Ordered charging control method and device for charging pile, equipment, storage medium and product

By introducing main station-to-table power load monitoring and protocol conversion technology in the charging pile system, the problem of excessive peak-to-valley difference in the power grid caused by disordered charging control is solved, and orderly charging control is achieved, ensuring the power grid Stablize.

CN118928112APending Publication Date: 2024-11-12XIAN RONGJUFENG ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411106832.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing technology cannot effectively carry out orderly charging control of charging piles, resulting in too large peak-to-valley difference in the power grid, threatening the safe operation of the transformer.

Method used

The main station monitors the power load in the station area. If the power output exceeds the transformer, the control command forwarded by the carrier router will be received, and the protocol conversion will be performed, and the charging parameters of the charging pile will be adjusted based on the CAN protocol.

Benefits of technology

The orderly charging control is achieved, the peak-to-valley difference of the power grid is reduced, and the safe operation of the transformer is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118928112A_ABST
    Figure CN118928112A_ABST
Patent Text Reader

Abstract

The invention discloses a charging pile ordered charging control method and device, equipment, a storage medium and a product, and relates to the technical field of charging control, and the method comprises the steps: monitoring the power load of a transformer area through a main station, so as to judge whether the power load of the transformer area exceeds the power output of a transformer or not; if so, receiving a first control command forwarded by the carrier router; performing protocol conversion on the first control command to obtain a second control command; and controlling the charging pile based on the second control command so as to adjust the charging parameter of the charging pile. According to the invention, the first control command generated based on the carrier protocol is converted into the second control command generated based on the CAN protocol, and the charging pile is controlled based on the second control command, so that the charging parameters of the charging pile are adjusted in an ordered control mode. The technical problem that in a traditional charging control method, the peak-valley difference of a power grid is too large due to disordered charging is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of charging control technology, and in particular to a method, device, equipment, storage medium and product for orderly charging control of a charging pile. Background Art

[0002] At present, most electric vehicles still adopt a disorderly charging mode. When a large number of electric vehicles are charged at high power, the impact on the stability of the power grid is very strong. If orderly regulation is not adopted, the peak-to-valley difference of the power grid will increase, which will seriously threaten the safe operation of the transformer. Therefore, it is very necessary to adopt orderly charging control for electric vehicle charging piles. Summary of the invention

[0003] The main purpose of this application is to provide a charging pile orderly charging control method, device, equipment, storage medium and product, aiming to solve the technical problem that the prior art cannot carry out orderly charging control of charging piles.

[0004] To achieve the above object, the present application provides a charging pile orderly charging control method, the method comprising the following steps:

[0005] The power load of the substation is monitored by the master station to determine whether the power load of the substation exceeds the power output of the transformer;

[0006] If it exceeds, receiving a first control command forwarded by a carrier router, wherein the communication protocol corresponding to the first control command is a carrier protocol;

[0007] Performing protocol conversion on the first control command to obtain a second control command, wherein the communication protocol of the second control command is the CAN protocol;

[0008] The charging pile is controlled based on the second control command to adjust the charging parameters of the charging pile.

[0009] In one embodiment, if the threshold is exceeded, the step of receiving a first control command forwarded by a carrier router comprises:

[0010] If the power load of the substation exceeds the power output of the transformer, a first control command is sent to the concentrator through the master station;

[0011] When detecting that the first control command is transparently transmitted from the concentrator to the carrier router, receiving the first control command forwarded by the carrier router;

[0012] The first control command is used to control the orderly charging of the charging pile, and the first control command includes the concentrator address, the charging pile address, the charging power value and the charging time.

[0013] In one embodiment, the step of performing protocol conversion on the first control command to obtain the second control command includes:

[0014] Obtaining a carrier protocol corresponding to the first control command, and inputting the carrier protocol into a protocol conversion module, wherein the carrier protocol is a 645 protocol or a 698 protocol;

[0015] The first control command is converted into a second control command by the protocol conversion module, and the protocol conversion module includes an MCU circuit module, a CAN communication module and a power supply circuit module.

