Medium-and-long-term electric power and electric quantity balance evaluation method for multi-region interconnected power system
By adopting the Lagrangian slack method and non-equal spacing gray model in multi-region interconnected power systems, the complexity problem of medium and long-term power balance analysis is solved, and the power balance evaluation and resource allocation under limited computing resources are realized The accuracy of the system ensures that the system resources fully cope with the power balance.
Patent Information
- Application Number
- CN202410814381.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-11-08
AI Technical Summary
The existing technology is difficult to conduct medium- and long-term power balance analysis in multi-region interconnected power systems, especially when the system is regulated by hydropower and seasonal energy storage resources are introduced, and conventional daily or monthly rolling calculations cannot perform the regulation performance. , resulting in the power balance analysis model becoming a complex and large-scale mixed integer programming problem, with serious dimensional disasters, difficulty in modeling and solving, and it is impossible to obtain accurate results under limited computing resources.
The Lagrangian relaxation method is used to deal with the power balance analysis model of multi-region interconnected power system. By spatially decoupling the objective function according to the unit type, the sub-problems corresponding to each unit type are obtained, and the balance index is calculated using the solution results, including cutting The load probability and power supply are insufficient to meet the expected value, and the medium- and long-term time series data prediction is carried out in combination with the non-equal spacing gray model to realize the system's medium- and long-term power balance evaluation.
Under limited computing resources, the accurate analysis of medium and long-term power balance of multi-region interconnected power systems is achieved, which improves the accuracy of power system resource allocation, can distinguish source and load supply and demand issues within the future time range, and ensures that the system resources fully respond to power Battery balance.
Smart Images

Figure CN118920595A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power system planning and operation, and in particular to a method for evaluating the long-term power and quantity balance in a multi-region interconnected power system. Background Art
[0002] The installed capacity and power generation of renewable energy on the power supply side of the power system are increasing. The uncertainty and volatility of its output may lead to supply and demand mismatches on both sides of the source and load, resulting in a certain period of power gap or renewable energy power abandonment. This makes it important to accurately analyze the power balance in the future medium and long term, so as to guide the resource allocation scale level or annual power generation resource adequacy of provincial or regional power systems.
[0003] Due to the introduction of multiple types and multiple regulation cycle resources such as annual hydropower and seasonal energy storage in the system, conventional daily or monthly rolling calculations cannot fully utilize the regulation performance of such resources, so it is necessary to seek a power and electricity balance analysis method that can achieve full-cycle calculations. Since the mathematical model corresponding to this problem is a complex and large-scale mixed integer programming problem, the dimensionality curse is serious and modeling and solving are difficult, and it cannot be guaranteed that the solution can be obtained under limited computing resources. The above problems must be solved to achieve the analysis and measurement of the long-term power and electricity balance of the power system, otherwise it will be difficult to accurately judge whether the system resources can fully cope with the source and load supply and demand problems in the future time range. Summary of the invention
[0004] The purpose of the present invention is to provide a method for evaluating the medium- and long-term power and electricity balance in a multi-regional interconnected power system, to solve the problems existing in the existing power and electricity balance analysis, and to provide a new solution for the formulation of medium- and long-term power and electricity balance plans for power systems.
[0005] To achieve the above-mentioned purpose, the present invention proposes a method for evaluating the medium- and long-term power and electricity balance in a multi-regional interconnected power system, the method comprising the following steps: spatially decoupling the objective function of the power and electricity balance analysis model of the multi-regional interconnected power system after Lagrangian relaxation according to the unit type, and obtaining sub-problems corresponding to each unit type; solving the sub-problems corresponding to each unit type, and when the relaxation error term corresponding to the Lagrangian multiplier is 0, calculating the balance index using the solution result, and performing medium- and long-term power and electricity balance evaluation; wherein the balance index includes the load shedding probability and the expected value of power shortage, and the medium- and long-term is greater than or equal to 1 month.
[0006] In one implementation of the above technical solution, the power balance analysis model of the multi-regional interconnected power system after Lagrangian relaxation processing is obtained, including: constructing the power balance analysis model of the multi-regional interconnected power system according to the partition structure within the power system and the set resource conditions; using Lagrangian multipliers to relax the coupling constraints in the power balance analysis model of the multi-regional interconnected power system to obtain the power balance analysis model of the multi-regional interconnected power system after Lagrangian relaxation processing.
