Ribbed bag type grouting structure for repairing bumping at bridgehead

By pre-embedding multi-layered reinforced slabs in the roadbed of the bridge approach slab area and injecting grout into the reinforced slab grouting structure, the problem of road surface damage caused by existing grouting technology is solved, and effective repair of bridge approach slabs is achieved without damaging the original road surface.

CN118910962APending Publication Date: 2024-11-08WUHAN UNIV
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411211119.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Existing grouting techniques for bridge approach slab settlement often involve drilling and grouting after the problem occurs, which damages the original road surface and increases the difficulty and cost of repair.

Method used

A reinforced bladder-type grouting structure is adopted, which involves pre-burying multiple layers of reinforced bladders in the roadbed in the bridge approach slab area, and then injecting grout into the bladders through grouting pipes for filling and repair, thus avoiding damage to the original road surface.

Benefits of technology

It reduces the difficulty and cost of repair, improves construction efficiency and safety, enables repairs to be completed without interrupting traffic, and enhances the density and stability of the foundation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118910962A_ABST
    Figure CN118910962A_ABST
Patent Text Reader

Abstract

The reinforced bag type grouting structure comprises multiple layers of reinforced bag sets and a grouting pipeline, the multiple layers of reinforced bag sets are all buried in a roadbed of a bridgehead bumping area, every two adjacent layers of reinforced bag sets are spaced in the height direction, each layer of reinforced bag set comprises a plurality of bags which are horizontally arranged, and the grouting pipeline is arranged between the multiple layers of reinforced bag sets and the multiple layers of reinforced bag sets. And the grouting pipeline is selectively communicated with each bag, so that grout is injected into the corresponding bag through the grouting pipeline. Therefore, the multiple layers of reinforced bag groups are pre-buried in the roadbed of the bridge-head bumping area, when roadbed settlement occurs in the bridge-head bumping area, grout is injected into the corresponding bags of the reinforced bag groups through the grouting pipelines so as to fill and repair the roadbed on the premise that an original pavement is not damaged, and the repair difficulty and cost can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of reinforced bladder grouting structure technology, and in particular to a reinforced bladder grouting structure for repairing bridge approach slab settlement. Background Technology

[0002] Bridge approach slab ...

[0003] Currently, common traditional methods for addressing bridge approach slab settlement include thickening and reinforcing the pavement at the approach, laying flexible transition layers, compacting the subgrade, and settlement monitoring. While these methods can alleviate the problem to some extent, they also have significant shortcomings. Thickening and reinforcing the pavement at the approach can temporarily improve pavement smoothness, but settlement differences will reappear over time. Laying flexible transition layers is greatly affected by material lifespan and external environmental factors, limiting its effectiveness. Subgrade compaction requires lengthy construction periods and disrupts traffic. While settlement monitoring provides settlement data, it cannot directly solve the bridge approach slab settlement problem.

[0004] Among related technologies, grouting is a relatively new method for treating bridge approach slab settlement that has been increasingly applied in recent years. By injecting grout into the roadbed, the settlement area can be effectively filled, improving the roadbed's density and bearing capacity, thereby reducing bridge approach slab settlement. However, existing grouting technologies also have some limitations. First, current grouting techniques often involve drilling and grouting after the problem has occurred, which can cause some damage to the original road surface, increasing the difficulty and cost of subsequent repairs. Summary of the Invention

[0005] This invention aims to at least solve one of the technical problems existing in the prior art. Therefore, the purpose of this invention is to propose a reinforced bladder-type grouting structure for repairing bridge approach slab settlement. By pre-embedding multiple layers of reinforced bladders within the roadbed in the bridge approach slab settlement area, when roadbed settlement occurs in the bridge approach slab settlement area, grout is injected into the corresponding bladders of the reinforced bladders through grouting pipes to achieve roadbed filling and repair without damaging the original pavement, thus reducing repair difficulty and cost.