[0016] In one embodiment, the step of performing protocol conversion on the first control command by the protocol conversion module to obtain the second control command includes:

[0017] Framing the carrier protocol corresponding to the first control command through the MCU circuit module according to the format of the CAN protocol;

[0018] The framed carrier protocol is framed to obtain the CAN protocol, and a second control command is obtained based on the CAN protocol. When the second control command is executed, the MCU circuit module and the CAN communication module convert the CAN protocol into a CAN bus signal through the CAN chip corresponding to the CAN protocol, and then perform data interaction with the charging pile.

[0019] In one embodiment, after the step of controlling the charging pile based on the second control command to adjust the charging parameters of the charging pile, the method further includes:

[0020] Obtaining the CAN protocol corresponding to the second control command, and inputting the CAN protocol into a protocol conversion module, wherein the carrier protocol is a 645 protocol or a 698 protocol;

[0021] The second control command is converted into a third control command by the protocol conversion module, wherein the protocol conversion module includes an MCU circuit module, a CAN communication module and a power supply circuit module, and the third control command is used to execute an uplink orderly charging command.

[0022] In one embodiment, the step of performing protocol conversion on the second control command by the protocol conversion module to obtain a third control command includes:

[0023] Framing the CAN protocol corresponding to the second control command through the MCU circuit module according to the format of the carrier protocol;

[0024] The framed CAN protocol is framed to obtain a carrier protocol, and a third control command is obtained based on the carrier protocol. When the third control command is executed, the charging pile communicates with the CAN communication module through the CAN bus, and the CAN communication module converts the CAN bus signal into the CAN protocol and then exchanges data with the MCU circuit module.

[0025] In addition, to achieve the above-mentioned purpose, the present application also proposes a charging pile orderly charging control device, the charging pile orderly charging control device comprising:

[0026] A data monitoring module is used to monitor the power load of the substation through the master station to determine whether the power load of the substation exceeds the power output of the transformer;

[0027] A first control module, configured to receive a first control command forwarded from a carrier router if the number of packets exceeds the limit, wherein the communication protocol corresponding to the first control command is a carrier protocol;

[0028] A protocol conversion module, used for performing protocol conversion on the first control command to obtain a second control command, wherein the communication protocol of the second control command is the CAN protocol;

[0029] The second control module is used to control the charging pile based on the second control command to adjust the charging parameters of the charging pile.

[0030] In addition, to achieve the above-mentioned purpose, the present application also proposes a charging pile orderly charging control device, which includes: a memory, a processor, and a charging pile orderly charging control program stored in the memory and executable on the processor, and the charging pile orderly charging control program is configured to implement the steps of the charging pile orderly charging control method as described above.

[0031] In addition, to achieve the above-mentioned purpose, the present application also proposes a storage medium, which is a computer-readable storage medium, and a charging pile orderly charging control program is stored on the storage medium. When the charging pile orderly charging control program is executed by the processor, the steps of the charging pile orderly charging control method described above are implemented.

[0032] In addition, to achieve the above-mentioned purpose, the present invention also provides a computer program product, which includes a charging pile orderly charging control program, and when the charging pile orderly charging control program is executed by a processor, the steps of the charging pile orderly charging control method described above are implemented.

[0033] This application monitors the power load of the substation through the main station to determine whether the power load of the substation exceeds the power output of the transformer; if it exceeds, a first control command forwarded from a carrier router is received, and the communication protocol corresponding to the first control command is the carrier protocol; the first control command is converted to obtain a second control command, and the communication protocol of the second control command is the CAN protocol; the charging pile is controlled based on the second control command to adjust the charging parameters of the charging pile. Compared with the traditional disordered charging control, the above method of this application converts the first control command generated based on the carrier protocol into the second control command generated based on the CAN protocol, and controls the charging pile based on the second control command, thereby adjusting the charging parameters of the charging pile in an orderly controlled manner, which solves the technical problem of excessive peak-to-valley difference in the power grid caused by disordered charging in the traditional charging control method. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 A schematic diagram of the structure of a charging pile orderly charging control device in the hardware operating environment involved in the embodiment of the present application;

