Shear wall formwork and prefabricating method thereof

By using integrated waterproof coils and fastening components in the shear wall formwork, combined with mobile driving components, the problems of leakage and manual investment during the pouring process are solved, and more efficient pouring and stability are achieved.

CN118906186AInactive Publication Date: 2024-11-08CHINA CONSTR THIRD ENG BUREAU GRP SOUTH CHINA CO LTD

Patent Information

Application Number
CN202410782318.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing shear wall formwork is prone to leakage during pouring, and requires a lot of manual labor to seal small holes, which increases the investment of staff.

Method used

A shear wall formwork including mounting base, waterproof coil winding assembly, fastening assembly and side support assembly is designed. Through the integrated waterproof coil installation and use of fastening assembly, the gap between the template is reduced and the gap is improved. The stability and efficiency of casting are achieved, and the convenient movement of the template is achieved by moving the driving parts.

Benefits of technology

It effectively reduces leakage during pouring, reduces manual investment, ensures the integrity and processing efficiency of the building, and reduces the dependence on the pulling screw, avoiding the opening of small holes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118906186A_ABST
    Figure CN118906186A_ABST
Patent Text Reader

Abstract

The invention relates to a shear wall formwork and a prefabricating method thereof.The shear wall formwork comprises a mounting base and a formwork body, a mounting groove is formed in the mounting base, a waterproof roll rolling assembly is arranged in the mounting base, column hoops are arranged on the two sides of the front face and the back face of a wood joist, and fastening assemblies are inserted into the left end and the right end of each column hoop; side pressing assemblies used for fastening and positioning the side plates are arranged between the left end and the right end of the column hoop, a moving running part is arranged at the bottom of the mounting base, and side supporting assemblies used for supporting the formwork are further arranged on the two sides of the shear wall formwork. The formwork is tensioned through the fastening assembly, opposite-pulling screws can be replaced for use, small holes do not need to be formed, integrated forming of a building is guaranteed, then the threaded rods on the two sides are twisted, the pressing plates can be driven to be close to and tightly attached to the outer sides of the side plates, therefore, the side faces of the formwork can be fastened and positioned, gaps of formwork pieces are reduced as much as possible, and leakage is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction moulds, in particular to a shear wall mould and a prefabrication method thereof. Background Art

[0002] Shear wall, also known as wind-resistant wall, earthquake-resistant wall or structural wall, is a wall in a house or structure used to withstand horizontal and vertical loads caused by wind loads or earthquakes. It is generally made of reinforced concrete. Its height and width are generally the same as the height and width of the entire building, which can effectively prevent the house structure from shear damage.

[0003] When pouring existing shear walls, it is necessary to support the formwork first, that is, first set two adjacent long plates on the opposite sides of the area to be poured concrete, and then use two side plates to seal and cover the gap between the ends of the two long plates, so that the long plates and the side plates are enclosed to form a formwork container for concrete pouring, and finally fill the formwork with concrete, and when the concrete solidifies, a shear wall will be formed.

[0004] During the pouring process, in order to ensure the stability of the formwork, it is necessary to tie and fix the screws on both sides through the tension screws. Therefore, during pouring, leakage will occur in the gap between the tension screws and the long plate. After the pouring is completed and the formwork is demoulded, several small holes penetrating the wall will be formed on the shear wall. Then, the staff will be required to seal the small holes, which increases the manpower input of the staff. Therefore, further improvements can be made. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a shear wall formwork and a prefabrication method thereof, which has the advantages of being able to integrally form the cast wall, reduce wall leakage during casting, and reduce labor input, thereby solving the above-mentioned problems.

[0006] In order to achieve the purpose of reducing the leakage of the wall during casting and reducing the labor input by achieving the above-mentioned integrally formed cast wall, the present invention provides the following technical solutions: a shear wall formwork, comprising a mounting base and a formwork, the mounting base is provided with a mounting groove inside, and a waterproof coiled material winding assembly is provided inside the mounting base between the mounting grooves on both sides, the mounting base is provided with a plurality of slots on one side of the inner wall of the mounting groove, the formwork is inserted into the mounting groove, a plurality of slats are abutted and installed on the outer side of the mounting groove, and the bottom ends of the slats are inserted into the slots, side panels are buckled at the left and right sides of the formwork, column hoops are provided on both sides of the front and back sides of the slats, and fastening assemblies are inserted in the left and right ends of the column hoops, the column hoops fasten the formworks on both sides by pulling the fastening assemblies, side pressure assemblies for fastening the side panels are provided between the left and right ends of the column hoops, a moving running component is provided at the bottom of the mounting base, and side support assemblies for supporting the formwork are also provided on both sides of the shear wall formwork.

