Comprehensive energy system dynamic confidence coefficient capacity evaluation method considering multi-time construction

By establishing a dynamic confidence capacity assessment method for integrated energy systems built over multiple time periods, the problem of not considering integrated energy systems in confidence capacity assessment is solved, and accurate assessment of the confidence capacity of photovoltaic and wind power is achieved, ensuring reliable power supply during peak periods.

CN118899824APending Publication Date: 2024-11-05CHINA YANGTZE POWER
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410793154.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

Existing technologies fail to accurately account for the role of integrated energy systems in confidence capacity assessments, leading to inaccurate assessments.

Method used

A dynamic confidence capacity assessment method for integrated energy systems that considers multiple construction periods is adopted, including calculating the guaranteed output of renewable energy, establishing an energy flow model with a unified energy flow bus structure, establishing an integrated energy system capacity model, and calculating the equivalent power generation substitution capacity through an adaptive sampling algorithm.

Benefits of technology

This improves the accuracy of confidence capacity assessment for photovoltaic and wind power in integrated energy systems, ensuring reliable power supply during peak periods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118899824A_ABST
    Figure CN118899824A_ABST
Patent Text Reader

Abstract

The invention discloses a comprehensive energy system dynamic confidence capacity assessment method considering multi-time investment and construction, and solves the problem that confidence capacity assessment is inaccurate due to the fact that the effect of a comprehensive energy system in confidence capacity is not considered in the existing capacity assessment execution work. The method comprises the steps of calculating renewable energy guarantee output, including wind driven generator output characteristic simulation; establishing a comprehensive energy system energy flow model of a unified energy flow bus structure; establishing a comprehensive energy system capacity model which comprises three energy forms of electric energy, heat energy and gas energy; and establishing and solving a dynamic confidence evaluation model to obtain the dynamic confidence capacity evaluation of the integrated energy system. According to the method, evaluation of the confidence capacity of photovoltaic power and wind power in an integrated energy system is taken as a target, a dynamic confidence capacity evaluation method considering a multi-energy complementary system is adopted, and the problem that the confidence capacity evaluation is inaccurate due to the fact that the effect of integrated energy in the confidence capacity is not considered is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of regional neutral energy systems, and in particular to a dynamic confidence capacity assessment method for an integrated energy system taking multi-time investment and construction into consideration. Background Art

[0002] Due to the increase in renewable energy penetration and the retirement of traditional generators, more variability and uncertainty are introduced into the system, which poses a challenge to the balance between supply and demand. In particular, it is crucial to evaluate the ability of a system based on renewable energy systems to always reliably meet demand, especially during peak hours. Therefore, the concept of confidence capacity is introduced to quantify the ability of renewable energy to replace traditional thermal power plants without reducing the level of system reliability. This concept is proposed in the context of sufficient supply and refers to whether there are enough power generation facilities to meet the peak demand of the system. Several indicators for evaluating confidence capacity have been proposed, addressing two main issues. If the focus is on power generation expansion planning, the recommended indicators include equivalent corporate capacity (EFC), equivalent conventional capacity (ECC), and equivalent generation capacity substitution (EGCS). When meeting demand growth, a commonly used indicator is effective carrying capacity (ELCC).

[0003] Some efforts have been made to assess the capacity credits of wind, solar, and energy storage when they operate individually or in coordination. Assessment methods can be divided into time-sequential and probabilistic methods. However, existing work shows that the contribution to supply security may be overestimated if the time sequence of wind power is not taken into account. In addition, if the output of the renewable energy system is closely correlated with the time of high demand, the confidence capacity of wind power will be higher, while if the correlation is poor or even negative, the confidence capacity of wind power will be much lower. Due to their inherent variability and uncertainty limitations, the confidence capacity of wind and solar power (expressed as a percentage of installed renewable energy capacity) generally decreases as the installed capacity increases. However, the aggregation of renewable energy resources across a larger area can generally improve their capacity credits. In addition, some studies have demonstrated the benefits of coordinating wind or solar power with energy storage to stabilize the output of renewable energy. For example, a pumped storage power station is modeled as a peaking generator, which stores excess wind energy during low demand periods and discharges it during peak demand periods. It is found that the confidence capacity of wind and water combined generation is higher than the confidence capacity of wind power alone. Or coordinate battery energy storage with solar PV to minimize system peak load and, to a certain extent, increase the confidence capacity of solar PV. Summary of the invention

[0004] The present invention mainly solves the problem that the role of the integrated energy system in the confidence capacity is not considered in the existing capacity assessment work, resulting in inaccurate confidence capacity assessment, and provides a dynamic confidence capacity assessment method for the integrated energy system considering multiple time investments.

