Communication method and device for on-site construction decision of external damage hidden danger of power transmission line, and medium
By establishing a communication connection between the mobile terminal and the backend management platform at the site of breaking hidden dangers outside the transmission line, data synchronization and intelligent analysis are realized, the instability and inaccuracy of construction decisions are solved, and the safety and efficiency of construction deployment are improved .
Patent Information
- Application Number
- CN202410974960.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-01
AI Technical Summary
During the maintenance and construction of transmission lines, the construction deployment decision-making effect of the external hazard site is poor, resulting in unstable and unreal-time data transmission, affecting the safety and accuracy of decision-making.
By establishing a communication connection between the mobile terminal and the backend management platform, the data synchronization module is used to synchronize on-site information in real time, denoising and formatting the image and text data, and using deep learning models and genetic algorithms to carry out the environment and Risk analysis to generate the optimal construction deployment strategy.
It improves the stability and real-time nature of data transmission, ensures data consistency, enhances the safety and accuracy of construction decisions, and improves the efficiency of on-site data processing.
Smart Images

Figure CN118890360A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of engineering deployment guidance, and in particular to a communication method, device and medium for on-site construction decision-making for hidden dangers of external damage to power transmission lines. Background Art
[0002] During the maintenance and construction of power transmission lines, safety issues are prone to occur at the site of external damage hazards. However, in the existing construction deployment technology for external damage hazard sites, on-site construction personnel are usually required to manually upload on-site monitoring data to the management background on mobile terminals. This process may be operated by multiple on-site construction personnel, and data may be omitted, sent repeatedly, or sent incorrectly, resulting in the management background being unable to accurately obtain on-site equipment information and construction information, resulting in inconsistent data between the mobile terminal and the management background, poor stability and real-time performance of data transmission, and affecting the data processing efficiency of the management background.
[0003] In addition, the management background’s construction decision-making based on on-site data is ineffective and cannot optimize existing construction plans. The safety analysis of on-site monitoring data and construction information is not comprehensive and accurate enough, which affects the safety and accuracy of construction deployment decisions. Summary of the invention
[0004] The present application provides a communication method, device and medium for on-site construction decision-making for external failure hazards of power transmission lines. The data of the mobile terminal is synchronized to the management background through a data synchronization method to ensure data consistency, stability and real-time data transmission. In addition, a comprehensive safety analysis is conducted on the site of external failure hazards, and construction deployment decisions are made, thereby improving the safety and accuracy of construction deployment decisions.
[0005] The present application provides a communication method for on-site construction decision-making of transmission line external damage hidden dangers, which is applied to a mobile terminal, wherein the mobile terminal is respectively connected to a synchronization module and a background management platform for communication; the synchronization module is connected to the background management platform for communication; the mobile terminal is used to collect on-site information of the transmission line external damage hidden danger site;
[0006] The communication method comprises:
[0007] Sending the on-site information to a synchronization module in real time, so that the synchronization module detects whether the first on-site information stored in the mobile terminal is consistent with the second on-site information stored in the background management platform. If they are inconsistent, synchronizing the first on-site information to the background management platform;
[0008] Sending the on-site information to a backend management platform in real time;
[0009] If a construction decision request from the user is received, the construction decision request will be sent to the background management platform, so that the background management platform can perform environmental analysis and risk analysis on the on-site information to obtain analysis results; the construction task will be optimized according to the analysis results to obtain the optimal safety measures strategy and the optimal construction deployment strategy; and the optimal construction deployment strategy and the optimal safety measures strategy will be transmitted back to the mobile terminal.
[0010] Furthermore, the data synchronization module further includes:
[0011] The data synchronization module periodically synchronizes the stored field data to the background management platform.
[0012] Furthermore, before sending the on-site information to the background management platform in real time, the method further includes:
[0013] De-noise the image data, format the text data, and store the processed field data in the database;
[0014] Wherein, the image data includes on-site image information;
[0015] The text data includes: location information, environmental parameters, transmission line equipment data and construction task data;
[0016] Denoising the image data includes: graying and resizing the image data; detecting noise in the image using an image processing algorithm, and removing the noise using a deep learning model to obtain a denoised image;
[0017] The formatting of the text data includes: performing data cleaning on the text data, removing invalid data in the text data, filling missing data in the text data, correcting erroneous data in the text data, and obtaining cleaned data; parsing the cleaned data, converting the cleaned data into structured data; converting the structured data into a standard format to obtain formatted text data.