[0007] As an optimization, the winding assembly of the waterproof membrane includes a winding roller rotatably connected to the inside of the mounting base, and the winding roller is transmission-connected to an external motor, the outer side of the winding roller is wound with the waterproof membrane, the surface of the mounting base is provided with a slot, and one end of the waterproof membrane passes through the slot, and by pulling out the slot and covering the inner side of the template, followed by pouring, the waterproof membrane can be installed in one piece, thereby improving processing efficiency.

[0008] As an optimization, the side pressure assembly includes a connecting column inserted between the ends of the column hoops on both sides, and the two ends of the connecting column are respectively inserted into the ends of the column hoops on both sides, a threaded sleeve is fixedly installed in the middle of the connecting column, and a threaded rod is inserted in the internal thread of the threaded sleeve, and the end of the threaded rod close to the side plate is rotatably connected to a pressure plate, and the pressure plate abuts against the outer side of the side plate, and the other end of the threaded rod is fixedly installed with a turning handle, and turning the turning handle will drive the threaded rod to rotate inside the threaded sleeve, and then drive the pressure plate close to the column hoop, so that the side plate can be squeezed and supported, thereby improving the stability of the formwork and avoiding leakage during pouring due to large gaps between the formworks.

[0009] As an optimization, the fastening assembly includes a fastening screw threadedly inserted into the end of the connecting column, a rotating plate is provided on the outer thread of the fastening screw, a connecting plate is provided on the outer side of the fastening screw and between the rotating plate and the connecting column, an abutment plate is slidably connected to the outer side of the column hoop, and one end of the connecting plate is fixedly installed in the middle of the abutment plate, and by twisting the rotating plate, the connecting plate will be moved closer to the column hoop, which will drive the abutment plate to squeeze the column hoop, thereby playing a role in fixing the template.

[0010] As an optimization, the mobile traveling component includes a fixed rod fixedly installed on the bottom side of the mounting base, a fixed cylinder fixedly installed on the bottom end of the fixed rod, a support fixedly installed on the outside of the fixed rod and the fixed cylinder, a roller rotatably connected inside the support, a rotating wheel rotatably connected inside the fixed rod, a threaded column fixedly installed on the bottom side of the rotating wheel, and a column leg slidably connected inside the fixed cylinder.

[0011] As an optimization, two sliding grooves are opened on the outer side of the column leg, and a limit strip is fixedly installed on the inner wall of the fixed tube, and the limit strip is slidably inserted in the sliding groove and slidably connected in the sliding groove through the limit strip, thereby limiting the position of the column leg so that the column leg can only slide vertically in the fixed tube.

[0012] As an optimization, a threaded groove is provided inside the column leg, and the threaded column is threadedly screwed and inserted in the threaded groove. A notch is provided on the outer side of the fixing rod to expose the rotating wheel. By screwing the rotating wheel, the threaded column is driven to rotate, and then the column leg is raised and lowered, so that the roller can be pressed against the ground to facilitate the overall movement of the shear wall formwork, and the roller can also be lifted away from the ground so that the formwork can stand stably on the ground.

[0013] As an optimization, the side support assembly includes a fixed seat, a fixed sleeve is fixedly installed on one side of the fixed seat, the top of the fixed seat is rotatably connected to a lower threaded barrel, the internal thread of the lower threaded barrel is inserted with a bidirectional screw, the middle of the bidirectional screw is fixedly installed with a hexagonal block, the outer thread of the upper half of the bidirectional screw is sleeved with an upper threaded barrel, and the top of the upper threaded barrel is rotatably connected to a clamping seat.

[0014] As an optimization, the fixed sleeve is sleeved on the outside of the preset steel bar, and the bracket is fixedly installed on the outside of the column hoop. By twisting the hexagonal block, the bidirectional screw will be driven to rotate in the lower threaded barrel and the upper threaded barrel respectively, which will make the lower threaded barrels approach or move away from each other, thereby facilitating the adjustment of the diagonal brace length.

