Method for determining suspended roof position and maximum suspended roof length of lateral roof of goaf
By obtaining the coal mining height and top plate drilling bar chart of the coal mining working face, the loads of each layer and the target overhanging layer position are calculated, and the maximum overhanging length is determined in combination with electromagnetic wave detection, the unknown overhanging layer position and length in the goaf area are solved. The problem of the roof plate pre-cracking treatment improves the accuracy and safety of the roof plate.
Patent Information
- Application Number
- CN202410986563.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-07-22
AI Technical Summary
In the goaf area, the lateral overhanging top layer position and the overhanging top length are unclear, which makes it difficult for the top plate to explode and hydraulic fracturing to play a role, posing safety risks and the fracturing layer position cannot be determined.
By obtaining the coal mining height and roof drilling bar chart of the coal mining working face, determine the roof collapse range and rock structure, calculate the loads of each layer, filter out the target overhanging top level and collapse step distance, arrange directional drilling and electromagnetic waves The detection device obtains the absorption coefficient to determine the maximum overhang length.
The accuracy of determining the roof layer position and the length of the roof is improved, the blindness of the roof pre-cracking treatment is reduced, the engineering volume is saved, and the practicality of impact ground pressure prevention and control technology is enhanced.
Smart Images

Figure CN118897323A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of roof rock strata control, and in particular to a method for determining a suspended top position and a maximum suspended top length of a lateral roof of a goaf area. Background Art
[0002] Affected by the lateral support pressure of the goaf, the goaf-side tunnels are often the main manifestation areas of rock burst, large deformation and strong mine pressure, and the main source of lateral support pressure is the lateral suspended roof of the goaf. For the lateral suspended roof of the goaf, the roof can be weakened by roof blasting or hydraulic fracturing in advance before the working face is mined, thereby reducing the length of the suspended roof in the goaf. However, some mines did not take measures in advance before the formation of the goaf. When they began to excavate or use the goaf-side tunnels, they were faced with the influence of lateral support pressure. At this time, measures to weaken and relieve the pressure on the roof were taken along the goaf tunnels toward the goaf. At this time, the position of the lateral suspended roof in the goaf is unclear and the length of the suspended roof is unknown. There are great safety risks in using roof blasting, and hydraulic fracturing is difficult to play a role because it is impossible to determine the fracturing layer. Summary of the invention
[0003] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.
[0004] To this end, the first object of the present invention is to provide a method for determining the position and maximum length of the suspended top of the lateral roof of a goaf, so as to more accurately determine the position and length of the suspended top.
[0005] The second object of the present invention is to provide a system for determining the position and maximum length of the lateral roof overhang in a goaf area.
[0006] A third objective of the present invention is to provide an electronic device.
[0007] A fourth object of the present invention is to provide a computer-readable storage medium.
[0008] To achieve the above-mentioned object, the first aspect of the present invention provides a method for determining the top hanging position and the maximum hanging length of the lateral roof of a goaf, comprising:
[0009] For the coal mining working face and goaf that have been mined, the roof rock structure of the roof collapse range is obtained based on the coal mining height of the coal mining working face and the roof drilling column diagram of the goaf;
[0010] Determine a possible overhanging top position set of the lateral roof based on the loads of each layer in the roof rock structure;
[0011] Calculating the collapse step distance of each possible hanging top position in the possible hanging top position set, and screening the possible hanging top position set based on the collapse step distance to obtain a target hanging top position set;
[0012] Constructing two directional boreholes in adjacent tunnels on one side of the goaf, the borehole openings of the two directional boreholes are separated by a set distance along the excavation direction, and each directional borehole extends to the uppermost target suspended top layer and then extends toward the goaf in a horizontal direction;
[0013] An electromagnetic wave detection device is arranged in the two directional boreholes to obtain the absorption coefficient of the detection area, and the maximum hanging top length is determined based on the comparison result of the absorption coefficient and the set absorption threshold.
[0014] In the method of the first aspect of the present invention, the roof rock structure of the roof collapse range is obtained based on the coal mining height of the coal mining working face and the roof drilling column chart of the goaf, including: calculating the roof collapse height based on the coal mining height of the coal mining working face and the initial expansion coefficient of the roof rock strata; determining the roof rock structure of the roof collapse range corresponding to the roof collapse height based on the roof drilling column chart of the goaf.
