Inclined drill hole water pressure test device with drill hole cleaning function and use method of inclined drill hole water pressure test device
By designing the drill bit in the drilling water pressure test device to rotate by friction and combine it with high-pressure water flow to clear the blockage, the problem of blockage in long drilling holes is solved, the test efficiency and capsule life are improved, and the cost is reduced.
Patent Information
- Application Number
- CN202411154436.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-12
AI Technical Summary
The existing double-end water blocker cannot be cleaned up in the long-drilling water pressure test, resulting in low test efficiency, high cost, and easy damage to the capsule, which cannot effectively solve the problem of drilling blockage.
A tilted drilling water pressure test device was designed to achieve the breaking and clearing function by using drill bit rotation during the drill rod without rotation, combined with high-pressure water flow to clear the blocking, avoiding the technical inertia that the drill bit needs to be driven by the drill rod, and through The walking unit converts friction force into drill bit rotation force to achieve drill hole cleaning.
It improves the efficiency of pressurized water test, extends the service life of the capsule, reduces the test cost, solves the problem of difficulty in cleaning drilling blockage, and achieves efficient clearing of drilling holes.
Smart Images

Figure CN118933556A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of borehole water pressure detection, and in particular to a water pressure test technology capable of coping with long borehole plugging. Background Art
[0002] The water pressure test is a method used to evaluate the permeability and pressure conditions of rock formations. The water pressure test injects high-pressure water into the borehole to observe the penetration and diffusion of water, thereby understanding the permeability, stress state, and crack distribution of the coal seam or surrounding rock. This is of great significance to the safe production of coal mines and resource mining planning.
[0003] The following reasons may cause the borehole to become clogged: 1. Rock cuttings deposition: The rock cuttings generated by the drill bit during the drilling process may be deposited in the borehole and become a cause of blockage.
[0004] 2. Mud intrusion: If mud is used to lubricate the drill bit and carry rock cuttings during drilling, solid particles in the mud may settle.
[0005] 3. Improper sealing. The borehole needs to be sealed before the water pressure test. Improper sealing may cause the borehole to be blocked.
[0006] 4. Cracks. Natural cracks or pores in the formation may be blocked by sediments brought in by pressure changes or water flow.
[0007] 5. Chemical reaction. The water injected during the water pressure test may react chemically with the minerals in the formation, generating precipitates and causing blockage. For example, calcium carbonate in the water reacts with sulfate in the formation to generate calcium sulfate and form precipitates.
[0008] 6. Microorganisms. Under suitable conditions, microorganisms in the formation may multiply in large numbers, producing biofilms or other organic matter that can clog the borehole.
[0009] 7. Swelling minerals: Some minerals, such as bentonite, swell when exposed to water, causing the borehole to become clogged.
[0010] 8. High-pressure water flushing: During the water pressure process, fine particles in the formation may be flushed away. These particles will settle in areas where the water flow slows down or stagnates, which may cause blockage.
[0011] When blockage occurs, the water flow in the borehole is blocked, water may not be able to enter the surrounding rock layer smoothly, and the double-ended water plug may not be smoothly pushed to the predetermined test depth by the drilling rig. Forcibly pushing the test equipment deep into the borehole when blockage occurs is also very likely to cause damage to the test equipment, especially the breakage of the sealing capsule. These will affect the normal progress of the water pressure test, and thus clearing operations are required.
[0012] The application scenario targeted by the present invention is mainly a long borehole water pressure test.
[0013] The length of a long borehole can reach 1,000 meters. In practice, long boreholes of 100 to 200 meters are more common.
[0014] When conducting a water pressure test on a long borehole, the following steps are usually followed: 1. Drilling preparation. Select the location and depth of the drilling water pressure test, and clean the borehole to prevent debris in the borehole from affecting the test results.
[0015] 2. Seal the borehole. Use cement slurry, bentonite or other sealing materials to seal the borehole to prevent water from seeping or even leaking through the sealing section.
[0016] 3. Install water pressure test equipment.
[0017] 4. Carry out a water pressure test, gradually inject water into the borehole, or gradually increase the pressure (increase the injection pressure), or increase the injection pressure in steps, and observe the water penetration.
[0018] Record the test data (water injection pressure, flow rate, time, etc.) for later data analysis. Subsequent data analysis can be used to evaluate the surrounding rock permeability, calculate the surrounding rock permeability coefficient and pore pressure, understand the distribution and characteristics of cracks in the surrounding rock, etc., to provide support for coal mine safety production, resource mining planning, drilling utilization planning, etc.
[0019] For example, for coal mine safety production, water pressure test has the following significance: The coal mining process will destroy the equilibrium state of the original rock stress field. The stress redistribution causes the overburden to move, deform and destroy, forming a roof damage zone. Under the action of the supporting pressure, the tensile stress and shear stress cause a series of fractures in the bottom plate that are perpendicular and parallel to the layer, forming a bottom plate damage zone, which makes the working face threatened by various types of water disasters such as surface water, old empty water, bottom plate pressure water, and roof water. In order to ensure the safe mining of coal seams, it is of great significance to study a borehole water injection test instrument to study the development law of water-conducting fracture zones and bottom plate damage zones.
[0020] The double-end water plug is the main equipment for underground borehole segmented water pressure observation, including an upper end plug (upper plugging capsule or rear plugging capsule), a lower end plug (lower plugging capsule or front plugging capsule), connecting pipes, water injection pipes, pressure sensors and flow meters and other equipment. The drilling section between the upper end plug and the lower end plug forms a water pressure test section, or a target test section.
[0021] At present, double-ended water plugs and other drilling water pressure test equipment have the following defects: 1. It does not have the function of clearing the borehole blockage. If the borehole is blocked during the water pressure test, the test equipment needs to be pulled out to clean the hole. Only after the hole is cleaned can the test equipment be put back into the hole for testing. The length of long boreholes is basically more than 100 meters, and may be several hundred meters or even 1,000 meters. Pulling the test equipment out of the borehole and putting it back to the predetermined position in the hole is a time-consuming, energy-consuming and labor-intensive process, which greatly reduces the test efficiency and increases the test cost.
[0022] Second, the existing double-end water plugging device includes a plugging capsule, and sliding friction occurs between the capsule and the wall of the drilled hole. In addition, the weight of the capsule is usually supported by the front end of the capsule, and there is a large pressure between the front end of the capsule and the wall of the drilled hole.
[0023] During the advancement process, there is sliding friction between the capsule and the borehole wall. When the plugging capsule passes through the damage zone, it may be scratched by the broken borehole wall and the gravel in the borehole, resulting in plugging failure. When passing through the non-destructive zone, due to the sliding friction between the capsule and the wall of the borehole, the capsule will also be obviously worn in the process of advancing a long distance in the long borehole, shortening the service life of the capsule, which is not conducive to the long-term and repeated participation of the capsule in the water pressure test.
