On-line early warning method and system for switching-on reliability of hot reverse bus operation of transformer substation
Through the comprehensive technology based on busbar separation, three-phase imbalance and busbar tool control position signal, the problem of difficulty in ensuring the reliability of thermal inverted busbar operation in the substation is solved, real-time and accurate monitoring and early warning of closing operations are achieved. , improves the safety and stability of the power system.
Patent Information
- Application Number
- CN202411107123.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-08
AI Technical Summary
The reliability of thermal inverted busbar operation of substations is difficult to ensure, and the accuracy and real-time accuracy of the existing technology are insufficient, which affects the safe and stable operation of the power system.
By calculating the busbar current, the three-phase imbalance is used to calculate the busbar current, the three-phase imbalance is used, the busbar current, the three-phase imbalance and the knife switch signal. , realize real-time and accurate monitoring and early warning of the reliability of thermal inverter bus operation and closing.
It improves the safety and accuracy of thermal inverter bus operation, promptly detects three-phase imbalances, avoids faults, enhances grid stability, and realizes real-time and accurate judgment of closing reliability.
Smart Images

Figure CN118914718A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of online early warning of closing reliability of hot-reversing busbar operation, and in particular to an online early warning method and system for closing reliability of hot-reversing busbar operation in a transformer substation. Background Art
[0002] In the power system, substations are important hubs for power transmission and distribution, and busbars, as the main component of substations, undertake the important task of power collection and distribution. Hot busbar operation is an important operation in substation operation, and its closing reliability directly affects the safe and stable operation of the power system. However, in the actual operation process, due to reasons such as equipment aging and improper operation, the closing reliability of hot busbar operation is often difficult to guarantee, which brings great hidden dangers to the safe and stable operation of the power system.
[0003] In order to solve this problem, some related technologies and methods have been proposed and applied. However, these methods often have some shortcomings, such as low early warning accuracy and low real-time performance. Therefore, the present invention proposes an online early warning method for the reliability of hot busbar switching operation in a substation, which aims to achieve accurate early warning of the reliability of hot busbar switching operation by real-time monitoring and analysis of key information such as busbar current and switch position, thereby improving the safe and stable operation level of the power system.
[0004] Specifically, the background technology of the present invention describes methods such as primary judgment of the isolating current based on the busbar small difference, secondary judgment based on three-phase imbalance, and direct verification of the reliability of the operation closing based on the busbar measuring switch position signal. These methods realize comprehensive monitoring and early warning of the reliability of the hot-reversed busbar operation closing by comprehensively using equipment and technical means such as current transformers and background data monitors. Summary of the invention
[0005] In view of the above-mentioned problems, the present invention is proposed.
[0006] Therefore, the present invention provides an online early warning method for the reliability of the operation and closing of the thermal busbar in the substation. By adopting the primary judgment technology of the isolation current based on the busbar small difference, a preliminary evaluation of the reliability of the operation and closing of the thermal busbar in the substation is realized. This technology calculates the current of the busbar isolation knife and judges whether the bus differential current is zero, thereby judging the reliability of the operation and closing, thereby improving the safety and accuracy of the operation; by introducing the secondary judgment technology based on three-phase imbalance, further verification of the reliability of the operation and closing is achieved. By calculating the three-phase imbalance and comparing it with the typical value, this technology can timely discover the three-phase imbalance, avoid operational failures caused by three-phase imbalance, and improve the stability of the power grid; by using the busbar knife position signal to directly verify the reliability of the operation and closing, and by monitoring the knife signal through the background data monitor, the real-time and accurate judgment of the reliability of the operation and closing is achieved.
[0007] In order to solve the above technical problems, the present invention provides the following technical solutions: an online early warning method for closing reliability of hot-reversing busbar operation in a substation, comprising the following steps:
[0008] Primary judgment of the knife current based on the small difference of the busbar;
[0009] Secondary judgment based on three-phase imbalance;
[0010] Direct verification of closing reliability based on busbar switch position signal;
[0011] The switch closing signal is judged based on the calculation result of the bus differential current.
[0012] As a preferred solution of the online early warning method for closing reliability of thermal busbar reversal operation in a substation described in the present invention, wherein: the primary judgment of the isolating knife current based on the busbar small difference is judged according to the settlement result of the respective current of the isolating knife in the busbar thermal conduction operation, the respective current of the isolating knife in the busbar thermal conduction operation is calculated according to the current of each branch and the bus-coupled current, the current of each branch is measured by the current transformer installed on the branch circuit breaker, and the bus-coupled current is directly measured by the current transformer installed on the bus-coupled branch;
[0013] The current of each switch in the busbar thermal conductivity operation is calculated according to Kirchhoff's current law. The specific calculation formula is as follows:
[0014] The calculation of the I bus differential current is as follows:
[0015]
[0016] The calculation of II mother differential current is as follows:
[0017]
[0018] Among them, I Ii represents the current of the branch numbered i, I represents the set of numbers of all branches on bus I, I ML Indicates bus current, I G1 Indicates I isolation current, I G2 Indicates II isolation current.
[0019] As a preferred solution of the online early warning method for the reliability of the thermal busbar operation closing of a substation described in the present invention, the primary judgment of the knife current based on the busbar small difference is to make a primary judgment on the reliability of the thermal busbar operation closing of the substation according to the current of the busbar knife, and the specific judgment is as follows:
[0020] When the substation thermal busbar operation closing is reliable and correct, the bus differential currents of line I and line II are both 0, and the currents on the busbars are completely balanced. When the bus differential currents of line I and line II are both 0, it means that the primary judgment result of the substation thermal busbar operation closing is reliable.
