Alternating current power grid robust topology control method and system with injection uncertainty

By considering the worst-case and uncertainty constraint budget of power generation scheduling in the AC power grid, a robust ACOTS model is built, decomposed into master-slave problems, and iteratively solves the existing method's insufficient robustness under injection uncertainty. The problem has achieved cost-effective and efficient power grid operation.

CN118889437APending Publication Date: 2024-11-01GUANGXI POWER GRID CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410815612.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The existing robust topological control methods for AC power grids are difficult to accurately consider the worst case when facing injection uncertainty, resulting in the approximate solution that may produce non-optimal transmission switching solutions, increasing operating costs or making the AC unfeasible.

Method used

By considering the worst case of power generation scheduling method, using uncertainty constraint budget modeling, constructing a robust ACOTS formula, decomposing it into the main problem and two slave problems, and iteratively solving to obtain the optimal robust setpoint and worst case Solution to ensure robustness and economicality of grid topology.

Benefits of technology

Achieving the robust optimal topology obtained in case of injection uncertainty is always AC feasible, reducing power generation costs, reducing inappropriate load reduction and line cutoff, and improving the operating reliability of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889437A_ABST
    Figure CN118889437A_ABST
Patent Text Reader

Abstract

The invention discloses a robust topology control method and system for an AC power grid with injection uncertainty, and relates to the technical field of AC transmission operation planning, and the method comprises the steps: deducing an optimal solution through considering the worst uncertainty condition of a power generation scheduling method, and employing uncertainty constraint budget modeling to balance robustness and conservative property, determining a robust optimal network topology; constructing a robust ACOTS formula and an objective function which aims at minimizing the power generation cost, controlling the number of cut-off lines and reducing improper load reduction; by simplifying a formula and introducing a constraint condition, line switching is processed as a variable, and the formula is formalized into a compact form; and decomposing the model into a master problem and two slave problems, and carrying out iterative solution to obtain an optimal robust set value and a worst case solution, so as to obtain an optimal line state. According to the method, the uncertainty of the worst case is considered, and the problem of injection uncertainty in the day-ahead operation of the power grid is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of AC transmission operation planning, and in particular to an AC power grid robust topology control method and system with injected uncertainty. Background Art

[0002] As the grid shifts toward clean and sustainable energy, a balance needs to be struck between the integration of variable renewable energy sources (RESs) and the assurance of grid flexibility, as the uncertainty of RESs poses challenges to the flexibility of the generation side.

[0003] The main existing approach is optimal transmission switching (OTS), which strategically changes the network topology by selecting line exchanges to enhance the flexibility of the grid. Intrinsic optimization of optimal power flow (OPF) using OTS is beneficial to enhance network topology and generation scheduling, thereby reducing typical day-ahead and hour-ahead operating costs. OTS alleviates line congestion, facilitates the scheduling of cheap generators, and improves the economic operation of the grid. However, deterministic OTS may fall short when faced with injected uncertainties from loads and RESs. Therefore, accurate uncertainty modeling is a prerequisite for the effective use of topological control.

[0004] Distributionally Robust Optimization (DRO) considers uncertain parameters as random variables with unknown probability distributions. DRO considers all potential distributions based on statistical moments and provides robust topology for all distributions. Since DRO considers all possible uncertainty distributions within a fuzzy set, the associated computational burden increases significantly. Another popular uncertainty modeling technique is Robust Optimization (RO), which defines distribution-free bounded intervals for uncertain variables and provides optimal solutions that consider the worst case scenario.

[0005] The effectiveness of OTS depends largely on the accuracy of the power flow equations used. The ACOTS modeling method currently studied is a two-stage decoupled ACOTS model, in which the first stage DCOTS finds the optimal topology and the second stage ACOPF finds the optimal generation plan. However, the above ACOTS model does not consider the impact of injected uncertainty on switching decisions and does not use the RO method, which is not accurate enough. Approximate ACOTS may produce non-optimal transmission exchange schemes, which significantly increase the operating costs of the actual AC network, or in the worst case, lead to AC unfeasibility. Although the feasibility of AC can be restored, the impact of using these approximations on the line exchange benefits of the actual AC power grid needs to be carefully evaluated, which is often overlooked in previous work. Summary of the invention

[0006] In view of the above-mentioned problems, the present invention is proposed.

[0007] Therefore, in order to solve the above technical problems, the present invention provides the following technical solutions: a robust topology control method for an AC power grid with injected uncertainty, comprising: deriving an optimal solution by considering the worst case of uncertainty in a power generation scheduling method, and using uncertainty constraint budget modeling to balance robustness and conservatism to determine a robust optimal network topology;

[0008] Construct a robust ACOTS formulation and an objective function to minimize generation costs, control the number of disconnected lines, and reduce inappropriate load reduction;

[0009] By simplifying the formula and introducing constraints, the line switching is treated as a variable and the formula is reduced to a compact form;

[0010] The model is decomposed into a master problem and two slave problems, which are solved iteratively to obtain the optimal robust setpoint and the worst-case solution to obtain the optimal line state.

[0011] As a preferred solution of the AC power grid robust topology control method with injected uncertainty described in the present invention, wherein: the derivation of the optimal solution includes:

[0012] Determine the uncertainty factors and their worst-case scenarios, and define uncertainty constraints using robust optimization methods;

[0013] Uncertain parameters are modeled using uncertainty constraint budgets. The uncertainty formula associated with node injection is as follows:

[0014]

[0015] Among them, L and R are the load bus set and the bus set for new energy access, respectively. and are the actual active and reactive loads on the ith load bus, P di and Q di are the predicted active and reactive loads on the i-th load bus, is the actual renewable energy active power on the busbar connected to the i-th renewable energy source, P ri is the predicted renewable energy active power on the busbar connected to the i-th renewable energy source, Q ri is the associated new energy reactive power, μ di and μ ri are the relevant deviations of actual active load and renewable energy power generation, and the average value around their respective predicted values ​​is 0; the maximum value of the associated renewable energy reactive power is calculated as follows:

[0016]

[0017] in, For the known μ ri The maximum value of is the maximum capacity of the busbar, Q ri is the upper limit of the reactive power of the renewable energy predicted on the bus connected to the i-th renewable energy source;

[0018] When the load operates at a constant power factor, Q di The deviation is δ i μ di ,

[0019]

[0020] Among them, cosφ i is a constant power factor, δ i is the proportionality coefficient;

[0021] The optimal solution is derived by considering the worst case scenario and a conservative optimal solution is obtained under the worst case scenario.