[0024] 3. The existing double-ended water plugging device takes too long to wait for pressure relief when testing the bottom plate damage zone of a long borehole. Sometimes, there are abnormal water level pressure differences in the hole or irregularities in the hole wall of the formation, which makes it difficult for the embolic capsule to completely relieve pressure and return to its original state, making it difficult to smoothly remove the tester embolism. Summary of the invention
[0025] The purpose of the present invention is to provide an inclined drilling water pressure testing device with a drilling cleaning function, by adding a drill bit to the water pressure testing equipment, and by designing a structure that can drive the drill bit to rotate without rotating the drill rod, the crushing and clearing function is achieved by rotating the drill bit during the non-rotational advancement of the drill rod.
[0026] To achieve the above-mentioned purpose, the inclined borehole water pressure test device with borehole cleaning function of the present invention comprises a water pressure mechanism, a pressure relief mechanism, a drilling rig and a double-end embolic water plug, the double-end embolic water plug having an inner tube; the drilling rig is arranged at the orifice of the inclined borehole, the drilling rig is connected with a drill rod, the drill rod extends into the borehole and is connected with the inner tube, the drilling rig is used to press the drill rod into the depth of the borehole or lift the drill rod out of the borehole; the double-end embolic water plug is installed on the drill rod through the inner tube; It also includes an obstacle cleaning mechanism; with the direction of drilling deep into the borehole as the forward direction and the radial direction of the borehole as the radial direction, the obstacle cleaning mechanism is located in front of the double-ended embolic water plugging device; The obstacle clearing mechanism includes a main shaft rotatably connected to the front end of the inner tube, and a drill bit is connected forwardly to the main shaft; The middle part of the main shaft is provided with a worm structure, and a traveling unit is matched with the worm structure. The traveling unit is used to convert the friction between the main shaft and the borehole wall into a rotational force for driving the drill bit to rotate when the main shaft is extended into the depth of the borehole.
[0027] The walking units are symmetrically arranged on both sides of the worm structure in the radial direction, namely the first walking unit and the second walking unit; the main shafts on the front and rear sides of the walking units are symmetrically provided with limiting structures; The limiting structure includes a limiting nut, the main shaft has an external thread, and the limiting nut is threadedly connected to the main shaft; with the direction pointing to the worm structure as the inward direction, a spring is sleeved on the main shaft inside the limiting nut, and the inner end of the spring is connected to a moving plate, which is sleeved on the main shaft and slidably cooperates with the main shaft; the moving plate is hinged inwardly with a first hinge rod and a second hinge rod, the first hinge rod is connected to the wheel frame of the first walking unit, and the second hinge rod is connected to the wheel frame of the second walking unit; The wheel frame of the first walking unit and the wheel frame of the second walking unit are collectively referred to as a unit wheel frame; two sets of unit wheel frames are symmetrically arranged on the left and right sides, a front outer sprocket, a rear outer sprocket and a middle inner sprocket are installed between the two sets of symmetrical unit wheel frames on the left and right sides, and a crawler chain is wound between the front outer sprocket, the rear outer sprocket and the middle inner sprocket; Two sets of front outer sprockets, rear outer sprockets and middle inner sprockets are symmetrically arranged on the left and right. A worm wheel is arranged between the two sets of front outer sprockets, rear outer sprockets and middle inner sprockets. The worm wheel is installed on the shaft of the middle inner sprocket and meshes with the worm structure on the main shaft for transmission.
[0028] The obstacle clearing mechanism also includes a water spraying mechanism; the water spraying mechanism includes a water tank fixedly connected to the front end of the drill pipe, the front end of the water tank is rotatably matched with the main shaft through a bearing, and the rear end of the main shaft is connected to the front end of the inner tube through a bearing and the water tank; the main shaft is a hollow shaft; the water tank is connected to a high-pressure flushing hose, which extends backward and is connected to the water pressure mechanism; A water spray pipe is connected to the main shaft in front, and the water spray pipe extends to the drill bit. A radial water spray port and a forward water spray port are arranged at the front end of the water spray pipe.
[0029] The water pressure mechanism comprises a high-pressure water pump, the water inlet of the high-pressure water pump is connected to a water source, the water outlet of the high-pressure water pump is connected to a water pressure main pipe, the water pressure main pipe is connected to a plugging branch pipe and a test branch pipe; a water pressure main stop valve is provided on the water pressure main pipe; A plugging stop valve is provided on the plugging branch pipe, and the front end of the plugging branch pipe is connected to the plugging high-pressure hose; The test branch pipe is provided with a rear stop valve, a first explosion-proof pressure gauge, a first pressure relief valve, a front stop valve, a second explosion-proof pressure gauge, a flow meter and a second pressure relief valve from back to front; the front end of the test branch pipe is connected with a test high-pressure hose, the drill rod is a hollow structure, the test high-pressure hose is connected to the drill rod forward, and the drill rod is connected to the inner pipe; The double-ended plug water stopper includes a rear water stop plug and a front water stop plug, the front water stop plug includes a front capsule, and the rear water stop plug includes a rear capsule; The inner tube between the front capsule and the rear capsule is a flower tube structure, which is used to inject water into the water pressure test section of the borehole; Punch the high pressure hose through the front and rear capsules.
[0030] The walking unit, the limiting structure and the worm structure constitute a first walking mechanism, and the drill pipe behind the double-ended embolic water plugging device is provided with a second walking mechanism, and the structure of the second walking mechanism is the same as that of the first walking mechanism.
[0031] The pressure relief mechanism includes a water reservoir, the water reservoir is connected to a return pipe, the front end of the return pipe is connected to a high-pressure hose for blocking and pressure relief, the high-pressure hose for blocking and pressure relief is connected to a pressure water pipe at the rear, a pressure water stop valve is provided on the pressure water pipe, the pressure water pipe behind the pressure water stop valve is connected to a hand pressure pump, and the water inlet end of the hand pressure pump is connected to the water reservoir; The return pipe is provided with a return stop valve and a water pump for pumping water into the water storage tank; a high-pressure hose for plugging and pressure relief extends forward into the borehole and penetrates into the front capsule and the rear capsule, and the high-pressure hose for plugging and pressure relief is connected with the front capsule and the rear capsule; The first pressure relief valve and the second pressure relief valve are respectively connected to the water reservoir through pipelines.
