Lining maintenance equipment for roads, bridges and tunnels

By integrating monitoring mechanisms and lifting and water spraying mechanisms in road and bridge tunnel lining maintenance equipment, the stress changes and seepage conditions are monitored in real time, the problem of insufficient monitoring of existing equipment is solved, and comprehensive and timely maintenance of tunnel lining is achieved, and the maintenance effect is improved. and adaptability of the equipment.

CN118933891AInactive Publication Date: 2024-11-12刘锋
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411213766.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-31
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing equipment used for road and bridge tunnel lining maintenance lacks real-time and comprehensive monitoring capabilities, and cannot effectively monitor the stress changes, structural deformation and seepage conditions of tunnel lining, resulting in the inability to detect potential problems in a timely manner, affecting the timeliness and effectiveness of maintenance.

Method used

A device including a monitoring mechanism, a lifting mechanism and a water spraying mechanism is designed. By installing stress sensors, deformation sensors and water seepage sensors on the tunnel lining, key parameters are monitored in real time, and the height of the water spraying mechanism is adjusted through the lifting mechanism, using rotation The spray head achieves uniform spraying of moisture to ensure a wet state.

Benefits of technology

Real-time monitoring of tunnel lining stress changes, structural deformation and seepage conditions is achieved, the timeliness and effectiveness of maintenance is improved, the application scope of equipment in tunnels of different heights is expanded, and the comprehensiveness and thoroughness of maintenance is significantly improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933891A_ABST
    Figure CN118933891A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of lining maintenance, and particularly discloses lining maintenance equipment for roads, bridges and tunnels, which comprises a water storage tank, a water spraying mechanism, a water supply device and a control device, and is characterized in that one end of the water storage tank is provided with the water spraying mechanism; the monitoring mechanism comprises a monitoring controller, two alarms, a protective shed, an operation key, a display screen and a storage box, the monitoring controller is installed at the other end of the water storage tank, and the number of the alarms is two; the stress sensor is installed on the tunnel lining, the strain change of the structure can be monitored in real time, the deformation sensor is arranged at the key position of the tunnel lining, the deformation condition of the tunnel can be captured in real time, and the water seepage sensor is ingeniously arranged between the tunnel lining and the surrounding rock or in the lining. By means of the series of measures, it is ensured that key parameters such as stress changes, structural deformation and the water seepage condition of the tunnel lining can be comprehensively monitored in real time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of lining maintenance, and in particular relates to a lining maintenance device for roads, bridges and tunnels. Background Art

[0002] With the vigorous advancement of my country's infrastructure construction, various infrastructure construction projects are in full swing and the number of buildings is increasing day by day. In the fine construction process of these buildings, the requirements for quality have reached an unprecedented height, especially for structural concrete. The maintenance link after pouring is crucial, and it usually takes seven days or even longer to carefully care for it. Water spraying curing is a widely used and effective method of concrete curing. Its importance is self-evident. It sprays water evenly on the concrete surface to effectively keep the concrete surface moist and promote the continuous cement hydration reaction, thereby ensuring that the strength, durability and appearance quality of the concrete meet the design requirements.

[0003] In a Chinese patent with publication number CN215718792U, a maintenance device for road bridge and tunnel linings is mentioned. When the maintenance device for road bridge and tunnel linings is used, with the assistance of a water supply mechanism, water in a water tank is sprayed out from a nozzle, and then with the assistance of a support mechanism and a shaking drive mechanism, the second water-conducting hard curved pipe, the water-conducting hard straight pipe and the nozzle are swung left and right together, and the moving mechanism can be used to push the water tank to move, so that the nozzle can water the lining surface, with low labor intensity and easy operation; however, the maintenance equipment lacks real-time and comprehensive monitoring capabilities during the maintenance of tunnel linings, especially for monitoring key parameters such as stress changes, structural deformations, and water seepage conditions of tunnel linings. The lack of such monitoring may result in potential problems not being discovered in a timely manner, thereby affecting the timeliness and effectiveness of maintenance. Summary of the invention

[0004] The object of the present invention is to provide a lining maintenance device for roads, bridges and tunnels to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A lining maintenance device for roads, bridges and tunnels, comprising:

[0007] A water storage tank, one end of which is provided with a water spraying mechanism;

[0008] A monitoring mechanism, the monitoring mechanism comprising a monitoring controller, an alarm, a protective shed, operating buttons, a display screen and a storage box, the monitoring controller being installed at the other end of the water storage tank, the alarm being provided with two, and the two alarms being respectively provided at both sides of the outer wall of the monitoring controller, the protective shed being installed at one side of the top of the monitoring controller, the operating buttons and the display screen being both provided at the top of the monitoring controller, and the storage box being installed at the bottom of the monitoring controller;

[0009] The lifting mechanism is installed in the middle of the top end of the water tank, and the lifting mechanism plays a role in adjusting the height of the water spraying mechanism.

