Hot rolling gauge changing control method

By searching contract data in the hot rolling modification control method and matching the spare specifications according to the ordering frequency priority algorithm, the problem of only thickness can be changed in the existing technology is solved, and the modification production that can meet the multi-process requirements in the event of a failure is achieved , improve product pass rate and reduce inventory rate.

CN118893088AActive Publication Date: 2024-11-05SHANGHAI MEISHAN IRON & STEEL CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202310495545.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-05
Publication Date
2024-11-05
Estimated Expiration
2043-05-05

AI Technical Summary

Technical Problem

The existing hot rolling modification method can only modify the thickness and cannot meet other process requirements at the same time, resulting in the production of products that cannot meet the design requirements, increasing the residual material and spot incidence.

Method used

By searching the contract data in advance before the plan issuance, matching the optimal backup modification rolling requirements based on the contract processing route code, thickness and ordering frequency priority algorithm, obtaining the modification data, and selecting the appropriate backup specifications in the event of a failure Adjust to ensure that production meets design requirements.

Benefits of technology

Reduced the search time for revising the regulations, improved the product qualification rate, reduced the inventory and residual material volume, and ensured that production can meet the contract requirements.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention relates to a hot rolling gauge changing control method. The method comprises the steps of information reading, standby specification matching and the like. According to the hot rolling rule changing control method provided by the invention, the rule changing information is retrieved in advance before the plan is issued and the contract data of the existing system is retrieved before the plan is issued from the design instead of being temporarily retrieved when an accident occurs, so that retrieval is avoided when a fault occurs, the rule changing plan retrieval time is saved, and the efficiency is improved. When a fault occurs, the rule changing plan retrieval time is almost neglected. Due to the fact that the system is not limited by time any more during retrieval, the optimal standby gauge-changing rolling requirement is matched according to a contract machining path code, a contract tapping mark, a thickness priority algorithm and a priority algorithm with the maximum ordering frequency, gauge-changing data of key products such as the optimal standby rolling thickness, width and temperature are obtained, and the optimal standby gauge-changing rolling requirement is obtained. According to the required design information of all the other products, the rule changing information and the plan are issued to a second-level system at the same time; and the thickness of the window is no longer limited to be one window.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a hot rolling gauge change control method, belonging to the technical field of metal smelting. Background Art

[0002] At present, when failures and plan transitions occur at the domestic hot rolling site, the online rolled steel coils will be re-rolled. This work mainly relies on the on-duty operator to manually change the rules in the process control system after comparing with the plan system. Since the time for on-site rolling change is extremely tight, only the thickness is changed. This will cause some of the produced steel coils to fail to correspond to the contract, and the process requirements cannot meet the product design requirements, resulting in surplus materials and increasing the spot incidence rate.

[0003] In the prior art, there is an invention patent for "A method for automatically exchanging and converting materials for urgent specification changes in hot rolling lines" (CN201410009796.7); the patent provides a method for automatically exchanging and converting materials for urgent specification changes in hot rolling lines. After receiving the second-level specification change telegram, the third-level computer searches for virtual slabs that meet the contract matching conditions from those that have not yet been included in the rolling mill operation plan, and if found, they are exchanged and converted. The model constraints are: the target width and target thickness of the hot-rolled material are consistent with the order, the actual steel code of the slab is the same as the steel code or nominal steel code represented by the order, the maximum value of the nominal width of the slab-the lateral pressure of the slab is ≤ the target width value of the hot rolling process outlet, and the target width value of the hot rolling process outlet is ≤ the nominal width of the slab-the minimum value of the lateral pressure of the slab, the weight of the inspection is ≥ the minimum unit weight at the entrance, and ≤ the maximum unit weight at the entrance. The matching between the slab and the contract is converted into a 0-1 multi-knapsack problem, which can be solved. The invention can improve work efficiency, shorten user delivery time, reduce inventory backlog, speed up logistics turnover, and reduce the amount of excess steel coils and capital occupancy rate.

[0004] Due to constraint adjustment limitations, this invention patent can only modify the thickness. However, when changing the thickness specification of a hot-rolled product, other process requirements also need to be changed. Otherwise, the actual products produced will hardly meet the design requirements. Summary of the invention

[0005] The technical problem to be solved by the present invention is: to overcome the disadvantages of the above-mentioned technology and provide a hot rolling gauge change control method capable of producing qualified products.

