Transportation device and method for prefabricated inverted arch assembly

By designing an integrated connection and selective double-head docking transportation mode on the transport device of the prefabricated arch assembly, the problem of one-way movement of the transportation trajectory in the prior art is solved, and the transportation efficiency and stability of the prefabricated arch assembly are improved. .

CN118906947APending Publication Date: 2024-11-08THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411058246.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing transportation devices for prefabricated arch components can only perform one-way movement, resulting in multiple direction adjustment operations at high-speed road construction sites, affecting transportation efficiency.

Method used

A transportation device is designed to realize integrated connection and selective double-head docking by placing the first and second semi-trailer on the end of the prefabricated arch assembly and a docking beam assembly between the two. Ensure that the transportation trajectory is in a straight-line motion state.

Benefits of technology

The transportation efficiency of the prefabricated arch assembly is improved, transportation operation is optimized, steering operation is reduced, and transportation stability and safety is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118906947A_ABST
    Figure CN118906947A_ABST
Patent Text Reader

Abstract

A transporting device and method for a prefabricated inverted arch assembly comprises a first semitrailer (1) placed on one end of the prefabricated inverted arch assembly, a second semitrailer (2) placed on the other end of the prefabricated inverted arch assembly, and a butt-joint beam assembly arranged between the first semitrailer (1) and the second semitrailer (2). The first semitrailer (1) and the second semitrailer (2) are integrally connected, selective double-end butt joint with a tractor is achieved through the first semitrailer (1) and the second semitrailer (2), and the conveying track of the prefabricated inverted arch assembly is in a linear motion state; the technical problem that an engineering semitrailer is used for transporting the prefabricated inverted arch assembly is solved, and therefore the transportation efficiency of the prefabricated inverted arch assembly is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a transport device and method, in particular to a transport device and method for prefabricated inverted arch components. Background Art

[0002] In order to improve the construction efficiency of high-speed tunnels, in accordance with geological conditions, the high-speed tunnel pavement support body is obtained by assembling an arch support assembly and a prefabricated inverted arch assembly. Since the prefabricated inverted arch assembly serves as a roadbed to support the high-speed pavement, during the construction of the high-speed pavement, the prefabricated inverted arch assembly needs to be transported from a prefabricated beam factory to the high-speed pavement construction site. Therefore, the transportation device for the prefabricated inverted arch assembly is an important construction device. In the existing transportation devices for the prefabricated inverted arch assembly, the prefabricated inverted arch assembly is still transported by an engineering semi-trailer. Since the engineering semi-trailer can only move in one direction, it is limited by the high-speed pavement construction site, and the prefabricated inverted arch assembly needs to be adjusted several times, thereby affecting the transportation efficiency of the prefabricated inverted arch assembly. The present invention uses the technical feature of making the transport track of the prefabricated inverted arch assembly in a linear motion state to effectively explore and study the technical problem of using an engineering semi-trailer to transport the prefabricated inverted arch assembly at the technical level. The statements here only provide background technology related to the present invention and do not necessarily constitute prior art. The technical solution of the present invention is made based on the technical briefing document provided by the applicant on April 22, 2024, which solves actual technical problems in the work process, and the existing technical problems, technical features and technical effects in the similar patent literature and background technology obtained through retrieval. Summary of the invention

[0003] The object of the invention is a transport device for prefabricated invert assemblies, The object of the invention is a method for transporting prefabricated invert assemblies.

[0004] In order to overcome the above technical disadvantages, an object of the present invention is to provide a transport device and method for prefabricated inverted arch assemblies, thereby improving the transport efficiency of the prefabricated inverted arch assemblies.

[0005] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a transportation device for prefabricated inverted arch assemblies, comprising a first semi-trailer placed on one end of the prefabricated inverted arch assembly, a second semi-trailer placed on the other end of the prefabricated inverted arch assembly, and a docking beam assembly arranged between the first semi-trailer and the second semi-trailer.

[0006] Due to the design of the first semi-trailer, the second semi-trailer and the docking beam assembly, the first semi-trailer and the second semi-trailer are integratedly connected through the docking beam assembly, and selective double-end docking with the tractor is achieved through the first semi-trailer and the second semi-trailer, so that the transportation track of the prefabricated inverted arch assembly is in a linear motion state, which solves the technical problem of using engineering semi-trailers to transport the prefabricated inverted arch assemblies, thereby improving the transportation efficiency of the prefabricated inverted arch assemblies.

[0007] The present invention is designed to connect the first semitrailer, the second semitrailer and the docking beam assembly to each other in a manner that the transport track of the prefabricated inverted arch assembly is in a linear motion state.

[0008] The present invention is designed to connect the first semi-trailer and the second semi-trailer with the docking beam assembly in a selective double-end docking mode with the tractor.

[0009] The present invention designs that the butt-jointed beam assembly is configured to include an intermediate beam and a connecting screw rod.

[0010] The technical effects of the above four technical solutions are: realizing direct tractor connection of the first semi-trailer or the second semi-trailer on the transport track of the prefabricated inverted arch assembly, eliminating the need for overall steering operation of the first semi-trailer and the second semi-trailer, and optimizing the transport operation.

[0011] The present invention is designed to further include a first accessory device, and the first accessory device is respectively arranged on the first semi-trailer and the second semi-trailer, and the first accessory device is arranged as a transverse tightening component.

[0012] The present invention is designed to further include a second accessory device, and the second accessory device is respectively arranged on the first semi-trailer and the second semi-trailer, and the second accessory device is arranged as a vertical clamping assembly.

[0013] The present invention is designed to further include a third accessory device, and the third accessory device is respectively arranged on the first semi-trailer and the second semi-trailer, and the third accessory device is arranged as a rope tensioning assembly.

[0014] The present invention is designed to further include a fourth accessory device, and the fourth accessory device is respectively arranged on the first semi-trailer and the second semi-trailer, and the fourth accessory device is arranged to include a first pressure sensor and a second pressure sensor. The present invention is designed to further include a fifth accessory device, and the fifth accessory device is respectively arranged on the first semi-trailer and the second semi-trailer, and the fifth accessory device is arranged as an indicator light.

[0015] The technical effects of the above five technical solutions are: realizing the integrated installation of other components, and expanding the technical effects of the present invention.

[0016] The present invention is designed to provide an intermediate beam between the first semi-trailer and the second semi-trailer, connecting screws are respectively provided between the intermediate beam and the first semi-trailer and the second semi-trailer, and a transverse tightening assembly, a vertical clamping assembly, a rope tensioning assembly and an indicator light are respectively provided on the first semi-trailer and the second semi-trailer, a first pressure sensor is provided on the first semi-trailer, and a second pressure sensor is provided on the second semi-trailer.

[0017] The technical effect of the above technical scheme is that the basic technical scheme of the present invention is formed by the first semi-trailer, the second semi-trailer, the middle beam, the connecting screw, the transverse tightening assembly, the vertical clamping assembly, the rope tensioning assembly, the first pressure sensor, the second pressure sensor and the indicator light, thereby solving the technical problem of the present invention.

[0018] The present invention is designed that step surface bodies are arranged on the left and right end surfaces of the prefabricated inverted arch assembly and a reserved hole body is arranged in the prefabricated inverted arch assembly, one side portion of the lower end surface of the prefabricated inverted arch assembly is arranged to be contact-connected with a first semi-trailer and a first pressure sensor and the other side portion of the lower end surface of the prefabricated inverted arch assembly is arranged to be contact-connected with a second semi-trailer and a second pressure sensor, the left and right side surfaces of the prefabricated inverted arch assembly are respectively arranged to be contact-connected with a transverse pressing assembly and the upper end surface of the step surface body is arranged to be contact-connected with a vertical pressing assembly, the reserved hole body is arranged to be connected with a rope tensioning assembly and the step surface body is arranged to be an L-shaped end head body, the reserved hole body is arranged to be a circular hole and the reserved hole bodies are arranged to be spaced and distributed along the transverse center line of the prefabricated inverted arch assembly.

[0019] The technical effect of the above technical solution is that it realizes the setting as a roadbed support body in a high-speed tunnel.