[0006] To achieve the above objectives, embodiments of the present invention propose a reinforced bladder-type grouting structure for repairing bridge approach slab settlements, comprising:

[0007] The multi-layer reinforced bag group is buried in the roadbed of the bridge approach slab area, and adjacent layers of reinforced bag groups are spaced apart along the height direction. Each layer of reinforced bag group includes multiple horizontally arranged bags.

[0008] Grouting pipes are selectively connected to each bladder to inject grout into the corresponding bladder.

[0009] According to an embodiment of the present invention, a reinforced bladder-type grouting structure for repairing bridge approach slab settlement pre-embeds multiple layers of reinforced bladder groups in the roadbed of the bridge approach slab settlement area. When roadbed settlement occurs in the bridge approach slab settlement area, grout is injected into the corresponding bladders of the reinforced bladder groups through grouting pipes to achieve roadbed filling and repair without damaging the original road surface, which helps to reduce repair difficulty and cost.

[0010] According to some examples of the invention, each layer of reinforced pouches comprises a plurality of pouches arranged in a horizontal array.

[0011] According to some examples of the present invention, each layer of reinforced bladders corresponds to a plurality of grouting pipes, wherein the number of grouting pipes is the same as the number of rows or columns of the arrayed bladders, and each grouting pipe is selectively connected to each bladder in the corresponding row or column.

[0012] According to some examples of the invention, the bags in two adjacent reinforced bag groups are misaligned along the height direction.

[0013] According to some examples of the present invention, each layer of reinforced bag group is provided with a corresponding reinforced geogrid, the reinforced geogrid is formed with multiple reinforced squares, wherein the multiple reinforced squares correspond one-to-one with multiple bags, and the upper surface of each bag is fixedly connected to the corresponding reinforced square.

[0014] According to some examples of the present invention, each bag is provided with a grouting hole, and the grouting pipe has a plurality of grouting holes that are provided one-to-one with the bags. The grouting hole of each bag is fixedly connected to the corresponding grouting hole of the grouting pipe, and each grouting hole is provided with a grouting device. The grouting device includes a sealing member that selectively opens or blocks the grouting hole so that the grouting hole of each bag is connected to or disconnected from the corresponding grouting hole.

[0015] According to some examples of the present invention, the grouting device further includes a driving member and a transmission member, one end of the transmission member being fixedly connected to the sealing member and the other end being fixedly connected to the driving member, and the transmission member being inserted into the grouting pipe along the radial direction of the grouting pipe, and the driving member being adapted to drive the transmission member to drive the sealing member to seal or open the grout outlet hole.

[0016] According to some examples of the present invention, the grouting device further includes: a signal receiving device, which is communicatively connected to the driving member, the signal receiving device being used to receive control signals, and the driving member driving the sealing member to seal or open the grout outlet hole according to the driving signals.

[0017] According to some examples of the present invention, the vertical distance between two adjacent reinforced bag groups along the height direction is h1, which satisfies the relationship: 3.5m≤h1≤4.5m.

[0018] According to some examples of the present invention, the horizontal distance between two adjacent pouches is d1, which satisfies the relationship: 1.3m≤h1≤1.7m.

[0019] Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description

[0020] The above and / or additional aspects and advantages of the present invention will become apparent and readily understood from the description of the embodiments taken in conjunction with the following drawings, in which:

[0021] Figure 1 This is a schematic diagram of a reinforced grouting structure and a bridge abutment for repairing bridge approach slab settlement according to an embodiment of the present invention.

[0022] Figure 2 This is a schematic diagram of a reinforced bladder-type grouting structure for repairing bridge approach slabs according to an embodiment of the present invention;

[0023] Figure 3 This is a schematic diagram of a reinforced geogrid and a geocell according to an embodiment of the present invention;

[0024] Figure 4 This is a schematic diagram from a first perspective when the pouch is not open, according to an embodiment of the present invention;

[0025] Figure 5 This is a schematic diagram from a first perspective when the pouch is opened according to an embodiment of the present invention;

[0026] Figure 6 This is a schematic diagram from a second perspective when the pouch is not open, according to an embodiment of the present invention.

