Method, device, medium and equipment for monitoring and analyzing landslide deformation without stable control point
By selecting a monitoring point with high stability as an approximate control point in landslide deformation monitoring, coordinate conversion and weighted least squares solution, the information unreality caused by instability in landslide deformation monitoring is solved, and the information is realized Accurate acquisition and early warning support for landslide deformation information.
Patent Information
- Application Number
- CN202410305815.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-18
- Publication Date
- 2024-11-08
AI Technical Summary
In landslide deformation monitoring, if the control point is unstable, the established monitoring reference network and coordinate system are unstable, resulting in the landslide deformation information calculated by poor coordinates of the monitoring point is untrue, especially when the landslide scale is large, the real landslide deformation cannot be obtained. information.
By obtaining the initial geodesic coordinates of the non-stable monitoring site of the landslide to be monitored, analyzing the real-time geodesic coordinates of multiple monitoring points, selecting monitoring points with higher stability as approximate control points, and performing coordinate conversion to obtain the true coordinates of the landslide. Weighted least squares method solves unknown parameters to minimize the direction angle change value of the displacement plane vector.
When the control point moves or there is no stable control point, the real deformation information of the landslide can be accurately obtained, and scientific data can be provided to support the landslide deformation mechanism analysis, stability identification and prediction warning, avoiding losses caused by inaccurate warning.
Smart Images

Figure CN118913197A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of landslide deformation monitoring and analysis data, and in particular to a method, device, medium and equipment for monitoring and analyzing landslide deformation without stable control points. Background Art
[0002] Landslide deformation monitoring data is very important for the stability analysis and prediction and early warning of landslides. Landslide surface deformation monitoring is widely used because of its simple operation and large monitoring range. At present, the surface deformation monitoring of landslides mainly uses stable measuring points outside the landslide area as measurement control points to establish a monitoring benchmark network and coordinate system; uses a total station to measure the corners to obtain the coordinate values of the monitoring points within the landslide area, and calculates the coordinate values of the monitoring points at different periods to obtain the displacement of the monitoring points. However, if there is a survey error, the selected control point may be unstable, that is, when the established monitoring benchmark network and coordinate system are unstable, the landslide deformation information obtained by calculating the coordinate difference of the monitoring points at different periods is not the real landslide deformation information. In addition, when the scale of the landslide is large, it may not be possible to establish a landslide deformation monitoring network with stable control points, and the existing technology cannot obtain the real landslide deformation information. Therefore, when monitoring landslide deformation, how to analyze and process the monitoring data without stable control points to obtain more realistic deformation information of the landslide is a problem that needs to be solved. Summary of the invention
[0003] In view of this, the present invention provides a method, device, medium and equipment for monitoring and analyzing landslide deformation without stable control points, which can more accurately obtain the real deformation information of the landslide when the control point moves or there is no stable control point, so as to be more suitable for practical use.
[0004] In order to achieve the first objective above, the technical solution of the method for monitoring and analyzing landslide deformation without stable control points provided by the present invention is as follows:
[0005] The method for monitoring and analyzing landslide deformation without stable control points provided by the present invention comprises the following steps:
[0006] Obtain the initial geodetic coordinates of at least two unstable monitoring stations of the landslide to be monitored as an imaginary coordinate system;
[0007] In the coordinate system, obtaining the initial geodetic coordinates of at least three other monitoring points of the landslide to be monitored;
[0008] Obtaining the real-time geodetic coordinates of each monitoring point in the first period, the second period, and the nth period among the other monitoring points;
[0009] Performing data analysis on the real-time geodetic coordinates of the first, second, and nth periods of each of the plurality of other monitoring points, and obtaining a set number of monitoring points with top stability data rankings among the plurality of other monitoring points as geodetic coordinates of approximate control points of the landslide to be monitored;
[0010] Wherein, n is a positive integer greater than or equal to 3.
[0011] The method for monitoring and analyzing landslide deformation without stable control points provided by the present invention can also be further implemented by adopting the following technical measures.
[0012] Preferably, after performing data analysis on the real-time geodetic coordinates of the first, second, and nth periods of each monitoring point among the plurality of other monitoring points to obtain a set number of monitoring points with top stability data among the plurality of other monitoring points as approximate control points of the landslide to be monitored, the following steps are also included:
[0013] The geodetic coordinates of the approximate control points of the landslide to be monitored are used as common points to perform coordinate transformation to obtain the real coordinates of the landslide to be monitored.
[0014] Preferably, in the step of using the geodetic coordinates of the approximate control points of the landslide to be monitored as common points to perform coordinate transformation to obtain the real coordinates of the landslide to be monitored, the coordinate transformation method includes whether the distance between the measuring points changes, or one or more of the limit difference method or the quasi-stable adjustment method.
[0015] Preferably, the geodetic coordinates of the approximate control points of the landslide to be monitored are used as common points to perform coordinate transformation to obtain the real coordinates of the landslide to be monitored, which specifically includes the following steps:
[0016] Assume that the geodetic coordinates of one of the approximate control points of the landslide to be monitored are as follows: Phase 1 is X1:(x 01 ,y 01 , α1) T , the second period is X2:(x 02 ,y 02 , α2) T , ..., the jth period is X j :(x 0j ,y 0j , α j ) T , ..., the nth period is X n :(x 0n ,y 0n , α n ) T ;
[0017] According to the actual situation, the constraint conditions satisfied by the conversion parameters of the approximate control points of the landslide to be monitored are established;
[0018] According to the constraint conditions satisfied by the conversion parameters of the approximate control points of the landslide to be monitored, the geodetic coordinates of one of the approximate control points of the landslide to be monitored are converted to obtain the real coordinates of the landslide to be monitored.