[0022] As a preferred solution of the AC power grid robust topology control method with injected uncertainty described in the present invention, wherein: the determining of the robust optimal network topology includes:

[0023] Define the range of uncertain parameters in robust optimization. The range of uncertainty set is:

[0024]

[0025] Among them, U is all possible injection uncertainty situations, To be the maximum deviation relative to the respective rated load and RES, under the uncertainty constraint budget, the uncertainty set U is modified as:

[0026]

[0027]

[0028] Among them, μ j is the jth element in the set U, for β j is a binary variable describing the state of the jth uncertain variable, is the possible maximum value of the jth element in the set U, and Z is a set of integers;

[0029] N μ is the range constraint of the uncertain parameter, whose value is between 0 and |U|. μ = 0, the uncertainty set is a single-element set, indicating a deterministic situation;

[0030] When Nμ =|U|, all uncertain parameters are considered and the most conservative solution is obtained;

[0031] When 0 <N μ <|U|, the trade-off between robustness and conservatism of the optimal solution is obtained, and the robust optimal network topology is determined.

[0032] As a preferred solution of the AC power grid robust topology control method with injected uncertainty described in the present invention, wherein: the construction of the robust ACOTS formula includes:

[0033] Construct an objective function to minimize the generation cost and add constraints to control the number of disconnected lines and reduce inappropriate load reduction;

[0034] A robust ACOTS model is established to determine the network topology of the power grid. The calculation formula of the non-deterministic ACOTS model is as follows:

[0035]

[0036] Where μ is the deviation from the rated load and RES, a i and b i is the finite positive cost coefficient of the i-th generator, P gi is the generator power, B is the set of all lines, C switch is a constant selected according to the optimal transmission switching, is the maximum rated power of the (i,j)th line, M is a large M number, ∈ ij is the disjunctive variable, N is the set of all busbars, C curtail is the value of the lost load, P cj is the lost load of the jth busbar, C η is a suitable positive constant, η ij is the apparent power flow on line (i, j);

[0037] Constructing the objective function includes:

[0038] To ensure that at most N z The lines are closed, and the objective function includes the following constraints:

[0039]

[0040] According to the switch state z of the (i,j)th line ij , set ∈ ij Range:

[0041]

[0042] Assume e i +jfi is the voltage vector of the ith bus, and c is defined ii , c ij and ij for:

[0043]

[0044] Among them, f req is the reference angle and its value is 0, c ii is the diagonal element of matrix C, c ij are the off-diagonal elements of matrix C, s ij is the determinant of matrix C;

[0045]

[0046]

[0047] Among them, g ij and b ij are the real and imaginary parts of the line impedance (i, j), t ij is the actual tap ratio, is the corresponding charging admittance, P ij is the switching state of line (i, j) for real power, Q ij is the switching state reactive power of line (i, j), P ji For P ij The switching state of the line (i, j) with opposite power direction has an effect on the real power, Q ji For Q ij The switching state reactive power of the line (i, j) with opposite power direction;

[0048] The actual output power of conventional generators is adjusted according to the respective automatic power generation control actions in the formula. The specific calculation formula is as follows:

[0049]

[0050] in, is the actual output power of the i-th conventional generator when μ≠0, μ j is an element in the set U, G is the set of all buses connected to conventional generators, P gi and ρ i They are the base point output when μ=0 and participation factor respectively;

[0051] According to the defined injection uncertainty model, the active power and reactive power balance equations of the node on the i-th bus are calculated as follows:

[0052]

[0053] Among them, Q gi is the reactive power generation of the first conventional generator, is the shunt impedance at busbar i;

[0054] The actual power load reduction boundary at bus i is:

[0055]

[0056] Among them, P ci is the actual power load reduction at bus i;

[0057] The bus voltage amplitude has a lower limit and an upper limit as follows:

[0058]

[0059] in, is the maximum value of bus voltage amplitude;

[0060] The upper and lower limits of the generator output power are:

[0061]

[0062] in, and are the maximum values ​​of active power and reactive power output by conventional generators respectively;

[0063] η ij is the apparent power flow on line (i, j), with an upper limit of the maximum value Specifically:

[0064]

[0065] in, is the maximum rated power of the (i,j)th line;

[0066] The convex constraints on the forward and reverse apparent power flows are:

[0067]

[0068] Convex constraints on the forward and reverse apparent power flows are used to solve for the convergence of the objective function with respect to the Lagrange multipliers of the constraints.

[0069] As a preferred solution of the AC power grid robust topology control method with injected uncertainty according to the present invention, wherein: the formulating into a compact form includes:

[0070]

[0071] sx m ≤ b

[0072] Ex s +Fx m ≤k

[0073] Cx s +Dμ′=h

[0074] Rx s ≤r

[0075] N E (x s )=0

[0076] N I (x s )≤0

[0077] Among them, x m is a set of variables, x s is a variable set consisting of the variables except μ, and the remaining linear constraints and nonlinear constraints are expressed in compact form. For x s The cost weight coefficient is For x m Cost weight coefficient;

[0078] The corresponding relationships include:

[0079]

[0080] The corresponding relationship of linear constraints is:

[0081]

[0082] Among them, A is the switch state constraint matrix, b is the switch state constraint condition;

[0083]

[0084] Among them, E and F are variables x s and x m The disjunctive constraint coefficient matrix, k is the disjunctive constraint condition;

[0085]

[0086] Among them, C and D are variables x s and μ' power balance coefficient matrix, h is the power balance condition;

[0087]

[0088] Where R is the variable x s The voltage power constraint coefficient matrix, r is the voltage power constraint condition;

[0089] The corresponding relationship of nonlinear constraints is:

[0090]

[0091] Among them, N E For variable x s The voltage vector coefficient, N I For variable x s The apparent power coefficient of x s It consists of the remaining variables except μ′ (which is the uncertain deviation).

