Household standby power switching management method, system and device, electronic equipment and storage medium

By detecting the grid recovery status and adjusting the voltage phase of the energy storage inverter, the problem of phase difference in the residential grid during grid recovery after a power outage is solved, enabling a fast and safe switchback to grid-connected status.

CN118889549APending Publication Date: 2024-11-01XIAN XIHE MICRONET TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410916432.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

In distributed home energy usage scenarios, when the grid loses power and is restored, the phase difference within the household grid may cause irreparable damage to the energy storage inverter and load.

Method used

When the household power grid is in a standby state, the recovery status of the main power grid is detected, voltage phase difference information is obtained, and a coordinated adjustment command is broadcast to the energy storage inverter to adjust the voltage phase. After confirming that it is ready, it switches to the grid-connected state to ensure voltage phase synchronization.

Benefits of technology

It improves the efficiency of adjusting the phase difference of the household power grid when the grid is restored after a power outage, increases the safety of switching, and enables a rapid switch from standby power to grid-connected power.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889549A_ABST
    Figure CN118889549A_ABST
Patent Text Reader

Abstract

The invention discloses a household standby power switching management method, system and device, electronic equipment and a storage medium, and the method comprises the steps: detecting the recovery state of a total power grid when the state of a household power grid is a whole-house standby power state, and if the recovery state of the total power grid is represented as recovery, switching the total power grid according to the voltage of the household power grid and the voltage of the total power grid; the method comprises the following steps: acquiring voltage phase difference information, based on the voltage phase difference information, broadcasting and cooperatively sending a first adjustment instruction to each energy storage inverter end in a group manner to adjust a voltage phase, and in response to an adjustment completion instruction sent by each energy storage inverter end, sending a first permission instruction to a user end, and first permission instruction feedback information is received to confirm that the state of the household power grid is switched from the whole house standby power state to the grid-connected state, so that the efficiency of adjusting the phase difference of the household power grid is improved when the power grid recovers from power failure, the state switching safety of the household power grid is improved, and the standby power state is rapidly switched to the grid-connected state.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of computer technology, and in particular to a household backup power switching management method, system, device, electronic device and storage medium. Background Art

[0002] In the distributed household energy usage scenario, a gateway is usually used for energy storage inverter aggregation management, and the grid side is used for power supply. However, when the grid side loses power and then recovers, there is a phase difference in the household power grid. At this time, the phase difference may cause irreparable losses to the energy storage inverter, the load electrically connected to the energy storage inverter, and other household loads in the household power grid. Summary of the invention

[0003] In order to solve the problems of the prior art, the embodiments of the present application provide a household backup power switching management method, system, device, electronic device and storage medium. The technical solution is as follows:

[0004] On the one hand, a household backup power switching management method is provided, and the method is applied to a gateway end, comprising:

[0005] When the household power grid is in a whole-house power standby state, detecting a recovery state of the main power grid;

[0006] If the recovery state of the total power grid is characterized as recovery, obtaining voltage phase difference information according to the voltage of the household power grid and the voltage of the total power grid;

[0007] Based on the voltage phase difference information, broadcasting a coordinated group-sending first adjustment instruction to each energy storage inverter terminal to adjust the voltage phase;

[0008] In response to the adjustment completion instruction sent by each of the energy storage inverter ends, a first permission instruction is sent to the user end, and the first permission instruction feedback information is received to confirm that the household power grid state is switched from the whole-house backup power state to the grid-connected state; the first permission instruction is used to characterize that the backup power switching management system state is in a ready state, and to notify the user end of the instruction to close the main switch of the household power grid.

[0009] Preferably, the method further comprises:

[0010] When the household power grid is in an off-grid backup state, a second permission instruction is sent to the user terminal; the second permission instruction is used to indicate that the backup power switching management system is in a ready state, and to notify the user terminal of an instruction to close the main switch of the household power grid;

[0011] In response to the second permission instruction feedback information sent by the user end, it is determined that the household power grid state is switched from the off-grid backup state to the grid-connected state; the second permission instruction feedback information indicates that the main switch is closed.

[0012] Preferably, when the household power grid is in the whole-house standby state, before detecting the total power grid recovery state, the method further includes:

[0013] The plug discharge information of each of the energy storage inverters is obtained. If the plug discharge information of each of the energy storage inverters is characterized as discharge, it is determined that the household power grid state is a whole-house standby power state.

[0014] Preferably, when the household power grid is in an off-grid standby state, before sending the second permission instruction to the user terminal, the method further includes:

[0015] Obtain the plug discharge information of each of the energy storage inverters; if the plug discharge information of each of the energy storage inverters is characterized by no discharge and no power supply, determine that the household power grid state is an off-grid standby power state.

