Optimization method and device of dual active bridge converter, storage medium and electronic equipment

By establishing the target loss model of the dual active bridge converter and analyzing the current effective value and soft switching conditions, determining the optimal optimization target, the problem of poor optimization results caused by a single optimization method in the existing technology is solved, and the dual active power is improved The efficiency of the bridge converter.

CN118889833APending Publication Date: 2024-11-01GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410938183.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-11-01

Smart Images

  • Figure CN118889833A_ABST
    Figure CN118889833A_ABST
Patent Text Reader

Abstract

The invention discloses an optimization method and device of a dual active bridge converter, a storage medium and electronic equipment. The method relates to the technical field of data processing, the technical field of electronics and other related technical fields, and comprises the following steps: determining a target loss model of a to-be-optimized dual active bridge converter; analyzing the target loss model to obtain a plurality of initial objects to be optimized; determining a target object and an optimization condition corresponding to the target object from a plurality of to-be-optimized initial objects according to a soft switching implementation condition of the dual-active bridge converter; and according to the optimization condition corresponding to the target object, performing optimization processing on the target object to obtain an optimized dual-active bridge converter. According to the method and the device, the problem that the optimization effect of the dual-active bridge converter is relatively poor due to the fact that the dual-active bridge converter is optimized through a single optimization mode such as backflow power optimization or current stress optimization in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the fields of data processing technology, electronic technology and other related technical fields, and in particular to an optimization method and device for a dual active bridge converter, a storage medium and an electronic device. Background Art

[0002] With the rapid development of technologies such as energy internet, solid-state transformers, and electric vehicles, DC / DC converters that can achieve multiple functions such as electrical isolation, voltage matching, bidirectional power transmission, and wide voltage range operation have received more and more attention. The dual active bridge (DAB) converter can meet the various needs of the above-mentioned application scenarios, has the advantages of easy soft switching and high power density, and has great application prospects. Therefore, how to efficiently optimize the dual active bridge converter has become the main focus of researchers. Most existing studies only optimize and control a single variable or multiple variables of the dual active bridge converter to achieve reflux power optimization or current stress optimization. Although it can effectively improve a certain efficiency, it has not determined the best optimization target among multiple optimization targets. At the same time, the influence of soft switching characteristics on losses is not taken into account during the optimization control, which leads to poor optimization effect of the dual active bridge converter.

[0003] Currently, no effective solution has been proposed to solve the problem that the dual active bridge converter is optimized by a single optimization method such as reflux power optimization or current stress optimization in the related art, resulting in a relatively poor optimization effect of the dual active bridge converter. Summary of the invention

[0004] The main purpose of the present application is to provide an optimization method and device, a storage medium and an electronic device for a dual active bridge converter, so as to solve the problem in the related art that the dual active bridge converter is optimized by a single optimization method such as reflux power optimization or current stress optimization, resulting in a relatively poor optimization effect of the dual active bridge converter.

[0005] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a method for optimizing a dual active bridge converter is provided. The method comprises: determining a target loss model of a dual active bridge converter to be optimized; analyzing the target loss model to obtain a plurality of initial objects to be optimized, wherein the plurality of initial objects to be optimized at least include: the effective value of the current of the dual active bridge converter and the instantaneous value of the current of the dual active bridge converter; determining a target object and an optimization condition corresponding to the target object from the plurality of initial objects to be optimized according to the soft switching implementation condition of the dual active bridge converter, wherein the optimization condition is whether the target object is optimized under the soft switching implementation condition; optimizing the target object according to the optimization condition corresponding to the target object to obtain an optimized dual active bridge converter.

[0006] Furthermore, determining the target loss model of the dual active bridge converter to be optimized includes: calculating according to the rated current and on-resistance of the dual active bridge converter to obtain the switch tube conduction loss model of the dual active bridge converter; calculating according to the primary voltage, output charge, reverse recovery charge, instantaneous value of switch tube current and switch tube turn-off time of the dual active bridge converter to obtain the switch tube switching loss model of the dual active bridge converter; calculating according to the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter to obtain the transformer loss model of the dual active bridge converter; calculating according to the switch tube conduction loss model, the switch tube switching loss model and the transformer loss model to obtain the target loss model of the dual active bridge converter.

[0007] Furthermore, the switch loss model of the switch tube of the dual active bridge converter is obtained by calculating according to the primary voltage, output charge, reverse recovery charge, instantaneous value of the switch tube current and switch tube turn-off time of the dual active bridge converter, including: calculating according to the primary voltage, the output charge and the reverse recovery charge to obtain the hysteresis loss of the dual active bridge converter; calculating according to the instantaneous value of the switch tube current and the switch tube turn-off time to obtain the switch tube turn-on loss and the switch tube turn-off loss of the dual active bridge converter; calculating according to the hysteresis loss, the switch tube turn-on loss and the switch tube turn-off loss to obtain the switch tube switch loss model of the dual active bridge converter.

[0008] Furthermore, the transformer loss model of the dual active bridge converter is obtained by calculating according to the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter, including: obtaining the iron loss model of the dual active bridge converter by calculating according to the core loss density and the transformer volume; obtaining the copper loss model of the dual active bridge converter by calculating according to the rated current and the winding resistance; and obtaining the transformer loss model of the dual active bridge converter by calculating according to the iron loss model and the copper loss model.

[0009] Furthermore, before determining the target object and the optimization conditions corresponding to the target object from the multiple initial objects to be optimized based on the soft switching implementation conditions of the dual active bridge converter, the method also includes: determining multiple switching tubes in the dual active bridge converter and multiple first zero voltage switching implementation conditions corresponding to the multiple switching tubes; performing simplified calculations based on the multiple first zero voltage switching implementation conditions to obtain second zero voltage switching implementation conditions; solving the second zero voltage switching implementation conditions to obtain the soft switching implementation conditions.

[0010] Furthermore, according to the soft switching implementation conditions of the dual active bridge converter, determining the target object and the optimization conditions corresponding to the target object from the multiple initial objects to be optimized includes: determining the initial optimization function corresponding to each initial object to be optimized according to the simulation implementation process of the dual active bridge converter; simulating and solving the initial optimization function according to the target algorithm to obtain a first solution result; simulating and solving the initial optimization function based on the soft switching implementation conditions according to the target algorithm to obtain a second solution result; determining the target object and the optimization conditions corresponding to the target object from the multiple initial objects to be optimized according to the first solution result and the second solution result.

[0011] Furthermore, based on the first solution result and the second solution result, determining the target object and the optimization conditions corresponding to the target object from the multiple initial objects to be optimized includes: sorting the first solution result and the second solution result to obtain a sorted solution result list; obtaining the target solution result in the sorted solution result list, wherein the order of the target solution result in the sorted solution result list is less than the order of the remaining solution results in the sorted solution result list; and based on the target solution result, determining the target object and the optimization conditions corresponding to the target object from the multiple initial objects to be optimized.

[0012] In order to achieve the above-mentioned purpose, according to another aspect of the present application, a dual active bridge converter optimization device is provided. The device comprises: a first determination unit, used to determine a target loss model of the dual active bridge converter to be optimized; an analysis unit, used to analyze the target loss model to obtain a plurality of initial objects to be optimized, wherein the plurality of initial objects to be optimized at least include: the effective value of the current of the dual active bridge converter and the instantaneous value of the current of the dual active bridge converter; a second determination unit, used to determine a target object and an optimization condition corresponding to the target object from the plurality of initial objects to be optimized according to the soft switching implementation condition of the dual active bridge converter, wherein the optimization condition is whether the target object is optimized under the soft switching implementation condition; an optimization unit, used to optimize the target object according to the optimization condition corresponding to the target object to obtain the optimized dual active bridge converter.