[0018] Furthermore, the environmental assessment and risk assessment are performed on the site information to obtain analysis results respectively, and the construction tasks are optimized according to the analysis results to obtain the optimal safety measures strategy and the optimal construction deployment strategy, specifically:
[0019] Analyze the on-site image information and environmental parameters to generate environmental assessment results;
[0020] Performing risk analysis on the transmission line equipment data to generate risk assessment results;
[0021] According to the environmental assessment results and risk assessment results, the construction task configuration data is safely optimized to obtain the optimal safety measures strategy;
[0022] According to the location information and the optimal safety measures strategy, the latest construction task allocation information and task detail information are optimized to generate an optimal construction deployment strategy.
[0023] Further, generating a safety briefing report according to the environmental assessment results, the risk assessment results and the corresponding safety measures strategy;
[0024] The environmental assessment results, the risk assessment results, the corresponding safety measures strategy, the safety briefing report and the construction plan are stored in a database.
[0025] Furthermore, the on-site image information and environmental parameters are analyzed to generate environmental assessment results, specifically:
[0026] Inputting the scene image information and environmental parameters into the first deep learning model for environmental analysis, and outputting the environmental condition level of the current scene;
[0027] The first deep learning model is used to analyze the environmental conditions at the site of the transmission line external damage hazard based on the on-site image information and environmental parameters;
[0028] The environmental parameters include: one or more of temperature, humidity and wind speed;
[0029] The environmental conditions are taken as the environmental assessment results.
[0030] Further, risk analysis is performed on the transmission line equipment data to generate risk assessment results, specifically:
[0031] Inputting the equipment monitoring data and equipment historical fault records in the power transmission line equipment data into a second deep learning model for risk analysis, analyzing the failure risk of each power transmission line equipment on site, and outputting a fault warning of each power transmission line equipment;
[0032] The second deep learning model is used to analyze the failure risk of each transmission line equipment on site according to the equipment monitoring data and the equipment historical failure records in the transmission line equipment data, and output the failure warning of each transmission line equipment;
[0033] The failure warning of each of the transmission line equipment is used as a risk assessment result.
[0034] Furthermore, according to the location information and the optimal safety measures strategy, the latest construction task allocation information and task detail information are optimized to generate the optimal construction deployment strategy, specifically:
[0035] According to the location information and the optimal safety measures strategy, the latest construction task allocation information and task detail information are optimized using genetic algorithms and ant colony algorithms to generate an optimal construction deployment strategy; the construction deployment strategy includes at least: task steps, personnel arrangements and time plans.
[0036] Furthermore, in response to the user's operation instruction on the interactive interface, data corresponding to the operation instruction is obtained from the database for display; the interactive interface is connected to the background management platform;
[0037] The operation instructions include: any one of: data query, construction task configuration, safety briefing information viewing and alarm processing.
[0038] As a preferred solution, this application realizes the real-time collection and transmission of field data by introducing the communication between the mobile terminal and the background management platform. At the same time, through the data synchronization module, the data consistency between the mobile terminal and the background management platform is realized. Whether it is regular synchronization or real-time synchronization, the system can effectively ensure the consistency and integrity of the data.
[0039] This application uses deep learning and data mining technology to intelligently analyze and process the collected data, so that this application can automatically identify and analyze potential safety hazards in on-site data and generate safety measures strategies; and combined with genetic algorithms and ant colony algorithms, this application can automatically generate the optimal construction deployment strategy for distribution and deployment based on the data analysis results of the background management platform. This intelligent data processing method effectively improves the processing efficiency of on-site data and improves the safety and accuracy of construction deployment decisions.
[0040] Accordingly, the present application also provides a communication system for on-site construction decision-making for external damage hazards of power transmission lines, including: a mobile terminal, a synchronization module, a background management platform and a deployment module; the mobile terminal is respectively connected to the synchronization module and the background management platform in communication; the synchronization module is connected to the background management platform in communication;
[0041] The mobile terminal is used to collect on-site information of the site of the hidden danger of external damage of the power transmission line; the on-site information is sent to the synchronization module in real time, so that the synchronization module detects whether the first on-site information stored in the mobile terminal is consistent with the second on-site information stored in the background management platform, and if they are inconsistent, the first on-site information is synchronized to the background management platform;
[0042] Sending the on-site information to a backend management platform in real time;
[0043] If a construction decision request is received from the user, the construction decision request will be sent to the background management platform, so that the background management platform can use the deployment module to perform environmental analysis and risk analysis on the on-site information to obtain analysis results; optimize the construction task according to the analysis results to obtain the optimal safety measures strategy and the optimal construction deployment strategy; and transmit the optimal construction deployment strategy and the optimal safety measures strategy back to the mobile terminal.