[0019] Preferably, according to the constraint conditions satisfied by the conversion parameters of the approximate control points of the landslide to be monitored, converting the geodetic coordinates of one of the approximate control points of the landslide to be monitored to obtain the real coordinates of the landslide to be monitored specifically comprises the following steps:
[0020] For the coordinates of the monitoring points of the control point to be monitored from the 1st to the nth period, select no less than 3n / (n-1) normal measuring points to calculate the difference between the coordinates of each period and the initial coordinates, and obtain the displacement plane vectors and vector direction angles of the monitoring points of the 1st to the nth period;
[0021] The displacement plane vector direction angle of the control point to be monitored from the 2nd to the nth period is calculated by comparing it with the displacement plane vector direction angle of the 1st period to obtain the displacement plane vector direction angle change value of the monitoring point from the 1st period to the n-1th period;
[0022] For the change value of the displacement plane vector direction angle in the n-1 period, under the condition of satisfying the coordinate system transformation parameter constraints, the weighted least squares method is used to solve the unknown parameters X1, X2, ..., X n ;
[0023] The unknown parameters X1, X2, ..., X n Substitute into the coordinate conversion formula to obtain the real coordinates of the landslide to be monitored.
[0024] Preferably, according to actual conditions, establishing the constraint conditions satisfied by the conversion parameters of the approximate control points of the landslide to be monitored specifically comprises the following steps:
[0025] The initial coordinates of the approximate control point are marked as L A0 , L B0 , select m monitoring points with initial coordinates marked as L 10 , L 20 ,……,L m0 ; The observed coordinates of the approximate control points for the 1st to nth periods are L A1 , L B1 , L A2 , L B2 ……、L An , L Bn The coordinates of the monitoring points are L 11 , L 21,……,L m1 , L 12 , L 22 ,……,L m2 , ..., L 1n , L 2n ,……,L mn ,
[0026] Assume that the unknown parameters X1, X2, ..., X n They are
[0027] X1=(x 01 ,y 01 , α1) T , X2=(x 02 ,y 02 , α2) T , ..., X j =(x 0j ,y 0j , α j ) T , ..., X n =(x 0n ,y 0n , α n ) T
[0028] In the formula, x 0j ,y 0j , α j are the translation parameters and rotation parameters of the j-th coordinate transformation,
[0029] Calculate the transformed coordinates L using the unknown parameters ij ′, the coordinate transformation calculation formula is listed as follows
[0030]
[0031] Where i = 1, 2, ..., m, j = 1, 2, ..., n,
[0032] Analyze the updated monitoring point coordinates, and calculate the plane displacement vectors of the m monitoring points in each period through the difference between the monitoring point coordinates from the 1st to the nth period and the initial coordinates. The formula is as follows
[0033]
[0034] List the calculation formulas for the plane displacement vector direction angles of all m monitoring points from the 1st to the nth period
[0035]
[0036] List the calculation formulas for the displacement plane vector angle change values of all m monitoring points from the 1st period to the n-1th period
[0037] Vθ ij =α i,j+1 -α i,j (4)
[0038] Where, i = 1, 2, ..., m, j = 1, 2, ..., n-1;
[0039] Write the displacement plane vector angle change values of m monitoring points from the 1st period to the n-1th period in matrix form
[0040]
[0041] Solve the unknown parameters using the weighted least squares method The optimal solution makes the following equation true,
[0042]
[0043] In the formula, is the weight matrix;
[0044] Calculate the weight matrix. Since the longer the observation time, the greater the possibility of the change of the displacement plane vector direction angle of the measuring point, the square of the observation time is used as the basis for calculating the weight matrix. The weight corresponding to the change value of the displacement plane vector angle from the 1st period to the n-1th period is 1 / (t j +1-t1)2,t1,t2,…t n They represent the difference between the observation time from the 1st to the nth period and the initial observation time. The calculation method of the weight matrix is as follows:
[0045]
[0046] In the formula,
[0047]
[0048] Expand to get
[0049]
[0050] List the constraints of the unknown parameters and transform the solution of the unknown parameters in formula (6) into a quadratic programming problem, that is,
[0051]
[0052] calculate The optimal solution of
[0053] Will Substituting the optimal solution into equation (1) can obtain the updated approximate control point coordinates and monitoring point coordinates;
[0054] Substitute the updated monitoring point coordinates into equations (2) and (3) to calculate the displacement plane vector and the displacement plane vector direction angle to obtain the actual landslide deformation information.
[0055] Preferably, the calculation The optimal solution is implemented using Matlab programming.
[0056] In order to achieve the above second purpose, the technical solution of the landslide deformation monitoring and analysis device without stable control points provided by the present invention is as follows:
[0057] The device for monitoring and analyzing landslide deformation without stable control points provided by the present invention comprises:
[0058] A first coordinate acquisition module is used to acquire the initial geodetic coordinates of at least two unstable monitoring sites of the landslide to be monitored as an imaginary coordinate system;
[0059] A second coordinate acquisition module is used to acquire the initial geodetic coordinates of at least three other monitoring points of the landslide to be monitored in the coordinate system;
[0060] A third coordinate acquisition module is used to acquire the real-time geodetic coordinates of each monitoring point in the first period, the second period, and the nth period among the other monitoring points;
[0061] A data analysis module is used to perform data analysis on the real-time geodetic coordinates of the first, second, and nth periods of each of the plurality of other monitoring points, and obtain a set number of monitoring points with top stability data rankings among the plurality of other monitoring points as the geodetic coordinates of the approximate control points of the landslide to be monitored;
[0062] Wherein, n is a positive integer greater than or equal to 3.
