Battery power system of small truck
By optimizing the charging and discharging logic of the battery pack in the battery power system of a small truck and using relay management status, the problem of insufficient range of MINI trucks is solved, charging efficiency and working efficiency are improved, and the power needs of customers are met.
Patent Information
- Application Number
- CN202411191954.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-12
AI Technical Summary
The existing MINI truck power battery pack has insufficient range, resulting in low on-board charging efficiency, affecting work efficiency and time cost. Without increasing the entire vehicle space, it is difficult to meet customer needs.
A small truck battery power system is designed, including the charging and discharging process of no less than one battery pack. Through relays, the charging and discharging state is managed, the charging and discharging logic of the battery pack is optimized, the power capacity meets the needs, and the battery swap is improved. System efficiency.
It effectively meets the different power requirements of small trucks and the vehicle range requirements, improves the efficiency of using this battery swap system, saves time and costs, and solves the problem of low on-board charging efficiency.
Smart Images

Figure CN118928041A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of power batteries, and in particular relates to a battery power system for a small truck. Background Art
[0002] In the process of implementing the present invention, the inventors found that the prior art has at least the following problems:
[0003] With the development of the new energy electric vehicle market, the market demand for MINI cards (small trucks) is gradually increasing.
[0004] What follows is the problem of increasing customer demand for driving range. Currently, there are many soft-pack batteries in the MINI truck power battery pack, and the driving range is not high. Due to the limited space of the MINI truck, the key is to overcome the customer's mileage anxiety without increasing the space. Increasing the power is one solution, but if the size of the vehicle remains unchanged, even if the battery cell is replaced with a smaller size, the increased power is not enough to meet the customer's mileage requirements. Therefore, in order to meet the demand for MINI truck driving range, another approach needs to be found.
[0005] The above problems seriously affect the efficiency of work using MINI cards, especially in jobs such as food delivery and express delivery. The on-board charging efficiency is low, which delays work time and thus affects the entire MINI truck market.
[0006] CN218331882U-External protection device for power battery pack charge and discharge test and power battery pack charge and discharge test system, discloses an external protection device for power battery pack charge and discharge test, the device includes: a relay array arranged between the battery management system BMS and the power supply; a main control unit, which is communicatively connected to the relay array and is CAN-connected to the battery management system BMS, and cannot solve the above technical problems. Summary of the invention
[0007] The technical problem to be solved by the present invention is to provide a battery power system for small trucks that can meet the different power requirements and vehicle range requirements of small trucks, effectively meet the application of actual scenarios of superimposed power battery packs, improve the use efficiency and work efficiency of the battery replacement system, and save time costs.
[0008] In order to solve the above technical problems, the technical solution adopted by the present invention is: a small truck battery power system,
[0009] The battery system on the vehicle body includes no less than one battery pack;
[0010] The use of the battery pack includes a charging process and a discharging process.
[0011] The number of battery packs on the vehicle body includes one, two or three.
[0012] The charging process comprises the following steps:
[0013] 1) After the protection board is powered on, it will self-check and enter the charging state after the self-check is normal, there is no keyon signal and the charging current is detected;
[0014] 2) Charging with charger;
[0015] 3) Stop charging when the battery is fully charged or a charging failure occurs;
[0016] 4) After the charging current returns to zero, the BMS is still in the charging state; after being fully charged, the relay is cut off and the current returns to zero, which is still the charging state;
[0017] 5) After the charging current returns to zero, the keyon signal must be detected and the discharge current must be ≥1A for a duration of >3s before entering the discharge state. The charging fault must be cleared before entering the discharge state.
[0018] In step 2 of the charging process, after entering the charging state, the charging relay is closed, the charging high voltage power is turned on, and a charging request is sent according to the current state of the battery to request the charger to charge.
[0019] In step 3 of the charging process, when the battery is fully charged and the SOC is calibrated to 100%, a charging request is sent with a voltage and current of 0, and a request to stop charging is made at the same time, and the charging relay is disconnected after a delay of 3s.
