Construction method of garden landscape steel trestle

Through the construction methods of the steel trestle in the garden landscape, including heating strips melting ice and snow and wind power generation, the problem of ice and snow in the steel trestle in winter is solved, the safety and stability are improved, and the safe walking experience for tourists are ensured.

CN118932864APending Publication Date: 2024-11-12HANGZHOU ZHONGBANG ECOLOGICAL ENVIRONMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411072618.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing steel trests are prone to freezing in winter, which makes tourists unable to walk safely, and have poor stability, which poses safety hazards.

Method used

A construction method of a garden landscape steel trestle is adopted, including pillar construction, clamping mechanism installation, bridge deck processing and installation, wind power generation mechanism installation and protective panel installation, and improve safety and snow through heating strips, wind power generation and solar power generation. stability.

Benefits of technology

This method can automatically remove ice and snow from the steel trest bridge deck, improve the safety of winter walking, and improve the installation stability and reliability of the steel trest bridge to ensure the safety of tourists.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932864A_ABST
    Figure CN118932864A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method of a garden landscape steel trestle. The construction method comprises the following steps: S1, supporting column construction; s2, mounting a clamping mechanism; s3, processing and mounting a bridge floor; s4, wind power generation mechanism installation; and S5, protection plate body installation. The construction method is simple in step, the stability and reliability of mounting of the steel trestle can be improved, ice and snow on the surface of the steel trestle can be automatically removed, the steel trestle is prevented from slipping when walking on the steel trestle in winter, and the safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a construction method of a garden landscape steel trestle. Background Art

[0002] Steel trestle is mainly used to improve the overall quality of garden landscape and enhance the viewing experience of tourists. Through its unique design and construction, the landscape steel trestle provides tourists with a different viewing experience, allowing tourists to not only look far away, but also enjoy the scenery of the garden up close.

[0003] The steel trestle in the prior art is prone to ice formation in winter, which makes it impossible for tourists to go up the bridge or poses a major safety hazard, and the stability is poor. Summary of the invention

[0004] The purpose of the present invention is to provide a technical solution for a construction method of a garden landscape steel trestle in view of the shortcomings of the prior art. The construction method has simple steps, which can not only improve the stability and reliability of the installation of the steel trestle, but also automatically remove ice and snow on the bridge deck of the steel trestle, prevent slipping when walking on the steel trestle in winter, and improve safety.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0006] A construction method for a garden landscape steel trestle, characterized by comprising the following steps:

[0007] S1. Pillar construction

[0008] a. First, determine the construction location of the steel trestle in the garden according to the design requirements, and determine the installation location of the pillars along the construction location. The pillars are grouped in pairs and marked;

[0009] b. Then, the pillars of appropriate size are processed and installed in sequence along the installation position, ensuring that the two pillars in the same group are arranged parallel to each other and the top heights of the two pillars in the same group are consistent, until the pillars in the entire construction position are installed;

[0010] c. Then reinforce the bottom of each pillar;

[0011] S2. Installation of the card connection mechanism

[0012] a. First, the size of the clamping mechanism is determined according to the size of the top surface of the pillar, and the required first connecting plate, second connecting plate and third connecting plate are formed by integral processing. The first connecting plate is provided with a first mounting hole, and first T-shaped bars are symmetrically installed on both sides of the third connecting plate, and a second T-shaped bar is symmetrically installed on one side of the first connecting plate close to the third connecting plate;

[0013] b. Then install the second positioning blocks symmetrically along both sides of the third connecting plate;

[0014] c. Then, the processed clamping mechanism is fixedly installed on the top surface of each pillar, and the second connecting plates of the clamping mechanism on the two pillars of the same group are both facing inwards;

[0015] d. Finally, a first positioning block is installed on the top surface of each pillar between the first connecting plate and the second connecting plate;

[0016] S3. Bridge deck processing and installation

[0017] a. First, the size of the bridge deck is determined according to the distance between each group of two pillars and the distance between two adjacent groups of pillars, and the corresponding bridge deck body is processed. Support blocks are installed at the corners along the bottom surface of the bridge deck body, and a first positioning hole matching the first positioning block is opened on the bottom surface of each support block;

[0018] b. Then install a heating mechanism on the bridge deck body;

[0019] c. Then, the processed bridge deck body is installed between two adjacent groups of pillars, and the support block is inserted between the first connecting plate and the second connecting plate of each clamping mechanism until the first positioning block on the top surface of the pillar is completely inserted into the first positioning hole on the support block, and the bridge deck body and the pillar are welded;