[0021] When the bus differential currents of line I and line II are not both 0, it means that the primary judgment result of the substation thermal busbar operation closing is unreliable, and the relevant personnel are notified to record the current unreliable operation and keep it on file.
[0022] As a preferred solution of the online early warning method for the closing reliability of the thermal bus operation of a substation described in the present invention, wherein: the secondary judgment based on three-phase imbalance is a secondary judgment of the closing reliability of the thermal bus operation of the substation based on the primary judgment of the isolation current of the bus small difference, and the secondary judgment of the closing reliability of the thermal bus operation of the substation is judged by using the three-phase imbalance;
[0023] The three-phase imbalance is calculated by comparing the ratio of the maximum current amplitude of any two phases to the maximum current amplitude, comparing the calculated ratio result with the typical value, and verifying the three-phase imbalance according to the comparison result. The three-phase imbalance includes the three-phase imbalance of the bus tie circuit breaker, the three-phase imbalance of the bus isolation knife in the switching interval I, and the three-phase imbalance of the bus isolation knife in the switching interval II. The specific calculation is as follows:
[0024] The specific calculation formula for the three-phase unbalance of the busbar circuit breaker is as follows:
[0025]
[0026] The specific calculation formula for the three-phase unbalance degree of the switching interval I busbar is as follows
[0027]
[0028] The specific calculation formula for the three-phase unbalance degree of the switching bay II busbar is as follows:
[0029]
[0030] Among them, a, b, and c represent phases A, B, and C respectively, and I ML·i Indicates the current of any phase of the busbar circuit breaker, I 1G·i Indicates the current of any phase of the switching interval I busbar, I 2G·i Indicates the current of any phase of the switching bay II busbar.
[0031] As a preferred solution of the online early warning method for closing reliability of hot busbar switching operation in a substation described in the present invention, the secondary judgment based on three-phase imbalance is jointly judged by using the three-phase imbalance of the bus tie circuit breaker, the three-phase imbalance of the busbar switch of switching interval I and the three-phase imbalance of the busbar switch of switching interval II, and the specific judgment is as follows:
[0032] By judging the three-phase unbalance of the busbar circuit breaker and the interval switch, the secondary judgment of the closing reliability of the substation thermal busbar operation is completed. The specific judgment is as follows:
[0033] When judging the three-phase imbalance of the bus tie circuit breaker and the interval knife, the three-phase balance judgment of the bus tie circuit breaker and the interval knife is completed by comparing the calculated three-phase imbalance with the typical value λ, as follows:
[0034] When the three-phase unbalance of the bus tie circuit breaker satisfies the formula ΔI ML When ≥λ, it means that the three-phase unbalance of the current bus tie circuit breaker exceeds the typical value. At this time, the three-phase of the bus tie circuit breaker is unbalanced, and the closing operation of the current substation thermal busbar is unreliable;
[0035] When the three-phase unbalance degree of the switching bay I busbar meets the formula ΔI 1G When ≥λ, it means that the three-phase unbalance degree of the current switching interval I busbar exceeds the typical value. At this time, the three-phase unbalance of the switching interval I busbar is unbalanced, and the closing operation of the current substation thermal busbar is unreliable;
[0036] When the three-phase unbalance degree of the switching bay II busbar meets the formula ΔI 2G When ≥λ, it means that the three-phase unbalance of the busbar of the current switching bay II exceeds the typical value. At this time, the three-phase unbalance of the busbar of the current switching bay II is unbalanced, and the closing operation of the thermal busbar of the current substation is unreliable.
[0037] As a preferred solution of the online early warning method for the reliability of the hot-reversed busbar operation of a substation described in the present invention, wherein: the direct verification of the reliability of the operation closing based on the busbar knife switch position signal is to use a background data monitor to monitor the knife switch signal, and to directly verify the reliability of the operation closing according to the monitored knife switch signal;
[0038] The direct verification of the reliability of the operation of closing the switch according to the monitored switch signal is verified by calculating the total signal of the switch position on the bus side, and the specific verification is as follows:
[0039] When the background data monitor detects the appearance of G201 data, it indicates that there is a double position signal of the knife switch closing position. The calculation formula of the total signal of the busbar side knife switch position is as follows:
[0040] G=G201+G202+G203+...G20n
[0041] Among them, G201 represents the double position signal of the closing position of the knife switch of the 201 circuit breaker, G202 represents the double position signal of the closing position of the knife switch of the 22 circuit breaker, and G203 represents the double position signal of the closing position of the knife switch of the 203 circuit breaker;
[0042] When the background data monitor detects the relevant signals of G2011 and G2012, it means that the 1st and 2nd knives on the bus side of the 201 circuit breaker have the closing position signal. The calculation formula of the total position signal of the bus side knife switch is as follows:
[0043] G=G2011*G2012+G2021*G2022+G2031*G2032+...+G20mn*G20m(n+1)
[0044] Among them, G2011 and G2012 respectively indicate that the 1st and 2nd switches on the bus side of the 201 circuit breaker have closing position signals, G2021 and G2022 respectively indicate that the 1st and 2nd switches on the bus side of the 202 circuit breaker have closing position signals, and G2031 and G2032 respectively indicate that the 1st and 2nd switches on the bus side of the 203 circuit breaker have closing position signals.