[0027] Figure 7 This is a schematic diagram from a second perspective when the pouch is opened according to an embodiment of the present invention.

[0028] Figure label:

[0029] 100 reinforced bladder-type grouting structure for repairing bridge approach slabs;

[0030] Reinforced bladder assembly 1; bladder 11; grouting hole 111;

[0031] Grouting pipe 2; Grout outlet 21;

[0032] 3 reinforced geogrids; 31 reinforced grids;

[0033] Grouting device 4; sealing component 41; driving component 42; spring device 421; transmission component 43; signal receiving device 44;

[0034] Bridge approach slab 5; Roadbed 51;

[0035] 200 at the bridgehead. Detailed Implementation

[0036] Embodiments of the present invention are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.

[0037] It's important to note that bridge approach slab slab slab occupancy refers to the bouncing and uncomfortable experience caused by the difference in settlement between the bridge foundation and the roadbed when vehicles pass over the transition section. This phenomenon is usually caused by the difference in stiffness and settlement characteristics between the bridge foundation and the roadbed foundation. Bridge foundations are generally more robust and experience less settlement, while the roadbed experiences greater settlement due to traffic loads and environmental influences, leading to the settlement difference between the two. Bridge approach slab slab occupancy not only affects driving comfort but, in severe cases, can also threaten the safety of vehicles and pedestrians, increasing the risk of traffic accidents. Furthermore, bridge approach slab slab occupancy can damage the bridge structure and the roadbed itself, accelerating pavement aging and deterioration, and increasing maintenance costs.

[0038] Currently, common traditional methods for addressing bridge approach slab settlement include thickening and reinforcing the pavement at the approach, laying flexible transition layers, compacting the subgrade, and settlement monitoring. While these methods can alleviate the problem to some extent, they also have significant shortcomings. Thickening and reinforcing the pavement at the approach can temporarily improve pavement smoothness, but settlement differences will reappear over time. Laying flexible transition layers is greatly affected by material lifespan and external environmental factors, limiting its effectiveness. Subgrade compaction requires lengthy construction periods and disrupts traffic. While settlement monitoring provides settlement data, it cannot directly solve the bridge approach slab settlement problem.

[0039] Among related technologies, grouting is a relatively new method for treating bridge approach slab settlement that has been increasingly applied in recent years. By injecting grout into the roadbed, the settlement area can be effectively filled, improving the roadbed's density and bearing capacity, thereby reducing bridge approach slab settlement. However, existing grouting technologies also have some limitations. First, current grouting techniques often involve drilling and grouting after the problem has occurred, which can cause some damage to the original road surface, increasing the difficulty and cost of subsequent repairs.

[0040] Based on this, the present invention proposes a reinforced bladder-type grouting structure 100 for repairing bridge approach slab settlement. By pre-burying multiple layers of reinforced bladder groups 1 in the roadbed 51 of the bridge approach slab settlement area 5, when the roadbed 51 settles in the bridge approach slab settlement area 5, grout is injected into the corresponding bladder 11 of the reinforced bladder group 1 through the grouting pipe 2 to fill and repair the roadbed 51 without damaging the original road surface, which helps to reduce the difficulty and cost of repair.

[0041] The following description, with reference to the accompanying drawings, describes a reinforced bladder-type grouting structure 100 for repairing bridge approach slab settlement according to an embodiment of the present invention.

[0042] like Figures 1-7 As shown, the reinforced bladder-type grouting structure 100 for repairing bridge approach slab settlement according to an embodiment of the present invention includes: a multi-layer reinforced bladder group 1 and a grouting pipe 2. The multi-layer reinforced bladder group 1 is buried in the roadbed 51 of the bridge approach slab settlement area 5, and adjacent layers of reinforced bladder group 1 are spaced apart along the height direction. Each layer of reinforced bladder group 1 includes a plurality of horizontally arranged bladders 11. The grouting pipe 2 is selectively connected to each bladder 11 to inject grout into the corresponding bladder 11 through the grouting pipe 2.

