A composite roof segmented uniform fracture blasting isolation and pressure holding device and its construction method

By using a segmented uniform cracking blasting isolation and pressure-holding device and an optimized blasting method in the composite roof structure, the problem of uneven crack development in traditional blasting methods was solved, achieving the ideal roof cutting effect and improved safety of the composite roof.

CN118913042BActive Publication Date: 2026-11-17SHANXI PINGSHU COAL CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411338486.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2026-11-17
Estimated Expiration
2044-09-25

AI Technical Summary

Technical Problem

Traditional blasting methods are difficult to controllably pre-crack composite roof structures, resulting in a gradual reduction in the development range of cracks after blasting, making it difficult for the cuts of adjacent pre-cracked holes to be connected, and failing to guarantee the ideal roof cutting effect.

Method used

A composite roof segmented uniform fracture blasting isolation and pressure holding device is adopted, including a pipe body, an expansion sleeve and a sealing component. By opening annular grooves and material passage holes in the circumferential sidewall of the pipe body, the expansion sleeve expands and fills the cut holes under the action of the expansion agent. Combined with the sensitivity differences of different lithological zones, the charge amount and blasting sequence are optimized to achieve independent blasting of each rock layer.

Benefits of technology

This method enabled the connection of cracks in each rock stratum after blasting, optimized the blasting effect, reduced the amount of explosives used, and improved the controllability and safety of the roof cutting effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118913042B_ABST
    Figure CN118913042B_ABST
Patent Text Reader

Abstract

This invention relates to a composite roof segmented uniform fracture blasting isolation and pressure-holding device and construction method, belonging to the field of mining technology. It includes a pipe body, an expansion sleeve, and a sealing component. The pipe body has an internal cavity, and multiple sets of annular grooves are formed on its circumferential sidewalls. These annular grooves are evenly spaced along the length of the pipe body. Multiple material passage holes communicating with the cavity are formed on the pipe wall located within the annular grooves. The expansion sleeve is fitted onto the circumferential groove wall of the annular grooves. The sealing component is disposed within the cavity and is used to seal both ends of the pipe body along its length. This invention fully utilizes the differences in sensitivity of different lithologies to blasting, reduces the amount of explosives used, optimizes the blasting effect, and solves the problems of difficulty in penetrating pre-splitting holes and poor roof cutting effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of mining technology, and in particular to a composite roof segmented uniform fracture blasting isolation and pressure holding device and construction method. Background Technology

[0002] Pre-splitting blasting for roof cutting is a key method in roof weakening technology. Current research on roof weakening mainly focuses on the surrounding rock control mechanisms and technologies that assume good roof cutting effects have been achieved. However, the assumed good roof cutting effect is difficult to control in actual engineering applications. Therefore, optimizing roof cutting and pressure relief technology, especially pre-splitting blasting technology for composite roof structures, is of great significance for improving roof weakening effects and mine safety.

[0003] The composite roof is composed of multiple layers of rocks with different lithologies. The sensitivity of each layer to blasting varies significantly, and the fracture state of each layer under blasting exhibits different patterns depending on the lithology of the blasting layer. Traditional blasting methods, due to the lack of consideration for the matching of explosives and lithology, typically employ pre-splitting blasting parameters with large explosive charges and small spacing. However, this method is difficult to controllably pre-splitting composite roof structures, easily leading to a gradual decrease in the fracture development range from the bottom of the hole to the opening, i.e., an inverted cone shape (see reference). Figure 1 Furthermore, the cuts between adjacent pre-splitting holes are difficult to connect, forming a rock ledge near the hole opening (see reference). Figure 2 Therefore, it is impossible to guarantee an ideal top-cutting effect.

[0004] Regarding the aforementioned technical phenomena, the inventors believe that the blasting effect is caused by the combined action of the explosive shock wave and the wedging of the explosive gas. The explosive shock wave is instantaneous, causing the rock mass to fracture and form a fracture zone under tensile and shear stresses. The explosive gas then wefts into the fractures, further damaging the rock mass. During the blasting process, the existing fractures in the rock mass can be considered as a buffer layer. Due to their porous nature, they can guide the explosive gas and weaken the blast shock wave. Macroscopically, this manifests as a significant difference in the sensitivity of soft and hard rock to blasting. Therefore, the inventors propose a composite roof segmented uniform fracture blasting isolation and pressure-maintaining device, combined with blasting construction methods, to optimize the roof cutting effect. Summary of the Invention

[0005] The purpose of this invention is to provide a composite roof slab segmented uniform cracking blasting isolation and pressure holding device and construction method, which solves the problem that the pre-cracked cutting holes are difficult to penetrate and the roof cutting effect is poor.