[0032] The present invention also discloses a method for using the inclined borehole water pressure test device with a borehole cleaning function, which is performed according to the following steps: The first step is the preparation step; connect the inclined borehole water pressure test device with the borehole cleaning function at the borehole mouth, and extend the drill bit, obstacle cleaning mechanism, double-end embolic water plug and drill rod into the borehole; in the initial state, all valves are in the closed state; The second step is the pushing step; starting the drilling rig, pushing the drill bit, obstacle clearing mechanism, double-ended embolic water plug and drill pipe to the depth of the borehole, the goal of pushing is to push the double-ended embolic water plug to the predetermined water pressure test position; During advancement, the crawler chain of the walking mechanism located at the front rotates under the action of the friction between it and the wall of the drill hole, drives the worm wheel to rotate through the shaft of the inner sprocket, drives the main shaft to rotate through the transmission relationship between the worm wheel and the worm structure, and finally drives the drill bit to rotate; During the advancement process, if the borehole is blocked and the advancement cannot be continued smoothly, clear the blockage; The clearing operation is: (1) Lift the drill; control the drilling rig to drive the drill bit, obstacle clearing mechanism, double-ended plugging water plug and drill pipe to retreat 1-5 meters; (2) Move forward and spray water; Moving forward means: controlling the drilling rig to drive the drill bit, obstacle clearing mechanism, double-ended plugging water plug and drill pipe forward; Until it encounters resistance and cannot move forward or the double-ended plug water plug has been pushed to the predetermined water pressure test position; When moving forward, the crawler chain drives the drill bit to rotate, and when the rotating drill bit encounters a blockage, it breaks the blockage; Water spraying is: open the high-pressure water pump, the main water shut-off valve and the plugging shut-off valve, and the high-pressure water enters the water spray pipe after passing through the main water pipe, the plugging branch pipe, the plugging high-pressure hose, the water tank and the main shaft, and finally sprays out from the radial water spray port and the forward water spray port at the drill bit to wash away the broken objects of the drill bit; The blockage clearing effect is achieved through the rotary crushing effect of the drill bit and the water spray flushing effect; The stopping condition of the second step is to meet condition A or condition B; Condition A is: you cannot move forward when you encounter resistance; Condition B is: the double-ended plug water stopper has been pushed to the next predetermined water pressure test position; When condition A is met, repeat steps (1) and (2) until condition B is met; When condition B is satisfied, the switching action from the second step to the third step is executed, thereby ending the second step and executing the third step; The switching action is: close the plugging stop valve and open the water pressure stop valve; The third step is the hole sealing step; open the water pressure stop valve, pressurize with a hand pressure pump, inject water and pressurize the front capsule and the rear capsule through the water pressure pipe and the high-pressure hose for blocking and pressure relief, so that the front capsule and the rear capsule expand and then seal the hole, and the drilling section between the front capsule and the rear capsule forms a closed test section; at this time, close the water pressure stop valve, stop pressurizing with the hand pressure pump, and proceed to the fourth step; The fourth step is a water pressure test step: the predetermined water injection pressure of the water pressure test is P MPa, the opening pressure of the first pressure relief valve is 1.05-1.1P MPa, the water pressure is controlled at 1.05-1.1P MPa through the first pressure relief valve, the high-pressure water pump is turned on, and when the water pressure is higher than the opening pressure of the first pressure relief valve, the water flows through the first pressure relief valve to the water reservoir; the water pressure is read through the first explosion-proof pressure gauge; Open the front stop valve and control the water pressure at P MPa through the second pressure relief valve; read the water pressure through the second explosion-proof pressure gauge, and the high-pressure water generated by the high-pressure water pump enters the flower tube structure of the inner tube through the pressure water main pipe, test branch pipe, test high-pressure hose, drill rod and inner tube, and injects water and pressurizes the test section of the borehole through the flower tube structure; before the test section is filled with water, the pressure of the first pressure relief valve and the second pressure relief valve are both lower than P MPa; When the pressures of the first explosion-proof pressure and the second explosion-proof pressure reach P MPa at the same time, read and record the test flow rate through the flow meter, and record the test time at the same time; After the water pressure test reaches the preset time, close the high-pressure water pump, the main water pressure stop valve, the rear stop valve and the front stop valve; after the high-pressure water pump is closed, the water pressure in the pipeline is lower than P MPa, and the first pressure relief valve and the second pressure relief valve are automatically closed; The fifth step is the pressure relief step; Open the water pump and the water return stop valve to pump the high-pressure water in the test section into the water reservoir to relieve the system pressure. After the pressure is relieved, the double-ended plug water plug can move forward or backward under the drive of the drilling rig. If there is a predetermined water pressure test section at another location in the same borehole, the drilling rig is started after the pressure is released, and the double-ended plug water plug is sent to the next predetermined water pressure test location, and the fourth step, i.e., the water pressure test step, is returned to be executed; If the water pressure test has been completed at all the scheduled water pressure test positions at this time, the water pump and the return water stop valve are turned off, and the drilling rig is controlled to pull the drill bit, obstacle clearing mechanism, double-ended embolic water plug and drill rod out of the borehole to complete the entire water pressure test process.
[0033] The present invention has the following advantages: The present invention breaks the technical inertia that the rotation of the drill bit must be driven by the drill rod in the past, and designs a technical solution in which the drill bit is driven by the friction force during the propulsion process. It is not necessary to lift all the water pressure test equipment out of the borehole to carry out breaking and clearing, thereby greatly improving the efficiency of the water pressure test. It is of particular significance for the water pressure test of long boreholes over 100 meters.
[0034] During the water pressure test, the task of the drilling rig is to press the drill pipe and the double-ended plug water plug and other test devices into the borehole. The drill pipe cannot be driven to rotate, otherwise the double-ended plug water plug and other test devices connected to the drill pipe will be damaged. Therefore, when the borehole is blocked, the existing technology cannot use the drilling rig to drive the drill bit to rotate.
[0035] One of the design ideas and technical effects of the present invention is that, through the walking unit, when the drilling rig presses the drill rod into the deep of the borehole, the friction between the walking unit and the borehole wall is converted into a rotational force that drives the drill bit to rotate, thereby breaking the objects blocking the borehole through the rotation of the drill bit, solving the problem that the drill bit cannot be driven to rotate in the water pressure test, and breaking and clearing the blockage in the borehole through the rotation of the drill bit.
[0036] During operation, the spring produces inward pressure on the movable plate, forcing the first hinged rod and the second hinged rod to open, so that the track chain of the walking unit is pressed tightly against the wall of the drill hole; in this way, when the drilling rig presses the drill rod to the depth of the drill hole, the track chain will drive the rotation of each sprocket due to the friction between it and the wall of the drill hole, and drive the worm wheel to rotate through the shaft of the inner sprocket, and drive the main shaft to rotate through the transmission relationship between the worm wheel and the worm structure, and finally drive the drill bit to rotate to produce the technical effect of crushing and clearing blockages.
