Combined type detachable grouting anchor rod

Through the combined disassembly of the grouting anchor casing to follow up the drilling and high-pressure grouting process, the problems of water, sand and hole collapse in traditional anchor cable construction are solved, the hole formation quality and support effect are improved, and the Construction costs and environmental pollution.

CN118933944APending Publication Date: 2024-11-12SHANXI FIRST CONSTR GROUP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411093735.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In an environment with high groundwater levels and complex geological conditions, traditional anchor cable construction is difficult to avoid problems such as water gushing, sand gushing, hole collapse, etc., resulting in difficulties in hole formation and threats to the safety of surrounding facilities.

Method used

Combined disassembly grouting anchor rods are adopted, including multi-bunch prestressed steel strands, grouting pipe system, isolation device and disassembly and locking device. The drilling process and high-pressure grouting process are followed by casing to ensure the stability of the anchor rods. Sex and bearing capacity.

Benefits of technology

It effectively avoids hole collapse and sand surge problems, improves the quality of anchor cable hole formation and the overall effect of support projects, reduces material waste and environmental pollution, reduces construction costs, shortens construction time and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933944A_ABST
    Figure CN118933944A_ABST
Patent Text Reader

Abstract

The invention discloses a combined type detachable grouting anchor rod, and particularly relates to the technical field of constructional engineering. According to the method, a casing pipe follow-up drilling process and a drilling method for construction at intervals of three jumps and one are adopted, after anchor cable holes are formed, steel strands are immediately put in, cement mortar is injected through a cement mortar pump for primary grouting, an early strength agent is added into the cement mortar to enable the cement mortar to be solidified as soon as possible, secondary grouting is conducted after initial solidification, cement mortar is adopted for secondary grouting, adjacent holes are constructed after grouting is conducted for not less than 12 hours, and the construction time is shortened. The anchor cable construction quality is effectively ensured. The problems of hole collapse and sand gushing in anchor cable construction are solved, social benefits are obvious, precious construction experience is accumulated for companies, a series of quality problems can be generated in traditional anchor cable drilling construction under the condition of a water-rich sand layer, the construction progress is affected, the problem is solved to a great extent by adopting the construction method, the construction time is shortened, and the construction efficiency is improved. The construction cost investment is reduced, good benefits are created for enterprises and the society, the construction progress is accelerated, and the economic benefits are remarkable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction engineering, and more particularly to a combined disassembly grouting anchor rod. Background Art

[0002] With the rapid development of the construction industry, the construction conditions faced by construction projects are becoming more and more complex, and new technologies are being applied more and more. For deep foundation pits with high groundwater levels, complex geological conditions, and surrounding municipal roads with complex pipelines under the roads, anchor cable support is often used. However, when constructing in water-rich sand layers, there are often problems such as water gushing, sand gushing, and hole collapse, which makes it difficult to form holes and even causes the surrounding strata to sink, seriously endangering the safety of other facilities around the foundation pit.

[0003] The traditional anchor cable construction method is to construct one jump at a time. When the drill rod passes through the slope protection and water-stop curtain, it encounters sand layers and groundwater to form quicksand, which causes serious hole collapse and damages surrounding buildings and facilities. The traditional construction process uses cement slurry grouting, but the cement slurry cannot suppress the pressure of underground water and sand gushing, resulting in quicksand backfilling in the hole.

[0004] Therefore, a combined disassembly grouting anchor is proposed. Summary of the invention

[0005] In order to overcome the above-mentioned defects of the prior art, the present invention provides a combined disassembly grouting anchor rod to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above object, the present invention provides the following technical solution: a combined disassembly grouting anchor rod, comprising: The anchor body is composed of a plurality of bundles of prestressed steel strands, wherein the prestressed steel strands are 2, 3 or 4 bundles, and each bundle is a 7X15.2X1860 grade bonded prestressed steel strand; The grouting pipe system includes a primary grouting pipe and a secondary grouting pipe. The primary grouting pipe is a plastic pipe with an outer diameter of 25 mm, which is used for the initial injection of cement mortar. The secondary grouting pipe is made of a polyethylene pipe, and its grout outlet is located 0.5 m above the bottom of the hole, and the exposed length of the anchor head steel strand is not less than 600 mm. The secondary grouting pipe is arranged with a grout outlet hole every 30 cm in a radial direction of 120° clockwise within the range of the rear end 2 / 3 anchoring length, and is sealed with adhesive tape; Fixed pipe racks are set up every 1.5m along the anchor body to support and protect the prestressed steel strands; Isolation device, including butter and isolation tube, used to wrap the free section of anchor rod to prevent mortar from penetrating; Grouting material: cement mortar with a consistency of about 60mm, a water-cement ratio of 0.5-0.55, a cement dosage of not less than 30kg / m, ordinary Portland cement with a grade of P.O42.5, and medium sand with a ratio of 1:3 (weight ratio); The disassembly and locking device is used for locking the anchor rod after tensioning and disassembly when necessary, including an anchor tool clip and a pre-tensioning adjustment mechanism.