[0043] Specifically, the bridge approach slab area 5 is the transition section between the bridge approach 200 and the ground subgrade 51. Multiple layers of reinforced bag assemblies 1 are pre-embedded within the subgrade 51 of the bridge approach slab area 5. For example, the number of layers of the reinforced bag assemblies 1 can be 2, 3, 4, or 5, depending on actual needs; no specific limitation is made here. In some examples of this invention, such as... Figure 1 and Figure 2 As shown, three layers of reinforced bag groups 1 are pre-embedded in the roadbed 51 of the bridge approach slab area 5. The uppermost layer of reinforced bag group 1 is spaced a certain distance from the road surface of the bridge approach slab area 5 in the height direction, and the uppermost layer of reinforced bag group 1 and the middle layer of reinforced bag group 1, as well as the middle layer of reinforced bag group 1 and the lowermost layer of reinforced bag group 1, are all spaced apart in the height direction.

[0044] Further, refer to Figures 1-3As shown, each layer of reinforced bladder group 1 includes multiple horizontally arranged bladders 11. It should be noted that the design strength of the bladder 11 can be 1.5 MPa to 3 MPa, the length of the bladder 11 can be 2.8 m to 3.2 m, the width can be 2.8 m to 3.2 m, and the thickness after grouting expansion is 0.8 m to 1.2 m. The specific dimensions are determined according to actual needs and are not specifically limited here. Furthermore, the reinforced bladder-type grouting structure 100 used for repairing bridge approach slab settlement also includes grouting pipes 2. The diameter of the grouting pipes 2 is 0.7 m to 1.1 m, and the thickness of the grouting pipes 2 is 0.3 m to 0.4 m. The grouting pipes 2 are selectively connected to each bladder 11 to inject grout into the corresponding bladder 11 through the grouting pipes 2. In other words, the grouting pipeline can be connected to or disconnected from any bag 11 in each layer of reinforced bag group 1, so that the grouting pipeline can inject grout into the corresponding bag 11 when connected to the bag 11, and stop injecting grout into the corresponding bag 11 when disconnected from the bag 11. After the bag 11 is injected with grout, such as Figure 5 and Figure 7 As shown, the bag 11 expands, thereby lifting the roadbed 51 above the bag 11 to overcome the settlement of the roadbed 51 in the bridge approach slab settlement area 5, and restore the road surface settlement to the specified alignment. Thus, when roadbed 51 settlement occurs in the bridge approach slab settlement area 5, grout is injected into the corresponding bag 11 of the reinforced bag group 1 through the grouting pipe 2. This allows for the filling and repair of the roadbed 51 without damaging the original road surface (e.g., by drilling holes in the original road surface). The construction process does not require traffic interruption, greatly reducing the impact on traffic, improving construction efficiency and safety, and enabling the grouting process to be completed without interrupting traffic, which helps reduce repair difficulty and cost.

[0045] It should be noted that a slow-setting grout can be used. When the bag 11 is filled with slow-setting grout, the grout will solidify within 12 to 40 hours, thus keeping the bag 11 in a specific shape to overcome the settlement of the subgrade 51 and bonding with the surrounding soil. This further enhances the compactness and stability of the foundation, which is beneficial to ensuring the stability of overcoming the settlement of the subgrade 51. It is understandable that using the bag 11 can prevent the grout from coming into contact with groundwater and soil in a liquid state, effectively preventing the impact on the nearby environment and achieving the goal of green environmental protection.

[0046] By setting up a multi-layered reinforced bag assembly 1, grouting can be carried out scientifically and progressively according to the different damage levels of the roadbed 51. This application continues to use a three-layered reinforced bag assembly 1 as an example. When the road surface is slightly damaged, only the top layer of the reinforced bag assembly 1 needs to be grouted until the road surface settlement returns to the specified alignment. When the road surface is moderately damaged, only the upper and middle layers of the reinforced bag assembly 1 need to be grouted until the road surface settlement returns to the specified alignment. When the road surface is severely damaged, all three layers of the reinforced bag assembly 1 need to be grouted until the road surface settlement returns to the specified alignment. In this way, by arranging the multi-layered reinforced bag assembly 1 structure, grouting can be carried out scientifically and progressively according to the different damage levels of the road surface, from slight to moderate to severe. This allows for multi-level repair and reinforcement of the roadbed 51 until the road surface settlement returns to the specified alignment, effectively alleviating the phenomenon of vehicle slumping at the bridge approach 200.

