Method for building paddy field through reclamation in engineering waste residue storage yard

By adopting a multi-layered waterproof and anti-seepage system in the engineering slag waste yard, the seepage problem is solved, the stability of the yard and the safety of paddy fields are improved, and the effective utilization of slag waste and the stable construction of paddy fields are achieved.

CN118901528AInactive Publication Date: 2024-11-08中铁科学研究院集团有限公司
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411405660.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the process of reclamation of paddy fields in the engineering waste slag yard, seepage problems lead to soil erosion, resource waste and environmental pollution. The performance of traditional anti-seepage materials is poor, making it difficult to ensure the stability and safety of the yard.

Method used

The waterproof and anti-seepage system adopts a multi-layer structure, including a waterproof polymer material layer, a gravel storage layer, a clay seepage layer and a soil planting layer, and a foundation pit, laying a hydrophobic film, and draining water The pipe and the filter layer form a stable paddy field structure.

Benefits of technology

It significantly enhances the waterproofing and anti-seepage performance, avoids water leakage and yard collapse, improves the stability of the yard, and effectively utilizes the waste residue resources to adapt to the growth needs of paddy crops.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118901528A_ABST
    Figure CN118901528A_ABST
Patent Text Reader

Abstract

The invention discloses a method for reclaiming and building a paddy field in an engineering waste residue storage yard, and belongs to the technical field of ecological restoration. When the paddy field is built in the engineering waste residue storage yard, the soil layer, the inverted filter layer, the seepage-proof layer, the regulation and storage layer, the seepage-proof layer, the leveling layer and the like are arranged in the storage yard, all the layers are matched with one another, the water-proof, regulation, storage and seepage-proof performance can be remarkably enhanced, water in the paddy field cannot permeate into the engineering waste residue storage yard, seepage can be prevented, water resources cannot be wasted, and the water-proof, regulation, storage and seepage-proof effects are achieved. The internal structure of the storage yard cannot be damaged, so that collapse of the storage yard is avoided, and the stability of the storage yard is improved; in addition, the controlled regulation and storage layer water in the storage yard cannot permeate back into the paddy field, and the growth requirements of crops in the paddy field can be effectively met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of ecological restoration, and in particular relates to a method for reclaiming and constructing paddy fields in an engineering waste dump. Background Art

[0002] Paddy fields are an important guarantee for my country's food security, but as the area and quality of paddy fields continue to decline, the development of new paddy field reclamation technologies needs to be continuously improved. Railway construction will produce a large amount of tunnel waste, and will occupy a certain amount of land to become waste dumps. Therefore, reclaiming railway engineering waste dumps into paddy fields is one of the effective ways to solve the problem of waste reuse.

[0003] In the process of reclaiming paddy fields from engineering waste dumps, water seepage problems often cause adverse effects such as soil erosion, waste of resources, and environmental pollution. Since the original physical properties of the slag dump have been destroyed, the internal porosity of the dump is large and the water permeability is good. If water is directly poured on the upper part of the slag dump to reclaim it as paddy fields, it will have a great impact on the stability of the slag dump, causing it to sink at best and slide at worst. In addition, the traditional bottom anti-seepage layer is mainly made of a single anti-seepage material, which has a simple structure and poor anti-seepage performance, which can easily cause the slag dump to be softened by water and form landslides, seriously affecting the safety of downstream structures. Therefore, before reclaiming paddy fields from the slag dump, it is necessary to select a reliable water-proof and anti-seepage system that meets the requirements of interception and drainage to ensure the safety and stability of the slag dump. Summary of the invention