[0015] In the method of the first aspect of the present invention, the possible hanging top position set of the lateral roof is determined based on the load of each layer in the roof rock structure, including: for the roof rock structure within the range of roof collapse, starting from the lowest first layer, the first layer is taken as the bearing layer, and the load of each layer on the bearing layer on the bearing layer is calculated to obtain a target layer that meets the hanging top load condition; the target layer is taken as a new bearing layer, and the load on the new bearing layer is calculated to obtain a new target layer, and the bearing layer is repeatedly updated until the number of layers reaches the total number of layers of the roof rock structure, wherein the target layer obtained each time constitutes the possible hanging top position set.
[0016] In the method of the first aspect of the present invention, satisfying the suspended top load condition means that the load of the current calculation layer on the bearing layer is less than the load of the previous layer of the current calculation layer on the bearing layer.
[0017] In the method of the first aspect of the present invention, the calculation of the collapse step distance of each possible suspended top layer position in the set of possible suspended top layer positions includes: calculating the corresponding collapse step distance based on the thickness, tensile strength and load bearing of each possible suspended top layer position.
[0018] In the method of the first aspect of the present invention, the possible hanging top layer position set is screened based on the collapse step distance to obtain a target hanging top layer position set, including: sorting each possible hanging top layer position in the possible hanging top layer position set from bottom to top according to the position in the roof rock layer structure; screening any group of two adjacent possible hanging top layers, the screening process includes: if the collapse step distance of the upper possible hanging top layer position is smaller than the collapse step distance of the lower possible hanging top layer position, adding the load of the upper possible hanging top layer position to the lower possible hanging top layer position to recalculate the collapse step distance of the lower possible hanging top layer position, and the upper possible hanging top layer position is deleted from the possible hanging top layer position set; after screening all groups of two adjacent possible hanging top layers, the final possible hanging top layer position set is the target hanging top layer position set.
[0019] In the method of the first aspect of the present invention, the length of each directional drill hole extending horizontally toward the goaf beyond the goaf boundary of the adjacent tunnel is a set length, and the set length is smaller than the collapse step distance of the uppermost target suspended top layer.
[0020] To achieve the above-mentioned object, the second aspect of the present invention provides a system for determining the top position and maximum top length of the lateral roof of a goaf, comprising:
[0021] A collapse range determination module is used to obtain the roof rock structure of the roof collapse range based on the coal mining height of the coal mining face and the roof drilling column diagram of the goaf for the coal mining face and the goaf that have been mined.
[0022] A possible overhanging top position determination module, used to determine a possible overhanging top position set of the lateral top plate based on the loads of each layer in the top plate rock structure;
[0023] A target suspended top position determination module is used to calculate the collapse step distance of each possible suspended top position in the possible suspended top position set, and screen the possible suspended top position set based on the collapse step distance to obtain a target suspended top position set;
[0024] A directional drilling arrangement module is used to construct two directional boreholes in adjacent tunnels on one side of the goaf, the borehole openings of the two directional boreholes are separated by a set distance along the excavation direction, and each directional borehole extends to the uppermost target suspended top layer and then extends toward the goaf in a horizontal direction;
[0025] The overhang length calculation module is used to arrange electromagnetic wave detection devices in the two directional drill holes to obtain the absorption coefficient of the detection area, and determine the maximum overhang length based on the comparison result of the absorption coefficient and the set absorption threshold.
[0026] To achieve the above-mentioned purpose, the third aspect of the present invention proposes an electronic device, comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement the method proposed in the first aspect of the present invention.
[0027] To achieve the above-mentioned purpose, the fourth aspect of the present invention proposes a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the method proposed in the first aspect of the present invention.