[0047] According to an embodiment of the present invention, the reinforced bladder-type grouting structure 100 for repairing bridge approach slab settlement pre-embeds multiple layers of reinforced bladder groups 1 in the roadbed 51 of the bridge approach slab settlement area 5. When the roadbed 51 settles in the bridge approach slab settlement area 5, grout is injected into the corresponding bladder 11 of the reinforced bladder group 1 through the grouting pipe 2 to achieve filling and repair of the roadbed 51 without damaging the original road surface, which helps to reduce the difficulty and cost of repair.

[0048] In some examples of the present invention, such as Figure 3 As shown, each layer of reinforced bag group 1 includes multiple bags 11 arranged in a horizontal array. That is, the multiple bags 11 in each layer of reinforced bag group 1 are constructed in a horizontal array. For example, each layer of reinforced bag group 1 can be constructed with 3*3, 4*4, or 5*5 rows and columns, depending on actual needs; no specific limitation is made here. Thus, by assembling multiple bags 11 in a horizontal array to form the reinforced bag group 1, the laying range of each layer of reinforced bag group 1 can be maximized, allowing the effective lifting range of the bags 11 to cover the entire road surface.

[0049] In some examples of the present invention, such as Figure 1 and Figure 2 As shown, each layer of reinforced bladder group 1 corresponds to multiple grouting pipes 2, wherein the number of grouting pipes 2 is the same as the number of rows or columns of bladders 11 arranged in the array, and each grouting pipe 2 is selectively connected to each bladder 11 in the corresponding row or column.

[0050] Specifically, when the multiple bags 11 of each layer of reinforced bag group 1 are arranged in a horizontal array, multiple grouting pipes with the same number of rows or columns as the arrayed bags 11 can be set up so that each grouting pipe 2 is selectively connected to each bag 11 in the corresponding row or column. For example, assuming the reinforced bag group 1 is constructed with 3*4 rows and columns, three grouting pipes can be set up accordingly. The first grouting pipe is selectively connected to each bag 11 in the first row, and the second grouting pipe is selectively connected to each bag 11 in the second row. The third grouting pipe is selectively connected to each bag 11 in the third row. It can be understood that four grouting pipes can also be set up, in which the first grouting pipe is selectively connected to each bag 11 in the first column, the second grouting pipe is selectively connected to each bag 11 in the second column, the third grouting pipe is selectively connected to each bag 11 in the third column, and the fourth grouting pipe is selectively connected to each bag 11 in the fourth column. This setting can improve the grouting efficiency of the corresponding bag 11 and make it easier to achieve precise control of grouting.

[0051] In some examples of the present invention, such as Figure 1 As shown, the bags 11 in adjacent layers of reinforced bag groups 1 are staggered in the projection along the height direction. Specifically, continuing with the example of a three-layer reinforced bag group 1, each bag 11 in the uppermost layer of reinforced bag group 1 is staggered in the projection along the height direction from each bag 11 in the middle layer of reinforced bag group 1. Furthermore, each bag 11 in the middle layer of reinforced bag group 1 is staggered in the projection along the height direction from each bag 11 in the lowermost layer of reinforced bag group 1. This allows the bags 11 in the three layers of reinforced bag group 1 to be staggered in sequence. This arrangement can further increase the paving range of each layer of reinforced bag group 1, allowing the effective lifting range of the bags 11 to further cover the entire road surface.

[0052] In some examples of the present invention, such as Figures 1-3 As shown, each layer of reinforced bag group 1 is provided with a reinforced geogrid 3. The reinforced geogrid 3 forms multiple reinforced squares 31, wherein the multiple reinforced squares 31 correspond one-to-one with multiple bags 11, and the upper surface of each bag 11 is fixedly connected to the corresponding reinforced square 31.

