Wastewater control method and device, water purification equipment and storage medium
By using control components and wastewater switching valves in water purification equipment, the wastewater treatment method is dynamically adjusted according to user instructions and water quality conditions, the problem of single wastewater flow control in the existing technology is solved, and the wastewater treatment effect and user experience are improved.
Patent Information
- Application Number
- CN202411169115.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-05
AI Technical Summary
The existing water purifiers cannot effectively take into account multiple wastewater flows while treating complex municipal water and user habits, resulting in poor user experience.
By introducing control components and wastewater switching valves into the water purification equipment, the wastewater treatment methods are dynamically switched according to user instructions and the current water quality conditions, and a variety of wastewater flow control is achieved.
It improves the wastewater treatment effect and user experience, can adapt to complex municipal water conditions and user habits, provides a variety of wastewater discharge methods, and enhances the flexibility and efficiency of water purification equipment.
Smart Images

Figure CN118894565A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of water purification equipment, and in particular to a wastewater control method, device, water purification equipment and storage medium. Background Art
[0002] With economic development and rising living standards, people's demands for a better quality of life, including higher standards for drinking water quality, have become increasingly stringent. Water purifiers have become an indispensable household appliance in every household. Water purifiers are primarily used to remove impurities, microorganisms, and harmful substances from water, thereby providing safe, clean drinking water.
[0003] However, municipal water quality varies across regions, and water quality varies from city to city, often affected by seasonal fluctuations. Existing water purifiers typically only have a single wastewater flow rate, failing to adequately address complex municipal water conditions and user habits, significantly impacting the user experience. Summary of the Invention
[0004] The present application provides a wastewater control method, device, water purification equipment and storage medium, which can effectively take into account complex municipal water conditions and user habits to discharge and treat wastewater, thereby improving the effect of wastewater treatment and user experience.
[0005] In a first aspect, the present application provides a wastewater control method, which is applied to a water purification device, the water purification device including a control component and a wastewater switching valve, and the method comprising:
[0006] receiving a user instruction and determining a target water quality corresponding to the user instruction;
[0007] Obtaining the original water quality of the area where the water purification equipment is currently located;
[0008] Based on the target water quality and the original water quality, the control component controls the switching of the wastewater switching valve to enable the water purification equipment to perform wastewater treatment.
[0009] In a possible implementation manner of the first aspect, receiving a user instruction and determining a target water quality of the user instruction includes:
[0010] Receive user instructions and obtain target water quality requirement information corresponding to the user instructions;
[0011] Based on the target water quality requirement information, the target water quality corresponding to the user instruction is determined.
[0012] In a possible implementation manner of the first aspect, the water purification device includes a first detection component, and obtaining the original water quality of the area where the water purification device is currently located includes:
[0013] receiving a water quality acquisition instruction, and detecting current water quality information of the water inlet pipe in the water purification device through the first detection component;
[0014] In response to the water quality acquisition instruction, the original water quality of the area where the water purification equipment is currently located is determined based on the current water quality information.
[0015] In a possible implementation manner of the first aspect, the water purification equipment includes a second detection component, and obtaining the original water quality of the area where the water purification equipment is currently located includes:
[0016] receiving a water quality acquisition instruction, and acquiring, through the second detection component, information about the region where the water purification device is currently located;
[0017] In response to the water quality acquisition instruction, the original water quality of the area where the water purification equipment is currently located is determined based on the area information.
[0018] In a possible implementation of the first aspect, based on the target water quality and the original water quality, controlling the switching of the wastewater switching valve by the control component to enable the water purification equipment to perform wastewater treatment includes:
[0019] Respectively determining a target water quality value corresponding to the target water quality and an original water quality value corresponding to the original water quality;
[0020] determining a target wastewater switching valve based on a difference between the target water quality value and the original water quality value;
[0021] The wastewater switching valve is switched to the target wastewater switching valve by the control component, so that the water purification equipment performs wastewater treatment.
[0022] In a possible implementation manner of the first aspect, switching the wastewater switching valve to the target wastewater switching valve by the control component so that the water purification equipment performs wastewater treatment includes:
[0023] Determining a target wastewater pipeline corresponding to the target wastewater switching valve;
[0024] Switching the wastewater switching valve to the target wastewater switching valve through the control component so that the target wastewater pipeline is connected to the water purification equipment;
[0025] After the water purification equipment completes the water purification process, the wastewater flowing out of the water purification equipment is discharged through the target wastewater pipeline.