[0037] The second design concept and technical effect of the present invention is to use high-pressure water flow to clear the blockage by flushing water to the blockage. Combined with the crushing effect of the drill bit, the drilling blockage clearing task can be completed more thoroughly.
[0038] The water jet mechanism can generate radial and forward water jets at the drill bit under the water supply of the water pressure mechanism. The particles generated by the drill bit rotating and crushing the obstructing objects are carried away by the water flow and rushed to the depth of the borehole. Of course, it does not exclude the possibility that the water flow returns upward to the hole mouth for discharge. The particles are carried away by the water flow, which completely completes the hole cleaning function, avoiding the possibility that the particles generated by the crushing are not driven by the water flow and re-form blockage.
[0039] Two sets of traveling mechanisms support the front and rear ends of the double-ended embolic water plugger, and the weight of the double-ended embolic water plugger is basically borne by the two sets of traveling mechanisms, so that the capsule of the double-ended embolic water plugger either does not contact the wall of the borehole, or contacts but with very little force, thereby greatly reducing the wear of the capsule when pushing forward or pulling out backward in a long borehole, extending the service life of the capsule and reducing the test cost.
[0040] The water pressure mechanism and pressure relief mechanism have simple structures and are easy to install and use. The water pump actively pumps water to relieve pressure, which greatly shortens the pressure relief time of the double-ended embolic water plug, avoids the problem of too long pressure relief time for the front and rear capsules, and the failure to pull out the double-ended embolic water plug and other test equipment from the borehole in time, and the test personnel can only wait for natural pressure relief, further greatly improving the test efficiency.
[0041] In the past, when advancing, resistance was encountered and the drill could not continue to advance. All the test equipment under the hole could only be lifted out of the hole mouth for hole cleaning. However, the length of the hole is often several hundred meters long. This hole cleaning operation method is very inefficient. With the present invention, it is only necessary to retreat 1-5 meters and then advance again, and repeatedly perform steps (1) and (2) to break the blockage and flush away the broken blockage. The test efficiency is greatly improved compared with the past, and the time cost, energy consumption and labor cost of lifting the drill over a long distance are saved.
[0042] According to the method of the present invention, the double-ended embolic water plugging device is suspended in the air by being supported by the first set of walking mechanisms and the second set of walking mechanisms during the advancement process, and in most cases no longer directly contacts the hole wall (except when there are protrusions on the hole wall), the friction force is greatly reduced, the wear and tear on the capsule during the advancement process is greatly reduced, the probability of the capsule being damaged due to being hooked by foreign objects on the hole wall is also greatly reduced, and the service life of the capsule is greatly extended.
[0043] After the double-ended embolic water plug is depressurized, the front capsule and the rear capsule will no longer block the borehole, and the double-ended embolic water plug can be smoothly pulled out of the borehole. The present invention uses a water pump to actively pump water and depressurize, which greatly shortens the depressurization time of the double-ended embolic water plug, avoids the problem that the front capsule and the rear capsule have too long depressurization time, the double-ended embolic water plug and other test equipment cannot be pulled out of the borehole in time, and the test personnel can only wait for natural depressurization, further greatly improves the test efficiency, and solves the problem of inability to depressurize.
[0044] By adjusting the front and rear positions of the limit nut, the preload force of the spring can be adjusted, thereby making the opening angle of the first hinge rod and the second hinge rod more compatible with the pressing force required by the crawler chain to press the hole wall of the drill hole. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 It is a structural schematic diagram of the present invention.
[0046] Figure 2 yes Figure 1 Enlarged view of the medium-pressure water mechanism and the pressure relief mechanism.
[0047] Figure 3 yes Figure 1 An enlarged view of the double-ended embolic water shutoff device.
[0048] Figure 4 yes Figure 1 Enlarged view of the obstacle clearing mechanism in the middle.
[0049] Figure 5 yes Figure 4 Enlarged view of the walking unit.
[0050] Figure 6 It is a side view structural diagram of the walking unit. DETAILED DESCRIPTION
[0051] like Figures 1 to 6 As shown, the inclined borehole water pressure test device with borehole cleaning function of the present invention comprises a water pressure mechanism 1, a pressure relief mechanism 2, a drilling rig 3 and a double-ended embolic water plug 4, the double-ended embolic water plug 4 having an inner tube 7; the drilling rig 3 is arranged at the orifice of the inclined borehole, the drilling rig 3 is connected with a drill rod 6, the drill rod 6 extends into the borehole and is connected with the inner tube 7, the drilling rig 3 is used to press the drill rod 6 into the depth of the borehole or lift the drill rod 6 out of the borehole; the double-ended embolic water plug 4 is installed on the drill rod 6 through the inner tube 7; It also includes an obstacle cleaning mechanism 5; with the direction of drilling deep into the borehole as the forward direction and the radial direction of the borehole as the radial direction, the obstacle cleaning mechanism 5 is located in front of the double-ended embolic water plug 4; The obstacle clearing mechanism 5 comprises a main shaft 8 rotatably connected to the front end of the inner tube 7 via a bearing, and the main shaft 8 is connected forwardly to a drill bit 9; A worm structure 10 is provided in the middle of the main shaft 8, and a traveling unit 11 is matched with the worm structure 10. The traveling unit 11 is used to convert the friction between the worm structure 10 and the borehole wall into a rotational force for driving the drill bit 9 to rotate when the worm structure 10 is extended into the depth of the borehole.
[0052] When conducting a water pressure test, the task of the drilling rig 3 is to press the drill rod 6 and the test devices such as the double-ended embolic water plug 4 into the borehole, and the drilling rig 3 cannot be driven to rotate, otherwise the test devices such as the double-ended embolic water plug 4 connected to the drill rod 6 will be damaged. Therefore, when the borehole is blocked, the drilling rig 3 cannot be used to drive the drill bit 9 to rotate in the prior art.
[0053] One of the design ideas and technical effects of the present invention is that, through the walking unit 11, when the drilling rig 3 presses the drill rod 6 into the deep of the borehole, the friction force between the walking unit 11 and the borehole wall is converted into a rotational force that drives the drill bit 9 to rotate, thereby breaking the objects blocking the borehole through the rotation of the drill bit 9, solving the problem that the drill bit 9 cannot be driven to rotate in the water pressure test, and breaking and clearing the blockage in the borehole through the rotation of the drill bit 9.