[0028] The present invention provides a method, system, electronic device and storage medium for determining the suspended top position and maximum suspended top length of the lateral roof of a goaf. For a coal mining face and a goaf that have been mined out, the roof rock structure of the roof collapse range is obtained based on the coal mining height of the coal mining face and the roof drilling column diagram of the goaf; a possible suspended top position set of the lateral roof is determined based on the load of each layer in the roof rock structure; the collapse step distance of each possible suspended top position in the possible suspended top position set is calculated, and the possible suspended top position set is screened based on the collapse step distance to obtain a target suspended top position set; two directional boreholes are constructed in adjacent tunnels on one side of the goaf, the borehole openings of the two directional boreholes are separated by a set distance along the excavation direction, and each directional borehole extends to the uppermost target suspended top position and then extends toward the goaf in a horizontal direction; an electromagnetic wave detection device is arranged in the two directional boreholes to obtain the absorption coefficient of the detection area, and the maximum suspended top length is determined based on the comparison result of the absorption coefficient and the set absorption threshold. In this case, considering that the roof in the collapse range has the most direct impact on the goaf-side tunnels, the roof rock structure in the roof collapse range is determined based on the coal mining height and the roof drill hole column diagram. The target suspended top position set is obtained according to the roof rock structure in the roof collapse range using the load and collapse step distance. The suspended top length is then obtained by combining the absorption coefficient collected by the electromagnetic wave detection device arranged in the two directional drill holes in the adjacent tunnels, thereby making the determination of the suspended top position and length more accurate.
[0029] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0031] Figure 1 A schematic flow chart of a method for determining the top position and maximum top length of the lateral roof of a goaf provided by an embodiment of the present invention;
[0032] Figure 2 A schematic diagram of the arrangement of directional drilling provided by an embodiment of the present invention;
[0033] Figure 3 A block diagram of a system for determining the top hanging position and maximum hanging length of the lateral roof of a goaf provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0034] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0035] The following describes a method and system for determining the suspended top position and maximum suspended top length of the lateral roof of a goaf according to an embodiment of the present invention with reference to the accompanying drawings.
[0036] The embodiment of the present invention provides a method for determining the suspended top position and the maximum suspended top length of the lateral roof of a goaf area, so as to more accurately determine the suspended top position and the suspended top length.
[0037] Figure 1 A schematic flow chart of a method for determining a suspended top position and a maximum suspended top length of a lateral roof in a goaf provided in an embodiment of the present invention.
[0038] like Figure 1 As shown, the method for determining the top hanging position and the maximum hanging length of the lateral roof of the goaf area includes the following steps:
[0039] Step S101, for the coal mining face and goaf that have been mined, the roof rock structure of the roof collapse range is obtained based on the coal mining height of the coal mining face and the roof drilling column diagram of the goaf.
[0040] Specifically, in step S101, a coal mining face that has been mined is first determined, and for the coal mining face and the goaf where the coal mining face is located, a roof drilling column chart of the coal mining height of the coal mining face and the lateral roof of the goaf is obtained.
[0041] In step S101, the roof rock structure of the roof collapse range is obtained based on the acquired coal mining height of the coal mining face and the roof drilling column chart of the goaf, including: calculating the roof collapse height based on the coal mining height of the coal mining face and the initial expansion coefficient of the roof rock strata; determining the roof rock structure of the roof collapse range corresponding to the roof collapse height based on the roof drilling column chart of the goaf.
[0042] The roof collapse height satisfies formula (1):
[0043]
[0044] Where H is the roof collapse height. M is the coal mining height of the coal mining face, in meters. P is the initial expansion coefficient of the roof rock layer, which can be taken as 1.1 to 1.4.
[0045] Among them, if the roof collapses sufficiently corresponding to the roof collapse height, it can fill the goaf, and sufficient collapse can reduce the impact of lateral stress in the goaf.
[0046] According to the obtained roof collapse height, the roof rock layer structure within the collapse range corresponding to the roof collapse height is obtained by comparing with the roof drilling column chart. The roof rock layer structure within the collapse range includes the rock layer distribution information of the roof within the collapse range.
[0047] In step S101, after obtaining the roof rock structure within the roof collapse range, cores are drilled from the rock layers within the roof rock structure to perform mechanical parameter tests. The mechanical parameters tested include but are not limited to uniaxial compressive strength, tensile strength, elastic model, Poisson's ratio and other parameters.
[0048] Step S102, determining a possible overhanging top position set of the lateral roof based on the loads of each layer in the roof rock structure.