[0035] Figure 2 This is a flow chart of the first embodiment of the orderly charging control method for a charging pile of the present application;

[0036] Figure 3 This is a schematic diagram of control command transmission in the orderly charging control method of the charging pile in this application;

[0037] Figure 4 This is a flow chart of the second embodiment of the orderly charging control method for a charging pile of the present application;

[0038] Figure 5 This is a schematic diagram of the protocol conversion module in the orderly charging control method of the charging pile in this application;

[0039] Figure 6 This is a flow chart of the third embodiment of the orderly charging control method for a charging pile of the present application;

[0040] Figure 7 This is a structural block diagram of the first embodiment of the orderly charging control device for a charging pile in the present application.

[0041] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0042] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0043] Reference Figure 1 , Figure 1This is a schematic diagram of the structure of a charging pile orderly charging control device in the hardware operating environment involved in the embodiment of the present application.

[0044] like Figure 1 As shown, the orderly charging control device of the charging pile may include: a processor 1001, such as a central processing unit (CPU), a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005. Among them, the communication bus 1002 is used to realize the connection and communication between these components. The user interface 1003 may include a display screen (Display), an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a wireless fidelity (Wireless-Fidelity, Wi-Fi) interface). The memory 1005 may be a high-speed random access memory (Random Access Memory, RAM) or a stable non-volatile memory (Non-Volatile Memory, NVM), such as a disk storage. The memory 1005 may optionally be a storage device independent of the aforementioned processor 1001.

[0045] Those skilled in the art will understand that Figure 1 The structure shown in the figure does not constitute a limitation on the orderly charging control device of the charging pile, and may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently.

[0046] like Figure 1 As shown, the memory 1005 as a storage medium may include an operating system, a network communication module, a user interface module, and a charging pile orderly charging control program.

[0047] exist Figure 1 In the charging pile orderly charging control device shown, the network interface 1004 is mainly used for data communication with the network server; the user interface 1003 is mainly used for data interaction with the user; the processor 1001 and the memory 1005 in the charging pile orderly charging control device of the present application can be set in the charging pile orderly charging control device, and the charging pile orderly charging control device calls the charging pile orderly charging control program stored in the memory 1005 through the processor 1001, and executes the charging pile orderly charging control method provided in the embodiment of the present application.

[0048] The present application provides a method for controlling orderly charging of a charging pile, referring to Figure 2 , Figure 2 This is a flow chart of the first embodiment of the orderly charging control method for a charging pile of the present application.

[0049] In this embodiment, the charging pile orderly charging control method includes the following steps:

[0050] Step S10: Monitor the power load of the substation through the master station to determine whether the power load of the substation exceeds the power output of the transformer.

[0051] It should be noted that the execution subject of the method of this embodiment can be a terminal device with protocol conversion, data processing and program running functions, such as a smart terminal, a computer, etc., or an electronic device with the same or similar functions, such as the above-mentioned charging pile orderly charging control device. The following takes the charging pile orderly charging control device (hereinafter referred to as the control device) as an example to illustrate this embodiment and the following embodiments.

[0052] It is understandable that the above-mentioned master station is a terminal with central control functions, which can monitor and manage the entire power system. It is mainly responsible for real-time monitoring and analysis of the operating status of various power equipment such as generators, substations, and transmission lines, and intelligent control and optimization according to the operating status. The above-mentioned substation refers to the power supply range or area of ​​(a) transformer. It is a term for power economic operation management and an important link in the power supply chain. The substation is responsible for reducing the voltage of the electric energy transmitted by the high-voltage transmission line to meet the electricity demand of end users, and ensuring the safety and stability of power supply through functions such as power distribution, monitoring and fault isolation.