[0063] In order to achieve the third objective above, the technical solution of the computer-readable storage medium provided by the present invention is as follows:
[0064] The computer-readable storage medium provided by the present invention stores a landslide deformation monitoring and analysis program without stable control points. When the landslide deformation monitoring and analysis program without stable control points is executed by a processor, the steps of the landslide deformation monitoring and analysis method without stable control points provided by the present invention are implemented.
[0065] In order to achieve the fourth objective, the technical solution of the electronic device provided by the present invention is as follows:
[0066] The electronic device provided by the present invention comprises a memory and a processor, wherein a program for monitoring and analyzing landslide deformation without stable control points is stored in the memory, and when the program for monitoring and analyzing landslide deformation without stable control points is executed by the processor, the steps of the method for monitoring and analyzing landslide deformation without stable control points provided by the present invention are implemented.
[0067] The method, device, medium and equipment for monitoring and analyzing landslide deformation without stable control points provided by the present invention aim at the problem that "when the control points in the landslide deformation monitoring network move or there are no stable control points, the deformation information of the landslide obtained by measuring and analyzing the coordinates of the monitoring points does not match the actual situation", and proposes a simple, economical and effective landslide deformation monitoring and analysis method. By using this monitoring and analysis method, combined with the inherent characteristics of landslide deformation and destruction, that is, the direction of the landslide does not change within a certain period of time, through the analysis and processing of the measurement data of the monitoring points, the movement of the control points can be estimated, and the deformation characteristics of the landslide close to the actual situation can be obtained, thereby providing scientific data support for the deformation mechanism analysis, stability identification and prediction and early warning of the landslide, which is of great significance. Among them, the control points are selected from the monitoring sites, because the monitoring sites (theoretical control points in the technical solution) are unstable points. According to the original theory and the understanding of those skilled in the art in the prior art, the substantially unstable monitoring points are mistaken for stable monitoring sites. Those skilled in the art will use these unstable monitoring points as stable monitoring sites, which will cause the monitoring data to be different from the actual situation, resulting in serious errors in the prediction and early warning of landslides, inaccurate early warnings, and the measures taken cannot avoid the losses caused by landslides. The monitoring site is a control point, which is essentially an imaginary coordinate system; the monitoring point is the coordinate in the coordinate system. In fact, this statement is for the sake of ease of understanding, and it only regards the monitoring site as an imaginary coordinate system. The problem now is that because the coordinate system is unstable, the obtained coordinates are also wrong, so it is necessary to correct the coordinate system so that the final coordinates can be corrected.
[0068] The correction of the landslide deformation monitoring and analysis method, device, medium and equipment without stable control points provided by the present invention is based on the fact that the landslide always moves in one direction, and the direction of the landslide sliding is calculated from the coordinates of the monitoring points. Each period is basically in one direction and unchanged, so correction is performed. Correction is performed through coordinate conversion. In the coordinate conversion process, there are many parameters, including 3 unknown quantities, including the x value, y value and rotation angle of the coordinate system translation. The wrong coordinates are converted into coordinates that match the actual situation using formulas. The 3 parameters can be selected arbitrarily in theory.
[0069] The method, device, medium and equipment for monitoring and analyzing landslide deformation without stable control points provided by the present invention, when correcting, the coordinates move in one direction, and the displacement directions are different in the first period, the second period ... the nth period. Among them, not only the displacement direction needs to be concerned, but also the specific change value of the displacement direction needs to be concerned. Therefore, the method, device, medium and equipment for monitoring and analyzing landslide deformation without stable control points provided by the present invention calculates the displacement direction change value of each monitoring point in different periods, and uses the function of the above-mentioned three unknowns to sum the numerical values of the displacement direction change of each monitoring point in each period, so that this sum The square of the minimum (least squares method), in which the numerical value of the change in displacement direction in each period is wrong, so I have to use the function containing 3 unknowns I provided to correct it and get the solution of the least squares method. In the solution process, the optimal algorithm is used. The optimal algorithm can plan the algorithm (known). In the optimal algorithm, there is a limited range, and the 3 unknowns must be selected within this limited range. Among them, the limited range is determined according to the actual situation on site. Under different limiting conditions, the results obtained are also different. Therefore, the higher the degree of conformity between the limiting conditions and the actual situation, the closer the results obtained are to the actual situation. BRIEF DESCRIPTION OF THE DRAWINGS
[0070] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0071] Figure 1 A flowchart of the steps of the method for monitoring and analyzing landslide deformation without stable control points provided by an embodiment of the present invention;
[0072] Figure 2 A schematic diagram of the signal flow relationship between the functional modules in the landslide deformation monitoring and analysis device without stable control points provided by an embodiment of the present invention;
[0073] Figure 3 A schematic diagram of the structure of a landslide deformation monitoring and analysis device without a stable control point in the hardware operating environment provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0074] In order to solve the problems existing in the prior art, the present invention provides a method, device, medium and equipment for monitoring and analyzing landslide deformation without stable control points, which can more accurately obtain the real deformation information of the landslide when the control point moves or there is no stable control point, so as to be more suitable for practical use.
[0075] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the following is a detailed description of the method, device, medium equipment, specific implementation methods, structures, features and effects of the landslide deformation monitoring and analysis method without stable control points proposed by the present invention, in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "embodiment" does not necessarily refer to the same embodiment. In addition, the features, structures, or characteristics in one or more embodiments may be combined in any suitable form.
[0076] The term "and / or" in this article is merely a description of the association relationship of associated objects, indicating that three relationships may exist, for example, A and / or B. Specifically, it is understood that: A and B may be included at the same time, A may exist alone, or B may exist alone, and any of the above three situations may be met.