[0013] Further, the first determination unit includes: a first calculation module, which is used to calculate according to the rated current and on-resistance of the dual active bridge converter to obtain a switch tube conduction loss model of the dual active bridge converter; a second calculation module, which is used to calculate according to the primary voltage, output charge, reverse recovery charge, instantaneous value of switch tube current and switch tube turn-off time of the dual active bridge converter to obtain a switch tube switching loss model of the dual active bridge converter; a third calculation module, which is used to calculate according to the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter to obtain a transformer loss model of the dual active bridge converter; a fourth calculation module, which is used to calculate according to the switch tube conduction loss model, the switch tube switching loss model and the transformer loss model to obtain a target loss model of the dual active bridge converter.

[0014] Furthermore, the second calculation module includes: a first calculation submodule, used to calculate based on the primary voltage, the output charge and the reverse recovery charge to obtain the hysteresis loss of the dual active bridge converter; a second calculation submodule, used to calculate based on the instantaneous value of the switch tube current and the switch tube turn-off time to obtain the switch tube turn-on loss and the switch tube turn-off loss of the dual active bridge converter; a third calculation submodule, used to calculate based on the hysteresis loss, the switch tube turn-on loss and the switch tube turn-off loss to obtain the switch tube switching loss model of the dual active bridge converter.

[0015] Furthermore, the third calculation module includes: a fourth calculation submodule, used to calculate based on the core loss density and the transformer volume to obtain an iron loss model of the dual active bridge converter; a fifth calculation submodule, used to calculate based on the rated current and the winding resistance to obtain a copper loss model of the dual active bridge converter; a sixth calculation submodule, used to calculate based on the iron loss model and the copper loss model to obtain a transformer loss model of the dual active bridge converter.

[0016] Furthermore, the device also includes: a third determination unit, used to determine multiple switching tubes in the dual active bridge converter and multiple first zero voltage switching implementation conditions corresponding to the multiple switching tubes before determining the target object and the optimization conditions corresponding to the target object from the multiple initial objects to be optimized based on the soft switching implementation conditions of the dual active bridge converter; a calculation unit, used to perform simplified calculations based on the multiple first zero voltage switching implementation conditions to obtain second zero voltage switching implementation conditions; and a solving unit, used to solve the second zero voltage switching implementation conditions to obtain the soft switching implementation conditions.

[0017] Furthermore, the second determination unit includes: a first determination module, used to determine the initial optimization function corresponding to each initial object to be optimized according to the simulation implementation process of the dual active bridge converter; a first solution module, used to simulate and solve the initial optimization function according to the target algorithm to obtain a first solution result; a second solution module, used to simulate and solve the initial optimization function based on the soft switching implementation condition according to the target algorithm to obtain a second solution result; a second determination module, used to determine the target object and the optimization conditions corresponding to the target object from the multiple initial objects to be optimized based on the first solution result and the second solution result.

[0018] Furthermore, the second determination module includes: a sorting submodule, used to sort the first solution result and the second solution result to obtain a sorted solution result list; an acquisition submodule, used to obtain a target solution result in the sorted solution result list, wherein the order of the target solution result in the sorted solution result list is less than the order of the remaining solution results in the sorted solution result list; a determination submodule, used to determine the target object and the optimization conditions corresponding to the target object from the multiple initial objects to be optimized based on the target solution result.

[0019] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a computer-readable storage medium is provided, wherein the storage medium stores a program, wherein when the program is running, the device where the storage medium is located is controlled to execute any one of the above-mentioned dual active bridge converter optimization methods.

[0020] In order to achieve the above-mentioned purpose, according to another aspect of the present application, an electronic device is also provided, the electronic device includes one or more processors and a memory, and the memory is used to store the optimization method of the dual active bridge converter described in any one of the above-mentioned ones implemented by one or more processors.

[0021] Through this application, the following steps are adopted: determine the target loss model of the dual active bridge converter to be optimized; analyze the target loss model to obtain multiple initial objects to be optimized, wherein the multiple initial objects to be optimized include at least: the effective value of the current of the dual active bridge converter and the instantaneous value of the current of the dual active bridge converter; according to the soft switching implementation conditions of the dual active bridge converter, determine the target object and the optimization conditions corresponding to the target object from the multiple initial objects to be optimized, wherein the optimization conditions are whether to optimize the target object under the soft switching implementation conditions; according to the optimization conditions corresponding to the target object, optimize the target object to obtain the optimized dual active bridge converter, through this application, the problem that the optimization effect of the dual active bridge converter is relatively poor is solved by optimizing the dual active bridge converter through a single optimization method such as reflux power optimization or current stress optimization in the related art. In this scheme, firstly establish the target loss model of the dual active bridge converter, analyze it, and determine multiple initial objects to be optimized that are most related to the loss, including: the effective value of the current and the instantaneous value of the current. Then, combined with the soft switching implementation conditions, the optimal optimization target (i.e., the target object and the corresponding optimization conditions) of the dual active bridge converter is obtained. The dual active bridge converter is optimized according to the optimal optimization target. Through the target loss model of the dual active bridge converter, multiple initial objects to be optimized related to the loss can be quickly determined. At the same time, combined with the soft switching conditions, it is convenient to accurately determine the optimal optimization target of the dual active bridge converter, avoiding the traditional method of only optimizing and controlling a single variable or multiple variables of the dual active bridge converter, while ignoring the influence of the soft switching characteristics on the loss, thereby improving the optimization effect of the dual active bridge converter. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0023] Figure 1 is a flow chart of an optimization method for a dual active bridge converter provided according to an embodiment of the present application;

[0024] Figure 2 is a schematic diagram of a dual active bridge converter topology structure provided according to an embodiment of the present application;

[0025] Figure 3is a schematic diagram of switching waveforms and working waveforms of a dual active bridge converter in mode 2 according to an embodiment of the present application;

[0026] Figure 4 is a schematic diagram of a soft switching process implemented by a dual active bridge converter provided in an embodiment of the present application;

[0027] Figure 5 is a schematic diagram of a comparison result of effective current values ​​provided according to an embodiment of the present application;

[0028] Figure 6 is a schematic diagram of current stress comparison results provided according to an embodiment of the present application;

[0029] Figure 7 is a schematic diagram of power changes in a simulation experiment provided according to an embodiment of the present application;

[0030] Figure 8 is a schematic diagram of the efficiency comparison results of the simulation experiment provided according to the embodiment of the present application;

[0031] Fig. 9 is a schematic diagram of an optimization device for a dual active bridge converter provided according to an embodiment of the present application;

[0032] Fig.10 is a schematic diagram of an electronic device provided according to an embodiment of the present application. DETAILED DESCRIPTION

[0033] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0034] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0035] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0036] It should be noted that the relevant information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data for display, data for analysis, etc.) involved in this disclosure are all information and data authorized by the user or fully authorized by all parties. For example, an interface is set between this system and the relevant user or organization. Before obtaining relevant information, it is necessary to send an acquisition request to the aforementioned user or organization through the interface, and obtain relevant information after receiving the consent information fed back by the aforementioned user or organization.

[0037] The present invention is described below in conjunction with preferred implementation steps. Figure 1 is a flow chart of an optimization method for a dual active bridge converter according to an embodiment of the present application, such as Figure 1 As shown, the method comprises the following steps:

[0038] Step S101, determining a target loss model of a dual active bridge converter to be optimized.