[0020] The present invention designs that the first semi-trailer and the second semi-trailer are respectively configured to include a frame part, a kingpin part, a running gear part, a lower vertical beam part, a cross beam part, an upper vertical beam part and a hook part. An accommodation groove body Ⅰ is provided in the middle part of the upper end face of the frame part. An accommodation groove body Ⅱ is provided in the vertical end face part of the accommodation groove body Ⅰ, and an accommodation groove body Ⅲ is provided in the rear side part of the upper end face of the frame part. The front side part of the lower end face of the frame part is configured to be connected to the kingpin part, and the middle part of the lower end face of the frame part is configured to be connected to the running gear part. The rear side part of the lower end face of the frame part is configured to be connected to the inner end face part of the lower vertical beam part, and the upper part of the outer side face of the lower vertical beam part is configured to be connected to the inner end face part of the cross beam part. The middle part of the upper end face of the frame part is configured to be connected to the lower end face part of the upper vertical beam part, and the front and rear side face parts of the frame part are configured to be connected to the inner end face parts of the hook part. The frame part is configured as a rectangular frame body, the kingpin part is configured as a semi-trailer kingpin, the running gear part is configured as an assembly having leaf springs, axles and tires, and the leaf springs of the running gear part are configured to be connected to the frame part. The lower vertical beam part is configured as a rectangular strip body having threaded hole bodies, and the threaded hole bodies of the lower vertical beam part are configured to be connected to connecting screws. The cross beam part and the upper vertical beam part are respectively configured as rectangular strip bodies, and the hook part is configured as a U-shaped block body. The accommodation groove body Ⅰ is configured as a dovetail groove body, the accommodation groove body Ⅱ is configured as a blind hole, and the accommodation groove body Ⅲ is configured as a C-shaped groove body.

[0021] The present invention designs that the lower vertical beam part is configured to be embedded-connected to the middle beam and is configured to be threadedly connected to the connecting screw. The cross beam part is respectively configured to be sleeved and connected to the first pressure sensor and the second pressure sensor, and the left side face of the upper vertical beam part is configured to be connected to the indicator light. The right side face of the upper vertical beam part and the accommodation groove body Ⅰ are respectively configured to be connected to the vertical pressing assembly, and the accommodation groove body Ⅱ is configured to be connected to the horizontal jacking assembly. The hook part is configured to be tied and connected to the rope tensioning assembly, and the accommodation groove body Ⅲ is configured to be in contact connection with the precast inverted arch assembly.

[0022] The technical effects of the above two technical solutions are as follows: The docking connection of the semi-trailer kingpin is realized, the rapid connection of the power chassis is improved, the support of the accommodation groove body Ⅲ for the precast inverted arch assembly is realized, and the support stability performance for the precast inverted arch assembly is improved.

[0023] The present invention designs that receiving holes are respectively arranged at the ends of the beam part of the middle beam, and a receiving groove body Ⅳ is arranged at one end of the beam part. A receiving groove body Ⅴ is arranged at the other end of the beam part. The receiving groove body Ⅳ is arranged to be in a receiving connection with the first semi-trailer, the receiving groove body Ⅴ is arranged to be in a receiving connection with the second semi-trailer, and the receiving hole is arranged to be in a connection with a connecting screw. The outer side end of the beam part is arranged to be in a contact connection with the connecting screw, and the beam part is arranged as a rectangular strip. The receiving groove body Ⅳ and the receiving groove body Ⅴ are respectively arranged as U-shaped groove bodies, and the receiving hole is arranged as a hole body. One of the receiving holes is arranged to be distributed corresponding to the receiving groove body Ⅳ, and one of the receiving holes is arranged to be distributed corresponding to the receiving groove body Ⅴ.

[0024] The technical effect of the above technical solution is that: the receiving connection by double U-shaped groove bodies is realized, and the connection strength between the first semi-trailer and the second semi-trailer is improved.

[0025] The present invention designs that the connecting screw is arranged as a hexagonal bolt, and the inner end of the connecting screw is arranged to be in a penetrating connection with the middle beam. The inner ends of the connecting screw are respectively arranged to be in a threaded connection with the first semi-trailer and the second semi-trailer, and the flange body of the connecting screw is arranged to be in a contact connection with the middle beam.

[0026] The technical effect of the above technical solution is that: the bolt fixation between the middle beam and the first semi-trailer and the second semi-trailer is realized.

[0027] The present invention designs that the transverse tightening assembly is arranged to include a thrust telescopic rod part Ⅰ and a block part Ⅰ. The telescopic end of the thrust telescopic rod part Ⅰ is arranged to be in a rotational connection with the middle part of the inner end face of the block part Ⅰ. The outer shell of the thrust telescopic rod part Ⅰ is respectively arranged to be in an embedded connection with the first semi-trailer and the second semi-trailer, and the outer end face part of the block part Ⅰ is arranged to be in a contact connection with the left and right side faces of the precast inverted arch assembly. The thrust telescopic rod part Ⅰ is arranged as an electric telescopic rod with a convex-shaped telescopic end, and the block part Ⅰ is arranged as a ∧-shaped seat body with a convex-shaped blind hole in the middle of the inner end face. The convex-shaped blind hole of the block part Ⅰ is arranged to be in a connection with the telescopic end of the thrust telescopic rod part Ⅰ.

[0028] The technical effect of the above technical solution is that: the clamping connection of the precast inverted arch assembly between the first semi-trailer and the second semi-trailer is realized.

[0029] The present invention is designed that the vertical clamping assembly is configured to include a thrust telescopic rod part II, a block part II, a thrust telescopic rod part III and a block part III, and the outer end of the block part II is configured to be accommodated and connected to the outer shell of the thrust telescopic rod part III, the telescopic end head of the thrust telescopic rod part III is configured to be rotatably connected to the middle part of the upper end face of the block part III, the telescopic end head of the thrust telescopic rod part II is configured to be rotatably connected to the inner end face part of the block part II, and the outer shell of the thrust telescopic rod part II is respectively configured to be connected to the first semi-trailer and the second semi-trailer, and the block part II is respectively configured to be connected to the first semi-trailer and the first semi-trailer. The two semi-trailers are slidably connected and the lower end surface of block part III is arranged to be contact-connected with the step surface of the prefabricated inverted arch assembly, the thrust telescopic rod part II and the thrust telescopic rod part III are respectively arranged to be electric telescopic rods with convex telescopic ends, and the block part II is arranged to be a dovetail seat-shaped body with a convex blind hole on the inner end surface, the convex blind hole of block part II is arranged to be connected with the telescopic end of thrust telescopic rod part II, and the block part III is arranged to be a seat-shaped body with a convex blind hole in the middle part of the end surface, and the convex blind hole of block part III is arranged to be connected with the telescopic end of thrust telescopic rod part III.

[0030] The technical effect of the above technical solution is that: the prefabricated inverted arch assembly is connected by a pressure plate on the first semi-trailer and the second semi-trailer.

[0031] The present invention is designed that the rope tensioning assembly is configured to include a rod portion and a rope portion, and the end of the rod portion is configured to be connected to the inner end of the rope portion, the outer end of the rope portion is configured to be connected to the first semi-trailer and the second semi-trailer respectively, and the rod portion is configured to be connected to the reserved hole body of the prefabricated inverted arch assembly in a through-type manner, the rod portion is configured to be a rod-shaped body with a mounting hole body at the end, and the rope portion is configured to be a textile rope, and the mounting hole body of the rod portion is configured to be connected to the rope portion.

[0032] The technical effect of the above technical solution is that: the rope-tensioning connection of the prefabricated inverted arch assembly on the first semitrailer and the second semitrailer is realized.

[0033] The present invention is designed that the first pressure sensor and the second pressure sensor are respectively configured as diffused silicon pressure transmitters and the shell of the first pressure sensor is configured to be embeddedly connected to the first semi-trailer, the shell of the second pressure sensor is configured to be embeddedly connected to the second semi-trailer and the contacts of the first pressure sensor and the contacts of the second pressure sensor are respectively configured to be contact-connected to the lower end surface portion of the prefabricated invert arch assembly.

[0034] The technical effect of the above technical solution is that: load distribution detection of the prefabricated inverted arch assembly is realized on the first semi-trailer and the second semi-trailer.

[0035] The present invention designs that the indicator light is configured as an LED lighting fixture and the housing of the indicator light is configured to be connected to the first semi-trailer and the second semi-trailer respectively.

[0036] The technical effect of the above technical solution is that lighting processing is achieved during the transportation of the prefabricated inverted arch components.

[0037] The present invention is designed that the first semi-trailer and the second semi-trailer and the middle beam and the connecting screw are arranged to be distributed in a butt-connected manner, and the first semi-trailer, the second semi-trailer, the middle beam and the connecting screw and the transverse tightening assembly, the vertical pressing assembly and the rope tensioning assembly are arranged to be distributed in a fixed connection manner, the first semi-trailer, the second semi-trailer, the middle beam and the connecting screw and the first pressure sensor and the second pressure sensor are arranged to be distributed in a manner of picking up weight signals, and the first semi-trailer, the second semi-trailer, the middle beam and the connecting screw and the indicator light are arranged to be distributed in a front lighting manner.

