Processing method for deploying power supply of transformer area based on carbon emission data
By configuring smart meters on the access side of the power supply backbone and dynamically adjusting the power distribution ratio parameters using a dispatching platform, the problem of optimizing the total carbon emissions in multi-source power supply areas has been solved, and dynamic allocation and reduction of carbon emissions have been achieved.
Patent Information
- Application Number
- CN202410898529.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-11-01
Smart Images

Figure CN118889671A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data processing technology, and in particular to a processing method for adjusting power supply to a substation based on carbon emission data. Background Art
[0002] In the power grid, there may be power supply backbone networks of various different types of power generation (hydropower, thermal power, wind power, photovoltaic power, nuclear power, etc.). The value of the electric carbon emission factor of each type of power supply backbone network is different. The electric carbon emission factor mentioned here refers to the conversion calculation factor from electric energy data to carbon emission data.
[0003] In the power network, a distribution substation that can access multiple types of power supply backbone networks (referred to as a multi-source power supply substation) usually has the function of multi-source power supply allocation, which is specifically achieved by using an intelligent transformer or intelligent transformer system (unit). The intelligent transformer or intelligent transformer system (unit) can proportionally regulate the real-time power input from various types of backbone networks and output electric energy to the distribution network in the substation through a designated output terminal; when the intelligent transformer or intelligent transformer system (unit) proportionally regulates the real-time power input from various types of backbone networks, it usually regulates the proportional allocation based on a proportional parameter set (also referred to as a power supply ratio parameter set) stored on the transformer side. At present, most of these multi-source power supply substations only perform fixed allocation of multi-source power supply based on a conventional fixed proportional parameter allocation method (referred to as a fixed parameter allocation method), and cannot dynamically allocate multi-source power supply based on the electric carbon emission factor of each type of power supply backbone network; and this fixed parameter allocation method does not play any role in optimizing the total carbon emissions of the distribution substation. Summary of the invention
[0004] The purpose of the present invention is to provide a processing method for allocating power supply to the substation based on carbon emission data in response to the defects of the prior art. The present invention sets a first allocation platform in each first distribution station area, and configures an intelligent meter (i.e., the first power supply meter) that can synchronously measure the power supply and carbon emissions on the access side of each type of first power supply backbone network connected to the substation area; and the first allocation platform updates the first power supply record list according to the first power supply metering record sent by each first power supply meter; and the first allocation platform regularly dynamically allocates the power ratio of different power supply types (hydropower, thermal power, wind power, photovoltaic power, nuclear power, etc.) on the power supply side of the substation according to the first power supply record list to obtain the latest first power ratio parameter set; and power supply allocation is performed according to the latest first power ratio parameter set. Through the present invention, multi-source power supply can be dynamically allocated based on the electric carbon emission factor of each type of power supply backbone network in the distribution station area, which can promote the optimization of the total carbon emissions of the distribution station area.
[0005] To achieve the above purpose, an embodiment of the present invention provides a processing method for adjusting power supply to a substation based on carbon emission data, the method comprising:
[0006] The first dispatching platform of the first distribution station area receives the first power supply metering record sent by any first power supply meter in the same station area and stores it in the first power supply record list of the platform; the first distribution station area includes the first dispatching platform and multiple first power supply meters;
[0007] The first allocation platform regularly dynamically allocates the power ratio of different power supply types on the power supply side of the substation according to the first power supply record list to obtain the latest first power ratio parameter set; and performs power supply allocation according to the latest first power ratio parameter set.
