Multi-rolling-process casting-rolling collaborative scheduling method and system based on knowledge base
By adopting a knowledge-based multi-stroke casting and rolling collaborative scheduling method, combined with improved clustering and search algorithms, the instability and inefficiency of hot rolling plans in steel plants were solved, achieving efficient and stable multi-stroke automatic scheduling and improving the level of automation in production management.
Patent Information
- Application Number
- CN202410929854.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-07-11
AI Technical Summary
In existing technologies, hot rolling plans in steel mills mainly rely on manual planning, which results in a large workload, unstable scheduling quality, low production efficiency, and a lack of multi-rolling process coordination considerations, leading to unstable production management and a low level of automation.
A knowledge-based multi-stroke casting and rolling collaborative scheduling method is adopted, which combines an improved condensed hierarchical clustering algorithm and a Monte Carlo tree search algorithm. Through data preparation, slab clustering, main material group division, hot roll material selection and merging, and tail material replenishment, intelligent automatic scheduling of multiple rolling strokes is achieved.
It significantly reduced scheduling time, improved rolling rhythm and hot charging rate, ensured the stability of scheduling quality and production efficiency, and enhanced the automation level of steel plants.
Smart Images

Figure CN118893090A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of metallurgical automation technology, and in particular to a knowledge base-based multi-rolling casting and rolling collaborative scheduling method and system. Background Art
[0002] At present, the production process of steel mostly adopts the process of "ironmaking-steelmaking-continuous casting-rolling-finishing". The sequential processing between the processes is closely connected, and the process production requirements are harsh and complex. The continuous casting process is to melt pig iron and scrap steel in a high temperature environment to remove impurities to obtain high-purity steel billets, while the hot rolling in steel rolling is to continuously roll the steel billets produced by continuous casting into steel of various specifications and shapes. At present, hot rolling mostly adopts a mixed rolling method, that is, cold-charged and hot-charged billets (direct-charged billets) are mixed and rolled to form the same rolling unit.
[0003] The quality of rolling plan scheduling for continuous casting and hot rolling production lines will directly affect the production capacity of the rolling line, smooth logistics, product quality, roll life, etc. The formulation of rolling plans has the characteristics of multiple goals, complex process constraints, many disturbances, and large scale. It is the core content and key technology of steel rolling production management.
[0004] At present, the hot rolling schedule of most steel mills is manually specified by planners. Since planners need to deal with multiple problems such as coordinating multiple production plans, various casting plans, sorting thousands of slabs, complex process constraints, and variable upstream and downstream capacity constraints, the operation volume is extremely large. In addition, different planners have different scheduling experiences, and their scheduling quality and production indicators will fluctuate, which is not conducive to the stability, standardization and refined management of factory production, and the production efficiency is low. Some existing studies on hot rolling automation scheduling are mainly based on heuristic algorithms, which have problems such as slow speed, poor algorithm KPI effect, poor satisfaction of process rules, and limited input scale. In addition, they can only schedule a single rolling process and do not consider casting and rolling coordination. Summary of the invention
[0005] In view of the above analysis, the present invention aims to provide a knowledge base-based multi-rolling casting and rolling collaborative scheduling method and system, which has more stable scheduling quality, improves the automation level of the steel plant, and improves production efficiency.