[0044] Correspondingly, the present application also provides a computer-readable storage medium, which includes a stored computer program; wherein, when the computer program is running, it controls the device where the computer-readable storage medium is located to execute a communication method for on-site construction decision-making for external damage hazards of transmission lines as described in the content of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 It is a flow chart of an embodiment of a communication method for on-site construction decision-making for external damage hazards of power transmission lines provided by the present application;
[0046] Figure 2 It is a structural schematic diagram of an embodiment of a communication device for on-site construction decision-making for external damage hazards of power transmission lines provided by the present application. DETAILED DESCRIPTION
[0047] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0048] Embodiment 1
[0049] Please refer to Figure 1 , a communication method for on-site construction decision-making of a transmission line external damage hidden danger provided by an embodiment of the present application, applied to a mobile terminal, the mobile terminal is respectively connected to a synchronization module and a background management platform for communication; the synchronization module is connected to the background management platform for communication; the mobile terminal is used to collect on-site information of a transmission line external damage hidden danger site;
[0050] The communication method comprises steps S101-S103:
[0051] Step S101: sending the on-site information to a synchronization module in real time, so that the synchronization module detects whether the first on-site information stored in the mobile terminal is consistent with the second on-site information stored in the background management platform; if they are inconsistent, synchronizing the first on-site information to the background management platform;
[0052] Step S102: sending the on-site information to the background management platform in real time;
[0053] Step S103: If a construction decision request from the user is received, the construction decision request is sent to the background management platform, so that the background management platform performs environmental analysis and risk analysis on the on-site information to obtain analysis results; optimizes the construction task according to the analysis results to obtain the optimal safety measures strategy and the optimal construction deployment strategy; and transmits the optimal construction deployment strategy and the optimal safety measures strategy back to the mobile terminal.
[0054] Furthermore, the data synchronization module further includes:
[0055] The data synchronization module periodically synchronizes the stored field data to the background management platform.
[0056] A communication method for on-site construction decision-making of a power transmission line external damage hazard in this embodiment is applied to a construction decision-making system. Please refer to Figure 2 , which is the construction decision-making system of this embodiment, includes: a mobile terminal 1, a background management platform 2, a data synchronization module 3, and a decision-making module 4.
[0057] The mobile terminal 1 is connected to the data synchronization module 3; the mobile terminal 1 includes a wireless communication module, a positioning module, a data processing module and a user interaction interface.
[0058] The mobile terminal 1 is used to transmit data with the background management platform 2 through the wireless communication module, and the data transmission protocol can adopt HTTP / HTTPS or MQTT, etc. The wireless communication module of the mobile terminal continuously detects the network connection status. When the network recovery is detected, the mobile terminal notifies the data synchronization module to start data synchronization. The mobile terminal 1 is used to obtain the on-site GPS coordinates as location information using the API of the positioning module, and the data processing module performs preliminary processing on the received data, such as denoising the image data and formatting the text data. The mobile terminal 1 builds a user interface based on HTML5 and CSS3, and uses JavaScript or mobile development frameworks (such as React Native, Flutter) to implement interactive functions, such as displaying data and receiving user operation instructions.
[0059] The mobile terminal 1 can be a smart phone or tablet computer, supporting Android or iOS operating system, and has good portability and operation performance. A dedicated briefing and construction guidance application is installed on the mobile terminal. The application of the mobile terminal 1 provides a user login authentication function to ensure that only authorized personnel can access the system. Through the application, on-site construction personnel can access safety measures strategies and construction strategy guidance in real time. On-site personnel can take photos and record videos through the mobile terminal, record the hidden dangers found and upload them to the background. The mobile terminal 1 stores all collected data in the local cache in offline mode.
[0060] The mobile terminal 1 is used to collect on-site data, including: on-site image information, location information, environmental parameters, power transmission line equipment data and construction task configuration data.
[0061] Among them, on-site image information includes: images generated by on-site personnel taking photos or recording videos through mobile terminals; location information includes: GPS coordinates; environmental parameters include: real-time monitoring data such as temperature, humidity and wind speed. Transmission line equipment data includes: status and fault information of transmission line equipment, etc. Construction task configuration data includes: construction progress, personnel arrangements and task completion status, etc.