[0005] The above technical problem of the present invention is mainly solved by the following technical solution: a dynamic confidence capacity assessment method for an integrated energy system considering multiple time investment and construction, comprising the following steps:

[0006] S1. Calculate the guaranteed output of renewable energy, including simulation of wind turbine output characteristics;

[0007] S2. Establish an energy flow model for an integrated energy system with a unified energy flow bus structure;

[0008] S3. Establish a comprehensive energy system capacity model, including three energy forms: electrical energy, thermal energy, and gas energy;

[0009] S4. Establish and solve a dynamic confidence assessment model to obtain a dynamic confidence capacity assessment of the integrated energy system.

[0010] The present invention aims to evaluate the confidence capacity of photovoltaic and wind power in an integrated energy system, and adopts a dynamic confidence capacity evaluation method considering a multi-energy complementary system to solve the problem of inaccurate confidence capacity evaluation caused by not considering the role of integrated energy in confidence capacity.

[0011] As a preferred solution, the wind turbine output characteristic simulation includes constructing a wind turbine model, a wind speed model, and a wind turbine shutdown model.

[0012] As a preferred solution, the specific process of step S2 includes:

[0013] The comprehensive energy system model includes distribution network, gas network, electric / heat / gas busbar, photovoltaic and wind power, cogeneration device, gas boiler, electric boiler, power storage device, thermal storage device, electric load and thermal load;

[0014] The electric busbar is connected to the distribution network, photovoltaic and wind power, cogeneration devices, electric loads, electric boilers and power storage devices; the gas busbar is connected to the gas grid, cogeneration devices and gas boilers; the heat busbar is connected to the electric boiler, heat load and heat storage system;

[0015] As a preferred solution,

[0016] Establish energy flow constraints for the integrated energy system with a unified energy flow bus structure, including power balance constraints for the electric bus, the gas bus, and the heat bus;

[0017] In the unified energy flow bus structure, the output model constraints of each device are established, including photovoltaic and wind power constraints, gas boiler constraints, electric boiler constraints, cogeneration device constraints, power storage system constraints, and thermal storage system constraints.

[0018] As a preferred solution, step S3 specifically includes:

[0019] Based on the energy flow model of the integrated energy system with wind turbine output characteristic simulation and unified energy flow bus structure, the capacity model under multi-time investment and construction is established with the goal of minimizing the investment, operation and maintenance of the integrated energy system throughout its life cycle, including the objective function.

[0020] As a preferred solution, based on the constructed integrated energy system capacity model, an adaptive sampling algorithm is used to calculate the equivalent power generation replacement capacity in the integrated energy system to obtain a dynamic confidence capacity assessment of the integrated energy system.

[0021] As a preferred solution,

[0022] Wind turbine model

[0023] The grid-connected wind turbine generator set uses a variable speed constant frequency generator to ensure that its speed can change synchronously with the wind speed. It is not necessary to control the speed of the wind turbine to obtain a constant frequency current, which reduces mechanical stress and simplifies the blade pitch control. The speed regulation can make the blade pitch control time sufficient to ensure full utilization of the energy of the wind speed, adjust the speed of the wind wheel in the generator, and achieve the best blade tip speed ratio tracking, that is, maximum power generation tracking. The standard characteristic curve mathematical model of the variable speed constant frequency generator, its output curve can be expressed as a polynomial function or a piecewise function.

[0024] It is expressed in piecewise function form as follows:

[0025]

[0026] Among them, V ci is the cut-in wind speed, V co is the cut-out wind speed, P r is the rated power;

[0027] When the wind speed is less than V ci When the wind speed is greater than the cut-in wind speed V ci When the wind speed increases, the output power of the wind turbine gradually increases until the wind speed reaches the rated wind speed V r When the output power of electric energy is the rated power P r , at this time, the power output from the fan is no longer positively correlated with the wind speed. co To prevent the wind wheel from rotating too fast and damaging the fan, the fan is shut down and stops running, no longer outputting power.

[0028] Wind speed model

[0029] In order to establish a wind speed model, in addition to relying on measured data, the present invention predicts the wind speed through an autoregressive smoothing model and establishes a wind speed model according to the probability distribution of the wind speed, among which the most commonly used is the two-parameter Weibull distribution model.

[0030] The probability expression of the wind speed model that obeys the Weibull distribution is as follows:

[0031]

[0032] Its probability distribution function is as follows:

[0033]

[0034] Where V represents the wind speed parameter, v represents the wind speed, F represents the probability patching function, and p() represents the probability distribution;

[0035] The c parameter is the scale of the formula, and k reflects the shape of the formula. The probability function is used to calculate and simulate the wind speed, and the probability function is transformed to find the inverse function of the distribution function:

[0036]

[0037] Draw a random number (1-F) between 0 and 1 and substitute it into the above formula to get the corresponding wind speed:

[0038]

[0039] Wind turbine outage model

[0040] The outage model of wind turbines is established, which is the same as that of conventional generators, assuming that there are only two types of wind turbines. In order to determine the operating state of the wind turbine, whether it is operating normally or faulty, the state time sampling method is used to obtain the operating state of each component and the continuous time and the transformation process of different steady states through continuous time sampling.