[0045] As a preferred solution of the online early warning method for the reliability of the hot-reversed bus operation of a substation described in the present invention, wherein: the judgment of the knife switch closing signal based on the calculation result of the bus differential current is performed by calculating the bus differential current, and then judging the knife switch closing signal according to the calculation result of the bus differential current; before calculating the bus differential current, it is first stipulated that the current flows out of the bus as the positive direction, and the bus coupling current flows from bus II to bus I as the positive direction. If the actual current direction of the substation is opposite to the stipulated direction, the actual result is the inverse of the calculation result under the current stipulated premise;
[0046] The calculation of the bus differential current is to calculate the three-phase differential current of the bus differential current respectively, including the three-phase differential current of the I bus differential current and the three-phase differential current of the II bus differential current, and the specific calculation is as follows:
[0047] When calculating the three-phase differential current of the I mother differential current, we have:
[0048] A phase difference flow:
[0049]
[0050] B phase difference flow:
[0051]
[0052] C phase difference flow:
[0053]
[0054] When calculating the three-phase differential current of the II mother differential current, we have:
[0055] A phase difference flow:
[0056]
[0057] B phase difference flow:
[0058]
[0059] C phase difference flow:
[0060]
[0061] Where Re[I] represents the real part of the phase difference current, Im[I] represents the imaginary part of the phase difference current, Represents the cosine value corresponding to the phase, Indicates the sine value corresponding to the phase.
[0062] As a preferred solution of the online early warning method for the reliability of hot-reversed bus operation of a substation described in the present invention, the judgment of the knife switch closing signal is based on the bus differential current imbalance, and the bus differential current imbalance includes bus differential current imbalance I, bus differential current imbalance II and bus coupling imbalance, which are specifically calculated as follows:
[0063] I mother differential current imbalance:
[0064]
[0065] II mother differential current imbalance:
[0066]
[0067] Bus coupling imbalance:
[0068]
[0069] Among them, a, b, and c represent phases A, B, and C respectively, and I ML·i Indicates the current of any phase of the busbar circuit breaker, I 1G·i Indicates the current of any phase of the switching interval I busbar, I 2G·i Indicates the current of any phase of the switching bay II busbar. 10 means that when the current is less than 10A, no judgment is made and the actual rated current is used for calculation. 0.01I N is a specific value;
[0070] The judgment based on the bus differential current imbalance is to combine the bus differential current imbalance calculation result with the switch total position signal for judgment. The specific judgment rules are as follows:
[0071] H=max{ΔI I ,ΔI II ,ΔI ML}*G
[0072] Among them, ΔI I It represents the calculation result of the imbalance degree of differential current of I mother, ΔI II It represents the calculation result of the imbalance degree of the differential current of the II mother, ΔI ML It indicates the calculation result of the main coupling imbalance, G indicates the total position signal of the knife switch, and H indicates the judgment of the knife switch not closing in place signal. When H satisfies the formula H≥0.15, it means that the current knife switch is not closed in place, triggering an alarm and notifying relevant staff to handle it.
[0073] In order to solve the above technical problems, the present invention provides the following technical solutions: an online early warning system for the reliability of hot-reversed busbar operation in a substation, comprising: a primary judgment module for busbar small differential cut-off current, a secondary judgment module for three-phase unbalance, a busbar side cut-off position signal verification module, and a busbar differential current calculation result judgment module;
[0074] The busbar small difference disconnecting current primary judgment module is responsible for making primary judgment based on the disconnecting current of the busbar small difference; by obtaining the current of each branch and the busbar current, using Kirchhoff's current law to calculate the respective current of the busbar disconnecting knife, and then judging the reliability of the substation thermal conduction busbar operation closing; when the busbar differential current of line I and line II are both 0, the judgment result is reliable; otherwise, the judgment result is unreliable, and the relevant personnel are notified to record and keep the results on file;
[0075] The three-phase unbalance secondary judgment module is responsible for making a secondary judgment on the reliability of the substation thermal busbar operation closing operation determined by the primary judgment of the busbar small difference current; by calculating the three-phase unbalance of the bus tie breaker, the switching bay I busbar and the switching bay II busbar, and comparing them with the typical value, it is judged whether the three phases are balanced; when the three-phase unbalance of any phase exceeds the typical value, it is judged that the current substation thermal busbar operation closing operation is unreliable;
[0076] The busbar side knife switch position signal verification module uses the background data monitor to monitor the knife switch signal, and directly verifies the reliability of the operation closing according to the monitored knife switch signal; verifies the calculation result of the busbar side knife switch position total signal to ensure that the knife switch is closed in place; when the background data monitor monitors a specific knife switch closing position dual position signal, the reliability of the knife switch closing is verified according to the preset busbar side knife switch position total signal calculation formula;
[0077] The bus differential current calculation result judgment module judges the knife switch closing signal based on the calculation result of the bus differential current; by calculating the bus differential current in real time, it is judged whether it is within the normal range, and then it is inferred whether the knife switch is closed; when the bus differential current calculation result is abnormal, the system will issue a warning signal to prompt relevant personnel to check and handle it.
[0078] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and is characterized in that when the processor executes the computer program, the steps of an online early warning method for closing reliability of a hot-reversing busbar operation in a substation are implemented.
[0079] A computer-readable storage medium having a computer program stored thereon, characterized in that when the computer program is executed by a processor, the steps of an online early warning method for closing reliability of a hot-reversing busbar operation in a substation are implemented.