[0062] The backend management platform 2 is connected to the data synchronization module 3, and the backend management platform 2 includes: a database server, an application server and a Web server.
[0063] The backend management platform 2 is used to store and manage system data through a database server. For example, a relational database (such as MySQL, PostgreSQL) or a NoSQL database (such as MongoDB) is used to store system data. A reasonable database architecture is designed to ensure efficient storage and fast retrieval of data. The backend management platform 2 uses programming languages such as Python or R to analyze and process data, and combines data mining algorithms (such as cluster analysis and regression analysis) to generate valuable analysis results.
[0064] The application server of the backend management platform 2 is responsible for processing data requests from mobile terminals and providing business logic support, and the web server is used to build a user interface for users to access the system through a browser. Exemplarily, the backend management platform 2 uses an application server (such as Node.js, Django, Spring Boot) to process data requests from mobile terminals and implement business logic, including data verification, processing and storage. The backend management platform 2 hosts the front-end application through a web server (such as Apache, Nginx), and uses a front-end framework (such as Ang l ar, React, Vue.js) to build a user interface, allowing users to access the system through a browser.
[0065] The backend management platform 2 has a built-in communication module, which includes: wireless communication function and wired interface; wireless communication supports 4G / 5G network and WiFi to ensure real-time communication between the site and the backend. The wired interface is a spare Ethernet interface for data transmission when the network environment is restricted.
[0066] The software of the backend management platform 2 provides user rights management functions and assigns access rights to different roles. Administrators can use the platform to update and manage the content of the briefing and construction instructions in real time, including multimedia information such as text, pictures, and videos. The uploaded data is analyzed to generate hidden danger statistics reports and construction progress reports.
[0067] The data synchronization module 3 is connected to the mobile terminal 1 and the background management platform 2, and is used to synchronize the data collected by the mobile terminal to the background management platform in a regular or real-time manner to maintain data consistency. Both the mobile terminal 1 and the data synchronization module 3 can detect the network status. When the network is restored, the data synchronization process will be started. The data synchronization module 3 reads the local cache data, checks the unsynchronized data entries; determines the data that needs to be synchronized, and establishes a synchronization task queue. After the background management platform 2 receives the data and confirms it, the data synchronization module 3 clears the synchronized data in the local cache to ensure data consistency.
[0068] The data synchronization module 3 designs a regular or real-time data synchronization mechanism to ensure the data consistency between the mobile terminal and the background management platform. Polling mechanism, WebSocket or MQTT protocol can be used to achieve real-time data synchronization. The data synchronization module 3 uses data conflict detection and processing algorithms to ensure the consistency and integrity of data during the synchronization process.
[0069] In this embodiment, the data synchronization module 3 provides two synchronization modes: real-time synchronization and offline mode. Real-time synchronization is to realize real-time synchronization of on-site and background data through a wireless communication network; offline mode is that when the network is unstable, the mobile terminal can work offline and automatically synchronize data after the network is restored.
[0070] The decision module 4 is connected to the background management platform 2. The decision module 4 is used to obtain the on-site information of the transmission line external damage hidden danger site, perform environmental assessment and risk assessment on the on-site information, and obtain analysis results respectively; based on the analysis results, the construction task configuration data is safely optimized to obtain the optimal safety measures strategy; based on the construction task configuration data, the latest construction task allocation information and task details information are determined; based on the location information and the optimal safety measures strategy, the latest construction task allocation information and task details information are optimized to generate the optimal construction deployment strategy; the deployment module is used to transmit the optimal construction deployment strategy and the optimal safety measures strategy back to the mobile terminal, so that the mobile terminal can perform policy decentralization and implementation response, and transmit them back to the mobile terminal or send them to the Web interface for display to the user.
[0071] Furthermore, before sending the on-site information to the background management platform in real time, the method further includes:
[0072] De-noise the image data, format the text data, and store the processed field data in the database;
[0073] Wherein, the image data includes on-site image information;
[0074] The text data includes: location information, environmental parameters, transmission line equipment data and construction task data;
[0075] Denoising the image data includes: graying and resizing the image data; detecting noise in the image using an image processing algorithm, and removing the noise using a deep learning model to obtain a denoised image;
[0076] The formatting of the text data includes: performing data cleaning on the text data, removing invalid data in the text data, filling missing data in the text data, correcting erroneous data in the text data, and obtaining cleaned data; parsing the cleaned data, converting the cleaned data into structured data; converting the structured data into a standard format to obtain formatted text data.