[0041] Assume that the fault of the unit in the power generation system is λ, the repair rate is μ, the continuous time of the healthy state is t1, and the fault stop time is t2, then

[0042]

[0043] Among them, γ1 represents the mean trouble-free working time, and γ2 represents the mean repair time. Both obey the uniform distribution on [0,1]. The duration of the state is obtained according to t1 and t2.

[0044] As a preferred solution,

[0045] The electric bus power balance constraint is:

[0046]

[0047] in, It represents the interaction power between the comprehensive energy system and the power grid during this period. It represents the CHP output power of the combined heat and power unit in the comprehensive energy system during this period. They represent the photovoltaic power generation and wind power generation of the comprehensive energy system during this period, It represents the power demand of the electric load of the comprehensive energy system during this period. It represents the electric power consumed by the electric boiler in the comprehensive energy system during this period. Respectively represent the charging and discharging power of the energy storage device in the comprehensive energy system during this period;

[0048] The power balance constraint of the gas bus is:

[0049]

[0050] in, Indicates the natural gas power purchased by the integrated energy system from the external gas grid during this period, Indicates the natural gas power consumed by the cogeneration unit in the integrated energy system during this period, Indicates the natural gas power consumed by the gas boiler in the comprehensive energy system during this period;

[0051] The power balance constraint of the thermal bus is:

[0052]

[0053] in, It represents the thermal power output of the CHP unit in the comprehensive energy system during this period. It represents the thermal power produced by the electric boiler in the comprehensive energy system during this period, It represents the thermal power generated by the gas boiler in the comprehensive energy system during this period. It represents the thermal load power demand of the comprehensive energy system during this period. They respectively represent the charging and discharging powers of the heat storage device in the comprehensive energy system during this period;

[0054] Photovoltaic and wind power constraints

[0055]

[0056] in, represents the predicted photovoltaic and wind power output system during this period, P i PV , P i WT represents the installed capacity of photovoltaic and wind power in year i, kW; Respectively represent the proportion coefficients of photovoltaic and wind power planning capacity;

[0057] Gas boiler constraints

[0058]

[0059] Among them, η GB is the heating efficiency of the gas boiler, is the installed capacity of the gas boiler in year i, kW; Indicates the proportion coefficient of the planned capacity of the gas boiler;

[0060] Electric boiler constraints

[0061]

[0062] Among them, η EB is the heating efficiency of EB, is the installed capacity of the electric boiler in year i, kW; Indicates the proportion coefficient of the planned capacity of the electric boiler;

[0063] Cogeneration plant constraints

[0064] Cogeneration generates electricity and heat by burning natural gas. Its operation model is as follows:

[0065]

[0066] Among them, η P,CHP is the power supply efficiency of cogeneration, η H,CHP The heating efficiency of combined heat and power generation is are the electricity and heat generation installed capacity of the cogeneration in year i, kW; They are the lower limits of electricity and heat generation power of cogeneration equipment, kW; It represents the proportion coefficient of the planned capacity of the CHP cogeneration unit;

[0067] Energy storage system constraints

[0068]

[0069] in, Indicates the capacity of the power storage system during this period, kWh; δ e Represents the self-discharge efficiency of the power storage system; η a,C , η a,F They represent the charging and discharging efficiency of the power storage system respectively; is the lower limit of the capacity of the power storage system, kWh; represents the newly built capacity of the power storage system in year i, kWh; represents the new power of the storage system in year i, kW, generally and are the charging and discharging state 0-1 variables of the power storage system, represents the capacity of the power storage system during the t-1 period, Δt represents the scheduling execution period, and are the charging and discharging state 0-1 variables of the power storage system, represents the minimum capacity boundary of the power storage device, Indicates the proportion coefficient of the planned power of the power storage device;

[0070] Thermal storage system constraints

[0071]

[0072] in, Indicates the capacity of the heat storage system during this period, kWh; δ h Represents the self-heating efficiency of the heat storage system; η h,C , η h,F They represent the charging and discharging efficiency of the thermal storage system respectively; is the lower limit of the thermal storage system capacity, kWh; represents the newly built capacity of the thermal storage system in year i, kWh; Indicates the new power of the thermal storage system in year i, kW, generally and They are the 0-1 variables of the heat storage system’s charging and discharging states. Since the heat storage system cannot charge and discharge heat at the same time, the sum of the two is less than or equal to 1; Indicates the proportion of the planned power of the thermal storage system.

[0073] As a preferred solution, the objective function is specifically:

[0074]

[0075] Where C represents the present value of the total cost of the entire life cycle of the integrated energy system; C ope,n , C main,n are the operation and maintenance costs of the regional integrated energy system in the nth year; R n is the present value coefficient for the nth year;

[0076] The operating cost of the regional integrated energy system in year n is:

[0077]

[0078] Among them, c grid,t is the grid electricity price at time t, yuan / kWh, c gas is the natural gas price, yuan / m3;

[0079] The maintenance cost of the regional integrated energy system in year n is:

[0080]

[0081] Among them, c main Represents the unit power maintenance cost matrix of each type of equipment; Represents the power maintenance matrix of various types of equipment.