[0007] In one implementation of the above technical solution, the solution includes the following steps: S40, setting the initial value of the Lagrange multiplier, setting the maximum number of iterative calculations; S41, solving the sub-problems corresponding to each unit type; S42, if the current number of iterations is not greater than the maximum number of iterative calculations, executing S43; if the current number of iterations is greater than the maximum number of iterative calculations, executing S44; S43, using the solution results of the sub-problems corresponding to each unit type, calculate the relaxation error term corresponding to the Lagrange multiplier; if the relaxation error term is 0, execute S44; otherwise, update the Lagrange multiplier and return to S41; S44, using the solution results of the sub-problems corresponding to each unit type, calculate the balance index.
[0008] In one implementation of the above technical solution, the evaluation step includes: if the load shedding probability of the power system or the expected value of the power shortage of the power system does not exceed the corresponding set threshold, it is determined that the current power generation resources and regulatory resource surplus of the power system are sufficient, and the long-term balance plan of the power system is obtained; otherwise, it is determined that the current power generation resources and regulatory resource surplus of the power system are insufficient, and the resource conditions of the power balance analysis model of the multi-regional interconnected power system are reset, and the balance indicators are recalculated.
[0009] In one implementation of the above technical solution, the Lagrange multiplier is updated as follows: Where: Multiplier for the kth iteration calculation The corresponding relaxed constraint error term, s k is the step size of the kth iteration.
[0010] In one implementation of the above technical solution, the multi-region interconnected power system includes wind turbines and photovoltaic units in each region, the maximum output corresponding to the wind turbines and photovoltaic units in each region is a predicted value, and the load demand of each region in the multi-region interconnected power system is also a predicted value.
[0011] In one implementation of the above technical solution, the predicted value is obtained based on the non-equidistant grey model, and the steps include: based on the historical time series data, recording it as Get the cumulative generation sequence as follows Where p is the order of the cumulative generated sequence, W (ρ) represents the p-order cumulative generation sequence of the variable W to be predicted, For the tth i The ρ-order cumulative value of the variable to be predicted W at time Δt j t j Time and t j-1 The time interval of the moment, n is the moment mark; the cumulative sequence is fitted using a first-order differential equation, and the corresponding whitening formula of the grey prediction model is expressed as: δ is the development coefficient, γ is the amount of gray; according to the obtained fitting parameter value, the variable to be predicted The tth i The p-order cumulative value at the moment is updated as: δ and γ are the fitting development coefficient and the gray amount respectively; the historical time series data are the maximum output of wind turbines, the maximum output of photovoltaic units or the load demand of each region in a multi-region interconnected power system.
[0012] In one embodiment of the above technical solution, the balance index is calculated using the solution results, and the steps include: obtaining a set of load shedding events S based on the solution results of the sub-problems corresponding to each unit type; calculating the load shedding probability P according to the following formula LOLP and the expected value of insufficient power E EEN S: Where: t j is the duration of load shedding event j, C j is the load shedding amount of load shedding event j, N T is the total duration of all analysis periods.
[0013] In order to achieve the above technical objectives, this case also proposes a medium- and long-term power balancing device for a multi-regional interconnected power system, including a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and execute any of the above methods.
[0014] In order to achieve the above technical objectives, the present case also proposes a computer-readable storage medium storing a computer program that can be loaded by a processor and execute any of the above methods.
[0015] The beneficial technical effects of this case are as follows: (1) This case can accurately describe the architecture and resources of the multi-regional interconnected power system through mathematical models, use the Lagrangian relaxation method to process the original multi-regional interconnected power system power balance analysis model, and obtain the sub-problems corresponding to each unit type by spatial decoupling according to the unit type, so as to solve the sub-problems corresponding to each unit type through iteration, and achieve approximation to the optimal solution of the original problem, solving the problem that the medium- and long-term power balance analysis problem is difficult to solve. (2) This case proposes a gray prediction method for non-uniformly spaced source-load time series data in the medium- and long-term scale. This method can realize medium- and long-term time series prediction of the output and load demand of new energy generators with independent fluctuation ranges and strong correlation with the time span when the historical time series data is known to be non-uniformly spaced, solve the problem that the boundary conditions and actual conditions in the current medium- and long-term power balance calculation are not fully matched, and improve the accuracy of the power balance analysis of the regional interconnected power system. (3) This case can, under the premise of reflecting the system balance characteristics, calculate the indicators required for the system's medium- and long-term power balance capacity based on the results of the balance analysis problem, and determine the future system's power generation resources and regulatory resource abundance in the medium and long term. The actual engineering personnel can carry out relevant research work based on this. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0017] Figure 1 , one Schematic diagram of the long-term electric power balance calculation process of a multi-regional interconnected power system in this implementation mode. DETAILED DESCRIPTION
[0018] The meanings of the parameters involved in this case are shown in Table 1.