[0004] In view of the above-mentioned prior art, the present invention provides a method for reclaiming and constructing paddy fields at engineering waste dumps, so as to solve the technical problems of poor stability and function when constructing paddy fields at engineering waste dumps in the prior art.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is: to provide a method for reclaiming and constructing paddy fields in an engineering waste dump, comprising the following steps: S1: Dig a foundation pit in the engineering waste dump and make waterproof and anti-seepage treatment on the side walls of the foundation pit; S2: Shovel the bottom of the foundation pit and lay a layer of hydrophobic film to form a leveling layer; S3: Laying an anti-seepage layer on the leveling layer by pressing; the anti-seepage layer includes a waterproof polymer material layer and a project waste slag layer; S4: A regulating and storage layer is laid on the anti-seepage layer; the paving material of the regulating and storage layer is crushed stone with a particle size of 2-10 cm, and a number of drainage pipes are arranged inside the regulating and storage layer, and the ends of the drainage pipes extend to the outside of the engineering waste dump; S5: The seepage-proof layer is laid on the regulating and storage layer by means of pressing and paving; the material of the seepage-proof layer is clay sorted from engineering waste; S6: Grading the engineering waste and spreading the graded materials on the seepage-proof layer to form a filter layer; S7: Spread the planting soil onto the filter layer to form a soil layer, thus completing the construction of the paddy field.

[0006] The beneficial effect of the above technical scheme adopted by the present invention is that the present invention sequentially arranges a filter layer, a seepage barrier layer, a storage layer, an anti-seepage layer and a leveling layer below the soil layer, and each layer cooperates with each other to significantly enhance the water-barrier and anti-seepage performance. The water in the paddy field will not penetrate into the engineering waste dump, which can prevent leakage from changing the internal stress state of the dump, thereby avoiding the dump collapse and improving the stability of the dump; and the controlled storage layer water in the dump will not directly infiltrate into the paddy field, which can effectively meet the growth needs of crops in the paddy field.

[0007] Among them, the filtration layer is paved with graded engineering waste, which not only can realize the recycling of engineering waste, but also after grading, the density and stability of the material are improved. The filtration layer paved with it has excellent anti-seepage performance and stability, which can ensure the stability of the paddy field.

[0008] The seepage-proof layer is made of sorted clay from engineering waste, and local materials are used during paving, which is convenient for the construction of paddy fields and can also recycle the engineering waste. The seepage-proof layer is made entirely of sorted clay, which has excellent water-proof and anti-seepage properties and can effectively prevent water infiltration and back-seepage.

[0009] The regulating and storage layer is paved with crushed stones. There is great friction between the crushed stones, which can effectively ensure the stability of the laid layers. In addition, drainage pipes are laid in the regulating and storage layer to discharge the water in the yard in time, which can play an excellent anti-seepage and storage and drainage effect, thereby effectively avoiding the collapse of the yard.

[0010] Based on the above technical solution, the present invention can also be improved as follows.

[0011] Furthermore, the waterproofing and anti-seepage treatment in S1 is to lay a hydrophobic film on the side wall of the foundation pit, or to pour a concrete layer with a thickness of 3 to 5 cm on the side wall of the foundation pit.

[0012] Furthermore, the hydrophobic film is a high-density polyethylene film.

[0013] Furthermore, the anti-seepage layer is a sandwich structure, the surface layer of the sandwich structure is an engineering waste slag layer, and the core layer is a waterproof polymer material layer.

[0014] The beneficial effect of the above-mentioned further technical scheme adopted by the present invention is: the anti-seepage layer is set as a sandwich structure, and the engineering waste is used as the surface layer, which can effectively protect the polymer core layer and prevent it from being damaged by external forces; the polymer core layer has an excellent waterproof effect and can effectively improve the anti-seepage effect of the anti-seepage layer.

[0015] Furthermore, the thickness of the anti-seepage layer is 2-10 cm; the material of the waterproof polymer material layer is a high-density polyethylene film or a polypropylene film.

[0016] Furthermore, the drainage pipes are arranged in two layers, and the drainage pipes in different layers are perpendicular to each other; drainage holes arranged at equal intervals are provided on the top of each drainage pipe.

[0017] Furthermore, the thickness of the regulating layer is 30~40cm.

[0018] Furthermore, the thickness of the barrier layer is 25 to 35 cm.

[0019] Furthermore, the grading method in S6 is continuous grading, and the particle size of the graded material is 5~40mm; the thickness of the filter layer is 10~20cm.

[0020] Furthermore, the thickness of the soil layer is 40~60cm; the top of the soil layer is 20~50cm away from the top of the engineering waste dump.

