Hydraulic support pure water sealing simulation test system

Through the hydraulic support pure water seal simulation test system, a variety of tests are carried out using the simulation test bench, plunger pump station unit and hydraulic power station, which solves the lack of pure water hydraulic support seal testing system in the existing technology, and achieves the correctness and stability Comprehensive evaluation and testing of seal performance.

CN118913663APending Publication Date: 2024-11-08SHANXI TAIBAO SCI & TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411403902.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The prior art lacks a seal testing system suitable for pure water hydraulic support, and it is impossible to effectively detect and evaluate the fatigue, durability and sealing properties of seals.

Method used

A hydraulic support pure water seal simulation test system was designed, including a simulation test bench, a plunger pump station unit, a hydraulic power station and a console. Life test, reciprocating test, pulsation test and sealing and pressure holding test are carried out through the simulation test bench. The plunger pump station unit and hydraulic power station provide pressure, the console performs data processing and control.

Benefits of technology

A comprehensive performance test of pure water seals is achieved, forming test curves and reports, filling the gap in performance testing of pure water seals, and providing a complete test system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118913663A_ABST
    Figure CN118913663A_ABST
Patent Text Reader

Abstract

The invention discloses a hydraulic support pure water sealing simulation test system, which comprises a to-be-tested sealing element arranged in a test jack of a simulation test bench, and the simulation test bench is used for carrying out a life test test, a full-stroke reciprocating test, a pulsation test and a sealing pressure maintaining test on the to-be-tested sealing element; the plunger pump station unit is used for providing pressure for one end of the simulation test bench; the hydraulic power station is used for providing loading pressure for the other end of the simulation test bed; the console serves as a control and data processing unit of the simulation test system and is used for controlling the simulation test bench, the plunger pump station unit and the hydraulic power station and receiving data fed back by the devices. According to the pure water sealing element test system, tests such as a reciprocating loading life test, a pulse test, a tension and compression external loading test and an unbalance loading test and a sealing pressure maintaining test can be carried out on a pure water sealing element, after the tests are finished, test data can be automatically recorded through the console and the upper computer, a test curve is formed, a test report is output, and a complete pure water sealing element test system is formed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pure water seals, in particular to a pure water seal simulation test system for a hydraulic support, and may also relate to similar seal test fields. Background Art

[0002] Hydraulic supports are important supporting equipment in coal mining projects. Currently, hydraulic supports mainly include emulsion hydraulic supports and pure water hydraulic supports. With the promotion of energy-saving and environmental protection concepts, pure water hydraulic supports are widely promoted and applied. Seals are an important component of hydraulic supports. Due to the different media of pure water hydraulic supports, the seals used in conventional emulsion hydraulic supports can no longer meet the use requirements. Therefore, it is urgent to develop seals suitable for pure water hydraulic supports. At the same time, the developed pure water seals need to have supporting equipment to test and evaluate the fatigue, durability and sealing of the seals. However, there is currently no complete and professional pure water seal test system. Summary of the invention

[0003] The purpose of the present invention is to solve the shortcomings in the prior art and to propose a pure water seal simulation test system for a hydraulic support.

[0004] In order to achieve the above object, the present invention adopts the following technical scheme: a hydraulic support pure water sealing simulation test system, comprising: A simulation test bench, wherein the seal to be tested is arranged inside the test jack of the simulation test bench, and the simulation test bench is used to perform life test, full stroke reciprocating test, pulsation test and sealing pressure holding test on the seal to be tested; A plunger pump station unit, the plunger pump station unit is connected to the simulation test bench and is used to provide pressure to one end of the simulation test bench; A hydraulic power station, the hydraulic power station is connected to the other end of the simulation test bench and is used to provide loading pressure to the other end of the simulation test bench; A control console, which serves as a control and data processing unit of the simulation test system, and is used to control the simulation test bench, the plunger pump station unit, and the hydraulic power station and receive data fed back by the above-mentioned devices; During the test, the seal to be tested is installed inside the test jack of the simulation test bench. According to the test items, the control console controls the plunger pump station unit, the hydraulic power station and the simulation test bench to work together.

[0005] As a further description of the above technical solution, the simulation test bench includes a test jack and a loading cylinder docked with the test jack; The test jack and the loading cylinder can both perform linear motion along the slide rail inside the simulation test bench.

[0006] As a further description of the above technical solution, the test jack and the loading cylinder are connected to the upper end of the same sliding support.