[0008] Preferably, the first distribution substation area includes a plurality of first power supply backbone networks, a first substation area transformer, a first substation area distribution line network, a plurality of the first power supply meters and the first dispatching platform;
[0009] Each of the first power supply backbone networks corresponds to a first power generation type; the first power generation type includes at least hydropower, thermal power, wind power, photovoltaic power and nuclear power;
[0010] The first transformer in the substation includes a plurality of first transformer input ends and a first transformer output end; the first transformer input ends correspond to the first power supply backbone network one by one, and each of the first transformer input ends is connected to the corresponding first power supply backbone network; the first transformer output end is connected to the first substation distribution line network;
[0011] The first substation transformer is an intelligent transformer or intelligent transformer system that can proportionally control the real-time power input to each input end of the first transformer according to the transformer-side power supply ratio parameter set stored locally in the transformer, and output electric energy to the first substation distribution network through the output end of the first transformer;
[0012] The transformer-side power supply ratio parameter set includes multiple first power supply ratio parameters; the first power supply ratio parameters correspond to the first transformer input terminal one by one; each of the first power supply ratio parameters is a percentage value less than 1, and the sum of all the first power supply ratio parameters is 1; the percentage value of the real-time power input at each first transformer input terminal and the real-time power output at the first transformer output terminal matches the corresponding first power supply ratio parameter; when the transformer-side power supply ratio parameter set is initialized, all the first power supply ratio parameters are the same;
[0013] The first area distribution line network is used to deliver electricity to each power consumption unit in the area;
[0014] A corresponding first power supply meter is connected at the connection position between each first power supply backbone network and the corresponding first transformer input end; the first power supply meter is an intelligent meter for synchronously measuring power supply and carbon emissions; the first power supply meter corresponds to the first power supply backbone network one by one; each first power supply meter is locally preset with a corresponding first electric carbon emission factor, and the first electric carbon emission factor corresponds to the first power supply backbone network or the first power generation type one by one;
[0015] Each of the first power supply meters is used to measure the total power supply of the corresponding first power supply backbone network within the most recent first time period every first time period to obtain the corresponding first total power supply; and use the product of the first electric carbon emission factor and the first total power supply as the corresponding first total carbon emission; and the start and end times corresponding to the most recent first time period form a corresponding first metering period; and the first metering period, the first total power supply, the first total carbon emission and the corresponding first power generation type form a corresponding first power supply metering record and send it to the first dispatching platform; the first time period is a preset time length;
[0016] The first dispatching platform is connected to the first substation transformer and each of the first power supply meters respectively through a wired communication method or a wireless communication method; the wired communication method includes a serial communication method and a power carrier communication method; the wireless communication method includes a 4G / 5G / LTE communication method;
[0017] The first allocation platform locally stores the first power supply record list; and backs up and stores the first electricity carbon emission factor corresponding to each of the first power supply meters.
[0018] Preferably, the first power supply record list includes a plurality of the first power supply metering records; the first power supply metering record includes the first metering period, the first power generation type, the first total power supply and the first total carbon emission; the first power generation type includes at least hydropower, thermal power, wind power, photovoltaic power and nuclear power;
[0019] When the first power ratio parameter set is not empty, it is composed of multiple first power ratio parameters; each of the first power ratio parameters is a percentage value less than 1, and the sum of all the first power ratio parameters is 1; the first power ratio parameters correspond one-to-one to the first power supply ratio parameters.
[0020] Preferably, the periodic dynamic allocation of the power ratio of different power supply types at the power supply side of the substation according to the first power supply record list to obtain the latest first power ratio parameter set specifically includes:
[0021] Step 4-1, the first allocation platform regularly uses the time period corresponding to the most recent second time length as the corresponding first power supply time period according to a preset first time frequency;
[0022] Wherein, the second duration is a preset time length;
[0023] Step 4-2, extracting all the first power supply metering records in the first power supply record list whose first metering period meets the first power supply time period to form a corresponding first power supply record set;
[0024] Step 4-3, counting the total number of types of the first power generation type in the first power supply record set to obtain a corresponding first total number N;
[0025] Step 4-4, and sort all the first electric carbon emission factors backed up locally in order from low to high to obtain the corresponding first electric carbon emission factor sequence {a i};
[0026] Among them, a i is the first electric carbon emission factor, 1≤index i≤N;
[0027] Step 4-5, the sum of all the first power supply totals in the first power supply record set is calculated and the calculation result is used as the corresponding first power supply total E sum ;
[0028] Step 4-6, and sum up all the first carbon emissions in the first power supply record set and use the sum as the corresponding first carbon emissions total C sum ;
[0029] Step 4-7, and sum up the first total power supply of all the first power supply metering records corresponding to each type of the first power generation type in the first power supply record set and use the calculation result as a corresponding first sub-item total power supply e i ;
[0030] Among them, the total power supply of the first sub-item is e i With the first electric carbon emission factor a i One to one correspondence;
[0031] Step 4-8, and calculate the total amount of the first carbon emissions C sum Is it less than or equal to the preset first total amount threshold C hold Identify; if yes, go to step 4-9; if no, go to step 4-10;
[0032] Step 4-9, setting the corresponding first power ratio parameter set to empty; and going to step 4-14;
[0033] Step 4-10, based on the first total amount threshold C hold , the first total power supply amount E sum 、Total power supply of all the first sub-items e i and the first electrocarbon emission factor sequence {a i} Setting a corresponding first objective function and a first set of constraints for the first objective function;
[0034] The first objective function is:
[0035] The first set of restriction conditions is:
[0036]
[0037] Among them, (e i +△e i ) is the total power supply amount e of the first sub-item i One-to-one correspondence of the first controlled electricity quantity; △e i is the first controlled electric quantity (e i +△e i ) and the corresponding first sub-item power supply total e i The first controlled power between; the total power supply of each of the first sub-items e i , each of the first controlled electric quantities △e i And each of the first regulated electric quantities (e i +△e i ) has a value range of [0, E sum ]; the known N first electric carbon emission factors a i The factor values are arranged in ascending order according to the index order; the expected N first controlled electric quantities (e i +△e i ) are arranged in descending order according to the index; the total power supply of the first sub-item is e i The total amount of electricity and the first controlled electricity (e i +△e i The total amount of electricity of the first power supply E sum , the first control quantity △e i The total amount of electricity is 0;
[0038] Step 4-11, based on a preset optimization algorithm, the control power sequence {△e i} to solve the optimal value and obtain a corresponding first control power sequence {△e i};
[0039] Wherein, the optimization algorithm includes at least a gradient descent algorithm, a genetic algorithm and a particle swarm optimization algorithm;
[0040] Step 4-12, according to the first control power sequence {△e i}、Total power supply of all the first sub-items e i and the first power supply total amount E sum Calculate the corresponding first electric energy ratio parameter b i ;
[0041] in,
[0042] Step 4-13, all the first electric energy ratio parameters b obtained i forming the corresponding first electric energy ratio parameter set;
[0043] Step 4-14: output the first power energy ratio parameter set obtained this time as the latest first power energy ratio parameter set.