[0082] As a preferred solution, step S4 specifically includes:

[0083] The reliability requirement must ensure that energy can still be supplied under specific circumstances, without load loss or output loss. Therefore, the concept of trusted capacity is proposed for new energy represented by wind power generation. The present invention defines photovoltaic and wind power output equipment. Under the integrated energy system, how much more power peak of electrical equipment can be added, that is, the trusted capacity of the wind farm is defined from the load side. In the calculation process, it refers to how much excess peak load the integrated energy system can carry at most after connecting to wind and photovoltaic power generation equipment, and still ensure the current system reliability level, that is, the dynamic confidence capacity carrying capacity of the integrated energy system.

[0084] The formula can be expressed as:

[0085] F(C,L)=F(C+ΔC,L+ΔL)

[0086] Among them, C represents installed capacity, L represents load, ΔC and ΔL represent installed capacity increment and load increment respectively.

[0087] The capacity confidence of the multi-energy flow system can be expressed according to the positioning as follows:

[0088]

[0089] The equivalent generation replacement capacity in the integrated energy system is calculated using an adaptive sampling method, which is a calculation process that uses a small number of samples to calculate the equivalent generation capacity, and then gradually increases it as the distance between the expected load shedding of the current system and the original system becomes shorter.

[0090] S41. According to the comprehensive energy system capacity model, calculate the equivalent power generation replacement capacity when the electricity, heat and gas systems are not connected but wind power and photovoltaic power are present, which is recorded as EENS0. This step is to calculate the equivalent power generation replacement capacity when the electricity, heat and gas systems are each independent and not connected.

[0091] S42. From the constructed regional capacity model of electricity, heat and gas multi-energy flows, the initial expected load EENS is deducted from the full equivalent generation replacement capacity of the interconnected system in each region. ori ; This step is to calculate the equivalent power generation replacement capacity when the electricity, heat and gas systems are connected independently.

[0092] The renewable energy power generation module (including photovoltaic and wind power) within the system is composed of the given wind turbine model, wind speed model, wind turbine outage model and the given photovoltaic and wind power constraints; based on the power balance constraints of the electrical bus, the power balance constraints of the gas bus, the power balance constraints of the thermal bus, as well as the gas boiler constraints, electric boiler constraints, combined heat and power unit constraints, electricity storage system constraints, and thermal energy storage system constraints, they jointly participate in calculating the equivalent power generation substitution capacity when the electrical, thermal, and gas systems are connected or not connected separately.

[0093] S43. Set the initial maximum sampling number N1, the incremental sampling number ΔN, and the maximum sampling number N max , the acceptable coefficient of variation βε, and set the iteration counter value k = 1;

[0094] S44. From the constructed multi-energy flow regions of electricity, heat, and gas, according to the descending order of the generator ages in each region, subtract one generator from the entire system, and calculate the expected energy not served (EENS) for each region and the entire system at the k-th time k ;

[0095] Record the coefficient of variance value βk, subtract the energy supply from each energy system and the entire system, denoted as C i,k and C k , and calculate dk = (EENS ori - EENS k ) / EENS k ;

[0096] where C i,k represents the energy supply subtracted from each energy system (independent electricity, heat, and gas systems) and the energy supply subtracted from the entire system (integrated electricity, heat, and gas system).

[0097] S45. If 0 < dk < 2 * βk and βk > βε, set N k = min{N k + ΔN, N max}, and return to step S42; if 0 < dk < 2 * βk and βk ≤ βε, set k = k + 1, and return to step S42; if neither condition is met, proceed to the next step;

[0098] S46. Add the generators subtracted in the previous round back to each region in turn, and at the same time calculate the EENS of the entire system until EENS < EENS ori , and proceed to the next step;

[0099] S47. Calculate the equivalent power generation substitution capacity for each region and the entire system.

[0100]

[0101] Complete the dynamic confidence capacity assessment of the neutral energy system.

[0102] Therefore, the advantages of the present invention are: aiming at evaluating the confidence capacity of photovoltaic and wind power in the integrated energy system, adopting a dynamic confidence capacity evaluation method considering a multi-energy complementary system, so as to solve the problem of inaccurate confidence capacity evaluation caused by not considering the role of integrated energy in the confidence capacity. BRIEF DESCRIPTION OF THE DRAWINGS

[0103] Figure 1 It is a schematic diagram of a process of the present invention.

[0104] Figure 2 It is a specific flow chart of step S4 in the present invention. DETAILED DESCRIPTION

[0105] The technical solution of the present invention is further specifically described below through embodiments and in conjunction with the accompanying drawings.

[0106] Example:

[0107] This embodiment provides a method for evaluating the dynamic confidence capacity of an integrated energy system considering multiple time investments. Figure 1 As shown, the following steps are included:

[0108] S1. Calculate the guaranteed output of renewable energy, including simulation of wind turbine output characteristics;

[0109] S2. Establish an energy flow model for an integrated energy system with a unified energy flow bus structure;

[0110] S3. Establish a comprehensive energy system capacity model, including three energy forms: electrical energy, thermal energy, and gas energy;

[0111] S4. Establish and solve a dynamic confidence assessment model to obtain a dynamic confidence capacity assessment of the integrated energy system.