[0077] In this embodiment, the image processing algorithm includes: median filtering or mean filtering. The format of structured data is such as JSON or XML.
[0078] Furthermore, the environmental assessment and risk assessment are performed on the site information to obtain analysis results respectively, and the construction tasks are optimized according to the analysis results to obtain the optimal safety measures strategy and the optimal construction deployment strategy, specifically:
[0079] Analyze the on-site image information and environmental parameters to generate environmental assessment results;
[0080] Performing risk analysis on the transmission line equipment data to generate risk assessment results;
[0081] According to the environmental assessment results and risk assessment results, the construction task configuration data is safely optimized to obtain the optimal safety measures strategy;
[0082] According to the location information and the optimal safety measures strategy, the latest construction task allocation information and task detail information are optimized to generate an optimal construction deployment strategy.
[0083] Further, generating a safety briefing report according to the environmental assessment results, the risk assessment results and the corresponding safety measures strategy;
[0084] The environmental assessment results, the risk assessment results, the corresponding safety measures strategy, the safety briefing report and the construction plan are stored in a database.
[0085] Furthermore, the on-site image information and environmental parameters are analyzed to generate environmental assessment results, specifically:
[0086] Inputting the scene image information and environmental parameters into the first deep learning model for environmental analysis, and outputting the environmental condition level of the current scene;
[0087] The first deep learning model is used to analyze the environmental conditions at the site of the transmission line external damage hazard based on the on-site image information and environmental parameters;
[0088] The environmental parameters include: one or more of temperature, humidity and wind speed;
[0089] The environmental conditions are taken as the environmental assessment results.
[0090] Further, risk analysis is performed on the transmission line equipment data to generate risk assessment results, specifically:
[0091] Inputting the equipment monitoring data and equipment historical fault records in the power transmission line equipment data into a second deep learning model for risk analysis, analyzing the failure risk of each power transmission line equipment on site, and outputting a fault warning of each power transmission line equipment;
[0092] The second deep learning model is used to analyze the failure risk of each transmission line equipment on site according to the equipment monitoring data and the equipment historical failure records in the transmission line equipment data, and output the failure warning of each transmission line equipment;
[0093] The failure warning of each of the transmission line equipment is used as a risk assessment result.
[0094] Furthermore, according to the location information and the optimal safety measures strategy, the latest construction task allocation information and task detail information are optimized to generate the optimal construction deployment strategy, specifically:
[0095] According to the location information and the optimal safety measures strategy, the latest construction task allocation information and task detail information are optimized using genetic algorithms and ant colony algorithms to generate an optimal construction deployment strategy; the construction deployment strategy includes at least: task steps, personnel arrangements and time plans.
[0096] In this embodiment, the optimal safety measures strategy and the optimal construction deployment strategy are generated by combining a rule engine (such as Droo ls) and an optimization algorithm (such as a genetic algorithm and an ant colony algorithm).
[0097] Exemplarily, the present application first uses Python's Pandas and NumPy libraries to preprocess and analyze the field data. The Sc i kit l earn library is used to implement data mining algorithms, such as cluster analysis (Kmeans) and regression analysis (linear regression, logistic regression).
[0098] This application uses TensorFlow or PyTorch framework to build deep learning models (such as convolutional neural networks, recursive neural networks) for processing and analysis of image and text data. In the optimization of safety measures strategy, this application uses genetic algorithm (GA) to optimize the construction task configuration data for safety, and uses ant colony algorithm (ACO) for path optimization and resource scheduling to obtain the optimal safety measures strategy; uses genetic algorithm (GA) to optimize the latest construction task allocation information and task details information, and uses ant colony algorithm (ACO) for path optimization and resource scheduling to generate the optimal construction deployment strategy.
[0099] In this application, based on environmental assessment and risk analysis, the safety hazards and risks existing on site are determined, and corresponding safety measures and prevention suggestions, that is, the optimal safety measures strategy, are provided.
[0100] Among them, environmental analysis includes determining whether environmental parameters exceed the safety threshold range;
[0101] Risk analysis includes identifying equipment failure conditions and severe weather conditions;
[0102] Safety measures strategies include: providing specific safety measures and prevention suggestions for identified risks, such as wearing protective equipment, setting up warning signs and formulating emergency plans.
[0103] Exemplarily, the environmental analysis result, that is, the environmental conditions are: temperature: 35°C; humidity: 60%; wind speed: 10km / h, and the temperature parameter among the three environmental parameters exceeds the equipment safety threshold and the body safety threshold.