[0049] In step S102, based on the loads of each layer in the roof rock structure, a possible overhanging top position set of the lateral roof is determined, including: for the roof rock structure within the roof collapse range, starting from the first layer at the bottom, the first layer is used as the bearing layer to calculate the loads of each layer on the bearing layer to the bearing layer to obtain a target layer that meets the overhanging top load condition; the target layer is used as a new bearing layer, the loads on the new bearing layer are calculated to obtain a new target layer, and the bearing layer is repeatedly updated until the number of layers reaches the total number of layers in the roof rock structure, wherein the target layers obtained each time constitute a possible overhanging top position set. Among them, satisfying the overhanging top load condition means that the load of the current calculated layer on the bearing layer is less than the load of the previous layer of the current calculated layer on the bearing layer.
[0050] Specifically, the roof rock layer structure within the collapse range is regarded as the first layer, the second layer, ..., the Nth layer from bottom to top. N is the total number of rock layers in the roof rock layer structure within the collapse range. According to the mechanical parameters of the rock layer measured in step S101, the load of each rock layer in the roof rock layer structure within the collapse range is calculated, and the formula for calculating the load of each rock layer is as shown in formula (2):
[0051]
[0052] Where q is the load of the nth layer on the first layer, in MPa. i (i=1,2,…n) is the elastic modulus of the i-th layer, in MPa; h i(i=1,2,…n) is the thickness of the i-th layer, in m; ρ i (i=1,2,…n) is the block density of the i-th layer, in kg / m 3 ; g is the acceleration due to gravity, in N / kg. If the cumulative terms in the numerator and denominator of formula (2) are added to the n+1th layer respectively, the load of the n+1th layer on the 1st layer is calculated.
[0053] When the load of the n+1th layer on the 1st layer is less than the load of the nth layer on the 1st layer, the calculation stops and the load of the nth layer on the 1st layer is taken as the load of the 1st layer. The load calculation of other layers can be similar to the load of the 1st layer.
[0054] Take the first layer as the bearing layer, calculate the loads of each layer on the first layer on the first layer, when the current calculation layer is the n+1th layer, if the load of the n+1th layer on the first layer is less than the load of the nth layer on the first layer, the n+1th layer meets the hanging top load condition, and the n+1th layer is the required target layer (that is, the possible hanging top position of the lateral top plate), take the n+1th layer as the new bearing layer, calculate the loads of the rock layers above the n+1th layer on the n+1th layer to obtain the new target layer, and repeatedly update the bearing layers until the number of layers reaches the total number of layers of the roof rock layer structure (for example, reaches the Nth layer), wherein the target layers obtained each time constitute a possible hanging top position set.
[0055] It should be noted that the total number of rock layers in the roof rock layer structure within the collapse range is limited. In the repeated updating process, if there are no layers that meet the hanging top load conditions between a certain target layer and the highest rock layer of the roof rock layer structure within the collapse range, then the target layer is the topmost possible hanging top position. The load of the topmost possible hanging top position can be calculated based on the remaining rock layers above it.
[0056] In step S102, while determining a set of possible suspended top positions of the lateral top plate, the load of each possible suspended top position is also obtained.
[0057] Step S103, calculating the collapse step distance of each possible hanging top layer position in the possible hanging top layer position set, and screening the possible hanging top layer position set based on the collapse step distance to obtain a target hanging top layer position set.
[0058] In step S103, the collapse step distance of each possible overhanging top layer position in the possible overhanging top layer position set is calculated, including: calculating the corresponding collapse step distance based on the thickness, tensile strength and bearing load of each possible overhanging top layer position.
[0059] The formula for calculating the collapse step distance of each possible suspended top layer is as follows:
[0060]
[0061] Where, L jis the collapse step distance of the jth possible hanging top position, h j is the thickness of the jth possible overhanging top layer, R T,j is the tensile strength of the jth possible hanging top layer, q j is the load of the jth possible hanging top bit. j is 1-J, and J is the number of possible hanging top bits in the set of possible hanging top bits.
[0062] In step S103, the possible hanging top layer position set is screened based on the collapse step distance to obtain the target hanging top layer position set, including: sorting each possible hanging top layer position in the possible hanging top layer position set from bottom to top according to the position in the roof rock layer structure; screening any group of two adjacent possible hanging top layers, the screening process includes: if the collapse step distance of the upper possible hanging top layer position is smaller than the collapse step distance of the lower possible hanging top layer position, adding the load of the upper possible hanging top layer position to the lower possible hanging top layer position to recalculate the collapse step distance of the lower possible hanging top layer position, and the upper possible hanging top layer position is deleted from the possible hanging top layer position set; the final possible hanging top layer position set after screening all groups of two adjacent possible hanging top layers is the target hanging top layer position set.