[0007] As a further description of the above technical solution, the interior of the simulation test bench also includes a displacement sensor, the body of the displacement sensor is fixed to the frame of the simulation test bench, and the sliding magnetic ring of the displacement sensor is fixed to the sliding support.

[0008] As a further description of the above technical solution, the plunger pump station unit includes a plunger pump, a supply water tank connected to the plunger pump, and a variable frequency power cabinet for controlling the plunger pump.

[0009] As a further description of the above technical solution, the hydraulic power station includes a cabinet, inside which are arranged a high-pressure water pump group, an oil replenishment pump group, an air cooler group, a proportional overflow valve group, an electromagnetic ball valve group, a hydraulic oil tank, a second water tank and a valve block group.

[0010] As a further description of the above technical solution, the proportional relief valve group includes a first proportional relief valve and a second proportional relief valve; The electromagnetic ball valve group includes a first electromagnetic ball valve, a second electromagnetic ball valve, a third electromagnetic ball valve, a fourth electromagnetic ball valve, a fifth electromagnetic ball valve, a sixth electromagnetic ball valve, a seventh electromagnetic ball valve and an eighth electromagnetic ball valve; The valve block group includes a first valve block, a second valve block and a third valve block.

[0011] As a further description of the above technical solution, the liquid outlet pipe of the plunger pump is connected to the P port of the first valve block, and then connected to the third valve block through the first solenoid ball valve and the second solenoid ball valve, the third solenoid ball valve and the fourth solenoid ball valve are connected to the P / T port of the first valve block, and the supply water tank is connected to the T port of the first valve block.

[0012] As a further description of the above technical solution, the liquid inlet of the high-pressure water pump group is connected to the second water tank, the liquid outlet of the high-pressure water pump group is connected in parallel with the sixth solenoid ball valve and the seventh solenoid ball valve, and the return liquid ports of the sixth solenoid ball valve and the seventh solenoid ball valve are connected in parallel with the second water tank.

[0013] As a further description of the above technical solution, the oil replenishment pump group is arranged inside the cabinet, the oil suction pipe of the oil replenishment pump group is connected to the hydraulic oil tank, and the oil outlet pipe of the oil replenishment pump group is connected to the third valve block; One end of the first proportional relief valve and the second proportional relief valve is connected to the hydraulic oil tank, the other end of the first proportional relief valve and the second proportional relief valve is connected to the second valve block respectively, the sixth solenoid ball valve and the seventh solenoid ball valve are connected to the second valve block, and the sixth solenoid ball valve and the seventh solenoid ball valve are connected in parallel to the hydraulic oil tank.

[0014] The present invention has the following beneficial effects: 1. The present invention can simulate the actual working conditions of pure water seals through the combination of four modules: a simulation test bench, a plunger pump station unit, a hydraulic power station and a control console. It can reflect the physical and chemical properties of the seals through several test methods, such as reciprocating loading life test, pulse test, tension and compression external loading pressure holding test and eccentric load test, etc. After the test, the control console and the host computer can automatically record the test data, form a test curve and output a test report, thereby forming a complete system for testing pure water seals, filling the gap in the performance test of pure water seals. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 A block diagram of the test system proposed by the present invention; Figure 2 is a schematic diagram of the simulation test bench; Figure 3 It is a top view of the simulation test bench; Figure 4 A side view of the jack side of the simulated test bench test; Figure 5 is an enlarged schematic diagram of the displacement sensor; Figure 6 It is a schematic diagram of the hydraulic power station; Figure 7 This is the internal schematic diagram of the hydraulic power station; Figure 8 This is the internal schematic diagram of the hydraulic power station; Fig. 9 This is an internal top view of the hydraulic power station.

[0016] Legend: 1. Simulation test bench; 11. Test jack; 12. Loading cylinder; 13. Slide rail; 14. Sliding support; 15. Displacement sensor; 2. Plunger pump station unit; 21. Liquid pump; 22. Supply water tank; 23. Frequency conversion power cabinet; 3. Hydraulic power station; 31. Cabinet; 32. High-pressure water pump group; 33. Make-up oil pump group; 34. Air cooler group; 35. Proportional relief valve group; 35.1. First proportional relief valve; 35.2. Second proportional relief valve; 36. Solenoid ball valve group; 36.1. First solenoid ball valve; 36.2. Second solenoid ball valve; 36.3. Third solenoid ball valve; 36.4. Fourth solenoid ball valve; 36.5. Fifth solenoid ball valve; 36.6. Sixth solenoid ball valve; 36.7. Seventh solenoid ball valve; 36.8. Eighth solenoid ball valve; 38. Hydraulic oil tank; 39. Second water tank; 310. Valve block group; 310.1. First valve block; 310.2. Second valve block; 310.3. Third valve block; 4. Control console; 5. Rack. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] Reference Figure 1 The present invention provides an embodiment of a pure water seal simulation test system for a hydraulic support: specifically, it includes a simulation test bench 1 as a carrier for testing pure water seals. Before conducting simulation tests of different projects, the pure water seals to be tested need to be loaded into the test jack of the simulation test bench 1. Through the simulation test bench 1, the pure water seals can be subjected to reciprocating loading life tests, pulse tests, tensile and compressive external loading and eccentric load tests in addition to conventional simulation tests, so as to simulate the state of the pure water seals under various usage conditions to judge their performance.