[0039] Optionally, the loss of the dual active bridge converter mainly comes from: the conduction loss of the switch tube, the switching loss of the switch tube, the copper loss and the iron loss of the transformer, that is, the expression of the target loss model is as follows:

[0040] P all =P cond +P t +P fe +P cu

[0041] Among them, P all Represents the total loss, P cond , P t , P fe , P cu They respectively represent the conduction loss of the DAB switch tube, the switching loss of the DAB switch tube, the iron loss of the DAB transformer and the copper loss of the DAB transformer.

[0042] It should be noted that Figure 2is a schematic diagram of a dual active bridge converter topology structure provided according to an embodiment of the present application, such as Figure 2 As shown, V1 and V2 represent the primary voltage and secondary voltage of the dual active bridge converter, respectively. The dual active bridge converter includes 8 power semiconductor switches (Q1-Q8), of which Q1-Q4 constitute the primary H bridge of the dual active bridge converter, Q5-Q8 constitute the secondary H bridge of the dual active bridge converter, and the AC outlets of the two groups of H bridges are connected through a high-frequency isolation transformer T, whose equivalent leakage reactance is L and the transformation ratio is n:1.

[0043] Step S102: Analyze the target loss model to obtain a plurality of initial objects to be optimized, wherein the plurality of initial objects to be optimized at least include: an effective current value of the dual active bridge converter and an instantaneous current value of the dual active bridge converter.

[0044] Optionally, the target loss model is analyzed to find that, when the voltage is given, the target loss model P of the dual active bridge converter is all Only the effective value of current and the instantaneous value of current The instantaneous value of the current at the switching moment contains the current stress value. Therefore, as long as the effective current value and the current stress value of the dual active bridge converter are optimized, analyzed and compared, the optimization with the minimum loss and the highest efficiency can be obtained.

[0045] Step S103, according to the soft switching implementation conditions of the dual active bridge converter, determine the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized, wherein the optimization condition is whether to optimize the target object under the soft switching implementation conditions.

[0046] Optionally, as the power density continues to increase, the frequency of the dual active bridge converter switch tubes also increases significantly, and the impact of soft switching characteristics on switching losses becomes increasingly prominent. Combined with the implementation conditions of zero voltage switching (ZVS) of the dual active bridge converter under light load and heavy load (i.e., soft switching implementation conditions), the impact of ZVS on losses is analyzed, and ZVS constraints are added to the optimization control for analysis, and then the target object and the optimization conditions corresponding to the target object are determined among multiple initial objects to be optimized.

[0047] Step S104, optimizing the target object according to the optimization conditions corresponding to the target object to obtain an optimized dual active bridge converter.

[0048] Optionally, after determining a target object and an optimization condition corresponding to the target object among a plurality of initial objects to be optimized, the dual active bridge converter is optimized to meet performance requirements and improve overall efficiency.

[0049] In summary, the target loss model of the dual active bridge converter is first established and analyzed to determine multiple initial objects to be optimized that are most relevant to the loss, including: current effective value and current instantaneous value. Then, combined with the soft switching implementation conditions, the optimal optimization target of the dual active bridge converter (i.e., the target object and the corresponding optimization conditions) is obtained. The dual active bridge converter is optimized according to the optimal optimization target. Through the target loss model of the dual active bridge converter, multiple initial objects to be optimized related to the loss can be quickly determined. At the same time, combined with the soft switching conditions, it is convenient to accurately determine the optimal optimization target of the dual active bridge converter, avoiding the traditional method of only optimizing and controlling a single variable or multiple variables of the dual active bridge converter, while ignoring the influence of the soft switching characteristics on the loss, thereby improving the optimization effect of the dual active bridge converter.

[0050] Optionally, in the optimization method of the dual active bridge converter provided in the embodiment of the present application, determining the target loss model of the dual active bridge converter to be optimized includes: calculating based on the rated current and on-resistance of the dual active bridge converter to obtain the switch tube conduction loss model of the dual active bridge converter; calculating based on the primary voltage, output charge, reverse recovery charge, instantaneous value of the switch tube current and switch tube turn-off time of the dual active bridge converter to obtain the switch tube switching loss model of the dual active bridge converter; calculating based on the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter to obtain the transformer loss model of the dual active bridge converter; calculating based on the switch tube conduction loss model, the switch tube switching loss model and the transformer loss model to obtain the target loss model of the dual active bridge converter.

[0051] In an optional embodiment, the GaN in the switch tube does not have a body diode, the path resistance is the same when the current is forward and reverse, and the forward conduction voltage drop is low and can be approximately ignored. Therefore, when calculating the switch tube conduction loss model of the dual active bridge converter, only the influence of the path resistance needs to be considered, that is:

[0052] P cond =I rms 2 *R on

[0053] Among them, I rms Represents the rated current of the dual active bridge converter, R on Indicates the on-resistance of GaN.

[0054] The switch loss model of the dual active bridge converter consists of three parts: the hysteresis loss E which is independent of the current oss , the switch tube turn-on loss E related to the current on And the switch turn-off loss E related to the current offBy calculating the above loss model through the primary voltage, output charge, reverse recovery charge, instantaneous value of switch tube current and switch tube turn-off time of the dual active bridge converter, the switch tube switching loss model of the dual active bridge converter can be obtained.

[0055] The transformer loss model of the dual active bridge converter consists of two parts: the iron loss model of the dual active bridge converter and the copper loss model of the dual active bridge converter. The transformer loss model of the dual active bridge converter can be obtained by calculating the above loss model through the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter.

[0056] The switch conduction loss model of the dual active bridge converter can be calculated quickly and accurately through the rated current and on-resistance of the dual active bridge converter.

[0057] Optionally, in the optimization method of the dual active bridge converter provided in the embodiment of the present application, the primary voltage, output charge, reverse recovery charge, instantaneous value of the switch tube current and switch tube turn-off time of the dual active bridge converter are calculated to obtain the switch tube switching loss model of the dual active bridge converter, including: calculating according to the primary voltage, output charge and reverse recovery charge to obtain the hysteresis loss of the dual active bridge converter; calculating according to the instantaneous value of the switch tube current and the switch tube turn-off time to obtain the switch tube turn-on loss and switch tube turn-off loss of the dual active bridge converter; calculating according to the hysteresis loss, switch tube turn-on loss and switch tube turn-off loss to obtain the switch tube switching loss model of the dual active bridge converter.

[0058] In an optional embodiment, the hysteresis loss E oss It can be expressed as the output charge Q oss and reverse recovery charge Q rr The product of the source and drain voltage V1 in the off state is expressed as follows:

[0059] E oss =(Q oss +Q rr )*V1

[0060] Among them, Q oss and Q rr It is usually obtained through the data manual.

[0061] Switching tube turn-on loss E on and the switch turn-off loss E off The instantaneous value of the current at the switching moment is calculated from the turn-off time in the data sheet, and the expression is as follows:

[0062] E on +E off =V dson *i Lt0 *ton *f+V dsoff *i Lt2 *t off *f

[0063] Among them, V dson is the voltage before the switch is turned on, i Lt0 is the current at the moment the switch is turned on, t on is the switch-on time, V dsoff is the voltage before the switch is turned off, i Lt2 is the current at the moment the switch is turned off, t off is the switch off time.

[0064] Therefore, the expression of the switch loss model of the switch tube is as follows:

[0065] P t =E oss +E on +E off

[0066] By calculating the primary voltage, output charge, reverse recovery charge, instantaneous value of switch tube current and switch tube turn-off time of the dual active bridge converter, the switch tube switching loss model of the dual active bridge converter can be obtained quickly and accurately.