[0010] Preferably, a water inlet pipe is installed on one side of the top end of the water tank, mounting frames are installed on the lower parts of both sides of the outer wall of the water tank, and a plurality of mounting holes are opened at the bottom ends of the two mounting frames.

[0011] Preferably, three storage boxes are arranged inside the storage box, and a number of water seepage sensors, a number of deformation sensors and a number of stress sensors are placed inside the three storage boxes respectively. Limit handles are installed on the upper sides of the outer walls of the three storage boxes, and magnetic blocks are arranged on the outer walls of the three storage boxes.

[0012] Preferably, the stress sensor is configured as a pressure sensor, the deformation sensor is configured as a fiber optic strain sensor, the water seepage sensor is configured as a humidity sensor, the magnetic poles of the magnetic block on the middle storage box are opposite to the magnetic poles of the magnetic blocks on the other two storage boxes, and the monitoring controller is electrically connected to the alarm, water seepage sensor, deformation sensor and stress sensor.

[0013] Preferably, the lifting mechanism includes a fixing frame, a support plate, an adjusting mechanism, a lifting seat and a fixing groove, the fixing frame is installed at the top of the water tank, the supporting plate is installed at the bottom of the fixing frame, the adjusting mechanism is arranged between the inner walls on both sides of the fixing frame, the lifting seat is installed at the top of the adjusting mechanism, and the fixing groove is opened in the middle of the top of the lifting seat.

[0014] Preferably, the adjustment mechanism includes forward and reverse screw rods, a driver, an adjustment frame, an adjustment rod and a connecting seat, the two ends of the forward and reverse screw rods are respectively mounted on the inner walls on both sides of the fixing frame through bearings, the output end of the driver is mounted on one end of the forward and reverse screw rods, the adjustment frame is mounted on the outer surface of the forward and reverse screw rods, the adjustment rod is mounted between the upper parts of the inner walls on both sides of the adjustment frame through a connecting shaft, the connecting seat is mounted on the upper part of the outer surface of the adjustment rod through a connecting shaft, and the top end of the connecting seat is mounted on the bottom end of the lifting seat.

[0015] Preferably, the adjustment frame is configured as a convex structure, and the middle portion of the bottom end of the adjustment frame is slidably connected to the bottom frame wall of the fixed frame, the driver is electrically connected to the monitoring controller, and the top surface of the lifting seat is configured as an arc surface.

[0016] Preferably, the water spraying mechanism includes a water pump, a water pipe, a diversion pipe, a rotating nozzle and a fixed rod. The water pump is installed on the lower part of the outer wall of the water tank, the water pipe is installed on the outer wall of the water pump, two diversion pipes are provided, and the two diversion pipes are respectively installed at the two ends of the water pipe, a number of rotating nozzles are provided, and the several rotating nozzles are respectively installed on the outer walls of the two diversion pipes, the middle part of the outer surface of the upper diversion pipe is installed on the groove wall of the fixed groove, the fixed rod is installed on the top end of the lower diversion pipe, and the outer wall of the fixed rod is installed on the outer wall of the water tank.

[0017] Preferably, the rotary nozzle includes a diverter head, a rotating tube, a maintenance nozzle and a connecting tube. Three rotating tubes are provided and the three rotating tubes are installed on the outer wall of the diverter head. Several maintenance nozzles are provided and the several maintenance nozzles are respectively arranged on the outer walls of the three rotating tubes. The connecting tube is installed at the bottom end of the diverter head, and the bottom end of the connecting tube is installed on the outer wall of the diverter tube.