[0016] On the other hand, a household backup power switching management method is provided, which is applied to an energy storage inverter, and includes:

[0017] Acquire the first adjustment instruction;

[0018] Obtaining the voltage phase difference;

[0019] According to the voltage phase difference, the plug discharge voltage of the energy storage inverter is adjusted until no voltage phase difference is generated.

[0020] On the other hand, a household backup power switching management system is provided, the system comprising a main power grid, a plurality of power grid branches, a gateway, a plurality of energy storage inverters, and a plurality of loads;

[0021] The gateway is electrically connected to the main power grid, and a plurality of the power grid branches are connected to the main power grid based on circuit switches;

[0022] The plurality of energy storage inverters include a first energy storage inverter, a second energy storage inverter, and a third energy storage inverter;

[0023] The plurality of power grid branches include a first power grid branch, a second power grid branch, and a third power grid branch, and the first power grid branch, the second power grid branch, and the third power grid branch are connected in parallel to the main power grid;

[0024] The first grid branch is electrically connected to the first energy storage inverter through a socket, the second grid branch is electrically connected to the second energy storage inverter through a socket, and the third grid branch is electrically connected to the third energy storage inverter through a socket;

[0025] The plurality of loads include a first load and a second load, the first load is electrically connected to the first energy storage inverter through a plug, and the second load is electrically connected to the third energy storage inverter through a plug;

[0026] The gateway is communicatively connected to the first energy storage inverter, the gateway is communicatively connected to the second energy storage inverter, and the gateway is communicatively connected to the third energy storage inverter.

[0027] On the other hand, a household backup power switching management device is provided, the device comprising:

[0028] A detection module, used for detecting the recovery state of the main power grid when the state of the household power grid is the whole-house backup power state;

[0029] A voltage phase difference information acquisition module, configured to obtain voltage phase difference information according to the voltage of the household power grid and the voltage of the total power grid if the recovery state of the total power grid is characterized as recovery;

[0030] A broadcast module, configured to broadcast a coordinated group-send first adjustment instruction to each energy storage inverter terminal to adjust the voltage phase based on the voltage phase difference information;

[0031] The first switching module is used to send a first permission instruction to the user end in response to the adjustment completion instruction sent by each of the energy storage inverter ends, and receive the first permission instruction feedback information to confirm that the household power grid state is switched from the whole-house backup power state to the grid-connected state.

[0032] Furthermore, the device also includes:

[0033] A second permission instruction sending module is used to send a second permission instruction to the user terminal when the state of the household power grid is an off-grid backup power state; the second permission instruction is used to indicate that the state of the backup power switching management system is a ready state, and to notify the user terminal of an instruction to close the main switch of the household power grid;

[0034] The second permission instruction response module is used to determine that the household power grid state is switched from the off-grid backup state to the grid-connected state in response to the second permission instruction feedback information sent by the user end; the second permission instruction feedback information indicates that the main switch is closed.

[0035] Furthermore, the device also includes:

[0036] The first household power grid state determination module is used to obtain the plug discharge information of each of the energy storage inverters. If the plug discharge information of each of the energy storage inverters is characterized as discharge, it is determined that the household power grid state is a whole-house standby power state.

[0037] Furthermore, the device also includes:

[0038] The second household power grid state determination module is used to obtain the plug discharge information of each of the energy storage inverters; if the plug discharge information of each of the energy storage inverters is characterized by no discharge and no power supply, then determine that the household power grid state is an off-grid standby power state.

[0039] Furthermore, the device also includes:

[0040] A first adjustment instruction acquisition module, used to acquire the first adjustment instruction;

[0041] A voltage phase difference acquisition module, used to acquire the voltage phase difference;

[0042] The voltage phase difference adjustment module is used to adjust the plug discharge voltage of the energy storage inverter according to the voltage phase difference until no voltage phase difference is generated.

[0043] On the other hand, a computer-readable storage medium is provided, in which at least one instruction or at least one program is stored, and the at least one instruction or the at least one program is loaded and executed by a processor to implement a household backup power switching management system method as described in any of the above aspects.

[0044] On the other hand, an electronic device is provided, comprising a processor and a memory, wherein the memory stores at least one instruction or at least one program, and the at least one instruction or the at least one program is loaded and executed by the processor to implement a household backup power switching management system method as described in any of the above aspects.

[0045] On the other hand, a computer program is provided, which, when executed by a processor, implements a household backup power switching management system method as described in any of the above aspects.