[0054] The walking units 11 are symmetrically arranged on both sides of the worm structure 10 in the radial direction, and are respectively the first walking unit and the second walking unit; the main shafts 8 on the front and rear sides of the walking unit 11 are symmetrically provided with limiting structures; The limiting structure includes a limiting nut 12, and the main shaft 8 has an external thread. The limiting nut 12 is threadedly connected to the main shaft 8; with the direction pointing to the worm structure 10 as the inward direction, a spring 13 is sleeved on the main shaft 8 inside the limiting nut 12, and the inner end of the spring 13 is connected to a moving plate 14, which is sleeved on the main shaft 8 and slidably cooperates with the main shaft 8; the moving plate 14 is hinged inwardly with a first hinge rod 15 and a second hinge rod 16, the first hinge rod 15 is connected to the wheel frame of the first walking unit, and the second hinge rod 16 is connected to the wheel frame of the second walking unit; The wheel frame of the first walking unit and the wheel frame of the second walking unit are collectively referred to as a unit wheel frame 17; the unit wheel frame 17 is provided with two sets symmetrically on the left and right, and a front outer sprocket 18, a rear outer sprocket 19 and a middle inner sprocket 20 are installed between the two sets of symmetrical unit wheel frames 17, and a crawler chain 21 is wound between the front outer sprocket 18, the rear outer sprocket 19 and the middle inner sprocket 20; Two sets of front outer sprockets 18, rear outer sprockets 19 and middle inner sprockets 20 are symmetrically arranged, and a worm wheel 22 is arranged between the two sets of front outer sprockets 18, rear outer sprockets 19 and middle inner sprockets 20. The worm wheel 22 is mounted on the shaft 54 of the middle inner sprocket 20, and the worm wheel 22 is meshed with the worm structure 10 on the main shaft 8 for transmission; the main shaft 8 is connected forwardly to the drill bit 9. By adjusting the front and rear positions of the limit nut 12, the preload force of the spring 13 can be adjusted, so that the opening angle of the first hinge rod 15 and the second hinge rod 16 can be more matched with the pressing force requirement of the crawler chain 21 pressing the hole wall of the drill hole.
[0055] During operation, the spring 13 generates an inward pressure on the movable plate 14, forcing the first hinged rod 15 and the second hinged rod 16 to open, so that the crawler chain 21 of the walking unit 11 is pressed tightly against the wall of the borehole; in this way, when the drilling rig 3 presses the drill rod 6 to the depth of the borehole, the crawler chain 21 will drive the sprockets to rotate due to the friction between it and the wall of the borehole, and drive the worm wheel 22 to rotate through the shaft of the inner sprocket 20, and drive the main shaft 8 to rotate through the transmission relationship between the worm wheel 22 and the worm structure 10, and finally drive the drill bit 9 to rotate to produce the technical effect of crushing and clearing blockages.
[0056] The obstacle clearing mechanism 5 also includes a water spraying mechanism; the water spraying mechanism includes a water tank 23 fixedly connected to the front end of the drill rod 6, the front end of the water tank 23 is rotatably matched with the main shaft 8 through a bearing, and the rear end of the main shaft 8 is connected to the front end of the inner tube 7 through a bearing and the water tank 23 (the main shaft 8 can rotate freely relative to the drill rod 6 and the inner tube 7, and the main shaft 8 is not connected to the inner tube 7); the main shaft 8 is a hollow shaft (preferably made of a steel pipe); the water tank 23 is connected to a high-pressure flushing hose 24, which extends backward and is connected to the water pressure mechanism 1; The main shaft 8 is connected forwardly with a water spray pipe 25 , which extends to the drill bit 9 . The front end of the water spray pipe 25 is provided with a radial water spray port and a forward water spray port.
[0057] The second design concept and technical effect of the present invention is to use high-pressure water flow to clear the blockage by flushing water to the blocked area. Combined with the crushing effect of the drill bit 9, the drilling and clearing task can be completed more thoroughly.
[0058] The water spray mechanism can generate radial and forward water spraying flow at the drill bit 9 under the water supply of the water pressure mechanism 1. The drill bit 9 rotates to crush the blockage object and the particles generated are carried away by the water flow and rushed to the depth of the borehole. Of course, it does not exclude the possibility that the water flow returns upward to the hole mouth for discharge. The particles are carried away by the water flow, and the hole cleaning function is completely completed, avoiding the possibility that the particles generated by the crushing are not driven by the water flow and re-blocking.
[0059] The water pressure mechanism 1 includes a high-pressure water pump 26, the water inlet of the high-pressure water pump 26 is connected to a water source (such as a water supply network or a pool), the water outlet of the high-pressure water pump 26 is connected to a pressure water main pipe 27, the pressure water main pipe 27 is connected to a plugging branch pipe 28 and a test branch pipe 29; the pressure water main pipe 27 is provided with a pressure water main stop valve 30; A blocking stop valve 31 is provided on the blocking branch pipe 28, and the front end of the blocking branch pipe 28 is connected to the blocking high-pressure hose 24; The test branch pipe 29 is provided with a rear stop valve 32, a first explosion-proof pressure gauge 33, a first pressure relief valve 34, a front stop valve 35, a second explosion-proof pressure gauge 36, a flow meter 37 (high-pressure flow meter 37) and a second pressure relief valve 38 from the back to the front; the front end of the test branch pipe 29 is connected to a test high-pressure hose 39, the drill rod 6 is a hollow structure, the test high-pressure hose 39 is connected to the drill rod 6 forward, and the drill rod 6 is communicated with the inner pipe 7; The double-ended embolic water stopper 4 includes a rear water stop plug 40 and a front water stop plug 41. The front water stop plug 41 includes a front capsule 42, and the rear water stop plug 40 includes a rear capsule 43. The water stop plug and the sealing capsule are conventional technologies, and the specific structure of the water stop plug and the capsule is not shown in the figure.
[0060] The inner tube 7 between the front capsule 42 and the rear capsule 43 is a flower tube structure 44 (the flower tube structure 44 is a tube wall of the inner tube 7 with multiple radial through holes 45), which is used to inject water into the water pressure test section of the borehole; the plugging high-pressure hose 24 passes through the front capsule 42 and the rear capsule 43. The plugging branch pipe 28, the test branch pipe 29 and the high-pressure water pump 26 are all located outside the orifice of the borehole.
[0061] The walking unit 11, the limiting structure and the worm structure 10 constitute a first walking mechanism, and the drill pipe 6 behind the double-ended embolic water plugging device 4 is provided with a second walking mechanism, and the structure of the second walking mechanism is the same as that of the first walking mechanism.
[0062] Two sets of traveling mechanisms support the front and rear ends of the double-ended embolic water plugger 4, and the weight of the double-ended embolic water plugger 4 is basically borne by the two sets of traveling mechanisms, so that the capsule of the double-ended embolic water plugger 4 is either not in contact with the wall of the borehole, or is in contact but with very little force, thereby greatly reducing the wear of the capsule when it is pushed forward or pulled out backward in a long borehole, extending the service life of the capsule and reducing the test cost.