[0018] Preferably, the diverter head is configured as a herringbone structure, the several maintenance nozzles on the rotating tube are configured as inclined structures, the water pump is electrically connected to the monitoring controller, the water supply pipe is configured as a Y-shaped structure, and the diverter pipe is configured as a U-shaped structure.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] (1) The present invention sets a monitoring mechanism on the outer surface of the water tank. By installing stress sensors on the tunnel lining, the strain changes of the structure can be monitored in real time. By deploying deformation sensors at key positions of the tunnel lining, the deformation of the tunnel can be captured in real time. By cleverly placing the seepage sensor between the tunnel lining and the surrounding rock or inside the lining, the water seepage condition of the tunnel can be monitored in real time. This series of measures ensures that key parameters such as stress changes, structural deformation and water seepage condition of the tunnel lining can be monitored in real time and comprehensively.

[0021] (2) The present invention sets a lifting mechanism at the top of the water tank. The forward and reverse screws are driven by the driver to rotate, and the two adjustment frames are driven respectively, so that the adjustment rods installed thereon move toward the middle, thereby prompting the lifting seat and the shunt pipe on its upper side to achieve vertical adjustment up and down. This design allows the position of the upper shunt pipe to be flexibly adjusted to adapt to tunnel tops of different heights, thereby significantly expanding the application scope of the maintenance equipment in tunnel maintenance operations at different heights.

[0022] (3) The present invention sets a water spraying mechanism on the outer surface of the water tank. The water pump inputs water into two diversion pipes, and then the water is diverted to a number of rotating nozzles. The rotating nozzles cleverly use the centrifugal force and reaction force of the water flow to achieve the function of rotating while spraying water, thereby ensuring that the water can be evenly and comprehensively sprayed on the top, side walls and ground concrete layer of the tunnel. This design significantly enhances the maintenance effect of the maintenance equipment on the tunnel and improves the comprehensiveness and thoroughness of the maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 A perspective view of the present invention;

[0024] Figure 2 is a three-dimensional diagram of the monitoring mechanism of the present invention;

[0025] Figure 3 is a cross-sectional view of the storage box of the present invention;

[0026] Figure 4 It is a three-dimensional diagram of the lifting mechanism of the present invention;

[0027] Figure 5 is a three-dimensional diagram of the adjustment mechanism of the present invention;

[0028] Figure 6 is a three-dimensional diagram of the water spraying mechanism of the present invention;

[0029] Figure 7 A three-dimensional diagram of a rotary spray head of the present invention;

[0030] In the figure: 1. water storage tank; 2. monitoring mechanism; 3. lifting mechanism; 4. water spraying mechanism; 5. water inlet pipe; 6. mounting frame; 7. mounting hole;

[0031] 21. Monitoring controller; 22. Alarm; 23. Protective shed; 24. Operation buttons; 25. Display screen; 26. Storage box; 27. Storage box; 28. Water seepage sensor; 29. ​​Deformation sensor; 210. Stress sensor; 211. Limit handle; 212. Magnetic block;

[0032] 31. Fixed frame; 32. Support plate; 33. Adjustment mechanism; 34. Lifting seat; 35. Fixed slot;

[0033] 331, positive and negative screw rods; 332, driver; 333, adjustment frame; 334, adjustment rod; 335, connecting seat;

[0034] 41. water pump; 42. water pipe; 43. diversion pipe; 44. rotating nozzle; 45. fixing rod;

[0035] 441. Diverter head; 442. Rotating tube; 443. Maintenance nozzle; 444. Connecting tube. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] Embodiment 1:

[0038] See also Figures 1 to 7 As shown, a lining maintenance device for roads, bridges and tunnels comprises:

[0039] A water storage tank 1, one end of which is provided with a water spray mechanism 4;

[0040] Monitoring mechanism 2, monitoring mechanism 2 includes monitoring controller 21, alarm 22, protection shed 23, operation button 24, display screen 25 and storage box 26, monitoring controller 21 is installed at the other end of water storage tank 1, two alarms 22 are provided, and the two alarms 22 are respectively arranged on both sides of the outer wall of monitoring controller 21, protection shed 23 is installed on one side of the top of monitoring controller 21, operation button 24 and display screen 25 are both arranged at the top of monitoring controller 21, and storage box 26 is installed at the bottom of monitoring controller 21;

[0041] The lifting mechanism 3 is installed at the middle of the top end of the water storage tank 1 , and the lifting mechanism 3 plays a role in adjusting the height of the water spraying mechanism 4 .