[0077] Deformation monitoring and analysis method of landslide without stable control points
[0078] See attached Figure 1 The method for monitoring and analyzing landslide deformation without stable control points provided by the present invention comprises the following steps:
[0079] Step S1: obtaining the initial geodetic coordinates of at least two unstable monitoring stations of the landslide to be monitored as an imaginary coordinate system;
[0080] Step S2: in the coordinate system, obtaining the initial geodetic coordinates of at least three other monitoring points of the landslide to be monitored;
[0081] Step S3: obtaining the real-time geodetic coordinates of each monitoring point in the first period, the second period, and the nth period among multiple other monitoring points;
[0082] Step S4: performing data analysis on the real-time geodetic coordinates of the first, second, and nth periods of each monitoring point among the other monitoring points, and obtaining a set number of monitoring points with top stability data among the other monitoring points as the geodetic coordinates of the approximate control points of the landslide to be monitored;
[0083] Wherein, n is a positive integer greater than or equal to 3.
[0084] The method for monitoring and analyzing landslide deformation without stable control points provided by the embodiment of the present invention aims at the problem that "when the control points in the landslide deformation monitoring network move or there are no stable control points, the deformation information of the landslide obtained by measuring and analyzing the coordinates of the monitoring points does not match the actual situation". By using this monitoring and analysis method, combined with the inherent characteristics of landslide deformation and destruction, that is, the direction of the landslide does not change within a certain period of time, the movement of the control points can be estimated by analyzing and processing the measurement data of the monitoring points, and the deformation characteristics of the landslide close to the actual situation can be obtained, thereby providing scientific data support for the deformation mechanism analysis, stability identification and prediction and early warning of the landslide, which is of great significance.
[0085] Among them, after performing data analysis on the real-time geodetic coordinates of the first, second, and nth periods of each monitoring point among multiple other monitoring points to obtain a set number of monitoring points with top stability data among multiple other monitoring points as approximate control points of the landslide to be monitored, the following steps are also included:
[0086] The geodetic coordinates of the approximate control points of the landslide to be monitored are used as common points to perform coordinate transformation and obtain the real coordinates of the landslide to be monitored.
[0087] Among them, in the step of using the geodetic coordinates of the approximate control points of the landslide to be monitored as common points to perform coordinate transformation to obtain the real coordinates of the landslide to be monitored, the coordinate transformation method includes whether the distance between the measuring points changes, or one or more of the limit difference method or the quasi-stable adjustment method.
[0088] The geodetic coordinates of the approximate control points of the landslide to be monitored are used as common points to perform coordinate transformation to obtain the real coordinates of the landslide to be monitored, which specifically includes the following steps:
[0089] Assume that the geodetic coordinates of one of the approximate control points of the landslide to be monitored are as follows: Phase 1 is X1:(x 01 ,y 01 , α1) T , the second period is X2:(x 02 ,y 02 , α2) T , ..., the jth period is X j :(x 0j ,y 0j , α j ) T , ..., the nth period is X n :(x 0n ,y 0n , α n ) T ;
[0090] According to the actual situation, the constraint conditions satisfied by the conversion parameters of the approximate control points of the landslide to be monitored are established;
[0091] According to the constraint conditions satisfied by the conversion parameters of the approximate control points of the landslide to be monitored, the geodetic coordinates of one of the approximate control points of the landslide to be monitored are converted to obtain the real coordinates of the landslide to be monitored.
[0092] According to the constraint conditions satisfied by the conversion parameters of the approximate control points of the landslide to be monitored, converting the geodetic coordinates of one of the approximate control points of the landslide to be monitored to obtain the real coordinates of the landslide to be monitored specifically includes the following steps:
[0093] For the coordinates of the monitoring points from the 1st to the nth period of the control point to be monitored, select no less than 3n / (n-1) normal measuring points to calculate the difference between the coordinates of each period and the initial coordinates, and obtain the displacement plane vectors and vector direction angles of the monitoring points from the 1st to the nth period;
[0094] The displacement plane vector direction angle of the control point to be monitored from the 2nd to the nth period is calculated by comparing it with the displacement plane vector direction angle of the 1st period, and the change value of the displacement plane vector direction angle of the monitoring point from the 1st period to the n-1th period is obtained;
[0095] For the change value of the displacement plane vector direction angle in the n-1 period, under the condition of satisfying the coordinate system transformation parameter constraints, the weighted least squares method is used to solve the unknown parameters X1, X2, ..., X n ;
[0096] The unknown parameters X1, X2, ..., X n Substitute into the coordinate conversion formula to obtain the real coordinates of the landslide to be monitored.