[0020] d. Finally, the size of the cross beam is determined according to the spacing between the second connecting plates on the same group of two pillars, the corresponding cross beam is processed, the cross beam is connected to the clamping mechanisms on both sides, and the bridge deck body and the cross beam are welded;

[0021] S4. Wind power generation mechanism installation

[0022] a. First, determine the size of the cantilever beam according to the distance between two adjacent beams, and process the corresponding cantilever beam;

[0023] b. Then, a suitable wind power generation mechanism is manufactured according to the distance between the bridge deck and the bottom surface, and the wind power generation mechanism is installed under the suspension beam, and the wind power generation mechanism is electrically connected to the battery pack;

[0024] S5. Installation of protective plate

[0025] a. First, the size of the protective plate is determined according to the distance between two adjacent groups of pillars, and the corresponding protective plate is processed according to the design requirements, so that the side of the protective plate away from the bridge deck is formed with a first inclined surface and a second inclined surface;

[0026] b. Then, a first T-shaped groove and a second T-shaped groove are respectively opened along the two end surfaces of the protective plate body and the side close to the bridge deck, wherein the length of the first T-shaped groove is greater than the length of the second T-shaped groove, and second positioning holes are opened along the two end surfaces of the protective plate body, and a second mounting hole is opened on the side of the protective plate body close to the second T-shaped groove;

[0027] c. Then vertically insert the processed protective plate body between two adjacent groups of pillars, so that the first T-shaped slots on both end surfaces of the protective plate body are inserted along the first T-shaped strip on the clamping mechanism, and the second T-shaped slots are inserted along the second T-shaped slots, until the second positioning block is inserted into the second positioning hole;

[0028] d. Finally, screw through the first mounting hole and the second mounting hole to form a drainage groove between the protective plate body and the bridge deck.

[0029] The construction method has simple steps and can not only improve the stability and reliability of the steel trestle installation, but also automatically remove ice and snow on the steel trestle deck to prevent slipping when walking on the steel trestle in winter, thereby improving safety.

[0030] Furthermore, the second connecting plate and the third connecting plate in step S2 process a are vertically connected to the first connecting plate and are located on both sides of the first connecting plate, which can not only improve the overall stability and reliability of the clamping mechanism, but also improve the connection stability between the protective plate body, the bridge deck and the pillar.

[0031] Furthermore, the first connecting plate and the third connecting plate are of equal height, and the second connecting plate is lower in height than the first connecting plate and the third connecting plate, which facilitates the installation and construction of the bridge deck and the protective plate body.

[0032] Furthermore, in step S2 process a, the length of the first T-shaped bar is greater than the length of the second T-shaped bar, which meets the installation requirements of the protective plate body.

[0033] Furthermore, the heating mechanism in step S3 process b includes heating strips and a battery pack. The heating strips are laid on the top surface of the bridge deck body at equal intervals and are arranged along the length direction of the bridge deck body. The battery pack is installed on the bottom surface of the bridge deck body. The battery pack is electrically connected to the heating strips. The heating strips are powered by the battery pack, so that the heating strips can heat the top surface of the bridge deck body, which is used to melt ice and snow on the bridge deck body and improve safety during walking.

[0034] Furthermore, a buckle groove is provided on the second connecting plate, and buckle blocks are provided at both ends of the crossbeam. The buckle blocks are inserted into the buckle grooves to realize the connection between the crossbeam and the clamping mechanism, thereby improving the connection stability and reliability between the crossbeam and the clamping mechanism.

[0035] Furthermore, the wind power generation mechanism in step S4 includes an upper support plate and a lower support plate distributed in parallel up and down, a wind power dual generator set installed between the upper support plate and the lower support plate, and a wind guide assembly fixed to the bottom of the lower support plate. The upper support plate is rotatably connected to the suspension beam through a rotating shaft, the lower support plate is fixedly connected to the upper support plate through a connecting rod, the wind power dual generator set is connected to the upper support plate and the lower support plate through a mounting column, and blades are provided on the wind power dual generator set. The wind guide assembly can turn the entire wind power generation mechanism toward the windward side to achieve wind power generation and store electrical energy in a battery pack. The upper support plate and the lower support plate improve the stability and reliability of the installation of the wind power dual generator set.

