted power switching and cross-regional billing.

Method used

The electrical load uninterrupted switching system is adopted, including a transmission switch unit, a high-voltage bypass unit and a switching switch unit. It is charged through a high-voltage bypass unit and provides uninterrupted power supply when the main bus is powered off, realizing the switching of cross-region transmission bus lines, combined with Cross-region power transmission billing method and device record switch operation time, determine cross-region power consumption information and billing.

Benefits of technology

Uninterrupted power supply between different power supply areas is achieved, economic losses caused by planned power outages are avoided, and the economic and stability of the power system is ensured through cross-regional billing methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889413A_ABST
    Figure CN118889413A_ABST
Patent Text Reader

Abstract

The embodiment of the invention discloses an electrical load uninterrupted switching system, a cross-region power transmission charging method and a cross-region power transmission charging device, belongs to the technical field of electric power, and can realize uninterrupted power supply switching of an electrical load end of a cross-region power transmission bus among different power supply regions. The system comprises a power transmission switch unit which is connected with a first high-voltage main bus and a second high-voltage main bus and is also connected with an electrical load end; the high-voltage bypass unit is connected with the first high-voltage main bus and the second high-voltage main bus and is used for charging through at least one of the first high-voltage main bus and the second high-voltage main bus; and the change-over switch unit is connected with the high-voltage bypass unit and is also connected with the electrical load end.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This document relates to the field of electric power technology, and in particular to an uninterrupted switching system for electrical loads, and a method and device for billing inter-regional power transmission. Background Art

[0002] With the development of inter-regional cooperation and the construction of power infrastructure, it is becoming increasingly important to carry out power supply cooperation activities in areas near regional boundaries between different power supply areas, so that the power systems in different power supply areas can support each other and jointly ensure the stability of electricity consumption for production and life in areas near the boundaries between different power supply areas.

[0003] At present, the power system often transmits electricity to the power load end of the power supply area through the high-voltage main busbar. The main busbar is usually equipped with a complete maintenance and overhaul plan, which requires planned power outages in the power supply area. However, the power infrastructure near the regional boundaries between different power supply areas (remote areas) is usually weak, and there are few self-provided redundant lines in the region. Planned power outages cause long-term operation interruptions to the power equipment used in production and life in the power supply area, which is likely to cause large regional economic losses. Summary of the invention

[0004] The purpose of the embodiments of this specification is to provide an uninterruptible switching system for electrical loads, a method and device for cross-regional power transmission billing, so as to avoid regional power supply interruptions caused by planned power outages in remote power supply areas due to maintenance and overhaul tasks, and thereby achieve uninterrupted switching of power supply to the load end of the cross-border (cross-regional) transmission bus between different power supply areas and realize cross-regional billing, thereby improving the stability and reliability of the transmission system.

[0005] In order to achieve the above purpose, the embodiments of this specification adopt the following scheme:

[0006] In a first aspect, an uninterruptible switching system for electrical loads is provided, comprising:

[0007] A power transmission switch unit, connected to the first high-voltage main bus and the second high-voltage main bus and also connected to the power load end, used to connect the first high-voltage main bus or the second high-voltage main bus to the power load end to perform main bus power transmission, the first high-voltage main bus and the second high-voltage main bus both pass through a preset location area between different power supply areas and are high-voltage main buses of power systems in different power supply areas;

[0008] a high-voltage bypass unit connected to the first high-voltage main bus and the second high-voltage main bus, and configured to charge the battery through at least one of the first high-voltage main bus and the second high-voltage main bus;

[0009] a switching switch unit connected to the high-voltage bypass unit and also connected to the power load end, for connecting the high-voltage bypass unit to the power load end to transmit power during the main bus power interruption period before the first high-voltage main bus or the second high-voltage main bus interrupts the main bus power transmission to the power load end;

[0010] In which, the transmission switch unit is also used to disconnect one of the first high-voltage main bus and the second high-voltage main bus whose power transmission is interrupted from the power load end after the high-voltage bypass bus is connected to the power load end, and connect the other main bus to the power load end to restore the main bus power transmission.

[0011] In a second aspect, a power transmission system is provided, comprising:

[0012] The first high-voltage main bus is the high-voltage main bus of the first power system;

[0013] The aforementioned electrical load uninterruptible switching system is connected to the first high-voltage main bus and the second high-voltage main bus and is also connected to the power load end, and is used to disconnect one of the first high-voltage main bus and the second high-voltage main bus from the power load end, and connect the other main bus to the power load end for power transmission;

[0014] Among them, the second high-voltage main bus is the high-voltage main bus of the second power system, the first power system and the second power system belong to different power supply areas, and the first high-voltage main bus and the second high-voltage main bus both pass through preset location areas between different power supply areas.

[0015] In a third aspect, a method for charging inter-regional power transmission is provided, which is applied to a first power system, wherein a first high-voltage main busbar of the first power system passes through a preset location area, and the method comprises:

[0016] Determine the cross-regional power transmission time when the power load end of the second power system switches from the second high-voltage main bus of the second power system to the first high-voltage main bus according to the switch operation time record in the aforementioned electrical load uninterruptible switching system;

[0017] Determining the cross-region power consumption information of the power load end during the cross-region power transmission time according to the record of the power load information of the power load end;

[0018] sending the cross-region electricity consumption information to the second power system;

[0019] Receive inter-regional billing information sent by the second power system, wherein the second power system is used to determine and send the inter-regional billing information based on the inter-regional electricity usage information and the inter-regional transmission price information.

[0020] In a fourth aspect, a method for charging inter-regional power transmission is provided, which is applied to a second power system, wherein a second high-voltage main bus of the second power system passes through the preset location area, and the method comprises:

[0021] Determine the off-grid time of the local area of ​​the second power system when the power load end of the second power system switches from the second high-voltage main bus to the first high-voltage main bus of the first power system according to the switch operation time record in the aforementioned electrical load uninterruptible switching system;

[0022] Receiving power load information of the power load end during the off-grid time in the local area sent by the first power system, wherein the first power system is used to record and send the power load information of the power load end;

[0023] Determine the cross-region power consumption information of the power load terminal during the off-grid time of the local area according to the power load information;

[0024] Determining inter-regional billing information based on the inter-regional electricity consumption information and the inter-regional transmission price information;

[0025] The cross-region billing information is sent to the first power system.

[0026] In a fifth aspect, a cross-regional power transmission billing device is provided, which is applied to a first power system, comprising:

[0027] A first power consumption time determination module is used to determine the cross-region power transmission time of the power load end of the second power system switching from the second high-voltage main bus of the second power system to the first high-voltage main bus according to the switch operation time record in the aforementioned electrical load uninterruptible switching system;

[0028] A first power consumption information determination module, configured to determine the inter-regional power consumption information of the power load end during the inter-regional power transmission time according to the record of the power load information of the power load end;

[0029] A first communication module, configured to send the cross-region power consumption information to the second power system;

[0030] The first communication module is also used to receive inter-regional billing information sent by the second power system, wherein the second power system is used to determine and send the inter-regional billing information based on the inter-regional electricity usage information and the inter-regional transmission price information.

[0031] In the scheme of the embodiment of this specification, the high-voltage bypass unit cooperates with the transmission switch unit and the switching switch unit, so that the high-voltage bypass unit obtains the electric energy provided by the high-voltage main bus for charging, and after the transmission switch unit triggers the main bus transmission interruption, the high-voltage bypass unit continuously supplies power to the power load end, and can realize the switching of the high-voltage main bus in the power supply area where maintenance and overhaul tasks need to be performed in the preset position area to the high-voltage main bus in the power supply area that has not been interrupted in the preset position area, and can also realize the switching from the high-voltage main bus in the power supply area that has not been interrupted in the preset position area back to the high-voltage main bus in the power supply area where the task is completed. The switching system ensures the power supply of the power load end during the entire electrical connection switching process. At the same time, it provides a sustainable and economical transmission architecture foundation for the power systems of various power supply areas.

[0032] In addition, the switch operation time record of the switching system can provide the high-voltage main bus power supply time period information of the power systems in different power supply areas, and obtain the corresponding power consumption information through the cross-regional transmission time and the off-grid time of the power systems in different power supply areas. According to the power consumption information and price information, each power system can determine the cost of cross-regional power consumption, so there is no need to build new redundant high-voltage main buses and supporting equipment such as power management and billing in each power supply area, which has sustainable economy for the power systems in each power supply area.