[0053] In the specific implementation, smart meters or other power monitoring equipment can be installed in the substation area, which can collect users' power consumption data in real time, including key parameters such as voltage, current, active power, reactive power, etc. These data are transmitted to the master station system through communication networks (such as optical fiber, wireless private network, power carrier, etc.). The master station system is responsible for receiving data from various substations and ensuring the accuracy and real-time nature of the data. This requires the establishment of a stable and reliable communication link and an efficient data processing mechanism. The master station system processes and analyzes the received data and calculates key indicators such as the total power load and power factor of the substation area. At the same time, the system compares these indicators with the rated power output of the transformer to assess whether the power load in the substation area exceeds the standard.

[0054] Step S20: If exceeded, a first control command forwarded from a carrier router is received, and the communication protocol corresponding to the first control command is a carrier protocol.

[0055] It should be noted that the above-mentioned carrier router is a router specially designed for carrier communication systems. It uses power lines as transmission media and transmits data on power lines through carrier signals. The carrier router can monitor and manage carrier channel resources between multiple coverage networks, and dynamically schedule according to actual needs to ensure efficient use of channel resources. As a relay device for data transmission, the carrier router can receive data from the source node and forward it to the coverage node to achieve reliable data transmission.

[0056] It should be understood that the above-mentioned carrier protocol may include but is not limited to signal transmission format, data frame structure, communication rate, bit error rate, communication distance, working mode, interface standard, communication security and other data.

[0057] Step S30: Perform protocol conversion on the first control command to obtain a second control command, wherein the communication protocol of the second control command is the CAN protocol.

[0058] It should be noted that the CAN protocol is called Controller Area Network, which is a widely used serial communication protocol. The CAN protocol uses a frame-based communication method. Each CAN frame consists of a start bit, a frame ID, a data field, a CRC (cyclic redundancy check) and an end bit. The frame ID is used to identify different messages, the data field is used to transmit actual data information, and the CRC is used to detect errors in the data transmission process.

[0059] Step S40: Control the charging pile based on the second control command to adjust the charging parameters of the charging pile.

[0060] In the specific implementation, you can refer to Figure 3 , Figure 3 This is a schematic diagram of the control command transmission in the orderly charging control method of the charging pile in this application. When the master station detects that the power load in the substation exceeds the power output of the transformer, it sends an orderly charging control command (i.e. the above-mentioned first control command) to the concentrator, and the concentrator forwards the first control command to the STA (i.e. the carrier module in the above-mentioned control device) through the CCO (i.e. the above-mentioned carrier router), and then the carrier module sends the first control command to the protocol conversion module for protocol conversion to obtain the above-mentioned second control command. Finally, the charging pile can be controlled based on the second control command to adjust the charging parameters of the charging pile, thereby achieving orderly control.

[0061] This embodiment monitors the power load of the substation through the main station to determine whether the power load of the substation exceeds the power output of the transformer; if it exceeds, a first control command forwarded from a carrier router is received, and the communication protocol corresponding to the first control command is the carrier protocol; the first control command is converted to obtain a second control command, and the communication protocol of the second control command is the CAN protocol; the charging pile is controlled based on the second control command to adjust the charging parameters of the charging pile. Compared with the traditional disordered charging control, the above method of this embodiment converts the first control command generated based on the carrier protocol into the second control command generated based on the CAN protocol, and controls the charging pile based on the second control command, thereby adjusting the charging parameters of the charging pile in an orderly control manner, which solves the technical problem of excessive peak-to-valley difference in the power grid caused by disordered charging in the traditional charging control method.

[0062] refer to Figure 4 , Figure 4 This is a flow chart of the second embodiment of the orderly charging control method for a charging pile of the present application.

[0063] In a feasible implementation manner, the step S20 may include:

[0064] Step S201: If the power load of the substation exceeds the power output of the transformer, a first control command is sent to the concentrator through the master station.