[0006] The present invention provides a composite roof segmented uniform fracture blasting isolation and pressure holding device, which adopts the following technical solution: A composite roof segmented uniform fracture blasting isolation and pressure holding device, comprising, The tube body has a cavity inside, and annular grooves are formed on the circumferential sidewalls of the tube body. Multiple sets of annular grooves are provided, and the multiple sets of annular grooves are distributed at equal intervals along the length of the tube body. Multiple sets of material passage holes communicating with the cavity are formed on the tube wall of the tube body located in the annular grooves. An expansion sleeve is fitted onto the circumferential groove wall of the annular groove; A sealing element is disposed within the cavity, and the sealing element is used to seal both ends of the pipe body along its length.

[0007] Preferably, the expansion sleeve is made of rubber and includes a main cylinder and an expanding cylinder. The main cylinder is fitted onto the circumferential wall of the annular groove, and the diameter of the expanding cylinder gradually decreases. The constricted end of the expanding cylinder is connected to the circumferential sidewall of the main cylinder.

[0008] Preferably, the sealing component includes a connecting rod and a sealing plate assembly, wherein two sets of sealing plate assemblies are provided, and the two sets of sealing plate assemblies are respectively provided at both ends of the connecting rod along its length. The cavity wall is provided with a limiting structure for fixing the sealing plate assemblies.

[0009] Preferably, the sealing plate assembly includes a septum and a steel sheet, which are sequentially installed on the end of a connecting rod, and the end of the connecting rod is provided with a limiting member for fixing the sealing plate assembly.

[0010] Preferably, the limiting structure is a limiting ring, and the limiting structure is provided in two sets, with the side of the diaphragm facing away from the steel sheet abutting against the limiting structure.

[0011] Preferably, the limiting ring body has a threading groove.

[0012] Preferably, mounting grooves are provided at both ends of the connecting rod along its length, and the spacer and steel sheet are fitted around the circumferential wall of the mounting groove. The limiting component is a nut, and the circumferential groove wall of the mounting groove is provided with a thread that matches the nut.

[0013] Preferably, the cavity walls at both ends along the length of the cavity are further provided with wire loops, which are located on the side of the septum away from the steel sheet.

[0014] The present invention also provides a construction method for the composite roof segmented uniform fracture blasting isolation and pressure holding device described above, comprising the following steps: S1. Drill core samples from the roof of the roadway to be pre-splitting blasting, with a core length greater than 3 times the mining height. Take several rock samples and test them to obtain the rock mass quality classification. S2. Based on the rock samples taken in step S1, analyze the location of the key layers of the top plate, design and construct slotting holes, drill through the slotting holes, analyze the lithological structure and fracture development characteristics of each layer, divide the pre-blasting zone and the non-blasting zone, and divide the pre-blasting zone into soft rock blasting zone, medium-hard rock blasting zone, hard rock blasting zone and their corresponding lengths. S3. Determine the charge amount for the soft rock blasting zone, medium-hard rock blasting zone, and hard rock blasting zone in step S2, and fill the explosives into multiple sets of shaped charge tubes; S4. Connect the energy-concentrating tube and the composite top plate segmented uniform fracture blasting isolation and pressure-holding device from step S3 end to end, and lead out the wires. S5. Repeat steps S3 and S4 to complete the loading of the slit hole, and insert an electronic digital detonator into the end of the pre-blasting zone near the non-blasting zone, and lead out the wire of the electronic digital detonator. S6. Seal the cut hole and connect it in parallel to the electronic digital detonator detonation network; S7. Let stand for 20-30 minutes, evacuate the underground personnel to a safe location, and detonate to complete the blasting and roof cutting operation.