[0067] Optionally, in the optimization method of the dual active bridge converter provided in an embodiment of the present application, calculation is performed based on the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter to obtain the transformer loss model of the dual active bridge converter, including: calculating based on the core loss density and transformer volume to obtain the iron loss model of the dual active bridge converter; calculating based on the rated current and winding resistance to obtain the copper loss model of the dual active bridge converter; calculating based on the iron loss model and the copper loss model to obtain the transformer loss model of the dual active bridge converter.

[0068] In an optional embodiment, since the high-frequency transformer in the dual active bridge converter operates under square wave excitation, the modified Steinmetz formula should be used to evaluate the core loss of the dual active bridge converter, that is, the core loss density can be expressed as:

[0069]

[0070] Among them, K, α, β are loss coefficients, which are generally obtained by fitting the data sheet of the core material; D c Represents the voltage duty cycle of the dual active bridge converter; B m is the magnetic flux density, calculated by the following formula:

[0071]

[0072] Wherein, V and N represent the transformer port voltage and the number of coil turns of the corresponding side in the dual active bridge converter, respectively; S represents the area of ​​the effective cross-section of the magnetic flux; and f is the operating frequency of the dual active bridge converter.

[0073] Therefore, the iron loss model expression of the dual active bridge converter is as follows:

[0074] P fe =p e *Vol

[0075] Where, Vol represents the volume of the transformer in the dual active bridge converter; p e is the core loss of the dual active bridge converter.

[0076] Transformer copper loss P of dual active bridge converter cu The main loss is caused by winding resistance.

[0077] Therefore, the copper loss model expression of the dual active bridge converter is as follows:

[0078] P cu =I rms 2 *R cu

[0079] Among them, I rms Represents the rated current of the dual active bridge converter, R on Represents the winding resistance of the dual active bridge converter.

[0080] By calculating the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter, the transformer loss model of the dual active bridge converter can be obtained accurately.

[0081] Optionally, in the optimization method of the dual active bridge converter provided in the embodiment of the present application, before determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized based on the soft switching implementation conditions of the dual active bridge converter, the method also includes: determining multiple switching tubes in the dual active bridge converter and multiple first zero voltage switching implementation conditions corresponding to the multiple switching tubes; performing simplified calculations based on the multiple first zero voltage switching implementation conditions to obtain second zero voltage switching implementation conditions; solving the second zero voltage switching implementation conditions to obtain soft switching implementation conditions.

[0082] In an optional embodiment, Table 1 is a table of multiple first zero voltage switch implementation conditions corresponding to multiple switch tubes (Q1-Q8) in the dual active bridge converter provided according to the embodiment of the present application. As shown in Table 1, before Q1 in the dual active bridge converter is turned on, because there is a certain dead time, the driving voltage of Q2 is first reduced to zero. At this time, the inductor current iL is a negative value, giving the capacitor C on Q2 ds2 While charging, the capacitor C on Q1 ds1 Discharge, when the drain-source voltage V ds When t0 is zero, the current is turned on through the body of Q1, thus forming a zero voltage turn-on (i.e., realizing soft switching). Among them, t0~t3 represents the turn-on time of the dual active bridge converter. The relationship between the capacitor charging and discharging time of the dual active bridge converter and the dead time determines whether the dual active bridge converter can realize soft switching within the dead time.

[0083] From the above analysis, it can be seen that in the case of an existing device with a fixed dead time, the only variable that affects zero voltage switching is the charge and discharge current iL, and the direction of the inductor current that can discharge the capacitor on the switch tube that is about to be turned on is a necessary condition for achieving zero voltage switching.

[0084] Table 1

[0085] Switching tube The first zero voltage switching condition <![CDATA[Q1、Q2]]> <![CDATA[i L (t1)<0]]> <![CDATA[Q3、Q4]]> <![CDATA[i L (t0)<0]]> <![CDATA[Q5、Q6]]> <h2 style=";text-align:left;direction:ltr"><![CDATA[i <h2 style=";text-align:left;direction:ltr"> L <h2 style=";text-align:left;direction:ltr"> (t3)>0]]><h2 style=";text-align:left;direction:ltr"> <![CDATA[Q7、Q8]]> <![CDATA[i L (t2)>0]]>

[0086] Therefore, the zero voltage realization condition of the dual active bridge converter can be obtained as follows:

[0087]

[0088] Among them, D1 represents the internal phase shift angle of the dual active bridge converter, D2 represents the internal phase shift angle of the dual active bridge converter; t0~t3 represents the turn-on time of the dual active bridge converter; V2 represents the secondary voltage of the dual active bridge converter; f represents the operating frequency of the dual active bridge converter; l represents the equivalent leakage reactance of the dual active bridge converter; n represents the transformation ratio of the dual active bridge converter.

[0089] Among them, i L (t0) L (t1), i L (t2) L (t3), therefore, by simplifying the above formula, the second zero voltage switching realization condition of the dual active bridge converter can be obtained, and the expression is as follows:

[0090]

[0091] Among them, D1 represents the internal phase shift angle of the dual active bridge converter, D2 represents the internal phase shift angle of the dual active bridge converter; t0~t3 represents the turn-on time of the dual active bridge converter; V2 represents the secondary voltage of the dual active bridge converter; f represents the operating frequency of the dual active bridge converter; l represents the equivalent leakage reactance of the dual active bridge converter; n represents the transformation ratio of the dual active bridge converter.

[0092] Solving and analyzing the second zero voltage switching realization conditions, we know that under mode 2, i​​L (t1)<0 is always true, and to make i L (t2)>0 also holds true, then D2 should be as large as possible and D1 as small as possible. Combined with the transmission power per unit value, it can be seen that under heavy load conditions, i L (t2)>0 is true, that is, under heavy load conditions, the dual active bridge converter has the necessary conditions to achieve soft switching.

[0093] It should be noted that the operation mode of the dual active bridge converter under dual phase shift control can be divided into four modes according to the relationship between D1 and D2, namely: mode 1, mode 2, mode 3 and mode 4.

[0094] The modal expression is as follows:

[0095] D1<D2,D1+D2≥1

[0096] The modal two expression is as follows:

[0097] D1<D2,D1+D2<1

[0098] The modal three expression is as follows:

[0099] D1≥D2,D1+D2<1

[0100] The modal four expressions are as follows:

[0101] D1≥D2,D1+D2≥1

[0102] Wherein, D1 is the internal phase shift angle of the dual active bridge converter, and D2 is the internal phase shift angle of the dual active bridge converter.

[0103] Since D1+D2≥1 in mode 1 and mode 4, one of the phase shift angles will be greater than 0.5, resulting in increased loss. In the embodiments provided in this application, these two modes will not be discussed. Figure 3 is a schematic diagram of switching waveforms and operating waveforms of a dual active bridge converter in mode 2 according to an embodiment of the present application, such as Figure 3 As shown in Figure 1, when the dual active bridge converter is in normal operation, the inductor current is in the form of a segmented broken line, and the positive and negative half cycles are symmetrical. L represents the inductor voltage of the dual active bridge converter, i L represents the inductor current of the dual active bridge converter, t0~t9 represent the turn-on time of the dual active bridge converter, Q1~Q8 represent the 8 power semiconductor switches of the dual active bridge converter respectively, where and Indicates that the power semiconductor state of the dual active bridge converter is in the off state; D1T and D2T respectively represent the duty cycle of the dual active bridge converter at different turn-on times. According to the primary switch state and secondary switch state of each section of the dual active bridge converter, the segmented dynamic equation of the inductor current can be written, and combined with the symmetry conditions, the analytical expression of each section current can be solved. The solution process is as follows:

[0104]

[0105] Among them, f represents the operating frequency of the dual active bridge converter; k represents the voltage transfer ratio of the dual active bridge converter, D1 represents the internal phase shift angle of the dual active bridge converter, D2 represents the internal phase shift angle of the dual active bridge converter; t represents the turn-on time of the dual active bridge converter; V2 represents the secondary voltage of the dual active bridge converter; f represents the operating frequency of the dual active bridge converter; l represents the equivalent leakage reactance of the dual active bridge converter; n represents the transformation ratio of the dual active bridge converter.