[0006] In order to solve the above technical problems, the technical solution proposed by the present invention is: a hot rolling gauge change control method, comprising the following steps: (1) Read the contract information of the hot-rolled products to be produced according to the production plan of the hot-rolling production line; (2) Based on the contract information read, search the product contract database for a contract with the same hot rolling production line number as that in the contract information; (3) Continue to query the contract completion status in the result of step (2); the contract completion status is divided into completed and uncompleted; if there are uncompleted contracts, select these uncompleted contracts as the processing results; if there are no uncompleted contracts, use the result of step (2) as the processing result of this step; (4) Read the product thickness data in the contract information of the processing result of step (3) and classify them; the first category is contracts with product thickness of 3.5 mm to 5.0 mm, the second category is contracts with product thickness of 2.5 mm to 3.49 mm, and the third category is contracts with product thickness greater than 5 mm; according to the classification results, first select the contracts in the first category as the result; if they do not exist, select the contracts in the second category as the result; if they do not exist, select the contracts in the third category as the result; (5) reading the product width data in the contract information of the result of step (4) and classifying them; the first category is contracts whose product widths have a deviation range of -5 mm to 15 mm from the width of the hot-rolled product to be produced in step (1), and the second category is contracts whose product widths have a deviation range of 15 mm to 50 mm from the width of the hot-rolled product to be produced in step (1); according to the classification results, selecting the contracts in the first category as first backup specification contracts and the contracts in the second category as second backup specification contracts; (6) If the first backup specification contract in step (5) is not unique, read the order frequency information in the contract information of the first backup specification contract; select the contract with the highest order frequency, and use the product specification in the contract as the first backup specification; If the second backup specification contract in step (5) is not unique, read the order frequency information in the contract information of the first backup specification contract; select the contract with the highest order frequency, and use the product specification in the contract as the second backup specification; (7) The production line is set up according to the relevant parameters corresponding to the contract information of the product to be hot-rolled in step (1), and then hot-rolling production is carried out; if a failure occurs during the production process, the on-site operator selects the first backup specification or the second backup specification, and adjusts the production line settings according to the relevant parameters corresponding to the first backup specification or the second backup specification, and then continues to produce products of the first backup specification or the second backup specification.

[0007] The above solution is further improved in that: in the step (7), the first backup specification is used when a failure occurs in the finishing area of ​​the hot rolling line; and the second backup specification is used when a failure occurs in the rough rolling area of ​​the hot rolling line.

[0008] The hot rolling gauge modification control method provided by the present invention changes the gauge modification information from temporary retrieval when an accident occurs to advance retrieval before the plan is issued, and searches the existing system contract data before the plan is issued to avoid searching again when a fault occurs, thereby saving the gauge modification plan retrieval time. The gauge modification plan retrieval time when a fault occurs is almost negligible and is zero. Since there is no longer a time limit on the system when searching, the present invention matches the optimal spare gauge modification rolling requirements according to the contract processing path code, contract steelmaking mark, thickness priority, and the algorithm with the highest order frequency priority, obtains the optimal spare rolling thickness, width, temperature and other key product gauge modification data, and all other required product design information, and issues the gauge modification information together with the plan to the secondary system; it is no longer limited to a thickness window. Implementation Example

[0009] The hot rolling gauge change control method of this embodiment includes the following steps: (1) Read the contract information of the hot-rolled products to be produced according to the production plan of the hot-rolling production line; (2) Based on the contract information read, search the product contract database for a contract with the same hot rolling production line number as that in the contract information; (3) Continue to query the contract completion status in the result of step (2); the contract completion status is divided into completed and uncompleted; if there are uncompleted contracts, select these uncompleted contracts as the processing results; if there are no uncompleted contracts, use the result of step (2) as the processing result of this step; (4) Read the product thickness data in the contract information of the processing result of step (3) and classify them; the first category is contracts with product thickness of 3.5 mm to 5.0 mm, the second category is contracts with product thickness of 2.5 mm to 3.49 mm, and the third category is contracts with product thickness greater than 5 mm; according to the classification results, first select the contracts in the first category as the result; if they do not exist, select the contracts in the second category as the result; if they do not exist, select the contracts in the third category as the result; (5) reading the product width data in the contract information of the result of step (4) and classifying them; the first category is contracts whose product widths have a deviation range of -5 mm to 15 mm from the width of the hot-rolled product to be produced in step (1), and the second category is contracts whose product widths have a deviation range of 15 mm to 50 mm from the width of the hot-rolled product to be produced in step (1); according to the classification results, selecting the contracts in the first category as first backup specification contracts and the contracts in the second category as second backup specification contracts; (6) If the first backup specification contract in step (5) is not unique, read the order frequency information in the contract information of the first backup specification contract; select the contract with the highest order frequency, and use the product specification in the contract as the first backup specification; If the second backup specification contract in step (5) is not unique, read the order frequency information in the contract information of the first backup specification contract; select the contract with the highest order frequency, and use the product specification in the contract as the second backup specification; (7) The production line is set up according to the relevant parameters corresponding to the contract information of the product to be hot-rolled in step (1), and then hot-rolling production is carried out; if a failure occurs during the production process, the on-site operator selects the first backup specification or the second backup specification, and adjusts the production line settings according to the relevant parameters corresponding to the first backup specification or the second backup specification, and then continues to produce products of the first backup specification or the second backup specification.

