Power grid state acquisition method and system based on data fusion
Through the path optimization model and RTU pseudo-measurement equivalent alignment technology, the intermediate node equivalent PMU data is generated, which solves the problem that PMU data is underutilized in the prior art, and improves the accuracy and data compatibility of grid state acquisition. Enhanced reliability of grid fault diagnosis.
Patent Information
- Application Number
- CN202410944085.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-08
AI Technical Summary
The prior art fails to make full use of PMU measurement data, resulting in low accuracy of pseudo-measurement data for power grid fault diagnosis, and poor compatibility of RTU pseudo-measurement data with PMU data, making it impossible to effectively play the maximum role of PMU.
By obtaining the shortest path from the initial node to the target node based on the path optimization model, performing RTU pseudo-measurement equivalent alignment, generating PMU data of the intermediate node, and using these data for data fusion to improve the accuracy of grid state acquisition.
It realizes more accurate real-time state acquisition of power grids, makes full use of PMU data, improves the accuracy and compatibility of data fusion, and enhances the reliability of power grid fault diagnosis.
Smart Images

Figure CN118920507A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system dispatching automation, and in particular to a power grid state acquisition method and system based on data fusion. Background Art
[0002] The most important measurement data in China comes from the Supervisory Control and Data Acquisition System (SCADA). The measurement data generally includes active and reactive power injected into the bus node, active and reactive power transmitted by the branch, and bus voltage amplitude. Data is collected and transmitted every 2 seconds. The data obtained by the system is transmitted through a remote transmission device. The errors of the transmission device and the errors generated in each link during the transmission process make the real-time accuracy of the voltage phase angle poor and the precision is not high. The RTU device cannot measure the phase angle of the line node. The PMU can measure the synchronous phasor in real time under the synchronous clock signal and maintain the signal punctuality in the out-of-synchronization state. The PMU transmits data faster and has a phase angle measurement device, so the accuracy of the measurement data is higher than that of the RTU. It is precisely because of its transmission accuracy reliability and the newly added phase angle measurement function that the PMU device is widely used in foreign power systems. Compared with RTU equipment, PMU equipment is more expensive and more difficult to maintain. Therefore, the domestic power system is insufficiently distributed and cannot guarantee that every node has PMU measurement, but the domestic RTU devices are almost all over all measurement nodes.
[0003] At present, the existing technology uses different technical platforms for SCADA and WAMS, and there are many differences between the two types of measurement data. If the two are combined into mixed measurement data without processing to serve other advanced applications, a series of data compatibility problems will occur, resulting in the introduction of PMU measurement not only failing to play its maximum role, but also proposing a multi-source information fusion power grid fault diagnosis method based on improved Petri net and Hilbert transform to solve the problems of poor reliability and low precision when using single switch quantity information to judge power grid faults. Some literatures have proposed the use of interpolation and fitting methods to obtain RTU pseudo-measurement data at the time of WAMS measurement, but they do not make full use of PMU measurement data, and there are shortcomings such as low precision of pseudo-measurement data caused by measurement errors and difficulty in setting weights, which cannot be directly applied. Summary of the invention
[0004] Based on the above problems, the present invention proposes a method and system for acquiring power grid status based on data fusion to solve the problem that the prior art does not fully utilize PMU measurement data and has low accuracy of pseudo-measurement data caused by measurement errors.
[0005] To achieve the above object, an embodiment of the present invention provides a method for acquiring power grid status based on data fusion, comprising:
[0006] Based on the path optimization model, the shortest path from the initial node to the target node is obtained;
[0007] Based on the initial node PMU data, perform RTU pseudo-measurement equivalent alignment on all intermediate nodes on the shortest path to obtain intermediate node equivalent PMU data corresponding to all intermediate nodes;
[0008] Based on the intermediate node equivalent PMU data corresponding to all the intermediate nodes and the target node RTU data, acquiring the target node equivalent PMU data;
[0009] The real-time state of the power grid is acquired based on the initial node PMU data, the intermediate node equivalent PMU data corresponding to all the intermediate nodes, and the target node equivalent PMU data.
[0010] The embodiment of the present invention proposes a method for acquiring power grid status based on data fusion. According to the power system topology, the optimal data flow direction (shortest path) of PMU data is constructed to lay a data flow foundation for subsequent RTU data synchronization alignment and pseudo-measurement generation; based on the optimal data flow direction, equivalent PMU data is obtained by effectively aligning the RTU data of the intermediate node, the RTU data of the target node and the PMU data of the initial node, and the PMU data is fully utilized to realize the pseudo-measurement generated by data fusion, thereby improving the accuracy of data fusion. Finally, the initial node PMU data, the equivalent PMU data of the intermediate node and the equivalent PMU data of the target node are used to acquire the power grid status. Data fusion based on the optimal data flow can obtain a more accurate real-time power grid status based on precise data fusion.
[0011] Furthermore, the shortest path from the initial node to the target node is obtained based on the path optimization model, specifically:
[0012] Based on the node-branch association matrix, branch decision variables and contact node decision variables, a path optimization model is constructed; wherein the node-branch association matrix is constructed by the number of power grid nodes and the number of branches, and the contact node decision variables are constrained to be preset real numbers;
[0013] Based on the path optimization model, the branch decision variables are solved by minimizing the number of branches to obtain the shortest path from the initial node to the target node.
[0014] Further, based on the initial node PMU data, RTU pseudo-measurement equivalent alignment is performed on all intermediate nodes on the shortest path to obtain intermediate node equivalent PMU data corresponding to all intermediate nodes, specifically:
[0015] Based on the initial node PMU data, align the data of all intermediate nodes on the shortest path according to the preset synchronization condition to obtain the RTU data sampling time of each intermediate node;
[0016] Based on the RTU data sampling time of the intermediate node, the RTU pseudo-measurement calculation is performed by injecting the power transfer distribution factor to obtain the intermediate node equivalent PMU data corresponding to all the intermediate nodes.