[0033] Other features and advantages of the embodiments of this specification will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] The drawings described herein are used to provide a further understanding of the present specification and constitute a part of the present specification. The present disclosure is described in the attached drawings in an exemplary rather than limiting manner, and in particular should not constitute the sole limitation or inappropriate limitation of the present specification. In the drawings:

[0035] Figure 1 A schematic diagram of main modules of an exemplary uninterruptible switching system for electrical loads according to an embodiment of this specification;

[0036] Figure 2 A schematic diagram of the main modules of a preferred uninterruptible switching system for electrical loads according to an embodiment of this specification;

[0037] Figure 3 A schematic diagram of the steps of a switching method for an exemplary electrical load uninterruptible switching system according to an embodiment of this specification;

[0038] Figure 4 A schematic diagram of an exemplary uninterruptible power transmission architecture within a preset location area according to an embodiment of this specification;

[0039] Figure 5This is a schematic diagram of the main steps of an exemplary inter-regional power transmission billing method according to an embodiment of this specification;

[0040] Figure 6 This is a schematic diagram of the main steps of an exemplary inter-regional power transmission billing method according to an embodiment of this specification;

[0041] Figure 7 This is a schematic diagram of the main modules of an exemplary inter-regional power transmission billing device according to an embodiment of this specification;

[0042] Figure 8 This is a schematic diagram of the main modules of an exemplary inter-regional power transmission billing device according to an embodiment of this specification. DETAILED DESCRIPTION

[0043] In order to make the purpose, technical solutions and advantages of this specification clearer, the technical solutions of this specification will be clearly and completely described below in combination with the specific embodiments of this specification and the corresponding drawings. It can be understood that the described embodiments are only part of the embodiments of this specification, rather than all the embodiments. Based on the embodiments in this specification, all other embodiments obtained by any modification, equivalent replacement, improvement, etc. made by ordinary technicians in this field without departing from the present disclosure shall fall within the scope of protection of this document.

[0044] As mentioned above, the power infrastructure in the area near the boundary between different power supply areas is relatively weak. Usually, there may be only one main bus in each power supply area in the area near the boundary. Therefore, when performing maintenance and inspection in each power supply area, a planned power outage will be required. In this specification, the nearby area whose distance from the regional boundary is less than the preset distance can be selected as the area near the boundary between different power supply areas, or the location areas of different power supply areas on both sides of the regional boundary can be divided into the same area near the boundary, which can be called cross-border areas, that is, preset location areas between different power supply areas, where the intersection of different power supply areas can be only the regional (inter) boundary, and the preset location area includes a section of the regional boundary.

[0045] The preset location area may include location areas of at least two different power supply areas, and at least one high-voltage main busbar passes through the location area of ​​each power supply area (belonging to the preset location area). For example, Country A borders Country B. When cooperating in power supply, a designated area near a section of the border can be designated as a preset location area. The preset location area includes both the location area of ​​Country A's power supply area and the location area of ​​Country B's power supply area. There is at least one high-voltage main busbar passing through the preset location area in the location area of ​​Country A's power supply area, and there is also at least one high-voltage main busbar passing through the preset location area in the location area of ​​Country B's power supply area. The power supply parameters (voltage, frequency, etc.) of the high-voltage main busbars between the two countries may be different or the same, and may be allocated, managed, and billed by the power systems corresponding to their respective high-voltage main busbars. It can be understood that the preset location areas between power supply areas under other administrative regions or areas such as provinces / states may also refer to similar settings here.

[0046] In order to achieve uninterrupted power transmission switching in the area near the boundary, you can try to set up a direct switching switch in the preset location area, but the high-voltage main bus is usually designed to bear a large power load. The direct switching process will generate voltage fluctuations and impact currents, which will cause damage to equipment in the power grid and further cause power outages, making it difficult to solve the defects of power outages caused by bus switching in the area near the boundary. You can also try to build auxiliary redundant transmission lines separately in the power supply area with planned power outages. However, the area near the boundary is often a remote area. The cost of rebuilding transmission lines and improving power supporting equipment in each power supply area is difficult to bear. Compared with the main bus in each area, the utilization rate of redundant transmission lines is very low. The cost of applying redundant transmission lines and improving power supporting equipment in the aforementioned preset location area is difficult to accept. It is difficult to solve the defects of power outages caused by bus switching in the area near the boundary in remote areas near the boundary.

[0047] In addition, you can also try to use the uninterruptible power supply switching scheme to directly set up an uninterruptible power supply in a power station within a power supply area. When the power supply area needs to perform maintenance and overhaul tasks, the high-voltage main busbar in the power supply area is switched to a line equipped with a transformer and an uninterruptible power supply, and the uninterruptible power supply is used to supply power to the corresponding power load end of the power supply area. However, the high-voltage main busbar is an important unit for daily power transmission and distribution of the power system in the power supply area. The supporting systems such as the energy management system and the power meter reading system of the power system are all dependent on the construction of the high-voltage main busbar. The line equipped with a transformer and an uninterruptible power supply is often used for short-term power support of medium and low voltage equipment, and is not equipped with supporting energy management, distribution and billing functions. Using this line is not only difficult to support for a long time to last until the time required for the planned power outage to be completed, but also easily leads to the difficulty of energy management and distribution of the power load in the power supply area during the planned power outage such as maintenance and overhaul, and the loss of power billing function. Therefore, this switching scheme still finds it difficult to solve the problem of switching the transmission busbar when the power load end is uninterruptedly supplied in the preset location area.

[0048] In view of this, the scheme of this specification provides a scheme of an uninterruptible switching system for electrical loads and a transmission system, a cross-regional transmission billing method and a device, which can utilize the high-voltage main bus, high-voltage bypass unit and various switch units in preset locations between different power supply areas to avoid regional power supply interruptions caused by planned power outages for maintenance and overhaul tasks in remote / weak power infrastructure (a power supply area has only one high-voltage main bus), thereby achieving uninterrupted switching of power supply to the load end of the cross-border regional transmission bus between different power supply areas. There is no need to establish a new power system and its supporting systems such as energy management and power billing, and it does not affect the power supply mode (applicable to both AC and DC) and management mode of power systems in different regions, thereby improving the stability and reliability of the transmission system and having good economic value.

[0049] The technical solutions provided by the embodiments of this specification are described in detail below in conjunction with the accompanying drawings.

[0050] One embodiment of this specification provides an uninterruptible switching system for electrical loads, please refer to Figure 1 , which may include:

[0051] The transmission switch unit 100 is connected to the first high-voltage main bus L1 and the second high-voltage main bus L2 and is also connected to the power load end 400, and is used to connect the first high-voltage main bus L1 or the second high-voltage main bus L2 to the power load end 400 for main bus power transmission. The first high-voltage main bus L1 and the second high-voltage main bus L2 both pass through preset location areas between different power supply areas and are high-voltage main buses of power systems in different power supply areas.

[0052] In the embodiments of this specification, the first high-voltage main bus and the second high-voltage main bus can both be main buses passing through the preset location area. For example, there is a section of national border in the preset location area, the location area south of the section of national border in the preset location area belongs to the power supply area of ​​country A and the first high-voltage main bus passes through the location area south of the section of national border, the location area north of the section of national border in the preset location area belongs to the power supply area of ​​country B and the second high-voltage main bus passes through the location area north of the section of national border; when looking at the corresponding location area here in each country's power supply area separately, there is only one high-voltage main bus, which belongs to the weak area of ​​power infrastructure construction, but as a whole of the preset location area, there will be two high-voltage main buses in the preset location area at the same time, and an uninterrupted switching system is formed through the embodiments of this specification to achieve mutual guarantee of power supply and improve the power experience of residents and producers in the area near the boundary. It should be noted that the high-voltage main bus in the power system has complete power supporting equipment for power transmission, distribution and billing, etc., and can withstand a larger power load for a long time compared with the medium and low voltage side equipment and lines.

[0053] In some possible implementations, the aforementioned transmission switch unit may be a unit for opening and closing the connection between the high-voltage main bus and the power load end. The transmission switch unit may be connected to the first high-voltage main bus and the second high-voltage main bus and also to the power load end, but only one high-voltage main bus is connected to the power load end to avoid problems such as abnormal power distribution and repeated billing for power systems in different regions, so that the transmission switch unit may be used to connect the first high-voltage main bus or the second high-voltage main bus to the power load end. During the main bus transmission period before / after switching, the power distribution and billing of the power load end operate normally in accordance with the regulations or designated methods of each power supply area. The power load end may be the load end of any production and living activity that uses electricity, and may be within the aforementioned preset location area, or may be outside the aforementioned preset location area and within the specified area. The implementation method is not limited in the embodiments of this specification.

[0054] In some possible examples, a transmission switch unit can be formed by two switch units. Figure 1 and Figure 2 , the power transmission switch unit 100 may include: a first switch unit 101, connected to the first high-voltage main bus L1 and also connected to the power load end 400; a second switch unit 102, connected to the second high-voltage main bus L2 and also connected to the power load end 400; wherein, one of the first switch unit 101 and the second switch unit 102 is used to connect the corresponding high-voltage main bus to the power load end for main bus power transmission, and the other switch unit disconnects the corresponding high-voltage main bus from the power load end 400 during uninterrupted main bus power transmission.