[0038] The present invention is designed that an intermediate beam and two connecting screws are arranged to form a group of butt-connecting components, multiple groups of butt-connecting components are arranged between a first semi-trailer and a second semi-trailer, a transverse tightening assembly, a vertical pressing assembly, a first pressure sensor and a second pressure sensor are arranged to be spaced and distributed along the longitudinal center line of the first semi-trailer and along the longitudinal center line of the second semi-trailer, respectively, at least one rope tensioning assembly is arranged between the first semi-trailer and the prefabricated inverted arch assembly, at least another rope tensioning assembly is arranged between the second semi-trailer and the prefabricated inverted arch assembly, the rope portion is arranged to be connected to the hook portion, the thrust telescopic rod portion II is arranged to be connected to the upper vertical beam portion, the block portion II is arranged to be connected to the accommodating tank body I, the thrust telescopic rod portion I is arranged to be connected to the accommodating tank body II, and the accommodating tank body IV and the accommodating tank body V are respectively arranged to be connected to the lower vertical beam portion.

[0039] The present invention designs a method for transporting prefabricated inverted arch components, the steps of which are: a first semi-trailer and a second semi-trailer are connected in an integrated manner by a docking beam component, the first semi-trailer and the second semi-trailer are selectively docked with a tractor at two ends, and the transport track of the prefabricated inverted arch components is placed in a linear motion state.

[0040] The technical effect of the above technical solution is: highlighting the technical feature of making the transportation track of the prefabricated inverted arch assembly in a linear motion state, and introducing the application in the technical field of the transportation method for the prefabricated inverted arch assembly.

[0041] The present invention is designed, and the steps are: when the prefabricated inverted arch assembly needs to be transported, according to the specifications of the prefabricated inverted arch assembly, an intermediate beam of corresponding length is selected, the accommodating tank body IV is placed on the lower vertical beam part located on the first semitrailer, the accommodating tank body V is placed on the lower vertical beam part located on the second semitrailer, the connecting screw rod is placed in the accommodating hole body, the connecting screw rod is rotated in the threaded hole body of the lower vertical beam part, the flange body of the connecting screw rod acts on the outer side end of the beam part, so that the first semitrailer and the second semitrailer are connected together, the semitrailer tractor is connected to the traction pin part located on the first semitrailer or the traction pin part located on the second semitrailer, and the first semitrailer and the second semitrailer are connected together through the semitrailer tractor. Arriving at the prefabricated beam factory, the prefabricated inverted arch assembly is hoisted by hoisting, and the first semi-trailer and the second semi-trailer are placed on the lower end surface of the prefabricated inverted arch assembly by a semi-trailer tractor, and one side of the lower end surface of the prefabricated inverted arch assembly is placed on the receiving tank body III and the first pressure sensor located on the first semi-trailer, and the other side of the lower end surface of the prefabricated inverted arch assembly is placed on the prefabricated inverted arch assembly and the second pressure sensor located on the second semi-trailer, and the comparison difference of the weight signal of the prefabricated inverted arch assembly picked up by the first pressure sensor and the second pressure sensor is used as a reference signal, and the first semi-trailer and the second semi-trailer are adjusted at the position of the lower end surface of the prefabricated inverted arch assembly, so as to place the prefabricated inverted arch assembly on the first semi-trailer and the second semi-trailer. At the middle position between the trailers, the thrust telescopic rod part I is in an extended state, the outer end surface of the block part I acts on the left and right side surfaces of the prefabricated inverted arch assembly, so that the thrust telescopic rod part II is in an extended state, the block part II moves outward on the accommodating tank body I, so that the thrust telescopic rod part III is in an extended state, the lower end surface of the block part III acts on the step surface body of the prefabricated inverted arch assembly, the rod part is placed in the reserved hole body of the prefabricated inverted arch assembly, the outer end of the rope part is tied together with the hook part, so that the prefabricated inverted arch assembly is installed on the prefabricated inverted arch assembly, and the first semi-trailer and the second semi-trailer arrive at the high-speed road construction site through the semi-trailer tractor, and the semi-trailer tractor is connected to the traction pin part located on the first semi-trailer or the hook part located on the first semi-trailer. The traction pin part on the second semi-trailer is connected in different ways, the prefabricated inverted arch assembly is placed on the lifting station, the prefabricated inverted arch assembly is connected with the lifting device, the outer end of the rope part is separated from the hook part, and the rod part is taken out from the reserved hole body of the prefabricated inverted arch assembly, so that the thrust telescopic rod part III is in a retracted state, the lower end surface of the block part III is separated from the step surface body of the prefabricated inverted arch assembly, so that the thrust telescopic rod part II is in a retracted state, the block part II is moved inward on the accommodating tank body I, so that the thrust telescopic rod part I is in a retracted state, the outer end surface of the block part I is separated from the left and right side parts of the prefabricated inverted arch assembly, the prefabricated inverted arch assembly is lifted from the accommodating tank body III by the lifting device, and the first semi-trailer and the second semi-trailer are moved out from the lifting station.

[0042] The technical effect of the above technical solution is: realizing the transportation operation of the prefabricated inverted arch assembly from the prefabricated beam factory to the highway road construction site, and realizing the fixing operation of the prefabricated inverted arch assembly in the transportation state.

[0043] In the present technical scheme, the first semi-trailer and the second semi-trailer are basic components and are also the necessary technical features of the present invention; the middle beam, connecting screw, transverse clamping assembly, vertical clamping assembly, rope tensioning assembly, first pressure sensor, second pressure sensor and indicator light are functional components and are the features for realizing other technical effects of the present invention; the designs of the technical features such as the step surface body, reserved hole body, frame part, traction pin part, walking system part, lower vertical beam part, cross beam part, upper vertical beam part, hook part, accommodating trough body I, accommodating trough body II, accommodating trough body III, beam part, accommodating trough body IV, accommodating trough body V, accommodating hole body, thrust telescopic rod part I, block part I, thrust telescopic rod part II, block part II, thrust telescopic rod part III, block part III, rod part and rope part are technical features that comply with the Patent Law and its implementing rules.

[0044] In the present technical solution, the first semi-trailer and the second semi-trailer are used to make the transport track of the prefabricated inverted arch assembly in a linear motion state.

[0045] In the present technical solution, the first semi-trailer, the second semi-trailer and the docking beam assembly that make the transport track of the prefabricated inverted arch assembly in a linear motion state are important technical features. In the technical field of transport devices and methods for prefabricated inverted arch assemblies, it has novelty, creativity and practicality. The terms in the present technical solution can be explained and understood using patent documents in this technical field. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0047] Figure 1 is a schematic diagram of a transport device for prefabricated inverted arch assemblies according to the present invention, First semi-trailer -1, second semi-trailer -2, middle beam -3, connecting screw -4, transverse jacking assembly -5, vertical clamping assembly -6, rope tensioning assembly -7, first pressure sensor -8, second pressure sensor -9\indicator light -91, step surface body -20, reserved hole body -30, frame part -11, traction pin part -12, walking system part -13, lower vertical beam part -14, cross beam part -15, upper Vertical beam part-16, hook part-10, accommodating trough body I-17, accommodating trough body II-18, accommodating trough body III-19, beam part-31, accommodating trough body IV-32, accommodating trough body V-33, accommodating hole body-34, thrust telescopic rod part I-51, block part I-52, thrust telescopic rod part II-61, block part II-62, thrust telescopic rod part III-63, block part III-64, rod part-71, rope part-72. DETAILED DESCRIPTION

[0048] According to the Examination Guidelines, terms such as “having”, “including” and “comprising” used in the present invention should be understood as not dispensing with the existence or addition of one or more other elements or combinations thereof.

[0049] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0050] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0051] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other. In addition, unless otherwise specified, the equipment and materials used in the following examples are commercially available. If the processing conditions are not clearly stated, please refer to the purchased product manual or proceed according to conventional methods in the art.

[0052] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0053] A transport device for prefabricated invert components, Figure 1 This is the first embodiment of the present invention, which is specifically described in conjunction with the accompanying drawings. It includes a first semi-trailer 1, a second semi-trailer 2, an intermediate beam 3, a connecting screw 4, a transverse tightening assembly 5, a vertical clamping assembly 6, a rope tensioning assembly 7, a first pressure sensor 8, a second pressure sensor 9 and an indicator light 91, and an intermediate beam 3 is arranged between the first semi-trailer 1 and the second semi-trailer 2, connecting screws 4 are respectively arranged between the intermediate beam 3 and the first semi-trailer 1 and the second semi-trailer 2, and a transverse tightening assembly 5, a vertical clamping assembly 6, a rope tensioning assembly 7 and an indicator light 91 are respectively arranged on the first semi-trailer 1 and the second semi-trailer 2, a first pressure sensor 8 is arranged on the first semi-trailer 1, and a second pressure sensor 9 is arranged on the second semi-trailer 2.