[0044] Preferably, the performing power supply allocation according to the latest first power energy ratio parameter set specifically includes:
[0045] When the latest first power energy ratio parameter set is not empty, the first dispatching platform updates the transformer-side power supply ratio parameter set stored locally in the first substation transformer to the latest first power energy ratio parameter set through remote parameter update.
[0046] Preferably, the method further comprises:
[0047] Each of the first power supply backbone networks corresponds to a first power generator; each of the first power generators corresponds to a first power generator information center; the first dispatching platform is also connected to each of the first power generator information centers respectively through the wired communication method or the wireless communication method;
[0048] Each of the first power generation party information centers will regularly send its latest statistics of the first power generation party's carbon emission factors to the first allocation platform; the first power generation party's carbon emission factors correspond one to one with the first power supply backbone network;
[0049] Whenever the first dispatching platform receives each of the first power generation carbon emission factors, it uses the first power generation carbon emission factor received at that time as the corresponding current power generation carbon emission factor; and uses the first power supply backbone network corresponding to the current power generation carbon emission factor as the corresponding current power supply backbone network; and uses the first power supply meter corresponding to the current power supply backbone network as the corresponding current power supply meter; and uses the first power emission factor corresponding to the current power supply backbone network saved on the platform side as the corresponding local factor to be updated; and updates the local factor to be updated to the corresponding current power generation carbon emission factor; and updates the first power emission factor preset locally in the current power supply meter to the corresponding current power generation carbon emission factor through remote parameter update.
[0050] The embodiment of the present invention provides a processing method for allocating power supply to a substation based on carbon emission data. As can be seen from the above content, the embodiment of the present invention sets a first allocation platform in each first distribution substation, and configures an intelligent meter (i.e., the first power supply meter) that can synchronously measure the power supply and carbon emissions on the access side of each type of first power supply backbone network connected to the substation; and the first allocation platform updates the first power supply record list according to the first power supply metering record sent by each first power supply meter; and the first allocation platform regularly dynamically allocates the power supply ratios of different power supply types (hydropower, thermal power, wind power, photovoltaic power, nuclear power, etc.) on the power supply side of the substation according to the first power supply record list to obtain the latest first power supply ratio parameter set; and power supply allocation is performed according to the latest first power supply ratio parameter set. Through the embodiment of the present invention, a dynamic allocation mechanism that can allocate multi-source power supply based on the electric carbon emission factor of each type of power supply backbone network is realized in the distribution substation, and the dynamic allocation mechanism promotes the optimization of the total carbon emissions of the distribution substation. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 A schematic diagram of a processing method for adjusting power supply to a substation based on carbon emission data provided by an embodiment of the present invention;
[0052] Figure 2 A schematic diagram of a first distribution station area provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0053] In order to make the purpose, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0054] The embodiment of the present invention provides a processing method for adjusting power supply to a substation based on carbon emission data. Figure 1 A processing method for adjusting power supply to a substation based on carbon emission data provided by an embodiment of the present invention is shown in a schematic diagram, which mainly includes the following steps:
[0055] Step 1: A first dispatching platform in a first distribution station area receives a first power supply metering record sent by any first power supply meter in the same distribution station area and stores the record in a first power supply record list locally on the platform.