[0055] The aforementioned first switch unit 101 may include a load circuit breaker and two disconnectors, and are arranged between the first high-voltage main bus L1 and the power load end 400 in the order of the first disconnector, the load circuit breaker and the second disconnector in the first switch unit 101. The load circuit breaker is located between the two disconnectors, the first disconnector in the first switch unit 101 is located between the first high-voltage main bus L1 and the load circuit breaker, and the second disconnector in the first switch unit 101 is located between the load circuit breaker and the power load end 400. The aforementioned second switch unit 102 may also include a load circuit breaker and two disconnectors, and are arranged between the second high-voltage main bus L2 and the power load end 400 in the order of the first disconnector, the load circuit breaker and the second disconnector in the second switch unit 102. The load circuit breaker is located between the two disconnectors, the first disconnector in the second switch unit 102 is located between the second high-voltage main bus L2 and the load circuit breaker, and the second disconnector in the second switch unit 102 is located between the load circuit breaker and the power load end 400. Figure 2 The components included in the dashed box can be a circuit breaker (a small solid rectangle in the dashed box) and two disconnectors.

[0056] It can be understood that the first switch unit and the second switch unit can also be designed with other devices that meet specific needs, such as protection devices and automatic operation supporting devices, according to application needs and requirements of local power supply areas; the internal components of each switch unit operate together (opening and closing of the isolating switch and opening and closing of the circuit breaker, etc.), which can be implemented in accordance with the power industry specifications and regional requirements; when the isolating switches are closed and the circuit breakers are closed, the corresponding switch units are in a closed state (connection is formed), and when the isolating switches are opened and / or the circuit breakers are opened, the corresponding switch units are in an open state (connection is disconnected); in the embodiments of this specification, each switch unit can be understood as herein.

[0057] In the examples of this manual, please refer to Figure 1 , the aforementioned electrical load uninterruptible switching system may also include:

[0058] The high-voltage bypass unit 200 is connected to the first high-voltage main bus L1 and the second high-voltage main bus L2, and is used for charging through at least one of the first high-voltage main bus L1 and the second high-voltage main bus L2. Figure 1 The middle dotted line indicates that the high-voltage bypass unit is directly connected to each high-voltage main bus without passing through the transmission switch unit.

[0059] In some possible implementations, the aforementioned high-voltage bypass unit may be an electric energy supply unit that can establish a high-voltage bypass connection relative to the connection between the high-voltage main bus and the power load end, and is also a chargeable and dischargeable unit. Since the power supply area in the preset location area that needs to perform tasks such as overhaul and maintenance is a planned power outage, the aforementioned high-voltage bypass unit can be charged through at least one main bus before the task is performed. In order to further reduce the cross-power supply of power systems in different power supply areas, it is preferably possible to use only one main bus for charging, and the aforementioned high-voltage bypass unit can be charged by the high-voltage main bus of the power system in the power supply area where tasks such as overhaul and maintenance need to be performed, so that the high-voltage bypass unit can be used as an electricity terminal during the charging period, and power distribution and billing can be managed in a normal manner in the region. For example, the second high-voltage main bus that is in the power load end transmission period can charge the aforementioned high-voltage bypass unit before tasks such as overhaul and maintenance are required.

[0060] For some possible examples, please combine Figure 1 and Figure 2 , a high-voltage bypass bus L0 (which can be relative to a high-voltage main bus with the same power transmission performance), a power storage unit and a switch unit can be set in the above-mentioned high-voltage bypass unit. The high-voltage bypass unit 200 may include: a third switch unit 201, connected to the first high-voltage main bus L1; a fourth switch unit 202, connected to the second high-voltage main bus L2; ​​a high-voltage bypass bus L0, connected to the third switch unit 201 and also connected to the fourth switch unit 202; a power storage unit, connected to the high-voltage bypass bus L0, for charging through at least one of the third switch unit 201 and the fourth switch unit 202 connected to the high-voltage bypass bus L0; the high-voltage bypass bus L0 is also connected to the power load end 400 through the switching switch unit 300, for connecting the power storage unit to the power load end 400 for power transmission.

[0061] The aforementioned third switch unit 201 may include two disconnectors and a bus tie circuit breaker, and are connected in sequence between the first high-voltage main bus L1 and the high-voltage bypass bus L0 in the order of the first disconnector, the bus tie circuit breaker and the second disconnector in the third switch unit 201, the bus tie circuit breaker is between the two disconnectors, the first disconnector in the third switch unit 201 is located between the first high-voltage main bus L1 and the bus tie circuit breaker, and the second disconnector in the third switch unit 201 is located between the bus tie circuit breaker and the high-voltage bypass bus L0. The aforementioned fourth switch unit 202 may also include two disconnectors and a bus tie circuit breaker, and are connected in sequence between the second high-voltage main bus L2 and the high-voltage bypass bus L0 in the order of the first disconnector, the bus tie circuit breaker and the second disconnector in the fourth switch unit 202, the bus tie circuit breaker is between the two disconnectors, the first disconnector in the fourth switch unit 202 is located between the second high-voltage main bus L2 and the bus tie circuit breaker, and the second disconnector in the fourth switch unit 202 is located between the bus tie circuit breaker and the high-voltage bypass bus L0.

[0062] The aforementioned high-voltage bypass bus L0 can be a bus, but the high-voltage bypass bus L0 can be constructed without the need for additional supporting equipment such as power energy transmission and distribution management and power billing, and can play the role of short-term (relative to the longer planned power outage time for tasks such as inspection and maintenance) power transmission during the main bus power transmission interruption of the main bus, providing a line basis for uninterrupted power transmission bus switching. The aforementioned power storage unit can be a chargeable and dischargeable device with the ability to carry the power load of the high-voltage main bus for a short time, and can obtain electric energy through the aforementioned high-voltage bypass bus L0, and connect the aforementioned high-voltage bypass bus L0 to the power load terminal 400 through the switching switch unit 300 to transmit power to the power load terminal 400.

[0063] The aforementioned power storage unit may preferably include: a fifth switch unit 203, connected to the high-voltage bypass bus L0; a voltage conversion unit 204, connected to the fifth switch unit 203; a battery energy storage unit 205, connected to the voltage conversion unit 204; the fifth switch unit 203 is used to connect the voltage conversion unit 204 to the high-voltage bypass bus L0 before the first high-voltage main bus L1 or the second high-voltage main bus L2 interrupts the main bus power transmission to the power load end 400. The fifth switch unit 203 may include two disconnectors and a bypass circuit breaker, the first disconnector in the fifth switch unit 203 is connected to the high-voltage bypass bus L0, and is also connected to the bypass circuit breaker, the bypass circuit breaker is connected to the second disconnector in the fifth switch unit 203, and the second disconnector in the fifth switch unit 203 is also connected to the voltage conversion unit 204. The voltage conversion unit 204 may preferably be a transformer, and the capacity scale of the battery energy storage unit 205 may be selected and set according to power indicators such as the peak value and average value of the power load in the power supply area within the preset location area and the test results.

[0064] It is understandable that the aforementioned high-voltage bypass unit can also be designed according to the needs and characteristics of the power supply area, and does not need to be implemented completely according to the aforementioned example. For example, the high-voltage bypass unit may include a high-voltage transmission line, a power station at a low altitude within a preset location area, and a water reservoir at a high altitude. The power station may include a water pump, a generator, and a transformer, etc. When the high-voltage bypass unit is charged at the second high-voltage main bus (or the first high-voltage main bus) (no need to associate the planned time of tasks such as overhaul and maintenance, which can be performed during the period of excess power production capacity), the transformer and the water pump in the power station use the charged electric energy to transport water at a low altitude to the water reservoir at a high altitude through the high-voltage transmission line, and before the second high-voltage main bus needs to interrupt power transmission, the water reservoir at a high altitude can be released so that the generator and transformer in the power station generate electric energy with a certain duration of voltage stability, and the high-voltage transmission line is connected to the power load end of the second high-voltage main bus by switching the switch unit, so as to transmit power through the power station and the high-voltage transmission line during the power outage of the second high-voltage main bus.

[0065] In the examples of this manual, please refer to Figure 1 , the aforementioned electrical load uninterruptible switching system may also include:

[0066] The switching switch unit 300 is connected to the high-voltage bypass unit 200 and also to the power load end 400, and is used to connect the high-voltage bypass unit 200 to the power load end 400 before the first high-voltage main bus L1 or the second high-voltage main bus L2 interrupts the main bus power transmission to the power load end 400 to transmit power during the main bus power transmission interruption period; wherein the transmission switch unit 100 is also used to disconnect one of the first high-voltage main bus L1 and the second high-voltage main bus L2 whose power transmission is interrupted from the power load end 400 after the high-voltage bypass bus L0 is connected to the power load end 400, and connect the other main bus to the power load end 400 to restore the main bus power transmission.

[0067] In the embodiment of the present specification, the switching unit 300 may be a unit that switches between the high-voltage main busbar that is about to interrupt the power load end 400 and the high-voltage bypass unit 200. The transmission switch unit 100 performs the main busbar switching, and during the main busbar power transmission interruption, the switching unit 300 may maintain the high-voltage bypass busbar L0 connected to the power load end 400, thereby achieving uninterrupted power supply during the power load end 400 switching the transmission busbar.