[0063] The pressure relief mechanism 2 includes a water reservoir 46, the water reservoir 46 is connected to a return pipe 47, the front end of the return pipe 47 is connected to a high-pressure hose 48 for blocking pressure relief, the high-pressure hose 48 for blocking pressure relief is connected to a pressure water pipe 49 at the rear, a pressure water stop valve 50 is provided on the pressure water pipe 49, and a hand pressure pump 51 is connected to the pressure water pipe 49 behind the pressure water stop valve 50, and the water inlet end of the hand pressure pump 51 is connected to the water reservoir 46; The return water pipe 47 is provided with a return water stop valve 52 and a water pump 53 for pumping water into the water reservoir 46; a high-pressure hose 48 for plugging and pressure relief extends forward into the borehole and penetrates the front capsule 42 and the rear capsule 43, and the high-pressure hose 48 for plugging and pressure relief is connected with the front capsule 42 and the rear capsule 43; The first pressure relief valve 34 and the second pressure relief valve 38 are respectively connected to the water reservoir 46 through pipelines.
[0064] The water pressure mechanism 1 and the pressure relief mechanism 2 have simple structures and are easy to install and use.
[0065] The present invention also discloses a method for using the inclined borehole water pressure test device with a borehole cleaning function (i.e., a water pressure test method), which is performed according to the following steps: The first step is the preparation step; connect the inclined drilling water pressure test device with drilling cleaning function at the borehole mouth, and extend the drill bit 9, obstacle cleaning mechanism 5, double-ended embolic water plug 4 and drill rod 6 into the borehole; in the initial state, all valves are in the closed state; The second step is the pushing step; start the drilling rig 3, push the drill bit 9, the obstacle clearing mechanism 5, the double-ended embolic water plug 4 and the drill rod 6 to the depth of the borehole, and the goal of the pushing is to push the double-ended embolic water plug 4 to the predetermined water pressure test position; During advancement, the crawler chain 21 of the walking mechanism located at the relatively front rotates under the action of the friction between it and the wall of the drill hole, and drives the worm wheel 22 to rotate through the shaft of the inner sprocket 20, and drives the main shaft 8 to rotate through the transmission relationship between the worm wheel 22 and the worm structure 10, and finally drives the drill bit 9 to rotate; During the advancement process, if the borehole is blocked and the advancement cannot be continued smoothly, clear the blockage; The clearing operation is: (1) Lifting the drill; controlling the drilling rig 3 to drive the drill bit 9, the obstacle clearing mechanism 5, the double-ended embolic water plug 4 and the drill rod 6 to retreat 1-5 meters (including both ends); (2) Move forward and spray water; Moving forward means: controlling the drilling rig 3 to drive the drill bit 9, the obstacle clearing mechanism 5, the double-ended embolic water plug 4 and the drill rod 6 forward; Until it encounters resistance and cannot move forward or the double-ended embolic water plug 4 has been pushed to the predetermined water pressure test position; When moving forward, the crawler chain 21 drives the drill bit 9 to rotate, and when the rotating drill bit 9 encounters a blockage, it breaks the blockage; Water spraying is: open the high-pressure water pump 26, the main water shut-off valve 30 and the plugging shut-off valve 31, and the high-pressure water enters the water spray pipe 25 after passing through the main water pump, the plugging branch pipe 28, the plugging high-pressure hose 24, the water tank 23 and the main shaft 8, and finally sprays out from the radial water spray port and the forward water spray port at the drill bit 9 to wash away the broken objects of the drill bit 9 (the water flows to the deep bottom of the hole, and the possibility of backflow outside the hole mouth is not absolutely ruled out); The blockage clearing effect is achieved through the rotary crushing effect of the drill bit 9 and the water spray flushing effect; The stopping condition of the second step is to meet condition A or condition B; Condition A is: you cannot move forward when you encounter resistance; Condition B is: the double-ended embolic water plug 4 has been pushed to the next predetermined water pressure test position; When condition A is met, repeat steps (1) and (2) until condition B is met; When condition B is satisfied, the switching action from the second step to the third step is executed, thereby ending the second step and executing the third step; The switching action is: close the blocking stop valve 31 and open the water pressure stop valve 50; The third step is the hole sealing step; open the water pressure stop valve 50, pressurize by the hand pressure pump 51, inject water and pressurize the front capsule 42 and the rear capsule 43 through the water pressure pipe 49 and the high-pressure hose 48 for plugging and pressure relief, so that the front capsule 42 and the rear capsule 43 expand and then seal the hole, and the drilling section between the front capsule 42 and the rear capsule 43 forms a closed test section; at this time, close the water pressure stop valve 50, stop pressurizing by the hand pressure pump 51, and proceed to the fourth step; The fourth step is a water pressure test step: the predetermined water injection pressure of the water pressure test is P MPa (P is a positive real number), the opening pressure of the first pressure relief valve 34 is 1.05-1.1P MPa (including both end values), the water pressure is controlled at 1.05-1.1P MPa through the first pressure relief valve 34, the high-pressure water pump 26 is turned on, and when the water pressure is higher than the opening pressure of the first pressure relief valve 34, the water flows through the first pressure relief valve 34 to the water reservoir 46; the water pressure is read through the first explosion-proof pressure gauge 33; Open the front stop valve 35, and control the water pressure at P MPa through the second pressure relief valve 38 (the opening pressure of the second pressure relief valve 38 is P MPa); read the water pressure through the second explosion-proof pressure gauge 36, and the high-pressure water generated by the high-pressure water pump 26 enters the flower tube structure 44 of the inner tube 7 through the pressure water main pipe 27, the test branch pipe 29, the test high-pressure hose 39, the drill rod 6 and the inner tube 7, and injects water into the test section of the borehole through the flower tube structure 44 to increase the pressure; before the test section is filled with water, the pressures of the first pressure relief valve 34 and the second pressure relief valve 38 are both lower than P MPa; When the pressures of the first explosion-proof pressure and the second explosion-proof pressure simultaneously reach P MPa, the test flow rate is read and recorded by the flow meter 37, and the test time is recorded at the same time; After the water pressure test reaches a predetermined time, the high-pressure water pump 26, the water pressure main stop valve 30, the rear stop valve 32 and the front stop valve 35 are closed; after the high-pressure water pump 26 is closed, the water pressure in the pipeline is lower than P MPa, and the first pressure relief valve 34 and the second pressure relief valve 38 are automatically closed; The fifth step is the pressure relief step; Open the water pump 53 and the water return stop valve 52 to pump the high-pressure water in the test section into the water reservoir 46 to relieve the system pressure. After the pressure is relieved, the double-ended embolic water plug can move forward or backward under the drive of the drilling rig. After the pressure relief step, if there is a predetermined water pressure test section at another location in the same borehole, the drilling rig is started after the pressure relief, the double-ended plug water plug is sent to the next predetermined water pressure test location, and the fourth step, i.e., the water pressure test step, is returned to be executed; If the water pressure test has been completed at all the predetermined water pressure test positions at this time, the water pump 53 and the return water stop valve 52 are closed, and the drilling rig 3 is controlled to pull the drill bit 9, the obstacle clearing mechanism 5, the double-ended embolic water plug 4 and the drill rod 6 out of the borehole to complete the entire water pressure test process.