[0020] In step 3) of the charging process, a charging fault occurs during the charging process, and a charging request is sent with a voltage and current of 0, and a request to stop charging is made at the same time, and the charging relay is disconnected after a delay of 3s.
[0021] The discharge process comprises the following steps:
[0022] 1) When the vehicle is powered on, the system performs a self-check. If the self-check fails, discharge is prohibited;
[0023] 2) After the self-test is successful, the pre-discharge starts. After the pre-discharge is completed, the discharge relay is closed, and the pre-discharge relay is disconnected after a delay of 500ms, and the discharge high voltage power-on is completed;
[0024] 3) Determine the number of battery packs and execute the discharge process;
[0025] In step 3) of the discharge process, if it is a single battery pack, it is directly connected to the grid and the discharge process is executed; if it is determined to be a double pack, the software allocates addresses, and determines that the rated difference of the SOC of the double packs is controlled within 5%, then the double packs are connected to the grid and can be discharged at the same time. If the difference is greater than 5%, the one with a higher SOC is connected to the grid first and discharge is executed until the difference with the other pack is controlled within 5%, then the double pack is connected to the grid and discharged; if it is determined to be a triple pack, the software allocates addresses, and determines that the SOC difference of the three packs is within 5%, then the three packs are connected to the grid and discharged, otherwise the SOC values of the three packs are compared and obtained, and they are sorted from high to low and named A, B, and C packs respectively. The A pack with the highest SOC is connected to the grid first and discharged until the SOC difference with the B pack is controlled within 5%, and the A and B packs are connected to the grid at the same time, and discharge is executed until the difference between the SOC of the A and B packs and the C pack is ≤5%, and the three packs are connected to the grid and discharged.
[0026] The self-test items during the discharge process include temperature sensing cable detachment, voltage sensing cable detachment, relay adhesion, extreme overtemperature, extreme undertemperature, extreme undervoltage, extreme overvoltage, and excessive temperature difference.
[0027] The charging and discharging state switching includes the following steps:
[0028] 1) Automatically release the discharge fault in the charging state, and automatically release the charging fault in the discharging state;
[0029] 2) The discharge relays are mutually exclusive. It is forbidden to close the discharge relay in the charging state, and it is forbidden to close the charging relay in the discharging state. When the discharge and charging states are allowed to be met at the same time, the priority is slow charging > discharging.
[0030] One of the above technical solutions has the following advantages or beneficial effects: it can meet the different power requirements and vehicle range requirements of small trucks, effectively meet the application of actual scenarios of superimposed power battery packs, improve the use efficiency and work efficiency of the battery replacement system, and save time costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 A charging principle diagram of a small truck battery power system provided in an embodiment of the present invention;
[0032] Figure 2 A discharge principle diagram of a small truck battery power system provided in an embodiment of the present invention; DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] A small truck battery power system, the battery system on the vehicle body includes no less than one battery pack; the use of the battery pack includes the charging process and the discharging process. The number of battery packs on the vehicle body includes one, two or three. It effectively meets the application of the actual scenario of the superimposed power battery pack, improves the use efficiency and work efficiency of the battery replacement system, and saves time and cost.
[0035] See also Figure 1 , charging and power-on process:
[0036] 1) The protection board performs self-test after power-on. The self-test is normal. There is no keyon signal and the charging current is detected to enter the charging state; (No keyon signal proves that there is no discharge. The power-on self-test considers that there is no abnormality. The protection board detects the voltage of the charging gun.)
[0037] 2) After entering the charging state, the charging relay is closed, the charging high voltage power-on is completed, and a charging request is sent according to the current state of the battery to request the charger to charge; (the relay is closed and the circuit is charged normally.)
[0038] 3) When the battery is fully charged and the SOC is calibrated to 100%, a charging request is sent with the voltage and current set to 0, and a request to stop charging is made at the same time, and the charging relay is disconnected after a delay of 3s; (When the battery is fully charged, the disconnection step is performed to avoid overcharging.)