[0080] Beneficial effects of the present invention: The present invention realizes a preliminary evaluation of the reliability of the operation and closing of the thermal busbar of the substation by adopting the primary judgment technology of the isolating current based on the small difference of the busbar. This technology determines whether the bus differential current is zero by calculating the current of the busbar isolating current, thereby judging the reliability of the operation and closing, thereby improving the safety and accuracy of the operation; by introducing the secondary judgment technology based on three-phase imbalance, further verification of the reliability of the operation and closing is achieved. By calculating the three-phase imbalance and comparing it with the typical value, this technology can timely detect the three-phase imbalance, avoid operational failures caused by three-phase imbalance, and improve the stability of the power grid; by using the busbar measuring knife switch position signal to directly verify the reliability of the operation and closing, and by monitoring the knife switch signal through the background data monitor, real-time and accurate judgment of the reliability of the operation and closing is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0081] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0082] Figure 1 The present invention is a schematic diagram of the overall method steps of an online early warning method for closing reliability of a substation hot-reversing busbar operation.
[0083] Figure 2 The present invention is an overall flow chart of an online early warning method for closing reliability of hot-reversing busbar operation in a substation.
[0084] Figure 3 The present invention is a schematic diagram of the overall composition structure of an online early warning system for closing reliability of a hot-reversing busbar operation in a substation. DETAILED DESCRIPTION
[0085] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0086] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0087] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0088] The present invention is described in detail with reference to schematic diagrams. When describing the embodiments of the present invention, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0089] At the same time, in the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper, lower, inner and outer" are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first, second or third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0090] In the present invention, unless otherwise clearly specified and limited, the terms "install, connect, connect" should be understood in a broad sense, for example: it can be a fixed connection, a detachable connection or an integral connection; it can also be a mechanical connection, an electrical connection or a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0091] Example 1
[0092] Reference Figure 1-2 , which is the first embodiment of the present invention, provides a substation hot-reversing busbar operation closing reliability online early warning method, comprising the following steps:
[0093] S1: Primary judgment of the knife-isolating current based on the small busbar difference.
[0094] Specifically, the primary judgment of the isolating current based on the busbar small difference is made according to the calculation results of the respective currents of the isolating switches in the busbar thermal conduction operation. The respective currents of the isolating switches in the busbar thermal conduction operation are calculated based on the currents of each branch and the bus-binding current. The currents of each branch are measured by current transformers installed on the branch circuit breakers, and the bus-binding current is directly measured by current transformers installed on the bus-binding branches.
[0095] Furthermore, the currents of the switches in the busbar thermal conductivity operation are calculated according to Kirchhoff's current law, and the specific calculation formula is as follows:
[0096] The calculation of the I bus differential current is as follows:
[0097]
[0098] The calculation of II mother differential current is as follows:
[0099]
[0100] Among them, I Ii represents the current of the branch numbered i, I represents the set of numbers of all branches on bus I, I ML Indicates bus current, IG1 Indicates I isolation current, I G2 Indicates II knife-isolating current;
[0101] It should be noted that the primary judgment of the disconnecting current based on the busbar small difference is a primary judgment of the reliability of the substation thermal busbar operation closing according to the current of the busbar disconnecting current. The specific judgment is as follows:
[0102] When the substation thermal busbar operation closing is reliable and correct, the bus differential currents of line I and line II are both 0, and the currents on the busbars are completely balanced. When the bus differential currents of line I and line II are both 0, it means that the primary judgment result of the substation thermal busbar operation closing is reliable.
[0103] When the bus differential currents of line I and line II are not both 0, it means that the primary judgment result of the substation thermal busbar operation closing is unreliable, and the relevant personnel are notified to record the current unreliable operation and keep it on file.
[0104] S2: Secondary judgment based on three-phase imbalance.
[0105] Specifically, the secondary judgment based on three-phase unbalance is a secondary judgment of the reliability of the substation thermal conduction busbar operation closing operation based on the primary judgment of the busbar small difference isolation current, and the secondary judgment of the reliability of the substation thermal conduction busbar operation closing operation is judged by using the three-phase unbalance;
[0106] Furthermore, the three-phase imbalance is calculated by comparing the ratio of the maximum current amplitude of any two phases to the maximum current amplitude, comparing the calculated ratio result with the typical value, and verifying the three-phase imbalance according to the comparison result. The three-phase imbalance includes the three-phase imbalance of the bus tie circuit breaker, the three-phase imbalance of the bus isolation knife of the switching interval I, and the three-phase imbalance of the bus isolation knife of the switching interval II. The specific calculation is as follows:
[0107] The specific calculation formula for the three-phase unbalance of the busbar circuit breaker is as follows:
[0108]
[0109] The specific calculation formula for the three-phase unbalance degree of the switching interval I busbar is as follows
[0110]
[0111] The specific calculation formula for the three-phase unbalance degree of the switching bay II busbar is as follows:
[0112]
[0113] Among them, a, b, and c represent phases A, B, and C respectively, and I ML·iIndicates the current of any phase of the busbar circuit breaker, I 1G·i Indicates the current of any phase of the switching interval I busbar, I 2G·i Indicates the current of any phase of the switching bay II busbar.