[0007] Preferably, during the processing and installation of the anchor body, a casing-following drilling process is adopted, and a construction method of three-step drilling is adopted to ensure the quality of the hole and prevent water and sand gushing.

[0008] Preferably, the primary grouting is carried out with a cement mortar pump, and secondary high-pressure grouting is carried out after initial setting. The grouting pressure is not less than 2.5-5.0 MPa, and the amount of cement for the secondary grouting is not less than 50 kg / m.

[0009] Preferably, the anchor bolt is tensioned after the anchor strength reaches 15 MPa (generally 7 days after the second high-pressure grouting), tensioned to 1.2 times the designed locking value and locked, and the anchor bolt axial force is measured and adjusted regularly to ensure the stability of prestress loss.

[0010] The grouting anchor construction process includes the following steps: S1: Construction preparation, ensuring that the required materials such as prestressed steel strands, grouting pipes, cement mortar, early strength agent, etc. are in place and meet the quality requirements; checking whether the anchor drill, grouting bucket, grouting pump, mortar pump and other equipment are in good condition, and conducting necessary debugging; cleaning and leveling the construction site to ensure that there is no debris in the construction area to facilitate the entry and operation of equipment; S2: According to the design requirements, the prestressed steel strands are cut into the required length and assembled into the anchor body. A fixed pipe rack is set up every 1.5m. The grouting pipe is inserted in the middle of the anchor body. The grouting pipe should be a plastic pipe with an outer diameter of 25mm and inserted into the bottom of the hole. The free section of the anchor needs to be coated with butter and wrapped with an isolation tube. S3: According to the construction drawings, accurately measure and mark the hole positions of the anchor bolts; adjust the anchor drilling rig to the appropriate angle, align it with the center of the hole position, and ensure that the drilling rig is stable; S4: Use casing follow-up drilling technology, a three-step drilling method, and maintain a moderate construction speed during drilling to avoid collapse in the hole due to excessive drilling speed; ensure that the inner tube is not larger than the outer tube by 10 cm to ensure the quality of the hole; S5: Slowly lower the processed anchor body (including grouting pipe) into the hole to ensure that the anchor is in the correct position without distortion or jamming; S6: Use a cement mortar pump to inject cement mortar for one grouting. The water-cement ratio is 0.5-0.55, and the cement dosage is not less than 30kg / m. During the grouting process, it is necessary to pay attention to the loss of slurry and make up the slurry in time if necessary. After one grouting, if the slurry loss is large, it is necessary to make up the grouting at the hole before the initial setting of the anchor slurry to ensure that the slurry in the anchor section is full. S7: After the primary grouting strength reaches 5MPa, secondary high-pressure grouting is carried out. The grouting pressure is not less than 2.5-5.0MPa, the cement volume of the secondary grouting is not less than 50kg / m, and the grouting pipe outlet is located 0.5m above the bottom of the hole; S8: After the grouting is completed, the anchor rods are maintained as necessary to ensure that the anchor strength meets the design requirements. When the anchor strength reaches 15MPa (generally 7 days after the second high-pressure grouting), prestress is applied according to the design requirements to tension the anchor rods. During the tensioning process, the load needs to be loaded gently to avoid damage to the anchor rods. S9: Inspect the anchor rod after tensioning, check whether the anchor rod displacement and pressure gauge pressure are stable. After acceptance, lock the anchor rod. Pre-tensioning is required before locking, and the tensioning value is fine-tuned according to actual conditions to ensure that the anchor rod prestress loss is stable and meets the locking load requirements.