[0092] As a preferred solution of the AC power grid robust topology control method with injected uncertainty described in the present invention, the main problem includes:

[0093] Suppose the latest value of the main variable of the main problem is Satisfy

[0094] For fixed The resulting problem is:

[0095]

[0096] Among them, ... is the remaining constraint condition of the compact constraint above;

[0097] In order to remove uncertainty from the equality constraints and capture the effects of uncertainty without approximation, the model is divided into two problems, fixing The Lagrangian function calculation formula of the formula is as follows:

[0098]

[0099] Among them, λ I ≥0,λ E ,ζ≥0,γ E and γ I ≥0 are the Lagrange multiplier vectors of the constraints;

[0100] Iteratively solve the slave problems, the first slave problem solves the deterministic ACOPF, and the second slave problem identifies the worst case, until the difference between the objective functions of the two slave problems is zero;

[0101] set up and μ′ v* are the converged optimal solutions from Problem 1 and Problem 2 in the vth iteration, respectively, where v is a fixed The following is the overall problem and μ′ * The number of convergences of ;

[0102] For fixed The Lagrangian function of the formula is:

[0103]

[0104] In each iteration of the solution process, ψ is updated and couples the master-slave problem;

[0105] In order to speed up the solution process and guide it to optimality, for a fixed and μ′ v* , transform the nonlinear constraints in the first main problem into a linearized form, specifically:

[0106]

[0107] when When solving, the optimal line state value x is obtained m As input from Problem 1

[0108] As a preferred solution of the AC power grid robust topology control method with injected uncertainty described in the present invention, wherein: the secondary problem includes:

[0109] Construct the first slave problem to solve the deterministic AC power flow optimization problem;

[0110] Keeping the line status and uncertain parameters fixed at their latest values, the nonlinear AC power flow optimization problem for a given network topology and uncertain parameters is obtained from Problem 1:

[0111]

[0112]

[0113] Cx s =h-Dμ' * <λ E >

[0114] After the problem converges, we get The optimal value of

[0115] Construct the second slave problem and identify the worst case scenario;

[0116] Get the latest from issue 1 And keeping the line states fixed at their latest values, the Lagrangian function L in the slave problem 2 relative to the master problem is obtained as:

[0117] max μ'∈U' t T μ'+α *

[0118]

[0119] Among them, t and α * is a fixed coefficient, and Fixed to the latest value in slave issue 1 and master issue;

[0120] From Problem 2, the goal is to maximize μ′.

[0121]

[0122] If βj=0, then μ=0;

[0123] From Problem 2, we get μ′ * (worst case value), we solve the problem again from Problem 1 with fixed and μ′ * of

[0124] When we get from question 1 Then, from question 2 and Under fixed conditions, μ′ is solved until the entire slave problem converges. When the absolute difference between the objectives of the two slave problems is equal to 0, μ′ reaches the worst-case value and the optimal line state is obtained.

[0125] Another object of the present invention is to provide an AC power grid robust topology control system with injected uncertainty. To solve the above technical problems, the present invention provides the following technical solutions: an AC power grid robust topology control system with injected uncertainty, comprising: a data acquisition module, an uncertainty modeling module, an objective function construction module, a constraint processing module, and a solution iteration module;

[0126] The data acquisition module is responsible for acquiring required data from the power grid system;

[0127] The uncertainty modeling module is used to establish a mathematical model of the AC power grid robust topology control problem with injected uncertainty based on the collected data;

[0128] The objective function building module is used to build the objective function of the optimization problem, with the goal of minimizing the power generation cost, controlling the number of cut-off lines and reducing inappropriate load reduction, and considering the influence of uncertain factors;

[0129] The constraint processing module is used to process various constraints in the problem, including line state constraints, power balance constraints, voltage constraints, etc., and convert the constraints into mathematical forms so as to be optimized and solved together with the objective function;

[0130] The solution iteration module is used to solve the established optimization problem by iterative algorithm, and solves the main problem and the slave problem by continuous iteration until convergence to obtain the optimal robust optimal network topology and the worst-case solution.

[0131] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and is characterized in that when the processor executes the computer program, the steps of the AC power grid robust topology control method with injected uncertainty as described above are implemented.

[0132] A computer-readable storage medium stores a computer program thereon, wherein when the computer program is executed by a processor, the steps of the AC power grid robust topology control method with injected uncertainty as described above are implemented.

[0133] The beneficial effects of the present invention are as follows: it is robust to a given set of day-ahead uncertainties, takes into account the uncertainty of the worst case, provides an optimal dispatching point for conventional generators based on the optimal topology of the first stage, makes the grid topology and the generator set point unaffected by the uncertainty injection, and solves the problem of injected uncertainty in the day-ahead operation of the grid; unlike the previous ACOTS formula, the formula proposed in this paper does not rely on the approximation of any power flow equation, so the obtained robust optimal topology is always AC feasible. BRIEF DESCRIPTION OF THE DRAWINGS

[0134] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0135] Figure 1 This is a schematic diagram of the structure of a terminal in the first embodiment of the present invention;

[0136] Figure 2 It is a schematic diagram of a flow chart in the first embodiment of the present invention;

[0137] Figure 3 FIG. 4 is a schematic diagram of the structure of a computer device in a third embodiment of the present invention.

[0138] Figure 4 It is an iterative flow chart in the first embodiment of the present invention; DETAILED DESCRIPTION

[0139] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0140] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0141] Example 1

[0142] Reference Figure 1 , which is an embodiment of the present invention, provides an AC power grid robust topology control method with injected uncertainty.