[0042] Depend on Figures 1 to 3 It can be seen that a water inlet pipe 5 is installed on one side of the top of the water storage tank 1, and mounting brackets 6 are installed at the lower part of both sides of the outer wall of the water storage tank 1, and a plurality of mounting holes 7 are opened at the bottom ends of the two mounting brackets 6;

[0043] Three storage boxes 27 are arranged inside the storage box 26, and a plurality of water seepage sensors 28, a plurality of deformation sensors 29 and a plurality of stress sensors 210 are placed inside the three storage boxes 27 respectively. Limiting handles 211 are installed on the upper sides of the outer walls of the three storage boxes 27, and magnetic blocks 212 are arranged on the outer walls of the three storage boxes 27.

[0044] As can be seen from the above, by holding the limit handle 211, the storage box 27 can be pulled out from the storage box 26, so as to take out a number of stress sensors 210, deformation sensors 29 and water seepage sensors 28, and then these sensors are installed at appropriate positions of the tunnel lining: the stress sensors 210 are evenly arranged on the tunnel lining and electrically connected to the monitoring controller 21 to monitor the strain changes of the structure in real time; the deformation sensors 29 are installed at key positions of the tunnel lining and are also connected to the monitoring controller 21 to realize real-time monitoring of the deformation of the tunnel; the water seepage sensor 28 is installed between the tunnel lining and the surrounding rock or inside the lining to ensure that the water seepage condition can be captured and maintain data communication with the monitoring controller 21. This complete monitoring system can obtain the stress of the tunnel lining in real time. , deformation, water seepage and other key parameters, and then use data analysis software to process and analyze these monitoring data in real time, so as to predict potential diseases and significantly improve the efficiency and accuracy of monitoring. In terms of installation, the entire maintenance equipment is firmly installed on the vehicle through the mounting frame 6, and it is ensured that the water spraying mechanism 4 is not in direct contact with the vehicle, so that the vehicle can carry the maintenance equipment and move freely in the tunnel to carry out comprehensive water spraying maintenance on the tunnel lining. During the maintenance operation, the monitoring controller 21 continuously receives data from all sensors. Once the data exceeds the preset safety threshold, the alarm 22 is immediately controlled to start and send out a warning signal to achieve early warning and real-time monitoring. This function ensures that potential problems can be discovered and handled in time, greatly improving the timeliness and effectiveness of maintenance work.

[0045] Specifically, refer to Figures 1 to 3 As shown, the stress sensor 210 is set as a pressure sensor, the deformation sensor 29 is set as a fiber optic strain sensor, the water seepage sensor 28 is set as a humidity sensor, the magnetic pole of the magnetic block 212 on the middle storage box 27 is opposite to the magnetic poles of the magnetic blocks 212 on the other two storage boxes 27, and the monitoring controller 21 is electrically connected to the alarm 22, the water seepage sensor 28, the deformation sensor 29 and the stress sensor 210.

[0046] As can be seen from the above, the stress sensor 210 can sense the strain or pressure changes produced by the tunnel lining structure under the action of force, and convert these physical quantities into measurable electrical signals, so as to realize real-time monitoring of the lining stress, so that the deformation sensor 29 can monitor the deformation of the tunnel lining in real time, and can promptly discover and deal with the deformation problem of the tunnel lining, so that the water seepage sensor 28 can sense the humidity inside the tunnel in real time, and can accurately monitor the water seepage condition of the tunnel lining. Through the magnetic adsorption between the magnetic blocks 212, the three storage boxes 27 can be limited in the storage box 26.

[0047] Embodiment 2:

[0048] refer to Figure 4 and Figure 5As shown, the lifting mechanism 3 includes a fixing frame 31, a support plate 32, an adjustment mechanism 33, a lifting seat 34 and a fixing groove 35. The fixing frame 31 is installed at the top of the water storage tank 1, the support plate 32 is installed at the bottom of the fixing frame 31, the adjustment mechanism 33 is arranged between the inner walls on both sides of the fixing frame 31, the lifting seat 34 is installed at the top of the adjustment mechanism 33, and the fixing groove 35 is opened in the middle of the top of the lifting seat 34;

[0049] The adjusting mechanism 33 includes a forward and reverse screw rod 331, a driver 332, an adjusting frame 333, an adjusting rod 334 and a connecting seat 335. The two ends of the forward and reverse screw rod 331 are respectively mounted on the inner walls on both sides of the fixing frame 31 through bearings, the output end of the driver 332 is mounted on one end of the forward and reverse screw rod 331, the adjusting frame 333 is mounted on the outer surface of the forward and reverse screw rod 331, the adjusting rod 334 is mounted between the upper parts of the inner walls on both sides of the adjusting frame 333 through a connecting shaft, the connecting seat 335 is mounted on the upper outer surface of the adjusting rod 334 through a connecting shaft, and the top end of the connecting seat 335 is mounted on the bottom end of the lifting seat 34.