[0015] Preferably, the installation of the composite roof segmented uniform fracture blasting isolation and pressure holding device in step S4 includes the following steps: S1. Place the expansion sleeve into the annular groove of the tube body, introduce the lead wire from the top of the tube body, and lead it out from the bottom of the tube body. S2. Install the sealing plate assembly located at the bottom of the pipe body. Place the septum and steel plate in the mounting groove of the connecting rod in sequence, install the nut to fix the sealing plate assembly, and make the side of the septum away from the steel plate abut against the limiting ring located at the bottom of the pipe body. S3. Prepare the slow-expansion agent and inject it into the cavity from the top of the pipe. Stop filling after the slow-expansion agent fills to the limiting ring at the top of the pipe. Install the diaphragm and steel plate at the top of the pipe in sequence, and install the nut to obtain the composite top plate segmented uniform fracture explosion isolation and pressure holding device.

[0016] In summary, the present invention has the following beneficial technical effects: 1. The present invention provides a composite roof segmented uniform fracture blasting isolation and pressure-maintaining device, comprising a pipe body, an expansion sleeve, and a sealing component. The pipe body has an annular groove on its circumferential sidewall, with a material passage hole in the groove wall. The expansion sleeve is fitted onto the groove wall. The pipe body has a cavity pre-filled with a slow-expansion agent. The sealing component seals both ends of the pipe body along its length, preventing the slow-expansion agent from flowing out. The slow-expansion agent flows from the material passage hole to the gap between the expansion sleeve and the annular groove. The sleeve expands under the action of the expansion agent, causing the slow-expansion agent to fill the cut hole, compacting the rock mass and achieving the isolation effect.

[0017] 2. The composite roof segmented uniform fracture blasting isolation and pressure holding device and blasting construction method in this invention weaken the energy absorption effect of the soft rock blasting zone on the explosive shock wave, reduce the phenomenon of explosive gas escaping from the hard rock blasting zone to the soft rock blasting zone, enable each blasting zone to have an independent post-blast explosive gas wedging process, make full use of the sensitivity differences of different lithologies to blasting action, reduce the amount of explosives used, and optimize the blasting effect. Attached Figure Description

[0018] Figure 1 These are blasting effect diagrams using traditional explosive charging methods; Figure 2 This is a diagram illustrating the blasting effect under uniformly dispersed explosive charge method; Figure 3 This is a schematic diagram of the structure of a composite roof segmented uniform cracking blasting isolation and pressure holding device provided in an embodiment of the present invention; Figure 4 This is a structural diagram to show the disassembled state of the sealing component; Figure 5 This is a schematic diagram of the pipe body without the expansion sleeve installed; Figure 6 This is a cross-sectional structural diagram of the expansion sleeve component; Figure 7 This is a structural schematic diagram of the site layout in an embodiment of the present invention; Figure 8 This is a schematic diagram of the blasting zone arrangement in an embodiment of the present invention; Figure 9 This is a schematic diagram of the blasting effect structure in an embodiment of the present invention.

[0019] Explanation of reference numerals in the attached drawings: 1. Tube body; 11. Cavity; 111. Limiting structure; 112. Wire groove; 113. Wire loop; 12. Ring groove; 121. Material passage hole; 2. Expansion sleeve; 21. Main cylinder; 22. Expanding cylinder; 3. Sealing component; 31. Connecting rod; 311. Mounting groove; 32. Sealing plate assembly; 321. Spacing pad; 322. Steel sheet; 4. Limiting component; 5. Pre-blasting zone; 51. Hard rock blasting zone; 52. Medium-hard rock blasting zone; 6. Non-blasting zone; 7. Digital electronic detonator. Detailed Implementation

[0020] The following is in conjunction with the appendix Figure 1-9 The present invention will be described in further detail below.

[0021] This invention provides a composite roof segmented uniform fracture blasting isolation and pressure holding device, referring to... Figure 3 and Figure 4 It includes a tube body 1, an expansion sleeve 2, and a sealing element 3; wherein, the tube body 1 has a cavity 11 extending through both ends along its length, and the cavity 11 is used to fill a slow-expansion agent; see reference Figure 5The pipe body 1 has multiple sets of annular grooves 12 evenly spaced along its length on its circumferential sidewall. The annular grooves 12 are used to install the expansion sleeve 2. The groove walls of the annular grooves 12 have multiple sets of material passage holes 121 that communicate with the cavity 11. The expansion agent flows through the material passage holes 121 to the gap between the expansion sleeve 2 and the annular grooves 12. The sleeve expands under the action of the expansion agent, thereby filling the cut hole with the slow-expanding agent, compacting the rock mass, and achieving the isolation effect. The sealing element 3 is set in the cavity 11 to seal both ends of the pipe body 1 along its length to prevent the expansion agent from flowing out from both ends of the pipe body 1 along its length.