[0046] The household backup power switching management method in the present application detects the recovery state of the total power grid when the household power grid is in the whole-house backup power state. If the recovery state of the total power grid is characterized as recovery, voltage phase difference information is obtained according to the voltage of the household power grid and the voltage of the total power grid. Based on the voltage phase difference information, a first adjustment instruction is broadcasted to each energy storage inverter end to adjust the voltage phase. In response to the adjustment completion instruction sent by each energy storage inverter end, a first permission instruction is sent to the user end, and the first permission instruction feedback information is received to confirm that the household power grid state is switched from the whole-house backup power state to the grid-connected state, so as to improve the efficiency of adjusting the household power grid phase difference when the power grid is restored after power failure, increase the safety of household power grid state switching, and quickly switch from the backup power state to the grid-connected state. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0048] Figure 1 It is a schematic diagram of an implementation environment provided by an embodiment of the present application;

[0049] Figure 2 It is a flowchart of a first household backup power switching management method provided in an embodiment of the present application;

[0050] Figure 3 It is a flowchart of a second household backup power switching management method provided in an embodiment of the present application;

[0051] Figure 4 It is a flowchart of a third household backup power switching management method provided in an embodiment of the present application;

[0052] Figure 5 It is a structural diagram of a household backup power switching management system provided in an embodiment of the present application;

[0053] Figure 6 It is a schematic diagram of the connection structure of an energy storage inverter of a household backup power switching management system provided in an embodiment of the present application;

[0054] Figure 7 It is a structural schematic diagram of a household backup power switching management device provided in an embodiment of the present application;

[0055] Figure 8 It is a hardware structure block diagram of a server of a household backup power switching management method provided in an embodiment of the present application. DETAILED DESCRIPTION

[0056] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0057] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0058] It is understandable that in the specific implementation of this application, related data such as user information is involved. When the above embodiments of this application are applied to specific products or technologies, user permission or consent is required, and the collection, use and processing of relevant data need to comply with relevant laws, regulations and standards of relevant countries and regions.

[0059] The terms involved in the embodiments of the present application are explained below.

[0060] Gateway: Also known as internetwork connector or protocol converter, gateway realizes network interconnection above the network layer and is only used for interconnection between two networks with different high-level protocols.

[0061] Grid: A system used to characterize the electrical power supply to households, including substations of various voltages and transmission and distribution lines.

[0062] See also Figure 1 , which is a schematic diagram of an implementation environment provided by an embodiment of the present application, the implementation environment includes a terminal 110, a server 120 and a gateway 130, wherein the terminal 110 and the server 120 and the gateway 130 can communicate through a wired or wireless network connection.

[0063] The terminal 110 includes but is not limited to a mobile phone, a computer, an intelligent voice interaction device, a smart home appliance, a vehicle terminal, an aircraft, etc. The terminal 110 is installed with a client software such as an application (Application, referred to as App) having a content display function, which can be an independent application or a subroutine in the application. In the embodiment of the present application, the content displayed by the content display function is the relevant information of the power grid detection.

[0064] The server 120 can provide background services for the applications in the terminal 110, and the background services can specifically provide services for content data. The gateway 130 communicates with the server 120 via a wired or wireless network connection, and sends the control status of the gateway, energy storage inverter, and power grid to the server 120 for storage or processing.

[0065] It should be noted that the server involved in the embodiments of the present application can be an independent physical server, a server cluster or a distributed system composed of multiple physical servers, or a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN (Content Delivery Network) and big data and artificial intelligence platforms.

[0066] In an exemplary embodiment, the terminal 110, the server 120 and the gateway 130 can all be node devices in the blockchain system, and can share the acquired and generated information with other node devices in the blockchain system to achieve information sharing between multiple node devices. Multiple node devices in the blockchain system can be configured with the same blockchain, which is composed of multiple blocks, and the adjacent blocks have an association relationship, so that when the data in any block is tampered, it can be detected by the next block, thereby preventing the data in the blockchain from being tampered with, and ensuring the security and reliability of the data in the blockchain.

[0067] The embodiments of the present application can be applied to various scenarios, including but not limited to cloud technology, artificial intelligence, smart transportation, smart home, assisted driving, etc.

[0068] See also Figure 2 , which is a flow chart of a first household backup power switching management method provided in an embodiment of the present application, which can be applied to Figure 1 Schematic diagram of the implementation environment in. It should be noted that this specification provides method operation steps such as embodiments or flow charts, but more or fewer operation steps may be included based on routine or non-creative work. The order of steps listed in the embodiments is only one way of executing the steps among many orders, and does not represent the only order of execution. When the actual system or product is executed, it can be executed in the order of the methods shown in the embodiments or drawings or in parallel (for example, in a parallel processor or multi-threaded processing environment). Specifically, Figure 2 As shown, the method is applied to the gateway, including:

[0069] S201. When the household power grid is in a whole-house backup state, detect the recovery state of the main power grid.