[0050] As can be seen from the above, by starting the driver 332, the forward and reverse screw rods 331 can be driven to rotate, and this action immediately causes the two adjustment frames 333 installed thereon to move toward the center smoothly and synchronously. In this process, the fixed frame 31 acts as a stable support and guide system to ensure the stability and accuracy of the adjustment frames 333 during movement, and effectively prevents deviation or shaking. As the adjustment frames 333 are closely approached, the adjustment rods 334 carried by them are also stably guided to move toward the center. When the adjustment rods 334 are gradually erected, they not only stabilize their own positions, but also slowly push the lifting seat 34 upwards through their strong supporting force. The rise of the lifting seat 34 directly drives the shunt pipe 43 installed in the fixed groove 35 to rise synchronously. This design ingeniously realizes the flexible adjustment of the position of the shunt pipe 43, so that the originally fixed equipment can be adaptively adjusted according to the actual height of the tunnel top. Regardless of whether the tunnel top is high or low, it can ensure that the shunt pipe 43 always remains in the best working position, ensuring the efficiency and accuracy of tunnel maintenance operations. It not only greatly improves the flexibility and adaptability of tunnel maintenance equipment, but also significantly expands its application scope in tunnel maintenance operations at different heights, bringing unprecedented convenience and efficiency to tunnel maintenance and maintenance work.

[0051] Preferably, reference Figure 4 and Figure 5 As shown, the adjustment frame 333 is configured as a convex structure, and the middle of the bottom end of the adjustment frame 333 is slidably connected to the bottom frame wall of the fixed frame 31, the driver 332 is electrically connected to the monitoring controller 21, and the top surface of the lifting seat 34 is configured as an arc surface.

[0052] As can be seen from the above, the fixing frame 31 can limit the adjusting frame 333, which can improve the stability of the adjusting frame 333 during the adjustment process. The lifting seat 34 with an arc-shaped top can increase its contact area with the upper shunt pipe 43, so that the lifting seat 34 can firmly install the upper shunt pipe 43.

[0053] Embodiment three:

[0054] refer to Figure 6 and Figure 7 As shown, the water spray mechanism 4 includes a water pump 41, a water delivery pipe 42, a diverter pipe 43, a rotating nozzle 44 and a fixing rod 45. The water pump 41 is installed at the lower part of the outer wall of the water storage tank 1, the water delivery pipe 42 is installed on the outer wall of the water pump 41, two diverter pipes 43 are provided, and the two diverter pipes 43 are respectively installed at the two ends of the water delivery pipe 42, a plurality of rotating nozzles 44 are provided, and the plurality of rotating nozzles 44 are respectively installed on the outer walls of the two diverter pipes 43, the middle part of the outer surface of the upper diverter pipe 43 is installed on the groove wall of the fixing groove 35, the fixing rod 45 is installed on the top end of the lower diverter pipe 43, and the outer wall of the fixing rod 45 is installed on the outer wall of the water storage tank 1;

[0055] The rotating nozzle 44 includes a diverter head 441, a rotating tube 442, a maintenance nozzle 443 and a connecting tube 444. Three rotating tubes 442 are provided, and the three rotating tubes 442 are all installed on the outer wall of the diverter head 441. A plurality of maintenance nozzles 443 are provided, and the plurality of maintenance nozzles 443 are respectively arranged on the outer walls of the three rotating tubes 442. The connecting tube 444 is installed at the bottom end of the diverter head 441, and the bottom end of the connecting tube 444 is installed on the outer wall of the diverter tube 43.

[0056] As can be seen from the above, the maintenance water in the water tank 1 can be pumped out by the water pump 41, and then the water is input into two carefully designed U-shaped diverter pipes 43 through the water delivery pipe 42. Under the fine distribution of the diverter pipe 43, the water is evenly introduced into multiple connecting pipes 444, and further refined to each diverter head 441. These diverter heads 441 guide the water to be diverted into the three rotating pipes 442 thereon, and finally sprayed out by a plurality of maintenance nozzles 443 at an inclined angle. Due to the inclined design of the maintenance nozzle 443, the sprayed water flow not only achieves accurate coverage of the tunnel structure, but also cleverly uses the reaction force principle to drive the entire tunnel. The rotary nozzle 44 rotates. This design enables the rotary nozzle 44 to evenly and comprehensively cover every corner of the tunnel while spraying water, whether it is the towering top, the straight side wall, or the flat ground concrete layer. The water spraying range of the rotary nozzle 44 is expanded, and the two U-shaped diversion pipes 43 cooperate with each other to ensure all-round coverage of the water flow, realizing comprehensive water spraying maintenance of the internal structure of the tunnel. This design not only enhances the water spraying range and efficiency of the maintenance equipment, but also improves the comprehensiveness and thoroughness of tunnel maintenance, providing a solid guarantee for the long-term stability and durability of the tunnel structure.