[0114] Furthermore, the secondary judgment based on three-phase imbalance is jointly judged by using the three-phase imbalance of the bus tie circuit breaker, the three-phase imbalance of the bus isolation knife of the switching bay I, and the three-phase imbalance of the bus isolation knife of the switching bay II. The specific judgment is as follows:
[0115] By judging the three-phase unbalance of the busbar circuit breaker and the interval switch, the secondary judgment of the closing reliability of the substation thermal busbar operation is completed. The specific judgment is as follows:
[0116] When judging the three-phase imbalance of the bus tie circuit breaker and the interval knife, the three-phase balance judgment of the bus tie circuit breaker and the interval knife is completed by comparing the calculated three-phase imbalance with the typical value λ, as follows:
[0117] When the three-phase unbalance of the bus tie circuit breaker satisfies the formula ΔI ML When ≥λ, it means that the three-phase unbalance of the current bus tie circuit breaker exceeds the typical value. At this time, the three-phase of the bus tie circuit breaker is unbalanced, and the closing operation of the current substation thermal busbar is unreliable;
[0118] When the three-phase unbalance degree of the switching bay I busbar meets the formula ΔI 1G When ≥λ, it means that the three-phase unbalance degree of the current switching interval I busbar exceeds the typical value. At this time, the three-phase unbalance of the switching interval I busbar is unbalanced, and the closing operation of the current substation thermal busbar is unreliable;
[0119] When the three-phase unbalance degree of the switching bay II busbar meets the formula ΔI 2G When ≥λ, it means that the three-phase unbalance of the busbar of the current switching bay II exceeds the typical value. At this time, the three-phase unbalance of the busbar of the current switching bay II is unbalanced, and the closing operation of the thermal busbar of the current substation is unreliable.
[0120] It should be noted that the typical value is set based on the performance of the electrical equipment, the stability of the system and the efficiency of the energy in the daily use of the electrical equipment, and is verified and set in combination with historical records. The typical value in the present invention is set in the range of 5% to 10%. In order to improve the verification of the reliability of the operation and closing of the thermal busbar of the substation, when judging the three-phase imbalance, the typical value is 5%, that is, when the three-phase imbalance of the busbar circuit breaker and the interval knife exceeds the set typical value, it indicates that the three-phase imbalance of the current busbar circuit breaker and the interval knife is unbalanced, which means that the current operation and closing of the thermal busbar of the substation is unreliable, and then the secondary judgment based on the three-phase imbalance is completed.
[0121] S3: Direct verification of the reliability of closing operation based on the busbar switch position signal.
[0122] Specifically, the direct verification of the reliability of the operation of closing the switch based on the busbar knife switch position signal is to monitor the knife switch signal using a background data monitor, and to directly verify the reliability of the operation of closing the switch based on the monitored knife switch signal.
[0123] Furthermore, the switch signal includes the switch total position signal G, the value of G is 0 and 1, 0 indicates the normal operation of the substation, 1 indicates that the substation is performing thermal busbar operation; the branch and busbar three-phase measurement current signals IA, IB and IC, the power factor , active power P and reactive power Q;
[0124] It should be noted that the direct verification of the reliability of the closing operation based on the monitored knife switch signal is verified by calculating the total signal of the busbar side knife switch position, and the specific verification is as follows:
[0125] When the background data monitor detects the appearance of G201 data, it indicates that there is a double position signal of the knife switch closing position. The calculation formula of the total signal of the busbar side knife switch position is as follows:
[0126] G=G201+G202+G203+...G20n
[0127] Among them, G201 represents the double position signal of the closing position of the knife switch of the 201 circuit breaker, G202 represents the double position signal of the closing position of the knife switch of the 22 circuit breaker, and G203 represents the double position signal of the closing position of the knife switch of the 203 circuit breaker;
[0128] When the background data monitor detects the relevant signals of G2011 and G2012, it means that the 1st and 2nd knives on the bus side of the 201 circuit breaker have the closing position signal. The calculation formula of the total position signal of the bus side knife switch is as follows:
[0129] G=G2011*G2012+G2021*G2022+G2031*G2032+...+G20mn*G20m(n+1)
[0130] Among them, G2011 and G2012 respectively indicate that the 1st and 2nd switches on the bus side of the 201 circuit breaker have closing position signals, G2021 and G2022 respectively indicate that the 1st and 2nd switches on the bus side of the 202 circuit breaker have closing position signals, and G2031 and G2032 respectively indicate that the 1st and 2nd switches on the bus side of the 203 circuit breaker have closing position signals.
[0131] S4: Determine the switch closing signal based on the calculation result of the bus differential current.
[0132] Specifically, the judgment of the knife switch closing signal based on the calculation result of the bus differential current is performed by calculating the bus differential current, and then judging the knife switch closing signal according to the calculation result of the bus differential current; before calculating the bus differential current, it is first stipulated that the current flows out of the bus as the positive direction, and the bus coupling current flows from bus II to bus I as the positive direction. If the actual current direction of the substation is opposite to the stipulated direction, the actual result is the inverse of the calculation result under the current stipulated premise.
[0133] Furthermore, the calculation of the bus differential current is to calculate the three-phase differential current of the bus differential current respectively, including the three-phase differential current of the I bus differential current and the three-phase differential current of the II bus differential current, and the specific calculation is as follows:
[0134] When calculating the three-phase differential current of the I mother differential current, we have:
[0135] A phase difference flow:
[0136]
[0137] B phase difference flow:
[0138]
[0139] C phase difference flow:
[0140]
[0141] When calculating the three-phase differential current of the II mother differential current, we have:
[0142] A phase difference flow:
[0143]
[0144] B phase difference flow:
[0145]
[0146] C phase difference flow:
[0147]
[0148] Where Re[I] represents the real part of the phase difference current, Im[I] represents the imaginary part of the phase difference current, Represents the cosine value corresponding to the phase, Indicates the sine value corresponding to the phase.