[0053] Specifically, continuing with the example of a three-layer reinforced geotextile bag assembly 1, each layer of the reinforced geotextile bag assembly 1 is equipped with a reinforced geogrid 3. The reinforced geogrid 3 is prefabricated using polyester fiber, and the geotextile bag 11 is prefabricated using polyurethane. Further, as... Figure 3As shown, the reinforced geogrid 3 includes multiple reinforced squares 31. Each layer of reinforced bag group 1 contains multiple bags 11 corresponding to multiple reinforced squares 31, and the upper surface of each bag 11 is fixedly connected to the corresponding reinforced square 31. When the bags 11 in the settlement area are grouted and expanded, the bags 11 can lift the reinforced geogrid 3 in the settlement area, thereby restoring the road surface settlement to the specified alignment. Thus, by pre-placing the reinforced geogrid 3 in the foundation of the bridge approach slab 5, the reinforced geogrid 3, as a reinforcing material, can form a stable structural network, significantly improving the bearing capacity and deformation resistance of the foundation. Simultaneously, under external loads, the reinforced geogrid 3 can effectively disperse and transfer loads, reduce local stress concentration, increase the overall stiffness and strength of the foundation, and improve the settlement resistance of the bridge approach slab 5, reducing the settlement difference between the bridge approach 200 and the roadbed 51.

[0054] In some examples of the present invention, such as Figures 4-7 As shown, each bag 11 is provided with a grouting hole 111, and the grouting pipe 2 has a plurality of grouting holes 21 that correspond one-to-one with the bags 11. The grouting hole 111 of each bag 11 is fixedly connected to the corresponding grouting hole 21 of the grouting pipe 2, and each grouting hole 21 is provided with a grouting device 4. The grouting device 4 includes a sealing member 41, which selectively opens or blocks the grouting hole 21 so that the grouting hole 111 of each bag 11 is connected to or disconnected from the corresponding grouting hole 21.

[0055] Specifically, such as Figure 5 and Figure 7 As shown, the grouting hole 111 of the bladder 11 is fixedly connected to the grout outlet hole 21 of the grouting pipe 2, and the grout outlet hole 21 of the grouting pipe 2 is provided with a corresponding sealing member 41 of the grouting device 4. The sealing member 41 is used to open or block the grout outlet hole 21. For example, the sealing member 41 can be constructed as, but is not limited to, a one-way rubber plug. When the one-way rubber plug opens the grout outlet hole 21, the grouting hole 111 of the bladder 11 is connected to the corresponding grout outlet hole 21. When the one-way rubber plug blocks the grout outlet hole 21, the grouting hole 111 of the bladder 11 is disconnected from the corresponding grout outlet hole 21. The one-way rubber plug can also effectively prevent the grout in the bladder 11 from flowing back to the grouting pipe 2. That is to say, by controlling the sealing member 41 to selectively open or block the grout outlet hole 21, it is possible to control the connection or disconnection between the grouting hole 111 of the corresponding bladder 11 and the corresponding grout outlet hole 21 of the grouting pipe 2.

[0056] Furthermore, as a specific example, when the roadbed 51 in the bridge approach slab settlement area 5 settles, the grouting device 4 on the grouting pipe 2 corresponding to the settlement area is controlled to open the sealing part 41, so that the grouting pipe injects grout into the corresponding bag 11. When the road surface settlement returns to the specified alignment, the sealing part 41 on the grouting device 4 on the corresponding grouting pipe 2 is controlled to seal the grout outlet 21. The sealing part 41 can effectively prevent the grout in the bag 11 from flowing back to the grouting pipe 2, preventing the grout from flowing back up, so that the bag 11 is kept in a specific shape to overcome the settlement of the roadbed 51. In this way, each bag 11 adopts an independent grouting design. During the grouting repair process, the corresponding bag 11 can be precisely controlled to repair the road surface without interrupting traffic, ensuring that the grout can be accurately filled into the area that needs to be repaired, realizing the precise lifting of the roadbed 51 and the precise repair of the road surface.