[0017] Further, based on the initial node PMU data, RTU pseudo-measurement equivalent alignment is performed on all intermediate nodes on the shortest path to obtain intermediate node equivalent PMU data corresponding to all intermediate nodes, specifically:
[0018] Based on the first intermediate node RTU data, a first RTU current amplitude measurement is constructed; based on the initial node PMU voltage amplitude measurement and the initial node PMU current amplitude measurement, a first intermediate node voltage amplitude pseudo-measurement is constructed; based on the absolute value of the difference between the first RTU current amplitude measurement and the initial node PMU current amplitude measurement and the absolute value of the difference between the first intermediate node voltage amplitude pseudo-measurement and the initial node PMU voltage amplitude measurement, the first intermediate node RTU data and the initial node PMU data are synchronized according to a preset difference minimum threshold to obtain the first intermediate node RTU data sampling time; based on the first intermediate node RTU data sampling time, a pseudo-measurement calculation is performed by injecting a power transfer distribution factor to obtain the first intermediate node equivalent PMU data; wherein, the voltage amplitude pseudo-measurement of the first intermediate node is constructed based on the initial node PMU voltage amplitude measurement and the initial node PMU current amplitude measurement;
[0019] Based on the second intermediate node RTU data, construct a second RTU current amplitude measurement; based on the first intermediate node equivalent PMU voltage amplitude measurement and the first intermediate node equivalent PMU current amplitude measurement, construct a second intermediate node voltage amplitude pseudo measurement; based on the absolute value of the difference between the second RTU current amplitude measurement and the first intermediate node equivalent PMU current amplitude measurement and the absolute value of the difference between the second intermediate node voltage amplitude pseudo measurement and the first intermediate node equivalent PMU voltage amplitude measurement, perform data synchronization alignment on the second intermediate node RTU data and the first intermediate node equivalent PMU data according to a preset minimum difference threshold to obtain the second intermediate node RTU data sampling time; based on the second intermediate node RTU data sampling time, perform pseudo measurement calculation by injecting a power transfer distribution factor to obtain the second intermediate node equivalent PMU data;
[0020] Based on the third intermediate node RTU data, a third RTU current amplitude measurement is constructed; based on the second intermediate node equivalent PMU voltage amplitude measurement and the second intermediate node equivalent PMU current amplitude measurement, a third intermediate node voltage amplitude pseudo measurement is constructed; based on the absolute value of the difference between the third RTU current amplitude measurement and the second intermediate node equivalent PMU current amplitude measurement and the absolute value of the difference between the third intermediate node voltage amplitude pseudo measurement and the second intermediate node equivalent PMU voltage amplitude measurement, the third intermediate node RTU data and the second intermediate node equivalent PMU data are synchronized according to a preset minimum difference threshold to obtain the third intermediate node RTU data sampling time; based on the third intermediate node RTU data sampling time, a pseudo measurement calculation is performed by injecting a power transfer distribution factor to obtain the third intermediate node equivalent PMU data;
[0021] Repeat the above steps until the intermediate node equivalent PMU data corresponding to all intermediate nodes are obtained.
[0022] Further, based on the RTU data sampling time of the intermediate node, the RTU pseudo measurement calculation is performed by injecting the power transfer distribution factor to obtain the intermediate node equivalent PMU data corresponding to all intermediate nodes, specifically:
[0023] Based on the RTU data sampling time of each intermediate node, the first RTU measurement value of each intermediate node is calculated to obtain the first RTU pseudo measurement value of each intermediate node;
[0024] Based on the injected power transfer distribution factor, the second RTU measurement value of each intermediate node is calculated to obtain the second RTU pseudo measurement value of each intermediate node;
[0025] Based on the first RTU pseudo measurement value of each intermediate node and the second RTU pseudo measurement value of each intermediate node, obtaining a synchronous pseudo measurement of each intermediate node;
[0026] Based on the synchronous pseudo-measurement of each intermediate node, the intermediate node equivalent PMU data corresponding to each intermediate node is obtained.
[0027] The embodiment of the present invention provides a method for acquiring power grid status based on data fusion, which injects a power transfer factor to perform pseudo-measurement calculation to acquire pseudo-measurements that cannot be directly generated through PMU data, thereby improving the accuracy of data fusion.
[0028] Further, the acquiring of the target node equivalent PMU data based on the intermediate node equivalent PMU data and the target node RTU data corresponding to all the intermediate nodes is specifically as follows:
[0029] Based on the equivalent PMU data of an intermediate node on the target node, align the second RTU data of the target node according to the preset synchronization condition to obtain the RTU data sampling time of the target node;
[0030] Based on the RTU data sampling time of the target node, a pseudo measurement calculation is performed by injecting a power transfer distribution factor to obtain equivalent PMU data of the target node.
[0031] Further, based on the equivalent PMU data of an intermediate node on the target node, the second RTU data of the target node is aligned according to a preset synchronization condition to obtain the RTU data sampling time of the target node, specifically:
[0032] Based on the second RTU data of the target node, construct the target node RTU current amplitude measurement; based on the target node upper intermediate node equivalent PMU voltage amplitude measurement and the target node upper intermediate node equivalent PMU current amplitude measurement, construct the target node voltage amplitude pseudo measurement;
[0033] Based on the absolute value of the difference between the current amplitude measurement of the target node RTU and the current amplitude measurement of an equivalent PMU of an intermediate node on the target node and the absolute value of the difference between the voltage amplitude pseudo-measurement of the target node and the voltage amplitude measurement of an equivalent PMU of an intermediate node on the target node, the second RTU data of the target node and the equivalent PMU data of an intermediate node on the target node are synchronized according to a preset minimum difference threshold to obtain the RTU data sampling time of the target node;
[0034] Based on the RTU data sampling time of the target node, a pseudo measurement calculation is performed by injecting a power transfer distribution factor to obtain equivalent PMU data of the target node.