[0026] In a possible implementation manner of the first aspect, the water purification equipment further includes a first detection component, and after the wastewater flowing out of the water purification equipment is discharged through the target wastewater pipe, further includes:
[0027] In response to the water quality adjustment instruction, obtaining the latest water quality of the water inlet pipe in the water purification device through the first detection component;
[0028] Based on the target water quality and the latest water quality, updating the target wastewater switching valve;
[0029] The current wastewater switching valve is switched to the updated target wastewater switching valve by the control component, so that the water purification equipment can dynamically adjust the water quality.
[0030] In a second aspect, the present application provides a wastewater control device, which is applied to a water purification device. The water purification device includes a control component and a wastewater switching valve. The device includes:
[0031] A determination module, configured to receive a user instruction and determine a target water quality corresponding to the user instruction;
[0032] An acquisition module is used to obtain the original water quality of the area where the water purification equipment is currently located;
[0033] The switching module is used to control the switching of the wastewater switching valve through the control component based on the target water quality and the original water quality, so that the water purification equipment can perform wastewater treatment.
[0034] In a third aspect, the present application provides a water purification device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the steps of the wastewater control method as described in the first aspect are implemented.
[0035] In a fourth aspect, the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the wastewater control method as described in the first aspect are implemented.
[0036] As described above, the present application provides a wastewater control method, device, water purification equipment and storage medium. First, a user instruction is received and the target water quality corresponding to the user instruction is determined. Then, the original water quality of the area where the water purification equipment is currently located is obtained. Then, based on the target water quality and the original water quality of the water purification equipment, the target wastewater switching valve is determined. Finally, the switching of the wastewater switching valve is controlled by the control component, so that the water purification equipment discharges or treats the wastewater after switching to the target wastewater switching valve. It can be seen that the wastewater control scheme provided by the present application provides a variety of wastewater flow control by switching the wastewater switching valve, which solves the problem that the existing technology has only a single wastewater flow control method, resulting in the inability to take into account the complex municipal water situation and user habits. It can effectively take into account the complex municipal water situation and user habits to discharge or treat wastewater in different ways, while improving the effect of wastewater treatment, it can also improve the user experience. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.
[0038] in:
[0039] Figure 1 This is an application environment diagram of the wastewater control method provided in the embodiment of the present application.
[0040] Figure 2 It is a flow chart of the wastewater control method provided in the embodiment of the present application.
[0041] Figure 3 It is a flow chart of step S2 provided in an embodiment of the present application.
[0042] Figure 4 It is a flowchart of step S3 provided in an embodiment of the present application.
[0043] Figure 5 This is another flow chart of the wastewater control method provided in an embodiment of the present application.
[0044] Figure 6 It is a structural schematic diagram of the wastewater control device provided in an embodiment of the present application.
[0045] Figure 7 This is another structural schematic diagram of the wastewater control device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0046] The following will be combined with the drawings in the embodiments of this application to clearly and completely describe the technical solutions in the embodiments of this application. Obviously, the embodiments described are only part of the embodiments of this application, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of this application.
[0047] In the following description, reference is made to “some embodiments”, which describes a subset of all possible embodiments, but it will be understood that “some embodiments” may be the same subset or different subsets of all possible embodiments and may be combined with each other without conflict.
[0048] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the art to which this application pertains. The terms used herein are for the purpose of describing the embodiments of this application only and are not intended to limit this application.
[0049] The wastewater control method provided by the embodiment of the present invention can be applied in Figure 1 In an application environment, the application environment includes: a processor 1, a memory 2, a detection component 31, a control component 32, and a wastewater switching valve 33, and the processor 1 is electrically connected to the memory 2, the detection component 31, the control component 32 and the wastewater switching valve 33.
[0050] When executing the computer program, the processor 1 performs the following steps: receiving a user instruction, determining the target water quality corresponding to the user instruction, obtaining the original water quality of the area where the water purification device is currently located using the detection component 31, and then, based on the target water quality and the original water quality, controlling the switching of the wastewater switching valve 33 via the control component 32 to cause the water purification device to perform wastewater treatment. This enables multiple different methods of wastewater flow control, improving wastewater treatment efficiency and user experience.