[0054] In the present embodiment, step surface bodies 20 are provided on the left and right end surfaces of the prefabricated inverted arch assembly and reserved hole bodies 30 are provided in the prefabricated inverted arch assembly, one side portion of the lower end surface of the prefabricated inverted arch assembly is arranged to be contact-connected with the first semi-trailer 1 and the first pressure sensor 8 and the other side portion of the lower end surface of the prefabricated inverted arch assembly is arranged to be contact-connected with the second semi-trailer 2 and the second pressure sensor 9, the left and right side surfaces of the prefabricated inverted arch assembly are respectively arranged to be contact-connected with the transverse clamping assembly 5 and the upper end surface of the step surface body 20 is arranged to be contact-connected with the vertical clamping assembly 6, the reserved hole bodies 30 are arranged to be connected with the rope tensioning assembly 7 and the step surface body 20 is arranged to be an L-shaped end head body, the reserved hole bodies 30 are arranged to be circular holes and the reserved hole bodies 30 are arranged to be arranged and distributed at intervals along the transverse center line of the prefabricated inverted arch assembly.

[0055] The technical effects of the above two technical solutions are: they are used as components of the roadbed of a high-speed road surface.

[0056] In this embodiment, the first semi-trailer 1 and the second semi-trailer 2 are respectively configured to include a frame part 11, a kingpin part 12, a running gear part 13, a lower vertical beam part 14, a cross beam part 15, an upper vertical beam part 16, and a hook part 10. An accommodation groove body Ⅰ17 is provided in the middle part of the upper end face of the frame part 11. An accommodation groove body Ⅱ18 is provided on the vertical end face part of the accommodation groove body Ⅰ17, and an accommodation groove body Ⅲ19 is provided at the rear side part of the upper end face of the frame part 11. The front side part of the lower end face of the frame part 11 is configured to be connected to the kingpin part 12, and the middle part of the lower end face of the frame part 11 is configured to be connected to the running gear part 13. The rear side part of the lower end face of the frame part 11 is configured to be connected to the inner end face part of the lower vertical beam part 14, and the upper part of the outer side face of the lower vertical beam part 14 is configured to be connected to the inner end face part of the cross beam part 15. The middle part of the upper end face of the frame part 11 is configured to be connected to the lower end face part of the upper vertical beam part 16, and the front and rear side face parts of the frame part 11 are configured to be connected to the inner end face parts of the hook part 10. The lower vertical beam part 14 is configured to be embeddedly connected to the intermediate beam 3 and is configured to be threadedly connected to the connecting screw 4. The cross beam part 15 is respectively configured to be sleeved and connected to the first pressure sensor 8 and the second pressure sensor 9, and the left side face of the upper vertical beam part 16 is configured to be connected to the indicator light 91. The right side face of the upper vertical beam part 16 and the accommodation groove body Ⅰ17 are respectively configured to be connected to the vertical pressing assembly 6, and the accommodation groove body Ⅱ18 is configured to be connected to the horizontal pressing assembly 5. The hook part 10 is configured to be tied and connected to the rope tensioning assembly 7, and the accommodation groove body Ⅲ19 is configured to be in contact connection with the precast inverted arch assembly. The frame part 11 is configured as a rectangular frame body, the kingpin part 12 is configured as a semi-trailer kingpin, the running gear part 13 is configured as an integrated body having spring plates, axles, and tires, and the spring plates of the running gear part 13 are configured to be connected to the frame part 11. The lower vertical beam part 14 is configured as a rectangular strip body having a threaded hole body, and the threaded hole body of the lower vertical beam part 14 is configured to be connected to the connecting screw 4. The cross beam part 15 and the upper vertical beam part 16 are respectively configured as rectangular strip bodies, and the hook part 10 is configured as a U-shaped block body. The accommodation groove body Ⅰ17 is configured as a dovetail groove body, the accommodation groove body Ⅱ18 is configured as a blind hole, and the accommodation groove body Ⅲ19 is configured as a C-shaped groove body.

[0057] Through the first semi-trailer 1 and the second semi-trailer 2, a supporting connection point for the middle beam 3, the connecting screw 4, the transverse clamping assembly 5, the vertical clamping assembly 6, the rope tensioning assembly 7, the first pressure sensor 8, the second pressure sensor 9 and the indicator light 91 is formed. The lower vertical beam part 14 realizes the connection with the middle beam 3, realizes the connection with the connecting screw 4, realizes the connection with the transverse clamping assembly 5 by the receiving tank body II 18, realizes the connection with the vertical clamping assembly 6 by the upper vertical beam part 16 and the receiving tank body I 17, and realizes the connection with the rope tensioning assembly 7 by the hook part 10. The cross beam 15 realizes connection with the first pressure sensor 8 and the second pressure sensor 9. The upper vertical beam 16 realizes connection with the indicator light 91. The frame 11 and the accommodating tank III 19 realize connection with the prefabricated inverted arch assembly. The traction pin 12 realizes connection with the semi-trailer tractor. The running system 13 realizes motion support processing for the frame 11. The technical purpose is to serve as a supporting carrier for the lateral clamping assembly 5, the vertical clamping assembly 6, the first pressure sensor 8, the second pressure sensor 9 and the indicator light 91.

[0058] In this embodiment, accommodating holes 34 are respectively provided on the ends of the beam portion 31 of the middle beam 3 and an accommodating groove body IV32 is provided on one of the ends of the beam portion 31, an accommodating groove body V33 is provided on the other end of the beam portion 31 and the accommodating groove body IV32 is arranged to be accommodatingly connected to the first semi-trailer 1, the accommodating groove body V33 is arranged to be accommodatingly connected to the second semi-trailer 2 and the accommodating hole body 34 is arranged to be connected to the connecting screw 4, the outer side surface end of the beam portion 31 is arranged to be contact-connected to the connecting screw 4 and the beam portion 31 is arranged to be a rectangular strip body, the accommodating groove body IV32 and the accommodating groove body V33 are respectively arranged to be U-shaped groove bodies and the accommodating hole body 34 is arranged to be a hole-shaped body, one of the accommodating hole bodies 34 is arranged to be distributed corresponding to the accommodating groove body IV32 and one of the accommodating hole bodies 34 is arranged to be distributed corresponding to the accommodating groove body V33.

[0059] Through the middle beam 3, a supporting connection point for the first semi-trailer 1, the second semi-trailer 2 and the connecting screw 4 is formed. The connection with the first semi-trailer 1 is realized by the beam portion 31 and the accommodating trough body IV32. The connection with the second semi-trailer 2 is realized by the beam portion 31 and the accommodating trough body V33. The connection with the connecting screw 4 is realized by the beam portion 31 and the accommodating hole body 34. The technical purpose is to be used as one of the components for connecting the first semi-trailer 1 and the second semi-trailer 2.

[0060] In this embodiment, the connecting screw 4 is configured as a hexagonal bolt and the inner end of the connecting screw 4 is configured to be connected to the middle beam 3 in a through-type manner, the inner end of the connecting screw 4 is respectively configured to be threadedly connected to the first semi-trailer 1 and the second semi-trailer 2 and the flange body of the connecting screw 4 is configured to be connected to the middle beam 3 in a contact manner.

[0061] By connecting the screw rod 4, a supporting connection point for the first semi-trailer 1, the second semi-trailer 2 and the middle beam 3 is formed. The connecting screw rod 4 realizes the connection with the first semi-trailer 1, the connection with the second semi-trailer 2, and the connection with the middle beam 3. Its technical purpose is to serve as the second component for connecting the first semi-trailer 1 and the second semi-trailer 2.

[0062] In this embodiment, the transverse tightening assembly 5 is configured to include a thrust telescopic rod portion Ⅰ51 and a block portion Ⅰ52, and the telescopic end of the thrust telescopic rod portion Ⅰ51 is configured to be rotatably connected to the middle part of the inner end face of the block portion Ⅰ52, the outer shell of the thrust telescopic rod portion Ⅰ51 is respectively configured to be embeddedly connected to the first semi-trailer 1 and the second semi-trailer 2, and the outer end face portion of the block portion Ⅰ52 is configured to be contact-connected to the left and right side faces of the prefabricated inverted arch assembly, the thrust telescopic rod portion Ⅰ51 is configured to be an electric telescopic rod with a convex telescopic end and the block portion Ⅰ52 is configured to be a ∧-shaped seat body with a convex blind hole in the middle part of the inner end face, and the convex blind hole of the block portion Ⅰ52 is configured to be connected to the telescopic end of the thrust telescopic rod portion Ⅰ51.