[0057] In some examples of the present invention, such as Figures 4-7 As shown, the grouting device 4 also includes a driving component 42 and a transmission component 43. One end of the transmission component 43 is fixedly connected to the sealing component 41, and the other end is fixedly connected to the driving component 42. The transmission component 43 passes through the grouting pipe 2 in the radial direction. The driving component 42 is adapted to drive the transmission component 43 to drive the sealing component 41 to seal or open the grout outlet hole 21.

[0058] Specifically, the driving component 42 is fixedly installed on the grouting pipeline, and the transmission component 43 can be constructed as a valve stem. The valve stem passes through the grouting pipeline 2 in the radial direction, with one end fixedly connected to the sealing component 41 and the other end fixedly connected to the driving component 42. The driving component 42 can be, but is not limited to, a hydraulic cylinder, a motor, or a pneumatic cylinder. The driving component 42 can drive the valve stem to move in the radial direction of the grouting pipeline 2 to block or open the grout outlet 21. For example, when the driving component 42 is a hydraulic cylinder, the spring device 421 inside the hydraulic cylinder is compressed by the hydraulic cylinder when the sealing component 41 needs to be opened for grouting, so as to open the grout outlet 21. Similarly, when the grout outlet 21 needs to be blocked, the spring device 421 is stretched by the hydraulic cylinder to block the grout outlet 21. This configuration greatly improves the automation level of the grouting device 4, enabling automatic grouting of the corresponding bags 11 as needed.

[0059] In some examples of the present invention, such as Figures 4-7 As shown, the grouting device 4 also includes a signal receiving device 44, which is communicatively connected to the driving component 42. The signal receiving device 44 is used to receive control signals, and the driving component 42 drives the sealing component 41 to seal or open the grout outlet hole 21 according to the driving signals.

[0060] Specifically, the grouting device 4 also includes a signal receiving device 44, which can be located inside or outside the grouting device 4. When the roadbed 51 of the bridge approach slab settlement occurs, grouting is required for the corresponding grouting bag 11. At this time, the signal receiving device 44 on the grouting device 4 corresponding to the grouting bag 11 will receive a control signal, and the driving component 42 will drive the sealing component 41 to seal or open the grout outlet 21 according to the driving signal. Thus, remote and precise control of the grouting of the grouting bag 11 can be achieved, enabling precise control of the corresponding grouting bag 11 for road surface repair and ensuring that the grout can be accurately filled into the area that needs to be repaired.

[0061] In some examples of this invention, the vertical distance between two adjacent reinforced bag groups 1 along the height direction is h1, satisfying the relationship: 3.5m ≤ h1 ≤ 4.5m. That is, the interval between two adjacent reinforced bag groups 1 along the height direction is 3.5m to 4.5m. Continuing with the example of a three-layer reinforced bag group 1, the interval between the uppermost reinforced bag group 1 and the middle reinforced bag group 1 along the height direction is 3.5m to 4.5m. Furthermore, the interval between the middle reinforced bag group 1 and the lowermost reinforced bag group 1 along the height direction is 3.5m to 4.5m. This arrangement satisfies the usage requirements and avoids interference after the bags 11 in the upper and lower reinforced bag groups 1 expand.

[0062] In some examples of this invention, the horizontal distance between two adjacent bags 11 is d1, satisfying the relationship: 1.3m ≤ h1 ≤ 1.7m. That is, the horizontal distance between two adjacent bags 11 in each layer of reinforced bag group 1 is 1.3m to 1.7m. In this way, combined with the size of the bags 11 themselves, the laying range of each layer of reinforced bag group 1 can be maximized, so that the effective lifting range of the bags 11 can cover the entire road surface.

[0063] It should be noted that, in the description of this invention, the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential," etc., indicating orientation or positional relationships, are based on the orientation or positional relationships shown in the accompanying drawings and are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this invention. Furthermore, features defined with "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, unless otherwise stated, "a plurality of" means two or more.