[0106] The expression of the voltage transfer ratio k of the dual active bridge converter is as follows:

[0107]

[0108] Wherein, V1 represents the primary voltage of the dual active bridge converter; V2 represents the secondary voltage of the dual active bridge converter; and n represents the transformation ratio of the dual active bridge converter.

[0109] Combining the inward shift comparison relationship and outward shift comparison relationship of mode 2 and mode 3, the relationship between the transmission power of each mode and the inward shift comparison and outward shift comparison can be established respectively. For the convenience of subsequent analysis, the per-unit value is used here, and the expression is as follows:

[0110]

[0111] Where, represents the reference power P real represents the transmission power of the dual active bridge converter; P base It represents the reference power of the dual active bridge converter, which is generally the maximum transmission power of the dual active bridge converter, expressed as:

[0112]

[0113] Wherein, V1 represents the primary voltage of the dual active bridge converter; V2 represents the secondary voltage of the dual active bridge converter; f represents the operating frequency of the dual active bridge converter; and L represents the equivalent leakage reactance of the dual active bridge converter.

[0114] It should be noted that Figure 4 is a schematic diagram of a soft switching process implemented by a dual active bridge converter according to an embodiment of the present application, such as Figure 4As shown in the figure, there are many factors that affect whether the dual active bridge converter can achieve soft switching. Under light load, due to the fixed dead time, it may be necessary to sacrifice the optimization of current stress, and the current direction may not be able to achieve correct charging and discharging of the capacitor, so achieving soft switching does not necessarily improve efficiency; under heavy load, the necessary conditions for achieving soft switching are met, and under heavy load conditions, the inductor current is large enough to achieve soft switching.

[0115] By comprehensively analyzing multiple switch tubes in the dual active bridge converter and multiple first zero voltage switching implementation conditions corresponding to each switch tube, the soft switching implementation conditions of the dual active bridge converter can be determined quickly and accurately.

[0116] Optionally, in the optimization method of the dual active bridge converter provided in the embodiment of the present application, determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized according to the soft switching implementation conditions of the dual active bridge converter includes: determining the initial optimization function corresponding to each initial object to be optimized according to the simulation implementation process of the dual active bridge converter; simulating and solving the initial optimization function according to the target algorithm to obtain a first solution result; simulating and solving the initial optimization function based on the soft switching implementation conditions according to the target algorithm to obtain a second solution result; determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized according to the first solution result and the second solution result.

[0117] In an optional embodiment, it is known from the above loss analysis of the dual active bridge that the loss is related to the current stress and the effective value of the current (i.e., multiple initial objects to be optimized), so the two are used as optimization targets. The per-unit value expression of the current stress in mode 2 and mode 3 (i.e., the initial optimization function corresponding to each initial object to be optimized) is obtained by (power) (instantaneous current value):

[0118]

[0119] Wherein, k represents the voltage transfer ratio of the dual active bridge converter, D1 represents the internal phase shift angle of the dual active bridge converter, and D2 represents the internal phase shift angle of the dual active bridge converter.

[0120] The per unit value of the effective current is obtained by integrating the (current expression):

[0121]

[0122] After the initial optimization function corresponding to each initial object to be optimized is determined, constraints are established:

[0123] (1) The two modes have their own modal segmentation constraints, expressed as follows:

[0124]

[0125] (2) The conditions for soft switching are analyzed as follows:

[0126] Obviously, it is very difficult to solve the optimal phase shift angle for optimizing the current effective value per unit value using the traditional KKT method. In the embodiment provided in the present application, the current effective value and current stress are optimized separately under multiple working conditions through the SQP algorithm / solver to obtain the corresponding optimal phase shift angle, and then a comparative analysis is performed (i.e., determining the target object and the optimization conditions corresponding to the target object).

[0127] By calculating the optimization function corresponding to each initial object to be optimized under the soft switching conditions with or without the dual active bridge converter, the target object and the optimization conditions corresponding to the target object can be quickly analyzed based on the comparison results, and then accurately determined.

[0128] Optionally, in the optimization method of the dual active bridge converter provided in an embodiment of the present application, determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized based on the first solution result and the second solution result includes: sorting the first solution result and the second solution result to obtain a sorted solution result list; obtaining the target solution result in the sorted solution result list, wherein the order of the target solution result in the sorted solution result list is less than the order of the remaining solution results in the sorted solution result list; and determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized based on the target solution result.

[0129] In an optional embodiment, Figure 5 is a schematic diagram of the comparison results of the effective current values ​​provided in the embodiment of the present application, Figure 6 is a schematic diagram of the comparison results of the current stress (i.e., the instantaneous value of the current) provided in the embodiment of the present application, such as Figure 5 and Figure 6 As shown in the figure, when the power per unit value p is between 0.2 and 0.9, under the current stress optimization, regardless of whether it is in the soft switching state (i.e. ZVS), the current stress is smaller than the result of the current effective value optimization, and the current effective value result is also the same; in addition, adding the soft switching implementation condition (i.e. ZVS) will reduce the selection range of the phase shift angle, thereby weakening the optimization result to a certain extent, especially under the light load state (i.e. the power per unit value is less than 0.5), the difference is more obvious. In addition, Figure 6In the figure, the per-unit value of the current stress after the optimization of the current effective value under the soft switching condition (i.e., ZVS) is very close to the two optimization results of the current stress, and the per-unit value of the optimized current effective value is significantly lower than the two optimization results of the current stress. Therefore, combined with the analysis of the target loss mathematical model, it can be seen that under the soft switching condition (i.e., ZVS), the efficiency after the current effective value optimization is higher than the efficiency after the two optimizations of the current stress.

[0130] By comparing and sorting the first solution result and the second solution result, the best optimization target can be determined quickly and accurately (i.e., determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized), thereby achieving efficient optimization of the dual active bridge converter.

[0131] It should be noted that, in the embodiments provided in the present application, in order to verify the correctness and effectiveness of the results obtained from the above analysis, a simulation process was performed using a 10kW dual active bridge converter as an example.

[0132] Table 2 is a table of main circuit parameters of a simulation experiment provided according to an embodiment of the present application. The example parameters are shown in Table 2. The rated power of the dual active bridge converter is 10kW, and the switching frequency is 100kHz; the input voltage range of the dual active bridge converter is 350-500V, and the output voltage range of the dual active bridge converter is 200-500V; the GaN FET device adopts LMG3422R030 of TI Company. After consulting the data sheet, the on-off time T on and T off They are 35ns and 15ns respectively, where the switching loss charge is 175nC and the on-resistance is 0.03Ω.

[0133] Table 2

[0134]

[0135]

[0136] Figure 7 is a schematic diagram of power changes in a simulation experiment provided in an embodiment of the present application, such as Figure 7 As shown, when p=0.4, the input, output and power loss of the dual active bridge converter are constant after 2ms.