[0019] The entire system includes, in addition to the simulation test bench 1, a plunger pump station unit 2, which includes a plunger pump 21, a water supply tank 22 and a variable frequency power cabinet 23. The plunger pump station unit 2 is connected to the simulation test bench 1 to provide a hydraulic power source suitable for different simulations for the simulation test, and the plunger pump 21 is driven by a variable frequency motor, and the speed regulation of the variable frequency motor is regulated and controlled by the variable frequency power cabinet 23.

[0020] The entire system also includes a hydraulic power station 3, through which the pressure of the loading cylinder 12 in the simulation test bench 1 can be regulated. By setting the loading pressure of the test jack 11 and the loading cylinder 12 in the simulation test bench 1 in a targeted manner, loading and reciprocating motion are completed, and the high and low pressure holding tests and the minimum starting pressure test are all controlled by electric proportional control.

[0021] It also includes a control console 4, which can be a PLC control console 4. The control console 4 is electrically connected to the above-mentioned simulation test bench 1, the plunger pump station unit 2 and the hydraulic power station 3, and can communicate data with the above-mentioned equipment, and control the plunger pump station unit 2 and the hydraulic power station 3 to adjust the pressure, and control the simulation test bench 1 to perform various simulation tests, and after the completion of each test, store the test data and generate a final test report.

[0022] Through the above technical solution, after the pure water medium seal to be tested is assembled to the jack to be tested, the jack to be tested and the loading cylinder 12 are controlled to perform preset actions through preset pressure parameters to carry out different tests. Under the condition of meeting and exceeding the existing GB25974.2 hydraulic support jack test standard, the test items are more comprehensive.

[0023] For the structure of the simulation test bench 1, please refer to Figure 2-Figure 5 , including a frame 5, a slide rail 13 is arranged inside the frame 5 and along its length direction, a slide support 14 is slidably connected to the slide rail 13, and two hinge units are arranged on the sliding support 14, and a test jack 11 and a loading cylinder 12 are respectively connected to the hinge units. The other end of the test jack 11 is connected to one end of the frame 5 through the jack support, and the inclination of the test jack 11 can be adjusted by adjusting the position of the jack support. The test jack 11 can be adjusted to be horizontal or have an inclination angle as needed to complete a reciprocating test and an eccentric load test.

[0024] A displacement sensor 15 is also provided inside the simulation test bench 1. For details, please refer to Figure 4 The displacement sensor 15 is fixed to the inner wall of the frame 5, and the sliding magnetic ring of the displacement sensor 15 is fixed on the sliding support 14. As the sliding support 14 moves, the magnetic ring moves. Through the preset of the external control device, i.e., the control console 4, the automatic reversal of the test jack 11 and the loading cylinder 12 after reaching the specified position can be captured and controlled to perform a reciprocating motion test.

[0025] Before the test, the pure water seal to be tested needs to be installed inside the test jack 11. Specifically, the pure water seal is installed at the position of the piston and the guide sleeve of the test jack 11. The test jack 11 is made of waterproof corrosion material and anti-rust treatment to avoid rust and other damage to the test jack 11 under pure water conditions, and the pure water seals are made of low-friction self-lubricating material.

[0026] Specifically, during the reciprocating loading life test, the tested jack 11 equipped with a seal is pressed against the loading cylinder 12, and the action function is completed through the high-pressure electromagnetic ball valve and the displacement sensor 15, and the test data is automatically recorded through the console 4 to form a test curve and a test report; When performing a pulse test, during the reciprocating test, the set pulse adoption number is inserted in any interface through the control console 4, and the pulse overflow pressure of the given proportional overflow valve is used to form a pulse loading force in the loading cylinder 12, and the pulse test state is automatically performed. The test data is automatically recorded by the host computer in the control console 4, a test curve is formed, and a test report is output.