[0143] First, the AC power grid robust topology control method with injected uncertainty provided in this application can be applied to Figure 1 In the terminal shown. Figure 1 As shown, the terminal may include one or two ( Figure 1 Only one is shown in the figure) processor and memory for storing data, wherein the processor may include but is not limited to a processing system such as a microprocessor MCU or a programmable logic device FPGA. The above terminal may also include a transmission device and an input and output device for communication functions. It can be understood by ordinary technicians in this field that Figure 1 The structure shown is only for illustration and does not limit the structure of the above terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations shown.

[0144] The memory can be used to store computer programs, such as the computer program corresponding to the robust topology control method for AC power grid injected with uncertainty in this embodiment. The processor executes various functional applications and data processing by running the computer program stored in the memory, that is, implementing the above method. The memory may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage systems, flash memory, or other non-volatile solid-state memory. In some instances, the memory may further include a memory remotely arranged relative to the processor, and these remote memories may be connected to the terminal via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0145] The transmission device is used to receive or send data via a network. The above-mentioned network includes a wireless network provided by a communication provider of the terminal. In one example, the transmission device includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device can be a radio frequency (Radio Frequency, referred to as RF) module, which is used to communicate with the Internet wirelessly.

[0146] like Figure 2 As shown, the embodiment of the present invention provides an AC power grid robust topology control method with injected uncertainty, and the method is applied to Figure 1 The terminal in is used as an example to illustrate, including the following steps:

[0147] S1: The optimal solution is derived by considering the worst-case uncertainty, and uncertainty constraint budget modeling is used to balance robustness and conservatism to determine the robust optimal network topology.

[0148] S1.1: Determine the uncertainty factors and their worst-case scenarios, and define uncertainty constraints using robust optimization methods;

[0149] In order to reduce conservatism, an uncertainty constraint budget is used to model the uncertain parameters. The uncertainty formula related to node injection is as follows:

[0150]

[0151] Among them, L and R are the load bus set and the bus set for new energy access, respectively. and are the actual active and reactive loads on the ith load bus, P di and Q di are the predicted active and reactive loads on the i-th load bus, is the actual renewable energy active power on the busbar connected to the i-th renewable energy source, P ri is the predicted renewable energy active power on the busbar connected to the i-th renewable energy source, Q ri is the associated new energy reactive power, μ di and μ ri are the relevant deviations of actual active load and renewable energy power generation, and the average value around their respective predicted values ​​is 0; the maximum value of the associated renewable energy reactive power is calculated as follows:

[0152]

[0153] in, For the known μ ri The maximum value of is the maximum capacity of the busbar, is the upper limit of the reactive power of the renewable energy predicted on the bus connected to the i-th renewable energy source;

[0154] When the load operates at a constant power factor, Q di The deviation is δ i μ di ,

[0155]

[0156] Among them, cosφ i is a constant power factor, δ i is the proportionality coefficient;

[0157] In robust optimization, uncertainty has the characteristic of being freely distributed in a bounded interval. The optimal solution is derived by considering the worst case scenario, and a conservative optimal solution is obtained in the worst case.

[0158] S1.2: Use the budget model to balance robustness and conservatism and determine the robust optimal network topology;

[0159] For buses without connected loads or new energy sources, the above formula does not apply when the relevant injection is undefined;

[0160] Since RO needs to have a range of uncertain parameters, The uncertainty set (μ∈U) is defined as the maximum deviation relative to the rated load and RES:

[0161]

[0162] Under the uncertainty constraint budget, the uncertainty set U is modified as follows:

[0163]

[0164]

[0165] Among them, μ j is the jth element in the set U, for β j is a binary variable describing the state of the jth uncertain variable, is the possible maximum value of the jth element in the set U, and Z is a set of integers;

[0166] N μ is the range constraint of the uncertain parameter, whose value is between 0 and |U|. μ = 0, the uncertainty set is a single-element set, indicating a deterministic situation;

[0167] When Nμ =|U|, all uncertain parameters are considered and the most conservative solution is obtained;

[0168] When 0 <N μ <|U|, the trade-off between robustness and conservatism of the optimal solution is obtained, and the robust optimal network topology is determined.

[0169] S2: Construct a robust ACOTS formula, determine the grid network topology, and construct an objective function to minimize the generation cost, control the number of disconnected lines, and reduce inappropriate load reduction.

[0170] S2.1: Establish a robust ACOTS (AC Optimal Transmission Switching) model and determine the network topology of the power grid.

[0171] S2.2: Construct an objective function to minimize the generation cost and add constraints to control the number of disconnected lines and reduce inappropriate load reduction;

[0172] According to the non-deterministic ACOTS formula, a feasible network topology is determined to cope with all possible scenarios of injected uncertainty, while encouraging more use of the cheapest generator dispatch. Considering the above uncertainty model, the non-deterministic ACOTS formula is given:

[0173]

[0174] Where x represents all variables except μ, μ is the deviation from the respective rated load and RES, a i and b i is the finite positive cost coefficient of the i-th generator, P gi is the generator power, B is the set of all lines, C switch is a constant selected according to the optimal transmission switching, is the maximum rated power of the (i,j)th line, M is a large M number, ∈ ij is the disjunctive variable, N is the set of all busbars, C curtail is the value of the lost load, P cj is the lost load of the jth busbar, C η is a proper positive constant. ij is the apparent power flow on line (i, j);

[0175] The first term of the objective function of the formula is to minimize the power generation cost of conventional generators;

[0176] The second term is to control the number of lines cut, switching transmission lines will result in unserved loads;

[0177] The third term in the formula is therefore to minimize inappropriate load shedding;

[0178] The fourth term in the formula helps the whole formula converge;

[0179] To ensure that at most N z The lines are closed, and the objective function includes the following constraints:

[0180]

[0181] According to the switch state z of the (i,j)th line ij , set ∈ ij Range:

[0182]

[0183] Assume e i +jf i is the voltage vector of the ith bus, and c is defined ii , c ij and ij for:

[0184]

[0185] Among them, f req is the reference angle and its value is 0;

[0186]