[0010] Take a steel plant as an example, the steel plant includes a manufacturing planning system, a hot rolling planning system, a secondary process control system, and a primary control system. The specific process is: Step 1: A steel plant obtains the contract information of the hot-rolled products to be produced from the manufacturing planning system, including steel type, slab thickness, width, rolling thickness, width and other information, to form corresponding intelligent matching rule parameters, and provides data support for the matching algorithm of the intelligent system.

[0011] Step 2: When a steel plant's manufacturing planning system collects the rolling plan, it automatically starts the intelligent matching system to perform contract intelligent matching calculations, and displays the calculation results on the corresponding planning screen; Specifically, it includes the matching of the contract processing route code, that is, the processing production line is consistent with the production line where the product to be produced is located; Then, check the contract completion status and give priority to unfinished contracts; Secondly, thickness matching is performed; the spare contracts are divided into three categories according to the product thickness, the first category is contracts with product thickness of 3.5mm to 5.0mm, the second category is contracts with product thickness of 2.5mm to 3.49mm, and the third category is contracts with product thickness greater than 5mm; when selecting these three categories, the priority is in descending order; since the rolling difficulty level of products with thickness of 3.5mm to 5.0mm is low, the rolling difficulty level of products with thickness of 2.5mm to 3.49mm is medium, and the contract volume of products with thickness greater than 5mm is relatively small, the priority order is set; priority is given to matching in the first category, and if no match is found, matching is performed in the second category, and if no match is found, matching is performed in the third category. In this way, balanced selection based on the two weights of rolling difficulty and contract volume can effectively improve the qualified rate of the final product and reduce the product inventory rate at the same time; Finally, width matching is performed; the spare contracts are classified according to the product width, the first category is the contract whose product width deviation from the width of the hot-rolled product to be produced in step (1) is in the range of -5mm to 15mm, and the second category is the contract whose product width deviation from the width of the hot-rolled product to be produced in step (1) is in the range of 15mm to 50mm; according to the classification results, the contracts in the first category are selected as the first spare specification contracts, and the contracts in the second category are selected as the second spare specification contracts; the first spare specification contracts have a small relative width change, while the second spare specification contracts have a larger relative width change.

[0012] If the first backup specification contract is not unique, read the order frequency information in the contract information of the first backup specification contract; select the contract with the highest order frequency, and use the product specification in the contract as the first backup specification; If the second backup specification contract is not unique, read the order frequency information in the contract information of the first backup specification contract; select the contract with the highest order frequency, and use the product specification in the contract as the second backup specification; Step 3: A planning auditor at a steel plant checks the plan modification screen and manually reviews the alternative plan modification information to confirm whether the plan modification is reasonable. If it is reasonable, it will be issued. If it is unreasonable, it will be returned for re-matching.

[0013] Step 4: After receiving the plan issuance instruction, the manufacturing planning system automatically sends the rolling plan information and the rule change matching contract information to the hot rolling planning system at the same time.

[0014] Step 5: The hot rolling planning system receives the rolling plan information and the rule matching contract information at the same time, integrates it into the PDI information of the hot rolling secondary process control system when the rolling command is determined, and finally sends it to the hot rolling secondary process control system.