[0056] Here, if Figure 2 As shown in the schematic diagram of the first distribution station area provided in the embodiment of the present invention, the first distribution station area in the embodiment of the present invention includes a plurality of first power supply backbone networks, a first station area transformer, a first station area distribution line network, a plurality of first power supply meters and a first dispatching platform; wherein:
[0057] 1) Each first power supply backbone network in the embodiment of the present invention corresponds to a first power generation type; the first power generation type in the embodiment of the present invention at least includes hydropower, thermal power, wind power, photovoltaic power and nuclear power;
[0058] It should be noted that each first power supply backbone network in the embodiment of the present invention also corresponds to a power generator, namely, a first power generator; each first power generator corresponds to an information center, namely, a first power generator information center; each first power generator information center regularly sends its latest statistical first power generator electric carbon emission factor to the first allocation platform; the first power generator electric carbon emission factor corresponds to the first power supply backbone network one by one;
[0059] 2) The first transformer of the embodiment of the present invention comprises a plurality of first transformer input ends and a first transformer output end; the first transformer input ends correspond to the first power supply backbone network one by one, and each first transformer input end is connected to the corresponding first power supply backbone network; the first transformer output end is connected to the first transformer distribution network;
[0060] It should be noted that the first substation transformer of the embodiment of the present invention is an intelligent transformer, intelligent transformer system or intelligent transformer unit that can proportionally control the real-time power input to each first transformer input terminal according to the transformer-side power supply ratio parameter set stored locally in the transformer, and output electric energy to the first substation distribution network through the first transformer output terminal;
[0061] It should also be noted that the above-mentioned transformer-side power supply ratio parameter set includes multiple first power supply ratio parameters; the first power supply ratio parameters correspond one-to-one to the first transformer input terminal; each first power supply ratio parameter is a percentage value less than 1, and the sum of all first power supply ratio parameters is 1; the percentage value of the real-time power input at each first transformer input terminal and the real-time power output at the first transformer output terminal matches the corresponding first power supply ratio parameter; when the above-mentioned transformer-side power supply ratio parameter set is initialized, all first power supply ratio parameters are the same;
[0062] 3) The first area distribution line network of the embodiment of the present invention is used to transmit power to each power consumption unit in the area;
[0063] 4) In the first distribution station area of the embodiment of the present invention, a corresponding first power supply meter is connected to the connection position between each first power supply backbone network and the corresponding first transformer input terminal; the first power supply meter is an intelligent meter for synchronously measuring power supply and carbon emissions, and the intelligent meter is also called an intelligent electric carbon meter in the industry; the first power supply meter corresponds to the first power supply backbone network one by one; each first power supply meter is locally preset with a corresponding first electric carbon emission factor, and the first electric carbon emission factor corresponds to the first power supply backbone network or the first power generation type one by one;
[0064] Each first power supply meter in the embodiment of the present invention is used to measure the total power supply of the corresponding first power supply backbone network within the most recent first time period at every first time period to obtain the corresponding first total power supply; and use the product of the first electric carbon emission factor and the first total power supply as the corresponding first total carbon emission; and the start and end times corresponding to the most recent first time period form a corresponding first metering period; and the first metering period, the first total power supply, the first total carbon emission and the corresponding first power generation type form a corresponding first power supply metering record and send it to the first dispatching platform; here, the first time period in the embodiment of the present invention is a preset time length;
[0065] 5) The first dispatching platform of the embodiment of the present invention is a module, device, server, system or platform that can implement the method of the embodiment of the present invention. The first dispatching platform is connected to the first transformer and each first power supply meter in the substation area through a wired communication method or a wireless communication method; and is also connected to each first power generation party information center outside the substation area through a wired communication method or a wireless communication method; the wired communication method here includes a serial communication method and a power carrier communication method; the wireless communication method includes a 4G / 5G / LTE communication method;
[0066] In addition, the first allocation platform will store the first power supply record list locally on the platform; and will also back up and store the first electricity carbon emission factor corresponding to each first power supply meter;
[0067] The first power supply record list mentioned here includes multiple first power supply metering records; the first power supply metering record includes a first metering period, a first power generation type, a first total power supply and a first total carbon emission; the first power generation type includes at least hydropower, thermal power, wind power, photovoltaic power and nuclear power.