[0137] Figure 8 is a schematic diagram of the efficiency comparison results of the simulation experiment provided in the embodiment of the present application, such as Figure 8As shown in the figure, the efficiency after current effective value optimization is higher than that after current stress optimization. Under heavy load conditions (i.e., the power per unit value p is greater than or equal to 0.5), soft switching (i.e., ZVS) optimization is not necessary, so the two current effective value optimization results are very close. Under light load conditions (i.e., the power per unit value p is less than 0.5), in order to achieve the soft switching conditions (i.e., ZVS), a part of the phase shift angle combination is sacrificed, which increases the current effective value per unit value, resulting in negative optimization, and the efficiency is lower than the direct optimization of the current effective value.

[0138] The optimization method of the dual active bridge converter provided by the embodiment of the present application is to determine the target loss model of the dual active bridge converter to be optimized; analyze the target loss model to obtain multiple initial objects to be optimized, wherein the multiple initial objects to be optimized include at least: the effective value of the current of the dual active bridge converter and the instantaneous value of the current of the dual active bridge converter; according to the soft switching implementation conditions of the dual active bridge converter, determine the target object and the optimization conditions corresponding to the target object from the multiple initial objects to be optimized, wherein the optimization condition is whether to optimize the target object under the soft switching implementation conditions; according to the optimization conditions corresponding to the target object, optimize the target object to obtain the optimized dual active bridge converter, which solves the problem that the optimization effect of the dual active bridge converter is relatively poor by optimizing the dual active bridge converter through a single optimization method such as reflux power optimization or current stress optimization in the related art. In summary, in this scheme, firstly, the target loss model of the dual active bridge converter is established, and it is analyzed to determine multiple initial objects to be optimized that are most relevant to the loss, including: the effective value of the current and the instantaneous value of the current. Then, combined with the soft switching implementation conditions, the optimal optimization target (i.e., the target object and the corresponding optimization conditions) of the dual active bridge converter is obtained. The dual active bridge converter is optimized according to the optimal optimization target. Through the target loss model of the dual active bridge converter, multiple initial objects to be optimized related to the loss can be quickly determined. At the same time, combined with the soft switching conditions, it is convenient to accurately determine the optimal optimization target of the dual active bridge converter, avoiding the traditional method of only optimizing and controlling a single variable or multiple variables of the dual active bridge converter, while ignoring the influence of the soft switching characteristics on the loss, thereby improving the optimization effect of the dual active bridge converter.

[0139] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0140] The embodiment of the present application also provides an optimization device for a dual active bridge converter. It should be noted that the optimization device for a dual active bridge converter in the embodiment of the present application can be used to execute the optimization method for a dual active bridge converter provided in the embodiment of the present application. The optimization device for a dual active bridge converter provided in the embodiment of the present application is introduced below.

[0141] Fig. 9 Schematic diagram of an optimization device for a dual active bridge converter according to an embodiment of the present application. Fig. 9 As shown, the device includes: a first determination unit 901, an analysis unit 902, a second determination unit 903, and an optimization unit 904.

[0142] A first determining unit 901 is used to determine a target loss model of a dual active bridge converter to be optimized;

[0143] An analysis unit 902 is used to analyze the target loss model to obtain a plurality of initial objects to be optimized, wherein the plurality of initial objects to be optimized at least include: a current effective value of the dual active bridge converter and a current instantaneous value of the dual active bridge converter;

[0144] A second determining unit 903 is used to determine a target object and an optimization condition corresponding to the target object from a plurality of initial objects to be optimized according to the soft switching implementation condition of the dual active bridge converter, wherein the optimization condition is whether to optimize the target object under the soft switching implementation condition;

[0145] The optimization unit 904 is used to optimize the target object according to the optimization conditions corresponding to the target object to obtain an optimized dual active bridge converter.

[0146] In the optimization device for a dual active bridge converter provided in an embodiment of the present application, a first determination unit 901 determines a target loss model of the dual active bridge converter to be optimized; an analysis unit 902 analyzes the target loss model to obtain a plurality of initial objects to be optimized, wherein the plurality of initial objects to be optimized include at least: the effective value of the current of the dual active bridge converter and the instantaneous value of the current of the dual active bridge converter; a second determination unit 903 determines a target object and an optimization condition corresponding to the target object from the plurality of initial objects to be optimized according to the soft switching implementation condition of the dual active bridge converter, wherein the optimization condition is whether the target object is optimized under the soft switching implementation condition; an optimization unit 904 optimizes the target object according to the optimization condition corresponding to the target object to obtain an optimized dual active bridge converter, thereby solving the problem in the related art that the dual active bridge converter is optimized by a single optimization method such as reflux power optimization or current stress optimization, resulting in a relatively poor optimization effect of the dual active bridge converter. In this scheme, the target loss model of the dual active bridge converter is first established and analyzed to determine multiple initial objects to be optimized that are most relevant to the loss, including: current effective value and current instantaneous value. Then, combined with the soft switching implementation conditions, the optimal optimization target of the dual active bridge converter (i.e., the target object and the corresponding optimization conditions) is obtained. The dual active bridge converter is optimized according to the optimal optimization target. Through the target loss model of the dual active bridge converter, multiple initial objects to be optimized related to the loss can be quickly determined. At the same time, combined with the soft switching conditions, it is convenient to accurately determine the optimal optimization target of the dual active bridge converter, avoiding the traditional method of only optimizing and controlling a single variable or multiple variables of the dual active bridge converter, while ignoring the influence of the soft switching characteristics on the loss, thereby improving the optimization effect of the dual active bridge converter.

[0147] Optionally, in the optimization device of the dual active bridge converter provided in the embodiment of the present application, the first determination unit includes: a first calculation module, which is used to calculate according to the rated current and on-resistance of the dual active bridge converter to obtain a switch tube conduction loss model of the dual active bridge converter; a second calculation module, which is used to calculate according to the primary voltage, output charge, reverse recovery charge, instantaneous value of the switch tube current and switch tube turn-off time of the dual active bridge converter to obtain a switch tube switching loss model of the dual active bridge converter; a third calculation module, which is used to calculate according to the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter to obtain a transformer loss model of the dual active bridge converter; a fourth calculation module, which is used to calculate according to the switch tube conduction loss model, the switch tube switching loss model and the transformer loss model to obtain a target loss model of the dual active bridge converter.

[0148] Optionally, in the optimization device of the dual active bridge converter provided in the embodiment of the present application, the second calculation module includes: a first calculation sub-module, which is used to calculate based on the primary voltage, output charge and reverse recovery charge to obtain the hysteresis loss of the dual active bridge converter; a second calculation sub-module, which is used to calculate based on the instantaneous value of the switch tube current and the switch tube turn-off time to obtain the switch tube turn-on loss and the switch tube turn-off loss of the dual active bridge converter; a third calculation sub-module, which is used to calculate based on the hysteresis loss, the switch tube turn-on loss and the switch tube turn-off loss to obtain the switch tube switching loss model of the dual active bridge converter.

[0149] Optionally, in the optimization device of the dual active bridge converter provided in the embodiment of the present application, the third calculation module includes: a fourth calculation sub-module, used to calculate based on the core loss density and the transformer volume to obtain the iron loss model of the dual active bridge converter; a fifth calculation sub-module, used to calculate based on the rated current and the winding resistance to obtain the copper loss model of the dual active bridge converter; a sixth calculation sub-module, used to calculate based on the iron loss model and the copper loss model to obtain the transformer loss model of the dual active bridge converter.