[0035] Further, based on the RTU data sampling time of the target node, the pseudo measurement calculation is performed by injecting the power transfer distribution factor to obtain the equivalent PMU data of the target node, specifically:
[0036] Based on the RTU data sampling time of the target node, the first RTU measurement value of the target node is calculated by using the PMU data of a node above the target node to obtain the first RTU pseudo measurement value of the target node;
[0037] Based on the injected power transfer distribution factor, the second RTU measurement value of the target node is calculated to obtain the second RTU pseudo measurement value of the target node;
[0038] Obtaining a target node synchronization pseudo measurement based on the target node first RTU pseudo measurement value and the target node second RTU pseudo measurement value;
[0039] Based on the synchronous pseudo measurement of the target node and the PMU data of a node above the target node, the equivalent PMU data of the target node is obtained.
[0040] Further, the real-time state of the power grid is obtained based on the initial node PMU data, the intermediate node equivalent PMU data corresponding to all the intermediate nodes, and the target node equivalent PMU data, specifically:
[0041] Based on the initial node PMU data, construct a PMU measurement value vector;
[0042] Constructing an RTU measurement value vector based on the intermediate node equivalent PMU data corresponding to all the intermediate nodes and the target node equivalent PMU data;
[0043] constructing a power grid state equation based on the PMU measurement value vector and the RTU measurement value vector;
[0044] Based on the power grid state equation, the real-time state of the power grid is obtained.
[0045] The embodiment of the present invention further provides a power grid status acquisition system based on data fusion, comprising:
[0046] Path optimization module, intermediate node equivalent module, target node equivalent module and power grid status acquisition module;
[0047] The path optimization module is used to obtain the shortest path from the initial node to the target node based on the path optimization model;
[0048] The intermediate node equivalent module is used to perform RTU pseudo-measurement equivalent alignment on all intermediate nodes on the shortest path based on the initial node PMU data, and obtain intermediate node equivalent PMU data corresponding to all intermediate nodes;
[0049] The target node equivalent module is used to obtain the target node equivalent PMU data based on the intermediate node equivalent PMU data corresponding to all the intermediate nodes and the target node RTU data;
[0050] The power grid status acquisition module is used to acquire the real-time status of the power grid based on the initial node PMU data, the intermediate node equivalent PMU data corresponding to all the intermediate nodes, and the target node equivalent PMU data.
[0051] The embodiment of the present invention proposes a power grid state acquisition system based on data fusion, which constructs the optimal data flow direction (shortest path) of PMU data according to the power system topology through the path optimization module, laying a data flow foundation for the subsequent RTU data synchronization alignment and pseudo-measurement generation; through the intermediate node equivalent module and the target node equivalent module based on the optimal data flow, the RTU data of the intermediate node, the RTU data of the target node and the PMU data of the initial node are effectively aligned to obtain equivalent PMU data, and the PMU data is fully utilized to realize the pseudo-measurement generated by data fusion, thereby improving the accuracy of data fusion; finally, the initial node PMU data, the intermediate node equivalent PMU data and the target node equivalent PMU data are used by the power grid state acquisition module to acquire the power grid state, and the data fusion based on the optimal data flow can obtain a more accurate real-time power grid state according to precise data fusion. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] Figure 1 A schematic diagram of a flow chart of steps of a method for acquiring power grid status based on data fusion provided in an embodiment of the present invention;
[0053] Figure 2 A schematic diagram of optimal path data flow of a method for acquiring power grid status based on data fusion provided in an embodiment of the present invention;
[0054] Figure 3 A schematic diagram of the module structure of a power grid status acquisition system based on data fusion provided in an embodiment of the present invention;
[0055] Figure 4 A schematic diagram of an IEEE39 node system and PMU configuration of a power grid status acquisition method based on data fusion provided in an embodiment of the present invention;
[0056] Figure 5 A schematic diagram of optimal data flow of unobservable nodes in an IEEE39 node system of a power grid status acquisition method based on data fusion provided by an embodiment of the present invention;
[0057] Figure 6 A voltage-related curve diagram of node 8 of a method for acquiring power grid status based on data fusion provided in one embodiment of the present invention is shown in FIG1 ;
[0058] Figure 7 FIG2 is a graph showing a voltage-related curve of node 8 of a method for acquiring power grid status based on data fusion provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0059] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0060] In an example of this embodiment, the PMU directly observable node is the initial node, the PMU indirectly observable node is all the intermediate nodes; the PMU unobservable node is the target node; and it will not be described in detail below. In addition, in this specification, the optimal path ijk is used as an example for explanation, and node i is the initial node, node j is the intermediate node, and node k is the target node.
[0061] Example 1
[0062] See also Figure 1 , Figure 1 A schematic diagram of a step flow of a method for acquiring power grid status based on data fusion provided in an embodiment of the present invention. Figure 1 As shown, the present invention proposes a method for acquiring power grid status based on data fusion, including steps 101 to 104, each of which is specifically as follows:
[0063] Step 101, based on the path optimization model, obtain the shortest path from the initial node to the target node;
[0064] As an example of this embodiment, a path optimization model is constructed based on the node-branch association matrix, branch decision variables and contact node decision variables; wherein the node-branch association matrix is constructed by the number of grid nodes and branches, and the contact node decision variables are constrained to be preset real numbers; based on the path optimization model, the branch decision variables are solved to minimize the number of branches, and the shortest path from the initial node to the target node is obtained. For details, see Figure 2 , Figure 2 A schematic diagram of the optimal path data flow of a power grid status acquisition method based on data fusion provided in a certain embodiment of the present invention; assuming that the PMU configured for node i is completely observable and node k is not observable, the shortest path from node i to node k is found below. Analysis shows that, among all the paths involved, the first and last nodes of the path are involved and only involved once in the selected branch group, and the middle nodes are involved twice in the selected branch group. In the several path situations shown on the right, the first and last nodes are only connected to one branch, while the middle nodes are connected to two branches. Based on this, for a system with N nodes and M branches, the following optimization model can be constructed for the optimal path selection from node i to node k. Assume that the node-branch association matrix of this system is A bus-branch , whose dimension is n×b; the branch decision vector is Kbranch , whose dimension is b×1; the contact node decision vector is K bus , whose dimension is n × 1. For the shortest path from node i to node k, an optimization model is selected.