[0036] Furthermore, the wind guide assembly includes two wind direction plates arranged parallel to each other, a connecting frame and a fixing column. The two wind direction plates are fixed to both sides of the connecting frame, and the connecting frame is connected to the lower support plate through the fixing column.

[0037] Furthermore, the first positioning block and the second positioning block are both elastic members.

[0038] Furthermore, a photovoltaic panel is provided on the first inclined surface, and a light strip is provided on the inner side of the protective plate body. Both the photovoltaic panel and the light strip are electrically connected to the battery pack. The photovoltaic panel is used for solar power generation and stores electrical energy in the battery pack. The battery pack supplies power to the light strip for night lighting.

[0039] The present invention has the following beneficial effects due to the adoption of the above technical solution:

[0040] 1. The construction method of the present invention has simple steps, which can not only improve the stability and reliability of the steel trestle installation, but also automatically remove ice and snow on the steel trestle bridge deck to prevent slipping when walking on the steel trestle in winter, thereby improving safety.

[0041] 2. The heating strips are powered by the battery pack so that they can heat the top surface of the bridge deck to melt the ice and snow on the bridge deck and improve walking safety.

[0042] 3. The wind guide assembly can turn the entire wind turbine toward the windward side to achieve wind power generation and store the electrical energy in the battery pack. The upper support plate and the lower support plate improve the stability and reliability of the installation of the wind turbine dual generator set. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] The present invention will be further described below in conjunction with the accompanying drawings:

[0044] Figure 1 The present invention is a process flow chart of a construction method of a garden landscape steel trestle;

[0045] Figure 2 It is a structural schematic diagram of the steel trestle in the present invention;

[0046] Figure 3 It is a schematic diagram of the connection between the clamping mechanism and the support in the present invention;

[0047] Figure 4 for Figure 3 Structural diagram of the middle A direction;

[0048] Figure 5 It is a schematic diagram of the structure of the protective plate body in the present invention;

[0049] Figure 6 for Figure 5 Schematic diagram of the structure in the B direction;

[0050] Figure 7 It is a structural schematic diagram of the bridge deck body in the present invention;

[0051] Figure 8 for Figure 7 Schematic diagram of the structure in the C direction;

[0052] Fig. 9 It is a structural schematic diagram of the wind power generation mechanism in the present invention.

[0053] In the figure: 1-pillar; 2-clamping mechanism; 3-protection plate body; 4-crossbeam; 5-bridge deck; 6-wind power generation mechanism; 7-first positioning block; 8-first connecting plate; 9-second connecting plate; 10-first mounting hole; 11-third connecting plate; 12-first T-shaped bar; 13-second T-shaped bar; 14-second positioning block; 15-first inclined surface; 16-second inclined surface; 17-photovoltaic panel; 18-first T-shaped groove; 19-second positioning hole; 20-second T-shaped slot; 21-light bar; 22-second mounting hole; 23-bridge panel body; 24-heating bar; 25-support block; 26-first positioning hole; 27-battery pack; 28-buckle slot; 29-buckle block; 30-cantilever beam; 31-rotating shaft; 32-upper support plate; 33-lower support plate; 34-connecting rod; 35-wind dual generator set; 36-wind deflector; 37-connecting frame; 38-mounting column; 39-drainage trough. DETAILED DESCRIPTION

[0054] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0055] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only embodiments of a part of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0056] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions.

[0057] like Figures 1 to 9 As shown, a construction method of a garden landscape steel trestle of the present invention comprises the following steps:

[0058] S1. Pillar construction

[0059] a. First, determine the construction location of the steel trestle in the garden according to the design requirements, and determine the installation location of the pillars 1 along the construction location. The pillars 1 are grouped in pairs and marked;

[0060] b. Then, the pillars 1 of appropriate size are processed, and the pillars 1 are installed one by one along the installation position, ensuring that the two pillars 1 in the same group are arranged parallel to each other and the top heights of the two pillars 1 in the same group are consistent, until the pillars 1 in the entire construction position are installed;

[0061] c. Then, the bottom of each pillar 1 is reinforced;

[0062] S2. Installation of the card connection mechanism

[0063] a. First, the size of the clamping mechanism 2 is determined according to the size of the top surface of the pillar 1, and the required first connecting plate 8, second connecting plate 9 and third connecting plate 11 are formed by integral processing. The first connecting plate 8 is provided with a first mounting hole 10, and first T-shaped bars 12 are symmetrically installed on both sides of the third connecting plate 11, and a second T-shaped bar 13 is symmetrically installed on one side of the first connecting plate 8 close to the third connecting plate 11;

[0064] The second connecting plate 9 and the third connecting plate 11 are vertically connected to the first connecting plate 8 and are located on both sides of the first connecting plate 8, which can not only improve the overall stability and reliability of the clamping mechanism 2, but also improve the connection stability between the protective plate body 3, the bridge deck 5 and the pillar 1.