[0015] A prefabrication method for a shear wall formwork is as follows: S1. First, the templates are lifted by the mechanical arms and inserted downward into the installation grooves, and then the waterproofing membrane is pulled upward to cover the inner side of the templates. Then, the side panels are lifted and placed downward along the ends of the templates on both sides, so that the templates on both sides are buckled in the side panels, and the two sides of the wooden board are sealed; then, the winding roller is rotated by the external motor, the waterproofing membrane is pulled out of the notch and fixed to one side of the template with a clip, and the bottom of the waterproofing membrane is close to the template to ensure that the vertical surface of the poured concrete is flat; S2, then insert the slats downward into the slats in sequence so as to fit the outer wall of the template, and then place the column hoop against the surface of the slats, and then insert the fastening components from both sides, and fasten the two sets of templates in place by pulling the fastening components together; S3. When tightening the assembly, first insert the connecting column into the ends of the column hoops on both sides, and then tighten the column hoops on both sides to the outside of the template, so that the side pressure assembly is installed on the outside of the side plate, and then turn the handle to drive the threaded rod to rotate in the threaded sleeve, so that the pressure plate will be driven to be close to the outside of the side plate, thereby tightening the side of the template, minimizing the gap between the template parts and reducing leakage; S4. The roller supported at the bottom of the installation base facilitates the movement of the template as a whole, and the template can be pushed to the designated position as a whole. Then, the rotating wheel is turned to drive the threaded column to rotate in the threaded groove inside the column leg, and then the column leg is driven to move downward until the column leg touches the ground and lifts the roller away from the ground. At this time, the template is placed in the designated area. S5, then put the fixing sleeve on the outside of the preset steel bar, and then bring one end of the clamp close to the template, and adjust the distance between the lower threaded tube and the upper threaded tube by twisting the clamp until it is adjusted to a suitable length. At this time, the clamp can be clamped on the outside of the column hoop, and then tighten the clamp to complete the installation of the inclined support frame of the template; S6. Finally, the steel frame can be hoisted into the formwork, and then the formwork can be poured.

[0016] Compared with the prior art, the present invention provides a shear wall formwork and a prefabrication method thereof, which have the following beneficial effects: 1. The present invention reduces the punching of the pulling method by providing an integrated waterproof coiled material and a prefabricated shear wall casting device. The waterproof coiled material installation method provided by the present invention realizes its overall installation, thus ensuring the integrity of the shear wall facade; 2. The present invention tightens the formwork by fastening components arranged on both sides, which can replace the use of tension screws, and thus there is no need to open small holes, thereby ensuring the one-piece forming of the building. By twisting the threaded rods on both sides, the pressure plate will be driven close to the outside of the side plate, thereby tightening the side of the formwork in place, minimizing the gap between the formwork parts and reducing leakage.

[0017] 3. The present invention drives the threaded column to rotate inside the column leg by twisting the rotating wheel, which will cause the column leg to rise and fall inside the fixed tube. When the column leg moves upward, the roller will contact the ground, which will facilitate the movement of the entire template and reduce labor input. When the column leg moves upward, the column leg will contact the ground and lift the roller upward away from the ground, which will make the template stand on the ground. After that, the template is firmly positioned by the inclined support frame, and then pouring can be carried out. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 This is a schematic diagram of the structure of the mobile base of the present invention; Figure 3 This is a schematic diagram of the installation structure of the clamp of the present invention; Figure 4 It is a schematic diagram of the structure of the side pressure assembly of the present invention; Figure 5 It is a schematic diagram of the compression structure of the side pressure assembly structure of the present invention; Figure 6 This is a schematic diagram of the mobile driving structure of the present invention; Figure 7 This is an exploded schematic diagram of the mobile structure of the present invention; Figure 8 It is a schematic diagram of the side support structure of the present invention.