[0150] Optionally, in the optimization device of the dual active bridge converter provided in the embodiment of the present application, the device also includes: a third determination unit, used to determine multiple switching tubes in the dual active bridge converter and multiple first zero voltage switching implementation conditions corresponding to the multiple switching tubes before determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized based on the soft switching implementation conditions of the dual active bridge converter; a calculation unit, used to perform simplified calculations based on the multiple first zero voltage switching implementation conditions to obtain second zero voltage switching implementation conditions; and a solving unit, used to solve the second zero voltage switching implementation conditions to obtain soft switching implementation conditions.

[0151] Optionally, in the optimization device of the dual active bridge converter provided in the embodiment of the present application, the second determination unit includes: a first determination module, used to determine the initial optimization function corresponding to each initial object to be optimized based on the simulation implementation process of the dual active bridge converter; a first solution module, used to simulate and solve the initial optimization function according to the target algorithm to obtain a first solution result; a second solution module, used to simulate and solve the initial optimization function based on the soft switching implementation condition according to the target algorithm to obtain a second solution result; a second determination module, used to determine the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized based on the first solution result and the second solution result.

[0152] Optionally, in the optimization device of the dual active bridge converter provided in the embodiment of the present application, the second determination module includes: a sorting submodule, used to sort the first solution result and the second solution result to obtain a sorted solution result list; an acquisition submodule, used to obtain a target solution result in the sorted solution result list, wherein the order of the target solution result in the sorted solution result list is less than the order of the remaining solution results in the sorted solution result list; a determination submodule, used to determine the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized based on the target solution result.

[0153] The optimization device of the dual active bridge converter includes a processor and a memory. The above-mentioned first determination unit 901, analysis unit 902, second determination unit 903, optimization unit 904, etc. are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to achieve efficient optimization of the dual active bridge converter.

[0154] The processor includes a kernel, and the kernel calls the corresponding program unit from the memory. One or more kernels can be set, and the dual active bridge converter can be efficiently optimized by adjusting the kernel parameters.

[0155] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.

[0156] An embodiment of the present invention provides a computer-readable storage medium having a program stored thereon, and when the program is executed by a processor, an optimization method for a dual active bridge converter is implemented.

[0157] An embodiment of the present invention provides a processor, which is used to run a program, wherein the program executes an optimization method for a dual active bridge converter when running.

[0158] like Fig.10As shown, an embodiment of the present invention provides an electronic device, the device includes a processor, a memory and a program stored in the memory and executable on the processor, and the processor implements the following steps when executing the program: determining a target loss model of a dual active bridge converter to be optimized; analyzing the target loss model to obtain a plurality of initial objects to be optimized, wherein the plurality of initial objects to be optimized include at least: an effective current value of the dual active bridge converter and an instantaneous current value of the dual active bridge converter; determining a target object and an optimization condition corresponding to the target object from the plurality of initial objects to be optimized according to the soft switching implementation condition of the dual active bridge converter, wherein the optimization condition is whether to optimize the target object under the soft switching implementation condition; optimizing the target object according to the optimization condition corresponding to the target object to obtain an optimized dual active bridge converter.

[0159] Optionally, determining the target loss model of the dual active bridge converter to be optimized includes: calculating based on the rated current and on-resistance of the dual active bridge converter to obtain a switch tube conduction loss model of the dual active bridge converter; calculating based on the primary voltage, output charge, reverse recovery charge, instantaneous value of the switch tube current and switch tube turn-off time of the dual active bridge converter to obtain a switch tube switching loss model of the dual active bridge converter; calculating based on the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter to obtain a transformer loss model of the dual active bridge converter; calculating based on the switch tube conduction loss model, the switch tube switching loss model and the transformer loss model to obtain a target loss model of the dual active bridge converter.

[0160] Optionally, the switch loss model of the switch tube of the dual active bridge converter is obtained by calculating based on the primary voltage, output charge, reverse recovery charge, instantaneous value of the switch tube current and switch tube turn-off time of the dual active bridge converter, including: calculating based on the primary voltage, output charge and reverse recovery charge to obtain the hysteresis loss of the dual active bridge converter; calculating based on the instantaneous value of the switch tube current and the switch tube turn-off time to obtain the switch tube turn-on loss and switch tube turn-off loss of the dual active bridge converter; calculating based on the hysteresis loss, switch tube turn-on loss and switch tube turn-off loss to obtain the switch tube switching loss model of the dual active bridge converter.

[0161] Optionally, calculation is performed based on the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter to obtain the transformer loss model of the dual active bridge converter, including: calculating based on the core loss density and transformer volume to obtain the iron loss model of the dual active bridge converter; calculating based on the rated current and winding resistance to obtain the copper loss model of the dual active bridge converter; calculating based on the iron loss model and the copper loss model to obtain the transformer loss model of the dual active bridge converter.

[0162] Optionally, before determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized based on the soft switching implementation conditions of the dual active bridge converter, the method also includes: determining multiple switching tubes in the dual active bridge converter and multiple first zero voltage switching implementation conditions corresponding to the multiple switching tubes; performing simplified calculations based on the multiple first zero voltage switching implementation conditions to obtain second zero voltage switching implementation conditions; solving the second zero voltage switching implementation conditions to obtain soft switching implementation conditions.

[0163] Optionally, according to the soft switching implementation conditions of the dual active bridge converter, determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized includes: determining the initial optimization function corresponding to each initial object to be optimized according to the simulation implementation process of the dual active bridge converter; simulating and solving the initial optimization function according to the target algorithm to obtain a first solution result; simulating and solving the initial optimization function based on the soft switching implementation conditions according to the target algorithm to obtain a second solution result; determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized based on the first solution result and the second solution result.

[0164] Optionally, based on the first solution result and the second solution result, determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized includes: sorting the first solution result and the second solution result to obtain a sorted solution result list; obtaining the target solution result in the sorted solution result list, wherein the order of the target solution result in the sorted solution result list is less than the order of the remaining solution results in the sorted solution result list; based on the target solution result, determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized.

[0165] The devices in this article can be servers, PCs, PADs, mobile phones, etc.

[0166] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program that initializes the following method steps: determining a target loss model of a dual active bridge converter to be optimized; analyzing the target loss model to obtain multiple initial objects to be optimized, wherein the multiple initial objects to be optimized include at least: the effective value of the current of the dual active bridge converter and the instantaneous value of the current of the dual active bridge converter; determining a target object and an optimization condition corresponding to the target object from the multiple initial objects to be optimized based on the soft switching implementation conditions of the dual active bridge converter, wherein the optimization condition is whether the target object is optimized under the soft switching implementation conditions; optimizing the target object based on the optimization condition corresponding to the target object to obtain an optimized dual active bridge converter.

[0167] Optionally, determining the target loss model of the dual active bridge converter to be optimized includes: calculating based on the rated current and on-resistance of the dual active bridge converter to obtain a switch tube conduction loss model of the dual active bridge converter; calculating based on the primary voltage, output charge, reverse recovery charge, instantaneous value of the switch tube current and switch tube turn-off time of the dual active bridge converter to obtain a switch tube switching loss model of the dual active bridge converter; calculating based on the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter to obtain a transformer loss model of the dual active bridge converter; calculating based on the switch tube conduction loss model, the switch tube switching loss model and the transformer loss model to obtain a target loss model of the dual active bridge converter.

[0168] Optionally, the switch loss model of the switch tube of the dual active bridge converter is obtained by calculating based on the primary voltage, output charge, reverse recovery charge, instantaneous value of the switch tube current and switch tube turn-off time of the dual active bridge converter, including: calculating based on the primary voltage, output charge and reverse recovery charge to obtain the hysteresis loss of the dual active bridge converter; calculating based on the instantaneous value of the switch tube current and the switch tube turn-off time to obtain the switch tube turn-on loss and switch tube turn-off loss of the dual active bridge converter; calculating based on the hysteresis loss, switch tube turn-on loss and switch tube turn-off loss to obtain the switch tube switching loss model of the dual active bridge converter.