[0063] In step S103, referring to the roof rock structure within the collapse range, the uppermost target suspended top layer among all the target suspended top layers included in the target suspended top layer set can be determined.
[0064] Step S104, construct two directional boreholes in adjacent tunnels on one side of the goaf, the borehole openings of the two directional boreholes are separated by a set distance along the excavation direction, and each directional borehole extends to the uppermost target suspended top position and then extends horizontally toward the goaf.
[0065] In step S104, the distance is set to, for example, 20 to 30 m.
[0066] In step S104, the length of each directional drill hole extending horizontally toward the goaf beyond the goaf boundary of the adjacent roadway is a set length, and the set length is less than the collapse step distance of the uppermost target suspended top layer. In the embodiment of the present invention, the goaf boundary of the adjacent roadway refers to the boundary surface between the goaf and the coal pillar.
[0067] Specifically, Figure 2 Schematic diagram of the arrangement of directional drilling provided by an embodiment of the present invention. Figure 2As shown, a directional borehole is first constructed in the adjacent tunnel on one side of the goaf. After the directional borehole is drilled to the uppermost target suspended top layer position determined in step S103, it continues to drill in the horizontal direction of the uppermost target suspended top layer toward the goaf, and exceeds the boundary of the goaf (i.e., the boundary surface between the goaf and the coal pillar) by a set length during drilling. Another borehole is opened at intervals of 20 to 30 meters along the excavation direction of the adjacent tunnel, and the same directional borehole is constructed again in accordance with the above directional drilling method.
[0068] Step S105, arranging electromagnetic wave detection devices in the two directional boreholes to obtain the absorption coefficient of the detection area, and determining the maximum hanging top length based on the comparison result of the absorption coefficient and the set absorption threshold.
[0069] Specifically, in step S105, electromagnetic wave detection devices are arranged in two directional drill holes to perform electromagnetic wave CT (Computed Tomography) detection, wherein an excitation device is installed in one hole and a receiving device is installed in the other hole. The installation position can be, for example, in a directional drill hole section corresponding to a set length (see Figure 2 ) within any position. The detection range is the area between the topmost target suspension layer and the two directional drill holes. The electromagnetic wave absorption coefficient in the area is detected by the arranged electromagnetic wave detection device. The electromagnetic wave absorption coefficient can be referred to as the absorption coefficient.
[0070] According to the distribution of electromagnetic wave absorption coefficient, when the absorption coefficient is higher than the set absorption threshold, it can be considered that there is a crack space in the area, that is, the roof of the area has been damaged. When the absorption coefficient is less than the set absorption threshold, it can be considered that the rock formation in the area is dense, there are fewer cracks, and no fractures have occurred. Therefore, based on the distribution of the electromagnetic wave absorption coefficient detected by the arranged electromagnetic wave detection device, the position where the absorption coefficient is higher than the set absorption threshold is determined. The length from each position to the boundary of the goaf is the suspended roof length. The maximum value selected from all suspended roof lengths is the required maximum suspended roof length. It should be noted that the set distance is determined based on experience. The suspended roof conditions between directional boreholes at a set distance are basically the same. Therefore, the maximum suspended roof length of the lateral roof of the goaf can be obtained by arranging electromagnetic wave detection devices using two directional boreholes separated by a set distance.
[0071] In order to implement the above-mentioned embodiment, the present invention further proposes a system for determining the position and maximum length of the suspended top of the lateral roof of the goaf.
[0072] Figure 3 A block diagram of a system for determining the top hanging position and maximum hanging length of the lateral roof of a goaf provided by an embodiment of the present invention.
[0073] like Figure 3As shown, the system for determining the top hanging position and maximum hanging length of the lateral roof of the goaf includes a collapse range determination module 11, a possible hanging top position determination module 12, a target hanging top position determination module 13, a directional drilling arrangement module 14 and a hanging top length calculation module 15, wherein:
[0074] The collapse range determination module 11 is used to obtain the roof rock structure of the roof collapse range based on the coal mining height of the coal mining face and the roof drilling column diagram of the goaf for the coal mining face and the goaf that have been mined.