[0070] S202: If the recovery state of the total power grid is characterized as recovery, voltage phase difference information is obtained according to the voltage of the household power grid and the voltage of the total power grid.

[0071] S203: Based on the voltage phase difference information, broadcast a coordinated group-send first adjustment instruction to each energy storage inverter terminal to adjust the voltage phase.

[0072] S204, in response to the adjustment completion instruction sent by each energy storage inverter, sending a first permission instruction to the user end, and receiving the first permission instruction feedback information to confirm that the household power grid state is switched from the whole-house backup power state to the grid-connected state.

[0073] The first permission instruction is used to indicate that the state of the backup power switching management system is in the ready state, and to notify the user end to close the main switch of the household power grid. When the household power grid is in the whole-house backup state, the recovery state of the main power grid is detected. At this time, the household power grid has been disconnected from the grid, and the main power grid is in a non-discharging state. Therefore, by detecting the recovery state of the main power grid, it is determined whether the main power grid has recovered the discharge state.

[0074] If the recovery state of the total power grid is characterized as recovery, the voltage phase difference information is obtained according to the voltage of the household power grid and the voltage of the total power grid. When the total power grid is not discharging, the household load in the household power grid can be discharged to the household power grid according to the plug of the energy storage inverter to supply electricity. Therefore, after the total power grid recovers to the discharge state, the voltage in the household power grid may be inconsistent with the voltage of the total power grid, and there is a voltage phase difference. Therefore, the voltage phase difference information is obtained.

[0075] Based on the voltage phase difference information, the first adjustment instruction is broadcasted and grouped to each energy storage inverter end to adjust the voltage phase. The voltage phase is adjusted through each energy storage inverter end in the household power grid, and based on the broadcast collaborative grouping, the consistency of the adjustment of each energy storage inverter end is ensured.

[0076] In response to the adjustment completion instruction sent by each energy storage inverter, a first permission instruction is sent to the user end, and the first permission instruction feedback information is received to confirm that the household power grid state is switched from the whole-house backup power state to the grid-connected state; the first permission instruction is used to indicate that the backup power switching management system state is in the ready state, and is an instruction to close the main switch of the household power grid. When the first permission instruction feedback information indicates that the user has closed the main switch of the household power grid, it can be confirmed that the household power grid state has switched from the whole-house backup power state to the grid-connected state.

[0077] The household backup power switching management method in the present application detects the recovery state of the total power grid when the household power grid is in the whole-house backup power state. If the recovery state of the total power grid is characterized as recovery, voltage phase difference information is obtained according to the voltage of the household power grid and the voltage of the total power grid. Based on the voltage phase difference information, a first adjustment instruction is broadcasted to each energy storage inverter end to adjust the voltage phase. In response to the adjustment completion instruction sent by each energy storage inverter end, a first permission instruction is sent to the user end, and the first permission instruction feedback information is received to confirm that the household power grid state is switched from the whole-house backup power state to the grid-connected state, so as to improve the efficiency of adjusting the household power grid phase difference when the power grid is restored after power failure, increase the safety of household power grid state switching, and quickly switch from the backup power state to the grid-connected state.

[0078] In an exemplary embodiment, specifically Figure 3 As shown, Figure 3 This is a flow chart of a second household backup power switching management method. After the grid state of the household grid is characterized as a power-off state, the method further includes:

[0079] S301. When the household power grid is in an off-grid standby state, send a second permission instruction to a user terminal.

[0080] The second permission instruction is used to indicate that the state of the backup power switching management system is in a ready state, and is an instruction to notify the user end to close the main switch of the household power grid.

[0081] S302, in response to the second permission instruction feedback information sent by the user end, determining that the household power grid state is switched from the off-grid backup state to the grid-connected state; the second permission instruction feedback information indicates that the main switch is closed.

[0082] When the household power grid is in the off-grid standby state, a second permission instruction is sent to the user end. The second permission instruction is used to indicate that the standby power switching management system is in the ready state and is an instruction to close the main switch of the household power grid. The off-grid standby state indicates that the plug discharge state of the energy storage inverter is not discharged, and based on the non-discharge of the main power grid, the plug discharge state does not receive power. At this time, the socket end of the energy storage inverter often discharges to the load electrically connected to it.