[0104] The risk analysis result, i.e. the equipment failure warning, is: equipment overheating risk.
[0105] Safety measures include: installing sunshade equipment to reduce equipment temperature; staff wearing heat-proof and cooling equipment, and providing adequate drinking water and rest time.
[0106] In this application, based on task planning and resource assessment, construction steps, personnel arrangements and time plans are determined to provide detailed construction guidance and optimization suggestions, that is, the optimal construction deployment strategy.
[0107] For example, the construction steps are determined: Step 1: Equipment inspection and maintenance; Step 2: New equipment installation; Step 3: Line testing and debugging. Personnel arrangements are determined: Equipment inspection person in charge: Zhang San; Installation personnel: Li Si and Wang Wu; Tester: Zhao Liu. Time plan is determined: Equipment inspection: 8:00-10:00; Equipment installation: 10:00-14:00; Line testing: 14:00-16:00; Resource requirements: Tools: wrench, screwdriver, multimeter; Equipment: new transformer; Materials: cables, connectors.
[0108] Optimization suggestions: Prepare the necessary tools and materials in advance to reduce waiting time; assign dedicated personnel to be responsible for the installation and testing process to improve work efficiency; avoid high temperature periods and check equipment that is prone to overheating risks in advance.
[0109] Furthermore, in response to the user's operation instruction on the interactive interface, data corresponding to the operation instruction is obtained from the database for display; the interactive interface is connected to the background management platform;
[0110] The operation instructions include: any one of: data query, construction task configuration, safety briefing information viewing and alarm processing.
[0111] In this embodiment, the data query operation instruction indicates that the user can query on-site real-time data, historical data, environmental data, etc. For example, the user selects environmental data for a certain period of time, and the system displays data curves such as temperature, humidity, and wind speed for that period of time.
[0112] The operation instructions of task management mean that users can create, assign, modify and view construction tasks. For example, when a user creates a new construction task, the system records the task details and assigns it to the relevant personnel.
[0113] The safety briefing operation instruction means that the user can view and confirm the on-site safety measures and policy information. For example, the user views the safety briefing report generated by the system, including the current safety hazards on the site and the corresponding preventive measures.
[0114] The operation instructions for alarm processing indicate that users can handle the risk warning information prompted by the system.
[0115] In this embodiment, the interactive interface provides flexible display methods, such as charts, reports, interactive interfaces, etc., for users to view and use. The interactive interface displays the optimal construction deployment strategy and the optimal safety measures strategy generated through the user interface, and allows users to download or print. The interactive interface also provides on-site data display, such as real-time monitoring data such as current environmental parameters and equipment operating status; construction task information such as current construction task progress and personnel arrangements; historical records such as past construction records and hidden danger handling records; current unhandled risk warning information and its details; safety briefing reports, construction guidance plans and optimization suggestions, etc.
[0116] Implementing the embodiments of the present application has the following effects:
[0117] This application realizes the real-time collection and transmission of field data by introducing the communication between the mobile terminal and the background management platform, which greatly improves the efficiency of the traditional method. At the same time, through the data synchronization module, the data consistency between the mobile terminal and the background management platform is achieved. Whether it is regular synchronization or real-time synchronization, the system can effectively ensure the consistency and integrity of the data.
[0118] This application uses deep learning and data mining technology to intelligently analyze and process the collected data, so that this application can automatically identify and analyze potential safety hazards in the field data and generate safety measures strategies; and combined with genetic algorithms and ant colony algorithms, this application can automatically generate the optimal construction deployment strategy for distribution and deployment based on the data analysis results of the background management platform. This intelligent data processing method effectively improves the processing efficiency of field data and improves the safety and accuracy of construction deployment decisions.
[0119] Embodiment 2
[0120] Please refer to Figure 2 , the present application also provides a communication system for on-site construction decision-making of transmission line external damage hidden dangers provided by the present application embodiment, including: a mobile terminal 1, a synchronization module 2, a background management platform 3 and a deployment module 4; the mobile terminal 1 is respectively connected to the synchronization module 2 and the background management platform 3 in communication; the synchronization module 2 is connected to the background management platform 3 in communication;
[0121] The mobile terminal 1 is used to collect on-site information of the site of the hidden danger of external damage of the power transmission line; the on-site information is sent to the synchronization module 2 in real time, so that the synchronization module 2 detects whether the first on-site information stored in the mobile terminal is consistent with the second on-site information stored in the background management platform, and if they are inconsistent, the first on-site information is synchronized to the background management platform 3;
[0122] Sending the on-site information to the backend management platform 3 in real time;
[0123] If a construction decision request from the user is received, the construction decision request will be sent to the background management platform 3, so that the background management platform 3 uses the deployment module 4 to perform environmental analysis and risk analysis on the on-site information to obtain analysis results; optimize the construction task according to the analysis results to obtain the optimal safety measures strategy and the optimal construction deployment strategy; and transmit the optimal construction deployment strategy and the optimal safety measures strategy back to the mobile terminal 1.