[0065] The first control command is used to control the orderly charging of the charging pile, and the first control command includes the concentrator address, the charging pile address, the charging power value and the charging time.

[0066] Step S202: When it is detected that the first control command is transparently transmitted from the concentrator to the carrier router, a first control command forwarded by the carrier router is received.

[0067] In a feasible implementation manner, the step S30 may include:

[0068] Step S301: Acquire the carrier protocol corresponding to the first control command, and input the carrier protocol into a protocol conversion module, wherein the carrier protocol is 645 protocol or 698 protocol.

[0069] Step S302: performing protocol conversion on the first control command through the protocol conversion module to obtain a second control command, wherein the protocol conversion module includes an MCU circuit module, a CAN communication module and a power circuit module.

[0070] It should be noted that the above-mentioned MCU circuit module may include a single-chip computer circuit, a crystal oscillator circuit, a reset circuit, a power input circuit, an SPI communication circuit, an interrupt input circuit, a signal output circuit, an indicator light circuit, etc.; the above-mentioned CAN communication module may include a CAN chip circuit, a power input circuit, etc.; the above-mentioned power circuit module may include a DC-DC power module, an LDO power module, an EMI protection circuit, an electrostatic protection circuit, etc.

[0071] In the specific implementation, the MCU circuit module can communicate with the STA through SPI, and communicate with the CAN communication module through SPI to realize the communication interaction between the carrier and the CAN communication module. The CAN communication module can communicate with the MCU circuit module through SPI, and communicate with the charging pile through CAN to realize the communication interaction with the charging pile. The power circuit module can power the MCU circuit module and the CAN communication module through power conversion. The power input is the low-voltage DC power output of the charging pile (the general power supply voltage is 12V or 24V), and the power module output voltage is 12V, 5V, and 3.3V, of which 12V powers the STA, 5V powers the CAN communication module, and 3.3V powers the MCU circuit module.

[0072] In a feasible implementation manner, the step S302 may include:

[0073] Step S3021: framing the carrier protocol corresponding to the first control command through the MCU circuit module according to the format of the CAN protocol.

[0074] Step S3022: The framed carrier protocol is framed to obtain a CAN protocol, and a second control command is obtained based on the CAN protocol. When the second control command is executed, the MCU circuit module and the CAN communication module convert the CAN protocol into a CAN bus signal through the CAN chip corresponding to the CAN protocol, and then perform data interaction with the charging pile.

[0075] In the specific implementation, you can refer to Figure 5 , Figure 5 This is a schematic diagram of the protocol conversion module in the orderly charging control method of the charging pile in this application.

[0076] In this embodiment, if the power load of the substation exceeds the power output of the transformer, the first control command is sent to the concentrator through the main station; when it is detected that the first control command is transparently transmitted from the concentrator to the carrier router, the first control command forwarded by the carrier router is received; wherein the first control command is used to control the orderly charging of the charging pile, and the first control command includes the concentrator address, the charging pile address, the charging power value and the charging time; the carrier protocol corresponding to the first control command is obtained, and the carrier protocol is input into the protocol conversion module, the carrier protocol is 645 protocol or 698 protocol, and the protocol conversion module includes an MCU circuit module, a CAN communication module and a power circuit module; according to the format of the CAN protocol, the carrier protocol corresponding to the first control command is framed by the MCU circuit module; the framed carrier protocol is framed to obtain the CAN protocol, and the second control command is obtained based on the CAN protocol. When the second control command is executed, the MCU circuit module and the CAN communication module convert the CAN protocol into a CAN bus signal through the CAN chip corresponding to the CAN protocol, and then perform data interaction with the charging pile. The above method of this embodiment introduces a protocol conversion module including an MCU circuit module, a CAN communication module and a power circuit module, and realizes communication with the charging pile through protocol conversion in the protocol conversion module, so that the charging pile executes orderly charging commands, thereby ensuring that the load in the user area is less than the safe output power of the transformer.