[0149] It should be noted that the sine and cosine values corresponding to the phase can be calculated through the active power and reactive power measured by the background data monitor. The specific calculation formula is as follows:
[0150] When the direction of the current can be clearly distinguished, is a known quantity, then we have,
[0151] When the direction of the current cannot be clearly distinguished, the active power and reactive power measured by the background data monitor are calculated as follows:
[0152]
[0153] According to the trigonometric calculation formula, the sine and cosine values corresponding to each interval B and C phase can be calculated. The specific calculation is as follows:
[0154]
[0155] Among them, P represents the active power measured by the data monitor, Q represents the reactive power measured by the data monitor, and 0.001 is to prevent errors in calculation when both P and Q are 0. Represents the cosine value corresponding to the phase, Indicates the sine value corresponding to the phase.
[0156] Furthermore, the switch closing signal is judged based on the bus differential current imbalance, which includes bus differential current imbalance I, bus differential current imbalance II and bus coupling imbalance, which are specifically calculated as follows:
[0157] I mother differential current imbalance:
[0158]
[0159] II mother differential current imbalance:
[0160]
[0161] Bus coupling imbalance:
[0162]
[0163] Among them, a, b, and c represent phases A, B, and C respectively, and I ML·i Indicates the current of any phase of the busbar circuit breaker, I 1G·i Indicates the current of any phase of the switching interval I busbar, I 2G·i Indicates the current of any phase of the switching bay II busbar. 10 means that when the current is less than 10A, no judgment is made and the actual rated current is used for calculation. 0.01I N is a specific value;
[0164] The judgment based on the bus differential current imbalance is to combine the bus differential current imbalance calculation result with the switch total position signal for judgment. The specific judgment rules are as follows:
[0165] H=max{ΔI I ,ΔI II ,ΔI ML}*G
[0166] Among them, ΔI I It represents the calculation result of the imbalance degree of differential current of I mother, ΔI II It represents the calculation result of the imbalance degree of the differential current of the II mother, ΔI ML It indicates the calculation result of the main coupling imbalance, G indicates the total position signal of the knife switch, and H indicates the judgment of the knife switch not closing in place signal. When H satisfies the formula H≥0.15, it means that the current knife switch is not closed in place, triggering an alarm and notifying relevant staff to handle it.
[0167] Example 2
[0168] Reference Figure 3 , which is the second embodiment of the present invention, provides a substation hot-reversed bus operation closing reliability online early warning system, including a bus small differential isolation knife current primary judgment module, a three-phase unbalanced secondary judgment module, a bus side knife position signal verification module, and a bus differential current calculation result judgment module;
[0169] Specifically, the busbar small difference isolating current primary judgment module is responsible for making primary judgments based on the busbar small difference isolating current. By obtaining the currents of each branch and the busbar current, the respective currents of the busbar isolating switches are calculated using Kirchhoff's current law, and then the reliability of the substation thermal busbar operation closing is judged. When the busbar differential currents of line I and line II are both 0, the judgment result is reliable; otherwise, the judgment result is unreliable, and the relevant personnel are notified to record and keep it on file;
[0170] The three-phase unbalance secondary judgment module is responsible for making a secondary judgment on the reliability of the substation thermal busbar operation closing operation determined by the primary judgment of the busbar small difference current; by calculating the three-phase unbalance of the bus tie breaker, the switching bay I busbar and the switching bay II busbar, and comparing them with the typical value, it is judged whether the three phases are balanced; when the three-phase unbalance of any phase exceeds the typical value, it is judged that the current substation thermal busbar operation closing operation is unreliable;
[0171] The busbar side knife switch position signal verification module uses the background data monitor to monitor the knife switch signal, and directly verifies the reliability of the operation closing according to the monitored knife switch signal. By verifying the calculation result of the busbar side knife switch position total signal, it ensures that the knife switch is closed in place; when the background data monitor monitors a specific knife switch closing position dual position signal, the reliability of the knife switch closing is verified according to the preset busbar side knife switch position total signal calculation formula;
[0172] The bus differential current calculation result judgment module judges the knife switch closing signal based on the calculation result of the bus differential current; by calculating the bus differential current in real time, it is judged whether it is within the normal range, and then it is inferred whether the knife switch is closed; when the bus differential current calculation result is abnormal, the system will issue a warning signal to prompt relevant personnel to check and handle it.
[0173] It should be noted that this system realizes comprehensive monitoring and early warning of the reliability of the hot-switching busbar operation of the substation by integrating multiple functional modules; the modules cooperate with each other to ensure the accurate judgment of the closing signal of the knife switch; at the same time, the system adopts an online early warning method, which can timely detect potential problems and issue early warning signals, thereby improving the reliability and safety of the hot-switching busbar operation of the substation; in addition, the system also has the characteristics of simple operation, accurate data, and high reliability, and is suitable for various substation scenarios.
[0174] Furthermore, if the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0175] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.
[0176] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.
[0177] Additionally, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment (ie, those features that are not relevant to the best mode presently contemplated for carrying out the invention or those that are not relevant to implementing the invention) may not be described.
[0178] It will be appreciated that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but will be a routine task of design, fabrication, and production for those of ordinary skill having the benefit of this disclosure without undue experimentation.
[0179] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. An online early warning method for reliability of hot busbar operation closing in a substation, characterized by: The following steps are included: Primary judgment of the knife current based on the small difference of the busbar; Secondary judgment based on three-phase imbalance; Direct verification of closing reliability based on busbar switch position signal; The switch closing signal is judged based on the calculation result of the bus differential current.