[0083] In response to the second permission instruction feedback information sent by the user end, it is determined that the household power grid state is switched from the off-grid backup state to the grid-connected state. The second permission instruction feedback information indicates that the main switch has been closed. When the main switch is closed from the user end, the energy storage inverter detects the plug phase and adjusts the output voltage phase to be the same as the phase on the GRID (grid) side.

[0084] In an exemplary embodiment, when the household power grid is in a whole-house power standby state, before detecting the total power grid recovery state, the method further includes:

[0085] The plug discharge information of each energy storage inverter is obtained. If the plug discharge information of each energy storage inverter is characterized as discharge, it is determined that the household power grid state is a whole-house backup power state.

[0086] When the household power grid is in the whole-house standby state, before detecting the recovery state of the total power grid, the plug discharge information of each energy storage inverter is obtained. If the plug discharge information of each energy storage inverter is characterized as discharge, it is determined that the household power grid is in the whole-house standby state. At this time, the socket end of the energy storage inverter often discharges to the load electrically connected to it.

[0087] In an exemplary embodiment, when the household power grid state is an off-grid standby power state, before sending the second permission instruction to the user terminal, it also includes:

[0088] The plug discharge information of each energy storage inverter is obtained; if the plug discharge information of each energy storage inverter indicates that there is no discharge and no power is supplied, it is determined that the household power grid state is an off-grid standby power state.

[0089] When the household power grid is in an off-grid standby state, before sending the second permission instruction to the user end, the plug discharge information of each energy storage inverter is obtained. If the plug discharge information of each energy storage inverter is characterized by no discharge and no power, the household power grid is determined to be in an off-grid standby state. At this time, the socket end of the energy storage inverter end often discharges to the load electrically connected to it.

[0090] See also Figure 4 , which is a flow chart of a third household backup power switching management method provided in an embodiment of the present application, which can be applied to Figure 1 Schematic diagram of the implementation environment in. It should be noted that this specification provides method operation steps such as embodiments or flow charts, but more or fewer operation steps may be included based on routine or non-creative work. The order of steps listed in the embodiments is only one way of executing the steps among many orders, and does not represent the only order of execution. When the actual system or product is executed, it can be executed in the order of the methods shown in the embodiments or drawings or in parallel (for example, in a parallel processor or multi-threaded processing environment). Specifically, Figure 4 As shown, Figure 4 A flowchart of a method for managing the switching of backup power for a third household is shown in FIG. 1 , which is applied to the energy storage inverter, including:

[0091] S401, obtaining a first adjustment instruction;

[0092] S402, obtaining a voltage phase difference;

[0093] S403: According to the voltage phase difference, adjust the plug discharge voltage of the energy storage inverter until no voltage phase difference is generated.

[0094] When the household power grid is in the grid-connected state, both the plug and the socket can discharge. When the household power grid is in the off-grid standby state, the plug does not output. When the household power grid is in the whole-house standby state, both the plug and the socket output.

[0095] The first adjustment instruction and the voltage phase difference carried by the first adjustment instruction are obtained, and according to the voltage phase difference, the discharge power of the plug of the energy storage inverter and / or the discharge power of the socket of the energy storage inverter are adjusted to generate no voltage phase difference, so as to ensure the safety of the household power grid and protect the energy storage inverter.

[0096] Furthermore, by adjusting the discharge power of the plug of the energy storage inverter and / or the discharge power of the socket of the energy storage inverter, the socket discharge voltage of the energy storage inverter and the plug voltage of the energy storage inverter can be obtained. According to the socket discharge voltage and the plug voltage, the voltage difference of the energy storage inverter is obtained and the voltage is adjusted to phase synchronization according to the inverter voltage difference.

[0097] Specifically, based on the phase synchronization instruction, the socket discharge voltage of the energy storage inverter and the plug voltage of the energy storage inverter are obtained, and the energy storage inverter voltage difference is obtained according to the socket discharge voltage and the plug voltage, and the voltage is adjusted to phase synchronization according to the inverter voltage difference to maintain phase synchronization to ensure the safety of the household power grid and protect the energy storage inverter and the load electrically connected to it.

