System and method for preventing construction equipment from impacting public facilities

By integrating the ground penetrating radar system on the excavator bucket, using SFCW, SFICW technology and IMU technologies, real-time and accurate detection of underground public facilities is achieved, the problem of poor detection in the existing technology is solved, and construction safety is improved Sex and efficiency.

CN118901025APending Publication Date: 2024-11-05RODRADAR LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380028936.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-03-21
Filing Date
2023-03-15
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

The existing methods of detecting underground public facilities are not effective enough, especially during construction. Conventional acoustics, magnetometers and ground penetrating radar methods have unreliability and operational complexity, making it difficult to detect and avoid damage to public facilities in real time.

Method used

A ground-penetrating radar system integrated on excavator buckets is designed, including a GPR antenna and data processor mounted on the bucket, transmit and receive pulses using SFCW and SFICW technologies, and pass through data processors and post-processing units Provide real-time alarm and positioning, combining IMU and Kalman filters to achieve accurate detection of underground facilities.

Benefits of technology

The system can detect underground public facilities in real time and accurately during the excavation process, reduce the risk of damage to the facilities, improve construction safety and efficiency, and reduce the professional knowledge requirements for operators.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118901025A_ABST
    Figure CN118901025A_ABST
Patent Text Reader

Abstract

A GPR (ground penetrating radar) system includes an excavating machine having a bucket, a GPR unit, and a post-processing unit. The GPR unit is mounted on the dipper and includes at least one GPR antenna and a data processor. At least one antenna and a data processor are both mounted within the dipper. A data processor detects the presence of a hazard during progressive removal of the soil layer. A post-processing unit is mounted in the cabin of the excavating machine and provides an alarm when the data processor detects a hazard during removal of the soil.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This application claims priority to U.S. Provisional Patent Application No. 63 / 321,787, filed on March 21, 2022, which is incorporated herein by reference. Technical Field

[0003] The present invention relates generally to construction equipment and, more particularly, to sensing systems for construction equipment. Background Art

[0004] In the construction industry, utility strikes (i.e., construction equipment collides with and often damages underground utility services) are frequent and result in significant direct and indirect costs. This is particularly common when excavating in or between built-up areas (which may have gas mains, underground electrical cables, and / or fiber optic cables, etc.). Strikes to gas mains and underground electrical cables are hazardous to life and property. Strikes to fiber optic cables are very expensive to repair and often result in a loss of communications for a significant amount of time, which can have subsequent impacts on many types of services that depend on communications.

[0005] Unfortunately, none of the known methods for detecting underground utilities are effective. Acoustic methods cannot detect utilities. Magnetometers detect ferrous metal pipes, but this is unreliable and prone to misinterpretation. Active methods involving injection of current and subsequent detection of electric and magnetic fields rely on conductive continuity, which is not always guaranteed. In addition, these methods require operating experience and are generally considered unreliable.

[0006] Live power cables can be detected by their magnetic field, but this is not the case with armoured cables, as the armour of the armoured cable shields the magnetic field.

[0007] Ground Penetrating Radar (GPR) is the most common inspection method because it detects material discontinuities regardless of the nature of the material. That is, it detects all metals, all plastics, ceramics, and even voids. Cables are inspected regardless of whether they are powered or not. GPR can inspect fiber optic cables, and especially high-traffic fiber optic cables used for city-to-city communications, where breaks can result in the most significant costs.

[0008] However, in conventional use, GPR requires preliminary site surveys for locating utilities and involves offline map preparation and coordination of maps with reference markers placed on site. Because coordination between radar maps and field references is often poor, and because interpretation of GPR images requires considerable expertise, conventional application of GPR is impractical in many cases.

[0009] GB2486375 to John Deere describes an antenna to be placed on the teeth of a bucket of an excavating machine so that the beam exit is in line with the teeth of the bucket. Such a beam direction is ineffective for detecting utilities during excavation. Summary of the invention

[0010] Therefore, according to a preferred embodiment of the present invention, there is provided a GPR (ground penetrating radar) system, comprising: an excavating machine having a bucket; a GPR unit mounted on the bucket; and a post-processing unit mounted in a cabin of the excavating machine. The GPR unit comprises: at least one GPR antenna mounted on and / or through the ground base of the bucket; and a data processor mounted in the upper part of the bucket. The data processor detects the presence of danger during the gradual removal of the soil layer. When the data processor detects danger during the gradual removal of the soil layer, the post-processing unit provides an alarm.

[0011] Furthermore, according to a preferred embodiment of the present invention, the data processor comprises a radar controller for transmitting and receiving pulses in both a SFCW (Stepped Frequency Continuous Wave) mode and a SFICW (Stepped Frequency Interrupted Continuous Wave) mode.

[0012] Furthermore, according to a preferred embodiment of the present invention, the data processor includes a tone calibrator for determining antenna defects. Since a pulse is a sequence of tones in the frequency domain, the data processor includes a pulse corrector for individually correcting defects in the tones using the output of the tone calibrator.

[0013] Additionally in accordance with a preferred embodiment of the present invention, the tone calibrator corrects for ringing in at least one of the GPR antennas.

[0014] Furthermore, according to a preferred embodiment of the present invention, the data processor includes: a sequence migration unit which receives the corrected pulse from the pulse corrector to migrate the echo energy in the corrected pulse to a maximum likelihood point indicating a location of the hazard.

[0015] Furthermore, in accordance with a preferred embodiment of the present invention, when the bucket is digging the ground, at least one antenna is directed toward the ground.