[0051] Figure 1 The application environment is suitable for water purification equipment, which may include a water inlet pipe, a wastewater pipe, a detection component, a control component, a wastewater switching valve, a processor, a memory, and a computer program stored in the memory and capable of running on the processor, wherein the water inlet end of the wastewater pipe is connected to the wastewater switching valve.
[0052] It is understandable that the water purification equipment may also include other components, such as a power supply component, the input end of the power supply component is electrically connected to the AC power supply, and the output end of the power supply component inputs electrical energy to the electrical components of the water purification equipment (that is, the control component, the detection component, the memory, and the processor), which is not limited here.
[0053] The present invention is described in detail below through specific examples.
[0054] See also Figure 2 As shown, Figure 2 This is a flow chart of a first embodiment of a wastewater control method provided in an embodiment of the present invention. The wastewater control method is applied to a water purification device, which includes a control component and a wastewater switching valve. The wastewater control method may specifically include:
[0055] S1. Receive user instructions and determine the target water quality corresponding to the user instructions;
[0056] Specifically, for step S1, after the water purification device receives a user instruction initiated by the user, such as an instruction for the user to input the target water quality, the target water quality corresponding to the user instruction is determined by identifying the user instruction. For example, the target water quality can be the soft water level or TDS value input by the user.
[0057] In addition, the user instruction can be generated by the user clicking the water purification button on the display screen of the water purification device, or by the user initiating a request through the APP of the smart mobile terminal, or after the user pre-sets a timed water purification task, the pre-set user instruction is generated when the current time reaches the preset time. No specific restrictions are made here.
[0058] S2. Obtain the original water quality of the area where the water purification equipment is currently located;
[0059] Specifically, for step S2, after determining the target water quality corresponding to this user instruction, it is also necessary to obtain the original water quality of the area where the water purification equipment is currently located. Since the municipal water conditions in various regions are different, the original water quality conditions corresponding to different regions are also different. Therefore, it is necessary to obtain the original water quality conditions of the area where the water purification equipment is currently located in order to carry out subsequent water purification treatment and wastewater flow control.
[0060] S3 based on the target water quality and the original water quality, the control unit controls the switching of the wastewater switching valve to enable the water purification equipment to treat the wastewater;
[0061] Specifically, due to different water purity requirements or flow requirements, the wastewater discharge method and flow control selected by the water purification equipment also need to be different. For example, when the user requires the water quality of the water purification equipment to be higher in purity, the waterway with a wastewater plug with a larger flow rate can be connected, and the wastewater discharge volume is large. Correspondingly, the desalination rate of the water purification equipment will also be improved, and the water quality purity will be higher. When the user wants to save water more, the waterway with a wastewater plug with a smaller flow rate can be connected. Therefore, for step S3, after determining the target water quality of this water purification task and the original water quality of the area where the water purification equipment is located, the target wastewater switching valve required for this water purification task is first determined based on the target water quality and the current original water quality. Then, the control component controls the switching of the wastewater switching valve and switches to the target wastewater switching valve, so that when the water purification equipment performs the water purification task, it can control and discharge the wastewater flow through the wastewater pipe corresponding to the target wastewater switching valve.
[0062] To sum up, the wastewater control method provided in this embodiment first determines the target wastewater switching valve based on the acquired target water quality and original water quality, thereby providing multiple wastewater flow controls by switching the wastewater switching valve, solving the problem that the existing technology has only a single wastewater flow control method, which cannot take into account the complex municipal water conditions and user habits. While improving the wastewater treatment effect, it can also improve the user experience.
[0063] Furthermore, in some embodiments, step S1 of “receiving a user instruction and determining the target water quality of the user instruction” may specifically include:
[0064] S11. Receive user instructions and obtain target water quality demand information corresponding to the user instructions;
[0065] S12. Determine the target water quality corresponding to the user instruction based on the target water quality requirement information.
[0066] In a specific embodiment, upon receiving a user instruction, the user instruction is first identified to determine the target water quality requirement information set by the user in the instruction, such as whether the soft water grade or pure water TDS value meets the target water quality requirement input by the user. The target water quality corresponding to the user instruction is then determined based on the target water quality requirement information. This embodiment, by identifying the user instruction, can quickly and accurately identify the target water quality input by the user.