[0006] On the one hand, the present invention provides a knowledge base-based multi-rolling casting and rolling collaborative scheduling method, comprising the following steps:
[0007] S1: Data preparation;
[0008] S2: Pre-sorting / slab grouping, using the slab insertion constraint knowledge set in the knowledge base as the constraint condition when merging, and performing the agglomerative hierarchical clustering algorithm to cluster the slabs and output the slab groups;
[0009] S3: Main material group division: Based on the main material group division constraint knowledge set in the knowledge base, the clustered slab groups are divided into main material groups, and the main material groups are prioritized according to the number of slabs, pouring time, steel grade priority and other information; based on the main material group division constraint knowledge set in the knowledge base, the main material groups are merged according to the scoring scores, and multiple candidate main material group sets are formed. Finally, the candidate slab groups are divided into multiple rolling processes, and each main material group set corresponds to a rolling process. The division goal is to maximize the rolling mileage and hot charging rate;
[0010] S4: Selection of hot roller materials: for each main material group set in the main material division result, traverse all unused slabs, and determine whether the slab can be used as the hot roller material of the current main material set based on the hot roller material constraint knowledge set in the knowledge base. If yes, put it into the hot roller material set corresponding to the main material set, and select the available hot roller material;
[0011] S5: Merge the main material groups, merge the adjacent slabs in the main material set based on the slab insertion constraint knowledge set in the knowledge base, and if the merger fails, traverse the unused slabs; then select appropriate transition materials for splicing based on the slab insertion constraint knowledge set in the knowledge base, and if the splicing fails, delete the next main material group, and repeat the above steps to form a continuous main rolling material group;
[0012] S6: Combine the hot roller material and the main material,
[0013] S7: Selection of tail stock; if the rolling mileage is insufficient, the Monte Carlo tree search algorithm is used to select tail stock to supplement and improve the rolling mileage performance;
[0014] S8: KPI calculation, calculate the KPI of the rolling plan, organize and fill in the rolling results, and return them to the front end for display.
[0015] Further, the data is prepared for reading slab data, steel grade configuration information and scheduling status information from a variety of heterogeneous underlying storage systems.
[0016] Furthermore, the agglomerative hierarchical clustering algorithm first merges clusters with the closest similarity and which are allowed to be put together according to process requirements, and secondly, the termination condition is that no new clusters are merged, and finally, the final pruning step is not required to determine the final clustering cluster.
[0017] Furthermore, the similarity includes target width, target thickness, steel type, and whether it is a hot billet.
[0018] Furthermore, the main material group division constraint knowledge set includes casting information, rolling rhythm and production process restrictions.
[0019] Furthermore, the slab insertion constraint knowledge set includes steel type, furnace temperature, furnace time, slab width, slab type, slab length and slab attribute jump.
[0020] Furthermore, the hot roll material constraint knowledge set includes steel type, slab width, slab type and slab length.
[0021] Furthermore, the KPI calculation is to calculate and fill the core technical indicators, including rolling mileage, hot charging rate and machine time rate.
[0022] On the other hand, the present invention provides a multi-rolling process casting and rolling collaborative scheduling system based on a knowledge base, including the multi-rolling process casting and rolling collaborative scheduling method based on a knowledge base described in the present invention, and the system includes a data preparation module, a slab grouping module, a hot roll material solver module, a tail material solver module, a main material division module, a main material merging module, a result organization module, a KPI calculation module and a knowledge base.
[0023] Furthermore, the data preparation module is used to read slab data, steel grade configuration information, scheduling status and other information from multiple heterogeneous underlying storage systems;
[0024] Knowledge base module: It is an abstraction of the expert system and uses generative knowledge representation to store various scheduling experiences of scheduling experts;
[0025] Slab grouping module: Since there are thousands of slabs to be scheduled, directly exploring the scheduling plan based on the granularity of a single slab will greatly increase the solution time. Therefore, we innovatively introduce the slab clustering function in this module. Based on the scheduling rules, similar slabs are clustered together. When selecting the main material or the finishing, the group form is used as the basis for selection. While ensuring the effect, it can greatly reduce the solution time;
[0026] Hot roll material solver module: used to search for the best hot roll material solution based on the depth-first search algorithm according to the main material specifications;
[0027] End material solver module: used to search for the best end material solution based on the Monte Carlo tree search algorithm according to the main material specifications to make the rolling length as long as possible;
[0028] Main material division module: used to divide thousands of input slabs into multiple rolling processes based on upstream casting information, rolling rhythm, production process restrictions and other factors, with the goal of maximizing rolling mileage and hot charging rate;
[0029] Main material group merging module: This module selects appropriate transition materials to smoothly transition the selected main material groups while meeting the production process;
[0030] Result organization module: according to the final scheduling results, fill in basic information such as rolling time, rolling mileage, and billet properties for downstream display;
[0031] KPI calculation module: used to calculate the core technical indicators of the rolling process and to quantify the scheduling effect of the rolling plan, including rolling mileage, hot loading rate, and machine time rate.