[0065]
[0066] Among them, the objective function l distance To minimize the number of branches from node i to node k; the branch decision vector K branch is a 0-1 integer variable. The value is 1, indicating that the u-th branch needs to be selected as part of the shortest path. If the value is 0, it means that the u-th branch does not need to be selected; the decision variables of the direct measurement point i and the unmeasured point k and The value is 1, the contact node The decision variable takes the value of 0 or 2.
[0067] By solving this optimization problem, we can get the shortest path from node i to node k. Then, through the shortest paths from all completely observable nodes to node k, we select the shortest path as the optimal data flow direction for the unobservable node k. The same is true for other unobservable nodes.
[0068] Step 102: Based on the initial node PMU data, perform RTU pseudo-measurement equivalent alignment on all intermediate nodes on the shortest path to obtain intermediate node equivalent PMU data corresponding to all intermediate nodes;
[0069] As an example of this embodiment, based on the initial node PMU data, data alignment is performed on all intermediate nodes on the shortest path according to a preset synchronization condition to obtain a sampling time of the RTU data of each intermediate node; specifically, based on the first intermediate node RTU data, a first RTU current amplitude measurement is constructed; based on the initial node PMU voltage amplitude measurement and the initial node PMU current amplitude measurement, a first moment intermediate node voltage amplitude pseudo-measurement is constructed; based on the absolute value of the difference between the first RTU current amplitude measurement and the initial node PMU current amplitude measurement and the absolute value of the difference between the first intermediate node voltage amplitude pseudo-measurement and the initial node PMU voltage amplitude measurement, the first intermediate node RTU data and the initial node are aligned according to a preset minimum difference threshold. The point PMU data is synchronized and aligned to obtain the first intermediate node RTU data sampling time; based on the first intermediate node RTU data sampling time, a pseudo-measurement calculation is performed by injecting a power transfer distribution factor to obtain the first intermediate node equivalent PMU data; wherein, the voltage amplitude pseudo-measurement of the first intermediate node is constructed based on the initial node PMU voltage amplitude measurement and the initial node PMU current amplitude measurement; based on the second intermediate node RTU data, a second RTU current amplitude measurement is constructed; based on the first intermediate node equivalent PMU voltage amplitude measurement and the first intermediate node equivalent PMU current amplitude measurement, a second intermediate node voltage amplitude pseudo-measurement is constructed; based on the second RTU current amplitude measurement and the first intermediate node equivalent PMU current amplitude measurement, a second intermediate node voltage amplitude pseudo-measurement is constructed. The absolute value of the current amplitude measurement difference of an intermediate node equivalent PMU and the absolute value of the voltage amplitude pseudo-measurement difference of the second intermediate node and the voltage amplitude measurement difference of the first intermediate node equivalent PMU are used to synchronize the data of the second intermediate node RTU data and the first intermediate node equivalent PMU data according to a preset minimum difference threshold to obtain the sampling time of the second intermediate node RTU data; based on the sampling time of the second intermediate node RTU data, a pseudo-measurement calculation is performed by injecting a power transfer distribution factor to obtain the second intermediate node equivalent PMU data; based on the third intermediate node RTU data, a third RTU current amplitude measurement is constructed; based on the second intermediate node equivalent PMU voltage amplitude measurement and the second intermediate node equivalent PMU current amplitude The method comprises the following steps: measuring, constructing a pseudo-measurement of the voltage amplitude of the third intermediate node; based on the absolute value of the difference between the third RTU current amplitude measurement and the second intermediate node equivalent PMU current amplitude measurement and the absolute value of the difference between the third intermediate node voltage amplitude pseudo-measurement and the second intermediate node equivalent PMU voltage amplitude measurement, aligning the third intermediate node RTU data and the second intermediate node equivalent PMU data according to a preset minimum difference threshold to obtain a sampling time of the third intermediate node RTU data; based on the sampling time of the third intermediate node RTU data, performing pseudo-measurement calculation by injecting a power transfer distribution factor to obtain the third intermediate node equivalent PMU data; repeating the above steps until the intermediate node equivalent PMU data corresponding to all intermediate nodes are obtained.More specifically, taking node i as an example, node i configures PMU (equivalent to initial node PMU data), for t. j The RTU data of node j sent to the master station (equivalent to the RTU data of the first intermediate node) is used to extract the voltage amplitude measurement And branch power measurement and Thus, the branch ji current amplitude measurement (equivalent to the first RTU current amplitude measurement) is constructed, and the calculation is as follows.
[0070]
[0071] For t j The PMU data of node i at D time sections before time t, extracting the voltage measurement (equivalent to the initial node PMU voltage amplitude measurement) and voltage phase angle data Branch ij current measurement (equivalent to the initial node PMU current amplitude measurement) and current phase angle data Thus, a pseudo measurement of the voltage amplitude at node j is constructed (Pseudo measurement of the voltage amplitude of the first intermediate node), calculated as follows:
[0072]
[0073] To synchronize the above RTU data with the PMU data, traverse t j The current amplitude of branch ij at D time sections before time And the voltage amplitude pseudo measurement of node j Find the following Thus As t j The sampling time of the RTU data of node j sent to the master station at time.
[0074]
[0075] in, The physical meaning is: "The time corresponding to the value of the RTU current amplitude of branch ji and the RTU voltage amplitude of node j is closest to (the preset minimum difference threshold) the PMU current amplitude of branch ij and the voltage amplitude pseudo-measurement of node j" is the sampling time of the RTU data of node j (equivalent to the RTU data sampling time of the first intermediate node). If there are other nodes on the optimal path, the corresponding RTU data sampling time is obtained according to the above steps, for example: the RTU data sampling time of the second intermediate node and the RTU data sampling time of the third intermediate node, etc., which will not be repeated here;
[0076] Based on the RTU data sampling time of the intermediate node, the RTU pseudo-measurement calculation is performed by injecting the power transfer distribution factor to obtain the intermediate node equivalent PMU data corresponding to all the intermediate nodes. Specifically, based on the RTU data sampling time of each intermediate node, the first RTU measurement value of each intermediate node is calculated to obtain the first RTU pseudo-measurement value of each intermediate node; based on the injected power transfer distribution factor, the second RTU measurement value of each intermediate node is calculated to obtain the second RTU pseudo-measurement value of each intermediate node; based on the first RTU pseudo-measurement value of each intermediate node and the second RTU pseudo-measurement value of each intermediate node, the synchronous pseudo-measurement of each intermediate node is obtained; based on the synchronous pseudo-measurement of each intermediate node, the intermediate node equivalent PMU data corresponding to each intermediate node is obtained. More specifically, after obtaining the RTU sampling time of node j, the pseudo-measurement of the physical quantity related to node j is obtained based on the PMU measurement data of node i (equivalent to the first RTU pseudo-measurement value of the intermediate node). It is known that The RTU measurements at time node j are It is necessary to calculate the pseudo measurements of these physical quantities for PMU and RTU fusion calculation. and the next moment PMU measurement can obtain the next moment The pseudo measurement of node j is as follows: The pseudo measurement can be directly The PMU measurement calculation of node i at time is:
[0077]
[0078] and The pseudo measurement generation needs to rely on the injected power transfer distribution factor. It is necessary to obtain the changes of other power physical quantities based on the changes of branch ij power.