[0097] Among them, according to the actual situation, establishing the constraint conditions satisfied by the conversion parameters of the approximate control points of the landslide to be monitored specifically includes the following steps:
[0098] The initial coordinates of the approximate control point are marked as L A0 , L B0 , select m monitoring points with initial coordinates marked as L 10 , L 20 ,……,L m0 ; The observed coordinates of the approximate control points for the 1st to nth periods are L A1 , L B1 , L A2 , L B2 ……、L An , L Bn The coordinates of the monitoring points are L 11 , L 21 ,……,L m1 , L12 , L 22 ,……,L m2 , ..., L 1n , L 2n ,……,L mn ,
[0099] Assume that the unknown parameters X1, X2, ..., X n They are
[0100] X1=(x 01 ,y 01 , α1) T , X2=(x 02 ,y 02 , α2) T , ..., X j =(x 0j ,y 0j , α j ) T ,……,
[0101] X n =(x 0n ,y 0n , α n ) T
[0102] In the formula, x 0j ,y 0j , α j are the translation parameters and rotation parameters of the j-th coordinate transformation,
[0103] Calculate the transformed coordinates L using the unknown parameters ij ′, the coordinate transformation calculation formula is listed as follows
[0104]
[0105] Where i = 1, 2, ..., m, j = 1, 2, ..., n,
[0106] Analyze the updated monitoring point coordinates, and calculate the plane displacement vectors of the m monitoring points in each period through the difference between the monitoring point coordinates from the 1st to the nth period and the initial coordinates. The formula is as follows
[0107]
[0108] List the calculation formulas for the plane displacement vector direction angles of all m monitoring points from the 1st to the nth period
[0109]
[0110] List the calculation formulas for the displacement plane vector angle change values of all m monitoring points from the 1st period to the n-1th period
[0111] Vθ ij =α i,j+1 -α i,j (4)
[0112] Where, i = 1, 2, ..., m, j = 1, 2, ..., n-1;
[0113] Write the displacement plane vector angle change values of m monitoring points from the 1st period to the n-1th period in matrix form
[0114]
[0115] Solve the unknown parameters using the weighted least squares method The optimal solution makes the following equation true,
[0116]
[0117] In the formula, is the weight matrix;
[0118] Calculate the weight matrix. Since the longer the observation time, the greater the possibility of the change of the displacement plane vector direction angle of the measuring point, the square of the observation time is used as the basis for calculating the weight matrix. The weight corresponding to the change value of the displacement plane vector angle from the 1st period to the n-1th period is 1 / (t j +1-t1)2,t1,t2,…t n They represent the difference between the observation time from the 1st to the nth period and the initial observation time. The calculation method of the weight matrix is as follows:
[0119]
[0120] In the formula,
[0121]
[0122] Expand to get
[0123]
[0124] List the constraints of the unknown parameters and transform the solution of the unknown parameters in formula (6) into a quadratic programming problem, that is,
[0125]
[0126] calculate The optimal solution of
[0127] Will Substituting the optimal solution into equation (1) can obtain the updated approximate control point coordinates and monitoring point coordinates;
[0128] Substitute the updated monitoring point coordinates into equations (2) and (3) to calculate the displacement plane vector and the displacement plane vector direction angle to obtain the actual landslide deformation information.
[0129] Among them, calculation The optimal solution is implemented using Matlab programming.
[0130] Landslide deformation monitoring and analysis device without stable control points
[0131] See attached Figure 2 The device for monitoring and analyzing landslide deformation without stable control points provided by the embodiment of the present invention comprises:
[0132] A first coordinate acquisition module is used to acquire the initial geodetic coordinates of at least two unstable monitoring sites of the landslide to be monitored as an imaginary coordinate system;
[0133] A second coordinate acquisition module is used to acquire the initial geodetic coordinates of at least three other monitoring points of the landslide to be monitored in the coordinate system;
[0134] The third coordinate acquisition module is used to obtain the real-time geodetic coordinates of each monitoring point in the first period, the second period, and the nth period among the other monitoring points;
[0135] A data analysis module is used to analyze the real-time geodetic coordinates of each monitoring point in the first, second, and nth periods among multiple other monitoring points, and obtain a set number of monitoring points with top stability data among multiple other monitoring points as the geodetic coordinates of the approximate control points of the landslide to be monitored;
[0136] Wherein, n is a positive integer greater than or equal to 3.
[0137] The landslide deformation monitoring and analysis device without stable control points provided by the embodiment of the present invention proposes a simple, economical and effective landslide deformation monitoring and analysis method to solve the problem that "when the control points in the landslide deformation monitoring network move or there are no stable control points, the deformation information of the landslide obtained by measuring and analyzing the coordinates of the monitoring points does not match the actual situation". By using this monitoring and analysis method, combined with the inherent characteristics of landslide deformation and destruction, that is, the direction of the landslide does not change within a certain period of time, through the analysis and processing of the measurement data of the monitoring points, the movement of the control points can be estimated, and the landslide deformation characteristics close to the actual situation can be obtained, thereby providing scientific data support for the deformation mechanism analysis, stability identification and prediction and early warning of the landslide, which is of great significance.
[0138] Computer readable storage medium
[0139] The computer-readable storage medium provided by the present invention stores a landslide deformation monitoring and analysis program without stable control points. When the landslide deformation monitoring and analysis program without stable control points is executed by a processor, the steps of the landslide deformation monitoring and analysis method without stable control points provided by the present invention are implemented.
[0140] The computer-readable storage medium provided by the present invention proposes a simple, economical and effective landslide deformation monitoring and analysis method for the problem that "when the control points in the landslide deformation monitoring network move or there are no stable control points, the deformation information of the landslide obtained by measuring and analyzing the coordinates of the monitoring points does not match the actual situation". By using this monitoring and analysis method, combined with the inherent characteristics of landslide deformation and destruction, that is, the direction of the landslide does not change within a certain period of time, the movement of the control points can be estimated by analyzing and processing the measurement data of the monitoring points, and the deformation characteristics of the landslide close to the actual situation can be obtained, thereby providing scientific data support for the deformation mechanism analysis, stability identification and prediction and early warning of the landslide, which is of great significance.
[0141] Electronic devices
[0142] The electronic device provided by the present invention comprises a memory and a processor. The memory stores a landslide deformation monitoring and analysis program without stable control points. When the landslide deformation monitoring and analysis program without stable control points is executed by the processor, the steps of the landslide deformation monitoring and analysis method without stable control points provided by the present invention are implemented.
[0143] The electronic device provided by the present invention proposes a simple, economical and effective landslide deformation monitoring and analysis method to solve the problem that "when the control points in the landslide deformation monitoring network move or there are no stable control points, the deformation information of the landslide obtained by measuring and analyzing the coordinates of the monitoring points does not match the actual situation". By using this monitoring and analysis method, combined with the inherent characteristics of landslide deformation and destruction, that is, the direction of the landslide does not change within a certain period of time, the movement of the control points can be estimated by analyzing and processing the measurement data of the monitoring points, and the deformation characteristics of the landslide close to the actual situation can be obtained, thereby providing scientific data support for the deformation mechanism analysis, stability identification and prediction and early warning of the landslide, which is of great significance.