[0039] 4) If the highest level of charging fault occurs during the charging process, the charging request voltage and current are 0, and a request to stop charging is sent at the same time, and the charging relay is disconnected after a delay of 3s; (If a charging fault occurs, the charging is disconnected to avoid danger caused by continued charging.)
[0040] 5) The charge and discharge relays are mutually exclusive, that is, only the charge relay is closed in the charging state, and only the discharge relay is closed in the discharging state. (To avoid problems with the charge and discharge logic.)
[0041] 6) Charging priority is high, only enter the charging state.
[0042] 7) After the charging current returns to zero, the BMS is still in the charging state. After full charge, the relay is cut off and the current returns to zero, which is still the charging state; (It is working to switch the discharge state.)
[0043] 8) After the charging current returns to zero, the keyon signal must be detected and the discharge current must be ≥1A for a duration of >3s before entering the discharge state. Clear the charging fault to enter the discharge state. (When the discharge conditions are met, clear the charging fault and switch to the discharge state.)
[0044] See also Figure 2 , discharge and power-on flow chart:
[0045] (1) When the vehicle is powered on (because there is no battery, the protection board is awakened by the key), the system performs a self-check. If the self-check fails, discharging is prohibited; (discharging is allowed only when the discharge conditions are met.)
[0046] (2) After the self-test is successful, pre-discharge begins. After the pre-discharge is completed, the discharge relay is closed, and the pre-discharge relay is disconnected after a delay of 500ms. The discharge high voltage power-on is completed; (Pre-charge is performed and power-on is safe.)
[0047] (3) Determine the number of battery packs. If there is only one pack, directly connect it to the grid and execute the discharge process.
[0048] If it is determined that there are two packs, the software will allocate addresses and determine that the difference in the SOC of the two packs is controlled within 5% (the voltage difference range of the battery packs is reduced to avoid the formation of circulation and thus short circuit). The two packs are connected to the grid and can be discharged at the same time. If the difference is greater than 5%, the one with higher SOC is connected to the grid first and discharges until the difference with the other pack is controlled within 5%. Then the two packs are connected to the grid and discharged; (determine the number of battery packs, control the voltage difference between packs, and avoid short circuit.)
[0049] If it is determined that there are three packs, the software will assign addresses, and if the SOC difference of the three packs is within 5%, the three packs will be connected to the grid for discharge. Otherwise, the SOC values of the three packs will be compared and sorted from high to low, named A, B, and C packs respectively. Pack A with the highest SOC will be connected to the grid first and discharged until the SOC difference with pack B is controlled within 5%. Pack A and pack B will be connected to the grid at the same time and discharge will be performed until the SOC difference between pack A and pack B and pack C is ≤5%. The three packs will be connected to the grid and discharged. (Judge the number of battery packs, control the voltage difference between packs, and avoid short circuits.)
[0050] 4.Self-test description:
[0051] Do not close any relays before the self-test is completed. The self-test items are as follows (including all three-level faults): ① Temperature sensor cable detached; ② Voltage sensor cable detached; ③ Relay adhesion; ④ Extreme overtemperature; ⑤ Extreme undertemperature; ⑥ Extreme undervoltage; ⑦ Extreme overvoltage; ⑧ Excessive temperature difference (3 levels). (For safety reasons, self-test is a necessary step before powering on.)
[0052] Charge and discharge state switching:
[0053] 1) Automatically release the power fault in the charging state, and automatically release the charging fault in the discharging state.
[0054] 2) The charge and discharge relays are mutually exclusive. The discharge relay is prohibited from closing in the charging state, and the charge relay is prohibited from closing in the discharge state. When the charge and discharge states are met at the same time, the priority is slow charge > discharge. (To avoid problems with the charge and discharge logic, when the charge and discharge states are met at the same time, charge first and then discharge to avoid the need for on-board charging.)
[0055] After adopting the above scheme,
[0056] In the description of the present invention, it is necessary to understand that the terms "coaxial", "bottom", "one end", "top", "middle", "the other end", "upper", "one side", "top", "inside", "front", "center", "both ends" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0057] In the present invention, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the present invention according to the specific circumstances.