[0098] See also Figure 5 , which shows a schematic diagram of the structure of a household backup power switching management system provided by an embodiment of the present application. The device has the function of implementing the household backup power switching management method in the above method embodiment. The function can be implemented by hardware or by hardware executing corresponding software. A household backup power switching management system includes a main power grid, several power grid branches, a gateway, several energy storage inverters, and several loads;

[0099] The gateway is electrically connected to the main power grid, and several power grid branches are connected to the main power grid based on circuit switches;

[0100] The plurality of energy storage inverters include a first energy storage inverter, a second energy storage inverter, and a third energy storage inverter;

[0101] The plurality of power grid branches include a first power grid branch, a second power grid branch, and a third power grid branch, and the first power grid branch, the second power grid branch, and the third power grid branch are connected in parallel to the main power grid;

[0102] The first grid branch is electrically connected to the first energy storage inverter through a socket, the second grid branch is electrically connected to the second energy storage inverter through a socket, and the third grid branch is electrically connected to the third energy storage inverter through a socket;

[0103] The plurality of loads include a first load and a second load. The first load is electrically connected to the first energy storage inverter through a plug, and the second load is electrically connected to the third energy storage inverter through a plug.

[0104] The gateway is communicatively connected to the first energy storage inverter, the gateway is communicatively connected to the second energy storage inverter, and the gateway is communicatively connected to the third energy storage inverter.

[0105] Specifically, Figure 5 As shown, the first grid branch (circuit1) is electrically connected to the first energy storage inverter through a socket, the second grid branch (circuit2) is electrically connected to the second energy storage inverter through a socket, the third grid branch (circuit3) is electrically connected to the third energy storage inverter through a socket, the gateway is communicatively connected to the first energy storage inverter, the gateway is communicatively connected to the second energy storage inverter, and the gateway is communicatively connected to the third energy storage inverter.

[0106] Specifically, Figure 5 As shown, the first grid branch also includes a first grid branch load (LOAD) connected in series with the first energy storage inverter, the second grid branch also includes a second grid branch load (LOAD) connected in series with the second energy storage inverter, and the third grid branch also includes a third grid branch load (LOAD) connected to the third energy storage inverter, wherein the first grid branch load and the second grid branch load are both household loads.

[0107] Specifically, Figure 6 As shown, Figure 6 This is a schematic diagram of the energy storage inverter connection structure of a household backup power switching management system provided in an embodiment of the present application. The multiple loads include a first load and a second load. The first load is electrically connected to the first energy storage inverter through a plug to form the first energy storage inverter.

[0108] The second load is electrically connected to the third energy storage inverter through the plug to form a second energy storage inverter.

[0109] Among them, the energy storage inverter is connected to the household backup power switching management system through a plug, that is, it is inserted into the socket on the wall, and the load is connected to the energy storage inverter through a plug. A socket is provided on the energy storage inverter, and the two form an electrical connection.

[0110] It can be seen from the above technical solutions of the embodiments of the present application that the household backup power switching management method in the present application detects the grid state of the household power grid, and when the grid state of the household power grid is characterized as a power-off state, sends a request to disconnect the main switch to the user end, and responds to the whole-house backup power instruction sent by the user end. A discharge instruction is sent to each energy storage inverter end to discharge the energy storage inverter, so that the household power supply is not completely dependent on the power grid, the power supply dependence is reduced, and the safety of switching the household backup power function when the power grid is powered off is improved.

[0111] Corresponding to the household backup power switching management method provided in the above-mentioned embodiments, the embodiment of the present application also provides a household backup power switching management device. Since the household backup power switching management device provided in the embodiment of the present application corresponds to the household backup power switching management method provided in the above-mentioned embodiments, the implementation method of the aforementioned household backup power switching management method is also applicable to the household backup power switching management device provided in this embodiment, and will not be described in detail in this embodiment.

[0112] See also Figure 7 , which is a schematic diagram of the structure of a household backup power switching management device provided in an embodiment of the present application, the device has the function of implementing the household backup power switching management method in the above method embodiment, and the function can be implemented by hardware, or by hardware executing corresponding software. Figure 7 As shown, the household backup power switching management device 800 may include:

[0113] The detection module 801 is used to detect the recovery state of the main power grid when the household power grid is in the whole-house backup state;

[0114] The voltage phase difference information acquisition module 802 is used to obtain the voltage phase difference information according to the voltage of the household power grid and the voltage of the total power grid when the recovery state of the total power grid is characterized as recovery;

[0115] A broadcast module 803 is used to broadcast a coordinated group-send first adjustment instruction to each energy storage inverter terminal to adjust the voltage phase based on the voltage phase difference information;

[0116] The first switching module 804 is used to send a first permission instruction to the user end in response to the adjustment completion instruction sent by each energy storage inverter end, and receive the first permission instruction feedback information to confirm that the household power grid state is switched from the whole-house backup power state to the grid-connected state.