[0068] In some possible implementations, the switching switch unit 300 can also be used to disconnect the high-voltage bypass unit 200 from the power load end 400 after the main bus power transmission is restored, so that the management of power transmission, distribution and billing of the power load end 400 is transferred to the power system corresponding to the uninterrupted switching target high-voltage main bus. The switching process is a switch state change, and the power source of the high-voltage bypass unit 200 is the power system of the high-voltage main bus that interrupts power transmission to perform tasks such as inspection and maintenance (already billed by the power system), which can basically support the completion of bus switching in a short time completely through charged power, and the charged power can replace the power supply power of the power system of the high-voltage main bus that interrupts power transmission to perform tasks such as inspection and maintenance, and almost no additional power provided by the power system of the switching target high-voltage main bus will be used.

[0069] For some possible examples, please combine Figure 1 and Figure 2The switching switch unit 300 includes: a sixth switch unit 301, connected to the high-voltage bypass bus L0 and also connected to the power load end 400, used to connect the high-voltage bypass bus L0 to the power load end 400 before the first high-voltage main bus L1 or the second high-voltage main bus L2 interrupts the main bus power transmission to the power load end 400, so as to transmit power to the power load end 400 during the main bus power transmission interruption period through the battery energy storage unit 205. The sixth switch unit 301 may include two disconnectors and a load circuit breaker, the first disconnector in the sixth switch unit 301 may be connected to the high-voltage bypass bus L0 in the high-voltage bypass unit 200 and may also be connected to the load circuit breaker, the load circuit breaker may also be connected to the second disconnector in the sixth switch unit 301, and the second disconnector in the sixth switch unit 301 may also be connected to the power load end 400.

[0070] It should be noted that in order to avoid grid instability caused by the intervention of unexpected switching switch units into the power load end of each power supply area, the aforementioned switching switch unit may include at least two switch units, each of which may be implemented with reference to the sixth switch unit, and the at least two switch units may be connected in series, at least one of the switch units in series is located on one side of the boundary within the preset position area, and at least another switch unit in the switch units in series is located on the other side of the boundary within the preset position area, so that the high-voltage bypass unit can be connected to the power load end only when all the switch units are closed.

[0071] In the embodiments of this specification, in an example of using the aforementioned switching system, please combine Figure 1 and Figure 2 The transmission switch unit 100 can be used to connect the second high-voltage main bus L2 to the power load end 400 for main bus power transmission, and disconnect the first high-voltage main bus L1 from the power load end 400; the third switch unit 201 can be used to disconnect the first high-voltage main bus L1 from the high-voltage bypass bus L0 during uninterrupted main bus power transmission; the fourth switch unit 202 can be used to connect the second high-voltage main bus L2 to the power storage unit via the high-voltage bypass bus L0 for charging before the second high-voltage main bus L2 interrupts the main bus power transmission to the power load end 400.

[0072] The switching unit 300 can be used to connect the high-voltage bypass bus L0 to the power load end 400 after the power storage unit is charged or charged to a specified charge state, so as to transmit power to the power load end 400 through the power storage unit; the transmission switch unit 100 can also be used to disconnect the second high-voltage main bus L2 from the power load end 400 after the high-voltage bypass bus L0 is connected to the power load end 400; the fourth switch unit 202 can also be used to disconnect the second high-voltage main bus L2 from the high-voltage bypass bus L0 after the high-voltage bypass bus L0 is connected to the power load end 400.

[0073] The third switch unit 201 can also be used to connect the first high-voltage main bus L1 to the high-voltage bypass bus L0 to supply power to the high-voltage bypass bus L0 after the connection between the second high-voltage main bus L2 and the high-voltage bypass bus L0 is disconnected; the transmission switch unit 100 can also be used to connect the first high-voltage main bus L1 to the power load end 400 to restore main bus power transmission; the switching unit 300 can also be used to disconnect the high-voltage bypass bus L0 from the power load end 400 after the main bus power transmission is restored.

[0074] In the embodiments of the present specification, the aforementioned uninterruptible switching system for electrical loads can realize the switching of the high-voltage main busbar in the power supply area where maintenance and overhaul tasks need to be performed in the preset location area to the high-voltage main busbar in the power supply area where maintenance and overhaul tasks are not interrupted in the preset location area, and uninterruptedly transmit electricity to the power load end of the power supply area where maintenance and overhaul tasks need to be performed, and can also realize the switching from the high-voltage main busbar in the power supply area where maintenance and overhaul tasks are not interrupted in the preset location area back to the high-voltage main busbar in the power supply area where the task is completed, and uninterruptedly transmit electricity to the power load end. Among them, the first high-voltage main busbar can be the high-voltage main busbar in the power supply area where maintenance and overhaul plans need to be performed, and the second high-voltage main busbar can be the high-voltage main busbar in the power supply area where maintenance and overhaul plans need to be performed, or the first high-voltage main busbar can be the high-voltage main busbar in the power supply area where maintenance and overhaul plans need to be performed, and the second high-voltage main busbar can be the high-voltage main busbar in the power supply area where maintenance and overhaul plans need to be performed.

[0075] It is understandable that each power supply area may have more than one high-voltage main busbar. In the aforementioned switching system, only the first high-voltage main busbar and the second high-voltage main busbar are used as the switching target busbar pair. The influence of other main busbars can be shielded by the switch unit, and the switching target busbar pair that needs to be paid attention to is connected to the aforementioned switching system according to the aforementioned example to perform uninterrupted switching, rather than being limited to only being able to achieve switching between two high-voltage main busbars. In addition, there may be more than two power supply areas in the preset location area. In the aforementioned switching system, only the power supply areas corresponding to the first high-voltage main busbar and the second high-voltage main busbar are used as target area combinations, rather than being limited to only being able to achieve bus switching for uninterrupted power transmission between the two power supply areas in the preset location area. The first high-voltage main busbar and the second high-voltage main busbar in the preset location area have perfect power transmission management and power distribution equipment, and both the first high-voltage main busbar and the second high-voltage main busbar can have power load terminals, rather than being limited to the uninterrupted high-voltage main busbar without power load terminals.

[0076] Each unit in the aforementioned electrical load uninterruptible switching system can be located on one side of the boundary in the preset position area, or distributed on multiple sides of the boundary. The connection in the aforementioned electrical load uninterruptible switching system can be realized by fully automatic operation of the controller, manual operation of some switch units and controller-controlled switch units, or all by manual operation.

[0077] In the embodiments of this specification, the first high-voltage main bus and the second high-voltage main bus are interchangeable. In order to more clearly illustrate the switching connection relationship, the first high-voltage main bus can be a high-voltage main bus in an area where power supply is not interrupted, and the second high-voltage main bus can be a high-voltage main bus in an area where maintenance and overhaul plans are required. On this basis, the embodiments of this specification also provide a switching method for the aforementioned electrical load uninterrupted switching system. Please refer to Figure 1 , Figure 2 and Figure 3 , which may include:

[0078] S1, before switching, determining that the second switch unit 102 in the power transmission switch unit 100 is in a closed state.

[0079] The load circuit breaker in the second switch unit 102 is closed and the corresponding isolating switch is closed, and the second high-voltage main bus L2 is connected to the power load terminal 400 through the second switch unit 102. At this time, the power load terminal 400 is still powered by the second high-voltage main bus L2.

[0080] S2, placing the fourth switch unit 202 in the high-voltage bypass unit 200 in a closed state.

[0081] The bus tie breaker in the fourth switch unit 202 is closed and the corresponding isolating switch is closed, and the second high-voltage main bus L2 is connected to the high-voltage bypass bus L0 in the high-voltage bypass unit 200 through the fourth switch unit 202, so as to charge the power storage unit in the high-voltage bypass unit 200 through the high-voltage bypass bus L0. The high-voltage bypass unit 200 serves as an electricity terminal of the power system corresponding to the second high-voltage main bus L2, and can be managed and billed by the power system corresponding to the second high-voltage bus L2.

[0082] S3, if the power storage unit is fully charged or charged to a specified state of charge, the switching unit 300 is placed in a closed state, the second switch unit 102 in the power transmission switch unit 100 is placed in an open state, and the fourth switch unit 202 in the high-voltage bypass unit 200 is placed in an open state. If the charging is not completed or not charged to the specified state of charge, the switch state of charging in step S2 needs to be maintained until the power storage unit is fully charged or charged to a specified state of charge.

[0083] The load circuit breaker in the sixth switch unit 301 in the switching switch unit 300 is closed and the corresponding isolating switch is closed, the load circuit breaker in the second switch unit 102 is opened and the corresponding isolating switch is disconnected, and the bus tie circuit breaker in the fourth switch unit 202 is opened and the corresponding isolating switch is disconnected. At this time, the high-voltage bypass bus L0 is connected to the power load end 400 through the sixth switch unit 301 for bypass bus power transmission, and the second high-voltage main bus L2 interrupts the main bus power transmission to the power load end 400. Although the power load end 400 is in the period of main bus power transmission interruption, the power load end 400 is continuously powered by the power storage unit through the high-voltage bypass bus L0. The power supply area corresponding to the second high-voltage main bus L2 can start to perform maintenance and overhaul tasks without causing power outages in the power supply area.