[0016] Furthermore, in accordance with a preferred embodiment of the present invention, at least one antenna is designed to withstand harsh excavation environments.

[0017] Still further in accordance with a preferred embodiment of the present invention, at least one GPR antenna is mounted within the volume of the bucket.

[0018] Furthermore, according to a preferred embodiment of the present invention, the data processor comprises an IMU (Inertial Measurement Unit) and a Kalman filter. The Kalman filter estimates the horizontal position of the bucket using the constrained motion of the bucket.

[0019] Furthermore in accordance with a preferred embodiment of the present invention the data processor includes a starting point determiner for establishing a reference from which horizontal and vertical coordinates of a utility scatterer are measured.

[0020] Furthermore, according to a preferred embodiment of the present invention, the alarm is a display alarm and / or an audible alarm.

[0021] Furthermore, according to a preferred embodiment of the present invention, the post-processing unit comprises a GPS unit for geo-locating the site of the excavation machine. The post-processing unit includes the position data from the GPS unit in the log of the removal of the soil layer.

[0022] Furthermore, according to a preferred embodiment of the present invention, the system comprises a communication unit for relaying the location and the location data of the hazard to an external agent.

[0023] Still further in accordance with a preferred embodiment of the present invention, the system comprises: at least one interface for receiving control information from the instrument for operator-assisted or autonomous operation.

[0024] Alternatively, according to an alternative preferred embodiment of the present invention, the system further comprises a transmitter and a plurality of receivers. The transmitter is mounted on a bar of the excavating machine and is proximate to a pivot between the bar and the bucket. A plurality of receivers are mounted in the cabin to receive signals from the transmitter. The data processor determines the horizontal position of the bucket based at least on a time-of-flight measurement between the transmitter and the receiver.

[0025] Furthermore, according to a preferred embodiment of the present invention, the transmitter and the plurality of receivers implement one of the following technologies: ultrasonics, UWB radar, millimeter wave radar, and optics.

[0026] Furthermore, according to a preferred embodiment of the present invention, the system includes an inclinometer for measuring the inclination of the bucket relative to a horizontal plane. The data processor uses the inclination to determine the horizontal position.

[0027] According to a preferred embodiment of the present invention, a method for a GPR system is also provided. The method includes: using a GPR unit mounted on a bucket of an excavation machine to detect the presence of danger during the gradual removal of soil layers, wherein the GPR unit includes: at least one GPR antenna mounted on and / or through the ground base of the bucket; and a data processor mounted in the upper part of the bucket; and when the data processor detects danger during the gradual removal of the soil layer, providing an alarm.

[0028] Furthermore, according to a preferred embodiment of the present invention, the detecting includes sending and receiving pulses in both a SFCW (Stepped Frequency Continuous Wave) mode and a SFICW mode.

[0029] Furthermore, in accordance with a preferred embodiment of the present invention, the pulse is a sequence of tones in the frequency domain, and the detecting includes determining antenna imperfections and using the determined output to individually correct the imperfections in the tones. The determining includes correcting ringing in at least one GPR antenna.

[0030] Still further in accordance with a preferred embodiment of the present invention, detecting includes receiving a corrected pulse and shifting echo energy in the corrected pulse to a point of maximum likelihood indicative of a location of the hazard.

[0031] Furthermore in accordance with a preferred embodiment of the present invention the method includes directing at least one antenna toward the ground while the bucket is digging the ground.

[0032] Furthermore in accordance with a preferred embodiment of the present invention the method includes mounting at least one GPR antenna within the volume of the bucket.

[0033] Furthermore, in accordance with a preferred embodiment of the present invention, the detecting includes estimating the horizontal position of the bucket using the constrained motion of the bucket and the output of an IMU (Inertial Measurement Unit) using a Kalman filter.

[0034] Furthermore, in accordance with a preferred embodiment of the present invention, the detecting includes establishing a reference according to which the horizontal and vertical coordinates of the utility scatterer are measured.

[0035] Still further in accordance with a preferred embodiment of the present invention the method includes geo-locating a site of the excavation machine and including position data from the geo-locating in a log of the removal of soil layers.

[0036] Furthermore, in accordance with a preferred embodiment of the present invention, the method comprises relaying the location of the hazard and the location data to an external agent.

[0037] Furthermore, in accordance with a preferred embodiment of the present invention, the method includes receiving control information from the instrument for operator-assisted or autonomous operation.

[0038] Alternatively, according to an alternative preferred embodiment of the present invention, the detection includes: determining the horizontal position of the bucket based at least on a time-of-flight measurement between a transmitter mounted on a rod of the excavation machine and close to a pivot between the rod and the bucket, and the multiple receivers mounted in a cabin and receiving signals from the transmitter.

[0039] Finally, according to a preferred embodiment of the invention, the method comprises: measuring the inclination of the bucket relative to a horizontal plane, the detection being used to determine the horizontal position using the inclination. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] The subject matter regarded as the invention is particularly pointed out and distinctly claimed in the concluding portion of the specification. However, the organization and method of operation of the invention, together with objects, features, and advantages thereof, may be best understood by reference to the following detailed description read in connection with the accompanying drawings, in which:

[0041] Figure 1A , Figure 1B and Figure 1C are schematic diagrams that together illustrate a GPR system operable during an excavation operation using an excavation machine;

[0042] Figure 2A , Figure 2B and Figure 2C Schematic diagrams of the trench dug for the buried utility, the processing unit in the operator's cabin, and the display, which are helpful for understanding Figure 1A , Figure 1B and Figure 1C GPR system;

[0043] Figure 3 is Figure 1C A block diagram of an analog signal generator and preprocessor useful in a GPR system;

[0044] Figure 4 is Figure 1C A block diagram illustration of a radar controller for generating tones useful in a GPR system of FIG.