[0075] A possible overhanging top position determination module 12 is used to determine a possible overhanging top position set of the lateral roof based on the loads of each layer in the roof rock structure;
[0076] The target suspended top position determination module 13 is used to calculate the collapse step distance of each possible suspended top position in the possible suspended top position set, and screen the possible suspended top position set based on the collapse step distance to obtain the target suspended top position set;
[0077] The directional drilling arrangement module 14 is used to construct two directional drilling holes in adjacent tunnels on one side of the goaf, the drilling openings of the two directional drilling holes are separated by a set distance along the excavation direction, and each directional drilling hole extends to the uppermost target suspended top layer and then extends toward the goaf in the horizontal direction;
[0078] The overhang length calculation module 15 is used to arrange electromagnetic wave detection devices in two directional boreholes to obtain the absorption coefficient of the detection area, and determine the maximum overhang length based on the comparison result of the absorption coefficient and the set absorption threshold.
[0079] Furthermore, in a possible implementation of an embodiment of the present invention, the collapse range determination module 11 is specifically used to: calculate the roof collapse height based on the coal mining height of the coal mining face and the initial expansion coefficient of the roof rock layer; determine the roof rock layer structure of the roof collapse range corresponding to the roof collapse height based on the roof drilling column chart of the goaf.
[0080] Furthermore, in a possible implementation of an embodiment of the present invention, the possible hanging top position determination module 12 is specifically used for: for the roof rock structure within the range of roof collapse, starting from the lowest first layer, taking the first layer as the bearing layer, calculating the loads of each layer on the bearing layer on the bearing layer to obtain a target layer that meets the hanging top load condition; taking the target layer as the new bearing layer, calculating the load on the new bearing layer to obtain a new target layer, repeatedly updating the bearing layer until the number of layers reaches the total number of layers of the roof rock structure, wherein the target layer obtained each time constitutes a possible hanging top position set.
[0081] Furthermore, in a possible implementation manner of the embodiment of the present invention, satisfying the hanging top load condition means that the load of the current calculation layer on the bearing layer is less than the load of the previous layer of the current calculation layer on the bearing layer.
[0082] Furthermore, in a possible implementation of an embodiment of the present invention, the target suspension top layer position determination module 13 calculates the collapse step distance of each possible suspension top layer position in the possible suspension top layer position set, including: calculating the corresponding collapse step distance based on the thickness, tensile strength and bearing load of each possible suspension top layer position.
[0083] Furthermore, in a possible implementation of an embodiment of the present invention, the target hanging top position determination module 13 screens the possible hanging top position set based on the collapse step distance to obtain the target hanging top position set, including: sorting each possible hanging top position in the possible hanging top position set from bottom to top according to the position in the roof rock layer structure; screening any group of two adjacent possible hanging top positions, the screening process includes: if the collapse step distance of the upper possible hanging top position is smaller than the collapse step distance of the lower possible hanging top position, adding the load of the upper possible hanging top position to the lower possible hanging top position to recalculate the collapse step distance of the lower possible hanging top position, and the upper possible hanging top position is deleted from the possible hanging top position set; the final possible hanging top position set after screening all groups of two adjacent possible hanging top positions is the target hanging top position set.
[0084] Furthermore, in a possible implementation of an embodiment of the present invention, the length of each directional drill hole in the directional drilling arrangement module 14 that exceeds the goaf boundary of the adjacent tunnel when extending horizontally toward the goaf is a set length, and the set length is smaller than the collapse step distance of the uppermost target suspended top layer.
[0085] It should be noted that the above explanation of the method for determining the top position and maximum length of the lateral roof of the goaf area also applies to the system for determining the top position and maximum length of the lateral roof of the goaf area of this embodiment, and will not be repeated here.