[0077] refer to Figure 6 , Figure 6 This is a flow chart of the third embodiment of the orderly charging control method for a charging pile of the present application.

[0078] In a feasible implementation manner, after step S40, the following may also be included:

[0079] Step S50: Acquire the CAN protocol corresponding to the second control command, and input the CAN protocol into the protocol conversion module, wherein the carrier protocol is the 645 protocol or the 698 protocol.

[0080] Step S60: The second control command is converted into a third control command by the protocol conversion module, wherein the protocol conversion module includes an MCU circuit module, a CAN communication module and a power supply circuit module, and the third control command is used to execute an uplink orderly charging command.

[0081] In a feasible implementation manner, the step S60 may include:

[0082] Step S601: framing the CAN protocol corresponding to the second control command through the MCU circuit module according to the format of the carrier protocol.

[0083] Step S602: The framed CAN protocol is framed to obtain a carrier protocol, and a third control command is obtained based on the carrier protocol. When the third control command is executed, the charging pile communicates with the CAN communication module through the CAN bus, and the CAN communication module converts the CAN bus signal into the CAN protocol and then exchanges data with the MCU circuit module.

[0084] In the specific implementation, the 645 protocol is sent and received through the serial port. The serial port has no limit on the data frame length at the link layer. However, the charging is interacted with through CAN. CAN has a limit on the data frame length at the link layer, and each length does not exceed 8 bytes. Therefore, the conversion between the two requires framing and grouping operations.

[0085] In this embodiment, the CAN protocol corresponding to the second control command is obtained, and the CAN protocol is input into the protocol conversion module. The carrier protocol is 645 protocol or 698 protocol. The protocol conversion module includes an MCU circuit module, a CAN communication module and a power circuit module. The third control command is used to execute the uplink orderly charging command; the CAN protocol corresponding to the second control command is framed by the MCU circuit module according to the format of the carrier protocol; the framed CAN protocol is framed to obtain the carrier protocol, and the third control command is obtained based on the carrier protocol. When executing the third control command, the charging pile communicates with the CAN communication module through the CAN bus, and the CAN communication module converts the CAN bus signal to the CAN protocol and then exchanges data with the MCU circuit module. The communication method used by the existing charging pile is CAN communication. At present, the device that supports CAN communication in the power grid is the concentrator. If the concentrator is used to directly control the charging pile, it is limited by the communication distance with CAN communication, and almost each charging pile needs to be equipped with a concentrator. This method not only has a large investment, but also does not meet the requirements of power grid construction. Based on this, the above method of this embodiment sets a protocol conversion module so that the charging pile can be connected to the power grid master station, so that the master station can observe, adjust and control the charging pile, achieve orderly charging, and thus reduce communication costs.

[0086] In addition, an embodiment of the present application further proposes a storage medium, on which a charging pile orderly charging control program is stored. When the charging pile orderly charging control program is executed by a processor, the steps of the charging pile orderly charging control method described above are implemented.

[0087] Reference Figure 7 , Figure 7 This is a structural block diagram of the first embodiment of the orderly charging control device for a charging pile in the present application.

[0088] like Figure 7As shown, the charging pile orderly charging control device proposed in the embodiment of the present application includes:

[0089] The data monitoring module 701 is used to monitor the power load of the substation through the master station to determine whether the power load of the substation exceeds the power output of the transformer;

[0090] A first control module 702 is configured to receive a first control command forwarded from a carrier router if the number of control commands exceeds the limit, wherein the communication protocol corresponding to the first control command is a carrier protocol;

[0091] The protocol conversion module 703 is used to perform protocol conversion on the first control command to obtain a second control command, wherein the communication protocol of the second control command is the CAN protocol;

[0092] The second control module 704 is used to control the charging pile based on the second control command to adjust the charging parameters of the charging pile.