[0066] In the past, when advancing, resistance was encountered and the drill could not continue to advance. All the test equipment under the hole could only be lifted out of the hole mouth for hole cleaning. However, the length of the hole is often several hundred meters long. This hole cleaning operation method is very inefficient. With the present invention, it is only necessary to retreat 1-5 meters and then advance again, and repeatedly perform steps (1) and (2) to break the blockage and flush away the broken blockage. The test efficiency is greatly improved compared with the past, and the time cost, energy consumption and labor cost of lifting the drill over a long distance are saved.
[0067] According to the method of the present invention, the double-ended embolic water plugger 4 is supported and suspended in the air by the first set of walking mechanisms and the second set of walking mechanisms during the advancement process, and in most cases no longer directly contacts the hole wall (except when there are protrusions on the hole wall), the friction force is greatly reduced, the wear and tear on the capsule during the advancement process is greatly reduced, and the probability of the capsule being damaged due to being hooked by foreign objects on the hole wall is also greatly reduced, and the service life of the capsule is greatly extended.
[0068] After the double-ended embolic water plug 4 is depressurized, the front capsule 42 and the rear capsule 43 will no longer block the borehole, and the double-ended embolic water plug 4 can be smoothly pulled out of the borehole. The present invention actively pumps water and releases pressure through the water pump 53, which greatly shortens the depressurization time of the double-ended embolic water plug 4, avoids the problem that the depressurization time of the front capsule 42 and the rear capsule 43 is too long, the double-ended embolic water plug 4 and other test equipment cannot be pulled out of the borehole in time, and the test personnel can only wait for natural depressurization, further greatly improving the test efficiency.
[0069] The above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention is described in detail with reference to the above embodiments, those skilled in the art should understand that the present invention can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.
Claims
1. An inclined borehole water pressure test device with a borehole cleaning function, comprising a water pressure mechanism, a pressure relief mechanism, a drilling rig and a double-ended embolic water plug, wherein the double-ended embolic water plug has an inner tube; the drilling rig is arranged at the opening of the inclined borehole, the drilling rig is connected with a drill rod, the drill rod extends into the borehole and is connected to the inner tube, the drilling rig is used to press the drill rod into the depth of the borehole or to lift the drill rod out of the borehole; the double-ended embolic water plug is installed on the drill rod through the inner tube; Features: It also includes an obstacle cleaning mechanism; with the direction of drilling deep into the borehole as the forward direction and the radial direction of the borehole as the radial direction, the obstacle cleaning mechanism is located in front of the double-ended embolic water plugging device; The obstacle clearing mechanism includes a main shaft rotatably connected to the front end of the inner tube, and a drill bit is connected forwardly to the main shaft; The middle part of the main shaft is provided with a worm structure, and a traveling unit is matched with the worm structure. The traveling unit is used to convert the friction between the main shaft and the borehole wall into a rotational force for driving the drill bit to rotate when the main shaft is extended into the depth of the borehole.
2. The inclined drilling water pressure test device with drilling cleaning function according to claim 1, Features: The walking units are symmetrically arranged on both sides of the worm structure in the radial direction, namely the first walking unit and the second walking unit; the main shafts on the front and rear sides of the walking units are symmetrically provided with limiting structures; The limiting structure includes a limiting nut, the main shaft has an external thread, and the limiting nut is threadedly connected to the main shaft; with the direction pointing to the worm structure as the inward direction, a spring is sleeved on the main shaft inside the limiting nut, and the inner end of the spring is connected to a moving plate, which is sleeved on the main shaft and slidably cooperates with the main shaft; the moving plate is hinged inwardly with a first hinge rod and a second hinge rod, the first hinge rod is connected to the wheel frame of the first walking unit, and the second hinge rod is connected to the wheel frame of the second walking unit; The wheel frame of the first walking unit and the wheel frame of the second walking unit are collectively referred to as a unit wheel frame; two sets of unit wheel frames are symmetrically arranged on the left and right sides, a front outer sprocket, a rear outer sprocket and a middle inner sprocket are installed between the two sets of symmetrical unit wheel frames on the left and right sides, and a crawler chain is wound between the front outer sprocket, the rear outer sprocket and the middle inner sprocket; Two sets of front outer sprockets, rear outer sprockets and middle inner sprockets are symmetrically arranged on the left and right. A worm wheel is arranged between the two sets of front outer sprockets, rear outer sprockets and middle inner sprockets. The worm wheel is installed on the shaft of the middle inner sprocket and meshes with the worm structure on the main shaft for transmission.
3. The inclined drilling water pressure test device with drilling cleaning function according to claim 1, Features: The obstacle clearing mechanism also includes a water spraying mechanism; the water spraying mechanism includes a water tank fixedly connected to the front end of the drill pipe, the front end of the water tank is rotatably matched with the main shaft through a bearing, and the rear end of the main shaft is connected to the front end of the inner tube through a bearing and the water tank; the main shaft is a hollow shaft; the water tank is connected to a high-pressure flushing hose, which extends backward and is connected to the water pressure mechanism; A water spray pipe is connected to the main shaft in front, and the water spray pipe extends to the drill bit. A radial water spray port and a forward water spray port are arranged at the front end of the water spray pipe.
4. The inclined borehole water pressure test device with borehole cleaning function according to claim 3, Features: The water pressure mechanism comprises a high-pressure water pump, the water inlet of the high-pressure water pump is connected to a water source, the water outlet of the high-pressure water pump is connected to a water pressure main pipe, the water pressure main pipe is connected to a plugging branch pipe and a test branch pipe; a water pressure main stop valve is provided on the water pressure main pipe; A plugging stop valve is provided on the plugging branch pipe, and the front end of the plugging branch pipe is connected to the plugging high-pressure hose; The test branch pipe is provided with a rear stop valve, a first explosion-proof pressure gauge, a first pressure relief valve, a front stop valve, a second explosion-proof pressure gauge, a flow meter and a second pressure relief valve from back to front; the front end of the test branch pipe is connected with a test high-pressure hose, the drill rod is a hollow structure, the test high-pressure hose is connected to the drill rod forward, and the drill rod is connected to the inner pipe; The double-ended plug water stopper includes a rear water stop plug and a front water stop plug, the front water stop plug includes a front capsule, and the rear water stop plug includes a rear capsule; The inner tube between the front capsule and the rear capsule is a flower tube structure, which is used to inject water into the water pressure test section of the borehole; Punch the high pressure hose through the front and rear capsules.