[0187] Among them, g ij and b ij are the real and imaginary parts of the line impedance (i, j), t ij is the actual tap ratio, is the corresponding charging admittance, P ij is the switching state of line (i, j) for real power, Q ij is the switching state reactive power of line (i, j), P ji (Q ji ) and P ij (Q ij ) The power direction is opposite. That is, if the line is opened (z ij =1), the power boundary is limited by the above formula. If z ij =0, then ∈ ij Take 0 and The value between , and the active and reactive power flows on the (i, j)th line are zero;

[0188] The actual output power of conventional generators is adjusted to accommodate the uncertainty injection of load and RES generation according to their respective automatic generation control actions in the formula:

[0189]

[0190] in, is the actual output power of the i-th conventional generator when μ≠0, μ j is an element in the set U, G is the set of all buses connected to conventional generators, P gi and ρ i are the base point outputs when μ=0 and participation factor, respectively, where ∑ i∈G ρ i =1;

[0191] According to the defined injection uncertainty model, the active power and reactive power balance equations of the node on the i-th bus are calculated as follows:

[0192]

[0193] Among them, Q gi is the reactive power generation of the first conventional generator, is the shunt impedance at busbar i;

[0194] The actual power load reduction at bus i (i.e., P ci ) is:

[0195]

[0196] The bus voltage amplitude has a lower limit and an upper limit as follows:

[0197]

[0198] in, is the maximum value of bus voltage amplitude;

[0199] The upper and lower limits of the generator output power are:

[0200]

[0201] in, and are the maximum values ​​of active power and reactive power output by conventional generators respectively;

[0202] η ij is the apparent power flow on line (i, j), with an upper limit of the maximum value

[0203]

[0204] in, is the maximum rated power of the (i,j)th line;

[0205] The convex constraints on the forward and reverse apparent power flows are:

[0206]

[0207] These two constraints help to converge the objective function with respect to the Lagrange multipliers of the constraints.

[0208] S3: By simplifying the formula and introducing constraints, line switching is treated as a variable and the formula is reduced to a compact form.

[0209] S3.1: Solve the problem of formula convergence and formulate the model into a compact form for easy solution, including:

[0210] The effectiveness of the ACOTS solution depends largely on the accuracy of the ACOPF equation. Any approximation in the ACOPF equation modeling will significantly affect the optimality and feasibility of the actual AC network switching decision.

[0211] The robust ACOTS formulation does not require any approximation in modeling the ACOPF equations, so the optimal topology derived from the proposed formula is AC feasible;

[0212] In addition, the new constraints in the formulation help the convergence of the proposed solution method, and the uncertainty constraint budget reduces the conservativeness of the optimal robust topology of the formulation;

[0213] Considering the constraints in the above formula, where line switching is a variable, there is a convergence problem, but the last two constraints in the formula increase the ease of convergence to the solution;

[0214] In compact form, the above formula and the budget constraint can also be expressed as:

[0215]

[0216] sx m ≤ b

[0217] Ex s +Fx m ≤k

[0218] Cx s +Dμ′=h

[0219] Rx s ≤r

[0220] N E (x s )=0

[0221] N I (x s )≤0

[0222] Among them, x m is a set of variables, xs is a variable set consisting of the variables except μ, and the remaining linear constraints and nonlinear constraints are expressed in compact form. For x s The cost weight coefficient is For x m Cost weight coefficient;

[0223] The corresponding relationship is:

[0224]

[0225] Linear constraints:

[0226]

[0227] Among them, A is the switch state constraint matrix, b is the switch state constraint condition;

[0228]

[0229] Among them, E and F are variables x s and x m The disjunctive constraint coefficient matrix, k is the disjunctive constraint condition;

[0230]

[0231] Among them, C and D are variables x s and μ' is the power balance coefficient matrix, and h is the power balance condition.

[0232]

[0233] Where R is the variable x s The voltage power constraint coefficient matrix, r is the voltage power constraint condition;

[0234] Nonlinear constraints:

[0235]

[0236] Among them, N E For variable x s The voltage vector coefficient, N I For variable x s The apparent power coefficient of x s It consists of the variables except μ′ (uncertain deviation), and the other letters represent the coefficient matrix of the variables.

[0237] S4: Decompose the model into a master problem and two slave problems, solve them iteratively to obtain the optimal robust setpoint and the worst-case solution, and obtain the optimal line state.

[0238] S4.1: Decompose the robust ACOTS model into a master problem and a slave problem, and define the master problem as a mixed integer linear programming (MILP) problem.

[0239] The main questions include,

[0240] Let the latest value of the complex variable or the main variable of the main problem be Satisfy

[0241] Therefore, in the above ACOTS formula for fixed The resulting problem can be stated as:

[0242]

[0243] where ... are the remaining constraints of the compact constraint above. The formula is the minimum-maximum non-deterministic non-convex ACOPF, and the solution is For the uncertain realization of all constraints in the formula, such as All satisfied;

[0244] It can be noted that this formulation is a stochastic, infinite-dimensional problem, which is computationally intractable;

[0245] Therefore, RO is used to transform it into a finite-dimensional deterministic problem, because the existence of uncertain terms in the equality constraints brings difficulties to the realization of the worst case and also limits the feasible domain;

[0246] Furthermore, removing uncertainties from equality constraints is challenging due to the associated nonlinearities;

[0247] Therefore, to address this issue and capture the impact of uncertainty without approximation, the problem is divided into two subproblems, fixing The Lagrangian function of the formula is:

[0248]

[0249] where, for the worst case implementation, it is relative to x s minimum, maximum relative to μ′∈U′, λ I ≥0,λ E ,ζ≥0,γ E and γ I ≥0 are the Lagrange multiplier vectors of the constraints. In the above formula, the worst case value of μ′ depends on λ E ,λ E and x s To obtain from the problem through sequential iterative solution;

[0250] Iteratively solve the slave problems, the first slave problem solves the deterministic ACOPF, and the second slave problem identifies the worst case, until the difference between the objective functions of the two slave problems is zero;

[0251] set up and μ′ v* are the converged optimal solutions from Problem 1 and Problem 2 in the vth iteration, respectively, where v is a fixed The following is the overall problem ( Figure 1 The yellow shaded area and μ′ * The number of convergences. For a fixed The Lagrangian function of the formula is:

[0252]

[0253]

[0254] Among them, the second formula represents all optimal cuts up to the vth iteration;

[0255] In each iteration of the solution process, ψ is updated and couples the master-slave problem;

[0256] In the proposed formulation, load shedding is considered and no feasibility shedding is required, since both problems are It is always possible.