[0032] Compared with the prior art, the present invention can achieve at least one of the following beneficial effects:
[0033] 1. The present invention provides a multi-rolling casting and rolling collaborative scheduling method, which is based on the knowledge base and adds a clustering process based on the improved agglomerative hierarchical clustering algorithm. After clustering, the properties of the slabs in the group are similar. When selecting the main materials, the group is used as a unit, so that the problem action space is reduced from thousands to less than a hundred, and the overall scheduling time is reduced from 20+ minutes to 7s. When dividing the main materials, the casting and rolling collaboration is comprehensively considered to maximize the rolling rhythm and hot charging rate. At the same time, the Monte Carlo tree search algorithm is also introduced to increase the rolling mileage, improve the KPI performance, and ensure the stability of the scheduling quality.
[0034] 2. The present invention proposes a multi-rolling process casting and rolling collaborative scheduling system based on a knowledge base. The system is based on a knowledge base expert system, improved agglomerative hierarchical clustering, Monte Carlo tree search and other algorithms, and comprehensively considers various factors such as scheduling process and casting sequence, and realizes one-click intelligent multi-rolling process automatic scheduling, effectively improving the rolling process hot charging rate, rolling mileage and other KPI indicators, while greatly reducing the workload of planners and having a more stable scheduling quality, thereby improving the automation level of the steel plant.
[0035] In the present invention, the above-mentioned technical solutions can also be combined with each other to achieve more preferred combination solutions. Other features and advantages of the present invention will be described in the subsequent description, and some advantages can become obvious from the description, or can be understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained through the contents particularly pointed out in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] The drawings are only for the purpose of illustrating particular embodiments and are not to be considered limiting of the present invention. Like reference symbols denote like components throughout the drawings.
[0037] Figure 1 It is a flow chart of the knowledge base-based multi-rolling process casting and rolling collaborative scheduling method;
[0038] Figure 2 Flowchart of the Monte Carlo tree search algorithm;
[0039] Figure 3 Execute flowcharts for knowledge bases;
[0040] Figure 4 This is a diagram of the multi-rolling casting and rolling collaborative scheduling system based on the knowledge base. DETAILED DESCRIPTION
[0041] The preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, wherein the accompanying drawings constitute a part of the present invention and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not used to limit the scope of the present invention.
[0042] In the field of steel production, there are many processes and complex operations, especially in the rolling process stage, which has the characteristics of multiple targets, complex process constraints, many disturbances and large scale. When formulating rolling plans, planners are mostly used to formulate them manually. Since planners need to deal with multiple production plans, various casting plans, thousands of slabs, complex process constraints, and variable upstream and downstream capacity constraints, the operation volume is extremely large. In addition, different planners have different scheduling experiences, and their scheduling quality and production indicators will fluctuate, which is not conducive to the stability, standardization and refined management of factory production. Some existing studies on hot rolling automation scheduling are mainly based on heuristic algorithms, which can only schedule a single rolling process and do not consider casting and rolling coordination. In addition, the scheduling quality and automation level of the steel plant are poor, and the production efficiency is low.