[0068] Step 2: The first allocation platform regularly dynamically allocates the power ratios of different power supply types on the power supply side of the substation according to the first power supply record list to obtain the latest first power ratio parameter set; and performs power supply allocation according to the latest first power ratio parameter set;
[0069] Specifically, it includes: step 21, the first allocation platform regularly dynamically allocates the power ratio of different power supply types on the power supply side of the substation according to the first power supply record list to obtain the latest first power ratio parameter set;
[0070] Specifically comprising: step 21-1, the first allocation platform regularly uses the time period corresponding to the most recent second time length as the corresponding first power supply time period according to the preset first time frequency;
[0071] The first time frequency is a preset time frequency; the second time length is a preset time length;
[0072] Step 21-2, extracting all first power supply metering records in the first power supply record list that meet the first power supply time period to form a corresponding first power supply record set;
[0073] Step 21-3, counting the total number of types of the first power generation type in the first power supply record set to obtain a corresponding first total number N;
[0074] Here, the first total number N is a positive integer greater than zero;
[0075] Step 21-4, and sort all the first electric carbon emission factors of the local backup in order from low to high to obtain the corresponding first electric carbon emission factor sequence {a i};
[0076] Among them, a i is a first electricity carbon emission factor, 1≤index i≤N;
[0077] Step 21-5, the sum of all first power supply totals in the first power supply record set is calculated and the calculation result is used as the corresponding first power supply total E sum ;
[0078] Step 21-6, the sum of all first carbon emissions in the first power supply record set is calculated and the calculation result is used as the corresponding first carbon emission total Csum ;
[0079] Step 21-7, the total first power supply amount of all first power supply metering records corresponding to each type of first power generation type in the first power supply record set is calculated and the calculation result is used as a corresponding first sub-item power supply amount e i ;
[0080] Among them, the total power supply of the first sub-item is e i The first electricity carbon emission factor a i One to one correspondence;
[0081] Step 21-8, and calculate the total amount of the first carbon emissions C sum Is it less than or equal to the preset first total amount threshold C hold Identify; if yes, go to step 21-9; if no, go to step 21-10;
[0082] Here, the first total amount threshold C hold is a preset carbon emission total amount recommendation value that matches the current first distribution station area. The first total amount threshold C hold Can be dynamically set according to actual application requirements;
[0083] The current real-time total carbon emissions of the first distribution station area is the total first carbon emissions C sum Less than or equal to the preset carbon emission total recommended value, i.e. the first total threshold C hold , it means that the real-time total carbon emissions of the current first distribution station area meet the standard and there is no need to adjust the power supply ratio of multi-source power supply, so go to step 21-9 for processing; otherwise, the total carbon emissions of the first distribution station area C sum Greater than the first total amount threshold C hold , it indicates that the real-time total carbon emissions of the current first distribution station area exceed the standard, and it is necessary to dynamically adjust the power supply ratio of multi-source power supply in the direction of reducing the total carbon emissions and output a new first power ratio parameter set, so go to step 21-10 for processing;
[0084] Step 21-9, setting the corresponding first power ratio parameter set to empty; and going to step 21-14;
[0085] Step 21-10, based on the first total amount threshold C hold 、The total amount of the first power supply E sum 、Total power supply of all first sub-items e i and the first electric carbon emission factor sequence {a i}Setting the corresponding first objective function and the first constraint condition set of the first objective function;
[0086] Here, the first objective function of the embodiment of the present invention is:
[0087]
[0088] The first constraint condition set of the first objective function of the embodiment of the present invention is:
[0089]
[0090] Among them, (e i +△e i ) is the total power supply of the first sub-item e i One-to-one correspondence of the first controlled electricity quantity; △e i is the first controlled electricity (e i +△e i ) and the corresponding first sub-item power supply total e i The first controlled electricity between; the total power supply of each first sub-item e i , each first control power △e i And each first controlled electricity (e i +△e i ) has a value range of [0, E sum ]; N known first electric carbon emission factors a i The factor values are arranged in ascending order according to the index; the expected N first controlled electricity (e i +△e i ) are arranged in descending order according to the index; the total power supply of the first sub-item is e i The total amount of electricity and the amount of electricity after the first regulation (e i +△e i The total amount of electricity of the first power supply is E sum , the first control power △e i The total amount of electricity is 0;
[0091] Here, the goal of the dynamic allocation in the embodiment of the present invention is to adjust the first electric carbon emission factor sequence {a i The optimization order of China Electricity's carbon emission factors from low to high is used for the first post-regulation electricity (e i +△e i ) to optimize the configuration from high to low;
[0092] Step 21-11, based on a preset optimization algorithm, the control power sequence {△e i} to solve the optimal value and obtain a corresponding first control power sequence {△e i};
[0093] Here, the optimization algorithm of the embodiment of the present invention includes at least a gradient descent algorithm, a genetic algorithm and a particle swarm optimization algorithm;
[0094] It should be noted that the tools and the solving process for solving the optimal solution of the independent variable of the known objective function under the premise of the known objective function, the set of constraint conditions and any of the above-mentioned optimization algorithms are all public algorithm tools and algorithm implementation processes. The use of these algorithm tools and algorithm implementation processes for the first control power sequence {△e i}The process of solving the problem is further elaborated;