[0084] S4, the third switch unit 201 in the high-voltage bypass unit 200 is placed in a closed state, the first switch unit 101 in the power transmission switch unit 100 is placed in a closed state, and the switching switch unit 300 is placed in an open state.

[0085] The bus tie breaker in the third switch unit 201 is closed and the corresponding isolating switch is closed to supply power to the high-voltage bypass bus L0 through the first high-voltage main bus L1. The load breaker in the first switch unit 101 is closed and the corresponding isolating switch is closed, and the first high-voltage main bus L1 is connected to the power load terminal 400 via the first switch unit 101 to restore the main bus power transmission. The load breaker in the sixth switch unit 301 in the switching switch unit 300 is opened and the corresponding isolating switch is disconnected, thereby disconnecting the high-voltage bypass unit 200 from the power load terminal 400 to end the power transmission from the high-voltage bypass bus L0 to the power load terminal 400.

[0086] S5, placing the third switch unit 201 in the high-voltage bypass unit 200 in an off state.

[0087] The bus tie circuit breaker in the third switch unit 201 is opened and the corresponding isolating switch is disconnected, thereby stopping the first high-voltage main bus L1 from charging the power storage unit via the high-voltage bypass bus L0, and ending a main bus switching process.

[0088] Among them, the aforementioned state of charge may be at least greater than or equal to the state of charge corresponding to the electric energy required for uninterrupted power transmission at the power load end from the time when the fourth switch unit is placed in the open state to the time when the third switch unit in the high-voltage bypass unit is placed in the closed state when the switching switch unit is in the closed state. The aforementioned short-term expression may refer to the time length between the moment when the third switch unit in the high-voltage bypass unit is placed in the closed state and the moment when the switching switch unit is placed in the open state, and after the switching switch unit is placed in the open state, the third switch unit in the high-voltage bypass unit may be placed in the open state immediately, so that the power supply time of the first high-voltage main busbar through the high-voltage bypass busbar will be very short, and the power supply energy of the first high-voltage main busbar to the high-voltage bypass busbar relative to the power consumed by the power load end per unit time can be set to be ignored as needed (or calculated when considering the cost), and the power energy of the first high-voltage main busbar to the power load end for main bus transmission can be determined by using the power equipment management and billing of the corresponding power system matched with the first high-voltage main busbar, thereby ensuring both the uninterrupted power supply to the power load end and the economic benefits of the power system are not lost.

[0089] In the embodiments of this specification, the switching method of the aforementioned uninterruptible switching system for electrical loads provides assistance for power management and billing in each power supply area, but it is not the only switching method to achieve uninterrupted power supply. For example, the third switch unit and the fourth switch unit may always have one switch unit connected to the high-voltage bypass bus to maintain the charge state of the power storage unit. In addition, the maintenance and inspection tasks of the power supply area corresponding to the second high-voltage main bus can be completed, and on the basis of the above-mentioned switching, the aforementioned power load end can be switched back to the state where the second high-voltage main bus performs main bus power transmission. Please continue to combine Figure 1 , Figure 2 and Figure 3 , the switching method may further include:

[0090] S6, before switching, determining that the first switch unit 101 in the power transmission switch unit 100 is in a closed state.

[0091] S7, placing the third switch unit 201 in the high-voltage bypass unit 200 in a closed state.

[0092] S8, if the power storage unit is fully charged or charged to a specified state of charge or its state of charge is not lower than a specified state of charge, the switching unit 300 is placed in a closed state, the first switch unit 101 in the transmission switch unit 100 is placed in an open state, and the third switch unit 201 in the high-voltage bypass unit 200 is placed in an open state.

[0093] S9, the fourth switch 202 in the high-voltage bypass unit 200 is placed in a closed state, the second switch unit 102 in the power transmission switch unit 100 is placed in a closed state, and then the switching switch unit 300 is placed in an open state.

[0094] S10, placing the fourth switch unit 202 in the high-voltage bypass unit 200 in an off state.

[0095] The closed state and open state of each switch unit correspond to the opening and closing of its circuit breaker and the opening and closing of the isolating switch, so they will not be described one by one. Thus, uninterrupted switching is realized again. At this time, the power load end switches back to the second high-voltage main bus for main bus transmission. The maintenance and overhaul tasks in the power supply area corresponding to the second high-voltage main bus will not cause power supply interruption to the power load end in the area, and can provide residents and producers with a good power experience in the area near the boundary of different power supply areas.

[0096] An embodiment of the present specification provides a power transmission system under the same inventive concept as the above embodiment, which may include:

[0097] The first high-voltage main bus is the high-voltage main bus of the first power system;

[0098] The aforementioned electrical load uninterruptible switching system is connected to the first high-voltage main bus and the second high-voltage main bus and is also connected to the power load end, and is used to disconnect one of the first high-voltage main bus and the second high-voltage main bus from the power load end, and connect the other main bus to the power load end for power transmission;

[0099] Among them, the second high-voltage main bus is the high-voltage main bus of the second power system, the first power system and the second power system belong to different power supply areas, and the first high-voltage main bus and the second high-voltage main bus both pass through preset location areas between different power supply areas.

[0100] In the embodiments of this specification, the first high-voltage main bus and the second high-voltage main bus, the first power system and the second power system can be replaced with each other. The power transmission system can be constructed and implemented on at least one side of the boundary of the aforementioned preset location area to achieve bus transmission switching for uninterrupted power supply to at least the opposite side. In a possible example, please refer to Figure 4 , a power transmission system 1 may include:

[0101] The first high-voltage main bus L1 is the high-voltage main bus of the first power system;

[0102] The aforementioned electrical load uninterruptible switching system is connected to the first high-voltage main bus L1 and the second high-voltage main bus L2 ( Figure 4 Not shown) and also connected to the power load end ( Figure 4 (not shown) connection, used to disconnect one of the first high-voltage main bus L1 and the second high-voltage main bus L2 from the power load end, and connect the other main bus to the power load end for power transmission;

[0103] Among them, the second high-voltage main bus L2 is the high-voltage main bus of the second power system, the first power system and the second power system belong to the power supply area of ​​country A and the power supply area of ​​country B respectively, the first high-voltage main bus L1 and the second high-voltage main bus L2 both pass through the preset location area B between different power supply areas, and there is a boundary C in the preset location area. The transmission system 1 can provide power to the power load end of the transmission system 2 through the high-voltage bypass bus L0 in the high-voltage bypass unit, so that the second power system and the second high-voltage main bus in the transmission system 2 can perform maintenance and overhaul tasks, and at the same time, it will not cause power interruption in the power supply area of ​​country B in the preset location area B.

[0104] In the embodiments of the present specification, the aforementioned uninterruptible switching system for electrical loads may further include a control unit, which may be used to control the aforementioned switching units to perform switch operations of closing or disconnecting the connections, and may also be used to store the switch operation time records of the aforementioned switching units. The control unit may be implemented by a device having communication, instruction processing, calculation, and storage capabilities. For example, it may be implemented by an electronic device, which includes: at least one processor; a memory connected to the at least one processor; wherein the memory stores instructions that can be executed by the at least one processor, and the at least one processor implements the aforementioned switching, control, and recording and storing methods (of the switch operation time records) of the aforementioned switch units by executing the instructions stored in the memory.

[0105] In the embodiments of the present specification, the preset location area may include a section of the boundary between different power supply areas and the intersection of different power supply areas in the preset location area is the boundary (actually a narrow and long area). The boundary may be a national border, a boundary between administrative regions, a demarcated independent power supply area line, etc. The first power system may be the power system of the power supply area on one side of the boundary, and the second power system may be the power system of the power supply area on the other side of the boundary. Each power system can only read the power meter of the power load end within the power supply area, and the power load end includes not only the power terminal, but also the basic power equipment facilities supporting the power terminal and other power-consuming equipment that is not read. When maintenance and overhaul tasks are required in one power supply area, the power system of the other power supply area after switching does not have the ability to read the power meter of the power load end, and the power supply area on one side that performs maintenance and overhaul tasks does not have the ability to transmit, distribute and manage the off-grid power load end, and it is difficult to analyze the actual load situation of the power load end during the off-grid period, so it is very difficult to complete the metering and billing of power consumption.

[0106] Therefore, in order to realize inter-regional power transmission billing, the embodiment of this specification also provides an inter-regional power transmission billing method, which is applied to a first power system, wherein the first high-voltage main bus of the first power system passes through a preset location area. The first power system can be used to obtain the switch operation time record in the aforementioned electrical load uninterruptible switching system. Figures 1 to 3 as well as Figure 5 , the method may include:

[0107] CR1, based on the switch operation time record in the aforementioned electrical load uninterruptible switching system, determines the cross-regional transmission time when the power load end of the second power system switches from the second high-voltage main bus of the second power system to the first high-voltage main bus.