[0117] Furthermore, the device also includes:

[0118] A second permission instruction sending module is used to send a second permission instruction to the user end when the household power grid state is an off-grid backup state; the second permission instruction is used to indicate that the backup power switching management system state is a ready state, and to notify the user end of an instruction to close the main switch of the household power grid;

[0119] The second permission instruction response module is used to respond to the second permission instruction feedback information sent by the user end, and determine that the household power grid state is switched from the off-grid backup state to the grid-connected state; the second permission instruction feedback information indicates that the main switch is closed.

[0120] Furthermore, the device also includes:

[0121] The first household power grid state determination module is used to obtain the plug discharge information of each energy storage inverter. If the plug discharge information of each energy storage inverter is characterized as discharge, it is determined that the household power grid state is a whole-house standby power state.

[0122] Furthermore, the device also includes:

[0123] The second household power grid state determination module is used to obtain the plug discharge information of each energy storage inverter; if the plug discharge information of each energy storage inverter is characterized by no discharge and no power supply, the household power grid state is determined to be an off-grid standby power state.

[0124] Furthermore, the device also includes:

[0125] A first adjustment instruction acquisition module, used to acquire a first adjustment instruction;

[0126] A voltage phase difference acquisition module, used for acquiring a voltage phase difference;

[0127] The voltage phase difference adjustment module is used to adjust the plug discharge voltage of the energy storage inverter according to the voltage phase difference until no voltage phase difference is generated.

[0128] An embodiment of the present application provides an electronic device, which includes a processor and a memory, wherein the memory stores at least one instruction or at least one program, and the at least one instruction or the at least one program is loaded and executed by the processor to implement any household backup power switching management method provided in the above method embodiments.

[0129] The memory can be used to store software programs and modules. The processor executes various functional applications and data processing by running the software programs and modules stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, application programs required for functions, etc.; the data storage area can store data created according to the use of the device, etc. In addition, the memory can include a high-speed random access memory and can also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other volatile solid-state storage devices. Accordingly, the memory can also include a memory controller to provide the processor with access to the memory.

[0130] The method embodiments provided in the embodiments of the present application can be executed in a computer terminal, a server or a similar computing device. Taking running on a server as an example, Figure 8 is a hardware structure block diagram of a server running a household backup power switching management method provided in an embodiment of the present application, such as Figure 8As shown, the server 900 may have relatively large differences due to different configurations or performances, and may include one or more central processing units (CPU) 910 (the processor 910 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA), a memory 930 for storing data, and one or more storage media 920 (such as one or more mass storage devices) for storing application programs 923 or data 922. Among them, the memory 930 and the storage medium 920 can be short-term storage or permanent storage. The program stored in the storage medium 920 may include one or more modules, each of which may include a series of instruction operations on the server. Furthermore, the central processing unit 910 can be configured to communicate with the storage medium 920 and execute a series of instruction operations in the storage medium 920 on the server 900. The server 900 may also include one or more power supplies 960, one or more wired or wireless network interfaces 950, one or more input and output interfaces 940, and / or one or more operating systems 921, such as Windows ServerTM, Mac OS XTM, UnixTM, LinuxTM, FreedSDTM, etc.

[0131] The input / output interface 940 may be used to receive or send data via a network. The specific example of the network may include a wireless network provided by a communication provider of the server 900. In one example, the input / output interface 940 includes a network adapter (Network Interface Controller, NIc), which may be connected to other network devices via a base station so as to communicate with the Internet. In one example, the input / output interface 940 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.

[0132] It can be understood by those skilled in the art that Figure 8 The structure shown is only for illustration and does not limit the structure of the above electronic device. Figure 8 More or fewer components as shown, or with Figure 8 Different configurations are shown.

[0133] An embodiment of the present application also provides a computer-readable storage medium, which can be set in an electronic device to store at least one instruction or at least one program related to implementing a household backup power switching management method. The at least one instruction or the at least one program is loaded and executed by the processor to implement any household backup power switching management method provided in the above method embodiments.

[0134] Optionally, in this embodiment, the above-mentioned storage medium may include but is not limited to: a USB flash drive, a read-only memory (ROM), a random access memory (RAM), a mobile hard disk, a magnetic disk or an optical disk, and other media that can store program codes.

[0135] It should be noted that the above-mentioned sequence of the embodiments of the present application is for description only and does not represent the advantages and disadvantages of the embodiments. The above-mentioned specific embodiments of this specification are described. Other embodiments are within the scope of the attached claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0136] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0137] A person skilled in the art will understand that all or part of the steps to implement the above embodiments may be accomplished by hardware or by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, and the above-mentioned storage medium may be a read-only memory, a disk or an optical disk, etc.