[0019] Table 1
[0020]
[0021]
[0022]
[0023]
[0024]
[0025]
[0026]
[0027]
[0028]
[0029] The medium and long term in this case is a time length of 1 month in some embodiments, and a time length of more than 1 month in some embodiments, such as a quarter, half a year, 1 year, etc. That is, the case takes a time length of more than or equal to 1 month as the medium and long term. In most cases, the analysis period is set to 1 hour.
[0030] The following is a clear and complete description of how to implement the medium- and long-term power balance calculation of a multi-regional interconnected power system. Obviously, the described implementation method is only a part of the implementation method of this case, not all of the implementation methods. Based on the implementation method in this case, all other implementation methods obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0031] (I) Spatial decoupling calculation of power and electricity balance analysis model for multi-regional interconnected power system
[0032] According to the zoning structure within the power system, the maximum value of new energy output in each zone and the load demand forecast value of each area, the economic and operating parameters of each type of power source in each zone, the parameters of the interconnection lines between zones and the resources contained in the power system, a multi-region interconnected power system power and electricity balance analysis model is constructed. Its mathematical expression is described as (1) to (59).
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
[0039]
[0040]
[0041]
[0042]
[0043]
[0044] The constraints corresponding to the objective function (1) include coal-fired unit constraints, gas-fired unit constraints, new energy output constraints, hydropower unit constraints, energy storage equipment constraints, and supply and demand balance constraints. The specific conditions are as follows. The coal-fired unit constraints are:
[0045]
[0046]
[0047]
[0048]
[0049]
[0050]
[0051]
[0052]
[0053]
[0054]
[0055] The gas unit constraints are:
[0056]
[0057]
[0058]
[0059]
[0060]
[0061]
[0062]
[0063]
[0064]
[0065]
[0066] The new energy output constraints are:
[0067]
[0068]
[0069] The constraints of the hydropower unit are:
[0070]
[0071]
[0072]
[0073]
[0074]
[0075]
[0076]
[0077]
[0078]
[0079]
[0080] The energy storage device constraints are:
[0081]
[0082]
[0083]
[0084]
[0085]
[0086]
[0087]
[0088]
[0089]
[0090]
[0091]
[0092] The supply-demand balance constraint is:
[0093]
[0094]
[0095]
[0096]
[0097]
[0098] Since the power system objects for power and electricity balance analysis are mostly provincial or regional power systems, using the above model to conduct balance analysis on a cycle of one, two or many years is a complex and large-scale mixed integer programming problem, which suffers from serious dimensionality curse and difficulty in modeling and solving.
[0099] In this regard, this case adopts the Lagrangian relaxation method to process the power balance analysis model of the multi-regional interconnected power system, that is, the coupling constraints in the power balance analysis model of the multi-regional interconnected power system are relaxed by using the Lagrangian multiplier to obtain the objective function of the power balance analysis model of the multi-regional interconnected power system after Lagrangian relaxation, as shown below:
[0100]
[0101] Formula (60) is about
[0102] The objective function of .
[0103] Next, the relaxation problem of equation (60) is spatially decoupled according to the unit type, and several relaxation sub-problems are decomposed, that is, the sub-problems corresponding to each unit type are obtained. The sub-problems corresponding to each unit type are iteratively solved to obtain the approximate value of the optimal solution of the power and electricity balance analysis model of the multi-regional interconnected power system.
[0104] (1.1) Relaxation subproblem of coal-fired units
[0105] The objective function of the relaxation subproblem of the coal-fired unit is shown in (61), and its constraints are (12) to (21):
[0106]
[0107] (1.2) Gas turbine unit relaxation subproblem
[0108] The objective function of the gas turbine unit relaxation subproblem is shown in (62), and its constraints are (22)-(31):
[0109]
[0110] (1.3) Wind turbine relaxation subproblem
[0111] The objective function of the wind turbine relaxation subproblem is shown in (63), and its constraints are (32).