[0067] Further, if Figure 2 As shown, in some embodiments, the water purification device in this embodiment may include a first detection component, and step S2 "obtaining the original water quality of the area where the water purification device is currently located" may specifically include:
[0068] S21 receives a water quality acquisition instruction, and detects the current water quality information of the water inlet pipe in the water purification device through the first detection component;
[0069] S22. Respond to the water quality acquisition instruction and determine the original water quality of the area where the water purification equipment is currently located based on the current water quality information.
[0070] Specifically, the water purification device in this embodiment may further include a first detection component, which is used to detect the current water quality information of the water inlet pipe in the water purification device. For step S2, a water quality acquisition instruction is first received, and then the current water quality information of the water inlet pipe in the water purification device is detected by the first detection component. The current water quality information of the water inlet pipe is generally related to the municipal water conditions in the area where the water purification device is currently located. Then, in response to the water quality acquisition instruction, the original water quality of the area where the water purification device is currently located is determined based on the current water quality information obtained by the first detection component. This embodiment accurately obtains the current original water quality of the water purification device by detecting the water quality of the water inlet pipe in the water purification device.
[0071] Further, if Figure 2 As shown, in some embodiments, the water purification device in this embodiment includes a second detection component, and step S2 "obtaining the original water quality of the area where the water purification device is currently located" may further include:
[0072] S23 receives the water quality acquisition instruction, obtains the water purification equipment through the second detection component current area information;
[0073] S24. Respond to the water quality acquisition instruction and determine the original water quality of the area where the water purification equipment is currently located based on the regional information.
[0074] Specifically, the water purification equipment in this embodiment may further include a second detection component, which is used to detect regional information of the current location of the water purification equipment. For step S2, a water quality acquisition instruction is first received, and then the regional information of the current location of the water purification equipment is obtained through the second detection component. For example, the location information of the water purification equipment is obtained through a GPS positioning sensor to determine the regional information of the water purification equipment, or the regional information of the water purification equipment is determined through a gateway according to the local area network where it is located. No specific restrictions are made here; then, in response to the water quality acquisition instruction, the original water quality of the current location of the water purification equipment is determined according to the current regional information obtained by the second detection component. For example, when the regional information obtained is xx province xx city, the local municipal water situation of xx province xx city is obtained as the original water quality situation; it can be seen that in addition to obtaining the current original water quality of the water purification equipment by detecting the water quality of the water inlet pipe in the water purification equipment through the first detection component, this embodiment can also obtain the original water quality by detecting the current regional information of the water purification equipment. While accurately obtaining the current original water quality of the water purification equipment, it can also improve the flexibility of information acquisition.
[0075] Further, if Figure 3 As shown, in some embodiments, step S3 "based on the target water quality and the original water quality, controlling the switching of the wastewater switching valve by the control component to enable the water purification equipment to perform wastewater treatment" may specifically include:
[0076] S31 respectively determine the target water quality value corresponding to the target water quality and the original water quality value corresponding to the original water quality;
[0077] S32. Determine the target wastewater switching valve based on the difference between the target water quality value and the original water quality value;
[0078] S33. Switch the wastewater switching valve to the target wastewater switching valve through the control component, so that the water purification equipment can perform wastewater treatment.
[0079] In a specific embodiment, for step S3, after obtaining the target water quality and the original water quality, the target water quality value corresponding to the target water quality and the original water quality value corresponding to the original water quality of the water purification equipment are first determined respectively, and then the difference between the target water quality value and the original water quality value is calculated. Since different wastewater circuits correspond to different wastewater discharge methods and flow control, for example, when the user requires the water quality of the water purification equipment to be higher in purity, the waterway with a wastewater plug with a larger flow rate can be connected, the wastewater discharge volume is large, and accordingly, the desalination rate of the water purification equipment will also be improved. The water quality is purer; therefore, it is necessary to determine the wastewater circuit that needs to be connected when the water purification equipment performs this water purification task, and the target wastewater switching valve required to connect the wastewater circuit based on the difference between the target water quality value and the original water quality value; finally, the wastewater switching valve is switched by the control component. After the wastewater switching valve is switched to the target wastewater switching valve, the water purification equipment is connected to the corresponding wastewater circuit through the target wastewater switching valve. When performing the water purification task, the wastewater circuit is connected through the target wastewater switching valve to complete the water quality switching, and the discharge and flow control of the wastewater are controlled through the wastewater circuit. This embodiment provides multiple wastewater flow control methods by switching the wastewater switching valve, solving the problem that the existing technology has only a single wastewater flow control method, which cannot well take into account the complex municipal water conditions and user habits.