[0045] Figure 5A and Figure 5B The conventional antenna response and the digitally corrected antenna response are shown respectively;

[0046] Figure 6 is Figure 1C A block diagram illustration of a GPR data interpreter useful in a GPR system;

[0047] Figure 7 is a schematic diagram of an exemplary scattering pattern of pulses during a draw of an excavation machine;

[0048] Figure 8 is Figure 1C A block diagram of a hazard identifier useful in a GPR system;

[0049] Fig. 9A and Fig. 9B is a schematic diagram of an alternative GPR system operable during an excavation operation using an excavation machine; and Fig. 9C Is Fig. 9A Schematic diagram of the triangulation operation performed by the system.

[0050] It will be appreciated that, for simplicity and clarity of illustration, the elements shown in the drawings are not necessarily drawn to scale. For example, the dimensions of some of the elements may be exaggerated relative to other elements for clarity. In addition, reference numerals may be repeated between the drawings to indicate corresponding or similar elements where appropriate. DETAILED DESCRIPTION

[0051] In the following specific embodiments, many specific details are set forth in order to provide a thorough understanding of the present invention. However, it will be appreciated by those skilled in the art that the present invention can be practiced without these specific details. In other examples, well-known methods, processes and components are not described in detail to avoid obscuring the present invention.

[0052] Applicants have recognized that a GPR system that integrates under-the-bucket detection with the digging action can replace off-line surveys and interpretations and enable practical application of GPR as protection against utility failures. This can provide a safer way to dig.

[0053] Reference now Figure 1A , Figure 1B and Figure 1C , which together illustrate a GPR system 10 operable during an excavation operation with an excavation machine 11. The GPR system 10 includes a GPR unit 12 attached to an excavation bucket 13 of the excavation machine or "excavator" 11, and a post-processing unit 14 mounted in a cabin 19 in which an operator 17 may sit while operating the excavation machine 11. The excavator 11 may be any suitable excavation machine, such as a backhoe, loader, bulldozer, grader, or any other excavation type construction vehicle.

[0054] GPR unit 12 may include a transmitting antenna 30, a receiving antenna 32, and a GPR data processor 34, all mounted within the volume of bucket 13. Antennas 30 and 32 may be mounted on a ground-mounted base 15 ( Figure 1B ) on, installed in and / or through the ground foundation 15. Figure 1BExemplary antennas 30 and 32 are shown mounted so that a portion thereof extends through the base 15 and a portion thereof is located on an inner surface of the base 15. A GPR data processor 34 may be mounted on an upper portion 37 of the bucket 13. The GPR data processor 34 may be isolated from the bucket 13 to prevent shock and vibration (e.g., by shock absorbers (not shown)), and may be powered from the excavator 11.

[0055] The GPR data processor 34 may include an analog signal generator and a preprocessor 21 ( Figure 1C ), a motion sensor unit 23, a digital data processor 25, and a radio communication unit 22, such as a radio device or a WiFi unit for cellular connection. The post-processing unit 14 may include a display 20 (e.g., a monitor or tablet computer) in radio communication with the radio communication unit 22, the GPS unit 24, and a speaker 26 for alerting the operator 17. The display 20 may include a menu system and touch sensing.

[0056] The transmitting antenna 30 and receiving antenna 32 may be any suitable GPR antenna pair that can withstand the harsh excavation environment, such as the GPR antenna pair described in U.S. Patent No. 9,899,741 and U.S. Patent Application No. 17 / 259,170 filed as PCT on July 18, 2019 and issued as U.S. Patent No. 11,502,416 on November 15, 2019, all of which are assigned to the applicant of the present invention and are incorporated herein by reference in their entirety. The GPR data processor 34 may control the antennas 30 and 32, may process the GPR data received from the receiving antenna 32, and may check the processed data to determine whether a hazard (i.e., a utility) has been detected. If so, it may generate a visual alarm to be displayed on the display 20 and / or an audio alarm for the speaker 26 to instruct the operator 17 to stop excavation and surveying.

[0057] In addition, the GPR data processor 34 may receive geo-location information of the excavator 11 from the GPS unit 24. The GPR data processor 34 may record excavation data, may associate the excavation data with at least the geographic location of the excavator 11, and may relay the excavation data to the display 22 via the radio communication unit 22. Additionally, the GPR data processor 34 may relay the geographic location to a computerized archive (not shown) storing excavation evidence and / or to a central control unit for inspection by a construction team.

[0058] Figure 1AThe basic process of digging a trench 40 is shown. The excavator 11 can be in position 42, and the operator 17 can use the bucket 13 to dig the trench 40. The operator 17 can move the bucket 13 horizontally to sequentially remove layers of material from the trench 40. According to a preferred embodiment of the present invention, during the excavation of each layer, the operator 17 can be instructed manually or using computer-assisted control to keep the base 15 of the bucket 11 horizontal. This can keep the radar beam 44 emitted from the GPR unit 12 vertical (i.e., detecting directly below and slightly in front of the bucket 13). It will be appreciated that the radar beam 44 can move horizontally with the horizontal movement of the bucket 13, but can look vertically at the ground to detect something that may be below the current layer of the trench 40.