2. The online early warning method for closing reliability of hot busbar operation in a substation according to claim 1, characterized in that: The primary judgment of the isolating switch current based on the busbar small difference is judged according to the settlement results of the respective currents of the isolating switches in the busbar thermal conduction operation, and the respective currents of the isolating switches in the busbar thermal conduction operation are calculated according to the currents of each branch and the busbar current, and the currents of each branch are measured by the current transformer installed on the branch circuit breaker, and the busbar current is directly measured by the current transformer installed on the busbar branch; The current of each switch in the busbar thermal conductivity operation is calculated according to Kirchhoff's current law. The specific calculation formula is as follows: The calculation of the I bus differential current is as follows: The calculation of II mother differential current is as follows: Among them, I Ii represents the current of the branch numbered i, I represents the set of numbers of all branches on bus I, I ML Indicates bus current, I G1 Indicates I isolation current, I G2 Indicates II isolation current.
3. The online early warning method for closing reliability of hot bus operation in a substation according to claim 2, characterized in that: The primary judgment of the disconnecting current based on the busbar small difference is to make a primary judgment on the reliability of the substation thermal busbar operation closing according to the current of the busbar disconnecting current. The specific judgment is as follows: When the substation thermal busbar operation closing is reliable and correct, the bus differential currents of line I and line II are both 0, and the currents on the busbars are completely balanced. When the bus differential currents of line I and line II are both 0, it means that the primary judgment result of the substation thermal busbar operation closing is reliable. When the bus differential currents of line I and line II are not both 0, it means that the primary judgment result of the substation thermal busbar operation closing is unreliable, and the relevant personnel are notified to record the current unreliable operation and keep it on file.
4. The online early warning method for closing reliability of hot busbar operation in a substation according to claim 3, characterized in that: The secondary judgment based on three-phase imbalance is a secondary judgment of the reliability of the substation thermal conduction busbar operation closing operation based on the primary judgment of the busbar small difference isolation current. The secondary judgment of the reliability of the substation thermal conduction busbar operation closing operation is judged by using the three-phase imbalance; The three-phase imbalance is calculated by comparing the ratio of the maximum current amplitude of any two phases to the maximum current amplitude, comparing the calculated ratio result with the typical value, and verifying the three-phase imbalance according to the comparison result. The three-phase imbalance includes the three-phase imbalance of the bus tie circuit breaker, the three-phase imbalance of the bus isolation knife in the switching interval I, and the three-phase imbalance of the bus isolation knife in the switching interval II. The specific calculation is as follows: The specific calculation formula for the three-phase unbalance of the busbar circuit breaker is as follows: The specific calculation formula for the three-phase unbalance degree of the switching interval I busbar is as follows The specific calculation formula for the three-phase unbalance degree of the switching bay II busbar is as follows: Among them, a, b, and c represent phases A, B, and C respectively, and I ML·i Indicates the current of any phase of the busbar circuit breaker, I 1G·i Indicates the current of any phase of the switching interval I busbar, I 2G·i Indicates the current of any phase of the switching bay II busbar.
5. The method for online early warning of closing reliability of hot busbar operation in a substation according to claim 4, characterized in that: The secondary judgment based on three-phase imbalance is jointly judged by using the three-phase imbalance of the bus tie circuit breaker, the three-phase imbalance of the bus breakers in the switching bay I, and the three-phase imbalance of the bus breakers in the switching bay II. The specific judgment is as follows: By judging the three-phase unbalance of the busbar circuit breaker and the interval switch, the secondary judgment of the closing reliability of the substation thermal busbar operation is completed. The specific judgment is as follows: When judging the three-phase imbalance of the bus tie circuit breaker and the interval knife, the three-phase balance judgment of the bus tie circuit breaker and the interval knife is completed by comparing the calculated three-phase imbalance with the typical value λ, as follows: When the three-phase unbalance of the bus tie circuit breaker satisfies the formula ΔI ML When ≥λ, it means that the three-phase unbalance of the current bus tie circuit breaker exceeds the typical value. At this time, the three-phase of the bus tie circuit breaker is unbalanced, and the closing operation of the current substation thermal busbar is unreliable; When the three-phase unbalance degree of the switching interval I busbar meets the formula ΔI 1G When ≥λ, it means that the three-phase unbalance of the current switching interval I busbar exceeds the typical value. At this time, the three-phase unbalance of the switching interval I busbar is unbalanced, and the current substation thermal busbar operation closing is unreliable; When the three-phase unbalance degree of the switching bay II busbar meets the formula ΔI 2G When ≥λ, it means that the three-phase unbalance of the busbar of the current switching bay II exceeds the typical value. At this time, the three-phase unbalance of the busbar of the current switching bay II is unbalanced, and the closing operation of the thermal busbar of the current substation is unreliable.