[0043] Therefore, the present invention provides a knowledge base-based multi-rolling casting and rolling collaborative scheduling method, comprising the following steps:
[0044] S1: Data preparation;
[0045] S2: Pre-sorting / slab grouping, using the slab insertion constraint knowledge set in the knowledge base as the constraint condition when merging, and performing the agglomerative hierarchical clustering algorithm to cluster the slabs and output the slab groups;
[0046] S3: Main material group division: Based on the main material group division constraint knowledge set in the knowledge base, the clustered slab groups are divided into main material groups, and the main material groups are prioritized according to the number of slabs, pouring time, steel grade priority and other information; based on the main material group division constraint knowledge set in the knowledge base, the main material groups are merged according to the scoring scores, and multiple candidate main material group sets are formed. Finally, the candidate slab groups are divided into multiple rolling processes, and each main material group set corresponds to a rolling process. The division goal is to maximize the rolling mileage and hot charging rate;
[0047] S4: Selection of hot roller materials: for each main material group set in the main material division result, traverse all unused slabs, and determine whether the slab can be used as the hot roller material of the current main material set based on the hot roller material constraint knowledge set in the knowledge base. If yes, put it into the hot roller material set corresponding to the main material set, and select the available hot roller material;
[0048] S5: Merge the main material groups, merge the adjacent slabs in the main material set based on the slab insertion constraint knowledge set in the knowledge base, and if the merger fails, traverse the unused slabs; then select appropriate transition materials for splicing based on the slab insertion constraint knowledge set in the knowledge base, and if the splicing fails, delete the next main material group, and repeat the above steps to form a continuous main rolling material group;
[0049] S6: Combine the hot roller material and the main material,
[0050] S7: Selection of tail stock; if the rolling mileage is insufficient, the Monte Carlo tree search algorithm is used to select tail stock to supplement and improve the rolling mileage performance;
[0051] S8: KPI calculation, calculate the KPI of the rolling plan, organize and fill in the rolling results, and return them to the front end for display.
[0052] Compared with the prior art, the present invention is based on the knowledge base and adds a clustering process based on the improved agglomerative hierarchical clustering algorithm. After clustering, the properties of the slabs in the group are similar. When selecting the main materials, the group is used as a unit, so that the problem action space is reduced from thousands to less than a hundred, and the overall scheduling time is reduced from 20+ minutes to 7s. When dividing the main materials, casting and rolling are comprehensively considered to maximize the rolling rhythm and hot loading rate. At the same time, the Monte Carlo tree search algorithm is also introduced to improve the rolling mileage, improve the KPI performance, and ensure the stability of the scheduling quality.
[0053] In the present invention, the rolling production process includes: obtaining slabs of various specifications through casting production, and the number of slabs is relatively large, so the slabs are classified and divided into multiple main material groups, and then the main material groups are divided into different priorities according to information such as the number of slabs, casting time, and steel grade priority; selecting suitable hot roll materials and transition materials, and merging them with the main materials; if the rolling mileage is not enough, it is necessary to add finishing materials to finally complete the entire rolling process.
[0054] It should be noted that the present invention relates to the following terms:
[0055] Rolling process: The daily hot rolling plan can be divided into multiple rolling processes. Each rolling process corresponds to the life of a finishing roll, that is, each replacement of the finishing roll corresponds to the beginning of a rolling process.
[0056] Main material: the main type of rolled slab in a rolling process (finishing rolling roll service).
[0057] Hot roll material: material used to preheat the rolls.
[0058] Transition material: In order to meet process constraints and ensure stable production of coils with high surface requirements or thin specifications, transition materials are required from hot rolled materials to main rolled materials or main rolled materials of different specifications.
[0059] Rolling process KPI: a data indicator that measures the quality of the rolling process.
[0060] Knowledge base: A knowledge base, also called a knowledge base system, is a system for acquiring, transforming, interpreting, storing, querying and innovating knowledge. It is a knowledge management tool that can simulate domain experts to solve various complex problems.
[0061] Specifically, the data is prepared to read slab data, steel grade configuration information, scheduling status and other information from a variety of heterogeneous underlying storage systems.
[0062] It should be noted that in the present invention, data preparation is an important step, which includes two parts: data collection and storage. First, slab inventory information, casting information, steel type information, and various rule configurations are collected and then stored in the underlying storage system for subsequent calls.
[0063] Specifically, the agglomerative hierarchical clustering algorithm first merges the clusters with the closest similarity and that can be put together as required by the process. Secondly, the termination condition is that no new clusters are merged. Finally, there is no need for a final pruning step to determine the final clustering cluster.
[0064] Specifically, the similarity includes target width, target thickness, steel type, and whether it is hot billet.