[0059] Applicants have recognized that because the GPR unit 12 can view the ground below the bucket 13 vertically, it can detect any utilities that are several layers below the layer currently being removed. Furthermore, applicants have recognized that initial detection may not be clear given that utilities may be significantly below the current ground layer, and given that the type of soil and the presence of moisture in the soil affect the quality of the detection. However, as each layer is removed, the detection can be significantly improved. This can enable high quality detection to occur well before the bucket 13 can contact any hidden utilities.

[0060] In addition, as discussed in U.S. Pat. No. 11,085,170, assigned to applicant and incorporated herein by reference in its entirety, the GPR data processor 34 can take advantage of the fact that the motion of the bucket 13 when digging the trench 40 is horizontal, and therefore, the rotation of the boom 50 and stick 52 of the excavator 11 can occur in only one plane. As discussed in U.S. Pat. No. 11,085,170, this simplifies the calculations for the position of the receiving antenna 32 when using the motion of the bucket 13 measured by the motion sensor unit 23 as input. Using these calculations, the GPR data processor 34 can determine the location of any detected utility from the starting point of the excavation. The GPR data processor 34 can then provide the location information to the display 20 and / or computerized archive, or to the central control unit for inspection by the construction team.

[0061] Now briefly refer to Figure 2A , Figure 2B and Figure 2C , which are schematic diagrams of a dug trench 40 through which a buried utility 60 passes, a processing unit 17 in a chamber 19, and a display 20 of the processing unit 14. Note that the display 20 has an alarm on the screen in response to the detection of the buried utility 60, and also shows the position indicated as the distance from the starting point of the trench 40 and the depth of the buried utility 60.

[0062] Applicants have recognized that in order to automatically detect underground utilities in real time (i.e., during excavation), the data quality of the GPR system 10 must be significantly more accurate than the data quality currently provided by conventional GPRs that transmit and receive pulses. Therefore, the analog signal generator and preprocessor 21 can instead generate a frequency sequence for transmission by the transmit antenna 30, which is the Fourier component of the short pulse. The analog signal generator and preprocessor 21 can receive, amplify and process the echo response from the underground material. As described in more detail below, the analog signal generator and preprocessor 21 can construct the short pulse based on the Fourier component echoes of the short pulse, and before finalizing the short pulse, the Fourier component echoes can be corrected for equipment defects present in the signal chain.

[0063] refer to Figure 3 In an exemplary embodiment, the analog signal generator and pre-processor 21 may include a radar controller 70 and a GPR pulse corrector 72 , and the digital data processor 25 may include a GPR data interpreter 74 and a hazard identifier 76 .

[0064] The radar controller 70 can control the operation of the antennas 30 and 32, and can activate the antennas 30 and 32, respectively, to sequentially transmit and receive a sequence of tones at intervals of approximately 1 / 10 second. From 100 to 400 tones can be transmitted and the echo data stored, and these tones are simple continuous wave carriers that are typically stepped frequencies. In one embodiment, the transmission can be synchronized using the principles described in U.S. Patent Application No. 16 / 163,799, filed on October 18, 2018 and granted on March 21, 2022 as U.S. Patent No. 11,280,881, which is assigned to the applicant and is incorporated herein by reference in its entirety.

[0065] As discussed below, the GPR pulse corrector 72 can correct any aberrations in the pulses in the radar signal to generate pulses that may be more accurate than those of conventional GPR systems. The GPR data interpreter 74 can use the more accurate pulse data to detect buried utilities 60 or other hazards and determine their location from the start of the trench 40. The hazard identifier 76 can warn the excavation operator 17 of impending hazards.

[0066] Reference now Figure 4 , which shows the operation of the radar controller 70 to generate tones. The radar controller 70 can synthesize tones to be transmitted according to the stepped frequency continuous wave (SFCW) technique. However, the SFCW method means simultaneous transmission and reception, which has the disadvantage that weak received signals may be suppressed by transmitter leakage.

[0067] To avoid this, the radar controller 70 may additionally implement an interrupted continuous wave (ICW) technique, as discussed in U.S. Pat. No. 6,664,914 (which is incorporated herein by reference), which may activate only one antenna 30 or 32 at a time, or may limit the duration that both antennas are activated simultaneously. Switching between antennas may isolate the receiver antenna 32 while the transmitter antenna 30 is active, and vice versa. By integrating this technique into the "stepped frequency interrupted continuous wave (SFICW)" technique, even weak tones may be received. Furthermore, by alternating between the SFCW technique and the SFICW technique, most targets may be detected.

[0068] Thus, the radar controller 70 may include a GPRSFCW tone transmitter 80 , a GPRSFCW tone receiver 82 , and a switch 84 .

[0069] When performing the SFICW technique, the switch 84 can alternately activate the transmitter 80 and the receiver 82, or can activate the transmitter 80 and the receiver 82 so that they overlap minimally. The GPRSFCW tone transmitter 80 can generate tones that are typically, but not substantially, equidistant in frequency. Typically when the radar controller 70 detects interference, the transmitter 80 can omit the tones, as described below. The ability to omit tones can make the GPR system 10 tolerant of interference and can also allow it to avoid interfering with other radio-related systems. The transmitter 80 can provide the generated tones to the transmit antenna 30, which can transmit these tones into the groove 40. The receiver 82, when activated by the switch 84, can receive the reflected signal (e.g., radar echo), and can provide the received signal to the GPR pulse corrector 72. It will be appreciated that the timing of the switching can be designed to enable the radar controller 70 to suppress closer and stronger echoes, thereby enabling the radar controller 70 to receive weaker tones that are typically farther away.