[0021] The beneficial effects of the present invention are: When the paddy field is constructed in the engineering waste dump in the present invention, a soil layer, a filter layer, a seepage barrier layer, a storage layer, an anti-seepage layer, a leveling layer and the like are arranged in the dump. The layers cooperate with each other to significantly enhance the water-barrier and anti-seepage performance. The water in the paddy field will not penetrate into the engineering waste dump, which can prevent leakage from damaging the internal structure of the dump, thereby avoiding the dump collapse and improving the stability of the dump. Moreover, the seepage in the dump will not seep back into the paddy field, which can effectively prevent the water in the paddy field from being polluted. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 Cross-sectional view of the construction of paddy fields for the reclamation of the engineering waste dump; Among them, 1. leveling layer; 2. anti-seepage layer; 3. regulating and storing layer; 4. drainage pipe; 5. isolation layer; 6. filter layer; 7. soil layer; 8. engineering waste dump. DETAILED DESCRIPTION

[0023] In the embodiment of the present invention, Figure 1 As shown, a method for reclaiming and constructing paddy fields in an engineering waste dump is provided, the method comprising the following steps: S1: dig a foundation pit in the engineering waste dump 8, and perform waterproof and anti-seepage treatment on the side walls of the foundation pit; S2: Shovel the bottom of the foundation pit and lay a layer of hydrophobic film to form a leveling layer 1; S3: Laying the anti-seepage layer 2 on the leveling layer 1 by pressing; the anti-seepage layer 2 includes a waterproof polymer material layer and an engineering waste slag layer; S4: laying a regulating and storing layer 3 on the anti-seepage layer 2; the paving material of the regulating and storing layer 3 is gravel with a particle size of 2 to 10 cm, and a plurality of drainage pipes 4 are arranged inside the regulating and storing layer 3, and the ends of the drainage pipes 4 extend to the outside of the engineering waste dump 8; S5: laying the seepage-proof layer 5 on the regulating and storage layer 3 by means of pressing and paving; the material of the seepage-proof layer 5 is the clay selected from the engineering waste; S6: grading the engineering waste and spreading the graded material on the seepage-proof layer 5 to form a filter layer 6; S7: Spread the planting soil on the filter layer 6 to form a soil layer 7, thus completing the construction of the paddy field.

[0024] The specific implementation modes of the present invention are described in detail below with reference to the embodiments.

[0025] Example 1 A method for reclaiming and constructing paddy fields in an engineering waste dump comprises the following steps: S1: digging a foundation pit in the engineering waste dump 8, and laying a high-density polyethylene film with a thickness of 2 mm on the side wall of the foundation pit to perform waterproof and anti-seepage treatment on the side wall of the foundation pit; S2: Shovel the bottom of the foundation pit and lay a layer of high-density polyethylene film with a thickness of 2 mm to form a leveling layer 1; S3: adopt the pressing method (lay a layer of engineering waste, compact it with a rammer, then lay the engineering waste, continue to compact it with the rammer, and continue this operation until the engineering waste layer is laid). First, lay a 4 cm thick engineering waste layer on the leveling layer 1, and then lay a 2 mm thick high-density polyethylene film on the engineering waste layer to form a polymer material layer, and then lay a 4 cm thick engineering waste layer on the polymer material layer by pressing, and complete the laying of the anti-seepage layer 2; S4: Spread gravel with a particle size of about 5 cm on the anti-seepage layer 2 to form a storage layer 3 with a thickness of 35 cm; during the laying process, bury a plurality of parallel drainage pipes 4 in the gravel, the spacing between each drainage pipe 4 is 1 m, and the top of the drainage pipe 4 is provided with drainage holes arranged at equal intervals (spacing 20 cm), and the end thereof extends to the outside of the engineering waste dump 8; S5: sorting the engineering waste in the engineering waste field, sorting out the clay therein, and then laying the sorted clay from the engineering waste on the regulating and storage layer 3 by pressing and paving, to form a seepage-proof layer 5 with a thickness of 30 cm; S6: Grading the engineering waste in a continuous grading manner, with the particle size distribution of the graded material being 5-40 mm, and then spreading the graded material on the seepage-proof layer to form a filter layer 6 with a thickness of 15 cm; S7: Spread the planting soil on the filter layer 6 to form a soil layer 7 with a thickness of 50 cm, and complete the construction of the paddy field. The top of the laid soil layer 7 is 30 cm away from the top of the engineering waste dump 8.