[0079] The injection power transfer distribution factor is specifically: based on the DC power flow calculation formula of reactive power and node voltage amplitude:
[0080] P ij =G ij (U i -U j )-B ij (θ i -θ j )
[0081] Q ij =-B ij (U i -U j )-G ij (θ i -θ j)
[0082] The relationship between the node injection power and the node voltage can be further obtained as follows:
[0083]
[0084] Among them, matrix G and matrix B represent the real part (conductance) and imaginary part (susceptance) of the node admittance matrix respectively. Matrix E and matrix F are intermediate variables defined for the convenience of expression in the process of formula transformation, which can be specifically expressed as:
[0085] E=(G+BG -1 B) -1
[0086] F=-(G+BG -1 B) -1 BG -1
[0087] Assume that when the injected power at node j changes to ΔP j and ΔQ j When , the power change of branch ji is ΔP ji and ΔQ ji The relationship between the two can be constructed by considering the DC power flow relationship between reactive power and node voltage amplitude. According to the above formula, when the node injection power changes, the node voltage changes as follows:
[0088] ΔU=E j ΔP j +F j ΔQ j
[0089] Δθ=F j ΔP j -E j ΔQ j
[0090] According to the DC power flow relationship, the relationship between branch power change and node voltage change is as follows:
[0091] ΔP ji =G ij (ΔU j -ΔU i )-B ij (Δθ j -Δθ i )
[0092] ΔQ ji =-B ij (ΔU j -ΔU i )-G ij (Δθ j -Δθi )
[0093] From this, the relationship between the injection power change and the branch power change can be derived:
[0094] ΔP ji =G ij (E jj -E ji )ΔP j +G ij (F jj -F ji )ΔQ j -B ij (F jj -F ji )ΔP j +B ij (E jj -E ji )ΔQ j
[0095] ΔQ ji =-B ij (E jj -E ji )ΔP j -B ij (F jj -F ji )ΔQ j -G ij (F jj -F ji )ΔP j +G ij (E jj -E ji )ΔQ j
[0096] Right now:
[0097]
[0098] Specific to the problem of this embodiment, from the moment Until the next moment The power change of branch j is
[0099]
[0100] but The next moment pseudo measurement is calculated as:
[0101]
[0102] in,
[0103]
[0104] At this point, node j The pseudo measurement of power is obtained by injecting it at all times.
[0105] When considering the pseudo-measurement of the power of branch jk, the injected power distribution factor is also used to obtain the relationship between the injected power change and the power change of branch jk, and then the relationship between the power changes of branches jk and ji is obtained. The details are as follows:
[0106]
[0107] thereby The next moment pseudo measurement is calculated as:
[0108]
[0109] At the same time, we need to get some other related to node j The pseudo measurement at each moment is used to synchronize the RTU data of node k. Specifically, it is the voltage phase angle Branch current amplitude Phase Angle Branch jk current amplitude Phase Angle Injection current amplitude Phase Angle The specific calculations for these pseudo measurements are as follows:
[0110]
[0111] The above is for The next moment The pseudo-measurement calculation is used to illustrate that the pseudo-measurement calculation process at the next time, the next next time, and so on is the same until new data of node j is sent to the master station.
[0112] Through the above calculations, we can obtain the synchronous pseudo measurement (RTU data with increased sampling density) and equivalent PMU measurement (mainly current and phase angle, etc., which are used for synchronization alignment of the next node) of node j.
[0113] Step 103, based on the intermediate node equivalent PMU data corresponding to all the intermediate nodes and the target node RTU data, acquiring the target node equivalent PMU data;
[0114] As an example of this embodiment, based on the equivalent PMU data of an intermediate node on the target node, the second RTU data of the target node is data aligned according to a preset synchronization condition to obtain the sampling time of the target node RTU data; specifically, based on the second RTU data of the target node, the target node RTU current amplitude measurement is constructed; based on the equivalent PMU voltage amplitude measurement of an intermediate node on the target node and the equivalent PMU current amplitude measurement of an intermediate node on the target node, the target node voltage amplitude pseudo-measurement is constructed; based on the absolute value of the difference between the target node RTU current amplitude measurement and the equivalent PMU current amplitude measurement of an intermediate node on the target node and the absolute value of the difference between the target node voltage amplitude pseudo-measurement and the equivalent PMU voltage amplitude measurement of an intermediate node on the target node, the second RTU data of the target node and the equivalent PMU data of an intermediate node on the target node are data-synchronized and aligned according to a preset minimum difference threshold to obtain the sampling time of the target node RTU data; based on the target node RTU data sampling time, the pseudo-measurement calculation is performed by injecting a power transfer distribution factor to obtain the target node equivalent PMU data. Based on the RTU data sampling time of the target node, a pseudo-measurement calculation is performed by injecting a power transfer distribution factor to obtain the equivalent PMU data of the target node. Specifically, based on the RTU data sampling time of the target node, the first RTU measurement value of the target node is calculated by the PMU data of the previous node of the target node to obtain the first RTU pseudo-measurement value of the target node; based on the injected power transfer distribution factor, the second RTU measurement value of the target node is calculated to obtain the second RTU pseudo-measurement value of the target node; based on the first RTU pseudo-measurement value of the target node and the second RTU pseudo-measurement value of the target node, the target node synchronous pseudo-measurement is obtained; based on the target node synchronous pseudo-measurement and the PMU data of the previous node of the target node, the target node equivalent PMU data is obtained. Specifically, for the PMU unobservable node k directly connected to the node j, the same processing method as described in step 102 is adopted, and the relevant data of the node j (synchronous pseudo-measurement and equivalent PMU measurement) is used to align t k The RTU data of node k sent to the master station at all times is then used to obtain the synchronized pseudo measurement and equivalent PMU measurement of node k. If node k is also connected to other PMU unobservable nodes (node h), the same process is used to align the RTU measurement and generate high-density pseudo measurement.