[0022] Reference Figure 3 and Figure 6 In this embodiment, the expansion sleeve 2 is made of rubber, thus possessing deformable characteristics. The expansion sleeve 2 includes a main cylinder 21 and an expanding cylinder 22. The main cylinder 21 is fitted onto the circumferential wall of the annular groove 12. The diameter of the expanding cylinder 22 gradually decreases, and its constricted end is fixedly connected to the circumferential sidewall of the main cylinder 21. Under the pressure of the slow-expansion agent, the expansion sleeve 2 expands. At this time, the flared end of the expanding cylinder 22 abuts against the wall of the slit hole, thereby achieving a positioning effect on the pipe body 1.

[0023] Reference Figure 4 The sealing component 3 includes a connecting rod 31 and a sealing plate assembly 32. In this embodiment, the connecting rod 31 is made of steel. Two sets of sealing plate assemblies 32 are provided, and the two sets of sealing plate assemblies 32 are respectively installed at both ends of the length direction of the connecting rod 31. The sealing plate assembly 32 includes a spacer 321 and a steel sheet 322. The two ends of the length direction of the connecting rod 31 are respectively provided with mounting grooves 311. The spacer 321 and the steel sheet 322 are sequentially fitted onto the circumferential groove wall of the mounting groove 311. The two ends of the length direction of the connecting rod 31 are respectively provided with limiting components 4 for fixing the sealing plate assembly 32, and the cavity wall of the cavity 11 is provided with a limiting structure 111 for fixing the sealing component 3.

[0024] Reference Figure 4 In this embodiment, the limiting member 4 is a nut, and the circumferential groove wall of the mounting groove 311 is provided with a thread that matches the nut. The nut is threadedly connected to the mounting groove 311 to fix the septum 321 and the steel plate 322. In this embodiment, the limiting structure 111 is a limiting ring. The limiting ring is fixedly connected to the cavity walls at both ends of the cavity 11 in the length direction. The side of the septum 321 facing away from the steel plate 322 abuts against the limiting ring, thereby completing the fixing of the sealing member 3.

[0025] Reference Figure 4The limiting ring body has a wire-passing groove 112, and the septum 321 in this embodiment is made of rubber. The lead wire can pass through the edge of the septum 321 into the wire-passing groove 112 to reduce the squeezing of the lead wire. The cavity walls at both ends of the cavity 11 along the length direction are also fixedly connected to wire-binding rings 113 for the lead wire to pass through. The wire-binding rings 113 are located on the side of the septum 321 away from the steel sheet 322, and the wire-binding rings 113 play a role in organizing the lead wire.