[0065] Specifically, the slab insertion constraint knowledge set of the knowledge base includes steel type, furnace temperature, furnace time, slab width, slab type, slab length and slab attribute jump.
[0066] It should be noted that hierarchical clustering is an unsupervised clustering method based on a hierarchical structure. It iteratively merges sample points with high similarity into the same cluster to form a tree-like clustering structure. Hierarchical clustering has the advantages of easy definition of distance and rule similarity and no need to predetermine the number of clusters. Agglomerative hierarchical clustering is a branch of the hierarchical clustering algorithm. It adopts a bottom-up strategy to cluster similar slabs together based on production scheduling rules. When selecting the main material or finishing, it is selected in the form of groups. While ensuring the effect, it can greatly reduce the solution time.
[0067] Slab clustering: Generally speaking, the total number of candidate slabs can reach thousands or more. If the scheduling plan is directly searched at the granularity of a single slab, the solution time will be greatly increased. In this invention, a slab clustering method is introduced. Based on the improved agglomerative hierarchical clustering algorithm combined with the knowledge base, similar slabs are clustered together. When selecting the main material or finishing, the slab group is used as the basis for selection. While ensuring the scheduling effect, the solution time can be greatly reduced.
[0068] The original agglomerative hierarchical clustering algorithm starts with each sample as an independent cluster, and then iteratively merges the clusters with the closest similarity (such as Euclidean distance, cosine similarity, etc.), and iterates this process until only one cluster remains, forming a cluster tree, in which each node represents a cluster or subcluster. Then, according to actual needs, the final number of clusters is selected through pruning.
[0069] In the application scenario of the present invention, some slabs are not allowed to be rolled together due to process requirements. The slab clustering of the present invention first merges the clusters with the closest similarity and allowed to be rolled together according to process requirements, and then the termination condition is that no new clusters are merged, and finally the final pruning step is not required to determine the final clustering cluster.
[0070] Specifically, the present invention uses the Euclidean distance of attributes such as target width, target thickness, steel type, whether it is hot billet, etc. as similarity, uses the slab insertion constraint knowledge set of the knowledge base as the restriction condition during merging, and performs the above-mentioned agglomerative hierarchical clustering algorithm.
[0071] Specifically, the main material group division constraint knowledge set includes casting information, rolling rhythm, and production process restrictions.
[0072] Specifically, the slab insertion constraint knowledge set includes restriction rules such as steel type, furnace temperature, furnace time, slab width, slab type, slab length, and slab attribute jump.
[0073] Specifically, the hot roll material constraint knowledge set includes restrictions such as steel type, slab width, slab type, and slab length.
[0074] Specifically, the tail material is selected; if the rolling mileage is not enough, the Monte Carlo tree search algorithm is used to select the tail material to supplement and improve the rolling mileage performance.
[0075] It should be noted that the specific operation steps / methods of the Monte Carlo tree search algorithm are:
[0076] Reference Figure 2 , initialize the root node, for the current rolling process plan, set the root node as the current node.
[0077] The algorithm starts:
[0078] First, initialize the root node, set the state of the current node to the initial schedule, the parent node to empty, the Q value to 0, the N value to 0, the number of loops to 0, and the root node to the current node.
[0079] Determine whether it is a terminal node: If yes, the algorithm ends and outputs the root node status, i.e., the rolling plan. If no, proceed to the next step.
[0080] Loop count control: Determine whether the loop count is less than the preset number of iterations (IterCount). If so, the node has been fully explored. Then, from the child nodes of the current node, find the child node with the highest score based on formula (1) (v in the formula represents the current node, Q(v) represents the Q value of node v, N(v) represents the N value of node v, and v' is any child node of v). The schedule is updated to the current schedule and step 2 is repeated, and the search continues. If not, stop the search and proceed to the next step.
[0081]
[0082] The subsequent execution steps include selection, expansion, simulation and propagation.
[0083] Determine whether it is a terminal node: if yes, enter the simulation step; if no, proceed to the next step; determine whether the current node has been fully explored. If yes, the node has been fully explored, then find the child node with the highest score from the child nodes of the current node based on Formula 1 as the current node; if no, enter the expansion step.