[0086] In an embodiment of the present invention, the roof rock structure of the roof collapse range is obtained based on the coal mining height of the coal mining face and the roof drilling column diagram of the goaf for the coal mining working face and the goaf that have been mined; the possible suspended top layer position set of the lateral roof is determined based on the load of each layer in the roof rock structure; the collapse step distance of each possible suspended top layer position in the possible suspended top layer position set is calculated, and the possible suspended top layer position set is screened based on the collapse step distance to obtain a target suspended top layer position set; two directional boreholes are constructed in adjacent tunnels on one side of the goaf, and the borehole openings of the two directional boreholes are separated by a set distance along the excavation direction, and each directional borehole extends to the uppermost target suspended top layer position and then extends toward the goaf in a horizontal direction; an electromagnetic wave detection device is arranged in the two directional boreholes to obtain the absorption coefficient of the detection area, and the maximum suspended top length is determined based on the comparison result of the absorption coefficient and the set absorption threshold. In this case, considering that the roof in the collapse range has the most direct impact on the goaf-side tunnels, the roof rock structure in the roof collapse range is determined based on the coal mining height and the roof drill hole column diagram. The target suspended top position set is obtained according to the roof rock structure in the roof collapse range using the load and collapse step distance. The suspended top length is then obtained by combining the absorption coefficient collected by the electromagnetic wave detection device arranged in the two directional drill holes in the adjacent tunnels, thereby making the determination of the suspended top position and length more accurate.
[0087] Considering that if the roof collapses and completely fills the goaf, the impact on the lateral roof is very small, the method and system of the present invention only analyze the suspended roof within the collapse zone, which is clearer and more reasonable. After determining the position of the suspended roof, directional drilling is carried out, and the electromagnetic wave CT is used to detect the roof. According to the size of the absorption coefficient, the lateral suspended roof length is obtained. This is important for guiding the pre-cracking treatment of the lateral roof to protect the goaf-side tunnels. Compared with the traditional on-site drilling method, the method and system of the present invention can more conveniently obtain the position and length of the suspended roof of the roof, which is more practical in rock burst prevention and control technology.
[0088] The method and system of the present invention have the following technical effects: 1) The roof of the collapse zone that has the most direct impact on the goaf-side tunnel is determined for analysis, and the selection of the analysis object is more reasonable; 2) The position of the suspended top of the lateral roof is determined by calculating the load of each rock layer, and the result obtained is more in line with the actual situation on site, and the object of the pre-cracking and weakening treatment of the roof is further clarified, so that the pressure relief measures are more targeted; 3) The length of the suspended top is obtained by electromagnetic wave detection. Compared with the traditional drilling detection method, it saves engineering workload and reduces the waste caused by blind construction. In addition, the detection range of drilling construction is limited, so this method is more universal.
[0089] In order to implement the above embodiments, the present invention also proposes an electronic device, comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement the method provided by the above embodiments.
[0090] In order to implement the above embodiments, the present invention further proposes a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the methods provided by the above embodiments.
[0091] In order to implement the above embodiments, the present invention further provides a computer program product, including a computer program, which implements the methods provided by the above embodiments when executed by a processor.
[0092] In the description of the aforementioned embodiments, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.
[0093] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0094] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present invention belong.
[0095] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute the instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.
[0096] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0097] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0098] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0099] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A method for determining the top hanging position and maximum hanging length of the lateral roof of a goaf, characterized in that: include: For the coal mining working face and goaf that have been mined, the roof rock structure of the roof collapse range is obtained based on the coal mining height of the coal mining working face and the roof drilling column diagram of the goaf; Determine a possible overhanging top position set of the lateral roof based on the loads of each layer in the roof rock structure; Calculating the collapse step distance of each possible hanging top position in the possible hanging top position set, and screening the possible hanging top position set based on the collapse step distance to obtain a target hanging top position set; Constructing two directional boreholes in adjacent tunnels on one side of the goaf, the borehole openings of the two directional boreholes are separated by a set distance along the excavation direction, and each directional borehole extends to the uppermost target suspended top layer and then extends toward the goaf in a horizontal direction; An electromagnetic wave detection device is arranged in the two directional boreholes to obtain the absorption coefficient of the detection area, and the maximum hanging top length is determined based on the comparison result of the absorption coefficient and the set absorption threshold.