[0019] In the figure: 1. Installation base; 01. Winding roller; 02. Waterproof membrane; 03. Notch; 2. Template; 3. Installation slot; 4. Slot; 5. Slatted wood; 6. Side panel; 7. Column hoop; 8. Fastening assembly; 81. Fastening screw; 82. Turntable; 83. Connecting plate; 84. Abutment plate; 9. Side pressure assembly; 10. Side support assembly; 11. Connecting column; 12. Threaded sleeve; 13. Threaded rod; 14. Press plate; 15. Turn handle; 16. Fixed rod; 17. Fixed cylinder; 18. Support; 19. Roller; 20. Turntable; 21. Threaded column; 22. Column leg; 23. Slide; 24. Limit strip; 25. Notch; 26. Fixed seat; 27. Fixed sleeve; 28. Lower threaded cylinder; 29. ​​Bidirectional screw; 30. Hexagonal block; 31. Upper threaded cylinder; 32. Clamp. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] See also Figure 1-2A shear wall formwork comprises a mounting base 1 and a formwork 2, wherein a mounting groove 3 is provided inside the mounting base 1, and a waterproof coiled material winding assembly is provided inside the mounting base 1 between the mounting grooves 3 on both sides, a plurality of slots 4 are provided on one side of the inner wall of the mounting groove 3, the formwork 2 is inserted into the mounting groove 3, a plurality of slats 5 are installed against the outer side of the mounting groove 3, and the bottom ends of the slats 5 are inserted into the slots 4, side panels 6 are buckled at the left and right sides of the formwork 2, column hoops 7 are provided on both sides of the front and back of the slats 5, and fastening assemblies 8 are inserted in the left and right ends of the column hoops 7, the column hoops 7 are fastened to the formworks 2 on both sides by pulling the fastening assemblies 8, side pressure assemblies 9 for fastening the side panels 6 are provided between the left and right ends of the column hoops 7, a moving running component is provided at the bottom of the mounting base 1, and side support assemblies 10 for supporting the formwork are also provided on both sides of the shear wall formwork.

[0022] See also Figure 3 The waterproofing coiled material winding assembly includes a winding roller 01 which is rotatably connected to the inside of the mounting base 1, and the winding roller 01 is transmission-connected to an external motor. The outer side of the winding roller 01 is wound with a waterproofing coiled material 02. A slot 03 is provided on the surface of the mounting base, and one end of the waterproofing coiled material 02 passes through the slot 03. By pulling out the slot 03 and covering the inner side of the template, and then pouring, the waterproofing coiled material can be installed in one piece, thereby improving processing efficiency.

[0023] See also Figure 4-5 The side pressure assembly 9 includes a connecting column 11 inserted between the ends of the column hoops 7 on both sides. The two ends of the connecting column 11 are respectively inserted into the ends of the column hoops 7 on both sides. A threaded sleeve 12 is fixedly installed in the middle of the connecting column 11. A threaded rod 13 is inserted into the internal thread of the threaded sleeve 12. The end of the threaded rod 13 close to the side plate 6 is rotatably connected to a pressure plate 14. The pressure plate 14 abuts against the outer side of the side plate 6. A turning handle 15 is fixedly installed on the other end of the threaded rod 13. By twisting the turning handle 15, the threaded rod 13 will be driven to rotate inside the threaded sleeve 12, and then the pressure plate 14 will be driven close to the column hoop 7, so that the side plate 6 can be squeezed and supported, the stability of the formwork is improved, and leakage during pouring due to the large gap between the formworks is avoided as much as possible.

[0024] See also Figure 4-5 The fastening assembly 8 includes a fastening screw 81 threadedly inserted into the end of the connecting column 11, a rotating plate 82 is provided on the outer thread of the fastening screw 81, a connecting plate 83 is provided on the outer side of the fastening screw 81 and between the rotating plate 82 and the connecting column 11, an abutment plate 84 is slidably connected to the outer side of the column hoop 7, and one end of the connecting plate 83 is fixedly installed in the middle of the abutment plate 84, by twisting the rotating plate 82, the connecting plate 83 will be moved closer to the column hoop 7, and then the abutment plate 84 will be driven to squeeze the column hoop 7, thereby playing a role in fixing the template 2 in position.

[0025] See also Figure 6-7 The movable travel component includes a fixed rod 16 fixedly installed on the bottom side of the mounting base 1, a fixed cylinder 17 is fixedly installed at the bottom end of the fixed rod 16, a support 18 is fixedly installed on the outside of the fixed rod 16 and the fixed cylinder 17, a roller 19 is rotatably connected inside the support 18, a rotating wheel 20 is rotatably connected inside the fixed rod 16, a threaded column 21 is fixedly installed on the bottom side of the rotating wheel 20, a column leg 22 is slidably connected inside the fixed cylinder 17, two slide grooves 23 are opened on the outside of the column leg 22, a limit strip 24 is fixedly installed on the inner wall of the fixed cylinder 17, and the limit strip 24 is slidably inserted in the slide groove 23, and is slidably connected in the slide groove 23 through the limit strip 24, so as to limit the column leg 22 to the left and right, so that the column leg 22 can only slide vertically in the fixed cylinder 17; See also Figure 6-7 A threaded groove is provided inside the column leg 22, and the threaded column 21 is threadedly screwed and inserted into the threaded groove. A notch 25 is provided on the outer side of the fixing rod 16 to expose the rotating wheel 20. By screwing the rotating wheel 20, the threaded column 21 will be driven to rotate, and then the column leg 22 will be raised and lowered, so that the roller 19 can be pressed against the ground to facilitate the overall movement of the shear wall formwork, and the roller 19 can also be lifted away from the ground so that the formwork can stand stably on the ground.