[0115] Step 104: Acquire the real-time state of the power grid based on the initial node PMU data, the intermediate node equivalent PMU data corresponding to all the intermediate nodes, and the target node equivalent PMU data.
[0116] As an example of this embodiment, based on the initial node PMU data, a PMU measurement value vector is constructed; based on the intermediate node equivalent PMU data corresponding to all intermediate nodes and the target node equivalent PMU data, an RTU measurement value vector is constructed; based on the PMU measurement value vector and the RTU measurement value vector, a power grid state equation is constructed; based on the power grid state equation, the real-time state of the power grid is obtained. Specifically, assuming that at time t, the PMU measurement value in the entire system is represented by vector Z pmu Represents (equivalent to constructing a PMU measurement value vector based on the initial node PMU data), the generated RTU pseudo measurement vector Z rtu Representation (equivalent to constructing an RTU measurement value vector based on the intermediate node equivalent PMU data corresponding to all the intermediate nodes and the target node equivalent PMU data), constructing a measurement equation group as shown in the following formula:
[0117]
[0118] Among them, vector X is the state vector of the power system, matrix A is the system matrix, and the relationship between the measurement vector Z and the state vector A is established. The process of finding the state vector X that best satisfies the above equations based on the measurement vector Z and the system matrix A is the real-time state perception of the power system. The specific solution method is relatively mature and will not be introduced in detail here.
[0119] The embodiment of the present invention proposes a method for acquiring power grid status based on data fusion. According to the power system topology, an optimal data flow direction (shortest path) of PMU data is constructed to lay a data flow foundation for subsequent RTU data synchronization alignment and pseudo-measurement generation; based on the optimal data flow direction, equivalent PMU data is obtained by effectively aligning the RTU data of the intermediate node, the RTU data of the target node and the PMU data of the initial node, and the PMU data is fully utilized to realize the pseudo-measurement generated by data fusion, thereby improving the accuracy of data fusion. Finally, the initial node PMU data, the equivalent PMU data of the intermediate node and the equivalent PMU data of the target node are used to acquire the power grid status. Based on the data fusion of the optimal data flow, a more accurate real-time power grid status can be acquired according to precise data fusion; pseudo-measurement calculation is performed by injecting power transfer factor to obtain pseudo-measurement that cannot be directly generated by PMU data, thereby improving the accuracy of data fusion.
[0120] Example 2
[0121] See also Figure 3 , Figure 3 A schematic diagram of the module structure of a power grid status acquisition system based on data fusion provided by an embodiment of the present invention. Figure 3 As shown, the present invention proposes a power grid status acquisition system based on data fusion, comprising:
[0122] Path optimization module 301, intermediate node equivalent module 302, target node equivalent module 303 and power grid status acquisition module 304;
[0123] The path optimization module 301 is used to obtain the shortest path from the initial node to the target node based on the path optimization model;
[0124] The intermediate node equivalent module 302 is used to perform RTU pseudo measurement equivalent alignment on all intermediate nodes on the shortest path based on the initial node PMU data, and obtain the intermediate node equivalent PMU data corresponding to all intermediate nodes;
[0125] The target node equivalent module 303 is used to obtain the target node equivalent PMU data based on the intermediate node equivalent PMU data corresponding to all the intermediate nodes and the target node RTU data;
[0126] The power grid state acquisition module 304 is used to acquire the real-time state of the power grid based on the initial node PMU data, the intermediate node equivalent PMU data corresponding to all the intermediate nodes, and the target node equivalent PMU data.
[0127] The embodiment of the present invention proposes a power grid state acquisition system based on data fusion, which constructs the optimal data flow direction (shortest path) of PMU data according to the power system topology through the path optimization module, laying a data flow foundation for the subsequent RTU data synchronization alignment and pseudo-measurement generation; through the intermediate node equivalent module and the target node equivalent module based on the optimal data flow, the RTU data of the intermediate node, the RTU data of the target node and the PMU data of the initial node are effectively aligned to obtain equivalent PMU data, and the PMU data is fully utilized to realize the pseudo-measurement generated by data fusion, thereby improving the accuracy of data fusion; finally, the initial node PMU data, the intermediate node equivalent PMU data and the target node equivalent PMU data are used by the power grid state acquisition module to acquire the power grid state, and the data fusion based on the optimal data flow can obtain a more accurate real-time power grid state according to precise data fusion.
[0128] Example 3
[0129] Based on the model and process design described in the above embodiment, this embodiment uses the IEEE 39 node system for simulation verification. The network structure of the IEEE 39 node system is as follows: Figure 4 As shown, Figure 4 A schematic diagram of an IEEE 39-node system and PMU configuration of a power grid status acquisition method based on data fusion is provided for a certain embodiment of the present invention; in the 39-node system, a total of 8 PMUs are configured, thus 8 directly observable nodes, 7 unobservable nodes and 24 indirectly observable nodes.
[0130] According to step S101, the optimal data flow direction of the PMU unobservable node is given as follows: Figure 5 As shown, Figure 5 A schematic diagram of optimal data flow of unobservable nodes in an IEEE 39-node system of a power grid state acquisition method based on data fusion provided by an embodiment of the present invention; it is worth mentioning that, Figure 4 and Figure 5 In the figure, Bus represents the node number, Load represents the load, and Generator represents the generator.