[0084] Randomly select a slab s that has not been explored and meets the knowledge base K constraint; add s to the schedule, create a new node with the new schedule as the state, the new node Q value and N value are 0, and the new node is used as the child node of the current node; then enter the simulation step;
[0085] Calculate the distance between all available candidate slabs and the end of the rolling process and the simulation report reward as the current node; set the current node as V1; and then enter the propagation step;
[0086] Set V1's Q = Q + reward, and V1's N = N + 1;
[0087] Determine whether the node of V1 is the root node. If so, increase the number of loops by 1 and enter the judgment step of "the number of loops is less than IterCount"; if not, set the parent node of V1 to V1, and then enter the step of "setting V1's Q = Q + reward, setting V1's N = N + 1".
[0088] Algorithm end: When a certain condition is met (such as reaching the iteration limit or finding the optimal solution), the algorithm ends and outputs the final root node state.
[0089] Specifically, KPI calculation is to calculate the core technical indicators of filling, including rolling mileage, hot charging rate and machine time rate.
[0090] It should be noted that KPI calculation is the final output result, which can reflect or be used to evaluate the quality of rolling plan and production scheduling.
[0091] Specifically, in the present invention, the knowledge base stores the experience of production scheduling experts in the knowledge base using a generative knowledge representation method, and the knowledge base is classified into categories, such as a slab insertion constraint knowledge set, a main material merging constraint knowledge set, a hot rod constraint knowledge set, and a tail material selection rule set.
[0092] The knowledge base execution process is as follows Figure 3 As shown, it specifically includes: inputting the name of the knowledge set and the fact set required by the knowledge set; selecting the knowledge set according to the name of the knowledge set; then traversing each knowledge in the knowledge set; inputting the fact set, and deciding whether to execute action Q according to condition P; and finally returning the result of the action execution.
[0093] Its expression method also adopts the production expression method as follows:
[0094] Knowledge generation knowledge representation method: IFPTHENQ;
[0095] Fact-generating knowledge representation: (object, attribute, value).
[0096] The invention also provides a system for the multi-rolling process casting and rolling collaborative scheduling method based on the knowledge base, including a data preparation module, a slab grouping module, a hot roll material solver module, a tail material solver module, a main material division module, a main material merging module, a result organization module, a KPI calculation module and a knowledge base;
[0097] Data preparation module: used to read slab data, steel grade configuration information, scheduling status and other information from various heterogeneous underlying storage systems;
[0098] Knowledge base module: It is an abstraction of the expert system and uses generative knowledge representation to store various scheduling experiences of scheduling experts;
[0099] Slab grouping module: Since there are thousands of slabs to be scheduled, directly exploring the scheduling plan based on the granularity of a single slab will greatly increase the solution time. Therefore, we innovatively introduce the slab clustering function in this module. Based on the scheduling rules, similar slabs are clustered together. When selecting the main material or the finishing, the group form is used as the basis for selection. While ensuring the effect, it can greatly reduce the solution time;
[0100] Hot roll material solver module: used to search for the best hot roll material solution based on the depth-first search algorithm according to the main material specifications;
[0101] End material solver module: used to search for the best end material solution based on the Monte Carlo tree search algorithm according to the main material specifications to make the rolling length as long as possible;
[0102] Main material division module: used to divide thousands of input slabs into multiple rolling processes based on upstream casting information, rolling rhythm, production process restrictions and other factors, with the goal of maximizing rolling mileage and hot charging rate;
[0103] Main material group merging module: This module selects appropriate transition materials to smoothly transition the selected main material groups while meeting the production process;
[0104] Result organization module: according to the final scheduling results, fill in basic information such as rolling time, rolling mileage, and billet properties for downstream display;
[0105] KPI calculation module: used to calculate the core technical indicators of the rolling process and to quantify the scheduling effect of the rolling plan, including rolling mileage, hot loading rate, machine time rate, etc.