[0112]
[0113] (1.4) Photovoltaic generator relaxation subproblem
[0114] The objective function of the PV system relaxation subproblem is shown in (64), and its constraints are (33).
[0115]
[0116] (1.5) Relaxation subproblem of hydropower units
[0117] The objective function of the relaxation subproblem of the hydropower unit is shown in (65), and its constraints are (34) to (43).
[0118] The objective function is about The objective function of .
[0119]
[0120] (1.6) Energy storage device relaxation subproblem
[0121] The objective function of the energy storage device relaxation subproblem is shown in (66), and its constraints are (44)-(54), where the objective function is about The objective function is:
[0122]
[0123] (1.7) System supply and demand balance relaxation subproblem
[0124] The objective function of the relaxed subproblem of system supply and demand balance is shown in (67), and its constraints are (56) to (59).
[0125]
[0126] Under the condition of given Lagrange multipliers, the judgment condition for finding the optimal solution is shown in formula (68), where each decision variable with a superscript (k) represents the value obtained by the kth iterative calculation.
[0127]
[0128] If it is not satisfied, the subgradient algorithm is used to update the Lagrange multiplier according to equation (69), and the step size s is selected according to the condition of equation (70) k , which can ensure the convergence of formula (69).
[0129]
[0130]
[0131] (II) Non-uniformly spaced grey prediction of source-load time series data in the medium and long term
[0132] Since the new energy generators and multi-category electricity load demands on the power generation side of the power system are random and periodic, it is necessary to adopt a medium- and long-term scale prediction method that can conform to the actual physical laws to determine the source-load side boundary condition data at the grade or multi-year scale. In the process of medium- and long-term prediction, the status of the operating generators and the historical data on the source-load side are known, while the data to be predicted at the medium- and long-term scale in the future is unknown, and internal information can only be inferred from external observations. Therefore, the power system with source-load data to be predicted at the medium- and long-term scale is a typical gray system, and the gray model can be used to predict data for a long time in the future. Compared with other models, the gray model has a lower requirement for known data and does not involve the acquisition and preprocessing of specific data features. It assumes that the data to be predicted has a separate fluctuation range and has a strong correlation with the time span.
[0133] The variable to be predicted W can correspond to the output of a certain renewable energy generator cluster in the system or the load demand in a certain area. Specifically, in the case of wind turbines, it corresponds to the area ρ A Wind turbine generator set at time t Maximum output. In the photovoltaic system, it corresponds to the area ρ A Photovoltaic generator set during period t Output maximum value. In addition, it can also correspond to the area ρ A Load demand during period t.
[0134] Using W (0) Represents the historical data sequence of the variable to be predicted, which is expressed as follows:
[0135]
[0136] Generally speaking, when the historical data is non-uniformly spaced time series data, the cumulative generated sequence of the grey prediction model satisfies the relationship shown in equations (60) and (61).
[0137]
[0138]
[0139] The cumulative sequence is fitted using a first-order differential equation, and the corresponding whitening formula of the grey prediction model is expressed as formula (62):
[0140]
[0141] The least squares method is used to determine the parameters described by equation (62), and the fitting parameter relationship is shown in equation (63):
[0142] [δ γ] T =(P T P) -1 P T Q (63)
[0143] P and Q are expressed as equations (64) to (65):
[0144]
[0145]
[0146] According to the obtained fitting parameter values, the variables to be predicted The tth i The ρ-order cumulative value update at the time is expressed as follows:
[0147]
[0148] (III) System balance index test
[0149] The power balance analysis in the medium and long term is responsible for judging the abundance of power generation resources and regulatory resources in the future system. It is necessary to quantify key indicators based on the solution of the balance analysis problem to reflect the system balance characteristics. The load shedding probability and the expected value of power shortage are selected as the indicators required to determine the medium and long term power balance capacity of the system, denoted as P LOLP 、E EENS .
[0150] Based on the solution results of the sub-problems corresponding to each unit type, the load shedding event set S is obtained, and the load shedding probability P is calculated according to equations (67) and (68). LOLP and the expected value of insufficient power E EENS :
[0151]
[0152]
[0153] If the load shedding probability of the power system is P LOLP Or the power system is short of the expected value E EENSIf the corresponding set threshold is exceeded, it can be determined that the current power generation resources and regulatory resources of the power system are insufficient, and the resource conditions of the power balance analysis model of the multi-regional interconnected power system are reset, and the balance index is recalculated. Otherwise, the current power generation resources and regulatory resources of the power system are sufficient, and the medium- and long-term balance plan of the power system is obtained.