[0108] In some possible implementations, relative to the power supply area corresponding to the first power system, the inter-regional transmission time may be the time when the power load end of the power system in the non-local power supply area is powered by the high-voltage main bus load of the power system in the local power supply area, for example, the transmission time of the first high-voltage main bus participating in the power supply to the power load end of the second power system. For example, the inter-regional transmission time may include the transmission time of the first high-voltage main bus to the power load end and the transmission time of the first high-voltage main bus to the power load end via the high-voltage bypass bus in the electrical load uninterruptible switching system. The transmission time of the first high-voltage main bus to the power load end via the high-voltage bypass bus in the electrical load uninterruptible switching system may include the transmission time of the first high-voltage main bus in the switching process from the second high-voltage main bus to the first high-voltage main bus and / or the transmission time of the first high-voltage main bus in the switching process from the first high-voltage main bus to the second high-voltage main bus. Based on actual needs such as the size of the power load at the power consumption end, the size of the charging power, and the time required for the uninterrupted power supply of the electrical load uninterrupted switching system, the inter-regional power transmission time may also include the transmission time during charging.

[0109] The first power system and the second power system are power systems in different power supply areas, and the second high-voltage main bus passes through the preset location area, and the preset location area is a location area between different power supply areas corresponding to the first power system and the second power system. The first power system does not need to have the ability to read meters at the power load end of the second power system.

[0110] The electrical load uninterruptible switching system is used to: switch the power load end from the second high-voltage main bus of the second power system to the first high-voltage main bus for cross-regional power transmission; switch the power load end from the first high-voltage main bus back to the second high-voltage main bus for power transmission recovery; and transmit power to the power load end during the main bus power transmission interruption to ensure uninterrupted power supply to the power load end. The internal unit design of the electrical load uninterruptible switching system can refer to the internal unit design in the aforementioned embodiment.

[0111] In some possible examples, the aforementioned switch operation time record can satisfy the required records for determining the transmission time of the first high-voltage main bus to the power load end and (during the switching process) the transmission time of the first high-voltage main bus to the power load end through the high-voltage bypass bus in the electrical load uninterrupted switching system.

[0112] For example, in order to more efficiently represent the switch operation time record in the aforementioned electrical load uninterrupted switching system, the switch operation time record may preferably be represented by a switch state table corresponding to the switch operation time. Taking the switching process as an example, the aforementioned step CR1 may include:

[0113] CR101, during the switching process, according to the switch operation time record of the third switch unit 201 in the high-voltage bypass unit 200 in the aforementioned electrical load uninterruptible switching system being set to the closed connection state, determine the starting time of the transmission time of the first high-voltage main bus L1 to the power load terminal 400 via the high-voltage bypass bus L0 in the electrical load uninterruptible switching system. As shown in the switch state table 1 in the electrical load uninterruptible switching system, the mark 1 indicates the closed connection state, and the mark 0 indicates the disconnected connection state.

[0114] Table 1 Switch status table in the uninterrupted switching system of electrical loads

[0115]

[0116] CR102, during the switching process, according to the switch operation time record of the sixth switch unit 301 in the switching switch unit in the aforementioned electrical load uninterruptible switching system being set to the disconnected state, determine the end time of the transmission time of the first high-voltage main bus L1 to the power load terminal 400 via the high-voltage bypass bus L0 in the electrical load uninterruptible switching system. As shown in the switch state table 2 in the electrical load uninterruptible switching system.

[0117] Table 2 Switch status table in the electrical load uninterrupted switching system

[0118]

[0119] Furthermore, the aforementioned step CR1 may also include:

[0120] CR103, according to the switch operation time record of the first switch unit 101 in the power transmission switch unit 100 in the above-mentioned electrical load uninterruptible switching system being set to the closed connection state, determines the starting time of the power transmission time of the first high-voltage main bus to the power load end. As shown in the switch state table 3 in the electrical load uninterruptible switching system.

[0121] Table 3 Switch status table in the electrical load uninterrupted switching system

[0122]

[0123] CR104, according to the switch operation time record of the first switch unit 101 in the power transmission switch unit 100 in the above-mentioned electrical load uninterruptible switching system being set to the disconnected state, determines the end time of the power transmission time of the first high-voltage main bus to the power load end. As shown in the switch state table 4 in the electrical load uninterruptible switching system.

[0124] Table 4 Switch status table in the electrical load uninterrupted switching system

[0125]

[0126] The above-mentioned inter-regional power transmission time is only a preferred implementation method, which can be designed and selected according to the power supply needs between regions, specific billing details, and test and experimental results. It should be supplemented that the above-mentioned switch status table is not the only limited implementation method, and can also be recorded in the form of data such as logs and texts. The switch status table in the embodiments of this specification can be understood in this way.

[0127] In the embodiment of this specification, the first power system cannot read the power meter of the power load end of the second power system, but the first power system has a high-voltage main bus supporting transmission, distribution and management equipment, which can be used to record the power load information of the power load end of the load. The above-mentioned inter-regional power transmission billing method can also include:

[0128] CR2, based on the record of the power load information of the power load end, determine the cross-region power consumption information of the power load end during the cross-region power transmission time.

[0129] In some possible implementations, this power load information is generated by the power load end under the condition of power transmission by the first high-voltage main bus of the first power system, and this cross-region power information can be the accumulation of the power load end under the condition of power transmission by the first high-voltage main bus of the first power system. For example, the power load information generated by the power load end under the condition of power transmission by the first high-voltage main bus can be recorded through a time-load size curve or a numerical relationship table, and the power load values ​​such as the power load mean / peak / selected characteristic value of the power load end in each unit time segment can be determined, so as to determine the accumulated cross-region power information based on the determined power load value and the number of unit time segments of the cross-region power transmission time. For example, the cross-region power information can include power parameters that meet the requirements such as the total cross-region power consumption and / or the cross-region power consumption range / cross-region power consumption level within the cross-region power transmission time, and the cross-region power consumption information can be represented by a chart or table data.

[0130] In the embodiment of the present specification, the first power system can be used to communicate with the second power system to determine the cross-regional billing information through information exchange. The aforementioned cross-regional power transmission billing method may also include:

[0131] CR3, sending the cross-region power consumption information to the second power system;

[0132] CR4, receiving the inter-regional billing information sent by the second power system, wherein the second power system is used to determine and send the inter-regional billing information based on the inter-regional electricity usage information and the inter-regional transmission price information.

[0133] In some possible implementations, inter-regional power transmission price information may include unit price information of electricity consumption, floating price information corresponding to the range / level of electricity consumption (which can be used as the weight of the unit price information of electricity consumption for price adjustment), etc., and can be designed according to the needs of different power supply areas.

[0134] For example, if the inter-regional electricity consumption information belongs to a specified electricity consumption range in each unit time segment of the inter-regional power transmission time, the inter-regional billing information M1 may be:

[0135] M1=G·F

[0136] In the formula, G is the inter-regional electricity consumption information, and F is the inter-regional transmission price information. The inter-regional transmission price information F can be the adjusted electricity consumption unit price information under the floating price information corresponding to the specified electricity consumption range.

[0137] If the inter-regional electricity consumption information does not belong to a specified electricity consumption range within each unit time segment of the inter-regional power transmission time, the inter-regional billing information M1 may be:

[0138]

[0139] In this formula, i represents the unit time segment (such as 1 minute, 1 hour, 1 day, etc.), N represents the number of unit time segments of inter-regional transmission time, and g i represents the power load value in the i-th unit time segment, f i It represents the inter-regional power transmission price information corresponding to the power load value in the i-th unit time segment. The inter-regional power transmission price information can be the adjusted power consumption unit price information under the floating price information corresponding to the i-th unit time segment. The adjustment can be made on the basis of the cumulative total of the power load values ​​corresponding to the previous i unit time segments.

[0140] It is understandable that the scope of the above cross-regional electricity consumption information can be determined without making a judgment, and the method of accumulating the fees for each unit time segment can be used directly. In addition, according to the actual situation such as application needs and testing, experiment, and use effect, the representation of the above billing information can be changed and adjusted, such as setting a linear adjustment method such as a constant and a multiplier, and introducing the cost impact factor and probability parameter corresponding to the transmission model factors such as the dispatch factor, the transaction factor, and the regional factor to correct the above cross-regional billing information M1.

[0141] The embodiments of this specification also provide a method for charging cross-regional power transmission, which is applied to a second power system, wherein the second high-voltage main bus of the second power system passes through the preset location area. At this time, the second power system may be a power system in the power supply area on the other side of the boundary corresponding to the aforementioned first power system in the power supply area on one side of the boundary within the preset location area. The power transmission scenario can be set with reference to the aforementioned embodiments, wherein the first power system and the second power system are power systems in different power supply areas, and the first high-voltage main bus passes through the preset location area, and the preset location area is a location area between different power supply areas corresponding to the first power system and the second power system; the electrical load uninterruptible switching system is used to switch the power load end from the second high-voltage main bus of the second power system to the first high-voltage main bus for cross-regional power transmission, and to switch the power load end from the first high-voltage main bus back to the second high-voltage main bus for power transmission restoration, and to provide uninterrupted power supply to the power load end during the main bus power transmission interruption.