[0106] Compared with the prior art, the present invention proposes a multi-rolling process casting and rolling collaborative scheduling system based on a knowledge base. The system is based on a knowledge base expert system, improved agglomerative hierarchical clustering, Monte Carlo tree search and other algorithms, and comprehensively considers various factors such as scheduling process and casting sequence, and realizes one-click intelligent multi-rolling process automatic scheduling, effectively improving the rolling process hot charging rate, rolling mileage and other KPI indicators, while greatly reducing the workload of planners and having a more stable scheduling quality, thereby improving the automation level of the steel plant.
[0107] Specifically, the knowledge base module includes a slab insertion constraint knowledge set, a main material merging constraint knowledge set, a hot roll material constraint knowledge set and a tail material selection rule set.
[0108] The multi-rolling casting and rolling collaborative scheduling system provided by the present invention: firstly, data preparation module is required to collect and store data, and the data is stored in the slab module in the knowledge base and object model, and is used as the subsequent limiting conditions and calls;
[0109] Then, the slab grouping module uses the slab insertion constraint knowledge set in the knowledge base as the restriction condition for merging, performs the agglomerative hierarchical clustering algorithm, clusters the slabs and outputs the slab groups, and stores the data in the slab grouping module in the object model;
[0110] Then, the clustered slab groups are divided into main material groups through the main material division module, and the priorities are divided;
[0111] Then, through the hot roller material solver module, based on the hot roller material constraint knowledge set in the knowledge base, whether the slab can be used as the hot roller material of the current main material set is determined. If so, it is placed in the hot roller material set corresponding to the main material set, and the available hot roller material is selected;
[0112] Then, through the main material merging module, adjacent main materials in the main material set are merged based on the slabs in the knowledge base and inserted into the constraint knowledge set, and appropriate transition materials are selected for splicing;
[0113] Furthermore, through the tail material solver module, the tail material is selected to supplement the main material and ensure that the entire rolling mileage meets the requirements;
[0114] Finally, the results are displayed through the result organization module, KPI calculation module and scheduling status module in the object model, so that the dispatcher or operator can adjust the overall rolling schedule in real time.
[0115] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.
Claims
1. A knowledge base-based multi-rolling casting and rolling collaborative scheduling method, characterized in that: The following steps are involved: S1: Data preparation; S2: Pre-sorting / slab grouping, using the slab insertion constraint knowledge set in the knowledge base as the constraint condition during merging, performing agglomerative hierarchical clustering algorithm, clustering the slabs and outputting slab groups; S3: Main material group division: Based on the main material group division constraint knowledge set in the knowledge base, the clustered slab groups are divided into main material groups, and the main material groups are prioritized according to the number of slabs, pouring time, steel grade priority and other information; based on the main material group division constraint knowledge set in the knowledge base, the main material groups are merged according to the scoring scores, and multiple candidate main material group sets are formed. Finally, the candidate slab groups are divided into multiple rolling processes, and each main material group set corresponds to a rolling process. The division goal is to maximize the rolling mileage and hot charging rate; S4: Selection of hot roller materials: for each main material group set in the main material division result, traverse all unused slabs, and determine whether the slab can be used as the hot roller material of the current main material set based on the hot roller material constraint knowledge set in the knowledge base. If yes, put it into the hot roller material set corresponding to the main material set, and select the available hot roller material; S5: Merge the main material groups, merge the adjacent slabs in the main material set based on the slab insertion constraint knowledge set in the knowledge base, and if the merger fails, traverse the unused slabs; then select appropriate transition materials for splicing based on the slab insertion constraint knowledge set in the knowledge base, and if the splicing fails, delete the next main material group, and repeat the above steps to form a continuous main rolling material group; S6: Combine the hot roller material and the main material, S7: Selection of tail stock; if the rolling mileage is insufficient, the Monte Carlo tree search algorithm is used to select tail stock to supplement and improve the rolling mileage performance; S8: KPI calculation, calculate the KPI of the rolling plan, organize and fill in the rolling results, and return them to the front end for display.