[0057] Preferably, reference Figure 6 and Figure 7 As shown, the diverter head 441 is configured as a herringbone structure, the several maintenance nozzles 443 on the rotating tube 442 are configured as inclined structures, the water pump 41 is electrically connected to the monitoring controller 21, the water delivery pipe 42 is configured as a Y-shaped structure, and the diverter pipe 43 is configured as a U-shaped structure.

[0058] It can be seen from the above that when the maintenance water is sprayed out through the inclined maintenance nozzle 443, a reaction force can be generated to drive the entire rotating nozzle 44 to rotate. The Y-shaped water pipe 42 is conducive to inputting water into the two diversion pipes 43, and the two U-shaped diversion pipes 43 can realize comprehensive water spraying maintenance of the tunnel.

[0059] Application examples:

[0060] The present design is applied to the maintenance link after the completion of tunnel construction and during the long-term operation. The specific environment includes but is not limited to: newly built tunnels, existing tunnels and tunnels with special geological conditions. By installing the seepage sensor 28, deformation sensor 29 and stress sensor 210 stored in the monitoring mechanism 2 inside the tunnel, the key parameters such as stress change, structural deformation and seepage condition of the tunnel lining can be monitored in real time and comprehensively. These parameters can reflect the health of the lining and provide data support for maintenance work. Then, the maintenance water is transported to the diversion pipe 43 through the water spraying mechanism 4, and the water is evenly sprayed onto the surface of the tunnel lining through the rotating nozzle 44. This process can not only keep the lining surface moist and promote the hydration reaction of cement particles, but also effectively prevent the occurrence of concrete cracking and seepage problems. The lifting mechanism 3 can automatically adjust the position of the diversion pipe 43 on the upper side of the water spraying mechanism 4. This function enables the water spraying mechanism 4 to adapt to tunnel tops of different heights to ensure the uniformity and comprehensiveness of water spraying maintenance.

[0061] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A lining maintenance equipment for roads, bridges and tunnels, characterized in that: include: A water storage tank (1), wherein one end of the water storage tank (1) is provided with a water spraying mechanism (4); A monitoring mechanism (2), the monitoring mechanism (2) comprising a monitoring controller (21), an alarm (22), a protective shed (23), an operating button (24), a display screen (25) and a storage box (26), the monitoring controller (21) being installed at the other end of the water storage tank (1), two alarms (22) being provided, and the two alarms (22) being respectively provided on both sides of the outer wall of the monitoring controller (21), the protective shed (23) being installed at one side of the top end of the monitoring controller (21), the operating button (24) and the display screen (25) being both provided at the top end of the monitoring controller (21), and the storage box (26) being installed at the bottom end of the monitoring controller (21); A lifting mechanism (3) is installed at the middle of the top end of the water storage tank (1), and the lifting mechanism (3) plays a role in adjusting the height of the water spraying mechanism (4).

2. The lining maintenance equipment for roads, bridges and tunnels according to claim 1 is characterized by: A water inlet pipe (5) is installed on one side of the top end of the water storage tank (1), mounting frames (6) are installed at the lower parts of both sides of the outer wall of the water storage tank (1), and a plurality of mounting holes (7) are provided at the bottom ends of the two mounting frames (6).

3. The lining maintenance equipment for roads, bridges and tunnels according to claim 2 is characterized by: Three storage boxes (27) are arranged inside the storage box (26), and a plurality of water seepage sensors (28), a plurality of deformation sensors (29) and a plurality of stress sensors (210) are respectively placed inside the three storage boxes (27). Limiting handles (211) are installed on the upper sides of the outer walls of the three storage boxes (27), and magnetic blocks (212) are arranged on the outer walls of the three storage boxes (27).