[0026] See also Figure 8 The side support assembly 10 includes a fixed seat 26, one side of which is fixedly installed with a fixed sleeve 27, which is sleeved on the outside of the preset steel bar, and the top of the fixed seat 26 is rotatably connected with a lower threaded barrel 28, and the internal thread of the lower threaded barrel 28 is inserted with a bidirectional screw 29, and the middle of the bidirectional screw 29 is fixedly installed with a hexagonal block 30, and the outer thread of the upper half of the bidirectional screw 29 is sleeved with an upper threaded barrel 31, and the top of the upper threaded barrel 31 is rotatably connected with a clamping seat 32, which is fixedly installed on the outside of the column hoop 7. By twisting the hexagonal block 30, the bidirectional screw 29 will be driven to rotate in the lower threaded barrel 28 and the upper threaded barrel 31 respectively, so that the lower threaded barrel 28 will be moved closer or farther away from each other, thereby facilitating the adjustment of the diagonal brace length.

[0027] See also Figure 1-8 , a prefabrication method of shear wall formwork, specifically as follows: S1. First, the templates 2 are lifted by the mechanical arms and inserted downward into the installation grooves 3, and then the waterproofing membrane 02 is pulled upward to cover the inner side of the template 2, and then the side panels 6 are lifted and placed downward along the ends of the templates 2 on both sides, so that the templates 2 on both sides are buckled in the side panels 6, and the two sides of the wooden board are sealed; then the winding roller 01 is rotated by the external motor, the waterproofing membrane 02 is pulled out of the notch 03 and fixed to one side of the template with a clip, and the bottom of the waterproofing membrane is close to the template to ensure that the vertical surface of the poured concrete is flat; S2, then insert the slats 5 downward into the slats 5 in sequence in accordance with the outer wall of the template 2, then place the column hoop 7 against the surface of the slats 5, and then insert the fastening components 8 from both sides, and fasten the two sets of templates 2 by pulling the fastening components 8; S3. When tightening the assembly 8, first insert the connecting column 11 into the ends of the column hoops 7 on both sides, and then tighten the column hoops 7 on both sides to the outside of the template, so that the side pressure assembly 9 is installed on the outside of the side plate 6, and then the handle 15 is turned to drive the threaded rod 13 to rotate in the threaded sleeve 12, so that the pressure plate 14 is driven to be close to the outside of the side plate 6, so that the side of the template is tightened and positioned, and the gap of the template parts is minimized to reduce leakage; S4. The roller 19 supported at the bottom of the installation base 1 facilitates the movement of the template as a whole, and the template can be pushed to the designated position as a whole. Then, the rotating wheel 20 is turned to drive the threaded column 21 to rotate in the threaded groove inside the column leg 22, and then the column leg 22 is driven to move downward until the column leg 22 touches the ground and lifts the roller 19 away from the ground. At this time, the template is erected in the designated area. S5, then put the fixing sleeve 27 on the outside of the preset steel bar, and then put one end of the clamping seat 32 close to the template, and adjust the distance between the lower threaded tube 28 and the upper threaded tube 31 by twisting the clamping seat 32 until it is adjusted to a suitable length. At this time, the clamping seat 32 can be clamped on the outside of the column hoop 7, and then the clamping seat 32 is tightened to complete the installation of the inclined support frame of the template; S6. Finally, the steel frame can be hoisted into the formwork, and then the formwork can be poured.

[0028] In summary, the shear wall formwork and its prefabrication method, by tightening the formwork through the fastening components 8 arranged on both sides, can replace the use of tension screws, and thus there is no need to open small holes, thereby ensuring the one-piece forming of the building, and then by twisting the threaded rods 13 on both sides, the pressure plate 14 will be driven to be close to the outside of the side plate 6, thereby tightening the side of the formwork in place, minimizing the gap between the formwork parts and reducing leakage.