[0257] In order to speed up the solution process and guide it to optimality, for a fixed and μ′ v* , consider transforming the nonlinear constraints in the master problem given first into a linearized form (using Taylor series), where exist Evaluate at

[0258] The optimal line state value x is obtained m As input from Problem 1

[0259] S4.2: Construct the first slave problem and solve the deterministic ACOPF (AC Optimal Power Flow).

[0260] While keeping the line state and uncertain parameters fixed at their latest values, i.e. and μ′=μ′ * In the case of , the nonlinear ACOPF problem obtained from Problem 1 for a given network topology and uncertain parameters is:

[0261]

[0262] Cxs =h-Dμ' * <λ E >

[0263] After the problem converges, we get The optimal value of .

[0264] S4.3: Construct a second slave problem and identify the worst case scenario;

[0265] Get the latest from issue 1 and keep the line states fixed at their respective latest values,

[0266] like The Lagrangian function L obtained from Problem 2 relative to the main problem is:

[0267] max μ'∈U' t T μ'+α *

[0268]

[0269] Among them, t and α * is a fixed coefficient, and Fixed to the latest value in slave issue 1 and master issue.

[0270] From Problem 2, the objective is to maximize μ′, so

[0271]

[0272] If βj=0, then μ=0.

[0273] Overall convergence of the problem: From Problem 2, we get μ′ * (worst case value), we solve the problem again from Problem 1 with fixed and μ′ * of

[0274] Similarly, from Question 1 we get Then, from question 2 and Under fixed conditions, μ′ is solved until the entire slave problem converges, that is, the absolute difference between the objectives of the two slave problems is theoretically equal to 0, where μ′ reaches the worst-case value and the optimal line state is obtained.

[0275] Example 2

[0276] As an embodiment of the present invention, there is provided an AC power grid robust topology control system with injected uncertainty, comprising: a data acquisition module, an uncertainty modeling module, an objective function construction module, a constraint processing module, and a solution iteration module;

[0277] The data acquisition module is responsible for obtaining the required data from the power grid system;

[0278] The uncertainty modeling module is used to establish a mathematical model of the AC power grid robust topology control problem with injected uncertainty based on the collected data;

[0279] The objective function building module is used to build the objective function of the optimization problem, with the goal of minimizing the power generation cost, controlling the number of cut-off lines and reducing inappropriate load reduction, and considering the influence of uncertain factors;

[0280] The constraint processing module is used to process various constraints in the problem, including line state constraints, power balance constraints, voltage constraints, etc., and convert the constraints into mathematical forms so as to be optimized and solved together with the objective function;

[0281] The solution iteration module is used to solve the established optimization problem by iterative algorithm, and solves the main problem and the slave problem by continuous iteration until convergence to obtain the optimal robust optimal network topology and the worst-case solution.

[0282] For the specific definition of the AC power grid robust topology control system with injected uncertainty, please refer to the definition of the AC power grid robust topology control method with injected uncertainty in the above text, which will not be repeated here. Each module in the above-mentioned AC power grid robust topology control system with injected uncertainty can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0283] Example 3

[0284] Reference Figure 3 , which is the third embodiment of the present invention. Based on the first two embodiments, the embodiment of the present invention provides a computer device, which may be a server, and its internal structure diagram may be as shown in FIG. Figure 3 As shown. The computer device includes a processor, a memory and a network interface connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium.

[0285] The database of the computer device is used to store action detection data. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the steps in any of the above-mentioned sparse tensor operation acceleration method embodiments are implemented.

[0286] Those skilled in the art will understand that Figure 3 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0287] In one embodiment, an embodiment of the present invention provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps in any of the above-mentioned sparse tensor operation acceleration method embodiments are implemented.

[0288] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory may include read-only memory (ROM), magnetic tape, floppy disk, flash memory or optical memory, etc. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).

[0289] Example 4

[0290] As an embodiment of the present invention, a robust topology control method for an AC power grid with injected uncertainty is provided. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments.

[0291] In order to verify the effectiveness of the AC power grid robust topology control method with injected uncertainty, we designed the following experiments:

[0292] Experimental preparation:

[0293] An IEEE RTS-24 power grid system with 24 buses is selected as the experimental object. The system has 38 lines, 17 generators, and a total of 17 nodes.

[0294] In the MATLAB environment, the power grid system is modeled using the MATPOWER tool.

[0295] Set the generator cost coefficient: the value ranges of ai and bi are [10,55] and [0.15,0.3] respectively, and the maximum value of μdi and μri is 0.1.

[0296] Set Nμ to 12, that is, consider 12 worst cases.

[0297] Select Ccurtail=1000, Cswitch=100, Cη=5.

[0298] Implementation process:

[0299] A robust ACOTS model is constructed for the IEEE RTS-24 power grid system to determine the power grid topology. The apparent power flow, generator output power, node power balance and other related quantities are calculated according to the invention formula.

[0300] To model the uncertainty of power generation, the uncertain constrained budget method is adopted, and the uncertainty set U is modified to only consider 12 worst cases.

[0301] The model is decomposed into a main problem and two sub-problems, and the optimal network topology is obtained by iterative solution. First, the main problem is solved to obtain the approximate values ​​of xm and xs, and then sub-problems 1 and 2 are solved respectively until convergence.

[0302] From problem 1, the deterministic ACOPF is solved to obtain the optimal power generation, node voltage, etc.; from problem 2, the worst case is identified to obtain the optimal solution in the worst case.

[0303] The master-slave problem is solved iteratively until the difference between the objective function values ​​of the two slave problems is 0, and the final optimal robust network topology is obtained.