[0093] This embodiment monitors the power load of the substation through the main station to determine whether the power load of the substation exceeds the power output of the transformer; if it exceeds, a first control command forwarded from a carrier router is received, and the communication protocol corresponding to the first control command is the carrier protocol; the first control command is converted to obtain a second control command, and the communication protocol of the second control command is the CAN protocol; the charging pile is controlled based on the second control command to adjust the charging parameters of the charging pile. Compared with the traditional disordered charging control, the above method of this embodiment converts the first control command generated based on the carrier protocol into the second control command generated based on the CAN protocol, and controls the charging pile based on the second control command, thereby adjusting the charging parameters of the charging pile in an orderly control manner, which solves the technical problem of excessive peak-to-valley difference in the power grid caused by disordered charging in the traditional charging control method.

[0094] Based on the first embodiment of the orderly charging control device of the charging pile mentioned above in the present application, a second embodiment of the orderly charging control device of the charging pile of the present application is proposed.

[0095] In this embodiment, the first control module 702 is also used to send a first control command to the concentrator through the master station if the power load of the substation exceeds the power output of the transformer; when it is detected that the first control command is transparently transmitted from the concentrator to the carrier router, the first control command forwarded from the carrier router is received; wherein the first control command is used to control the orderly charging of the charging pile, and the first control command includes the concentrator address, the charging pile address, the charging power value and the charging time.

[0096] Furthermore, the protocol conversion module 703 is also used to obtain the carrier protocol corresponding to the first control command, and input the carrier protocol into the protocol conversion module, and the carrier protocol is the 645 protocol or the 698 protocol; the first control command is converted by the protocol conversion module to obtain the second control command, and the protocol conversion module includes an MCU circuit module, a CAN communication module and a power circuit module.

[0097] Furthermore, the protocol conversion module 703 is also used to frame the carrier protocol corresponding to the first control command through the MCU circuit module according to the format of the CAN protocol; frame the framed carrier protocol to obtain the CAN protocol, and obtain the second control command based on the CAN protocol. When executing the second control command, the MCU circuit module and the CAN communication module convert the CAN protocol into a CAN bus signal through the CAN chip corresponding to the CAN protocol, and then exchange data with the charging pile.

[0098] Furthermore, the second control module 704 is also used to obtain the CAN protocol corresponding to the second control command, and input the CAN protocol into the protocol conversion module, and the carrier protocol is the 645 protocol or the 698 protocol; the second control command is converted by the protocol conversion module to obtain a third control command, and the protocol conversion module includes an MCU circuit module, a CAN communication module and a power supply circuit module, and the third control command is used to execute an uplink orderly charging command.

[0099] Furthermore, the second control module 704 is also used to frame the CAN protocol corresponding to the second control command through the MCU circuit module according to the format of the carrier protocol; frame the framed CAN protocol to obtain the carrier protocol, and obtain the third control command based on the carrier protocol. When the third control command is executed, the charging pile communicates with the CAN communication module through the CAN bus, and the CAN communication module converts the CAN bus signal into the CAN protocol and then exchanges data with the MCU circuit module.

[0100] Other embodiments or specific implementation methods of the orderly charging control device for a charging pile of the present application can refer to the above-mentioned method embodiments and will not be repeated here.

[0101] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.

[0102] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.

[0103] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory / random access memory, a disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present application.

[0104] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.

Claims

1. A charging pile orderly charging control method, characterized in that: The method comprises the following steps: The power load of the substation is monitored by the master station to determine whether the power load of the substation exceeds the power output of the transformer; If it exceeds, receiving a first control command forwarded by a carrier router, wherein the communication protocol corresponding to the first control command is a carrier protocol; Performing protocol conversion on the first control command to obtain a second control command, wherein the communication protocol of the second control command is the CAN protocol; The charging pile is controlled based on the second control command to adjust the charging parameters of the charging pile.