[0154] In one implementation, the calculation process of the long-term power balance of the multi-regional interconnected power system is referred to Figure 1 As shown, the steps include:
[0155] S1. Construct a non-uniformly spaced grey prediction model for source-load time series data. Based on the historical time series data of renewable energy power generation output and load demand, fit the development coefficient of each variable and the amount of grey used, obtain the medium- and long-term time series of the variables to be predicted on the source-load side, and obtain the maximum value of renewable energy output in each sub-area and the predicted load demand in each region.
[0156] S2. Construct a power and electricity balance analysis model for a multi-region interconnected power system based on the zoning structure within the power system, the maximum output of renewable energy in each zone, the predicted load demand in each region, the economic and operating parameters of each type of power source in each zone, the parameters of interconnection lines between zones, and the resources contained in the power system.
[0157] S3. Based on the Lagrangian relaxation method, the original problem is spatially decoupled according to the unit type.
[0158] S4. Iterative solution, as follows.
[0159] S40, setting the initial value of the Lagrange multiplier and the maximum number of iterative calculations.
[0160] S41. Solve the sub-problems corresponding to each unit type.
[0161] S42. If the current number of iterations is not greater than the maximum number of iterations, execute S43; if the current number of iterations is greater than the maximum number of iterations, execute S44.
[0162] S43. Using the solution results of the sub-problems corresponding to each unit type, calculate the relaxation error term corresponding to the Lagrange multiplier; if the relaxation error term is 0, execute S5; otherwise, update the Lagrange multiplier and return to S41.
[0163] S5. Calculate the system balance index according to the iterative solution results.
[0164] S6. Check whether the system balance indicators under the current resource conditions meet the actual operation requirements. If not, reset the resource conditions for participating in the balance analysis and return to S2.
[0165] S7. Output the medium- and long-term balance plan and key indicators of the system.
[0166] The resource conditions described in S6 above include boundary conditions, power generation resources and regulatory resources. Among them, boundary conditions include power installed capacity, etc., which are reflected in the range of parameter values. A given set of boundary conditions is used in an assessment, but if the system balancing capacity is insufficient, these boundary conditions need to be changed, such as adding a new power system planning scheme, increasing power transmission and reception plans, etc., until the system balancing capacity index reaches the expected range. The power generation resources include various types of generator sets. Regulatory resources are stored energy.
[0167] In summary, the method for evaluating the medium- and long-term power balance of multi-regional interconnected power systems proposed in this case solves the problem that the existing power balance analysis model is difficult to handle complex large-scale data, and realizes the evaluation of the current power generation resources and regulatory resource abundance under limited computing resources. This method also uses gray model prediction to determine the source-load side boundary condition data at the grade or multi-year scale, solves the problem of incomplete matching between boundary conditions and actual conditions in the current medium- and long-term power balance calculation, and improves the accuracy of power balance analysis of regional interconnected power systems.
[0168] Figure 1 The operations may be implemented out of order, in reverse order, or simultaneously. In addition, one or more other operations may be added to the flowchart. One or more operations may be removed from the flowchart.
[0169] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method of the present disclosure can be implemented by means of software plus necessary general hardware, and of course can also be implemented by special hardware including special integrated circuits, special CPUs, special memories, special components, etc. In general, all functions performed by computer programs can be easily implemented by corresponding hardware, and the specific hardware structures used to implement the same function can also be various, such as analog circuits, digital circuits or special circuits, etc. However, for the present disclosure, software program implementation is a better implementation method in most cases.
[0170] Although the embodiments of the present invention are described above in conjunction with the accompanying drawings, the present invention is not limited to the above specific embodiments and application fields, and the above specific embodiments are only illustrative and instructive, rather than restrictive. A person of ordinary skill in the art can also make many forms under the guidance of this specification and without departing from the scope of protection of the claims of the present invention, all of which belong to the protection of the present invention.