[0142] The respective implementation methods of the second power system, the uninterruptible switching system for electrical loads, and the first power system, as well as the coordinated switching transmission methods, can be implemented with reference to the aforementioned embodiments and will not be described in detail. The second power system can be used to obtain the switch operation time record in the uninterruptible switching system for electrical loads. Figures 1 to 3 as well as Figure 6 The method may include:

[0143] RC1, based on the switch operation time record in the aforementioned electrical load uninterruptible switching system, determines the off-grid time of the local area when the power load end of the second power system switches from the second high-voltage main bus to the first high-voltage main bus of the first power system.

[0144] In some possible implementations, relative to the power supply area corresponding to the second power system, the aforementioned off-grid time of this area may be the off-grid time when the high-voltage main bus of the power system in this power supply area stops transmitting power to the power load end of the power system in this power supply area. By way of example, the aforementioned off-grid time of this area may include the transmission time of the first high-voltage main bus to the power load end and the transmission time of the first high-voltage main bus to the power load end via the high-voltage bypass bus in the electrical load uninterruptible switching system. The transmission time of the first high-voltage main bus to the power load end via the high-voltage bypass bus in the electrical load uninterruptible switching system may include the transmission time of the first high-voltage main bus during the switching process from the second high-voltage main bus to the first high-voltage main bus and / or the transmission time of the first high-voltage main bus during the switching back from the first high-voltage main bus to the second high-voltage main bus. According to the actual needs such as the size of the power load at the power load end and the size of the charging power, as well as the actual time required for the uninterrupted power supply of the electrical load uninterrupted switching system, if the state of charge is not sufficient to meet the switchback and the first high-voltage main bus is selected to charge the power storage unit, the off-grid time of this area can also include the transmission time during the charging of the first high-voltage main bus. Therefore, the off-grid time of this area can be the same as or different from the aforementioned cross-regional transmission time.

[0145] Taking the switching back process as an example, the aforementioned step RC1 may include:

[0146] RC101, during the switching back process, determines the starting time of the transmission time of the first high-voltage main bus to the power load end according to the switch operation time record of the first switch unit 101 in the power transmission switch unit 100 in the aforementioned electrical load uninterruptible switching system being set to the closed connection state, as shown in the switch state table 5 in the electrical load uninterruptible switching system.

[0147] Table 5 Switch status table in the electrical load uninterrupted switching system

[0148]

[0149] RC102, during the switching back process, determines the end time of the transmission time of the first high-voltage main bus to the power load end according to the switch operation time record of the first switch unit 101 in the power transmission switch unit 100 in the aforementioned electrical load uninterruptible switching system being set to the disconnected state, as shown in the switch state table 6 in the electrical load uninterruptible switching system.

[0150] Table 6 Switch status table in the electrical load uninterrupted switching system

[0151]

[0152] RC103, during the switching back process, according to the switch operation time record of the third switch unit 201 in the high-voltage bypass unit 200 in the aforementioned electrical load uninterruptible switching system being set to the closed connection state, determine the starting time of the transmission time of the first high-voltage main bus L1 to the power load terminal 400 via the high-voltage bypass bus L0 in the electrical load uninterruptible switching system. As shown in the switch state table 7 in the electrical load uninterruptible switching system.

[0153] Table 7 Switch status table in the electrical load uninterrupted switching system

[0154]

[0155] RC104, during the switching back process, according to the switch operation time record of the third switch unit 201 in the high-voltage bypass unit 200 in the aforementioned electrical load uninterruptible switching system being set to the disconnected state, determine the end time of the transmission time of the first high-voltage main bus L1 to the power load terminal 400 via the high-voltage bypass bus L0 in the electrical load uninterruptible switching system. As shown in the switch state table 8 in the electrical load uninterruptible switching system.

[0156] Table 8 Switch status table in the uninterrupted switching system of electrical loads

[0157]

[0158] In the embodiment of this specification, the supporting management system of the second power system is not online during the off-grid time of the area, and it is difficult to determine the load change and size of the power load end during the off-grid time of the area. The power meter reading is difficult to cover the power equipment and cannot reflect the overall load situation of the second high-voltage main bus of the second power system. However, the second power system can be used to communicate with the first power system to determine the power load information during the off-grid time of the area through information exchange. The aforementioned inter-regional power transmission billing method can also include:

[0159] RC2, receiving the power load information of the power load end during the off-grid time in the area sent by the first power system, wherein the first power system is used to record and send the power load information of the power load end.

[0160] In some possible implementations, the power load information can be set with reference to the above-mentioned embodiments. For example, the power load information generated by the power load terminal when the first high-voltage main bus transmits power can be recorded through a time-load size curve or a numerical relationship table.

[0161] In the embodiments of this specification, the implementation methods of cross-regional electricity consumption information, unit time segmentation and cross-regional transmission price information can all be implemented with reference to the above embodiments. The above-mentioned cross-regional transmission billing method can also include:

[0162] RC3, determining the cross-region power consumption information of the power load terminal during the off-grid time of the local area according to the power load information;

[0163] RC4, determining the cross-regional billing information according to the cross-regional electricity consumption information and the cross-regional transmission price information.

[0164] For example, the cross-region charging information M2 may be:

[0165]

[0166] In this formula, j represents a unit time segment (e.g., 1 minute, 1 hour, 1 day, etc.), P represents the number of unit time segments of inter-regional transmission time, and g j represents the power load value in the j-th unit time segment, f j It represents the inter-regional power transmission price information corresponding to the power load value in the j-th unit time segment. The inter-regional power transmission price information can be the adjusted power consumption unit price information under the floating price information corresponding to the j-th unit time segment. The adjustment can be made on the basis of the cumulative total of the power load values ​​corresponding to the first j unit time segments.

[0167] It can be understood that the representation of the above-mentioned billing information can be changed and adjusted according to application needs and actual conditions such as testing, experiments, and usage effects. For example, linear adjustment methods such as constants and multipliers can be set, and cost impact factors and probability parameters corresponding to transmission model factors such as scheduling factors, transaction factors, and regional factors can be introduced to correct the above-mentioned cross-regional billing information M2.

[0168] In the embodiment of the present specification, the second power system can exchange the cross-region billing information to the first power system to complete the determination of the electric energy billing information of the uninterrupted power supply for the first power system. The aforementioned cross-region power transmission billing method may also include:

[0169] RC5, sending the cross-region billing information to the first power system.

[0170] In the embodiments of the present specification, at least one of the aforementioned first power system and the second power system executes the corresponding inter-regional power transmission billing method to determine the inter-regional billing information. In an example that is more conducive to implementation, the same inter-regional power transmission time and the local area off-grid time can be selected, and the aforementioned first power system and the second power system can each determine the inter-regional billing information according to the aforementioned inter-regional power transmission billing method, and the inter-regional billing information determined by the two power systems can be compared. If the difference in inter-regional billing information is too large (|M1-M2|>ε, ε is the cost difference threshold), it can be regarded as at least one power system having a billing anomaly, thereby realizing inter-regional power transmission power cost verification.

[0171] It should be noted that, during the aforementioned switching process and the switching back process, when the conversion between the high-voltage bypass bus and the high-voltage main bus is about to occur, the state conversion between the first switch unit 101 and the third switch unit 201, and the second switch unit 102 and the fourth switch unit 202 is almost instantaneous, and the time required is very small relative to the aforementioned unit time segment (for example, less than ten times, the unit time segment is 1 hour, and the state conversion time is a few seconds or tens of seconds), which will have almost no effect on the setting of the aforementioned start time and end time.

[0172] At the same time, in some preset location areas, the power load is generally small, and when it is not necessary to supply power for a long time from the first high-voltage main bus L1 via the high-voltage bypass bus L0 (relative to the unit time segment), the aforementioned local off-grid time and cross-regional transmission time may not consider the transmission time of the first high-voltage main bus L1 via the high-voltage bypass bus L0 in the electrical load uninterruptible switching system to the power load end 400. However, in other preset location areas, the power load is generally large, and the first high-voltage main bus L1 supplies power for a long time via the high-voltage bypass bus L0, then it is advisable to consider the transmission time of the first high-voltage main bus L1 via the high-voltage bypass bus L0 in the electrical load uninterruptible switching system to the power load end 400 in the aforementioned local off-grid time and cross-regional transmission time.

[0173] The embodiment of this specification also provides an inter-regional power transmission billing device, which is applied to a first power system, such as Figure 7 The inter-regional power transmission billing device 500 may include:

[0174] The first power consumption time determination module 501 is used to determine the cross-region power transmission time of the power load end of the second power system switching from the second high-voltage main bus of the second power system to the first high-voltage main bus according to the switch operation time record in the aforementioned electrical load uninterruptible switching system;

[0175] A first power consumption information determination module 502, configured to determine the inter-regional power consumption information of the power load end during the inter-regional power transmission time according to the record of the power load information of the power load end;

[0176] A first communication module 503, configured to send the cross-region power consumption information to the second power system;

[0177] The first communication module 503 is further used to receive the inter-regional billing information sent by the second power system, wherein the second power system is used to determine and send the inter-regional billing information according to the inter-regional electricity usage information and the inter-regional transmission price information.