[0095] Step 21-12, according to the first control power sequence {△e i}、Total power supply of all first sub-items e i The total amount of the first power supply is E sum Calculate the corresponding first electric energy ratio parameter b i ;
[0096] in,
[0097] Here, because the first regulation power (e i +△e i ) is optimized in descending order, then the corresponding first power ratio parameter b i The optimization configuration is also carried out in order from high to low;
[0098] Step 21-13, all the first electric energy ratio parameters b are obtained i Forming a corresponding first electric energy ratio parameter set;
[0099] Step 21-14, outputting the first power energy ratio parameter set obtained this time as the latest first power energy ratio parameter set;
[0100] Here, the first power ratio parameter set obtained this time is either empty or not empty; when it is not empty, it consists of multiple first power ratio parameters b i Composition, each first power ratio parameter b i is a percentage value less than 1, all first energy ratio parameters b i is 1; the first power ratio parameter set that is not empty in the embodiment of the present invention corresponds to the transformer side power supply ratio parameter set on the transformer side of the first substation, and the first power ratio parameter b in the first power ratio parameter set i One-to-one correspondence with the first power supply ratio parameter in the transformer side power supply ratio parameter set;
[0101] Step 22, the first allocation platform performs power allocation according to the latest first power allocation parameter set;
[0102] Specifically, when the latest first power ratio parameter set is not empty, the first dispatching platform updates the transformer side power supply ratio parameter set stored locally in the first substation transformer to the latest first power ratio parameter set through remote parameter update.
[0103] Here, the remote parameter update method of an embodiment of the present invention is a processing mechanism that can update the parameters stored on the remote device / system (such as the first substation transformer, the first power supply meter, etc.) connected to the first dispatching platform (such as the transformer-side power supply ratio parameter set on the first substation transformer, the first electric carbon emission factor on the first power supply meter); the processing mechanism can be customized based on actual application requirements.
[0104] In addition, as described above, the first substation transformer of the embodiment of the present invention will proportionally control the real-time power input at each first transformer input terminal according to the transformer side power supply ratio parameter set. Then, after the first allocation platform updates the transformer side power supply ratio parameter set through remote parameter update, the first substation transformer will proportionally control the real-time power input at each first transformer input terminal based on the new transformer side power supply ratio parameter set.
[0105] In addition, as described above, each first power generation party information center in the embodiment of the present invention will regularly send its latest statistics of the first power generation party's carbon emission factors to the first allocation platform; the corresponding processing flow on the first allocation platform side is as follows:
[0106] Whenever the first dispatching platform receives a first power generation carbon emission factor, it uses the first power generation carbon emission factor received at that time as the corresponding current power generation carbon emission factor; and uses the first power supply backbone network corresponding to the current power generation carbon emission factor as the corresponding current power supply backbone network; and uses the first power supply meter corresponding to the current power supply backbone network as the corresponding current power supply meter; and uses the first power emission factor corresponding to the current power supply backbone network saved on the platform side as the corresponding local factor to be updated; and updates the local factor to be updated to the corresponding current power generation carbon emission factor; and updates the first carbon emission factor preset locally in the current power supply meter to the corresponding current power generation carbon emission factor through remote parameter update.
[0107] In summary, the embodiment of the present invention provides a processing method for allocating power supply to a substation based on carbon emission data. As can be seen from the above content, the embodiment of the present invention sets a first allocation platform in each first distribution station area, and configures an intelligent meter (i.e., the first power supply meter) that can synchronously measure the power supply and carbon emissions on the access side of each type of first power supply backbone network connected to the substation area; and the first allocation platform updates the first power supply record list according to the first power supply metering record sent by each first power supply meter; and the first allocation platform regularly dynamically allocates the power supply ratios of different power supply types (hydropower, thermal power, wind power, photovoltaic power, nuclear power, etc.) on the power supply side of the substation according to the first power supply record list to obtain the latest first power supply ratio parameter set; and power supply allocation is performed according to the latest first power supply ratio parameter set. Through the embodiment of the present invention, a dynamic allocation mechanism that can allocate multi-source power supply based on the electric carbon emission factor of each type of power supply backbone network is realized in the distribution station area, and the dynamic allocation mechanism promotes the optimization of the total carbon emissions of the distribution station area.
[0108] The professionals should further realize that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented by electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to the function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0109] The steps of the method or algorithm described in conjunction with the embodiments disclosed herein may be implemented using hardware, a software module executed by a processor, or a combination of the two. The software module may be placed in a random access memory (RAM), a memory, a read-only memory (ROM), an electrically programmable ROM, an electrically erasable programmable ROM, a register, a hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art.