[0063] Through the transverse clamping component 5, a supporting connection point for the first semi-trailer 1 and the second semi-trailer 2 is formed. The transverse clamping component 5 realizes the connection with the first semi-trailer 1 and the second semi-trailer 2. The block part I52 realizes the connection with the prefabricated inverted arch assembly. Its technical purpose is to be used as a component for clamping the prefabricated inverted arch assembly.

[0064] In this embodiment, the vertical clamping assembly 6 is configured to include a thrust telescopic rod portion II 61, a block portion II 62, a thrust telescopic rod portion III 63 and a block portion III 64, and the outer end portion of the block portion II 62 is configured to be accommodated and connected to the outer shell of the thrust telescopic rod portion III 63, the telescopic end head of the thrust telescopic rod portion III 63 is configured to be rotatably connected to the middle portion of the upper end face of the block portion III 64, the telescopic end head of the thrust telescopic rod portion II 61 is configured to be rotatably connected to the inner end face portion of the block portion II 62, and the outer shell of the thrust telescopic rod portion II 61 is respectively configured to be connected to the first semi-trailer 1 and the second semi-trailer 2, and the block portion II 62 is respectively configured to be connected to the first semi-trailer The vehicle 1 is slidably connected to the second semi-trailer 2 and the lower end surface of the block part III 64 is arranged to be contact-connected with the step surface body 20 of the prefabricated inverted arch assembly, the thrust telescopic rod part II 61 and the thrust telescopic rod part III 63 are respectively arranged to be electric telescopic rods with convex telescopic ends, and the block part II 62 is arranged to be a dovetail seat-shaped body with a convex blind hole on the inner end surface, the convex blind hole of the block part II 62 is arranged to be connected with the telescopic end of the thrust telescopic rod part II 61, and the block part III 64 is arranged to be a seat-shaped body with a convex blind hole in the middle part of the end surface, and the convex blind hole of the block part III 64 is arranged to be connected with the telescopic end of the thrust telescopic rod part III 63.

[0065] Through the vertical clamping assembly 6, a supporting connection point for the first semi-trailer 1 and the second semi-trailer 2 is formed, and the connection with the first semi-trailer 1 and the second semi-trailer 2 is realized by the thrust telescopic rod part II 61 and the block part II 62. The connection with the prefabricated inverted arch assembly is realized by the block part III 64. The thrust telescopic rod part III 63 is used to drive the block part III 64 to perform lifting and lowering movements. The technical purpose is to be used as a component for clamping the prefabricated inverted arch assembly.

[0066] In this embodiment, the rope tensioning assembly 7 is configured to include a rod portion 71 and a rope portion 72, and the end of the rod portion 71 is configured to be connected to the inner end of the rope portion 72, the outer end of the rope portion 72 is respectively configured to be connected to the first semi-trailer 1 and the second semi-trailer 2 in a tethered manner, and the rod portion 71 is configured to be through-connected to the reserved hole body 30 of the prefabricated invert arch assembly, the rod portion 71 is configured to be a rod-shaped body with a mounting hole body at the end, and the rope portion 72 is configured to be a textile rope, and the mounting hole body of the rod portion 71 is configured to be connected to the rope portion 72.

[0067] A supporting connection point for the first semi-trailer 1 and the second semi-trailer 2 is formed by the rope tensioning assembly 7. The connection with the first semi-trailer 1 and the second semi-trailer 2 is realized by the rope portion 72. The connection with the prefabricated inverted arch assembly is realized by the rod portion 71. The technical purpose is to be used as a component for tensioning the prefabricated inverted arch assembly.

[0068] In this embodiment, the first pressure sensor 8 and the second pressure sensor 9 are respectively configured as diffused silicon pressure transmitters and the shell of the first pressure sensor 8 is configured to be embeddedly connected to the first semi-trailer 1, the shell of the second pressure sensor 9 is configured to be embeddedly connected to the second semi-trailer 2, and the contacts of the first pressure sensor 8 and the contacts of the second pressure sensor 9 are respectively configured to be contact-connected to the lower end surface of the prefabricated invert arch assembly.

[0069] Through the first pressure sensor 8 and the second pressure sensor 9, a supporting connection point for the first semi-trailer 1 and the second semi-trailer 2 is formed. The first pressure sensor 8 and the second pressure sensor 9 realize the connection with the first semi-trailer 1 and the connection with the second semi-trailer 2. The technical purpose is to serve as a component for picking up the weight signal of the prefabricated arch assembly on the first semi-trailer 1 and the second semi-trailer 2.

[0070] In this embodiment, the indicator light 91 is configured as an LED lighting fixture and the housing of the indicator light 91 is configured to be connected to the first trailer 1 and the second trailer 2 respectively.

[0071] Through the indicator light 91, a supporting connection point for the first semi-trailer 1 and the second semi-trailer 2 is formed. The indicator light 91 realizes the connection with the first semi-trailer 1 and the connection with the second semi-trailer 2. Its technical purpose is to serve as a component for lighting on the driving route of the first semi-trailer 1 and the second semi-trailer 2.

[0072] In this embodiment, the first semi-trailer 1 and the second semi-trailer 2 and the middle beam 3 and the connecting screw 4 are arranged to be distributed in a butt-connected manner, and the first semi-trailer 1, the second semi-trailer 2, the middle beam 3 and the connecting screw 4 and the transverse tightening component 5, the vertical pressing component 6 and the rope tensioning component 7 are arranged to be distributed in a fixed connection manner, the first semi-trailer 1, the second semi-trailer 2, the middle beam 3 and the connecting screw 4 and the first pressure sensor 8 and the second pressure sensor 9 are arranged to be distributed in a manner of picking up weight signals, and the first semi-trailer 1, the second semi-trailer 2, the middle beam 3 and the connecting screw 4 and the indicator light 91 are arranged to be distributed in a front lighting manner, an middle beam 3 and two connecting screws 4 are arranged to form a group of butt-connected components, and multiple groups of butt-connected components are arranged on the first semi-trailer Between the vehicle 1 and the second semi-trailer 2, the transverse tightening assembly 5, the vertical pressing assembly 6, the first pressure sensor 8 and the second pressure sensor 9 are respectively arranged to be spaced and distributed along the longitudinal center line of the first semi-trailer 1 and along the longitudinal center line of the second semi-trailer 2, wherein at least one rope tensioning assembly 7 is arranged between the first semi-trailer 1 and the prefabricated inverted arch assembly, wherein at least another rope tensioning assembly 7 is arranged between the second semi-trailer 2 and the prefabricated inverted arch assembly, the rope portion 72 is arranged to be connected to the hook portion 10, the thrust telescopic rod portion II 61 is arranged to be connected to the upper vertical beam portion 16, the block portion II 62 is arranged to be connected to the accommodating tank body I 17, the thrust telescopic rod portion I 51 is arranged to be connected to the accommodating tank body II 18, and the accommodating tank body IV 32 and the accommodating tank body V 33 are respectively arranged to be connected to the lower vertical beam portion 14.

[0073] The present invention is further described below in conjunction with examples. The following examples are intended to illustrate the present invention rather than to further limit the present invention.