2. The knowledge-based multi-rolling casting and rolling collaborative scheduling method according to claim 1 is characterized in that: The data preparation is used to read slab data, steel grade configuration information and scheduling status information from multiple heterogeneous underlying storage systems.
3. The knowledge-based multi-rolling casting and rolling collaborative scheduling method according to claim 1 is characterized in that: The agglomerative hierarchical clustering algorithm first merges the clusters with the closest similarity and that can be put together according to the process requirements. Secondly, the termination condition is that no new clusters are merged. Finally, the final pruning step is not required to determine the final clustering cluster.
4. The knowledge-based multi-rolling casting and rolling collaborative scheduling method according to claim 3 is characterized in that: The similarity includes target width, target thickness, steel type, and whether it is hot billet.
5. The knowledge-based multi-rolling casting and rolling collaborative scheduling method according to claim 1 is characterized in that: The main material group division constraint knowledge set includes casting information, rolling rhythm and production process restrictions.
6. The knowledge-based multi-rolling casting and rolling collaborative scheduling method according to claim 1 is characterized in that: The slab insertion constraint knowledge set includes steel type, furnace temperature, furnace time, slab width, slab type, slab length and slab attribute jump.
7. The knowledge-based multi-rolling casting and rolling collaborative scheduling method according to claim 1 is characterized in that: The hot rolling material constraint knowledge set includes steel type, slab width, slab type and slab length.
8. The knowledge-based multi-rolling casting and rolling collaborative scheduling method according to claim 1 is characterized in that: The KPI calculation is to calculate the core technical indicators of filling, including rolling mileage, hot charging rate and machine time rate.
9. A knowledge-based multi-rolling casting and rolling collaborative scheduling system, characterized in that: The system comprises a multi-rolling process casting and rolling collaborative scheduling method based on a knowledge base as described in any one of claims 1 to 8, and the system comprises a data preparation module, a slab grouping module, a hot roll material solver module, a tail material solver module, a main material division module, a main material merging module, a result organization module, a KPI calculation module and a knowledge base.
10. The knowledge-based multi-rolling casting and rolling collaborative scheduling system according to claim 9, characterized in that: Data preparation module: used to read slab data, steel grade configuration information, scheduling status and other information from multiple heterogeneous underlying storage systems; Knowledge base module: It is an abstraction of the expert system and uses generative knowledge representation to store various production scheduling experiences of production scheduling experts; Slab grouping module: Since there are thousands of slabs to be scheduled, directly exploring the scheduling plan based on the granularity of a single slab will greatly increase the solution time. Therefore, we innovatively introduce the slab clustering function in this module. Based on the scheduling rules, similar slabs are clustered together. When selecting the main material or the finishing, the group form is used as the basis for selection. While ensuring the effect, it can greatly reduce the solution time; Hot roll material solver module: used to search for the best hot roll material solution based on the depth-first search algorithm according to the main material specifications; End material solver module: used to search for the best end material solution based on the Monte Carlo tree search algorithm according to the main material specifications to make the rolling length as long as possible; Main material division module: used to divide thousands of input slabs into multiple rolling processes based on upstream casting information, rolling rhythm, production process restrictions and other factors, with the goal of maximizing rolling mileage and hot charging rate; Main material group merging module: This module selects appropriate transition materials to smoothly transition the selected main material groups while meeting the production process; Result organization module: according to the final scheduling results, fill in basic information such as rolling time, rolling mileage, and billet properties for downstream display; KPI calculation module: used to calculate the core technical indicators of the rolling process and to quantify the scheduling effect of the rolling plan, including rolling mileage, hot loading rate, and machine time rate.
Citation Information
Patent Citations
Continuous casting automatic predetermined slab plan control method
CN106269894A
Control method for slab hot charging trial rolling
CN107537861A
Steel-making and continuous casting industrial process optimization control method
CN108588323A
Configuration method and device for hot rolling multiple roll types
CN114985473A
Hot rolling production line integrated planning and scheduling method and system based on ant colony optimization
CN118014294A