[0026] This invention also provides a method for installing and blasting a composite roof segmented uniform fracture blasting isolation and pressure-holding device, referring to... Figures 1-8 This includes the following steps: S1. The mining height is 4m. The roof of the roadway to be pre-splitting and blasting is drilled and cored. The core length is more than 3 times the mining height. In this embodiment, the core length is 15m. Several mudstone, coarse sandstone, sandy mudstone, coarse sandstone and fine sandstone rock samples are obtained and tested. The wave impedance, elastic modulus and compressive strength of the rock samples are measured and the rock mass quality is classified. S2. Based on the analysis of the key layer location of the roof based on the rock samples taken in step S1, design and construct the slotting holes. The slotting location is 800mm away from the sidewall of the working face, the slotting angle is 15°, the hole depth is 15.0m, and the hole spacing is 1.5m. The directly roof mudstone is considered to be unable to resist the action of blasting and is prone to hole punching, which may lead to local collapse of the roof. Therefore, it is divided into a non-blasting zone 6 with a length of 4.0m and a pre-blasting zone 5 with a length of 11.0m. S3. Drill through the slotted hole to analyze the lithological structure and fracture development characteristics of each layer, and divide the pre-blasting zone 5 into a soft rock blasting zone 52, a medium-hard rock blasting zone 52, and a hard rock blasting zone 51, along with their corresponding lengths. In this embodiment, 3.42m from the bottom of the hole is fine sandstone, which is hard and has poor bedding, and is classified as hard rock blasting zone 51, with a length of 3.2m; 2.15m from the outside of the fine sandstone is coarse sandstone, which is hard and has well-developed bedding, and is also classified as hard rock blasting zone 51, with a length of 1.7m; 2.74m from the outside of the coarse sandstone is sandy mudstone, which is relatively hard and has well-developed bedding, and is classified as medium-hard rock blasting zone 52, with a length of 2.3m; 2.21m from the outside of the sandy mudstone is limestone, which is hard and has well-developed bedding, and is also classified as hard rock blasting zone 51, with a length of 2m. S4. Based on the blasting zones and lengths defined in S3, determine the charge amount for each blasting zone. For the hard rock blasting zone, the charge density for line 51 is 600g / m, and the required charge amount is 4.08kg, so we take 4.1kg. For the medium-hard rock blasting zone, the charge density for line 52 is 300g / m, and the required charge amount is 690g, so we take 0.7kg. S5. Based on the charge amount determined in S4, load the explosive and digital electronic detonator 7 into the shaped charge tube from the bottom of the hole. The shaped charge direction of the shaped charge tube should be towards the working face advancing direction. The shaped charge hole of the digital electronic detonator 7 should always be towards the bottom of the hole to control the detonation direction. After the explosive is loaded, use the shaped charge hole to tie the wire to form a limiter to fix the position of the explosive. S6. After the explosive is loaded, install the composite roof segmented uniform fracture blasting isolation and pressure holding device. Place the expansion sleeve 2 on the annular groove 12 of the tube body 1. Introduce the lead wire from the top of the tube body 1 and bring it out from the bottom of the tube body 1. Install the sealing plate group 32 located at the bottom of the tube body 1. Place the diaphragm 321 and steel plate 322 in the mounting groove 311 of the connecting rod 31 in sequence. Install the nut to fix the sealing plate group 32, so that the side of the diaphragm 321 away from the steel plate 322 abuts against the limiting ring at the bottom of the tube body 1. Prepare the slow expansion agent and inject the slow expansion agent from the top of the tube body 1 into the cavity 11. Stop filling after the slow expansion agent fills to the limiting ring at the top of the tube body 1. Install the diaphragm 321 and steel plate 322 located at the top of the tube body 1 in sequence and install the nut to obtain the composite roof segmented uniform fracture blasting isolation and pressure holding device. S7, the shaped charge tube in step S5 and the composite top plate segmented uniform fracture blasting isolation and pressure holding device in step S6 are connected end to end in sequence, and wires are led out. Steps S5 and S6 are repeated to complete the loading of explosives into the cut hole. An electronic digital detonator is filled into the end of the pre-blasting zone 5 near the non-blasting zone 6, and the wires of the electronic digital detonator are led out. S8. Seal the cut hole and connect it in parallel to the electronic digital detonator detonation network; S9. Let stand for 20-30 minutes, evacuate the underground personnel to a safe location, and detonate to complete the blasting and roof cutting operation.

[0027] Reference Figure 9 By employing the composite roof segmented uniform cracking blasting isolation and pressure-holding device and the matching charging blasting method of the present invention, the cracks in the composite roof after blasting are in a continuous state, achieving an ideal roof-cutting effect.

[0028] The above are all preferred embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Therefore, all equivalent changes made in accordance with the structure, shape and principle of the present invention should be covered within the scope of protection of the present invention.