[0027] When conducting high and low pressure holding tests, after the holding pressure and time are preset through the control console 4, the pressure holding test is automatically entered after startup. When the pressure reaches the set holding pressure, the oil pump automatically stops supplying fluid and maintains the pressure to the set time. The pressure holding situation can be observed through the pressure gauge. At the same time, the control console 4 can also automatically record the test data, form a test curve and output a test report.

[0028] When the minimum starting pressure test is performed, the test jack 11 has no external load, and the test can be automatically performed after starting, and the console 4 can also automatically record the test data, form a test curve and output a test report. The reciprocating full stroke test also has the same steps as the previous test.

[0029] For the specific structure of the hydraulic power station 3, please refer to Figure 6-Figure 9 The hydraulic power station 3 includes a cabinet 31, inside which are arranged a high-pressure water pump group 32, an oil replenishment pump group 33, an air cooler group 34, a proportional relief valve group 35, an electromagnetic ball valve group 36, a hydraulic oil tank 38, a second water tank 39 and a valve block group 310, wherein the proportional relief valve group 35 includes a first proportional relief valve 35.1 and a second proportional relief valve 35.2, the electromagnetic ball valve group 36 includes a first electromagnetic ball valve 36.1, a second electromagnetic ball valve 36.2, a third electromagnetic ball valve 36.3, a fourth electromagnetic ball valve 36.4, a fifth electromagnetic ball valve 36.5, a sixth electromagnetic ball valve 36.6, a seventh electromagnetic ball valve 36.7 and an eighth electromagnetic ball valve 36.8, and the valve block group 310 includes a first valve block 310.1, a second valve block 310.2 and a third valve block 310.3.

[0030] The liquid outlet pipe of the liquid pump 21 is connected to the P port of the first valve block 310.1, and then connected to the third valve block 310.3 through the first solenoid ball valve 36.1 and the second solenoid ball valve 36.2. The third solenoid ball valve 36.3 and the fourth solenoid ball valve 36.4 are connected to the P / T port of the first valve block 310.1, where the P port refers to the pressure port and the T port refers to the oil tank port or the oil tank port. The supply water tank 22 is connected to the T port of the first valve block 310.1.

[0031] The liquid inlet of the high-pressure water pump group 32 is connected to the second water tank 39, the liquid outlet of the high-pressure water pump group 32 is connected in parallel with the sixth electromagnetic ball valve 36.6 and the seventh electromagnetic ball valve 36.7, and the return liquid ports of the sixth electromagnetic ball valve 36.6 and the seventh electromagnetic ball valve 36.7 are connected in parallel with the second water tank 39.

[0032] The oil replenishment pump group 33 is arranged inside the cabinet 31, the oil suction pipe of the oil replenishment pump group 33 is connected to the hydraulic oil tank 38, and the oil outlet pipe of the oil replenishment pump group 33 is connected to the A / B port of the third valve block 310.3, wherein the A port and the B port refer to the control ports of the hydraulic actuator; One end of the first proportional relief valve 35.1 and the second proportional relief valve 35.2 are connected to the hydraulic oil tank 38, and the other ends of the first proportional relief valve 35.1 and the second proportional relief valve 35.2 are respectively connected to the second valve block 310.2, the sixth solenoid ball valve 36.6 and the seventh solenoid ball valve 36.7 are connected to the A / B port of the second valve block 310.2, and the sixth solenoid ball valve 36.6 and the seventh solenoid ball valve 36.7 are connected in parallel to the hydraulic oil tank 38.

[0033] The hydraulic power station 3 provides a power source to the simulation test bench 1 to ensure that the simulation test bench 1 can complete electric proportional control functions such as loading, reciprocating motion, high and low pressure holding tests, and minimum starting pressure test.

[0034] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A hydraulic support pure water sealing simulation test system, characterized in that: include: A simulation test bench (1), wherein the seal to be tested is arranged inside a test jack (11) of the simulation test bench (1), and the simulation test bench (1) is used to perform a life test, a full stroke reciprocating test, a pulsation test, and a sealing pressure holding test on the seal to be tested; A plunger pump station unit (2), the plunger pump station unit (2) being connected to the simulation test bench (1) and used to provide pressure to one end of the simulation test bench (1); A hydraulic power station (3), the hydraulic power station (3) being connected to the other end of the simulation test bench (1) and used to provide loading pressure to the other end of the simulation test bench (1); A control console (4), the control console (4) serving as a control and data processing unit of the simulation test system, used to control the simulation test bench (1), the plunger pump station unit (2) and the hydraulic power station (3) and receive data fed back by the above-mentioned devices; During the test, the seal to be tested is installed inside the test jack (11) of the simulation test bench (1), and according to the test items, the control console (4) controls the plunger pump station unit (2), the hydraulic power station (3) and the simulation test bench (1) to work together.