[0070] Before providing the tone to the GPR pulse corrector 72, the receiver 82 may check for interference. Specifically, a tone is assigned to a specific frequency in a specific time slot. Therefore, if the signal received in a specific time slot does not have the expected frequency for that time slot, the received signal is not a tone. Instead, the received signal has interference therein, and thus the receiver 82 may not pass the tone to the GPR pulse corrector 72.

[0071] Applicants have recognized that conventional GPR systems cannot come close to approximating an ideal pulse due to internal reflections that cannot be suppressed. For example, reflections within the antenna structure produce ringing that adversely affects resolution by spreading the pulse energy. Applicants have also recognized that by correcting the tone and generating a synthesized tone therefrom, these detrimental effects can be significantly suppressed.

[0072] To find defects in the equipment, the radar controller 70 may additionally include a tone calibrator 86, which may be a high-fidelity bypass link (e.g., a calibration path) connecting the end of the transmit path to the beginning of the receive path, so that the calibration signal is never passed into the air, only within the hardware. The resulting "radar" signal will only be subject to the actual distortion imposed by the transmit and receive hardware. The tone calibrator 86 may occasionally activate the calibration path and may store the resulting calibration signal.

[0073] The GPR pulse corrector 72 can use the resulting calibration tones to perform digital corrections on individual received tones using an approach similar to that employed by a vector network analyzer (a common laboratory instrument). Since the correlation correction is performed in the frequency domain, and since the corrected tones form a Fourier series, the GPR pulse corrector 72 can perform an inverse Fourier transform (a standard signal processing operation) on the corrected tones to convert them into corrected pulses. Thus, the GPR pulse corrector 72 can restore the fidelity of the received tones by performing independent digital corrections on the tones. This is in Figure 5A and Figure 5B Now briefly refer to Figure 5A and Figure 5B . Figure 5A and Figure 5B A conventional antenna response and a digitally corrected antenna response, such as that produced by the GPR pulse corrector 72, are shown respectively. As can be seen, Figure 5A The conventional antenna response of Figure 5B The corrected response of is close to the theoretical ideal with little antenna ringing. It will be appreciated that the GPR pulse corrector 72 may be implemented in a conventional signal processing unit.

[0074] Reference now Figure 6 , which shows elements of a GPR data interpreter 74 that can process the sequence of pulses received during the approach and retreat of the radar as it passes over a buried utility 60. It will be appreciated that before processing the pulses, the horizontal position of the GPR unit 12 at each emission point can be determined so that the arrival time of the pulses indicating the depth of the buried utility 60 can be correlated with its horizontal position. The motion sensor system 23 can be used to determine the horizontal position, and a new sequence of tone emissions can be triggered based on the horizontal movement of the bucket 13. For example, the motion sensor system 23 can trigger a tone emission for every 1 cm of horizontal movement.

[0075] The GPR data interpreter 74 may include a horizontal position determiner 90 that may receive horizontal position information from at least one of the various sensor systems and a sequence migration unit 92 that may examine a pulse sequence to determine the depth of a hazard, such as a buried utility 60. The GPR data interpreter 74 may also include a starting position determiner 94 to indicate to the operator 17 when to begin excavating the next layer of the trench 40 and to store the horizontal position coordinates of the bucket position at the start of the excavation.

[0076] The starting position determiner 94 may receive the bearing of the rotation axis of the excavator 11 from the Hall Effect compass on the GPS 24 on the excavator 11. Additionally, the operator 17 may start a "pull" at a known extension of the bucket 13. Using this information, the starting position determiner 94 may determine the starting position of the pull.

[0077] A motion sensor system 23 may include a 6-DOF IMU 96 and a constrained Kalman filter 98 which, as mentioned above, can utilize the constrained motion of the machine linkages of the boom 50 and the rod 52 to reduce the inherent drift of the accelerometers of the IMU 96. This is described in U.S. Patent 11,085,170 owned by the applicant and incorporated herein by reference. The IMU typically has a gyroscope, which in this embodiment can also provide an offset orientation for the scan of the bucket 13.

[0078] The IMU 96 can measure the motion of the bucket 13 and can provide its output to the constrained Kalman filter 98, which in turn can generate the position of the bucket 13 at each point in time. Note that, as mentioned above, the operator 17 can ensure that the bucket 13 moves horizontally as each layer of the trench 40 is excavated.

[0079] When the operator 17 brings the bucket 13 to a stationary point before starting to dig the next layer (known as a "pull"), the starting position determiner 94 can register the stationary point as the starting position, and then the horizontal position determiner 90 can be activated to begin operation. The horizontal position determiner 90 can determine the horizontal position relative to this zero point or starting point.

[0080] The sequence migration unit 92 can process the pulse sequence received during the pull and can migrate the echo energy in the pulse to the maximum likelihood point, thereby indicating the location of the scattering object, i.e., the buried utility 60. Sequence migration is known and discussed in the book Exploplation Seismology (Sheriff and Geldart, Cambridge University Press, ISBN 0-521-48626-4 (Lib. of Congress), page 237 onwards).