[0058] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A small truck battery power system, characterized in that: The battery system on the vehicle body includes no less than one battery pack; The use of the battery pack includes a charging process and a discharging process.
2. The small truck battery power system according to claim 1, characterized in that: The number of battery packs on the vehicle body includes one, two or three.
3. The small truck battery power system according to claim 2, characterized in that: The charging process comprises the following steps: 1) After the protection board is powered on, it will self-check and enter the charging state after the self-check is normal, there is no keyon signal and the charging current is detected; 2) Charging with charger; 3) Stop charging when the battery is fully charged or a charging failure occurs; 4) After the charging current returns to zero, the BMS is still in the charging state; After full charge, the relay is cut off and the current returns to zero, which is still the charging state; 5) After the charging current returns to zero, the keyon signal must be detected and the discharge current must be ≥1A for a duration of >3s before entering the discharge state. The charging fault must be cleared before entering the discharge state.
4. The small truck battery power system as claimed in claim 3, characterized in that: In step 2 of the charging process, after entering the charging state, the charging relay is closed, the charging high voltage is powered on, and a charging request is sent according to the current state of the battery to request the charger to charge.
5. The small truck battery power system as claimed in claim 4, characterized in that: In step 3 of the charging process, when the battery is fully charged and the SOC is calibrated to 100%, a charging request is sent with a voltage and current of 0, and a request to stop charging is made at the same time, and the charging relay is disconnected after a delay of 3s.
6. The small truck battery power system according to claim 5, characterized in that: In step 3) of the charging process, a charging fault occurs during the charging process, and a charging request is sent with a voltage and current of 0, and a request to stop charging is made at the same time, and the charging relay is disconnected after a delay of 3s.
7. The small truck battery power system as claimed in claim 6, characterized in that: The discharge process comprises the following steps: 1) When the vehicle is powered on, the system performs a self-check. If the self-check fails, discharge is prohibited; 2) After the self-test is successful, the pre-discharge starts. After the pre-discharge is completed, the discharge relay is closed, and the pre-discharge relay is disconnected after a delay of 500ms, and the discharge high voltage power-on is completed; 3) Determine the number of battery packs and execute the discharge process.
8. The small truck battery power system according to claim 7, characterized in that: In step 3) of the discharge process, if it is a single battery pack, it is directly connected to the grid and the discharge process is executed; If it is determined to be a double package, the software will allocate addresses. If the difference between the SOC of the double packages is controlled within 5%, the double packages will be connected to the grid and can be discharged at the same time. If the difference is greater than 5%, the one with higher SOC will be connected to the grid first and discharge will be performed until the difference with the other package is controlled within 5%, then the double packages will be connected to the grid and discharged; If it is determined that there are three packages, the software will assign an address, and if the SOC difference of the three packages is within 5%, the three packages will be connected to the grid for discharge. Otherwise, the SOC values of the three packages are compared and sorted from high to low, named A, B, and C packages respectively. Package A with the highest SOC is connected to the grid first and discharged until the SOC difference with package B is controlled within 5%. Package A and package B are connected to the grid at the same time and discharge is performed until the SOC difference between packages A and B and package C is ≤5%. The three packages are connected to the grid and discharged.
9. The small truck battery power system according to claim 8, characterized in that: The self-test items during the discharge process include temperature sensing cable detachment, voltage sensing cable detachment, relay adhesion, extreme overtemperature, extreme undertemperature, extreme undervoltage, extreme overvoltage, and excessive temperature difference.
10. The small truck battery power system according to claim 9, characterized in that: The charging and discharging state switching includes the following steps: 1) Automatically release the discharge fault in the charging state, and automatically release the charging fault in the discharging state; 2) The discharge relays are mutually exclusive. It is forbidden to close the discharge relay in the charging state, and it is forbidden to close the charging relay in the discharging state. When the discharge and charging states are allowed to be met at the same time, the priority is slow charging > discharging.