[0064] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0065] In the description of this specification, references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.

[0066] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this invention, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.

[0067] Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of the present invention.

Claims

1. A reinforced bladder grouting structure for repairing a bridge head jump. It is characterized in that include: A multi-layer reinforced bag group, wherein the multi-layer reinforced bag group is buried in the roadbed of the bridge head jump area, and two adjacent layers of the reinforced bag group are spaced apart in the height direction, and each layer of the reinforced bag group includes a plurality of horizontally arranged bags; A grouting pipe is selectively connected to each of the bladder bags so as to inject slurry into the corresponding bladder bag through the grouting pipe.

2. The reinforced bladder grouting structure for repairing a bridge head vehicle jump according to claim 1, It is characterized in that Each layer of the reinforced bladder group includes a plurality of bladders arranged in a horizontal array.

3. The reinforced bladder grouting structure for repairing a bridge head bump according to claim 2, It is characterized in that Each layer of the reinforced bag group corresponds to a plurality of grouting pipes, wherein the number of the grouting pipes is the same as the number of rows or columns of the bags arranged in an array, and each of the grouting pipes is selectively connected to each of the bags in the corresponding row or column.

4. The reinforced bladder grouting structure for repairing a bridge head jump according to claim 1, It is characterized in that The bags in the two adjacent layers of the reinforced bag groups are staggered in projection along the height direction.

5. The reinforced bladder grouting structure for repairing a bridge head bump according to claim 1, It is characterized in that Each layer of the reinforced bag group is correspondingly provided with a reinforced geogrid, and the reinforced geogrid forms a plurality of reinforced grids, wherein the plurality of reinforced grids correspond one-to-one to the plurality of bags, and the upper surface of each bag is fixedly connected to the corresponding reinforced grid.

6. The reinforced bladder grouting structure for repairing a bridge head bounce according to any one of claims 1 to 4, It is characterized in that Each of the bladders is provided with a grouting hole, and the grouting pipe has a plurality of slurry outlet holes arranged one-to-one with the bladders. The grouting hole of each of the bladders is fixedly connected to the corresponding slurry outlet hole of the grouting pipe, and each of the slurry outlet holes is correspondingly provided with a grouting device, and the grouting device includes a plugging member, and the plugging member selectively opens or blocks the slurry outlet hole so that the grouting hole of each of the bladders is connected or disconnected with the corresponding slurry outlet hole.

7. The reinforced bladder grouting structure for repairing a bridge head bump according to claim 6, It is characterized in that The grouting device also includes: a driving member and a transmission member, one end of the transmission member is fixedly connected to the blocking member, and the other end is fixedly connected to the driving member, and the transmission member is penetrated in the grouting pipe along the radial direction of the grouting pipe, and the driving member is suitable for driving the transmission member to drive the blocking member to block or open the grouting hole.

8. The reinforced bladder grouting structure for repairing a bridge head bump according to claim 7, It is characterized in that The grouting device further includes: a signal receiving device, which is communicatively connected with the driving member, and is used to receive a control signal. The driving member drives the blocking member to block or open the grout outlet according to the driving signal.

9. The reinforced bladder grouting structure for repairing a bridge head jump according to claim 1, It is characterized in that The vertical distance between two adjacent layers of the reinforced bag groups in the height direction is h1, which satisfies the relationship: 3.5m≤h1≤4.5m.

10. The reinforced bladder grouting structure for repairing a bridge head jump according to claim 1, It is characterized in that The horizontal distance between two adjacent bags is d1, satisfying the relationship: 1.3m≤h1≤1.7m.

Citation Information

Patent Citations

  • Geogrid reinforcement and film bag grouting combined settlement reduction device, settlement reduction method and application

    CN111379203A

  • Bag type grouting soil stress active dynamic control method

    CN113638398A

  • Bridge head bumping bag type grouting repair construction method

    CN113737624A

  • Bridgehead bumping pavement reinforcing and repairing method

    CN114508015A

  • First roadbed structure of public road bridge

    CN206680822U