6. The online early warning method for closing reliability of hot busbar operation in a substation according to claim 5, characterized in that: The direct verification of the reliability of the operation of the switch based on the busbar knife switch position signal is to use the background data monitor to monitor the knife switch signal, and to directly verify the reliability of the operation of the switch based on the monitored knife switch signal; The direct verification of the reliability of the operation of closing the switch according to the monitored switch signal is verified by calculating the total signal of the switch position on the bus side, and the specific verification is as follows: When the background data monitor detects the appearance of G201 data, it indicates that there is a double position signal of the knife switch closing position. The calculation formula of the total signal of the busbar side knife switch position is as follows: G=G201+G202+G203+...G20n Among them, G201 represents the double position signal of the closing position of the knife switch of the 201 circuit breaker, G202 represents the double position signal of the closing position of the knife switch of the 22 circuit breaker, and G203 represents the double position signal of the closing position of the knife switch of the 203 circuit breaker; When the background data monitor detects G2011 and G2012 related signals, it means that the 1st and 2nd knives on the bus side of the 201 circuit breaker have closing position signals. The calculation formula for the total position signal of the bus side knife switch is as follows: G=G2011*G2012+G2021*G2022+G2031*G2032+...+G20mn*G20m(n+1) Among them, G2011 and G2012 respectively indicate that the 1st and 2nd switches on the bus side of the 201 circuit breaker have closing position signals, G2021 and G2022 respectively indicate that the 1st and 2nd switches on the bus side of the 202 circuit breaker have closing position signals, and G2031 and G2032 respectively indicate that the 1st and 2nd switches on the bus side of the 203 circuit breaker have closing position signals.
7. The method for online early warning of closing reliability of hot busbar operation in a substation according to claim 6, characterized in that: The determination of the switch closing signal based on the calculation result of the bus differential current is performed by calculating the bus differential current, and then determining the switch closing signal based on the calculation result of the bus differential current; before calculating the bus differential current, it is first stipulated that the current flows out of the bus as the positive direction, and the bus coupling current flows from bus II to bus I as the positive direction. If the actual current direction of the substation is opposite to the stipulated direction, the actual result is the inverse of the calculation result under the current stipulated premise; The calculation of the bus differential current is to calculate the three-phase differential current of the bus differential current respectively, including the three-phase differential current of the I bus differential current and the three-phase differential current of the II bus differential current, and the specific calculation is as follows: When calculating the three-phase differential current of the I mother differential current, we have: A phase difference flow: B phase difference flow: C phase difference flow: When calculating the three-phase differential current of the II mother differential current, we have: A phase difference flow: B phase difference flow: C phase difference flow: Where Re[I] represents the real part of the phase difference current, Im[I] represents the imaginary part of the phase difference current, Represents the cosine value corresponding to the phase, Indicates the sine value corresponding to the phase; The judgment of the knife switch closing signal is based on the bus differential current imbalance, which includes bus differential current imbalance I, bus differential current imbalance II and bus coupling imbalance, which is specifically calculated as follows: I mother differential current imbalance: II mother differential current imbalance: Bus coupling imbalance: Among them, a, b, and c represent phases A, B, and C respectively, and I ML·i Indicates the current of any phase of the busbar circuit breaker, I 1G·i Indicates the current of any phase of the switching interval I busbar, I 2G·i Indicates the current of any phase of the switching bay II busbar. 10 means that when the current is less than 10A, no judgment is made and the actual rated current is used for calculation. 0.01I N is a specific value; The judgment based on the bus differential current imbalance is to combine the bus differential current imbalance calculation result with the switch total position signal for judgment. The specific judgment rules are as follows: H=max{ΔI I ,ΔI II ,ΔI ML }*G Among them, ΔI I It represents the calculation result of the imbalance degree of differential current of I mother, ΔI II Indicates the calculation result of the imbalance degree of the differential current of the II mother, ΔI ML It indicates the calculation result of the main coupling imbalance, G indicates the total position signal of the knife switch, and H indicates the judgment of the knife switch not closing in place signal. When H satisfies the formula H≥0.15, it means that the current knife switch is not closed in place, triggering an alarm and notifying relevant staff to handle it.
8. A system using the online early warning method for closing reliability of hot-reversing busbar operation in a substation as claimed in any one of claims 1 to 7, characterized in that: The busbar small differential current primary judgment module, the three-phase unbalanced secondary judgment module, the busbar side switch position signal verification module, and the busbar differential current calculation result judgment module; The busbar small difference disconnecting current primary judgment module is responsible for making primary judgment based on the disconnecting current of the busbar small difference; by obtaining the current of each branch and the busbar current, using Kirchhoff's current law to calculate the respective current of the busbar disconnecting knife, and then judging the reliability of the substation thermal conduction busbar operation closing; when the busbar differential current of line I and line II are both 0, the judgment result is reliable; otherwise, the judgment result is unreliable, and the relevant personnel are notified to record and keep the results on file; The three-phase unbalance secondary judgment module is responsible for making a secondary judgment on the reliability of the substation thermal busbar operation closing operation determined by the primary judgment of the busbar small difference current; by calculating the three-phase unbalance of the bus tie breaker, the switching bay I busbar and the switching bay II busbar, and comparing them with the typical value, it is judged whether the three phases are balanced; when the three-phase unbalance of any phase exceeds the typical value, it is judged that the current substation thermal busbar operation closing operation is unreliable; The busbar side knife switch position signal verification module uses the background data monitor to monitor the knife switch signal, and directly verifies the reliability of the operation closing according to the monitored knife switch signal; verifies the calculation result of the busbar side knife switch position total signal to ensure that the knife switch is closed in place; when the background data monitor monitors a specific knife switch closing position dual position signal, the reliability of the knife switch closing is verified according to the preset busbar side knife switch position total signal calculation formula; The bus differential current calculation result judgment module judges the knife switch closing signal based on the calculation result of the bus differential current; By calculating the bus differential current in real time, it is determined whether it is within the normal range, and then it is inferred whether the knife switch is in place; when the bus differential current calculation result is abnormal, the system will issue a warning signal to prompt relevant personnel to check and handle it.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Method for judging switching-on position of isolating switch in hot reverse bus operation