[0124] The above-mentioned communication device for on-site construction decision-making of transmission line external damage hidden danger can implement the communication method for on-site construction decision-making of transmission line external damage hidden danger of the above-mentioned method embodiment. The options in the above-mentioned method embodiment are also applicable to this embodiment and will not be described in detail here. The rest of the contents of the embodiments of this application can refer to the contents of the above-mentioned method embodiment, and in some preferred embodiments, they will not be repeated.
[0125] Embodiment 3
[0126] Accordingly, the present application also provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the communication method for on-site construction decision-making for external damage hazards of transmission lines as described in any one of the above embodiments.
[0127] Exemplarily, the computer program may be divided into one or more modules / units, which are stored in the memory and executed by the processor to complete the present application. The one or more modules / units may be a series of computer program instruction segments capable of completing specific functions, which are used to describe the execution process of the computer program in the terminal device.
[0128] The terminal device may be a computing device such as a desktop computer, a notebook, a PDA, a cloud server, etc. The terminal device may include, but is not limited to, a processor and a memory.
[0129] The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the terminal device, and uses various interfaces and lines to connect various parts of the entire terminal device.
[0130] The memory can be used to store the computer program and / or module, and the processor realizes various functions of the terminal device by running or executing the computer program and / or module stored in the memory, and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, at least one application required for a function, etc.; the data storage area can store data created according to the use of the mobile terminal, etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Med ia Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0131] Wherein, if the module / unit integrated in the terminal device is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Wherein, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form, etc. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium, etc.
[0132] The specific embodiments described above further describe the purpose, technical solutions and beneficial effects of the present application in detail. It should be understood that the above description is only a specific embodiment of the present application and is not intended to limit the scope of protection of the present application. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of protection of the present application.
Claims
1. A communication method for on-site construction decision-making for external damage hazards of power transmission lines, characterized in that: Applied to a mobile terminal, the mobile terminal is respectively connected to a synchronization module and a background management platform for communication; the synchronization module is connected to the background management platform for communication; The mobile terminal is used to collect on-site information of the site of the hidden danger of external damage of the power transmission line; The communication method comprises: Sending the on-site information to a synchronization module in real time, so that the synchronization module detects whether the first on-site information stored in the mobile terminal is consistent with the second on-site information stored in the background management platform. If they are inconsistent, synchronizing the first on-site information to the background management platform; Sending the on-site information to a backend management platform in real time; If a construction decision request from the user is received, the construction decision request will be sent to the background management platform, so that the background management platform can perform environmental analysis and risk analysis on the on-site information to obtain analysis results; the construction task will be optimized according to the analysis results to obtain the optimal safety measures strategy and the optimal construction deployment strategy; and the optimal construction deployment strategy and the optimal safety measures strategy will be transmitted back to the mobile terminal.
2. A communication method for on-site construction decision-making for external damage hazards of power transmission lines as claimed in claim 1, characterized in that: The data synchronization module further includes: The data synchronization module periodically synchronizes the stored field data to the background management platform.
3. A communication method for on-site construction decision-making for external damage hazards of power transmission lines as claimed in claim 1, characterized in that: Before sending the on-site information to the backend management platform in real time, the process also includes: De-noise the image data, format the text data, and store the processed field data in the database; Wherein, the image data includes on-site image information; The text data includes: location information, environmental parameters, transmission line equipment data and construction task data; Denoising the image data includes: graying and resizing the image data; detecting noise in the image using an image processing algorithm, and removing the noise using a deep learning model to obtain a denoised image; The formatting of the text data includes: performing data cleaning on the text data, removing invalid data in the text data, filling missing data in the text data, correcting erroneous data in the text data, and obtaining cleaned data; parsing the cleaned data, converting the cleaned data into structured data; converting the structured data into a standard format to obtain formatted text data.