[0081] Now briefly refer to Figure 7 , which shows an exemplary scattering pattern of pulses as bucket 13 passes over buried utility 60 during a pull. The points show the reported depth as bucket 13 moves horizontally within trench 40 (as indicated by horizontal line 110). It can be seen that the first point (point 112) is away from horizontal line 110. As bucket 13 moves horizontally along trench 40, the points approach horizontal line 110 and then move away from horizontal line 110. The point at the peak marked 114 is closest to horizontal line 110 and indicates the true depth of buried utility 60.

[0082] The migration unit 92 may continuously and automatically process the pulse data. The migration unit 92 may utilize pattern recognition techniques to determine one or more target xz coordinates, where x is the horizontal distance from the start of the bucket movement and z is the depth from the horizontal plane. It will be appreciated that by using a pattern recognition process, the resulting position and depth information may be more accurate, ideally eliminating the need for human intervention to check whether the buried utility 60 is at the location determined by the migration unit 92. It should also be appreciated that such accuracy may facilitate autonomous or semi-autonomous operation of the excavator 11. To this end, the GPR system 10 may include at least one interface to receive control information from the instrument for operator-assisted or autonomous operation.

[0083] Now briefly refer to Figure 8 ,like Figure 8 As shown, the hazard identifier 76 can receive the horizontal position and hazard depth information generated by the GPR data interpreter 74, and when the information indicates a hazard, it can provide the position and depth information to the display 20 and activate an alarm. In addition, the hazard identifier 76 can instruct the post-processor 14 ( Figure 1C ) activates a series of audible tones using speaker 26. The machine operator 17 can assess whether the indicated hazard will be encountered the next time the bucket digs into the ground, and can react accordingly.

[0084] Return to Figure 6 , there may be a measurement of GPR motion (in Figure 6The horizontal position determiner 90 may combine its output with the output of the IMU 96 and the constrained Kalman filter 98, or may use them independently. While the IMU may be self-contained within the GPR unit 12, other methods may require more complex installations involving mounting sensors on or external to the structure of the excavator 11.

[0085] Applicants have recognized that inertial measurements require calibration, which requires pausing during the digging motion. In addition, an IMU with the necessary mass is expensive. In an alternative embodiment, the system 10 may utilize a designated fixed-point digging bar 52 ( Figure 1A ) to a known reference position on the cabin 19. This is Fig. 9A and 9B As shown in the figure, now refer to Fig. 9A and Fig. 9B .

[0086] Fig. 9A The excavator 11 is shown with a transmitter 130 mounted on the excavation rod 52 and a plurality of receiver units 133 mounted in the cabin 19 (in Fig. 9B 19). For example, the transmitter 130 may be positioned relatively close to the bucket pivot 135 to provide relatively accurate position determination, and there may be three or more receivers 133, wherein two receivers 133A and 133B may be formed as receiver units 132A mounted above the head of the operator 17 (e.g., on a crossbar extending across the top of the cabin 19), one mounted on the right side of the cabin 19 and one mounted on the left side of the cabin 19, and one receiver 133C may be formed as receiver unit 132B near the feet of the operator 17 on the centerline of the cabin.

[0087] from Fig. 9B As can be seen in FIG. 1 , receivers 133 may form a triangle 134 , which may be an equilateral triangle, with receivers 133A and 133B forming the base of triangle 134 with receiver unit 132A, and receiver 133C forming the vertex of triangle 134 with receiver unit 132B.

[0088] In this embodiment, the transmitter 130 may, for example, continuously send signals at times t1, t2, and t3, such as Fig. 9A Receivers 133 may receive these signals and may provide their output to horizontal position determiner 90. Determiner 90 may use time of flight calculations to determine the distance d of transmitter 130 as seen by each receiver 133 in a coordinate system defined by a fixed position on cabin 19. i .

[0089] The determiner 90 may be configured to determine the distance d measured by each receiver 133 based on the distance d i Conventional triangulation calculations are performed to locate the position of the transmitter 130 on the digging rod 52, which is expressed in a coordinate system centered on the cabin. Fig. 9C , Fig. 9C A triangulation operation for finding the coordinates (x, y, z) of the emitter 130 is shown. Fig. 9C The distances d1, d2, and d3 and the coordinates (x 1, The determiner 90 may form three equations for the three unknowns (coordinates x, y and z of the transmitter 130) as follows:

[0090] (d i ) 2 = (x - x i ) 2 +(y - y i ) 2 +(z - z i ) 2 , where i = 1, 2, 3 (1)

[0091] Using Equation 1, the determiner 90 can therefore determine the coordinates of the transmitter 130 on the digging bar 52. It will be appreciated that the vertical distance D between the bucket pivot 135 and the antenna 12 can be fixed because the operator 17 can keep the floor of the bucket 13 level, so that the determiner 90 can combine the coordinates of the transmitter 130 with the fixed vertical distance D to determine the position of the antenna 12. This is true even when there is an angle between the bucket 13 and the digging bar 52, so that the effect of the known angle can be included in estimating the position of the antenna. The known angle can be measured by any suitable angle sensor, such as an inclinometer 136 within the data processor 34 installed in the bucket 13. The inclinometer 136 can measure the deviation of the bucket 13 from the horizontal plane and infer the deviation of the bottom surface of the bucket 13 from the horizontal plane.

[0092] It will be appreciated that time of flight calculations and triangulation calculations are simple and well known, and therefore, the determiner 90 can quickly determine the horizontal position of the bucket 13 .

[0093] It will be appreciated that the transmitter 130 and receiver 133 of the present embodiment are relatively low cost technology. Furthermore, the operation is simpler than using the IMU 96 as no calibration is required and therefore no pauses are required during operation.