2. A hydraulic support pure water sealing simulation test system according to claim 1, characterized in that: The simulation test bench (1) comprises a test jack (11) and a loading cylinder (12) connected to the test jack (11); The test jack (11) and the loading cylinder (12) can both perform linear motion along the slide rail (13) inside the simulation test bench (1).

3. A hydraulic support pure water sealing simulation test system according to claim 2, characterized in that: The test jack (11) and the loading cylinder (12) are connected to the top of the same sliding support (14).

4. A hydraulic support pure water sealing simulation test system according to claim 3, characterized in that: The simulation test bench (1) further comprises a displacement sensor (15) inside, the body of the displacement sensor (15) being fixed to the frame of the simulation test bench (1), and the sliding magnetic ring of the displacement sensor (15) being fixed to the sliding support (14).

5. The pure water sealing simulation test system for hydraulic support according to claim 1 is characterized by: The plunger pump station unit (2) comprises a plunger pump (21), a supply water tank (22) connected to the plunger pump (21), and a variable frequency power cabinet (23) for controlling the plunger pump (21).

6. A hydraulic support pure water sealing simulation test system according to claim 5, characterized in that: The hydraulic power station (3) comprises a cabinet (31), inside of which are arranged a high-pressure water pump group (32), an oil replenishment pump group (33), an air cooler group (34), a proportional overflow valve group (35), an electromagnetic ball valve group (36), a hydraulic oil tank (38), a second water tank (39) and a valve block group (310).

7. A hydraulic support pure water sealing simulation test system according to claim 6, characterized in that: The proportional relief valve group (35) comprises a first proportional relief valve (35.1) and a second proportional relief valve (35.2); The electromagnetic ball valve group (36) comprises a first electromagnetic ball valve (36.1), a second electromagnetic ball valve (36.2), a third electromagnetic ball valve (36.3), a fourth electromagnetic ball valve (36.4), a fifth electromagnetic ball valve (36.5), a sixth electromagnetic ball valve (36.6), a seventh electromagnetic ball valve (36.7) and an eighth electromagnetic ball valve (36.8); The valve block group (310) comprises a first valve block (310.1), a second valve block (310.2) and a third valve block (310.3).

8. A hydraulic support pure water sealing simulation test system according to claim 7, characterized in that: The liquid outlet pipe of the plunger pump (21) is connected to the P port of the first valve block (310.1), and then connected to the third valve block (310.3) through the first electromagnetic ball valve (36.1) and the second electromagnetic ball valve (36.2); the third electromagnetic ball valve (36.3) and the fourth electromagnetic ball valve (36.4) are connected to the P / T port of the first valve block (310.1); and the supply water tank (22) is connected to the T port of the first valve block (310.1).

9. A hydraulic support pure water sealing simulation test system according to claim 7, characterized in that: The liquid inlet of the high-pressure water pump group (32) is connected to the second water tank (39), the liquid outlet of the high-pressure water pump group (32) is connected in parallel to the sixth electromagnetic ball valve (36.6) and the seventh electromagnetic ball valve (36.7), and the liquid return ports of the sixth electromagnetic ball valve (36.6) and the seventh electromagnetic ball valve (36.7) are connected in parallel to the second water tank (39).

10. A hydraulic support pure water sealing simulation test system according to claim 7, characterized in that: The oil replenishment pump group (33) is arranged inside the cabinet (31), the oil suction pipe of the oil replenishment pump group (33) is connected to the hydraulic oil tank (38), and the oil outlet pipe of the oil replenishment pump group (33) is connected to the third valve block (310.3); One end of the first proportional relief valve (35.1) and the second proportional relief valve (35.2) are connected to the hydraulic oil tank (38), and the other ends of the first proportional relief valve (35.1) and the second proportional relief valve (35.2) are respectively connected to the second valve block (310.2), the sixth electromagnetic ball valve (36.6) and the seventh electromagnetic ball valve (36.7) are connected to the second valve block (310.2), and the sixth electromagnetic ball valve (36.6) and the seventh electromagnetic ball valve (36.7) are connected in parallel to the hydraulic oil tank (38).