[0144] Reference Figure 3 , Figure 3 It is a schematic diagram of the structure of a landslide deformation monitoring and analysis device without a stable control point in the hardware operating environment involved in the embodiment of the present invention.
[0145] like Figure 3As shown, the landslide deformation monitoring and analysis device without stable control points may include: a processor 1001, such as a central processing unit (CPU), a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005. Among them, the communication bus 1002 is used to realize the connection and communication between these components. The user interface 1003 may include a display screen (Display), an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a wireless fidelity (WIreless-FIdelity, WI-FI) interface). The memory 1005 may be a high-speed random access memory (Random Access Memory, RAM) memory, or a stable non-volatile memory (Non-Volatile Memory, NVM), such as a disk memory. The memory 1005 may also be a storage device independent of the aforementioned processor 1001.
[0146] Those skilled in the art will understand that Figure 3 The structure shown in the figure does not constitute a limitation on the landslide deformation monitoring and analysis equipment without stable control points, and may include more or less components than those shown in the figure, or a combination of certain components, or a different arrangement of components.
[0147] like Figure 3 As shown, the memory 1005 as a storage medium may include an operating system, a data storage module, a network communication module, a user interface module, and a landslide deformation monitoring and analysis program without stable control points.
[0148] exist Figure 3 In the device for monitoring and analyzing landslide deformation without stable control points shown in the figure, the network interface 1004 is mainly used for data communication with the network server; the user interface 1003 is mainly used for data interaction with the user; the processor 1001 and the memory 1005 in the device for monitoring and analyzing landslide deformation without stable control points of the present invention can be arranged in the device for monitoring and analyzing landslide deformation without stable control points, and the device for monitoring and analyzing landslide deformation without stable control points calls the program for monitoring and analyzing landslide deformation without stable control points stored in the memory 1005 through the processor 1001, and executes the method for monitoring and analyzing landslide deformation without stable control points provided in the embodiment of the present invention.
[0149] The technical solution of the present invention is clearly and completely described below in conjunction with embodiments.
[0150] Aiming at the accumulation landslide in a reservoir area in Guizhou Province, after analyzing the engineering geological conditions, two relatively stable areas were selected to establish observation stations, namely CZ1 and CZ2. In addition, several monitoring points were arranged on the landslide, and monitoring points 32-1, 33-1, 34-1, 34-3, 36-1, and 36-2 were selected as the basic monitoring points for landslide deformation analysis. The initial data in the observation data and the two-phase observation data were used for analysis.
[0151] Table 1 Landslide monitoring data (unit: m)
[0152]
[0153] The coordinates of the measuring points in each period are analyzed, and the changes in horizontal distance and displacement between different measuring points are statistically shown in Table 2 (representative data are listed, and some data are not listed). It can be seen from Table 2 that the maximum change in horizontal distance between measuring points CZ1 and CZ2 is only 1.89mm, and the displacement values of these two points are very small, 1.414mm and 1.414mm respectively. It can be determined that CZ1 and CZ2 are the two most stable measuring points, and CZ1 and CZ2 are selected as approximate control points. In addition, according to the monitoring data, it can be calculated that the monitoring point 34-3 has the smallest displacement, which is 0.019m in the first period and 0.129m in the second period. The maximum distance that the coordinate system (or approximate control point) can be translated is set to d = (0.0095, 0.0645) T .
[0154] Table 2 Statistics of horizontal distance change and displacement of measuring points
[0155]
[0156] Note: The maximum horizontal distance difference is the difference between the maximum and minimum values of the horizontal distance in each period. The displacement is calculated based on the observation data of the first and last periods of the measuring point.
[0157] Assume that the unknown parameters X1 and X2 in the first and second periods are
[0158] X1=(x01, y01, α1)T, X2=(x02, y02, α2)T
[0159] Since the control point is set on the mountain on the opposite side of the landslide and is relatively stable, only one constraint condition is selected for calculation.
[0160] The solution of the least squares model is transformed into a quadratic programming problem. The mathematical model is as follows
[0161]
[0162] Use Matlab programming to solve this problem
[0163]
[0164] From the calculated unknown parameters, it can be seen that the translation parameters and rotation parameters of the first and second phases are very small, indicating that the selected approximate control points are basically stable and consistent with the actual situation; the original data can be directly used to calculate the displacement plane vector and displacement plane vector direction angle of the monitoring point, which is consistent with the actual situation.
[0165] In order to verify the effectiveness of the monitoring and analysis method of the present invention when the approximate control point moves, a set of virtual data is constructed based on the above real data for simulation analysis. Assuming that the control points are moved to the first period: CZ1` (2992379.0826, 367970.4421), CZ2` (2992404.8186, 367938.7071), the second period: CZ1`` (2992379.0976, 367970.4931), CZ2`` (2992404.8336, 367938.7581), the deformation characteristics of the landslide remain unchanged (still the above landslide), and the displacement of the CZ1 point is calculated, the first period: 0.0187m, the second period: 0.0389m. The above coordinates are the real coordinates of CZ1` and CZ2``, and in the measurement, it is assumed that these two points have not moved, and the initial coordinate data is still used. Assuming that a total station is installed on the moved control point for observation, the moved control point is used as the common point, and the real geodetic coordinates are converted into virtual coordinates through the coordinate conversion formula. The conversion parameters are the first period (-0.003, -0.003, 6.98132E-9) and the second period (-0.018, -0.054, 6.98132E-9). The rotation parameters in the two conversion parameters are the same. The conversion parameters are obtained by analyzing the coordinates before and after the common point conversion. The real coordinates of CZ1`, CZ2`, CZ1``, and CZ2`` are converted using this parameter to obtain the initial coordinates of the station. Assuming that when the control point is moved, the original coordinates of the control point are still input into the total station to measure the virtual coordinates of the monitoring point. The virtual coordinates are shown in Table 3.