[0065] The first connecting plate 8 and the third connecting plate 11 are of equal height, and the second connecting plate 9 is lower than the first connecting plate 8 and the third connecting plate 11 , which facilitates the installation and construction of the bridge deck 5 and the protection plate body 3 .

[0066] The length of the first T-shaped bar 12 is greater than that of the second T-shaped bar 13 , meeting the installation requirements of the protection plate body 3 .

[0067] b. Then, the second positioning blocks 14 are symmetrically installed along both sides of the third connecting plate 11;

[0068] c. Then, the processed clamping mechanism 2 is fixedly installed on the top surface of each pillar 1, and the second connecting plates 9 of the clamping mechanism 2 on the same group of two pillars 1 are facing inwards;

[0069] d. Finally, a first positioning block 7 is installed on the top surface of each support 1 between the first connecting plate 8 and the second connecting plate 9;

[0070] S3. Bridge deck processing and installation

[0071] a. First, the size of the bridge deck 5 is determined according to the distance between each group of two pillars 1 and the distance between two adjacent groups of pillars 1, and the corresponding bridge deck body 23 is processed. Support blocks 25 are installed at the bottom corners of the bridge deck body 23, and a first positioning hole 26 matching the first positioning block 7 is opened on the bottom surface of each support block 25;

[0072] b. Then install a heating mechanism on the bridge deck body 23; the heating mechanism includes heating strips 24 and battery packs 27. The heating strips 24 are laid on the top surface of the bridge deck body 23 at equal intervals and are arranged along the length direction of the bridge deck body 23. The battery pack 27 is installed on the bottom surface of the bridge deck body 23. The battery pack 27 is electrically connected to the heating strips 24. The heating strips 24 are powered by the battery pack 27, so that the heating strips 24 can heat the top surface of the bridge deck body 23 to melt ice and snow on the bridge deck body 23 and improve safety when walking.

[0073] c. Then, the processed bridge deck body 23 is installed between two adjacent groups of pillars 1, and the support block 25 is inserted between the first connecting plate 8 and the second connecting plate 9 of each clamping mechanism 2, until the first positioning block 7 on the top surface of the pillar 1 is completely inserted into the first positioning hole 26 on the support block 25, and the bridge deck body 23 and the pillar 1 are welded;

[0074] A buckle groove 28 is provided on the second connecting plate 9, and buckle blocks 29 are provided at both ends of the cross beam 4. The buckle blocks 29 are inserted into the buckle groove 28 to achieve connection between the cross beam 4 and the clamping mechanism 2, thereby improving the connection stability and reliability between the cross beam 4 and the clamping mechanism 2.

[0075] d. Finally, the size of the cross beam 4 is determined according to the spacing between the second connecting plates 9 on the same group of two pillars 1, the corresponding cross beam 4 is processed, the cross beam 4 is connected to the clamping mechanism 2 on both sides, and the bridge deck body 23 and the cross beam 4 are welded;

[0076] S4. Wind power generation mechanism installation

[0077] a. First, determine the size of the suspension beam 30 according to the distance between two adjacent beams 4, and process the corresponding suspension beam 30;

[0078] b. Then, a suitable wind power generation mechanism 6 is manufactured according to the distance between the bridge deck 5 and the bottom surface, and the wind power generation mechanism 6 is installed below the suspension beam 30, and the wind power generation mechanism 6 is electrically connected to the battery pack 27;

[0079] The wind power generation mechanism 6 includes an upper support plate 32 and a lower support plate 33 which are distributed in parallel up and down, a wind dual generator set 35 installed between the upper support plate 32 and the lower support plate 33, and a wind guide component fixed to the bottom of the lower support plate 33. The upper support plate 32 is rotatably connected to the suspension beam 30 through a rotating shaft 31, and the lower support plate 33 is fixedly connected to the upper support plate 32 through a connecting rod 34. The wind dual generator set 35 is connected to the upper support plate 32 and the lower support plate 33 through a mounting column 38, and blades are provided on the wind dual generator set 35. The wind guide component can turn the entire wind power generation mechanism 6 toward the windward side to realize wind power generation and store electric energy in the battery pack 27. The upper support plate 32 and the lower support plate 33 improve the stability and reliability of the installation of the wind dual generator set 35.