2. The method for determining the top hanging position and maximum hanging length of the lateral roof of the goaf according to claim 1 is characterized in that: The method of obtaining the roof rock structure of the roof collapse range based on the coal mining height of the coal mining working face and the roof drilling column diagram of the goaf includes: The roof collapse height is calculated based on the coal mining height of the coal mining working face and the initial expansion coefficient of the roof rock layer; The roof rock structure of the roof collapse range corresponding to the roof collapse height is determined based on the roof drilling column diagram of the goaf.
3. The method for determining the position and maximum length of the lateral roof overhang in the goaf according to claim 1, characterized in that: The method of determining a possible overhanging top position set of the lateral roof based on the loads of each layer in the roof rock structure includes: For the roof rock structure within the roof collapse range, starting from the lowest first layer, the first layer is taken as the bearing layer, and the loads of each layer above the bearing layer on the bearing layer are calculated to obtain the target layer that meets the hanging roof load condition; The target layer is taken as a new bearing layer, the load on the new bearing layer is calculated to obtain a new target layer, and the bearing layer is repeatedly updated until the number of layers reaches the total number of layers of the roof rock structure, wherein the target layer obtained each time constitutes the possible hanging top position set.
4. The method for determining the top hanging position and maximum hanging length of the lateral roof of the goaf according to claim 3 is characterized in that: The satisfying of the hanging top load condition means that the load of the current calculation layer on the bearing layer is less than the load of the previous layer of the current calculation layer on the bearing layer.
5. The method for determining the position and maximum length of the lateral roof overhang in a goaf according to claim 1, characterized in that: The calculating of the collapse step distance of each possible suspended top layer position in the possible suspended top layer position set includes: The corresponding collapse step distance is calculated based on the thickness, tensile strength and load-bearing capacity of each possible suspension top position.
6. The method for determining the position and maximum length of the lateral roof overhang in the goaf according to claim 5, characterized in that: The step of screening the possible suspended top layer position set based on the collapse step distance to obtain a target suspended top layer position set includes: Sort each possible suspended top layer position in the set of possible suspended top layer positions from bottom to top according to the position in the roof rock layer structure; Screening any two adjacent possible suspended top positions, the screening process includes: if the collapse step distance of the upper possible suspended top position is smaller than the collapse step distance of the lower possible suspended top position, adding the load of the upper possible suspended top position to the lower possible suspended top position to recalculate the collapse step distance of the lower possible suspended top position, and deleting the upper possible suspended top position from the set of possible suspended top positions; After screening all groups of two adjacent possible hanging top positions, the final possible hanging top position set is the target hanging top position set.
7. The method for determining the position and maximum length of the lateral roof overhang in a goaf according to claim 1, characterized in that: The length of each directional drill hole that exceeds the boundary of the goaf of the adjacent tunnel when extending horizontally toward the goaf is a set length, and the set length is smaller than the collapse step distance of the uppermost target suspended top layer.
8. A system for determining the top position and maximum length of the lateral roof of a goaf, characterized in that: include: A collapse range determination module is used to obtain the roof rock structure of the roof collapse range based on the coal mining height of the coal mining face and the roof drilling column diagram of the goaf for the coal mining face and the goaf that have been mined. A possible overhanging top position determination module, used to determine a possible overhanging top position set of the lateral top plate based on the loads of each layer in the top plate rock structure; A target suspended top position determination module is used to calculate the collapse step distance of each possible suspended top position in the possible suspended top position set, and screen the possible suspended top position set based on the collapse step distance to obtain a target suspended top position set; A directional drilling arrangement module is used to construct two directional boreholes in adjacent tunnels on one side of the goaf, the borehole openings of the two directional boreholes are separated by a set distance along the excavation direction, and each directional borehole extends to the uppermost target suspended top layer and then extends toward the goaf in a horizontal direction; The overhang length calculation module is used to arrange electromagnetic wave detection devices in the two directional drill holes to obtain the absorption coefficient of the detection area, and determine the maximum overhang length based on the comparison result of the absorption coefficient and the set absorption threshold.
9. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which are used to implement the method according to any one of claims 1 to 7 when executed by a processor.
Citation Information
Patent Citations
Control method of coal mining roadway roof
CN112610251A
Coal mine working face end suspended roof caving monitoring and forecasting device
CN210195822U
System for acquiring movement information of high-level rock stratum in coal mine stope, and acquisition and analysis method
US20200325775A1