[0080] Further, if Figure 4 As shown, in some embodiments, step S33 "switching the wastewater switching valve to the target wastewater switching valve through the control component to enable the water purification equipment to perform wastewater treatment" may specifically include:
[0081] S331. Determine the target wastewater pipe corresponding to the target wastewater switching valve;
[0082] S332. The wastewater switching valve is switched to the target wastewater switching valve by the control component so that the target wastewater pipe is connected to the water purification equipment;
[0083] S333. After the water purification equipment completes the water purification process, the wastewater flowing out of the water purification equipment is discharged through the target wastewater pipeline.
[0084] In a specific embodiment, step S33 first determines the target wastewater pipe corresponding to the target wastewater switching valve. The water purification device is provided with multiple waterways containing wastewater plugs with inconsistent wastewater flow rates. In this embodiment, a control component can be used to rotate the wastewater switching valve to the target wastewater switching valve, thereby connecting the target wastewater pipe corresponding to the target wastewater switching valve. The wastewater flow rate of the wastewater plug in the target wastewater pipe matches the difference between the target water quality value and the original water quality value. After the water purification device is connected to the target wastewater pipe, when the water purification device performs the water purification task, the wastewater flowing out of the water purification device will flow out through the target wastewater pipe and flow out at the wastewater flow rate corresponding to the target wastewater pipe. This embodiment, by switching the wastewater switching valve to connect wastewater pipes with different wastewater flow rates for wastewater discharge, can effectively take into account different municipal water conditions and user habits, thereby improving water purification effects and user experience.
[0085] Further, if Figure 5 As shown, in some embodiments, the water purification device further includes a first detection component, and after step S333 "discharging the wastewater flowing out of the water purification device through the target wastewater pipe", specifically further includes:
[0086] S41 responds to the water quality adjustment instruction, obtains the latest water quality of the water inlet pipe in the water purification equipment through the first detection component;
[0087] S42. Based on the target water quality and the latest water quality, update the target wastewater switching valve;
[0088] S43. Switch the current wastewater switching valve to the updated target wastewater switching valve through the control component, so that the water purification equipment can dynamically adjust the water quality.
[0089] Specifically, after the wastewater switching valve is switched to the target wastewater switching valve by the control component, and the wastewater flowing out of the water purification equipment is discharged and treated through the target wastewater pipe, this embodiment also provides a method for dynamically adjusting the water quality. First, the water quality adjustment instruction initiated by the user is responded to, and then the latest water quality of the water inlet pipe in the water purification equipment is obtained by controlling the first detection component. The latest water quality refers to the latest water quality of the water inlet pipe after the water purification equipment has performed the water purification task. Then, the target water quality value corresponding to the target water quality and the latest water quality value corresponding to the latest water quality are determined respectively. Then, the difference between the target water quality value and the latest water quality value is calculated, and the new target wastewater switching valve is updated according to the difference. Finally, the current wastewater switching valve is switched to the new target wastewater switching valve by the control component, and the water purification equipment is connected to the wastewater pipe corresponding to the new target wastewater switching valve, so that the water quality of the water purification equipment is dynamically adjusted through the new wastewater pipe when performing the water purification task, thereby effectively enhancing the water purification effect.
[0090] See also Figure 6As shown, this embodiment also provides a wastewater control device, which is applied to a water purification device. The water purification device includes a control component and a wastewater switching valve. The wastewater control device may specifically include:
[0091] The determination module 100 is used to receive a user instruction and determine the target water quality corresponding to the user instruction;
[0092] The acquisition module 200 is used to obtain the original water quality of the area where the water purification equipment is currently located;
[0093] The switching module 300 is used to control the switching of the wastewater switching valve through the control component based on the target water quality and the original water quality, so that the water purification equipment can perform wastewater treatment.
[0094] Furthermore, in some embodiments, the determination module 100 may specifically include:
[0095] A receiving unit, configured to receive a user instruction and obtain target water quality requirement information corresponding to the user instruction;
[0096] The determination unit is used to determine the target water quality corresponding to the user instruction based on the target water quality requirement information.