[0112] The present invention aims to evaluate the confidence capacity of photovoltaic and wind power in an integrated energy system, and adopts a dynamic confidence capacity evaluation method considering a multi-energy complementary system to solve the problem of inaccurate confidence capacity evaluation caused by not considering the role of integrated energy in confidence capacity.

[0113] As a preferred solution of this embodiment, the wind turbine output characteristic simulation includes building a wind turbine model, a wind speed model, and a wind turbine shutdown model, which specifically includes the following:

[0114] Wind turbine model

[0115] The grid-connected wind turbine generator set uses a variable speed constant frequency generator to ensure that its speed can change synchronously with the wind speed. It is not necessary to control the speed of the wind turbine to obtain a constant frequency current, which reduces mechanical stress and simplifies the blade pitch control. The speed regulation can make the blade pitch control time sufficient to ensure full utilization of the energy of the wind speed, adjust the speed of the wind wheel in the generator, and achieve the best blade tip speed ratio tracking, that is, maximum power generation tracking. The standard characteristic curve mathematical model of the variable speed constant frequency generator, its output curve can be expressed as a polynomial function or a piecewise function.

[0116] It is expressed in piecewise function form as follows:

[0117]

[0118] Among them, V ci is the cut-in wind speed, V co is the cut-out wind speed, P r is the rated power;

[0119] When the wind speed is less than V ci When the wind speed is greater than the cut-in wind speed V ci When the wind speed increases, the output power of the wind turbine gradually increases until the wind speed reaches the rated wind speed V r When the output power of electric energy is the rated power P r , at this time, the power output from the fan is no longer positively correlated with the wind speed. co To prevent the wind wheel from rotating too fast and damaging the fan, the fan is shut down and stops running, and no longer outputs power.

[0120] Wind speed model

[0121] In order to establish a wind speed model, in addition to relying on measured data, the present invention predicts the wind speed through an autoregressive smoothing model and establishes a wind speed model according to the probability distribution of the wind speed, among which the most commonly used is the two-parameter Weibull distribution model.

[0122] The probability expression of the wind speed model that obeys the Weibull distribution is as follows:

[0123]

[0124] Its probability distribution function is as follows:

[0125]

[0126] Where V represents the wind speed parameter, v represents the wind speed, F represents the probability patching function, and p() represents the probability distribution;

[0127] The c parameter is the scale of the formula, and k reflects the shape of the formula. The probability function is used to calculate and simulate the wind speed, and the probability function is transformed to find the inverse function of the distribution function:

[0128]

[0129] Draw a random number (1-F) between 0 and 1 and substitute it into the above formula to get the corresponding wind speed:

[0130]

[0131] Wind turbine outage model

[0132] The outage model of wind turbines is established, which is the same as that of conventional generators, assuming that there are only two types of wind turbines. In order to determine the operating state of the wind turbine, whether it is operating normally or faulty, the state time sampling method is used to obtain the operating state of each component and the continuous time and the transformation process of different steady states through continuous time sampling.

[0133] Assume that the fault of the unit in the power generation system is λ, the repair rate is μ, the continuous time of the healthy state is t1, and the fault stop time is t2, then

[0134]

[0135] Among them, γ1 represents the mean trouble-free working time, and γ2 represents the mean repair time. Both obey the uniform distribution on [0,1]. The duration of the state is obtained according to t1 and t2.

[0136] As a preferred solution of this embodiment, an energy flow model of an integrated energy system with a unified energy flow bus structure is established, wherein the integrated energy system model includes a distribution network, a gas network, an electric / heat / gas bus, photovoltaic wind power, a cogeneration device, a gas boiler, an electric boiler, an electricity storage device, a heat storage device, an electric load and a thermal load; the electric bus is connected to the distribution network, photovoltaic wind power, a cogeneration device, an electric load, an electric boiler and an electricity storage device; the gas bus is connected to the gas network, the cogeneration device and the gas boiler; the heat bus is connected to the electric boiler, the thermal load and the thermal storage system, to construct an energy flow model of an integrated energy system with a unified energy flow bus structure.

[0137] Establish energy flow constraints for an integrated energy system with a unified energy flow bus structure, including power balance constraints for the electric bus, power balance constraints for the gas bus, and power balance constraints for the thermal bus.