Claims
1. A method for evaluating the medium- and long-term power balance of a multi-regional interconnected power system, characterized in that: The method comprises the following steps: The objective function of the power and electricity balance analysis model of the multi-regional interconnected power system after Lagrangian relaxation is spatially decoupled according to the unit type to obtain the sub-problems corresponding to each unit type; Solve the sub-problems corresponding to each unit type separately. When the relaxation error term corresponding to the Lagrange multiplier is 0, use the solution results to calculate the balance index and conduct medium- and long-term power balance assessment. The balance indicators include load shedding probability and expected value of power shortage, and the medium and long term is greater than or equal to 1 month.
2. The method according to claim 1, characterized in that The multi-region interconnected power system power and quantity balance analysis model after Lagrangian relaxation processing is obtained including: According to the zoning structure within the power system and the set resource conditions, a power and electricity balance analysis model for the multi-regional interconnected power system is constructed; The coupling constraints in the power balance analysis model of the multi-regional interconnected power system are relaxed by using Lagrange multipliers, and the power balance analysis model of the multi-regional interconnected power system after Lagrange relaxation is obtained.
3. The method according to claim 1, characterized in that The solution comprises the following steps: S40, setting the initial value of the Lagrange multiplier and the maximum number of iterative calculations; S41, solving the sub-problems corresponding to each unit type; S42. If the current number of iterations is not greater than the maximum number of iterations, execute S43; If the current number of iterations is greater than the maximum number of iterations, execute S44; S43, using the solution results of the sub-problems corresponding to each unit type, calculating the relaxation error term corresponding to the Lagrange multiplier; If the relaxation error term is 0, execute S5; Otherwise, update the Lagrange multiplier and return to S41; S5. Calculate the balance index using the solution results of the sub-problems corresponding to each unit type.
4. The method according to claim 1, characterized in that: The steps of the assessment include: If the load shedding probability of the power system or the expected value of power shortage of the power system does not exceed the corresponding set threshold, it is determined that the current power generation resources and regulatory resources of the power system are sufficient, and a medium-term balance plan for the power system is obtained; Otherwise, it is determined that the current power generation resources and regulatory resources of the power system are insufficient, and the resource conditions of the power and electricity balance analysis model of the multi-regional interconnected power system are reset, and the balance indicators are recalculated.
5. The method according to claim 1, characterized in that: The Lagrange multiplier is updated as follows: Where: When calculating for the kth iteration, multiply The corresponding relaxed constraint error term, s k is the step size of the kth iteration.
6. The method according to claim 1, characterized in that The multi-region interconnected power system includes wind turbines and photovoltaic units in each region, the maximum output values corresponding to the wind turbines and photovoltaic units in each region are predicted values, and the load demand of each region in the multi-region interconnected power system is also a predicted value.
7. The method according to claim 6, characterized in that The predicted value is obtained based on a non-equidistant grey model, and the steps include: Based on historical time series data, it is recorded as Get the cumulative generation sequence as follows Among them, ρ is the order of the cumulative generated sequence, W (ρ) represents the ρ-order cumulative generation sequence of the variable W to be predicted, For the tth i The ρ-order cumulative value of the variable to be predicted W at time t, Δt j t j Time and t j-1 The time interval between moments, n is the moment identifier; Using a first-order differential equation to fit the cumulative sequence, the corresponding whitening formula of the grey prediction model is expressed as: σ is the development coefficient, γ is the amount of gray used; According to the obtained fitting parameter values, the variables to be predicted The tth i The ρ-order cumulative value at the moment is updated as: δ and γ are the fitting development coefficient and the amount of gray used, respectively; The historical time series data is the maximum output of a wind turbine generator set, the maximum output of a photovoltaic generator set, or the load demand of each region in a multi-region interconnected power system.
8. The method according to claim 7, characterized in that The balance index is calculated using the solution results, and the steps include: Based on the solution results of the sub-problems corresponding to each unit type, the load shedding event set S is obtained; The load shedding probability P is calculated as follows: LOLP and the expected value of insufficient power E EENS : Where: t j is the duration of load shedding event j, C j is the load shedding amount of load shedding event j, N T is the total duration of all analysis periods.
9. A medium- and long-term electric power balance device for a multi-region interconnected electric power system, characterized in that: The method comprises a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and executes the method according to any one of claims 1 to 8.
10. A computer-readable storage medium, characterized in that: A computer program is stored which can be loaded by a processor and execute the method according to any one of claims 1 to 8.