[0097] Furthermore, in some embodiments, the acquisition module 200 may specifically include:
[0098] a first acquisition unit configured to receive a water quality acquisition instruction, detect current water quality information of a water inlet pipe in the water purification device through a first detection component, and respond to the water quality acquisition instruction to determine the original water quality of the area where the water purification device is currently located based on the current water quality information;
[0099] The second acquisition unit is used to receive a water quality acquisition instruction, obtain the area information where the water purification equipment is currently located through the second detection component; respond to the water quality acquisition instruction, and determine the original water quality of the area where the water purification equipment is currently located based on the area information.
[0100] Furthermore, in some embodiments, the switching module 300 may specifically include:
[0101] a water quality value determination unit, for respectively determining a target water quality value corresponding to the target water quality and an original water quality value corresponding to the original water quality;
[0102] a switching valve determining unit, configured to determine a target wastewater switching valve based on a difference between a target water quality value and an original water quality value;
[0103] The switching unit is used to switch the wastewater switching valve to the target wastewater switching valve through the control component, so that the water purification equipment can perform wastewater treatment.
[0104] Furthermore, in some embodiments, the switching unit is specifically used to: determine the target wastewater pipe corresponding to the target wastewater switching valve; switch the wastewater switching valve to the target wastewater switching valve through the control component to connect the target wastewater pipe with the water purification equipment; after the water purification equipment completes the water purification treatment, discharge the wastewater flowing out of the water purification equipment through the target wastewater pipe.
[0105] Further, if Figure 7 As shown, in some embodiments, the wastewater control device may further include an adjustment module 400, which is specifically used to: respond to a water quality adjustment instruction, obtain the latest water quality of the water inlet pipe in the water purification equipment through the first detection component; update the target wastewater switching valve based on the target water quality and the latest water quality; switch the current wastewater switching valve to the updated target wastewater switching valve through the control component, so that the water purification equipment can dynamically adjust the water quality.
[0106] The wastewater control device provided in this embodiment provides multiple wastewater flow control methods by switching the wastewater switching valve, solving the problem that the existing technology has only a single wastewater flow control method, which cannot take into account the complex municipal water conditions and user habits. It can effectively take into account the complex municipal water conditions and user habits to discharge or treat wastewater in different ways, while improving the wastewater treatment effect, it can also improve the user experience.
[0107] The process of each module in the wastewater control device provided in this embodiment realizing its own function can be specifically referred to the aforementioned Figure 2 The description of the illustrated embodiment and other related method embodiments will not be repeated here.
[0108] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of this application. Their specific functions and technical effects can be found in the method embodiment section and will not be repeated here.
[0109] In one embodiment, a water purification device is proposed, which may include a water inlet pipe, a wastewater pipe, a detection component, a control component, a wastewater switching valve, a processor, a memory, and a computer program stored in the memory and run on the processor, wherein the water inlet end of the wastewater pipe is connected to the wastewater switching valve.
[0110] In addition, it should be noted that the water purification device of this embodiment is equipped with multiple waterways with wastewater plugs having different wastewater flow rates. A wastewater switching valve (e.g., a ceramic plate switching valve) allows users to freely select the required wastewater volume, thereby meeting user needs for higher water purity or greater water conservation. The water purification device includes two or more waterways with wastewater plugs having different wastewater flow rates. Each waterway is an inlet for a wastewater plug of a different specification, and switching is controlled by one or more ceramic plates.
[0111] This embodiment provides multiple wastewater flow control methods by switching the wastewater switching valve, solving the problem that the existing technology has only a single wastewater flow control method, which cannot take into account the complex municipal water conditions and user habits. It can effectively take into account the complex municipal water conditions and user habits to discharge or treat wastewater in different ways, while improving the wastewater treatment effect, it can also improve the user experience.
[0112] In one embodiment, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of any of the above-mentioned wastewater control methods are implemented.
[0113] This embodiment provides multiple wastewater flow control methods by switching the wastewater switching valve, solving the problem that the existing technology has only a single wastewater flow control method, which cannot take into account the complex municipal water conditions and user habits. It can effectively take into account the complex municipal water conditions and user habits to discharge or treat wastewater in different ways, while improving the wastewater treatment effect, it can also improve the user experience.