[0080] The wind guide assembly includes two wind deflectors 36 arranged parallel to each other, a connecting frame 37 and a fixing column. The two wind deflectors 36 are fixed to both sides of the connecting frame 37, and the connecting frame 37 is connected to the lower support plate 33 via the fixing column.

[0081] S5. Installation of protective plate

[0082] a. First, the size of the protection plate body 3 is determined according to the distance between two adjacent groups of pillars 1, and the corresponding protection plate body 3 is processed according to the design requirements, so that the first inclined surface 15 and the second inclined surface 16 are formed on the side of the protection plate body 3 away from the bridge deck 5;

[0083] A photovoltaic panel 17 is provided on the first inclined surface 15, and a light bar 21 is provided on the inner side of the protective plate body 3. The photovoltaic panel 17 and the light bar 21 are both electrically connected to the battery pack 27. The photovoltaic panel 17 is used for solar power generation and stores electrical energy in the battery pack 27. The battery pack 27 supplies power to the light bar 21 for night lighting.

[0084] b. Then, a first T-shaped slot 18 and a second T-shaped slot 20 are respectively opened along the two end surfaces of the protection plate body 3 and the side close to the bridge deck 5. The length of the first T-shaped slot 18 is greater than the length of the second T-shaped slot 20. Second positioning holes 19 are opened along the two end surfaces of the protection plate body 3. A second mounting hole 22 is opened on the side of the protection plate body 3 close to the second T-shaped slot 20.

[0085] c. Then vertically insert the processed protection plate body 3 between two adjacent groups of pillars 1, so that the first T-slots 18 on the two end surfaces of the protection plate body 3 are inserted along the first T-slot 12 on the clamping mechanism 2, and the second T-slots 20 are inserted along the second T-slots 20 until the second positioning block 14 is inserted into the second positioning hole 19; the first positioning block 7 and the second positioning block 14 are both elastic parts.

[0086] d. Finally, screws are passed through the first mounting hole 10 and the second mounting hole 22 to form a drainage groove 39 between the protective plate body 3 and the bridge deck 5.

[0087] The construction method has simple steps, and can not only improve the stability and reliability of the steel trestle installation, but also automatically remove ice and snow on the steel trestle bridge deck 5, thereby preventing slipping when walking on the steel trestle in winter and improving safety.

[0088] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to achieve basically the same technical effects are all included in the protection scope of the present invention.