[0015] Step 6: The hot rolling secondary process control system receives the PDI information issued by the hot rolling planning system and stores it in the secondary process control system SQL database. The information includes rolling plan information and regulation matching contract information.

[0016] Step 6.1: The hot rolling secondary process control system receives the PDI information issued by the hot rolling tertiary planning system through the Gateway communication software.

[0017] Step 6.2: Store the PDI plan information in the secondary process control system database through the database storage software, which includes the rolling plan information and the regulation matching contract information. Step 7: The human-machine interface system of the secondary hot rolling process provides inquiries to the online production slab rolling plan information system and the gauge change information. The system adds a backup specification rolling selection function. When a failure occurs on site and the plan transition requires rolling change, the operator determines the gauge change selection based on the location of the strip. Only one click is required to select the backup rolling specification to automatically update the gauge change information.

[0018] Since the width control of the hot rolling production line is located in the rough rolling area, when a fault occurs in the finishing area of ​​the hot rolling production line, the first backup specification with a small width change is used; when a fault occurs in the rough rolling area of ​​the hot rolling production line, the first backup specification can be used, or the second backup specification can be used.

[0019] Step 8: After the hot rolling secondary process system selects the gauge change information according to the human-machine interface system, it notifies the secondary model control system. The model system recalculates the thickness, width, final rolling temperature and other information of the product after the gauge change, and sends it to the primary process control system for production control to complete the gauge change rolling.

[0020] The present invention is not limited to the above embodiments. Any technical solution formed by equivalent replacement falls within the protection scope required by the present invention.

Claims

1. A hot rolling gauge control method, characterized in that: The steps include: (1) Read the contract information of the hot-rolled products to be produced according to the production plan of the hot-rolling production line; (2) Based on the contract information read, search the product contract database for a contract with the same hot rolling production line number as that in the contract information; (3) Continue to query the contract completion status in the result of step (2); the contract completion status is divided into completed and uncompleted; if there are uncompleted contracts, select these uncompleted contracts as the processing results; if there are no uncompleted contracts, use the result of step (2) as the processing result of this step; (4) Read the product thickness data in the contract information of the processing result of step (3) and classify them; the first category is contracts with product thickness of 3.5 mm to 5.0 mm, the second category is contracts with product thickness of 2.5 mm to 3.49 mm, and the third category is contracts with product thickness greater than 5 mm; according to the classification results, first select the contracts in the first category as the result; if they do not exist, select the contracts in the second category as the result; if they do not exist, select the contracts in the third category as the result; (5) reading the product width data in the contract information of the result of step (4) and classifying them; the first category is contracts whose product widths have a deviation range of -5 mm to 15 mm from the width of the hot-rolled product to be produced in step (1), and the second category is contracts whose product widths have a deviation range of 15 mm to 50 mm from the width of the hot-rolled product to be produced in step (1); according to the classification results, selecting the contracts in the first category as first backup specification contracts and the contracts in the second category as second backup specification contracts; (6) If the first backup specification contract in step (5) is not unique, read the order frequency information in the contract information of the first backup specification contract; select the contract with the highest order frequency, and use the product specification in the contract as the first backup specification; If the second backup specification contract in step (5) is not unique, read the order frequency information in the contract information of the first backup specification contract; select the contract with the highest order frequency, and use the product specification in the contract as the second backup specification; (7) The production line is set up according to the relevant parameters corresponding to the contract information of the product to be hot-rolled in step (1), and then hot-rolling production is carried out; if a failure occurs during the production process, the on-site operator selects the first backup specification or the second backup specification, and adjusts the production line settings according to the relevant parameters corresponding to the first backup specification or the second backup specification, and then continues to produce products of the first backup specification or the second backup specification.

2. The hot rolling gauge control method according to claim 1, characterized in that: In the step (7), when a failure occurs in the finishing area of ​​the hot rolling line, the first backup specification is used; when a failure occurs in the rough rolling area of ​​the hot rolling line, the first backup specification or the second backup specification is used.

Citation Information

Patent Citations

  • Method for automatic material interchange in urgent specification change of hot rolling production line

    CN103752621A

  • Control method for improving rolling force model precision of CSP double-strand specification switching

    CN107931329A

  • Continuous rolling method and device based on MCCR

    CN111515249A

  • Method of optimization hot rolling scaduled sequence

    CN1753008A

  • Schedule preparation system, schedule preparation method and schedule preparation program

    JP2010097506A