[0138] The power balance constraint of the electric bus is:

[0139]

[0140] in, It represents the interaction power between the comprehensive energy system and the power grid during this period. It represents the CHP output power of the combined heat and power unit in the comprehensive energy system during this period. They represent the photovoltaic power generation and wind power generation of the comprehensive energy system during this period, It represents the power demand of the electric load of the comprehensive energy system during this period. It represents the electric power consumed by the electric boiler in the comprehensive energy system during this period. Respectively represent the charging and discharging power of the energy storage device in the comprehensive energy system during this period;

[0141] The power balance constraint of the gas bus is:

[0142]

[0143] in, Indicates the natural gas power purchased by the integrated energy system from the external gas grid during this period, Indicates the natural gas power consumed by the cogeneration unit in the integrated energy system during this period, Indicates the natural gas power consumed by the gas boiler in the comprehensive energy system during this period;

[0144] The power balance constraint of the thermal bus is:

[0145]

[0146] in, It represents the thermal power output of the CHP unit in the comprehensive energy system during this period. It represents the thermal power produced by the electric boiler in the comprehensive energy system during this period, It represents the thermal power generated by the gas boiler in the comprehensive energy system during this period. It represents the thermal load power demand of the comprehensive energy system during this period. They respectively represent the charging and discharging powers of the heat storage device in the comprehensive energy system during this period;

[0147] In the unified energy flow bus structure, the output model constraints of each device are established, including photovoltaic and wind power constraints, gas boiler constraints, electric boiler constraints, cogeneration device constraints, power storage system constraints, and thermal storage system constraints.

[0148] Photovoltaic and wind power constraints

[0149]

[0150] in, represents the predicted photovoltaic and wind power output system during this period, P i PV , P iWT represents the installed capacity of photovoltaic and wind power in year i, kW; Respectively represent the proportion coefficients of photovoltaic and wind power planning capacity;

[0151] Gas boiler constraints

[0152]

[0153] Among them, η GB is the heating efficiency of the gas boiler, is the installed capacity of the gas boiler in year i, kW; Indicates the proportion coefficient of the planned capacity of the gas boiler;

[0154] Electric boiler constraints

[0155]

[0156] Among them, η EB is the heating efficiency of EB, is the installed capacity of the electric boiler in year i, kW; Indicates the proportion coefficient of the planned capacity of the electric boiler;

[0157] Cogeneration plant constraints

[0158] Cogeneration generates electricity and heat by burning natural gas. Its operation model is as follows:

[0159]

[0160] Among them, η P,CHP is the power supply efficiency of cogeneration, η H,CHP The heating efficiency of combined heat and power generation is are the electricity and heat generation installed capacity of the cogeneration in year i, kW; They are the lower limits of electricity and heat generation power of cogeneration equipment, kW; It represents the proportion coefficient of the planned capacity of the CHP cogeneration unit;

[0161] Energy storage system constraints

[0162]

[0163] in, Indicates the capacity of the power storage system during this period, kWh; δ e Represents the self-discharge efficiency of the power storage system; η a,C , η a,F They represent the charging and discharging efficiency of the power storage system respectively; is the lower limit of the capacity of the power storage system, kWh; represents the newly built capacity of the power storage system in year i, kWh; Pi ES represents the new power of the storage system in year i, kW, generally and are the charging and discharging state 0-1 variables of the power storage system, represents the capacity of the power storage system during the t-1 period, Δt represents the scheduling execution period, and are the charging and discharging state 0-1 variables of the power storage system, represents the minimum capacity boundary of the power storage device, Indicates the proportion coefficient of the planned power of the power storage device;

[0164] Thermal storage system constraints

[0165]

[0166] in, Indicates the capacity of the heat storage system during this period, kWh; δ h Represents the self-heating efficiency of the heat storage system; η h,C , η h,F They represent the charging and discharging efficiency of the thermal storage system respectively; is the lower limit of the thermal storage system capacity, kWh; represents the newly built capacity of the thermal storage system in year i, kWh; Indicates the new power of the thermal storage system in year i, kW, generally and They are the 0-1 variables of the heat storage system’s charging and discharging states. Since the heat storage system cannot charge and discharge heat at the same time, the sum of the two is less than or equal to 1; Indicates the proportion of the planned power of the thermal storage system.

[0167] As a preferred scheme of this embodiment, based on the simulation of the output characteristics of the wind turbine determined in step S1 and the energy flow model of the integrated energy system with the same energy flow bus structure in step S2, the capacity model of the integrated energy system considering multiple time investments is established with the goal of minimizing the investment, operation and maintenance of the integrated energy system throughout its life cycle, thereby establishing a capacity model of the integrated energy system, including an objective function.

[0168] The specific objective function is:

[0169]

[0170] Where C represents the present value of the total cost of the entire life cycle of the integrated energy system; C ope,n , C main,n are the operation and maintenance costs of the regional integrated energy system in the nth year; R n is the present value coefficient for the nth year;

[0171] The operating cost of the regional integrated energy system in year n is:

[0172]

[0173] Among them, c grid,t is the grid electricity price at time t, yuan / kWh, c gas is the natural gas price, yuan / m3;

[0174] The maintenance cost of the regional integrated energy system in year n is:

[0175]

[0176] Among them, c main Represents the unit power maintenance cost matrix of each type of equipment; Represents the power maintenance matrix of various types of equipment.