[0131] The ordinary generator on node 31 is replaced by a wind turbine. Considering the random output of the wind turbine, the simulation sets the PMU sampling time interval to 10ms, the RTU sampling time interval to approximately 1s, and the total simulation time to 8s. At the same time, the standard deviation of the PMU measurement error Gaussian distribution is set as shown in Table 1, and the Gaussian distribution of the RTU measurement error is set as shown in Table 2. The RTU asynchronous error obeys a uniform distribution in the interval [t-100ms, t-100ms].
[0132] Table 1 PMU error setting level
[0133] Error Type Standard Deviation Voltage amplitude (pu) 0.002 Voltage phase angle (°) 0.2 Current amplitude (pu) 0.003 Current phase angle (°) 0.3
[0134] Table 2 RTU error setting level
[0135] Error Type Standard Deviation Voltage amplitude (pu) 0.002 Voltage phase angle (°) 0.2 Active power (pu) 0.003 Reactive power (pu) 0.003
[0136] Based on the above settings, the RTU pseudo-measurement data generation results of the voltage amplitude and phase angle of node 8 are compared with the true value and direct PMU measurement results. Figure 6 and Figure 7 As shown, Figure 6 A voltage-related curve diagram of node 8 of a method for acquiring power grid status based on data fusion provided in one embodiment of the present invention is shown in FIG1 ; Figure 7 FIG2 is a graph showing a voltage-related curve of node 8 of a method for acquiring power grid status based on data fusion provided in an embodiment of the present invention.
[0137] pass Figure 6 and Figure 7 It can be seen that the error between the pseudo-measurement generated result and the true value is close to the error between the PMU direct measurement result and the true value, whether it is the voltage amplitude or the phase angle. The average pseudo-measurement generated error and the average PMU measurement error of all time sections of the entire system are quantitatively calculated, and the results are shown in Table 3:
[0138] Table 3 Error comparison of two cases
[0139] Pseudo-measurement error PMU direct measurement error R 0.1382 0.1386
[0140] It can be seen from the above table that the generated pseudo measurement error is at the same level as the PMU direct measurement error. Therefore, the above method can obtain RTU pseudo measurement more accurately, thereby realizing PMU and RTU data fusion.
[0141] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
[0142] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples, unless they are contradictory.
[0143] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
Claims
1. A method for acquiring power grid status based on data fusion, It is characterized in that include: Based on the path optimization model, the shortest path from the initial node to the target node is obtained; Based on the initial node PMU data, perform RTU pseudo-measurement equivalent alignment on all intermediate nodes on the shortest path to obtain intermediate node equivalent PMU data corresponding to all intermediate nodes; Based on the intermediate node equivalent PMU data corresponding to all the intermediate nodes and the target node RTU data, acquiring the target node equivalent PMU data; The real-time state of the power grid is acquired based on the initial node PMU data, the intermediate node equivalent PMU data corresponding to all the intermediate nodes, and the target node equivalent PMU data.
2. A method for acquiring power grid status based on data fusion as claimed in claim 1, It is characterized in that The shortest path from the initial node to the target node is obtained based on the path optimization model, specifically: Based on the node-branch association matrix, branch decision variables and contact node decision variables, a path optimization model is constructed; wherein the node-branch association matrix is constructed by the number of power grid nodes and the number of branches, and the contact node decision variables are constrained to be preset real numbers; Based on the path optimization model, the branch decision variables are solved by minimizing the number of branches to obtain the shortest path from the initial node to the target node.
3. A method for acquiring power grid status based on data fusion as claimed in claim 1, It is characterized in that Based on the initial node PMU data, RTU pseudo-measurement equivalent alignment is performed on all intermediate nodes on the shortest path to obtain intermediate node equivalent PMU data corresponding to all intermediate nodes, specifically: Based on the initial node PMU data, align the data of all intermediate nodes on the shortest path according to the preset synchronization condition to obtain the RTU data sampling time of each intermediate node; Based on the RTU data sampling time of the intermediate node, the RTU pseudo-measurement calculation is performed by injecting the power transfer distribution factor to obtain the intermediate node equivalent PMU data corresponding to all the intermediate nodes.
4. A method for acquiring power grid status based on data fusion as claimed in claim 3, It is characterized in that Based on the initial node PMU data, RTU pseudo-measurement equivalent alignment is performed on all intermediate nodes on the shortest path to obtain intermediate node equivalent PMU data corresponding to all intermediate nodes, specifically: Based on the first intermediate node RTU data, construct a first RTU current amplitude measurement; based on the initial node PMU voltage amplitude measurement and the initial node PMU current amplitude measurement, construct a first intermediate node voltage amplitude pseudo measurement; Based on the absolute value of the difference between the current amplitude measurement of the first RTU and the current amplitude measurement of the initial node PMU and the absolute value of the difference between the voltage amplitude pseudo-measurement of the first intermediate node and the voltage amplitude measurement of the initial node PMU, the first intermediate node RTU data and the initial node PMU data are synchronized according to a preset difference minimum threshold to obtain the first intermediate node RTU data sampling time; based on the first intermediate node RTU data sampling time, a pseudo-measurement calculation is performed by injecting a power transfer distribution factor to obtain the first intermediate node equivalent PMU data; wherein the voltage amplitude pseudo-measurement of the first intermediate node is constructed based on the initial node PMU voltage amplitude measurement and the initial node PMU current amplitude measurement; Based on the second intermediate node RTU data, construct a second RTU current amplitude measurement; based on the first intermediate node equivalent PMU voltage amplitude measurement and the first intermediate node equivalent PMU current amplitude measurement, construct a second intermediate node voltage amplitude pseudo measurement; based on the absolute value of the difference between the second RTU current amplitude measurement and the first intermediate node equivalent PMU current amplitude measurement and the absolute value of the difference between the second intermediate node voltage amplitude pseudo measurement and the first intermediate node equivalent PMU voltage amplitude measurement, perform data synchronization alignment on the second intermediate node RTU data and the first intermediate node equivalent PMU data according to a preset minimum difference threshold to obtain the second intermediate node RTU data sampling time; based on the second intermediate node RTU data sampling time, perform pseudo measurement calculation by injecting a power transfer distribution factor to obtain the second intermediate node equivalent PMU data; Based on the third intermediate node RTU data, a third RTU current amplitude measurement is constructed; based on the second intermediate node equivalent PMU voltage amplitude measurement and the second intermediate node equivalent PMU current amplitude measurement, a third intermediate node voltage amplitude pseudo measurement is constructed; based on the absolute value of the difference between the third RTU current amplitude measurement and the second intermediate node equivalent PMU current amplitude measurement and the absolute value of the difference between the third intermediate node voltage amplitude pseudo measurement and the second intermediate node equivalent PMU voltage amplitude measurement, the third intermediate node RTU data and the second intermediate node equivalent PMU data are synchronized according to a preset minimum difference threshold to obtain the third intermediate node RTU data sampling time; based on the third intermediate node RTU data sampling time, a pseudo measurement calculation is performed by injecting a power transfer distribution factor to obtain the third intermediate node equivalent PMU data; Repeat the above steps until the intermediate node equivalent PMU data corresponding to all intermediate nodes are obtained.