Claims

1. A construction method for a garden landscape steel trestle, characterized in that The steps include: S1. Pillar construction a. First, determine the construction location of the steel trestle in the garden according to the design requirements, and determine the installation location of the pillars along the construction location. The pillars are grouped in pairs and marked; b. Then, the pillars of appropriate size are processed and installed in sequence along the installation position, ensuring that the two pillars in the same group are arranged parallel to each other and the top heights of the two pillars in the same group are consistent, until the pillars in the entire construction position are installed; c. Then reinforce the bottom of each pillar; S2. Installation of the card connection mechanism a. First, the size of the clamping mechanism is determined according to the size of the top surface of the pillar, and the required first connecting plate, second connecting plate and third connecting plate are formed by integral processing. The first connecting plate is provided with a first mounting hole, and first T-shaped bars are symmetrically installed on both sides of the third connecting plate, and a second T-shaped bar is symmetrically installed on one side of the first connecting plate close to the third connecting plate; b. Then install the second positioning blocks symmetrically along both sides of the third connecting plate; c. Then, the processed clamping mechanism is fixedly installed on the top surface of each pillar, and the second connecting plates of the clamping mechanism on the two pillars of the same group are both facing inwards; d. Finally, a first positioning block is installed on the top surface of each pillar between the first connecting plate and the second connecting plate; S3. Bridge deck processing and installation a. First, the size of the bridge deck is determined according to the distance between each group of two pillars and the distance between two adjacent groups of pillars, and the corresponding bridge deck body is processed. Support blocks are installed at the corners along the bottom surface of the bridge deck body, and a first positioning hole matching the first positioning block is opened on the bottom surface of each support block; b. Then install a heating mechanism on the bridge deck body; c. Then, the processed bridge deck body is installed between two adjacent groups of pillars, and the support block is inserted between the first connecting plate and the second connecting plate of each clamping mechanism until the first positioning block on the top surface of the pillar is completely inserted into the first positioning hole on the support block, and the bridge deck body and the pillar are welded; d. Finally, the size of the cross beam is determined according to the spacing between the second connecting plates on the same group of two pillars, the corresponding cross beam is processed, the cross beam is connected to the clamping mechanisms on both sides, and the bridge deck body and the cross beam are welded; S4. Wind power generation mechanism installation a. First, determine the size of the cantilever beam according to the distance between two adjacent beams, and process the corresponding cantilever beam; b. Then, a suitable wind power generation mechanism is manufactured according to the distance between the bridge deck and the bottom surface, and the wind power generation mechanism is installed under the suspension beam, and the wind power generation mechanism is electrically connected to the battery pack; S5. Installation of protective plate a. First, the size of the protective plate is determined according to the distance between two adjacent groups of pillars, and the corresponding protective plate is processed according to the design requirements, so that the side of the protective plate away from the bridge deck is formed with a first inclined surface and a second inclined surface; b. Then, a first T-shaped groove and a second T-shaped groove are respectively opened along the two end surfaces of the protective plate body and the side close to the bridge deck, wherein the length of the first T-shaped groove is greater than the length of the second T-shaped groove, and second positioning holes are opened along the two end surfaces of the protective plate body, and a second mounting hole is opened on the side of the protective plate body close to the second T-shaped groove; c. Then vertically insert the processed protection plate body between two adjacent groups of pillars, so that the first T-shaped slots on both end surfaces of the protection plate body are inserted along the first T-shaped strip on the clamping mechanism, and the second T-shaped slots are inserted along the second T-shaped slots, until the second positioning block is inserted into the second positioning hole; d. Finally, screws are passed through the first mounting hole and the second mounting hole to achieve a fixed connection between the protective plate body and the clamping mechanism, so that a drainage groove is formed between the protective plate body and the bridge deck.

2. The construction method of a garden landscape steel trestle according to claim 1 is characterized in that: In step S2 process a, the second connecting plate and the third connecting plate are vertically connected to the first connecting plate and are located on both sides of the first connecting plate.

3. The construction method of a garden landscape steel trestle according to claim 2 is characterized in that: The first connecting plate and the third connecting plate have the same height, and the second connecting plate has a lower height than the first connecting plate and the third connecting plate.

4. The construction method of a garden landscape steel trestle according to claim 1 is characterized in that: In step S2 process a, the length of the first T-shaped bar is greater than the length of the second T-shaped bar.

5. The construction method of a garden landscape steel trestle according to claim 1 is characterized by: The heating mechanism in step S3 process b includes heating strips and a battery pack. The heating strips are laid on the top surface of the bridge deck body at equal intervals and arranged along the length direction of the bridge deck body. The battery pack is installed on the bottom surface of the bridge deck body, and the battery pack is electrically connected to the heating strips.

6. The construction method of a garden landscape steel trestle according to claim 1 is characterized by: The second connecting plate is provided with a buckle groove, and buckle blocks are provided at both ends of the cross beam. The buckle blocks are inserted into the buckle groove to realize the connection between the cross beam and the clamping mechanism.

7. The construction method of a garden landscape steel trestle according to claim 1 is characterized by: The wind power generation mechanism in step S4 includes an upper support plate and a lower support plate distributed in parallel up and down, a wind dual generator set installed between the upper support plate and the lower support plate, and a wind guide assembly fixed to the bottom of the lower support plate, the upper support plate is rotatably connected to the suspension beam through a rotating shaft, the lower support plate is fixedly connected to the upper support plate through a connecting rod, the wind dual generator set is connected to the upper support plate and the lower support plate through a mounting column, and the wind dual generator set is provided with blades.

8. The construction method of a garden landscape steel trestle according to claim 7 is characterized by: The wind guide assembly includes two wind direction plates arranged parallel to each other, a connecting frame and a fixing column. The two wind direction plates are fixed on both sides of the connecting frame, and the connecting frame is connected to the lower support plate through the fixing column.

9. The construction method of a garden landscape steel trestle according to claim 1 is characterized by: The first positioning block and the second positioning block are both elastic members.

10. The construction method of a garden landscape steel trestle according to claim 5, characterized in that: A photovoltaic panel is disposed on the first inclined surface, a light bar is disposed on the inner side surface of the protective plate body, and both the photovoltaic panel and the light bar are electrically connected to the battery pack.