[0166] Table 3 Virtual coordinates of monitoring points after control point movement (unit: m)
[0167]
[0168] Subtract the actual coordinates in Table 1 from the coordinates in Table 3, and the result is as follows.
[0169] Table 4 The difference between the virtual coordinates of the monitoring point and the real coordinates after the control point is moved (unit: m)
[0170]
[0171] It can be seen from Table 4 that there is an obvious deviation between the virtual coordinates and the actual coordinates. The virtual coordinates in Table 3 do not conform to the actual situation and are non-real coordinates. The landslide deformation monitoring and analysis method without stable control points proposed in this invention is used to process the non-real coordinates. Considering the maximum distance d of the translation parameter, the maximum angle β that the coordinate system can rotate, and the approximate control point moving in one direction (assuming that it will not swing back and forth), the mathematical model of the quadratic programming problem is given as follows:
[0172]
[0173] Where d = (0.0095, 0.0645) T, β = (1E-8, 1E-8) T
[0174] Use Matlab programming to solve this problem
[0175]
[0176] Based on the conversion parameters, the optimal solution of the real coordinates of the approximate control points can be calculated as follows: Period 1: CZ1`(2992379.078, 367970.4483), CZ2`(2992404.814, 367938.7133), Period 2: CZ1``(2992379.073, 367970.5178), CZ2``(2992404.809, 367938.7828), which are close to the real coordinates. The displacement of the approximate control points calculated using this data is 0.0117m for Period 1 and 0.0579m for Period 2. The solution results show that the approximate control points have moved, which is consistent with the actual situation, and the calculated displacement is close to the actual displacement of the control points, which verifies the effectiveness of this method.
[0177] The virtual coordinates and the corrected coordinates are used to calculate the difference between the first and second period displacement values of the measuring point and the real displacement, and the absolute value of the ratio of the virtual coordinate deviation to the corrected deviation is calculated, see Table 5.
[0178] Table 5 Comparison table of the deviation between the displacement of the measuring point calculated by the virtual coordinates and the corrected coordinates and the actual displacement (deviation unit: m)
[0179]
[0180] It can be seen from Table 5 that the displacement deviation of the measuring point calculated by the virtual coordinate is large, the deviation of the measured point displacement after correction and the actual displacement is small, and the maximum absolute value of the ratio of the virtual coordinate deviation to the corrected deviation is 65.48, indicating that the measurement data is inconsistent with the actual situation due to the movement of the control point. The monitoring and analysis method proposed in the present invention can be used to correct the measurement data and obtain the landslide deformation information that conforms to the actual situation.
[0181] It should be noted that the landslide deformation monitoring and analysis method of the present invention has certain applicable conditions and scopes, such as the deformation monitoring network containing relatively stable control points or approximate control points. In addition, the solution result is closely related to the constraint conditions. The more comprehensive and accurate the constraint conditions are, the more the calculated deformation data conforms to the actual situation.
[0182] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0183] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for monitoring and analyzing landslide deformation without stable control points, characterized in that: The following steps are involved: Obtain the initial geodetic coordinates of at least two unstable monitoring stations of the landslide to be monitored as an imaginary coordinate system; In the coordinate system, obtaining the initial geodetic coordinates of at least three other monitoring points of the landslide to be monitored; Obtaining the real-time geodetic coordinates of each monitoring point in the first period, the second period, and the nth period among the other monitoring points; Performing data analysis on the real-time geodetic coordinates of the first, second, and nth periods of each of the plurality of other monitoring points, and obtaining a set number of monitoring points with top stability data rankings among the plurality of other monitoring points as geodetic coordinates of approximate control points of the landslide to be monitored; Wherein, n is a positive integer greater than or equal to 3.
2. The method for monitoring and analyzing landslide deformation without stable control points according to claim 1 is characterized in that: After performing data analysis on the real-time geodetic coordinates of the first, second, and nth periods of each of the plurality of other monitoring points to obtain a set number of monitoring points with top stability data rankings among the plurality of other monitoring points as approximate control points of the landslide to be monitored, the following steps are also included: The geodetic coordinates of the approximate control points of the landslide to be monitored are used as common points to perform coordinate transformation to obtain the real coordinates of the landslide to be monitored.
3. The method for monitoring and analyzing landslide deformation without stable control points according to claim 2 is characterized in that: In the step of using the geodetic coordinates of the approximate control points of the landslide to be monitored as common points to perform coordinate transformation to obtain the real coordinates of the landslide to be monitored, the coordinate transformation method includes whether the distance between the measuring points changes, or one or more of the limit difference method or the quasi-stable adjustment method.
4. The method for monitoring and analyzing landslide deformation without stable control points according to claim 2 is characterized in that: The geodetic coordinates of the approximate control points of the landslide to be monitored are used as common points to perform coordinate transformation to obtain the real coordinates of the landslide to be monitored, which specifically includes the following steps: Assume that the geodetic coordinates of one of the approximate control points of the landslide to be monitored are as follows: Phase 1 is X1:(x 01 ,y 01 , α1) T , the second period is X2:(x 02 ,y 02 , α2) T , ..., the jth period is X j :(x 0j ,y 0j , α j ) T , ..., the nth period is X n :(x 0n ,y 0n , α n ) T ; According to the actual situation, the constraint conditions satisfied by the conversion parameters of the approximate control points of the landslide to be monitored are established; According to the constraint conditions satisfied by the conversion parameters of the approximate control points of the landslide to be monitored, the geodetic coordinates of one of the approximate control points of the landslide to be monitored are converted to obtain the real coordinates of the landslide to be monitored.