[0029] By turning the rotating wheel 20, the threaded column 21 is driven to rotate inside the column leg 22, which will cause the column leg 22 to rise and fall inside the fixed tube 17. When the column leg 22 moves upward, the roller 19 will abut the ground, which will facilitate the movement of the entire formwork and reduce labor input. When the column leg 22 moves upward, the column leg 22 will contact the ground and lift the roller 19 upward away from the ground, which will make the formwork stand on the ground. After that, the formwork is firmly positioned by the inclined support frame before pouring.

[0030] After pouring is completed, the precast shear wall is demolded after final setting, and the roll material at the bottom is cut with an engineering knife to ensure the next construction requirements.

[0031] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A shear wall formwork, comprising a mounting base (1) and a formwork (2), characterized in that: The installation base (1) is provided with an installation groove (3) inside, and a waterproofing coiled material reeling assembly is provided inside the installation base (1) between the installation grooves (3) on both sides. The installation base (1) is provided with a plurality of slots (4) on one side of the inner wall of the installation groove (3). The template (2) is inserted into the installation groove (3). A plurality of slats (5) are installed in contact with the outer side of the installation groove (3), and the bottom ends of the slats (5) are inserted into the slots (4). The template (2) is buckled with side panels (6) at the left and right sides. The front and back sides of the slatted wood (5) are both provided with column hoops (7), and the left and right ends of the column hoops (7) are provided with fastening components (8). The column hoops (7) are used to fasten and position the templates (2) on both sides by pulling the fastening components (8). Side pressure components (9) for fastening and positioning the side panels (6) are both provided between the left and right ends of the column hoops (7). A movable running component is provided at the bottom of the mounting base (1), and side support components (10) for supporting the templates are also provided on both sides of the shear wall templates. The waterproof coiled material reel assembly comprises a reel (01) rotatably connected to the inside of the mounting base (1), and the reel (01) is transmission-connected to an external motor, the outer side of the reel (01) is reeled with a waterproof coiled material (02), a notch (03) is provided on the surface of the mounting base, and one end of the waterproof coiled material (02) passes through the notch (03), and before pouring concrete, the waterproof coiled material is first stretched to the upper edge of the template and fixed by a clip; The side pressure assembly (9) comprises a connecting column (11) inserted between the ends of the column hoops (7) on both sides, and the two ends of the connecting column (11) are respectively inserted into the ends of the column hoops (7) on both sides, a threaded sleeve (12) is fixedly installed in the middle of the connecting column (11), and a threaded rod (13) is inserted into the internal thread of the threaded sleeve (12), and the end of the threaded rod (13) close to the side plate (6) is rotatably connected to a pressure plate (14), and the pressure plate (14) abuts against the outer side of the side plate (6), and the other end of the threaded rod (13) is fixedly installed with a rotating handle (15).

2. The shear wall formwork according to claim 1, characterized in that: The fastening assembly (8) comprises a fastening screw (81) threadedly inserted into the end of the connecting column (11); a rotating plate (82) is sleeved on the outer thread of the fastening screw (81); a connecting plate (83) is sleeved on the outer side of the fastening screw (81) and located between the rotating plate (82) and the connecting column (11); an abutment plate (84) is slidably connected to the outer side of the column hoop (7), and one end of the connecting plate (83) is fixedly mounted on the middle part of the abutment plate (84); by twisting the rotating plate (82), the connecting plate (83) is moved closer to the column hoop (7), thereby driving the abutment plate (84) to squeeze the column hoop (7), thereby playing a role in fastening and positioning the template (2).

3. The shear wall formwork according to claim 1, characterized in that: The movable travel component comprises a fixed rod (16) fixedly mounted on the bottom side of the mounting base (1); a fixed cylinder (17) is fixedly mounted on the bottom end of the fixed rod (16); a support (18) is fixedly mounted on the outside of the fixed rod (16) and the fixed cylinder (17); a roller (19) is rotatably connected inside the support (18); a rotating wheel (20) is rotatably connected inside the fixed rod (16); a threaded column (21) is fixedly mounted on the bottom side of the rotating wheel (20); and a column leg (22) is slidably connected inside the fixed cylinder (17).