[0304] Table 1 Experimental comparison table:

[0305]

[0306] It can be seen from the above table that compared with the existing methods, the method of the present invention has significant advantages in the following aspects:

[0307] The power generation cost of the method of the present invention is 18,657 U.S. dollars, which is nearly 6% lower than that of the existing method, reflecting better economic benefits.

[0308] The load reduction of the method of the present invention is only 45MW, while that of the existing method is as high as 135MW, which shows that the method can retain the load to the maximum extent and improve the reliability of power supply.

[0309] The method of the present invention cuts off three lines, thereby ensuring power supply reliability and avoiding energy waste caused by excessive cutting off.

[0310] The maximum apparent power of the method of the present invention is 173 MVA, which is lower than 186 MVA of the existing method, and is beneficial to the safe and economical operation of the power grid.

[0311] The reactive power deviation of the method of the present invention is 33 MVar, and the active power deviation is 22 MW, both of which are significantly lower than those of the existing method, proving that the method of the present invention can better suppress power fluctuations.

[0312] In summary, the method of the present invention accurately models the uncertainty of power generation by introducing uncertainty constraint budget, and determines the optimal network topology by adopting the idea of ​​robust optimization. Compared with the existing methods, the method of the present invention shows obvious innovative advantages in reducing operating costs, reducing load reduction, controlling the number of cut-off lines, and suppressing power fluctuations, which fully reflects the effectiveness and practical value of the robust topology control method of AC power grid injected with uncertainty.

[0313] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A robust topology control method for AC power grid with injected uncertainty, It is characterized in that include: The optimal solution is derived by considering the worst-case uncertainty of the generation dispatch method, and the robust optimal network topology is determined by using uncertainty constraint budget modeling to balance robustness and conservatism. Construct a robust ACOTS formulation and an objective function to minimize generation cost, control the number of disconnected lines, and reduce inappropriate load reduction; By simplifying the formula and introducing constraints, the line switching is treated as a variable and the formula is reduced to a compact form; The model is decomposed into a master problem and two slave problems, which are solved iteratively to obtain the optimal robust setpoint and the worst-case solution to obtain the optimal line state.

2. The AC power grid robust topology control method with injected uncertainty according to claim 1, Features: The derivation of the optimal solution includes: Determine the uncertainty factors and their worst-case scenarios, and define uncertainty constraints using robust optimization methods; Uncertain parameters are modeled using uncertainty constraint budgets. The uncertainty formula associated with node injection is as follows: Among them, L and R are the load bus set and the bus set for new energy access, respectively. and are the actual active and reactive loads on the ith load bus, P di and Q di are the predicted active and reactive loads on the i-th load bus, is the actual renewable energy active power on the busbar connected to the i-th renewable energy source, P ri is the predicted renewable energy active power on the busbar connected to the i-th renewable energy source, Q ri is the associated new energy reactive power, μ di and μ ri are the relevant deviations of actual active load and renewable energy power generation, and the average value around their respective predicted values ​​is 0; the maximum value of the associated renewable energy reactive power is calculated as follows: in, For the known μ ri The maximum value of is the maximum capacity of the busbar, is the upper limit of the reactive power of the renewable energy predicted on the bus connected to the i-th renewable energy source; When the load operates at a constant power factor, Q di The deviation is δ i μ di , in, is a constant power factor, δ i is the proportionality coefficient; The optimal solution is derived by considering the worst case scenario and a conservative optimal solution is obtained under the worst case scenario.

3. The AC power grid robust topology control method with injected uncertainty as claimed in claim 2, Features: Determining the robust optimal network topology includes: Define the range of uncertain parameters in robust optimization. The range of uncertainty set is: Among them, U is all possible injection uncertainty situations, To be the maximum deviation relative to the respective rated load and RES, under the uncertainty constraint budget, the uncertainty set U is modified as: Among them, μ j is the jth element in the set U, for β j is a binary variable describing the state of the jth uncertain variable, is the possible maximum value of the jth element in the set U, and Z is a set of integers; N μ is the range constraint of the uncertain parameter, whose value is between 0 and |U|. μ = 0, the uncertainty set is a single-element set, indicating a deterministic situation; When N μ =|U|, all uncertain parameters are considered and the most conservative solution is obtained; When 0 <N μ <|U|, the trade-off between robustness and conservatism of the optimal solution is obtained, and the robust optimal network topology is determined.

4. The AC power grid robust topology control method with injected uncertainty as claimed in claim 3, Features: The construction of the robust ACOTS formula includes, Construct an objective function to minimize the generation cost and add constraints to control the number of disconnected lines and reduce inappropriate load reduction; A robust ACOTS model is established to determine the network topology of the power grid. The calculation formula of the non-deterministic ACOTS model is as follows: Where μ is the deviation from the rated load and RES, a i and b i is the finite positive cost coefficient of the i-th generator, P gi is the generator power, B is the set of all lines, C switch is the constant selected according to the optimal transmission switching, is the maximum rated power of the (i,j)th line, M is a large M number, ∈ ij is the disjunctive variable, N is the set of all busbars, C curtail is the value of the lost load, P cj is the lost load of the jth busbar, C η is a suitable positive constant, η ij is the apparent power flow on line (i, j); Constructing the objective function includes: To ensure that at most N z The lines are closed, and the objective function includes the following constraints: According to the switch state z of the (i,j)th line ij , set ∈ ij Range: Assume e i +jf i is the voltage vector of the ith bus, and c is defined ii , c ij and ij for: Among them, f req is the reference angle and its value is 0, c ii is the diagonal element of matrix C, c ij are the off-diagonal elements of matrix C, s ij is the determinant of matrix C; Among them, g ij and b ij are the real and imaginary parts of the line impedance (i, j), t ij is the actual tap ratio, is the corresponding charging admittance, P ij is the switching state of line (i, j) for real power, Q ij is the switching state reactive power of line (i, j), P ji For P ij The switching state of the line (i, j) with opposite power direction has an effect on the real power, Q ji For Q ij Reactive power of the switching state of the line (i, j) with opposite power direction; The actual output power of conventional generators is adjusted according to the respective automatic power generation control actions in the formula. The specific calculation formula is as follows: in, is the actual output power of the i-th conventional generator when μ≠0, μ j is an element in the set U, G is the set of all buses connected to conventional generators, P gi and ρ i They are the base point output when μ=0 and participation factor respectively; According to the defined injection uncertainty model, the active power and reactive power balance equations of the node on the i-th bus are calculated as follows: Among them, Q gi is the reactive power generation of the first conventional generator, is the shunt impedance at busbar i; The actual power load reduction boundary at bus i is: Among them, P ci is the actual power load reduction at bus i; The bus voltage amplitude has a lower limit and an upper limit as follows: in, is the maximum value of bus voltage amplitude; The upper and lower limits of the generator output power are: in, and are the maximum values ​​of active power and reactive power output by conventional generators respectively; η ij is the apparent power flow on line (i, j), with an upper limit of the maximum value Specifically: in, is the maximum rated power of the (i,j)th line; The convex constraints on the forward and reverse apparent power flows are: Convex constraints on the forward and reverse apparent power flows are used to solve for the convergence of the objective function with respect to the Lagrange multipliers of the constraints.