2. The orderly charging control method for a charging pile according to claim 1, characterized in that: If the number of control commands exceeds the limit, the step of receiving a first control command forwarded by a carrier router comprises: If the power load of the substation exceeds the power output of the transformer, a first control command is sent to the concentrator through the master station; When detecting that the first control command is transparently transmitted from the concentrator to the carrier router, receiving the first control command forwarded by the carrier router; The first control command is used to control the orderly charging of the charging pile, and the first control command includes the concentrator address, the charging pile address, the charging power value and the charging time.

3. The orderly charging control method of a charging pile according to claim 1, characterized in that: The step of performing protocol conversion on the first control command to obtain a second control command includes: Obtaining a carrier protocol corresponding to the first control command, and inputting the carrier protocol into a protocol conversion module, wherein the carrier protocol is a 645 protocol or a 698 protocol; The first control command is converted into a second control command by the protocol conversion module, and the protocol conversion module includes an MCU circuit module, a CAN communication module and a power supply circuit module.

4. The orderly charging control method of a charging pile as claimed in claim 3, characterized in that: The step of performing protocol conversion on the first control command by the protocol conversion module to obtain a second control command includes: Framing the carrier protocol corresponding to the first control command through the MCU circuit module according to the format of the CAN protocol; The framed carrier protocol is framed to obtain the CAN protocol, and a second control command is obtained based on the CAN protocol. When the second control command is executed, the MCU circuit module and the CAN communication module convert the CAN protocol into a CAN bus signal through the CAN chip corresponding to the CAN protocol, and then perform data interaction with the charging pile.

5. The orderly charging control method of a charging pile as claimed in claim 1, characterized in that: After the step of controlling the charging pile based on the second control command to adjust the charging parameters of the charging pile, the method further includes: Obtaining the CAN protocol corresponding to the second control command, and inputting the CAN protocol into a protocol conversion module, wherein the carrier protocol is a 645 protocol or a 698 protocol; The second control command is converted into a third control command by the protocol conversion module, wherein the protocol conversion module includes an MCU circuit module, a CAN communication module and a power supply circuit module, and the third control command is used to execute an uplink orderly charging command.

6. The orderly charging control method of a charging pile as claimed in claim 5, characterized in that: The step of performing protocol conversion on the second control command by the protocol conversion module to obtain a third control command includes: Framing the CAN protocol corresponding to the second control command through the MCU circuit module according to the format of the carrier protocol; The framed CAN protocol is framed to obtain a carrier protocol, and a third control command is obtained based on the carrier protocol. When the third control command is executed, the charging pile communicates with the CAN communication module through the CAN bus, and the CAN communication module converts the CAN bus signal into the CAN protocol and then exchanges data with the MCU circuit module.

7. A charging pile orderly charging control device, characterized in that: The charging pile orderly charging control device comprises: A data monitoring module is used to monitor the power load of the substation through the master station to determine whether the power load of the substation exceeds the power output of the transformer; A first control module, configured to receive a first control command forwarded from a carrier router if the number of packets exceeds the limit, wherein the communication protocol corresponding to the first control command is a carrier protocol; A protocol conversion module, used for performing protocol conversion on the first control command to obtain a second control command, wherein the communication protocol of the second control command is the CAN protocol; The second control module is used to control the charging pile based on the second control command to adjust the charging parameters of the charging pile.

8. A charging pile orderly charging control device, characterized in that: The device includes: a memory, a processor, and a charging pile orderly charging control program stored in the memory and executable on the processor, wherein the charging pile orderly charging control program is configured to implement the steps of the charging pile orderly charging control method as described in any one of claims 1 to 6.

9. A storage medium, characterized in that: The storage medium is a computer-readable storage medium, and a charging pile orderly charging control program is stored on the storage medium. When the charging pile orderly charging control program is executed by a processor, the steps of the charging pile orderly charging control method according to any one of claims 1 to 6 are implemented.

10. A computer program product, characterized in that The computer program product comprises a charging pile orderly charging control program, and when the charging pile orderly charging control program is executed by a processor, the steps of the charging pile orderly charging control method according to any one of claims 1 to 6 are implemented.