[0114] It should be noted that the above functions or steps that can be implemented by the computer-readable storage medium or computer device can be found in the relevant descriptions of the server side and the client side in the aforementioned method embodiment. To avoid repetition, they will not be described one by one here.
[0115] Those skilled in the art will appreciate that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program. The computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in various forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0116] Those skilled in the art will clearly understand that for the sake of convenience and brevity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.
[0117] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the present invention, and should all be included in the scope of protection of the present invention.
Claims
1. A wastewater control method, characterized in that: The method is applied to a water purification device, the water purification device comprising a control component and a wastewater switching valve, and the method comprises: receiving a user instruction and determining a target water quality corresponding to the user instruction; Obtaining the original water quality of the area where the water purification equipment is currently located; Based on the target water quality and the original water quality, the control component controls the switching of the wastewater switching valve so that the water purification equipment performs wastewater treatment.
2. The wastewater control method according to claim 1, characterized in that: The receiving of a user instruction and determining a target water quality of the user instruction includes: Receive user instructions and obtain target water quality requirement information corresponding to the user instructions; Based on the target water quality requirement information, the target water quality corresponding to the user instruction is determined.
3. The wastewater control method according to claim 1, characterized in that: The water purification device includes a first detection component, and obtaining the original water quality of the area where the water purification device is currently located includes: Receiving a water quality acquisition instruction, and detecting current water quality information of a water inlet pipe in the water purification device through the first detection component; In response to the water quality acquisition instruction, the original water quality of the area where the water purification equipment is currently located is determined based on the current water quality information.
4. The wastewater control method according to claim 1, characterized in that: The water purification device includes a second detection component, and obtaining the original water quality of the area where the water purification device is currently located includes: receiving a water quality acquisition instruction, and acquiring information about the area where the water purification device is currently located through the second detection component; In response to the water quality acquisition instruction, the original water quality of the area where the water purification device is currently located is determined based on the area information.
5. The wastewater control method according to claim 1, characterized in that: The method of controlling the switching of the wastewater switching valve by the control component based on the target water quality and the original water quality so that the water purification device performs wastewater treatment includes: Respectively determining a target water quality value corresponding to the target water quality and an original water quality value corresponding to the original water quality; determining a target wastewater switching valve based on a difference between the target water quality value and the original water quality value; The wastewater switching valve is switched to the target wastewater switching valve by the control component so that the water purification equipment performs wastewater treatment.
6. The wastewater control method according to claim 5, characterized in that: The step of switching the wastewater switching valve to the target wastewater switching valve by the control component so that the water purification equipment performs wastewater treatment includes: Determine a target wastewater pipeline corresponding to the target wastewater switching valve; Switching the wastewater switching valve to the target wastewater switching valve through the control component so that the target wastewater pipeline is connected to the water purification equipment; After the water purification equipment completes the water purification process, the wastewater flowing out of the water purification equipment is discharged through the target wastewater pipeline.
7. The wastewater control method according to claim 6, characterized in that: The water purification device further includes a first detection component, and after the wastewater flowing out of the water purification device is discharged through the target wastewater pipeline, further includes: In response to the water quality adjustment instruction, the first detection component obtains the latest water quality of the water inlet pipe in the water purification device; Based on the target water quality and the latest water quality condition, updating the target wastewater switching valve; The current wastewater switching valve is switched to the updated target wastewater switching valve through the control component, so that the water purification equipment can dynamically adjust the water quality.
8. A wastewater control device, characterized in that: Applied to water purification equipment, the water purification equipment includes a control component and a wastewater switching valve, and the device includes: A determination module, used to receive a user instruction and determine a target water quality corresponding to the user instruction; An acquisition module, used to obtain the original water quality of the area where the water purification equipment is currently located; A switching module is used to control the switching of the wastewater switching valve through the control component based on the target water quality and the original water quality, so that the water purification equipment can perform wastewater treatment.
9. A water purification device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the wastewater control method according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the wastewater control method according to any one of claims 1 to 7 are implemented.
Citation Information
Patent Citations
Water filtering system
CN108569781A
Water purification system, and control method and apparatus of water purifier
CN110790410A
Waste water valve control method and device, water purification equipment and storage medium
CN113031662A
Water treatment system
JP1988263508A
Water quality control device, water treatment system, thermal plant, power generation plant, and water quality control method
JP2019040430A