[0110] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for adjusting power supply in a substation based on carbon emission data, characterized in that: The method comprises: The first dispatching platform of the first distribution station area receives the first power supply metering record sent by any first power supply meter in the same station area and stores it in the first power supply record list of the platform; the first distribution station area includes the first dispatching platform and multiple first power supply meters; The first allocation platform regularly dynamically allocates the power ratio of different power supply types on the power supply side of the substation according to the first power supply record list to obtain the latest first power ratio parameter set; and performs power supply allocation according to the latest first power ratio parameter set.
2. The method for adjusting power supply to a substation based on carbon emission data according to claim 1, characterized in that: The first distribution station area includes a plurality of first power supply backbone networks, a first station area transformer, a first station area distribution line network, a plurality of the first power supply meters and the first dispatching platform; Each of the first power supply backbone networks corresponds to a first power generation type; the first power generation type includes at least hydropower, thermal power, wind power, photovoltaic power and nuclear power; The first transformer in the substation includes a plurality of first transformer input ends and a first transformer output end; the first transformer input ends correspond to the first power supply backbone network one by one, and each of the first transformer input ends is connected to the corresponding first power supply backbone network; the first transformer output end is connected to the first substation distribution line network; The first substation transformer is an intelligent transformer or intelligent transformer system that can proportionally control the real-time power input to each input end of the first transformer according to the transformer-side power supply ratio parameter set stored locally in the transformer, and output electric energy to the first substation distribution network through the output end of the first transformer; The transformer-side power supply ratio parameter set includes multiple first power supply ratio parameters; the first power supply ratio parameters correspond to the first transformer input terminal one by one; each of the first power supply ratio parameters is a percentage value less than 1, and the sum of all the first power supply ratio parameters is 1; the percentage value of the real-time power input at each first transformer input terminal and the real-time power output at the first transformer output terminal matches the corresponding first power supply ratio parameter; when the transformer-side power supply ratio parameter set is initialized, all the first power supply ratio parameters are the same; The first area distribution line network is used to deliver electricity to each power consumption unit in the area; Connecting a corresponding first power supply meter at a connection position between each first power supply backbone network and a corresponding first transformer input end; The first power supply meter is a smart meter for synchronously measuring power supply and carbon emissions; The first power supply meter corresponds to the first power supply backbone network one by one; each of the first power supply meters is locally preset with a corresponding first electric carbon emission factor, and the first electric carbon emission factor corresponds to the first power supply backbone network or the first power generation type one by one; Each of the first power supply meters is used to measure the total power supply of the corresponding first power supply backbone network within the most recent first time period at every first time period to obtain the corresponding first total power supply; and taking the product of the first electricity carbon emission factor and the first total power supply as the corresponding first total carbon emission; The start and end times corresponding to the most recent first duration form a corresponding first metering period; the first metering period, the first total power supply, the first total carbon emissions and the corresponding first power generation type form a corresponding first power supply metering record and send it to the first dispatching platform; The first duration is a preset time length; The first dispatching platform is connected to the first substation transformer and each of the first power supply meters respectively through a wired communication method or a wireless communication method; the wired communication method includes a serial communication method and a power carrier communication method; the wireless communication method includes a 4G / 5G / LTE communication method; The first allocation platform locally stores the first power supply record list; and backs up and stores the first electricity carbon emission factor corresponding to each of the first power supply meters.
3. The method for adjusting power supply to a substation based on carbon emission data according to claim 2 is characterized in that: The first power supply record list includes a plurality of the first power supply metering records; the first power supply metering record includes the first metering period, the first power generation type, the first total power supply and the first total carbon emission; The first power generation type includes at least hydropower, thermal power, wind power, photovoltaic power and nuclear power; When the first power ratio parameter set is not empty, it is composed of multiple first power ratio parameters; each of the first power ratio parameters is a percentage value less than 1, and the sum of all the first power ratio parameters is 1; The first electric energy ratio parameter corresponds one-to-one to the first power supply ratio parameter.