[0169] Optionally, calculation is performed based on the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter to obtain the transformer loss model of the dual active bridge converter, including: calculating based on the core loss density and transformer volume to obtain the iron loss model of the dual active bridge converter; calculating based on the rated current and winding resistance to obtain the copper loss model of the dual active bridge converter; calculating based on the iron loss model and the copper loss model to obtain the transformer loss model of the dual active bridge converter.

[0170] Optionally, before determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized based on the soft switching implementation conditions of the dual active bridge converter, the method also includes: determining multiple switching tubes in the dual active bridge converter and multiple first zero voltage switching implementation conditions corresponding to the multiple switching tubes; performing simplified calculations based on the multiple first zero voltage switching implementation conditions to obtain second zero voltage switching implementation conditions; solving the second zero voltage switching implementation conditions to obtain soft switching implementation conditions.

[0171] Optionally, according to the soft switching implementation conditions of the dual active bridge converter, determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized includes: determining the initial optimization function corresponding to each initial object to be optimized according to the simulation implementation process of the dual active bridge converter; simulating and solving the initial optimization function according to the target algorithm to obtain a first solution result; simulating and solving the initial optimization function based on the soft switching implementation conditions according to the target algorithm to obtain a second solution result; determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized based on the first solution result and the second solution result.

[0172] Optionally, based on the first solution result and the second solution result, determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized includes: sorting the first solution result and the second solution result to obtain a sorted solution result list; obtaining the target solution result in the sorted solution result list, wherein the order of the target solution result in the sorted solution result list is less than the order of the remaining solution results in the sorted solution result list; based on the target solution result, determining the target object and the optimization conditions corresponding to the target object from multiple initial objects to be optimized.

[0173] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0174] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0175] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0176] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0177] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0178] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0179] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0180] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0181] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0182] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.

Claims

1. An optimization method for a dual active bridge converter, It is characterized in that include: Determining a target loss model of a dual active bridge converter to be optimized; Analyzing the target loss model to obtain a plurality of initial objects to be optimized, wherein the plurality of initial objects to be optimized at least include: an effective current value of the dual active bridge converter and an instantaneous current value of the dual active bridge converter; According to the soft switching implementation condition of the dual active bridge converter, determining a target object and an optimization condition corresponding to the target object from the multiple initial objects to be optimized, wherein the optimization condition is whether to optimize the target object under the soft switching implementation condition; According to the optimization conditions corresponding to the target object, the target object is optimized to obtain an optimized dual active bridge converter.

2. The method according to claim 1, It is characterized in that Determining the target loss model of the dual active bridge converter to be optimized includes: Calculating according to the rated current and on-resistance of the dual active bridge converter to obtain a switch tube conduction loss model of the dual active bridge converter; Calculating according to the primary voltage, output charge, reverse recovery charge, instantaneous value of switch tube current and switch tube turn-off time of the dual active bridge converter to obtain a switch tube switching loss model of the dual active bridge converter; Calculating according to the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter to obtain a transformer loss model of the dual active bridge converter; The target loss model of the dual active bridge converter is obtained by performing calculations based on the switch tube conduction loss model, the switch tube switching loss model and the transformer loss model.

3. The method according to claim 2, It is characterized in that The switch loss model of the switch tube of the dual active bridge converter is obtained by calculating according to the primary voltage, output charge, reverse recovery charge, instantaneous value of the switch tube current and switch tube turn-off time of the dual active bridge converter, including: Calculating according to the primary voltage, the output charge and the reverse recovery charge to obtain the hysteresis loss of the dual active bridge converter; Calculating according to the instantaneous value of the switch tube current and the switch tube turn-off time to obtain the switch tube turn-on loss and the switch tube turn-off loss of the dual active bridge converter; The switch loss model of the switch tube of the dual active bridge converter is obtained by calculating according to the hysteresis loss, the switch tube turn-on loss and the switch tube turn-off loss.

4. The method according to claim 2, It is characterized in that The transformer loss model of the dual active bridge converter is obtained by calculating the core loss density, transformer volume, winding resistance and rated current of the dual active bridge converter, including: Calculating according to the core loss density and the transformer volume to obtain an iron loss model of the dual active bridge converter; Calculating according to the rated current and the winding resistance to obtain a copper loss model of the dual active bridge converter; The transformer loss model of the dual active bridge converter is obtained by performing calculations based on the iron loss model and the copper loss model.

5. The method according to claim 1, It is characterized in that Before determining a target object and an optimization condition corresponding to the target object from the plurality of initial objects to be optimized according to the soft switching realization condition of the dual active bridge converter, the method further comprises: Determining a plurality of switch tubes in the dual active bridge converter and a plurality of first zero voltage switching implementation conditions corresponding to the plurality of switch tubes; Performing simplified calculation according to the plurality of first zero voltage switching realization conditions to obtain a second zero voltage switching realization condition; The second zero voltage switching realization condition is solved to obtain the soft switching realization condition.

6. The method according to claim 1, It is characterized in that According to the soft switching realization conditions of the dual active bridge converter, determining a target object and an optimization condition corresponding to the target object from the multiple initial objects to be optimized includes: According to the simulation implementation process of the dual active bridge converter, determining an initial optimization function corresponding to each initial object to be optimized; Simulating and solving the initial optimization function according to the target algorithm to obtain a first solution result; Simulating and solving the initial optimization function based on the soft switching implementation condition according to the target algorithm to obtain a second solution result; The target object and the optimization condition corresponding to the target object are determined from the multiple initial objects to be optimized according to the first solution result and the second solution result.

7. The method according to claim 6, It is characterized in that Determining the target object and the optimization condition corresponding to the target object from the multiple initial objects to be optimized according to the first solution result and the second solution result includes: Sorting the first solution result and the second solution result to obtain a sorted solution result list; Obtaining a target solution result in the sorted solution result list, wherein the order of the target solution result in the sorted solution result list is smaller than the order of the remaining solution results in the sorted solution result list; According to the target solution result, the target object and the optimization conditions corresponding to the target object are determined from the multiple initial objects to be optimized.

8. An optimization device for a dual active bridge converter, It is characterized in that include: A first determining unit, used to determine a target loss model of a dual active bridge converter to be optimized; An analysis unit, configured to analyze the target loss model to obtain a plurality of initial objects to be optimized, wherein the plurality of initial objects to be optimized at least include: an effective current value of the dual active bridge converter and an instantaneous current value of the dual active bridge converter; A second determining unit is used to determine a target object and an optimization condition corresponding to the target object from the multiple initial objects to be optimized according to the soft switching implementation condition of the dual active bridge converter, wherein the optimization condition is whether to optimize the target object under the soft switching implementation condition; The optimization unit is used to optimize the target object according to the optimization conditions corresponding to the target object to obtain an optimized dual active bridge converter.

9. A computer-readable storage medium, It is characterized in that The computer-readable storage medium includes a stored program, wherein when the program is executed, the storage medium is controlled to execute the optimization method of the dual active bridge converter according to any one of claims 1 to 7 on a device.

10. An electronic device, It is characterized in that It comprises one or more processors and a memory, wherein the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the optimization method of the dual active bridge converter described in any one of claims 1 to 7.

Citation Information

Cited By

  • Potentially isolating DC / DC converter for high voltages and frequencies

    DE102025111717A1

  • Potential-separating DC / DC converter for high voltages and frequencies

    WO2026202138A1