[0138] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A household backup power switching management method, characterized in that: The method is applied to the gateway side, comprising: When the household power grid is in a whole-house power standby state, detecting a recovery state of the main power grid; If the recovery state of the total power grid is characterized as recovery, obtaining voltage phase difference information according to the voltage of the household power grid and the voltage of the total power grid; Based on the voltage phase difference information, broadcasting a coordinated group-sending first adjustment instruction to each energy storage inverter terminal to adjust the voltage phase; In response to the adjustment completion instruction sent by each of the energy storage inverter ends, a first permission instruction is sent to the user end, and the first permission instruction feedback information is received to confirm that the household power grid state is switched from the whole-house backup power state to the grid-connected state; the first permission instruction is used to characterize that the backup power switching management system state is in a ready state, and to notify the user end of the instruction to close the main switch of the household power grid.

2. The household backup power switching management method according to claim 1, characterized in that: The method further comprises: When the household power grid is in an off-grid backup state, a second permission instruction is sent to the user terminal; the second permission instruction is used to indicate that the backup power switching management system is in a ready state, and to notify the user terminal of an instruction to close the main switch of the household power grid; In response to the second permission instruction feedback information sent by the user end, it is determined that the household power grid state is switched from the off-grid backup state to the grid-connected state; the second permission instruction feedback information indicates that the main switch is closed.

3. The household backup power switching management method according to claim 1, characterized in that: When the household power grid is in the whole-house power standby state, before detecting the total power grid recovery state, the method further includes: The plug discharge information of each of the energy storage inverters is obtained. If the plug discharge information of each of the energy storage inverters is characterized as discharge, it is determined that the household power grid state is a whole-house standby power state.

4. The household backup power switching management method according to claim 2, characterized in that: When the household power grid state is an off-grid standby power state, before sending a second permission instruction to the user terminal, the method further includes: Obtain the plug discharge information of each of the energy storage inverters; if the plug discharge information of each of the energy storage inverters is characterized by no discharge and no power supply, determine that the household power grid state is an off-grid standby power state.

5. A household backup power switching management method, characterized in that: The method is applied to the energy storage inverter end, comprising: Acquire the first adjustment instruction; Obtaining the voltage phase difference; According to the voltage phase difference, the plug discharge voltage of the energy storage inverter is adjusted until no voltage phase difference is generated.

6. A household backup power switching management system, characterized in that: The system includes a main power grid, several power grid branches, a gateway, several energy storage inverters, and several loads; The gateway is electrically connected to the main power grid, and a plurality of the power grid branches are connected to the main power grid based on circuit switches; The plurality of energy storage inverters include a first energy storage inverter, a second energy storage inverter, and a third energy storage inverter; The plurality of power grid branches include a first power grid branch, a second power grid branch, and a third power grid branch, and the first power grid branch, the second power grid branch, and the third power grid branch are connected in parallel to the main power grid; The first grid branch is electrically connected to the first energy storage inverter through a socket, the second grid branch is electrically connected to the second energy storage inverter through a socket, and the third grid branch is electrically connected to the third energy storage inverter through a socket; The plurality of loads include a first load and a second load, the first load is electrically connected to the first energy storage inverter through a plug, and the second load is electrically connected to the third energy storage inverter through a plug; The gateway is communicatively connected to the first energy storage inverter, the gateway is communicatively connected to the second energy storage inverter, and the gateway is communicatively connected to the third energy storage inverter.

7. A household backup power switching management device, characterized in that: The device comprises: A detection module, used for detecting the recovery state of the main power grid when the state of the household power grid is the whole-house backup power state; A voltage phase difference information acquisition module, configured to obtain voltage phase difference information according to the voltage of the household power grid and the voltage of the total power grid if the recovery state of the total power grid is characterized as recovery; A broadcast module, configured to broadcast a coordinated group-send first adjustment instruction to each energy storage inverter terminal to adjust the voltage phase based on the voltage phase difference information; The first switching module is used to send a first permission instruction to the user end in response to the adjustment completion instruction sent by each of the energy storage inverter ends, and receive the first permission instruction feedback information to confirm that the household power grid state is switched from the whole-house backup power state to the grid-connected state.

8. An electronic device, characterized in that: It comprises a processor and a memory, wherein the memory stores at least one instruction or at least one program, and the at least one instruction or the at least one program is loaded and executed by the processor to implement the household backup power switching management method as described in any one of claims 1 to 5.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores at least one instruction or at least one program, and the at least one instruction or the at least one program is loaded and executed by the processor to implement the household backup power switching management method according to any one of claims 1 to 5.

10. A computer program, characterized in that When the computer program is executed by a processor, the household backup power switching management method according to any one of claims 1 to 5 is implemented.