5. The inclined drilling water pressure test device with drilling cleaning function according to claim 4, Features: The walking unit, the limiting structure and the worm structure constitute a first walking mechanism, and the drill pipe behind the double-ended embolic water plugging device is provided with a second walking mechanism, and the structure of the second walking mechanism is the same as that of the first walking mechanism.
6. The inclined borehole water pressure test device with borehole cleaning function according to claim 5, Features: The pressure relief mechanism includes a water reservoir, the water reservoir is connected to a return pipe, the front end of the return pipe is connected to a high-pressure hose for blocking and pressure relief, the high-pressure hose for blocking and pressure relief is connected to a pressure water pipe at the rear, a pressure water stop valve is provided on the pressure water pipe, the pressure water pipe behind the pressure water stop valve is connected to a hand pressure pump, and the water inlet end of the hand pressure pump is connected to the water reservoir; The return pipe is provided with a return stop valve and a water pump for pumping water into the water storage tank; a high-pressure hose for plugging and pressure relief extends forward into the borehole and penetrates into the front capsule and the rear capsule, and the high-pressure hose for plugging and pressure relief is connected with the front capsule and the rear capsule; The first pressure relief valve and the second pressure relief valve are respectively connected to the water reservoir through pipelines.
7. A method for using the inclined borehole water pressure testing device with a borehole cleaning function as claimed in claim 6, Features Follow these steps: The first step is the preparation step; connect the inclined borehole water pressure test device with the borehole cleaning function at the borehole mouth, and extend the drill bit, obstacle cleaning mechanism, double-end embolic water plug and drill rod into the borehole; in the initial state, all valves are in the closed state; The second step is the pushing step; starting the drilling rig, pushing the drill bit, obstacle clearing mechanism, double-ended embolic water plug and drill pipe to the depth of the borehole, the goal of pushing is to push the double-ended embolic water plug to the predetermined water pressure test position; During advancement, the crawler chain of the walking mechanism located at the front rotates under the action of the friction between it and the wall of the drill hole, drives the worm wheel to rotate through the shaft of the inner sprocket, drives the main shaft to rotate through the transmission relationship between the worm wheel and the worm structure, and finally drives the drill bit to rotate; During the advancement process, if the borehole is blocked and the advancement cannot be continued smoothly, clear the blockage; The clearing operation is: (1) Lift the drill; control the drilling rig to drive the drill bit, obstacle clearing mechanism, double-ended plugging water plug and drill pipe to retreat 1-5 meters; (2) Move forward and spray water; Moving forward means: controlling the drilling rig to drive the drill bit, obstacle clearing mechanism, double-ended plugging water plug and drill pipe forward; Until it encounters resistance and cannot move forward or the double-ended plug water plug has been pushed to the predetermined water pressure test position; When moving forward, the crawler chain drives the drill bit to rotate, and when the rotating drill bit encounters a blockage, it breaks the blockage; Water spraying is: open the high-pressure water pump, the main water shut-off valve and the plugging shut-off valve, and the high-pressure water enters the water spray pipe after passing through the main water pipe, the plugging branch pipe, the plugging high-pressure hose, the water tank and the main shaft, and finally sprays out from the radial water spray port and the forward water spray port at the drill bit to wash away the broken objects of the drill bit; The blockage clearing effect is achieved through the rotary crushing effect of the drill bit and the water spray flushing effect; The stopping condition of the second step is to meet condition A or condition B; Condition A is: you cannot move forward when you encounter resistance; Condition B is: the double-ended plug water stopper has been pushed to the next predetermined water pressure test position; When condition A is met, repeat steps (1) and (2) until condition B is met; When condition B is satisfied, the switching action from the second step to the third step is executed, thereby ending the second step and executing the third step; The switching action is: close the plugging stop valve and open the water pressure stop valve; The third step is the sealing step; Open the water pressure stop valve, apply pressure through the hand pressure pump, inject water and pressurize the front capsule and the rear capsule through the water pressure pipe and the high-pressure hose for blocking and pressure relief, so that the front capsule and the rear capsule expand and then seal the hole, and the drilling section between the front capsule and the rear capsule forms a closed test section; at this time, close the water pressure stop valve, stop applying pressure through the hand pressure pump, and proceed to the fourth step; The fourth step is a water pressure test step: the predetermined water injection pressure of the water pressure test is P MPa, the opening pressure of the first pressure relief valve is 1.05-1.1P MPa, the water pressure is controlled at 1.05-1.1P MPa through the first pressure relief valve, the high-pressure water pump is turned on, and when the water pressure is higher than the opening pressure of the first pressure relief valve, the water flows through the first pressure relief valve to the water reservoir; the water pressure is read through the first explosion-proof pressure gauge; Open the front stop valve and control the water pressure at P MPa through the second pressure relief valve; read the water pressure through the second explosion-proof pressure gauge, and the high-pressure water generated by the high-pressure water pump enters the flower tube structure of the inner tube through the pressure water main pipe, test branch pipe, test high-pressure hose, drill rod and inner tube, and injects water and pressurizes the test section of the borehole through the flower tube structure; before the test section is filled with water, the pressure of the first pressure relief valve and the second pressure relief valve are both lower than P MPa; When the pressures of the first explosion-proof pressure and the second explosion-proof pressure reach P MPa at the same time, read and record the test flow rate through the flow meter, and record the test time at the same time; After the water pressure test reaches the preset time, close the high-pressure water pump, the main water pressure stop valve, the rear stop valve and the front stop valve; after the high-pressure water pump is closed, the water pressure in the pipeline is lower than P MPa, and the first pressure relief valve and the second pressure relief valve are automatically closed; The fifth step is the pressure relief step; Open the water pump and the water return stop valve to pump the high-pressure water in the test section into the water reservoir to relieve the system pressure. After the pressure is relieved, the double-ended plug water plug can move forward or backward under the drive of the drilling rig. If there is a predetermined water pressure test section at another location in the same borehole, the drilling rig is started after the pressure is released, and the double-ended plug water plug is sent to the next predetermined water pressure test location, and the fourth step, i.e., the water pressure test step, is returned to be executed; If the water pressure test has been completed at all the scheduled water pressure test positions at this time, the water pump and the return water stop valve are turned off, and the drilling rig is controlled to pull the drill bit, obstacle clearing mechanism, double-ended embolic water plug and drill rod out of the borehole to complete the entire water pressure test process.
Citation Information
Cited By
Coal mine wireless measuring device integrating track video and gamma measurement
CN120990578A