[0094] The transmitter 130 and receiver 133 may employ any suitable technology, for example, ultrasound, UWB radar, millimeter wave radar, and optics. In all cases, the transmitter is located at a designated point on the pole 52, and the receiver is placed at a reference position coordinate.

[0095] The determiner 90 can perform a one-time calibration by measuring the position error of the transmitter 130 in a known position. Due to the short propagation distances involved, a high signal-to-noise ratio at the receiving point is desirable and feasible. The signal resolution is given by the propagation speed divided by the signal bandwidth, and the accuracy is proportional to the resolution divided by the square root of the signal-to-noise ratio. In all cases, an accuracy approaching one centimeter is possible. A marginal advantage of ultrasound is that the low propagation speed of sound waves compared to electromagnetic waves reduces the bandwidth requirements, while affecting design and cost.

[0096] It will be appreciated that the GPR system 10 can integrate detection within the act of digging and within standard trench digging operations, thereby gradually approaching potential utility hazards during the removal of soil layers. It will be appreciated that such gradual removal of soil can reduce the requirements for penetration and detection depth, thereby making the application applicable to a wider range of soil conditions.

[0097] In addition, the GPR system 10 can achieve excellent measurement quality by applying pulse synthesis techniques to enhance waveform fidelity, thereby correcting the imperfections of the synthesized components at the level of the individual frequency components transmitted in the Fourier spectrum of the pulse. This can result in improved resolution properties. Specifically, the correction techniques can compensate for antenna imperfections that are the main source of imperfections in conventional GPR systems. These improved aggregations can be supplemented by algorithmic methods of hazard detection, which can reduce or eliminate the need for human interpretation, which can enable successful application of GPR detection to avoid utility damage. In this embodiment, the operator 17 can be replaced by an automatic excavation control system to ensure that the bucket 13 moves horizontally at an optimal speed as each layer of the trench 40 is excavated.

[0098] GPR system 10 can eliminate the need for registration between survey and site, and the need for human intelligence in interpreting GPR data. In addition, GPR system 10 can reduce the amount of operator training required, and can require no additional capabilities beyond the normal skills required for operation of excavator 11.

[0099] It will also be appreciated that since the GPR unit 12 can be mounted within the volume of the digging bucket, it can provide a mount that minimizes compromise to the digging efficiency of the bucket. Furthermore, as discussed above, the antennas 30 and 32 are pointed at the ground when the bucket is digging, and therefore, the GPR system 10 can be oriented for detecting buried obstacles. Furthermore, the GPR system 10 can utilize the found objects to geolocate the digging site and can index the information for broadcasting to external agents via WiFi.

[0100] It will also be appreciated that the GPR system 10 can provide real-time (ie, while digging) alerts to hazards beneath the surface.

[0101] Unless otherwise specifically noted, as will be apparent from the foregoing discussion, it will be appreciated that throughout the specification, discussions utilizing terms such as "processing," "computing," "calculating," "determining," and the like refer to actions and / or processes of any type of computing device, such as a general purpose or special purpose computer, e.g., a client / server system, a mobile computing device, a tablet device, a smart appliance, a cloud computing unit, a signal processing unit, or a similar electronic computing device that manipulates and / or transforms data within registers and / or memory of a computing system into other data within a memory, registers, or other such information storage, transmission, or display device of the computing system.

[0102] Embodiments of the present invention may include a device for performing the operations herein. The device may be specially constructed for the desired purpose, or it may include a computing device or system typically having at least one processor and at least one memory, selectively activated or reconfigured by a computer program stored in a computer. The resulting device can transform a general-purpose computer into an inventive element as discussed herein when indicated by software. Instructions may define an inventive device that operates with a desired computer platform. Such a computer program may be stored in a computer-readable storage medium, such as, but not limited to, any type of disk, including an optical disk, a magneto-optical disk, a read-only memory (ROM), a volatile and non-volatile memory, a random access memory (RAM), an electrically programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a magnetic card or an optical card, a flash memory, a key disk (disk-on-key) or any other type of medium suitable for storing electronic instructions and capable of being coupled to a computer system bus. The computer-readable storage medium may also be implemented with a cloud storage device.

[0103] Some general purpose computers may include at least one communication element for enabling communications with a data network and / or a mobile communication network.

[0104] The processes and displays presented herein are not inherently related to any particular computer or other device. Various general purpose systems may be used together with the programs taught herein, or it may prove convenient to construct more specialized devices to perform the desired method. The desired structures of various these systems will emerge from the following description. Additionally, embodiments of the present invention are not described with reference to any particular programming language. It will be appreciated that various programming languages ​​may be used to implement the teachings of the present invention as described herein.

[0105] While the features of the present invention have been shown and described herein, many modifications, substitutions, changes and equivalents will now occur to one of ordinary skill in the art. It will therefore be understood that the appended claims are intended to cover all such modifications and changes that fall within the true spirit of the invention.

Claims

1. A GPR (ground penetrating radar) system, comprising: An excavation machine having a bucket; a GPR unit mounted on the bucket, the GPR unit comprising: at least one GPR antenna mounted on and / or through the bucket's ground-mounted base; and a data processor mounted in an upper portion of the bucket, the data processor for detecting the presence of a hazard during the progressive removal of a soil layer; and A post-processing unit is mounted in a cabin of the excavation machine, the post-processing unit being configured to provide an alarm when the data processor detects the danger during the gradual removal of the soil layer.