Claims

1. A composite roof segmented uniform fracture blasting isolation and pressure holding device, characterized in that, include, The tube body (1) has a cavity (11) inside. The circumferential sidewall of the tube body (1) has an annular groove (12). There are multiple sets of annular grooves (12). The multiple sets of annular grooves (12) are distributed at equal intervals along the length of the tube body (1). The tube body (1) has multiple sets of material passage holes (121) that communicate with the cavity (11) on the tube wall of the annular groove (12). An expansion sleeve (2) is fitted onto the circumferential groove wall of the annular groove (12); A sealing element (3) is disposed in the cavity (11), and the sealing element (3) is used to seal both ends of the tube body (1) in the length direction; The expansion sleeve (2) is made of rubber. The expansion sleeve (2) includes a main cylinder (21) and an expansion cylinder (22). The main cylinder (21) is sleeved on the circumferential groove wall of the annular groove (12). The diameter of the expansion cylinder (22) gradually decreases. The constricted end of the expansion cylinder (22) is connected to the circumferential side wall of the main cylinder (21). The sealing component (3) includes a connecting rod (31) and a sealing plate group (32). The sealing plate group (32) is provided in two sets, and the two sets of sealing plate groups (32) are respectively provided at both ends of the connecting rod (31) in the length direction. The cavity wall (11) is provided with a limiting structure (111) for fixing the sealing plate group (32). The sealing plate assembly (32) includes a septum (321) and a steel plate (322). The septum (321) and the steel plate (322) are installed sequentially at the end of the connecting rod (31). The end of the connecting rod (31) is provided with a limiting member (4) for fixing the sealing plate assembly (32). The limiting structure (111) is a limiting ring body. The limiting structure (111) is provided in two sets. The side of the diaphragm (321) facing away from the steel sheet (322) abuts against the limiting structure (111). The connecting rod (31) has mounting grooves (311) at both ends along its length. The spacer (321) and the steel plate (322) are fitted onto the circumferential wall of the mounting groove (311). The limiting member (4) is a nut, and the circumferential wall of the mounting groove (311) has threads that match the nut.

2. The composite roof segmented uniform fracture blasting isolation and pressure holding device according to claim 1, characterized in that, The limiting ring body is provided with a threading groove (112).

3. The composite roof segmented uniform fracture blasting isolation and pressure holding device according to claim 1, characterized in that, The cavity (11) is provided with wire loops (113) at both ends of the cavity wall along its length. The wire loops (113) are located on the side of the septum (321) away from the steel sheet (322).

4. A construction method for the composite roof segmented uniform fracture blasting isolation and pressure-holding device according to any one of claims 1-3, characterized in that, Includes the following steps: S1. Drill core samples from the roof of the roadway to be pre-splitting blasting, with a core length greater than 3 times the mining height. Take several rock samples and test them to obtain the rock mass quality classification. S2. Based on the rock samples taken in step S1, analyze the location of the key layer of the top plate, design and construct the slotting hole, drill the slotting hole for inspection, analyze the lithological structure and fracture development characteristics of each layer, divide the pre-blasting zone (5) and non-blasting zone (6), and divide the pre-blasting zone (5) into soft rock blasting zone, medium-hard rock blasting zone (52), hard rock blasting zone (51) and their corresponding lengths; S3. Determine the charge amount of the soft rock blasting zone, medium-hard rock blasting zone (52) and hard rock blasting zone (51) in step S2, and fill the explosives into multiple sets of shaped charge tubes; S4. Connect the energy-concentrating tube and the composite top plate segmented uniform fracture blasting isolation and pressure-holding device from step S3 end to end, and lead out the wires. The installation of the composite roof segmented uniform fracture blasting isolation and pressure holding device includes the following steps: S41. Place the expansion sleeve (2) into the annular groove (12) of the tube body (1), introduce the lead wire from the top of the tube body (1), and bring it out from the bottom of the tube body (1); S42. Install the sealing plate assembly (32) located at the bottom of the pipe body (1), place the septum (321) and steel plate (322) in the mounting groove (311) of the connecting rod (31) in sequence, install the nut to fix the sealing plate assembly (32), and make the side of the septum (321) away from the steel plate (322) abut against the limiting ring located at the bottom of the pipe body (1); S43. Prepare the slow-expansion agent and inject the slow-expansion agent from the top of the tube (1) into the cavity (11). After the slow-expansion agent fills to the limiting ring at the top of the tube (1), stop filling. Install the diaphragm (321) and steel sheet (322) at the top of the tube (1) in sequence, and install the nut to obtain the composite top plate segmented uniform cracking explosion isolation and pressure holding device. S5. Repeat steps S3 and S4 to complete the loading of the slit hole, and fill the end of the pre-blasting zone (5) near the non-blasting zone (6) with an electronic digital detonator, and lead out the wire of the electronic digital detonator. S6. Seal the cut hole and connect it in parallel to the electronic digital detonator detonation network; S7. Let stand for 20-30 minutes, evacuate the underground personnel to a safe location, and detonate to complete the blasting and roof cutting operation.

Citation Information

Patent Citations

  • Self-expanding filling body for blasthole blocking and preparation and construction method of self-expanding filling body

    CN115235309A

  • Blasting hole sealing device

    CN117029604A

  • Multistage portfire

    JP1998288500A