[0026] Example 2 A method for reclaiming and constructing paddy fields in an engineering waste dump comprises the following steps: S1: digging a foundation pit in the engineering waste dump 8, and pouring a 4 cm thick concrete layer on the side wall of the foundation pit to waterproof and anti-seepage the side wall of the foundation pit; S2: Shovel the bottom of the foundation pit and lay a layer of high-density polyethylene film with a thickness of 2 mm to form a leveling layer 1; S3: adopt the pressing method (lay a layer of engineering waste, compact it with a rammer, then lay the engineering waste, continue to compact it with the rammer, and continue this operation until the engineering waste layer is laid). First, lay a layer of engineering waste with a thickness of 1 cm on the leveling layer 1, and then lay a layer of high-density polyethylene film with a thickness of 2 mm on the engineering waste layer to form a polymer material layer, and then lay a layer of engineering waste with a thickness of 1 cm on the polymer material layer by pressing, and complete the laying of the anti-seepage layer 2; S4: Spread gravel with a particle size of about 2 cm on the anti-seepage layer 2 to form a storage layer 3 with a thickness of 30 cm; during the laying process, bury a plurality of parallel drainage pipes 4 in the gravel, the spacing between each drainage pipe 4 is 1 m, and the top of the drainage pipe 4 is provided with drainage holes arranged at equal intervals (spacing 20 cm), and the end thereof extends to the outside of the engineering waste dump 8; S5: sorting the engineering waste in the engineering waste field, sorting out the clay therein, and then paving the sorted clay from the engineering waste on the regulating and storage layer 3 by pressing and paving, to form a seepage-proof layer 5 with a thickness of 35 cm; S6: Grading the engineering waste in a continuous grading manner, with the particle size distribution of the graded material being 5-40 mm, and then spreading the graded material on the seepage-proof layer to form a filter layer 6 with a thickness of 10 cm; S7: Spread the planting soil on the filter layer 6 to form a soil layer 7 with a thickness of 40 cm, and complete the construction of the paddy field. The top of the laid soil layer 7 is 20 cm away from the top of the engineering waste dump 8.

[0027] Example 3 A method for reclaiming and constructing paddy fields in an engineering waste dump comprises the following steps: S1: digging a foundation pit in the engineering waste dump 8, and pouring a 4 cm thick concrete layer on the side wall of the foundation pit to waterproof and anti-seepage the side wall of the foundation pit; S2: Shovel the bottom of the foundation pit and lay a layer of high-density polyethylene film with a thickness of 2 mm to form a leveling layer 1; S3: adopt the pressing method (lay a layer of engineering waste, compact it with a rammer, then lay the engineering waste, continue to compact it with the rammer, and continue this operation until the engineering waste layer is laid). First, lay a 3cm thick engineering waste layer on the leveling layer 1, and then lay a 2mm thick high-density polyethylene film on the engineering waste layer to form a polymer material layer, and then lay a 5cm thick engineering waste layer on the polymer material layer by pressing, and complete the laying of the anti-seepage layer 2; S4: Spread gravel with a particle size of about 10 cm on the anti-seepage layer 2 to form a storage layer 3 with a thickness of 40 cm; during the laying process, bury a horizontal drainage pipe layer and a vertical drainage pipe layer in the gravel, and the horizontal drainage pipe layer and the vertical drainage pipe layer each include a plurality of parallel drainage pipes 4, and the spacing between each drainage pipe 4 is 1m. The top of the drainage pipe 4 is provided with drainage holes arranged at equal intervals (spacing 20cm), and the end thereof extends to the outside of the engineering waste dump 8; S5: sorting the engineering waste in the engineering waste field, sorting out the clay therein, and then paving the sorted clay from the engineering waste on the regulating and storage layer 3 by pressing and paving, to form a seepage-proof layer 5 with a thickness of 25 cm; S6: Grading the engineering waste in a continuous grading manner, with the particle size distribution of the graded material being 5-40 mm, and then spreading the graded material on the seepage-proof layer to form a filter layer 6 with a thickness of 20 cm; S7: Spread the planting soil on the filter layer 6 to form a soil layer 7 with a thickness of 60 cm, and complete the construction of the paddy field. The top of the laid soil layer 7 is 50 cm away from the top of the engineering waste dump 8.