4. A communication method for on-site construction decision-making for external damage hazards of power transmission lines as claimed in claim 3, characterized in that: Perform environmental assessment and risk assessment on the site information to obtain analysis results, optimize the construction tasks according to the analysis results, and obtain the optimal safety measures strategy and the optimal construction deployment strategy, specifically: Analyze the on-site image information and environmental parameters to generate environmental assessment results; Performing risk analysis on the transmission line equipment data to generate risk assessment results; According to the environmental assessment results and risk assessment results, the construction task configuration data is safely optimized to obtain the optimal safety measures strategy; According to the location information and the optimal safety measures strategy, the latest construction task allocation information and task detail information are optimized to generate an optimal construction deployment strategy.
5. A communication method for on-site construction decision-making for external damage hazards of power transmission lines as claimed in claim 4, characterized in that: Also includes: Generate a safety briefing report based on the environmental assessment results, the risk assessment results and the corresponding safety measures strategy; The environmental assessment results, the risk assessment results, the corresponding safety measures strategy, the safety briefing report and the construction plan are stored in a database.
6. A communication method for on-site construction decision-making for external damage hazards of power transmission lines as claimed in claim 4, characterized in that: The on-site image information and environmental parameters are analyzed to generate environmental assessment results, specifically: Inputting the scene image information and environmental parameters into the first deep learning model for environmental analysis, and outputting the environmental condition level of the current scene; The first deep learning model is used to analyze the environmental conditions at the site of the transmission line external damage hazard based on the on-site image information and environmental parameters; The environmental parameters include: one or more of temperature, humidity and wind speed; The environmental conditions are taken as the environmental assessment results.
7. A communication method for on-site construction decision-making for external damage hazards of power transmission lines as claimed in claim 4, characterized in that: Perform risk analysis on the transmission line equipment data to generate risk assessment results, specifically: Inputting the equipment monitoring data and equipment historical fault records in the power transmission line equipment data into a second deep learning model for risk analysis, analyzing the failure risk of each power transmission line equipment on site, and outputting a fault warning of each power transmission line equipment; The second deep learning model is used to analyze the failure risk of each transmission line equipment on site according to the equipment monitoring data and the equipment historical failure records in the transmission line equipment data, and output the failure warning of each transmission line equipment; The failure warning of each of the transmission line equipment is used as a risk assessment result.
8. A communication method for on-site construction decision-making for external damage hazards of power transmission lines as claimed in any one of claim 7, characterized in that: According to the location information and the optimal safety measures strategy, the latest construction task allocation information and task detail information are optimized to generate the optimal construction deployment strategy, specifically: According to the location information and the optimal safety measures strategy, the latest construction task allocation information and task detail information are optimized by using genetic algorithm and ant colony algorithm to generate the optimal construction deployment strategy; The construction deployment strategy at least includes: task steps, personnel arrangements and time planning.
9. A communication method for on-site construction decision-making for external damage hazards of power transmission lines as described in any one of claims 1 to 8, characterized in that: Also includes: In response to the user's operation instruction on the interactive interface, data corresponding to the operation instruction is obtained from the database for display; The interactive interface is connected with the backend management platform; The operation instructions include: any one of: data query, construction task configuration, safety briefing information viewing and alarm processing.
10. A communication system for on-site construction decision-making for hidden dangers of external damage to power transmission lines, characterized in that: include: A mobile terminal, a synchronization module, a background management platform and a deployment module; the mobile terminal is respectively connected to the synchronization module and the background management platform for communication; The synchronization module is communicatively connected with the background management platform; The mobile terminal is used to collect on-site information of the site of the hidden danger of external damage of the power transmission line; the on-site information is sent to the synchronization module in real time, so that the synchronization module detects whether the first on-site information stored in the mobile terminal is consistent with the second on-site information stored in the background management platform, and if they are inconsistent, the first on-site information is synchronized to the background management platform; Sending the on-site information to a backend management platform in real time; If a construction decision request is received from the user, the construction decision request will be sent to the background management platform, so that the background management platform can use the deployment module to perform environmental analysis and risk analysis on the on-site information to obtain analysis results; optimize the construction task according to the analysis results to obtain the optimal safety measures strategy and the optimal construction deployment strategy; and transmit the optimal construction deployment strategy and the optimal safety measures strategy back to the mobile terminal.
11. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program; wherein, when the computer program is running, it controls the device where the computer-readable storage medium is located to execute a communication method for on-site construction decision-making for external damage hazards of a transmission line as described in any one of claims 1 to 9.