4. The method for adjusting power supply to a substation based on carbon emission data according to claim 3 is characterized in that: The step of periodically dynamically allocating the power ratios of different power supply types at the power supply side of the substation according to the first power supply record list to obtain the latest first power ratio parameter set specifically includes: Step 4-1, the first allocation platform regularly uses the time period corresponding to the most recent second time length as the corresponding first power supply time period according to a preset first time frequency; Wherein, the second duration is a preset time length; Step 4-2, extracting all the first power supply metering records in the first power supply record list whose first metering period meets the first power supply time period to form a corresponding first power supply record set; Step 4-3, counting the total number of types of the first power generation type in the first power supply record set to obtain a corresponding first total number N; Step 4-4, and sort all the first electric carbon emission factors backed up locally in order from low to high to obtain the corresponding first electric carbon emission factor sequence {a i }; Among them, a i is the first electric carbon emission factor, 1≤index i≤N; Step 4-5, the sum of all the first power supply totals in the first power supply record set is calculated and the calculation result is used as the corresponding first power supply total E sum ; Step 4-6, and sum up all the first carbon emissions in the first power supply record set and use the sum as the corresponding first carbon emissions total C sum ; Step 4-7, and sum up the first total power supply of all the first power supply metering records corresponding to each type of the first power generation type in the first power supply record set and use the calculation result as a corresponding first sub-item total power supply e i ; Among them, the total power supply of the first sub-item is e i With the first electric carbon emission factor a i One to one correspondence; Step 4-8, and calculate the total amount of the first carbon emissions C sum Is it less than or equal to the preset first total amount threshold C hold Identify; if yes, go to step 4-9; if no, go to step 4-10; Step 4-9, setting the corresponding first power ratio parameter set to empty; and going to step 4-14; Step 4-10, based on the first total amount threshold C hold , the first total power supply amount E sum 、Total power supply of all the first sub-items e i and the first electrocarbon emission factor sequence {a i } Setting a corresponding first objective function and a first set of constraints for the first objective function; The first objective function is: The first set of restriction conditions is: e i 、Δe i 、(e i +Δe i )∈[0,E sum ], a i=1 ≤a i=2 ≤…≤a i=N-1 ≤a i=N , (e i=1 +Δe i=1 )≥(e i=2 +Δe i=2 )≥…≥(e i=N-1 +Δe i= N -1 )≥(e i=N +Δe i=N ), Among them, (e i +Δe i ) is the total power supply amount e of the first sub-item i One-to-one correspondence of the first controlled electricity; Δe i is the first controlled electric quantity (e i +Δe i ) and the corresponding first sub-item power supply total e i The first controlled power between; the total power supply of each of the first sub-items e i , each of the first controlled electric quantities Δe i And each of the first regulated electric quantities (e i +Δe i ) has a value range of [0, E sum ]; the known N first electric carbon emission factors a i The factor values are arranged in ascending order according to the index order; the expected N first controlled electric quantities (e i +Δe i ) are arranged in descending order according to the index; the total power supply of the first sub-item is e i The total amount of electricity and the first controlled electricity (e i +Δe i The total amount of electricity of the first power supply E sum , the first control quantity △e i The total amount of electricity is 0; Step 4-11, based on a preset optimization algorithm, the control power sequence {△e i } to solve the optimal value and obtain a corresponding first control power sequence {△e i }; Wherein, the optimization algorithm includes at least a gradient descent algorithm, a genetic algorithm and a particle swarm optimization algorithm; Step 4-12, according to the first control power sequence {△e i }、Total power supply of all the first sub-items e i and the first power supply total amount E sum Calculate the corresponding first electric energy ratio parameter b i ; in, Step 4-13, all the first electric energy ratio parameters b obtained i forming the corresponding first electric energy ratio parameter set; Step 4-14: output the first power energy ratio parameter set obtained this time as the latest first power energy ratio parameter set.
5. The method for adjusting power supply to a substation based on carbon emission data according to claim 3 is characterized in that: The performing power supply allocation according to the latest first power allocation parameter set specifically includes: When the latest first power energy ratio parameter set is not empty, the first dispatching platform updates the transformer-side power supply ratio parameter set stored locally in the first substation transformer to the latest first power energy ratio parameter set through remote parameter update.
6. The method for adjusting power supply to a substation based on carbon emission data according to claim 3 is characterized in that: The method further comprises: Each of the first power supply backbone networks corresponds to a first power generator; each of the first power generators corresponds to a first power generator information center; the first dispatching platform is also connected to each of the first power generator information centers respectively through the wired communication method or the wireless communication method; Each of the first power generation party information centers will regularly send its latest statistics of the first power generation party's carbon emission factors to the first allocation platform; the first power generation party's carbon emission factors correspond one to one with the first power supply backbone network; Whenever the first dispatching platform receives each of the first power generation carbon emission factors, it uses the first power generation carbon emission factor received at that time as the corresponding current power generation carbon emission factor; and uses the first power supply backbone network corresponding to the current power generation carbon emission factor as the corresponding current power supply backbone network; and uses the first power supply meter corresponding to the current power supply backbone network as the corresponding current power supply meter; and uses the first power emission factor corresponding to the current power supply backbone network saved on the platform side as the corresponding local factor to be updated; and updates the local factor to be updated to the corresponding current power generation carbon emission factor; and updates the first power emission factor preset locally in the current power supply meter to the corresponding current power generation carbon emission factor through remote parameter update.