4. The shear wall formwork according to claim 3, characterized in that: Two sliding grooves (23) are provided on the outer side of the column leg (22), a limiting strip (24) is fixedly installed on the inner wall of the fixing cylinder (17), and the limiting strip (24) is slidably inserted in the sliding groove (23).

5. The shear wall formwork according to claim 4, characterized in that: The column leg (22) is provided with a thread groove inside, the thread column (21) is threadedly screwed and inserted into the thread groove, and the outer side of the fixing rod (16) is provided with a notch (25) for exposing the rotating wheel (20).

6. The shear wall formwork according to claim 1, characterized in that: The side support assembly (10) comprises a fixing seat (26), a fixing sleeve (27) is fixedly mounted on one side of the fixing seat (26), a lower threaded barrel (28) is rotatably connected to the top of the fixing seat (26), a bidirectional screw (29) is inserted into the internal thread of the lower threaded barrel (28), a hexagonal block (30) is fixedly mounted in the middle of the bidirectional screw (29), an upper threaded barrel (31) is threadedly sleeved on the outer side of the upper half of the bidirectional screw (29), and a clamping seat (32) is rotatably connected to the top of the upper threaded barrel (31).

7. The shear wall formwork according to claim 6, characterized in that: The fixing sleeve (27) is sleeved on the outside of the preset steel bar, and the clamping seat (32) is fixedly installed on the outside of the column hoop (7).

8. The shear wall formwork prefabrication method according to any one of claims 1 to 7, characterized in that: The prefabrication method of the shear wall formwork is as follows: S1. First, the templates (2) are lifted by the mechanical arms and inserted downward into the installation grooves (3), and then the grooves (03) are pulled upward to cover the inner side of the templates (2). Then, the side panels (6) are lifted and placed downward along the ends of the templates (2) on both sides, so that the templates (2) on both sides are buckled into the side panels (6), and the two sides of the wooden board are sealed; then, the winding roller (01) is rotated by the external motor, the waterproofing membrane (02) is pulled out of the grooves (03) and fixed to one side of the template with a clip, and the bottom of the waterproofing membrane is close to the template to ensure that the vertical surface of the poured concrete is flat; S2, then the slats (5) are sequentially fitted to the outer wall of the template (2) and inserted downward into the slats (5), and then the column hoop (7) is pressed against the surface of the slats (5), and then the fastening components (8) are inserted from both sides, and the two sets of templates (2) are fastened and fixed in place by pulling the fastening components (8); S3. When the fastening assembly (8) is pulled and fastened, the connecting column (11) is first inserted into the ends of the column hoops (7) on both sides, and then after the column hoops (7) on both sides are pulled and fastened to the outside of the template, the side pressure assembly (9) is installed on the outside of the side plate (6), and then the handle (15) is turned to drive the threaded rod (13) to rotate in the threaded sleeve (12), so that the pressure plate (14) is driven to be close to the outside of the side plate (6), thereby tightening the side of the template, minimizing the gap between the template parts and reducing leakage; S4, and then, by supporting the roller (19) at the bottom of the installation base (1), the template is pushed to move as a whole, and the template is pushed to move as a whole to the designated position, and then the rotating wheel (20) is turned to drive the threaded column (21) to rotate in the threaded groove inside the column leg (22), and then the column leg (22) is driven to move downward until the column leg (22) contacts the ground and lifts the roller (19) away from the ground, and at this time, the template is made to stand in the designated area; S5, then put the fixing sleeve (27) on the outside of the preset steel bar, and then put one end of the clamping seat (32) close to the template, and adjust the distance between the lower threaded tube (28) and the upper threaded tube (31) by twisting the clamping seat (32) until it is adjusted to a suitable length. At this time, the clamping seat (32) can be clamped on the outside of the column hoop (7), and then the clamping seat (32) is tightened to complete the installation of the inclined support frame of the template; S6. Finally, the steel frame can be hoisted into the formwork, and then the formwork can be poured.

Citation Information

Patent Citations

  • Prefabricated column formwork structure and construction method thereof

    CN112388806A

  • Construction method of cast-in-place concrete waterproof closing head

    CN117231002A

  • Wall formwork mounting structure

    CN210713799U

  • Stable moving device for numerical control lathe

    CN214720617U

  • Formwork reinforcing structure for controlling forming quality of concrete at root of shear wall

    CN219219780U

Cited By

  • Anti-explosion fan capable of reducing noise

    CN120592888A