2. The GPR system of claim 1, wherein: The data processor includes a radar controller for sending and receiving pulses in both SFCW (Stepped Frequency Continuous Wave) and SFICW (Stepped Frequency Interrupted Continuous Wave) modes.

3. The GPR system of claim 2, wherein: The pulses are sequences of tones in the frequency domain, wherein the data processor comprises a tone calibrator for determining antenna imperfections, and wherein the data processor comprises a pulse corrector for individually correcting imperfections in the tones using the output of the tone calibrator.

4. The GPR system of claim 3, wherein: The data processor includes a sequence migration unit that receives the corrected pulses from the pulse corrector to migrate echo energy in the corrected pulses to a maximum likelihood point indicative of a location of the hazard.

5. The GPR system of claim 3, wherein: When the bucket is digging the ground, the at least one GPR antenna is pointed toward the ground.

6. The GPR system of claim 1, wherein: The at least one GPR antenna is designed to withstand a harsh excavation environment.

7. The GPR system of claim 1, wherein: The at least one GPR antenna is mounted within the volume of the bucket.

8. The GPR system of claim 3, said tone calibrator being used to correct for ringing in said at least one GPR antenna.

9. The GPR system of claim 1, wherein: The data processor includes an IMU (Inertial Measurement Unit) and a Kalman filter for estimating the horizontal position of the bucket using the constrained motion of the bucket.

10. The GPR system of claim 9, wherein: The data processor includes a starting point determiner for establishing a reference from which horizontal and vertical coordinates of a utility scatterer are measured.

11. The GPR system of claim 1, wherein: The alarm is at least one of a display alarm and an audible alarm.

12. The GPR system of claim 9, wherein: The post-processing unit comprises a GPS unit for geo-locating a site of the excavation machine, and wherein the post-processing unit includes position data from the GPS unit in a log of the removal of the soil layer.

13. The GPR system of claim 12, and further comprising: A communication unit for relaying the location of the hazard and the location data to an external agent.

14. The GPR system of claim 1, and comprising: At least one interface for receiving control information from the instrument for operator-assisted or autonomous operation.

15. The GPR system of claim 1, and further comprising: a transmitter mounted on a bar of the excavating machine proximate a pivot between the bar and the bucket; as well as a plurality of receivers mounted in the cabin for receiving signals from the transmitter; The data processor is used to determine the horizontal position of the bucket based on at least a time-of-flight measurement between the transmitter and the receiver.

16. The GPR system of claim 15, wherein: The transmitter and the plurality of receivers implement one of the following technologies: ultrasonics, UWB radar, millimeter wave radar, and optics.

17. The GPR system of claim 15, and further comprising: An inclinometer is used to measure the inclination of the bucket relative to a horizontal plane, and the data processor is used to determine the horizontal position using the inclination.

18. A method for a GPR (ground penetrating radar) system, the method comprising: Detecting the presence of a hazard during progressive removal of a soil layer using a GPR unit mounted on a bucket of an excavation machine, the GPR unit comprising: at least one GPR antenna mounted on and / or through a ground-mounted base of the bucket; and a data processor mounted in an upper portion of the bucket; and When the data processor detects the danger during the gradual removal of the soil layer, an alarm is provided by a post-processing unit installed in the cabin of the excavation machine.

19. The method according to claim 18, and wherein: The detection includes sending and receiving pulses in both SFCW (Stepped Frequency Continuous Wave) mode and SFICW (Stepped Frequency Interrupted Continuous Wave) mode.

20. The method according to claim 19, wherein: The pulses are sequences of tones in the frequency domain, wherein the detecting includes determining antenna imperfections and using outputs of the determinations to individually correct imperfections in the tones.

21. The method according to claim 20, wherein: The detecting includes receiving a corrected pulse and shifting echo energy in the corrected pulse to a maximum likelihood point indicative of a location of the hazard.

22. The method of claim 20, and further comprising: While the bucket is digging the ground, the at least one GPR antenna is directed toward the ground.

23. The method of claim 18, and further comprising: The at least one GPR antenna is mounted within the volume of the bucket.

24. The method of claim 20, wherein the determining comprises: Ringing in the at least one GPR antenna is corrected.

25. The method of claim 18, wherein: The detection includes estimating the horizontal position of the bucket using the constrained motion of the bucket and the output of an IMU (Inertial Measurement Unit) using a Kalman filter.

26. The method according to claim 25, wherein: The detection includes establishing a reference according to which the horizontal and vertical coordinates of the utility scatterer are measured.

27. The method according to claim 18, wherein: The alarm is at least one of a display alarm and an audible alarm.

28. The method of claim 25, and further comprising: A site of the excavation machine is geolocated and the position data from the geolocation is included in a log of the removal of the soil layer.

29. The method of claim 28, and further comprising: The location of the hazard and the location data are relayed to an external agent.

30. The method of claim 18, and comprising: Receives control information from the instrument for operator-assisted or autonomous operation.

31. The method of claim 18, and wherein: The detection includes: The horizontal position of the bucket is determined based at least on a time-of-flight measurement between a transmitter mounted on a bar of the excavator machine near a pivot between the bar and the bucket and a plurality of receivers mounted within the cabin and receiving signals from the transmitter.

32. The method according to claim 31, wherein: The transmitter and the plurality of receivers implement one of the following technologies: ultrasonics, UWB radar, millimeter wave radar, and optics.

33. The method of claim 31 , and further comprising: The inclination of the bucket relative to a horizontal plane is measured, and the detection is used to determine the horizontal position using the inclination.