[0028] Although the specific implementation of the present invention is described in detail in conjunction with the drawings and embodiments, it should not be understood as limiting the scope of protection of this patent. Within the scope described in the claims, various modifications and variations that can be made by those skilled in the art without creative work still fall within the scope of protection of this patent.

Claims

1. A method for reclaiming paddy fields at engineering waste dumps, characterized in that: The following steps are involved: S1: Dig a foundation pit in the engineering waste dump and make waterproof and anti-seepage treatment on the side walls of the foundation pit; S2: Shovel the bottom of the foundation pit and lay a layer of hydrophobic film to form a leveling layer; S3: Laying an anti-seepage layer on the leveling layer by pressing; the anti-seepage layer includes a waterproof polymer material layer and an engineering waste slag layer; S4: laying a regulating and storing layer on the anti-seepage layer; the paving material of the regulating and storing layer is gravel with a particle size of 2-10 cm, and a plurality of drainage pipes are arranged inside the regulating and storing layer, and the ends of the drainage pipes extend to the outside of the engineering waste dump; S5: laying an impermeable layer on the regulating and storage layer by means of pressing and paving; the material of the impermeable layer is clay sorted from engineering waste; S6: Grading the engineering waste and spreading the graded materials on the seepage-proof layer to form a filter layer; S7: Spread the planting soil onto the filter layer to form a soil layer, thus completing the construction of the paddy field.

2. The method for reclaiming and constructing paddy fields at an engineering waste dump according to claim 1, characterized in that: The waterproofing and anti-seepage treatment in S1 is to lay a hydrophobic film on the side wall of the foundation pit, or to pour a concrete layer with a thickness of 3 to 5 cm on the side wall of the foundation pit.

3. The method for reclaiming paddy fields at engineering waste dumps according to claim 1 or 2, characterized in that: The hydrophobic film is a high-density polyethylene film.

4. The method for reclaiming paddy fields at engineering waste dumps according to claim 1, characterized in that: The anti-seepage layer is a sandwich structure, the surface layer of the sandwich structure is an engineering waste slag layer, and the core layer is a waterproof polymer material layer.

5. The method for reclaiming paddy fields at engineering waste dumps according to claim 3, characterized in that: The thickness of the anti-seepage layer is 2-10 cm; the material of the waterproof polymer material layer is a high-density polyethylene film or a polypropylene film.

6. The method for reclaiming paddy fields at engineering waste dumps according to claim 1, characterized in that: The drainage pipes are arranged in two layers, and the drainage pipes in different layers are perpendicular to each other; the top of each drainage pipe is provided with drainage holes arranged at equal intervals.

7. The method for reclaiming paddy fields at engineering waste dumps according to claim 6, characterized in that: The thickness of the storage layer is 30-40 cm.

8. The method for reclaiming paddy fields at engineering waste dumps according to claim 1, characterized in that: The thickness of the barrier layer is 25-35 cm.

9. The method for reclaiming paddy fields at engineering waste dumps according to claim 1, characterized in that: The grading method in S6 is continuous grading, and the particle size of the graded material is 5-40 mm; the thickness of the filter layer is 10-20 cm.

10. The method for reclaiming paddy fields at engineering waste dumps according to claim 1, characterized in that: The thickness of the soil layer is 40-60 cm; the top of the soil layer is 20-50 cm away from the top of the engineering waste dump.

Citation Information

Patent Citations

  • Surface ecological management method for mining subsidence area of coal mine

    CN102726187A

  • Harmless treatment method for solid waste stacking site

    CN106552806A

  • Ecological restoration method of solid waste yards

    CN106613138A

  • Refuse landfill with anti-seepage function

    CN112681395A

  • Photovoltaic panel along railway and protection structure thereof

    CN118573106A