5. The method for monitoring and analyzing landslide deformation without stable control points according to claim 4 is characterized in that: According to the constraint conditions satisfied by the conversion parameters of the approximate control points of the landslide to be monitored, converting the geodetic coordinates of one of the approximate control points of the landslide to be monitored to obtain the real coordinates of the landslide to be monitored specifically comprises the following steps: For the coordinates of the monitoring points of the control point to be monitored from the 1st to the nth period, select no less than 3n / (n-1) normal measuring points to calculate the difference between the coordinates of each period and the initial coordinates, and obtain the displacement plane vectors and vector direction angles of the monitoring points of the 1st to the nth period; The displacement plane vector direction angle of the control point to be monitored from the 2nd to the nth period is calculated by comparing it with the displacement plane vector direction angle of the 1st period to obtain the displacement plane vector direction angle change value of the monitoring point from the 1st period to the n-1th period; For the change value of the displacement plane vector direction angle in the n-1 period, under the condition of satisfying the coordinate system transformation parameter constraints, the weighted least squares method is used to solve the unknown parameters X1, X2, ..., X n ; The unknown parameters X1, X2, ..., X n Substitute into the coordinate conversion formula to obtain the real coordinates of the landslide to be monitored.
6. The method for monitoring and analyzing landslide deformation without stable control points according to claim 4 is characterized in that: According to the actual situation, establishing the constraint conditions satisfied by the conversion parameters of the approximate control points of the landslide to be monitored specifically includes the following steps: The initial coordinates of the approximate control point are marked as L A0 , L B0 , select m monitoring points with initial coordinates marked as L 10 , L 20 ,……,L m0 ; The observed coordinates of the approximate control points for the 1st to nth periods are L A1 , L B1 , L A2 , L B2 ……、L An , L Bn The coordinates of the monitoring points are L 11 , L 21 ,……,L m1 , L 12 , L 22 ,……,L m2 , ..., L 1n , L 2n ,……,L mn , Assume that the unknown parameters X1, X2, ..., X n They are X1=(x 01 、y 01 、α1) T ,X2=(x 02 、y 02 、α2) T ,......,X j (x 0j 、y 0j 、α j ) T ,......, X n =(x 0n 、y 0n ,a n ) T In the formula, x 0j ,y 0j , α j are the translation parameters and rotation parameters of the j-th coordinate transformation, Calculate the transformed coordinates L using the unknown parameters ij ′, the coordinate transformation calculation formula is listed as follows Where i = 1, 2, ..., m, j = 1, 2, ..., n, Analyze the updated monitoring point coordinates, and calculate the plane displacement vectors of the m monitoring points in each period through the difference between the monitoring point coordinates from the 1st to the nth period and the initial coordinates. The formula is as follows List the calculation formulas for the plane displacement vector direction angles of all m monitoring points from the 1st to the nth period List the calculation formulas for the displacement plane vector angle change values of all m monitoring points from the 1st period to the n-1th period Vth ij =a i,j+1 -a i,j (4) Where, i = 1, 2, ..., m, j = 1, 2, ..., n-1; Write the displacement plane vector angle change values of m monitoring points from the 1st period to the n-1th period in matrix form Solve the unknown parameters using the weighted least squares method The optimal solution makes the following equation true, In the formula, is the weight matrix; Calculate the weight matrix. Since the longer the observation time, the greater the possibility of the change of the displacement plane vector direction angle of the measuring point, the square of the observation time is used as the basis for calculating the weight matrix. The weight corresponding to the change value of the displacement plane vector angle from the 1st period to the n-1th period is 1 / (t j +1-t1)2,t1,t2,…t n They represent the difference between the observation time from the 1st to the nth period and the initial observation time. The calculation method of the weight matrix is as follows: In the formula, Expand to get List the constraints of the unknown parameters and transform the solution of the unknown parameters in formula (6) into a quadratic programming problem, that is, calculate The optimal solution of Will Substituting the optimal solution into equation (1) can obtain the updated approximate control point coordinates and monitoring point coordinates; Substitute the updated monitoring point coordinates into equations (2) and (3) to calculate the displacement plane vector and the displacement plane vector direction angle to obtain the actual landslide deformation information.
7. The method for monitoring and analyzing landslide deformation without stable control points according to claim 6 is characterized in that: The calculation The optimal solution is implemented using Matlab programming.
8. A landslide deformation monitoring and analysis device without stable control points, characterized in that: include: A first coordinate acquisition module is used to acquire the initial geodetic coordinates of at least two unstable monitoring sites of the landslide to be monitored as an imaginary coordinate system; A second coordinate acquisition module is used to acquire the initial geodetic coordinates of at least three other monitoring points of the landslide to be monitored in the coordinate system; A third coordinate acquisition module is used to acquire the real-time geodetic coordinates of each monitoring point in the first period, the second period, and the nth period among the other monitoring points; A data analysis module is used to perform data analysis on the real-time geodetic coordinates of the first, second, and nth periods of each of the plurality of other monitoring points, and obtain a set number of monitoring points with top stability data rankings among the plurality of other monitoring points as the geodetic coordinates of the approximate control points of the landslide to be monitored; Wherein, n is a positive integer greater than or equal to 3.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a landslide deformation monitoring and analysis program without stable control points. When the landslide deformation monitoring and analysis program without stable control points is executed by the processor, the steps of the landslide deformation monitoring and analysis method without stable control points described in any one of claims 1-7 are implemented.
10. An electronic device, characterized in that: The invention comprises a memory and a processor, wherein a program for monitoring and analyzing deformation of a landslide without stable control points is stored in the memory, and when the program for monitoring and analyzing deformation of a landslide without stable control points is executed by the processor, the steps of the method for monitoring and analyzing deformation of a landslide without stable control points described in any one of claims 1 to 7 are realized.