5. A method for acquiring power grid status based on data fusion as claimed in claim 4, It is characterized in that Based on the RTU data sampling time of the intermediate node, the RTU pseudo measurement calculation is performed by injecting the power transfer distribution factor to obtain the intermediate node equivalent PMU data corresponding to all intermediate nodes, specifically: Based on the RTU data sampling time of each intermediate node, the first RTU measurement value of each intermediate node is calculated to obtain the first RTU pseudo measurement value of each intermediate node; Based on the injected power transfer distribution factor, the second RTU measurement value of each intermediate node is calculated to obtain the second RTU pseudo measurement value of each intermediate node; Based on the first RTU pseudo measurement value of each intermediate node and the second RTU pseudo measurement value of each intermediate node, obtaining a synchronous pseudo measurement of each intermediate node; Based on the synchronous pseudo-measurement of each intermediate node, the intermediate node equivalent PMU data corresponding to each intermediate node is obtained.
6. A method for acquiring power grid status based on data fusion as claimed in claim 1, It is characterized in that The acquiring the target node equivalent PMU data based on the intermediate node equivalent PMU data and the target node RTU data corresponding to all the intermediate nodes is specifically: Based on the equivalent PMU data of an intermediate node on the target node, align the second RTU data of the target node according to the preset synchronization condition to obtain the RTU data sampling time of the target node; Based on the RTU data sampling time of the target node, a pseudo measurement calculation is performed by injecting a power transfer distribution factor to obtain equivalent PMU data of the target node.
7. A method for acquiring power grid status based on data fusion as claimed in claim 6, It is characterized in that Based on the equivalent PMU data of an intermediate node on the target node, the second RTU data of the target node is aligned according to a preset synchronization condition to obtain the RTU data sampling time of the target node, specifically: Based on the second RTU data of the target node, construct the target node RTU current amplitude measurement; based on the target node upper intermediate node equivalent PMU voltage amplitude measurement and the target node upper intermediate node equivalent PMU current amplitude measurement, construct the target node voltage amplitude pseudo measurement; Based on the absolute value of the difference between the current amplitude measurement of the target node RTU and the current amplitude measurement of an equivalent PMU of an intermediate node on the target node and the absolute value of the difference between the voltage amplitude pseudo-measurement of the target node and the voltage amplitude measurement of an equivalent PMU of an intermediate node on the target node, the second RTU data of the target node and the equivalent PMU data of an intermediate node on the target node are synchronized according to a preset minimum difference threshold to obtain the RTU data sampling time of the target node; Based on the RTU data sampling time of the target node, a pseudo measurement calculation is performed by injecting a power transfer distribution factor to obtain equivalent PMU data of the target node.
8. A method for acquiring power grid status based on data fusion as claimed in claim 7, It is characterized in that The target node equivalent PMU data is obtained by performing pseudo measurement calculation based on the target node RTU data sampling time by injecting the power transfer distribution factor, specifically: Based on the RTU data sampling time of the target node, the first RTU measurement value of the target node is calculated by using the PMU data of a node above the target node to obtain the first RTU pseudo measurement value of the target node; Based on the injected power transfer distribution factor, the second RTU measurement value of the target node is calculated to obtain the second RTU pseudo measurement value of the target node; Obtaining a target node synchronization pseudo measurement based on the target node first RTU pseudo measurement value and the target node second RTU pseudo measurement value; Based on the synchronous pseudo measurement of the target node and the PMU data of a node above the target node, the equivalent PMU data of the target node is obtained.
9. A method for acquiring power grid status based on data fusion as claimed in claim 1, It is characterized in that The acquiring of the real-time state of the power grid based on the initial node PMU data, the intermediate node equivalent PMU data corresponding to all the intermediate nodes, and the target node equivalent PMU data is specifically as follows: Based on the initial node PMU data, construct a PMU measurement value vector; Constructing an RTU measurement value vector based on the intermediate node equivalent PMU data corresponding to all the intermediate nodes and the target node equivalent PMU data; constructing a power grid state equation based on the PMU measurement value vector and the RTU measurement value vector; Based on the power grid state equation, the real-time state of the power grid is obtained.
10. A power grid status acquisition system based on data fusion, It is characterized in that include: Path optimization module, intermediate node equivalent module, target node equivalent module and power grid status acquisition module; The path optimization module is used to obtain the shortest path from the initial node to the target node based on the path optimization model; The intermediate node equivalent module is used to perform RTU pseudo-measurement equivalent alignment on all intermediate nodes on the shortest path based on the initial node PMU data, and obtain intermediate node equivalent PMU data corresponding to all intermediate nodes; The target node equivalent module is used to obtain the target node equivalent PMU data based on the intermediate node equivalent PMU data corresponding to all the intermediate nodes and the target node RTU data; The power grid status acquisition module is used to acquire the real-time status of the power grid based on the initial node PMU data, the intermediate node equivalent PMU data corresponding to all the intermediate nodes, and the target node equivalent PMU data.