[0074] A method for transporting a prefabricated inverted arch assembly, the steps of which are as follows: when the prefabricated inverted arch assembly needs to be transported, according to the specifications of the prefabricated inverted arch assembly, an intermediate beam 3 of a corresponding length is selected, a receiving tank body IV 32 is placed on a lower vertical beam portion 14 located on a first semitrailer 1, a receiving tank body V 33 is placed on a lower vertical beam portion 14 located on a second semitrailer 2, a connecting screw 4 is placed in a receiving hole body 34, the connecting screw 4 is rotated in the threaded hole body of the lower vertical beam portion 14, the flange body of the connecting screw 4 acts on the outer side end of the beam portion 31, thereby connecting the first semitrailer 1 and the second semitrailer 2 together, and the semitrailer tractor is connected to the traction pin portion 12 located on the first semitrailer 1 or the traction pin portion 1 on the second semitrailer 2. 2 are connected together, the first semi-trailer 1 and the second semi-trailer 2 are brought to the prefabricated beam factory by a semi-trailer tractor, the prefabricated inverted arch assembly is lifted by a hoisting method, the first semi-trailer 1 and the second semi-trailer 2 are placed on the lower end surface of the prefabricated inverted arch assembly by the semi-trailer tractor, one side of the lower end surface of the prefabricated inverted arch assembly is placed on the containing tank body III 19 and the first pressure sensor 8 located on the first semi-trailer 1, and the other side of the lower end surface of the prefabricated inverted arch assembly is placed on the prefabricated inverted arch assembly and the second pressure sensor 9 located on the second semi-trailer 2, and the comparison difference of the weight signal of the prefabricated inverted arch assembly picked up by the first pressure sensor 8 and the second pressure sensor 9 is used as a reference signal, and the first semi-trailer 1 and the second semi-trailer 2 are used to carry out the prefabricated inverted arch assembly. The position of the lower end surface of the assembly is adjusted, so that the prefabricated inverted arch assembly is placed in the middle position between the first semitrailer 1 and the second semitrailer 2, so that the thrust telescopic rod part I51 is in an extended state, the outer end surface of the block part I52 acts on the left and right side surfaces of the prefabricated inverted arch assembly, so that the thrust telescopic rod part II61 is in an extended state, and the block part II62 moves outward on the accommodating groove body I17, so that the thrust telescopic rod part III63 is in an extended state, and the lower end surface of the block part III64 acts on the step surface body 20 of the prefabricated inverted arch assembly, and the rod part 71 is placed in the reserved hole body 30 of the prefabricated inverted arch assembly, and the outer end of the rope part 72 is tied to the hook part 10, so that the prefabricated inverted arch assembly is installed on the prefabricated inverted arch assembly, and the semitrailer tractor is used to make The first semi-trailer 1 and the second semi-trailer 2 arrive at the highway construction site, and the semi-trailer tractor is connected to the traction pin 12 on the first semi-trailer 1 or the traction pin 12 on the second semi-trailer 2 in different ways, and the prefabricated inverted arch assembly is placed on the lifting station, and the prefabricated inverted arch assembly is connected with the sling, and the outer end of the rope part 72 is separated from the hook part 10, and the rod part 71 is taken out from the reserved hole body 30 of the prefabricated inverted arch assembly, so that the thrust telescopic rod part III 63 is in a retracted state, and the lower end surface of the block part III 64 is separated from the step surface body 20 of the prefabricated inverted arch assembly, so that the thrust telescopic rod part II 61 is in a retracted state, and the block part II 62 is moved inward on the accommodating groove body I 17, so that the thrust telescopic rod part I 51 is in a retracted state.The outer end surface of the block part I 52 is separated from the left and right side surfaces of the prefabricated inverted arch assembly, and the prefabricated inverted arch assembly is lifted from the receiving tank body III 19 by the lifting device, and the first semi-trailer 1 and the second semi-trailer 2 are moved out of the lifting station.

[0075] When verifying the present invention, the inventor abandoned the existing technical feature of using an engineering semi-trailer to transport the prefabricated inverted arch assembly, and first proposed a technical feature of making the transportation trajectory of the prefabricated inverted arch assembly in a linear motion state, thereby obtaining a first unexpected technical effect: realizing the transportation of the prefabricated inverted arch assembly in a single straight line, optimizing the transportation route, and reducing the transportation cost of the prefabricated inverted arch assembly, thereby obtaining a second unexpected technical effect: realizing the transportation of the prefabricated inverted arch assembly to an intermediate position, realizing the central distribution of the transportation load, improving the transportation safety performance of the prefabricated inverted arch assembly, and reducing the collision risk of the prefabricated inverted arch assembly, thereby obtaining a third unexpected technical effect: realizing the configuration of the power vehicle body with dual locomotive heads, and realizing dual power drive through the re-optimization design of the power vehicle body. , expanding the scope of use of the prefabricated inverted arch assembly, and obtaining the fourth unexpected technical effect: realizing the semi-trailer train setting, simplifying the docking operation, and obtaining the fifth unexpected technical effect: realizing the connection of multiple intermediate beams 3 and connecting screws 4 between the first semi-trailer 1 and the second semi-trailer 2, improving the overall performance of the first semi-trailer 1 and the second semi-trailer 2, and obtaining the sixth unexpected technical effect: realizing the composite fixing of the prefabricated inverted arch assembly on the first semi-trailer 1 and the second semi-trailer 2, and improving the fixing strength of the prefabricated inverted arch assembly, and obtaining the sixth unexpected technical effect: realizing the detection of the distributed load of the prefabricated inverted arch assembly on the first semi-trailer 1 and the second semi-trailer 2, and improving the centering performance of the prefabricated inverted arch assembly between the first semi-trailer 1 and the second semi-trailer 2.

[0076] In the second embodiment of the present invention, the first semitrailer 1, the second semitrailer 2 and the docking beam assembly are connected to each other in such a way that the transport track of the prefabricated inverted arch assembly is in a linear motion state.

[0077] In this embodiment, the first semi-trailer 1 and the second semi-trailer 2 are connected to the docking beam assembly in a selective double-end docking manner with the tractor.

[0078] In this embodiment, the docking beam assembly is configured to include an intermediate beam 3 and a connecting screw 4 .

[0079] In this embodiment, a first accessory device is further included and the first accessory device is respectively arranged on the first semi-trailer 1 and the second semi-trailer 2 , and the first accessory device is arranged as a transverse tightening assembly 5 .

[0080] In this embodiment, a second accessory device is further included and is respectively arranged on the first semi-trailer 1 and the second semi-trailer 2 , and the second accessory device is arranged as a vertical clamping assembly 6 .

[0081] In this embodiment, a third accessory device is further included and is respectively arranged on the first semi-trailer 1 and the second semi-trailer 2 , and the third accessory device is arranged as a rope tensioning assembly 7 .

[0082] In this embodiment, a fourth accessory device is further included and is disposed on the first semi-trailer 1 and the second semi-trailer 2 respectively. The fourth accessory device is configured to include a first pressure sensor 8 and a second pressure sensor 9. In this embodiment, a fifth accessory device is further included and is respectively arranged on the first semi-trailer 1 and the second semi-trailer 2 , and the fifth accessory device is arranged as an indicator light 91 .

[0083] The second embodiment of the present invention is based on the first embodiment. The second embodiment of the present invention comprises the following steps: the first semi-trailer 1 and the second semi-trailer 2 are integrally connected by the docking beam assembly, the first semi-trailer 1 and the second semi-trailer 2 are selectively docked with the tractor at two ends, and the transport track of the prefabricated invert arch assembly is in a linear motion state.

[0084] The second embodiment of the present invention is based on the first embodiment.

[0085] The present invention has the following characteristics: 1. Due to the design of the first semi-trailer 1, the second semi-trailer 2 and the docking beam assembly, the first semi-trailer 1 and the second semi-trailer 2 are connected in an integrated manner through the docking beam assembly, and the first semi-trailer 1 and the second semi-trailer 2 are selectively docked with a tractor at both ends, so that the transportation track of the prefabricated inverted arch assembly is in a linear motion state, which solves the technical problem of using engineering semi-trailers to transport the prefabricated inverted arch assembly, thereby improving the transportation efficiency of the prefabricated inverted arch assembly.

[0086] 2. Due to the design of the middle beam 3 and the connecting screw 4, the first semi-trailer 1 and the second semi-trailer 2 are connected by a hanging rod.

[0087] 3. Due to the design of the transverse tightening component 5, the prefabricated inverted arch component can be clamped and fixed.

[0088] 4. Due to the design of the vertical pressing component 6, the prefabricated inverted arch component can be pressed and fixed.

[0089] 5. Due to the design of the rope tensioning assembly 7, the prefabricated inverted arch assembly can be tightened and fixed.

[0090] 6. Due to the design of the first pressure sensor 8 and the second pressure sensor 9, it is possible to pick up load signals of the prefabricated inverted arch assembly on the first semi-trailer 1 and the second semi-trailer 2.

[0091] 7. Due to the design of the indicator light 91, lighting processing is achieved.

[0092] 8. Since the design limits the numerical range of the structural shape, the numerical range is the technical feature in the technical solution of the present invention, rather than a technical feature calculated by a formula or obtained through a limited number of tests. Tests have shown that the technical feature of this numerical range has achieved good technical effects.

[0093] 9. Due to the design of the technical features of the present invention, the effects of the individual and combined technical features have been shown through experiments to have various performance indicators of the present invention that are at least 1.7 times the existing performance indicators, and have been evaluated to have good market value.

[0094] There are other technical features that are connected to the first semi-trailer 1, the second semi-trailer 2 and the docking beam assembly so that the transport track of the prefabricated inverted arch assembly is in a linear motion state, which are all embodiments of the present invention, and the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to meet the requirements of the Patent Law, Patent Implementing Rules and Examination Guidelines, all possible combinations of the technical features in the above-mentioned embodiments will no longer be described.

[0095] The above embodiment is only one implementation form of the transportation device and method for prefabricated inverted arch assemblies provided by the present invention. Other variations of the scheme provided by the present invention, adding or reducing components or steps therein, or applying the present invention to other technical fields close to the present invention, all fall within the protection scope of the present invention.

Claims

1. A transport device for prefabricated inverted arch assemblies, characterized in that: The invention comprises a first semitrailer (1) placed on one end of a prefabricated inverted arch assembly, a second semitrailer (2) placed on the other end of the prefabricated inverted arch assembly, and a butt-jointed beam assembly arranged between the first semitrailer (1) and the second semitrailer (2).