5. The AC power grid robust topology control method with injected uncertainty as claimed in claim 4, Features: The formulation into a compact form comprises, s.t.Ax m ≤b Ex s +Fx m ≤k Cx s +Dμ′=h Rx s ≤r N E (x s )=0 N I (x s )≤0 Among them, x m is a set of variables, x s is a variable set consisting of the variables except μ, and the remaining linear constraints and nonlinear constraints are expressed in compact form. For x s The cost weight coefficient is For x m Cost weight coefficient; The corresponding relationships include: The corresponding relationship of linear constraints is: Among them, A is the switch state constraint matrix, b is the switch state constraint condition; Among them, E and F are variables x s and x m The disjunctive constraint coefficient matrix, k is the disjunctive constraint condition; Among them, C and D are variables x s and μ' power balance coefficient matrix, h is the power balance condition; Where R is the variable x s The voltage power constraint coefficient matrix, r is the voltage power constraint condition; The corresponding relationship of nonlinear constraints is: Among them, N E For variable x s The voltage vector coefficient, N I For variable x s The apparent power coefficient of x s It consists of the remaining variables except μ′ (which is the uncertain deviation).

6. The AC power grid robust topology control method with injected uncertainty as claimed in claim 5, Features: The main questions include: Suppose the latest value of the main variable of the main problem is Satisfy For fixed The resulting problem is: Among them, ... is the remaining constraint condition of the compact constraint above; In order to remove uncertainty from the equality constraints and capture the effects of uncertainty without approximation, the model is divided into two problems, fixing The Lagrangian function calculation formula of the formula is as follows: Among them, λ I ≥0,λ E ,ζ≥0,γ E and γ I ≥0 are the Lagrange multiplier vectors of the constraints; Iteratively solve the slave problems, the first slave problem solves the deterministic ACOPF, and the second slave problem identifies the worst case, until the difference between the objective functions of the two slave problems is zero; set up and μ′ v* are the converged optimal solutions from Problem 1 and Problem 2 in the vth iteration, respectively, where v is a fixed The following is the overall problem and μ′ * The number of convergences of ; For fixed The Lagrangian function of the formula is: In each iteration of the solution process, ψ is updated and couples the master-slave problem; In order to speed up the solution process and guide it to optimality, for a fixed and μ′ v* , transform the nonlinear constraints in the first main problem into a linearized form, specifically: when When solving, the optimal line state value x is obtained m As input from Problem 1 7. The AC power grid robust topology control method with injected uncertainty as claimed in claim 6, Features: The problems include: Construct the first slave problem to solve the deterministic AC power flow optimization problem; Keeping the line status and uncertain parameters fixed at their latest values, the nonlinear AC power flow optimization problem for a given network topology and uncertain parameters is obtained from Problem 1: Cx s =h-Dμ' * <l E > After the problem converges, we get The optimal value of Build the second slave problem and identify the worst case scenario; Get the latest from issue 1 And keeping the line states fixed at their latest values, the Lagrangian function L in the slave problem 2 relative to the master problem is obtained as: max μ'∈U' t T m'+a * Among them, t and α * is a fixed coefficient, and Fixed to the latest value in slave issue 1 and master issue; From Problem 2, the goal is to maximize μ′. like Then μ′ reaches its maximum value If βj=1, then If βj=0, then μ=0; From Problem 2, we get μ′ * (worst case value), we solve the problem again from Problem 1 with fixed and μ′ * of When we get from question 1 Then, from question 2 and Under fixed conditions, μ′ is solved until the entire slave problem converges. When the absolute difference between the objectives of the two slave problems is equal to 0, μ′ reaches the worst-case value and the optimal line state is obtained.

8. A system using the AC power grid robust topology control method with injected uncertainty as claimed in any one of claims 1 to 7, It is characterized in that include: Data acquisition module, uncertainty modeling module, objective function construction module, constraint processing module, solution iteration module; The data acquisition module is responsible for acquiring required data from the power grid system; The uncertainty modeling module is used to establish a mathematical model of the AC power grid robust topology control problem with injected uncertainty based on the collected data; The objective function building module is used to build the objective function of the optimization problem, with the goal of minimizing the power generation cost, controlling the number of cut-off lines and reducing inappropriate load reduction, and considering the influence of uncertain factors; The constraint processing module is used to process various constraints in the problem, including line state constraints, power balance constraints, voltage constraints, etc., and convert the constraints into mathematical forms so as to be optimized and solved together with the objective function; The solution iteration module is used to solve the established optimization problem by iterative algorithm, and solves the main problem and the slave problem by continuous iteration until convergence to obtain the optimal robust optimal network topology and the worst-case solution.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program. It is characterized in that When the processor executes the computer program, the steps of the robust topology control method for an AC power grid with injected uncertainty are implemented as described in any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the robust topology control method for an AC power grid with injected uncertainty according to any one of claims 1 to 7 are implemented.