[0178] The embodiment of this specification also provides a cross-regional power transmission billing device, which is applied to a second power system, wherein a second high-voltage main bus of the second power system passes through the preset location area, such as Figure 8 The inter-regional power transmission billing device 600 comprises:

[0179] The second power consumption time determination module 601 is used to determine the local off-grid time when the power load end of the second power system switches from the second high-voltage main bus to the first high-voltage main bus of the first power system according to the switch operation time record in the aforementioned electrical load uninterruptible switching system;

[0180] The second communication module 603 is used to receive the power load information of the power load end during the off-grid time in the local area sent by the first power system, wherein the first power system is used to record and send the power load information of the power load end;

[0181] The second power consumption information determination module 602 is used to determine the cross-region power consumption information of the power load terminal during the off-grid time of the local area according to the power load information;

[0182] The second power usage information determination module 602 is further used to determine the inter-regional billing information according to the inter-regional power usage information and the inter-regional power transmission price information;

[0183] The second communication module 603 is further used to send the cross-region billing information to the first power system.

[0184] The hardware of the aforementioned inter-regional power transmission billing device can be implemented using electronic devices, servers and other devices with communication, computing and instruction processing capabilities. A program can be set on the device, and when the program is executed by the device, the corresponding module can be implemented to implement any method / step of the aforementioned embodiment.

[0185] The inter-regional power transmission billing method of the embodiment of this specification is simple and efficient. It does not require the establishment of a unified power grid and supporting systems between different power supply areas, nor does it require the provision of power meter reading authority to the other party. In particular, it can provide residents and producers near the border of the two countries with a good electricity experience and uninterrupted power transmission and energy management and supporting services. At the same time, it also has sustainable economic benefits for the power systems of each power supply area.

[0186] All activities carried out between different power supply areas in this manual must comply with the laws and regulations of the country or administrative region or the provisions of the relevant region, and may be subject to appropriate supervision.

[0187] The processor may also be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it may also be a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or a single-chip microcomputer, a system-on-chip chip, etc. The memory may include but is not limited to phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, read-only compact disc read-only memory (CD-ROM), digital versatile disc (DVD) or other optical storage, magnetic cassettes, magnetic tapes, disk storage or other magnetic storage devices or any other non-transmission media.

[0188] It should also be noted that the aforementioned terms such as first (one), second (one), etc. are only used for distinguishing descriptions and do not indicate limitations such as order and importance. The terms "include", "comprises", or any other variations thereof are intended to cover non-exclusive inclusions, so that a process, method, commodity, or device including elements in the present disclosure includes not only those elements, but also includes the coordination of other elements not explicitly listed, or also includes elements inherent to such process, method, commodity, or device.

[0189] The present invention has been described above with reference to the embodiments of this specification. Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. However, these embodiments are only for illustrative purposes and are not intended to limit the scope of this specification. Without departing from the scope of this disclosure, a person of ordinary skill in the art can make a variety of substitutions and modifications, and these substitutions and modifications should all fall within the scope of this disclosure.

Claims

1. An uninterruptible switching system for electrical loads, characterized in that: include: A power transmission switch unit, connected to the first high-voltage main bus and the second high-voltage main bus and also connected to the power load end, used to connect the first high-voltage main bus or the second high-voltage main bus to the power load end to perform main bus power transmission, the first high-voltage main bus and the second high-voltage main bus both pass through a preset location area between different power supply areas and are high-voltage main buses of power systems in different power supply areas; a high-voltage bypass unit connected to the first high-voltage main bus and the second high-voltage main bus, and configured to charge the battery through at least one of the first high-voltage main bus and the second high-voltage main bus; a switching switch unit connected to the high-voltage bypass unit and also connected to the power load end, for connecting the high-voltage bypass unit to the power load end to transmit power during the main bus power interruption period before the first high-voltage main bus or the second high-voltage main bus interrupts the main bus power transmission to the power load end; In which, the transmission switch unit is also used to disconnect one of the first high-voltage main bus and the second high-voltage main bus whose power transmission is interrupted from the power load end after the high-voltage bypass bus is connected to the power load end, and connect the other main bus to the power load end to restore the main bus power transmission.

2. The uninterruptible switching system for electrical loads according to claim 1, characterized in that: The power transmission switch unit comprises: A first switch unit, connected to the first high-voltage main bus and also connected to the power load end; A second switch unit, connected to the second high-voltage main bus and also connected to the power load end; Among them, one of the first switch unit and the second switch unit is used to connect the corresponding high-voltage main bus to the power load end for main bus power transmission, and the other switch unit disconnects the corresponding high-voltage main bus from the power load end during uninterrupted main bus power transmission.

3. The uninterruptible switching system for electrical loads according to claim 1, characterized in that: The high-voltage bypass unit comprises: A third switch unit, connected to the first high-voltage main bus; a fourth switch unit, connected to the second high-voltage main bus; a high-voltage bypass busbar, connected to the third switch unit and also connected to the fourth switch unit; an electric energy storage unit, connected to the high-voltage bypass bus, and configured to be connected to the corresponding high-voltage main bus through at least one of the third switch unit and the fourth switch unit connected to the high-voltage bypass bus for charging; The high-voltage bypass bus is also connected to the power load end through the switching switch unit, and is used to connect the power storage unit to the power load end for power transmission.

4. The uninterruptible switching system for electrical loads according to claim 1, characterized in that: The switching switch unit is also used to disconnect the high-voltage bypass unit from the power load end after the main bus power transmission is restored.

5. A method for charging inter-regional power transmission, characterized in that: Applied to a first power system, a first high-voltage main busbar of the first power system passes through a preset location area, and the method includes: According to the switch operation time record in the electrical load uninterruptible switching system according to any one of claims 1 to 4, determining the cross-regional power transmission time when the power load end of the second power system switches from the second high-voltage main bus of the second power system to the first high-voltage main bus; Determining the cross-region power consumption information of the power load end during the cross-region power transmission time according to the record of the power load information of the power load end; sending the cross-region electricity consumption information to the second power system; Receive inter-regional billing information sent by the second power system, wherein the second power system is used to determine and send the inter-regional billing information based on the inter-regional electricity usage information and the inter-regional transmission price information.

6. The inter-regional power transmission billing method according to claim 5, characterized in that: in, The inter-regional power transmission time includes the power transmission time of the first high-voltage main bus to the power load end and the power transmission time of the first high-voltage main bus to the power load end via the high-voltage bypass bus in the electrical load uninterrupted switching system.

7. The inter-regional power transmission billing method according to claim 5, characterized in that: in, The first power system and the second power system are power systems in different power supply areas. The second high-voltage main bus passes through the preset location area, and the preset location area is a location area between different power supply areas corresponding to the first power system and the second power system.

8. The inter-regional power transmission billing method according to claim 5, characterized in that: in, The electrical load uninterruptible switching system is used for: Switching the power load end from the second high-voltage main bus of the second power system to the first high-voltage main bus to perform inter-regional power transmission; Switching the power load end from the first high-voltage main bus back to the second high-voltage main bus to restore power transmission; Power is transmitted to the power load end during the main bus power transmission interruption period, so that the power supply to the power load end is uninterrupted.

9. A method for charging inter-regional power transmission, characterized in that: Applied to a second power system, a second high-voltage main busbar of the second power system passes through the preset location area, and the method includes: According to the switch operation time record in the electrical load uninterruptible switching system according to any one of claims 1 to 4, determining the local off-grid time when the power load end of the second power system switches from the second high-voltage main bus to the first high-voltage main bus of the first power system; Receiving power load information of the power load end during the off-grid time in the local area sent by the first power system, wherein the first power system is used to record and send the power load information of the power load end; Determine the cross-region power consumption information of the power load terminal during the off-grid time of the local area according to the power load information; Determining inter-regional billing information based on the inter-regional electricity consumption information and the inter-regional transmission price information; The cross-region billing information is sent to the first power system.

10. An inter-regional power transmission billing device, characterized in that: Applied to the first power system, including: A first power consumption time determination module, for determining the cross-region power transmission time when the power load end of the second power system switches from the second high-voltage main bus of the second power system to the first high-voltage main bus according to the switch operation time record in the electrical load uninterruptible switching system according to any one of claims 1 to 4; A first power consumption information determination module, configured to determine the inter-regional power consumption information of the power load end during the inter-regional power transmission time according to the record of the power load information of the power load end; A first communication module, configured to send the cross-region power consumption information to the second power system; The first communication module is also used to receive inter-regional billing information sent by the second power system, wherein the second power system is used to determine and send the inter-regional billing information based on the inter-regional electricity usage information and the inter-regional transmission price information.