2. The transport device for prefabricated inverted arch assemblies according to claim 1, characterized in that: The first semitrailer (1), the second semitrailer (2) and the butt beam assembly are connected to each other in such a way that the transport track of the prefabricated inverted arch assembly is in a linear motion state.

3. The transport device for prefabricated inverted arch assemblies according to claim 2, characterized in that: The first semitrailer (1) and the second semitrailer (2) are connected to the docking beam assembly in a selective double-end docking manner with the tractor.

4. The transport device for prefabricated inverted arch assemblies according to claim 1, characterized in that: The butt-jointed beam assembly is configured to include an intermediate beam (3) and a connecting screw (4). Or, it further comprises a first accessory device and the first accessory device is respectively arranged on the first semi-trailer (1) and the second semi-trailer (2), and the first accessory device is arranged as a transverse tightening component (5), Or, it further comprises a second accessory device and the second accessory device is respectively arranged on the first semi-trailer (1) and the second semi-trailer (2), and the second accessory device is arranged as a vertical clamping assembly (6), Or, it further comprises a third accessory device and the third accessory device is respectively arranged on the first semi-trailer (1) and the second semi-trailer (2), and the third accessory device is arranged as a rope tensioning assembly (7), Or, it further comprises a fourth accessory device and the fourth accessory device is respectively arranged on the first semi-trailer (1) and the second semi-trailer (2), and the fourth accessory device is arranged to comprise a first pressure sensor (8) and a second pressure sensor (9), Or, it further comprises a fifth accessory device and the fifth accessory device is respectively arranged on the first semi-trailer (1) and the second semi-trailer (2), and the fifth accessory device is arranged as an indicator light (91).

5. The transport device for prefabricated inverted arch assemblies according to claim 4, characterized in that: An intermediate beam (3) is arranged between the first semitrailer (1) and the second semitrailer (2), connecting screws (4) are arranged between the intermediate beam (3) and the first semitrailer (1) and the second semitrailer (2), and a transverse tightening assembly (5), a vertical pressing assembly (6), a rope tensioning assembly (7) and an indicator light (91) are arranged on the first semitrailer (1) and the second semitrailer (2), respectively, a first pressure sensor (8) is arranged on the first semitrailer (1), and a second pressure sensor (9) is arranged on the second semitrailer (2).

6. The transport device for prefabricated inverted arch assemblies according to claim 5, characterized in that: Step-shaped bodies (20) are provided at the left and right end faces of the precast invert component, and reserved hole bodies (30) are provided in the precast invert component. One side of the lower end face of the precast invert component is set to be in contact connection with the first semi-trailer (1) and the first pressure sensor (8), and the other side of the lower end face of the precast invert component is set to be in contact connection with the second semi-trailer (2) and the second pressure sensor (9). The left and right side faces of the precast invert component are respectively set to be in contact connection with the lateral tightening components (5), and the upper end face of the step-shaped body (20) is set to be in contact connection with the vertical pressing component (6). The reserved hole body (30) is set to be connected with the rope tensioning component (7), and the step-shaped body (20) is set to be an L-shaped end body. The reserved hole body (30) is set to be a circular hole and is arranged at intervals along the transverse center line of the precast invert component.

7. The transport device for prefabricated inverted arch assemblies according to claim 5, characterized in that: The first semi-trailer (1) and the second semi-trailer (2) are respectively provided with a frame part (11), a kingpin part (12), a running gear part (13), a lower vertical beam part (14), a cross beam part (15), an upper vertical beam part (16) and a hook part (10). An accommodation groove body I (17) is provided in the middle of the upper end face of the frame part (11). An accommodation groove body II (18) is provided on the vertical end face of the accommodation groove body I (17), and an accommodation groove body III (19) is provided at the rear side of the upper end face of the frame part (11). The front side of the lower end face of the frame part (11) is set to be connected with the kingpin part (12), and the middle of the lower end face of the frame part (11) is set to be connected with the running gear part (13). The rear side of the lower end face of the frame part (11) is set to be connected with the inner end face of the lower vertical beam part (14), and the upper part of the outer side of the lower vertical beam part (14) is set to be connected with the inner end face of the cross beam part (15). The middle of the upper end face of the frame part (11) is set to be connected with the lower end face of the upper vertical beam part (16), and the front and rear side faces of the frame part (11) are set to be connected with the inner end faces of the hook part (10). The frame part (11) is set to be a rectangular frame body, the kingpin part (12) is set to be a semi-trailer kingpin, the running gear part (13) is set to be an integrated body with leaf springs, axles and tires, and the leaf springs of the running gear part (13) are set to be connected with the frame part (11). The lower vertical beam part (14) is set to be a rectangular strip body with threaded hole bodies, and the threaded hole bodies of the lower vertical beam part (14) are set to be connected with the connecting screw (4). The cross beam part (15) and the upper vertical beam part (16) are respectively set to be rectangular strip bodies, and the hook part (10) is set to be a U-shaped block body. The accommodation groove body I (17) is set to be a dovetail groove body, the accommodation groove body II (18) is set to be a blind hole, and the accommodation groove body III (19) is set to be a C-shaped groove body. Or, the lower vertical beam (14) is configured to be embeddedly connected to the middle beam (3) and the lower vertical beam (14) is configured to be threadedly connected to the connecting screw (4), the cross beam (15) is configured to be sleeve-type connected to the first pressure sensor (8) and the second pressure sensor (9) respectively and the left side surface of the upper vertical beam (16) is configured to be connected to the indicator light (91), the right side surface of the upper vertical beam (16) and the receiving trough body I (17) are configured to be connected to the vertical clamping assembly (6) respectively and the receiving trough body II (18) is configured to be connected to the horizontal tightening assembly (5), the hook portion (10) is configured to be connected to the rope tensioning assembly (7) in a tethered manner and the receiving trough body III (19) is configured to be contact-type connected to the prefabricated inverted arch assembly, Or, the ends of the beam portion (31) of the middle beam (3) are respectively provided with receiving holes (34), and one of the ends of the beam portion (31) is provided with a receiving groove IV (32), and the other end of the beam portion (31) is provided with a receiving groove V (33), and the receiving groove IV (32) is arranged to be connected to the first semi-trailer (1) in a receiving manner, and the receiving groove V (33) is arranged to be connected to the second semi-trailer (2) in a receiving manner, and the receiving hole (34) is arranged to be connected to the connecting The outer side end of the beam portion (31) is configured to be contact-connected with the connecting screw rod (4), and the beam portion (31) is configured to be a rectangular strip body, the receiving groove body IV (32) and the receiving groove body V (33) are respectively configured to be U-shaped groove bodies, and the receiving hole body (34) is configured to be a hole body, one of the receiving hole bodies (34) is configured to be distributed corresponding to the receiving groove body IV (32) and one of the receiving hole bodies (34) is configured to be distributed corresponding to the receiving groove body V (33), Or, the connecting screw (4) is configured as a hexagonal bolt and the inner end of the connecting screw (4) is configured to be connected to the middle beam (3) in a through-type manner, the inner end of the connecting screw (4) is configured to be connected to the first semitrailer (1) and the second semitrailer (2) in a threaded manner respectively, and the flange of the connecting screw (4) is configured to be connected to the middle beam (3) in a contact manner, Alternatively, the transverse tightening assembly (5) is configured to include a thrust telescopic rod portion I (51) and a block portion I (52), and the telescopic end of the thrust telescopic rod portion I (51) is configured to be rotatably connected to the middle portion of the inner end surface of the block portion I (52), the outer shell of the thrust telescopic rod portion I (51) is configured to be embeddedly connected to the first semitrailer (1) and the second semitrailer (2), respectively, and the outer end surface of the block portion I (52) is configured to be contact-connected to the left and right side surfaces of the prefabricated inverted arch assembly, the thrust telescopic rod portion I (51) is configured to be an electric telescopic rod having a convex telescopic end, and the block portion I (52) is configured to be a ∧-shaped seat having a convex blind hole in the middle portion of the inner end surface, and the convex blind hole of the block portion I (52) is configured to be connected to the telescopic end of the thrust telescopic rod portion I (51), Alternatively, the vertical clamping assembly (6) is configured to include a thrust telescopic rod portion II (61), a block portion II (62), a thrust telescopic rod portion III (63) and a block portion III (64), and the outer end portion of the block portion II (62) is configured to be accommodated and connected to the outer shell of the thrust telescopic rod portion III (63), the telescopic end head of the thrust telescopic rod portion III (63) is configured to be rotatably connected to the middle portion of the upper end face of the block portion III (64), the telescopic end head of the thrust telescopic rod portion II (61) is configured to be rotatably connected to the inner end face portion of the block portion II (62), and the outer shell of the thrust telescopic rod portion II (61) is configured to be connected to the first semi-trailer (1) and the second semi-trailer (2), respectively, and the block portion II (62) is configured to be connected to the first semi-trailer (1) and the second semi-trailer (2), respectively. The vehicle (1) and the second semitrailer (2) are slidably connected and the lower end surface of the block part III (64) is arranged to be contact-connected with the step surface body (20) of the prefabricated inverted arch assembly, the thrust telescopic rod part II (61) and the thrust telescopic rod part III (63) are respectively arranged to be electric telescopic rods with convex-shaped telescopic ends, and the block part II (62) is arranged to be a dovetail seat-shaped body with a convex-shaped blind hole on the inner end surface, the convex-shaped blind hole of the block part II (62) is arranged to be connected with the telescopic end of the thrust telescopic rod part II (61), and the block part III (64) is arranged to be a seat-shaped body with a convex-shaped blind hole in the middle part of the end surface, and the convex-shaped blind hole of the block part III (64) is arranged to be connected with the telescopic end of the thrust telescopic rod part III (63). Alternatively, the rope tensioning assembly (7) is configured to include a rod (71) and a rope (72), and the end of the rod (71) is configured to be connected to the inner end of the rope (72), the outer end of the rope (72) is configured to be connected to the first semi-trailer (1) and the second semi-trailer (2) respectively, and the rod (71) is configured to be connected to the reserved hole (30) of the prefabricated inverted arch assembly in a through-type manner, the rod (71) is configured to be a rod-shaped body with a mounting hole at the end, and the rope (72) is configured to be a textile rope, and the mounting hole of the rod (71) is configured to be connected to the rope (72), Or, the first pressure sensor (8) and the second pressure sensor (9) are respectively configured as diffused silicon pressure transmitters, and the housing of the first pressure sensor (8) is configured to be embeddedly connected to the first semi-trailer (1), the housing of the second pressure sensor (9) is configured to be embeddedly connected to the second semi-trailer (2), and the contact of the first pressure sensor (8) and the contact of the second pressure sensor (9) are respectively configured to be contact-connected to the lower end face portion of the prefabricated invert assembly, Alternatively, the indicator light (91) is configured as an LED lighting fixture and the housing of the indicator light (91) is configured to be connected to the first semitrailer (1) and the second semitrailer (2), respectively.