4. The lining maintenance equipment for roads, bridges and tunnels according to claim 3 is characterized by: The stress sensor (210) is configured as a pressure sensor, the deformation sensor (29) is configured as an optical fiber strain sensor, the water seepage sensor (28) is configured as a humidity sensor, the magnetic pole of the magnetic block (212) on the middle storage box (27) is opposite to the magnetic poles of the magnetic blocks (212) on the other two storage boxes (27), and the monitoring controller (21) is electrically connected to the alarm (22), the water seepage sensor (28), the deformation sensor (29) and the stress sensor (210).

5. The lining maintenance equipment for roads, bridges and tunnels according to claim 1 is characterized by: The lifting mechanism (3) comprises a fixing frame (31), a support plate (32), an adjusting mechanism (33), a lifting seat (34) and a fixing groove (35); the fixing frame (31) is mounted on the top end of the water storage tank (1); the supporting plate (32) is mounted on the bottom end of the fixing frame (31); the adjusting mechanism (33) is arranged between the inner walls on both sides of the fixing frame (31); the lifting seat (34) is mounted on the top end of the adjusting mechanism (33); and the fixing groove (35) is arranged in the middle of the top end of the lifting seat (34).

6. The lining maintenance equipment for roads, bridges and tunnels according to claim 5 is characterized by: The adjusting mechanism (33) comprises a positive and negative screw rod (331), a driver (332), an adjusting frame (333), an adjusting rod (334) and a connecting seat (335); the two ends of the positive and negative screw rod (331) are respectively mounted on the inner walls on both sides of the fixing frame (31) through bearings; the output end of the driver (332) is mounted on one end of the positive and negative screw rod (331); the adjusting frame (333) is mounted on the outer surface of the positive and negative screw rod (331); the adjusting rod (334) is mounted between the upper parts of the inner walls on both sides of the adjusting frame (333) through a connecting shaft; the connecting seat (335) is mounted on the upper part of the outer surface of the adjusting rod (334) through a connecting shaft; and the top end of the connecting seat (335) is mounted on the bottom end of the lifting seat (34).

7. The road bridge and tunnel lining maintenance equipment according to claim 6 is characterized by: The adjusting frame (333) is configured as a convex structure, and the middle portion of the bottom end of the adjusting frame (333) is slidably connected to the bottom frame wall of the fixing frame (31), the driver (332) is electrically connected to the monitoring controller (21), and the top end surface of the lifting seat (34) is configured as an arc surface.

8. The lining maintenance equipment for roads, bridges and tunnels according to claim 1 is characterized by: The water spray mechanism (4) comprises a water pump (41), a water delivery pipe (42), a diverter pipe (43), a rotating spray head (44) and a fixing rod (45). The water pump (41) is mounted on the lower part of the outer wall of the water storage tank (1). The water delivery pipe (42) is mounted on the outer wall of the water pump (41). Two diverter pipes (43) are provided, and the two diverter pipes (43) are respectively mounted on the two ends of the water delivery pipe (42). A plurality of rotating spray heads (44) are provided, and the plurality of rotating spray heads (44) are respectively mounted on the outer walls of the two diverter pipes (43). The middle part of the outer surface of the upper diverter pipe (43) is mounted on the groove wall of the fixing groove (35). The fixing rod (45) is mounted on the top end of the lower diverter pipe (43), and the outer wall of the fixing rod (45) is mounted on the outer wall of the water storage tank (1).

9. The road bridge tunnel lining maintenance equipment according to claim 8 is characterized by: The rotating spray head (44) comprises a diverter head (441), a rotating tube (442), a maintenance nozzle (443) and a connecting tube (444); three rotating tubes (442) are provided, and the three rotating tubes (442) are all installed on the outer wall of the diverter head (441); a plurality of maintenance nozzles (443) are provided, and the plurality of maintenance nozzles (443) are respectively installed on the outer walls of the three rotating tubes (442); the connecting tube (444) is installed at the bottom end of the diverter head (441), and the bottom end of the connecting tube (444) is installed on the outer wall of the diverter tube (43).

10. The road bridge tunnel lining maintenance equipment according to claim 9, characterized in that: The diverter head (441) is configured as a herringbone structure, the plurality of maintenance nozzles (443) on the rotating tube (442) are configured as inclined structures, the water pump (41) is electrically connected to the monitoring controller (21), the water delivery pipe (42) is configured as a Y-shaped structure, and the diverter pipe (43) is configured as a U-shaped structure.