[0177] As a preferred solution of this embodiment, based on the constructed integrated energy system capacity model, an adaptive sampling algorithm is used to calculate the equivalent power generation replacement capacity in the integrated energy system to obtain a dynamic confidence capacity assessment of the integrated energy system.

[0178] The reliability requirement must ensure that energy can still be supplied under specific circumstances, without load loss or output loss. Therefore, the concept of trusted capacity is proposed for new energy represented by wind power generation. The present invention defines photovoltaic and wind power output equipment. Under the integrated energy system, how much more power peak of electrical equipment can be added, that is, the trusted capacity of the wind farm is defined from the load side. In the calculation process, it refers to how much excess peak load the integrated energy system can carry at most after connecting to wind and photovoltaic power generation equipment, and still ensure the current system reliability level, that is, the dynamic confidence capacity carrying capacity of the integrated energy system.

[0179] The formula can be expressed as:

[0180] F(C,L)=F(C+ΔC,L+ΔL)

[0181] Among them, C represents installed capacity, L represents load, ΔC and ΔL represent installed capacity increment and load increment respectively.

[0182] The capacity confidence of the multi-energy flow system can be expressed according to the positioning as follows:

[0183]

[0184] The equivalent generation replacement capacity in the integrated energy system adopts an adaptive sampling calculation method, which is a calculation process that uses a small number of samples to calculate the equivalent generation capacity, and then gradually increases it as the distance between the expected load abandonment of the current system and the original system becomes shorter. Figure 2As shown, the specific calculation process includes:

[0185] S41. According to the integrated energy system capacity model, calculate the equivalent power generation substitution capacity of separate electricity, heat, and gas without connection but with wind power and photovoltaic power, denoted as EENS0; this step is to calculate the equivalent power generation substitution capacity of separate electricity, heat, and gas independent systems without connection.

[0186] S42. From the constructed multi-energy flow regional capacity model of electricity, heat, and gas, subtract the complete equivalent power generation substitution capacity set as the interconnected system from each region, which is the initial expected load EENS ori ; this step is to calculate the equivalent power generation substitution capacity when the separate electricity, heat, and gas independent systems are connected.

[0187] The renewable energy power generation module (including photovoltaic and wind power) in the system is jointly composed of the given wind turbine model, wind speed model, wind turbine outage model and the given photovoltaic and wind power constraints; according to the power balance constraints of the electricity bus, the power balance constraints of the gas bus, the power balance constraints of the heat bus, as well as the gas boiler constraints, electric boiler constraints, combined heat and power unit constraints, electricity storage system constraints, and heat storage system constraints, they jointly participate in the calculation of the equivalent power generation substitution capacity when the separate electricity, heat, and gas systems are connected / disconnected.

[0188] S43. Set the initial maximum sampling times N1, the incremental sampling times ΔN, and the maximum sampling times N max , the acceptable coefficient of variation βε, and set the iteration counter value k = 1;

[0189] S44. From the constructed multi-energy flow regions of electricity, heat, and gas, according to the descending order of the generator age in each region, subtract one generator from the entire system, and calculate the expected load shedding EENS of each region and the entire system at the kth time k ;

[0190] Record the coefficient of variance value βk, subtract the energy supply from each energy system and the entire system, denoted as C i,k and C k , and calculate dk = (EENS ori - EENS k ) / EENS k ;

[0191] where C i,k represents the energy supply subtracted from each energy system (separate electricity, heat, and gas systems) and the energy supply subtracted from the entire system (integrated electricity, heat, and gas system).

[0192] S45. If 0 < dk < 2 * βk and βk > βε, set N k = min{N k + ΔN, Nmax}, return to step S42; if 0 < dk < 2*βk and βk ≤ βε, set k = k + 1, return to step S42; if neither condition is met, proceed to the next step;

[0193] S46. Add the generators subtracted in the previous round back to each area one by one, and at the same time calculate the EENS of the entire system. If EENS < EENS is not satisfied ori then repeat step S46 until EENS < EENS ori , proceed to the next step;

[0194] S47. Calculate the equivalent power generation replacement capacity of each area and the entire system,

[0195]

[0196] Complete the dynamic confidence capacity assessment of the integrated energy system.

[0197] The specific embodiments described in this article are only illustrative of the spirit of the present invention. Those skilled in the art of the present invention can make various modifications or supplements to the described specific embodiments or use similar methods for substitution, but will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.

[0198] Although terms such as wind turbine output characteristic simulation, integrated energy system energy flow model, integrated energy system capacity model, and dynamic confidence capacity are used more frequently in this article, the possibility of using other terms is not excluded. Using these terms is only for more convenient description and explanation of the essence of the present invention; interpreting them as any additional limitation is contrary to the spirit of the present invention.