8. The transport device for prefabricated inverted arch assemblies according to any one of claims 1 to 7, characterized in that: The first semi-trailer (1) and the second semi-trailer (2) are arranged to be distributed in a docking connection manner with the intermediate beam (3) and the connecting screw (4), and the first semi-trailer (1), the second semi-trailer (2), the intermediate beam (3) and the connecting screw (4) are arranged to be distributed in a fixed connection manner with the transverse jacking assembly (5), the vertical pressing assembly (6) and the rope tensioning assembly (7), the first semi-trailer (1), the second semi-trailer (2), the intermediate beam (3) and the connecting screw (4) are arranged to be distributed in a first pressure sensor (8) and a second pressure sensor (9) in a manner of picking up weight signals, and the first semi-trailer (1), the second semi-trailer (2), the intermediate beam (3) and the connecting screw (4) are arranged to be distributed in a front lighting manner with the indicator light (91), Alternatively, an intermediate beam (3) and two connecting screws (4) are arranged to form a set of butt-jointed components, a plurality of sets of butt-jointed components are arranged between the first semitrailer (1) and the second semitrailer (2), a transverse tightening assembly (5), a vertical pressing assembly (6), a first pressure sensor (8) and a second pressure sensor (9) are arranged to be spaced and distributed along the longitudinal center line of the first semitrailer (1) and along the longitudinal center line of the second semitrailer (2), respectively, wherein at least one rope tensioning assembly (7) is arranged between the first semitrailer (1) and the pre-trailer (2). The invention relates to a prefabricated inverted arch assembly, wherein at least another rope tensioning assembly (7) is arranged between the second semitrailer (2) and the prefabricated inverted arch assembly, the rope portion (72) is arranged to be connected to the hook portion (10), the thrust telescopic rod portion II (61) is arranged to be connected to the upper vertical beam portion (16), the block portion II (62) is arranged to be connected to the receiving tank body I (17), the thrust telescopic rod portion I (51) is arranged to be connected to the receiving tank body II (18), and the receiving tank body IV (32) and the receiving tank body V (33) are respectively arranged to be connected to the lower vertical beam portion (14).

9. A method for transporting prefabricated inverted arch assemblies, characterized in that the steps are: The docking beam assembly realizes the integrated connection of the first semitrailer (1) and the second semitrailer (2), and the first semitrailer (1) and the second semitrailer (2) realize the selective double-end docking with the tractor, so that the transport track of the prefabricated inverted arch assembly is in a linear motion state.

10. The method for transporting prefabricated inverted arch assemblies according to claim 1, characterized in that the steps are: When the prefabricated inverted arch assembly needs to be transported, an intermediate beam (3) of corresponding length is selected according to the specifications of the prefabricated inverted arch assembly, the receiving trough body IV (32) is placed on the lower vertical beam portion (14) located on the first semitrailer (1), the receiving trough body V (33) is placed on the lower vertical beam portion (14) located on the second semitrailer (2), and the connecting screw (4) is placed in the receiving hole body (34), so that the connecting screw (4) is rotated in the threaded hole body of the lower vertical beam portion (14), so that the flange body of the connecting screw (4) acts on the outer side end of the beam portion (31), thereby connecting the first semitrailer (1) and the second semitrailer (2) together, and the semitrailer tractor is connected to the traction pin portion (12) located on the first semitrailer (1) or the traction pin portion (12) located on the second semitrailer (2). The traction pins (12) on the trailers (2) are connected together, and the first semi-trailer (1) and the second semi-trailer (2) are brought to the prefabricated beam factory by a semi-trailer tractor. The prefabricated inverted arch assembly is lifted by a hoisting method, and the first semi-trailer (1) and the second semi-trailer (2) are placed on the lower end surface of the prefabricated inverted arch assembly by the semi-trailer tractor. One side of the lower end surface of the prefabricated inverted arch assembly is placed on the receiving tank body III (19) and the first pressure sensor (8) located on the first semi-trailer (1), and the other side of the lower end surface of the prefabricated inverted arch assembly is placed on the prefabricated inverted arch assembly and the second pressure sensor (9) located on the second semi-trailer (2) to measure the weight of the prefabricated inverted arch assembly picked up by the first pressure sensor (8) and the second pressure sensor (9). The signal comparison difference is a reference signal. The first semi-trailer (1) and the second semi-trailer (2) are adjusted at the lower end surface position of the prefabricated inverted arch assembly, so that the prefabricated inverted arch assembly is placed in the middle position between the first semi-trailer (1) and the second semi-trailer (2), so that the thrust telescopic rod part I (51) is in an extended state, the outer end surface of the block part I (52) acts on the left and right side surfaces of the prefabricated inverted arch assembly, so that the thrust telescopic rod part II (61) is in an extended state, the block part II (62) moves outward on the accommodating groove body I (17), so that the thrust telescopic rod part III (63) is in an extended state, the lower end surface of the block part III (64) acts on the step surface body (20) of the prefabricated inverted arch assembly, and the rod part (71) is placed in the reserved position of the prefabricated inverted arch assembly. The outer end of the rope part (72) is connected to the hook part (10) in the hole body (30), so that the prefabricated inverted arch assembly is installed on the prefabricated inverted arch assembly. The first semitrailer (1) and the second semitrailer (2) are brought to the high-speed road construction site by a semitrailer tractor. The prefabricated inverted arch assembly is placed on the lifting station by connecting the semitrailer tractor with the traction pin part (12) on the first semitrailer (1) or the traction pin part (12) on the second semitrailer (2) in different ways. The prefabricated inverted arch assembly is connected to the lifting device, the outer end of the rope part (72) is separated from the hook part (10), and the rod part (71) is taken out from the reserved hole body (30) of the prefabricated inverted arch assembly, so that the thrust telescopic rod part III (63) is in a contracted state.The lower end surface of the block part III (64) is separated from the step surface body (20) of the prefabricated inverted arch assembly, so that the thrust telescopic rod part II (61) is in a retracted state, and the block part II (62) is moved inward on the receiving tank body I (17), so that the thrust telescopic rod part I (51) is in a retracted state, and the outer end surface of the block part I (52) is separated from the left and right side surfaces of the prefabricated inverted arch assembly, and the prefabricated inverted arch assembly is lifted from the receiving tank body III (19) by the lifting device, and the first semi-trailer (1) and the second semi-trailer (2) are moved out from the lifting station.