Claims

1. A dynamic confidence capacity assessment method for an integrated energy system considering multiple time investment and construction. Features: The following steps are involved: S1. Calculate the guaranteed output of renewable energy, including simulation of wind turbine output characteristics; S2. Establish an energy flow model for an integrated energy system with a unified energy flow bus structure; S3. Establish a comprehensive energy system capacity model, including three energy forms: electrical energy, thermal energy, and gas energy; S4. Establish and solve a dynamic confidence assessment model to obtain a dynamic confidence capacity assessment of the integrated energy system.

2. According to the method for dynamic confidence capacity assessment of an integrated energy system considering multiple time investment and construction as described in claim 1, Its characteristics are The wind turbine generator output characteristic simulation includes constructing a wind turbine model, a wind speed model, and a wind turbine generator shutdown model.

3. According to the method for dynamic confidence capacity assessment of the integrated energy system considering multiple time investment and construction as described in claim 1, Its characteristics are The specific process of step S2 includes: The comprehensive energy system model includes distribution network, gas network, electric / heat / gas busbar, photovoltaic and wind power, cogeneration device, gas boiler, electric boiler, power storage device, thermal storage device, electric load and thermal load; The electric bus is connected to the distribution network, photovoltaic and wind power, cogeneration devices, electric loads, electric boilers and power storage devices; the gas bus is connected to the gas grid, cogeneration devices and gas boilers; the thermal bus is connected to electric boilers, thermal loads and heat storage systems.

4. According to the method for dynamic confidence capacity assessment of integrated energy system considering multi-time investment and construction as described in claim 3, Its characteristics are: Establish energy flow constraints for integrated energy systems with unified energy flow busbar structure; In the unified energy flow bus structure, the output model constraints of each device are established.

5. According to the method for dynamic confidence capacity assessment of integrated energy system considering multiple time investment and construction as described in claim 4, Its characteristics are The step S3 specifically includes: Based on the energy flow model of the integrated energy system with wind turbine output characteristic simulation and unified energy flow bus structure, the capacity model under multi-time investment and construction is established with the goal of minimizing the investment, operation and maintenance of the integrated energy system throughout its life cycle, including the objective function.

6. According to the method for dynamic confidence capacity assessment of the integrated energy system considering multiple time investment and construction as described in claim 5, Its characteristics are According to the constructed integrated energy system capacity model, an adaptive sampling algorithm is used to calculate the equivalent power generation replacement capacity in the integrated energy system to obtain a dynamic confidence capacity assessment of the integrated energy system.

7. According to the method for dynamic confidence capacity assessment of an integrated energy system considering multiple time investment and construction as described in claim 4, 5 or 6, Its characteristics are The energy flow constraints of the integrated energy system with a unified energy flow bus structure include the power balance constraints of the electric bus, the power balance constraints of the gas bus, and the power balance constraints of the thermal bus.

8. According to the method for dynamic confidence capacity assessment of an integrated energy system considering multiple time investment and construction as described in claim 4, 5 or 6, Its characteristics are The constraints of each equipment output model include photovoltaic and wind power constraints, gas boiler constraints, electric boiler constraints, cogeneration device constraints, power storage system constraints, and thermal storage system constraints.

9. The dynamic confidence capacity assessment method for an integrated energy system considering multiple time investments according to claim 5 or 6, Its characteristics are: The objective function is specifically: Where C represents the present value of the total cost of the entire cycle of the integrated energy system; Cope,n, C main,n are the operation and maintenance costs of the regional integrated energy system in the nth year; R n is the present value coefficient in the nth year.

10. According to the method for dynamic confidence capacity assessment of the integrated energy system considering multiple time investment and construction as described in claim 9, Its characteristic is that Step S4 specifically includes: S41. According to the integrated energy system capacity model, calculate the equivalent generation replacement capacity after the individual electricity, heat and gas are disconnected but with wind power and photovoltaic power, recorded as EENS 0 ; S42. From the constructed regional capacity model of electricity, heat and gas multi-energy flows, the initial expected load EENS is deducted from the full equivalent generation replacement capacity of the interconnected system in each region. ori ; S43. Set the initial maximum sampling number N1, the incremental sampling number ΔN, and the maximum sampling number N max , acceptable coefficient of variation βε, set the iteration counter value k = 1; S44. From the constructed electricity, heat, and gas multi-energy flow zones, arrange the generators in each zone in descending order of age, subtract one generator from the entire system, and calculate the kth expected load shedding EENS for each zone and the entire system k ; Record the variance coefficient value βk, and subtract the energy supply from each energy system and the entire system and record it as C i,k and C k , calculate dk = (EENS ori -EENS k ) / EENS k ; S45. If 0 < dk < 2 * βk and βk > βε, set N k = min{N k + ΔN, N max}, return to step S42; if 0 < dk < 2 * βk and βk ≤ βε, set k = k + 1, return to step S42; if neither condition is met, proceed to the next step; S46. Add the generators subtracted in the previous round back to each area in turn, and calculate the EENS of the entire system at the same time until EENS <EENS ori , proceed to the next step; S47. Calculate the equivalent generation replacement capacity for each region and the entire system, Complete the dynamic confidence capacity assessment of the neutral energy system.