[0011] Technical effects and advantages of the present invention: 1. The casing follow-up drilling technology and the three-step drilling method are adopted to effectively avoid the problems of hole collapse and sand gushing that are prone to occur in traditional construction, and improve the quality of anchor hole formation.

[0012] 2. By improving the grouting materials and optimizing the grouting process, the bearing capacity and stability of the anchor rods are improved, and the overall effect of the support project is enhanced.

[0013] 3. The design of combined disassembly grouting anchor is easy to disassemble and recycle, which reduces material waste and environmental pollution and reduces construction costs.

[0014] 4. Traditional anchor cable drilling construction will cause a series of quality problems in water-rich sand layers, affecting the construction progress. The use of this construction method has largely solved this problem, shortened the construction time, and reduced the construction cost investment, creating good benefits for enterprises and society, accelerating the construction progress and achieving significant economic benefits. The optimization of construction technology has reduced the uncertainty and risk in construction and improved construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a construction process flow chart of the present invention.

[0016] Figure 2 It is a schematic diagram of the construction result of the traditional anchor cable process in the first embodiment of the present invention.

[0017] Figure 3 It is a curve diagram of the change rate of horizontal displacement monitoring of the construction process of the present invention.

[0018] Figure 4 It is a curve diagram of the vertical displacement monitoring change rate of the construction process of the present invention. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] As attached Figure 1 The combined disassembly grouting anchor shown comprises: The anchor body is composed of a plurality of bundles of prestressed steel strands, wherein the prestressed steel strands are 2, 3 or 4 bundles, and each bundle is a 7X15.2X1860 grade bonded prestressed steel strand; The grouting pipe system includes a primary grouting pipe and a secondary grouting pipe. The primary grouting pipe is a plastic pipe with an outer diameter of 25 mm, which is used for the initial injection of cement mortar. The secondary grouting pipe is made of a polyethylene pipe, and its grout outlet is located 0.5 m above the bottom of the hole, and the exposed length of the anchor head steel strand is not less than 600 mm. The secondary grouting pipe is arranged with a grout outlet hole every 30 cm in a radial direction of 120° clockwise within the range of the rear end 2 / 3 anchoring length, and is sealed with adhesive tape; Fixed pipe racks are set up every 1.5m along the anchor body to support and protect the prestressed steel strands; Isolation device, including butter and isolation tube, used to wrap the free section of anchor rod to prevent mortar from penetrating; Grouting material: cement mortar with a consistency of about 60mm, a water-cement ratio of 0.5-0.55, a cement dosage of not less than 30kg / m, ordinary Portland cement with a grade of P.O42.5, and medium sand with a ratio of 1:3 (weight ratio); The disassembly and locking device is used for locking the anchor rod after tensioning and disassembly when necessary, including an anchor tool clip and a pre-tensioning adjustment mechanism.

[0021] During the processing and installation of the anchor body, a casing-following drilling process and a three-step drilling construction method are adopted to ensure the quality of the hole and prevent water and sand gushing.

[0022] The primary grouting is carried out by a cement mortar pump, and secondary high-pressure grouting is carried out after initial setting. The grouting pressure is not less than 2.5-5.0 MPa, and the amount of cement for the secondary grouting is not less than 50 kg / m.

[0023] The anchor bolt tensioning is carried out after the anchor body strength reaches 15MPa (generally 7 days after the second high-pressure grouting), and is locked after tensioning to 1.2 times the designed locking value. The anchor bolt axial force is measured and adjusted regularly to ensure the stability of prestress loss.

[0024] The grouting anchor construction process includes the following steps: S1: Construction preparation, ensuring that the required materials such as prestressed steel strands, grouting pipes, cement mortar, early strength agent, etc. are in place and meet the quality requirements; checking whether the anchor drill, grouting bucket, grouting pump, mortar pump and other equipment are in good condition, and conducting necessary debugging; cleaning and leveling the construction site to ensure that there is no debris in the construction area to facilitate the entry and operation of equipment; Specifically, the equipment used includes: a BHD-180B anchor drilling rig, a slurry mixing bucket, a BW250 grouting pump, and a UHB-ZK mortar pump; S2: According to the design requirements, the prestressed steel strands are cut into the required length and assembled into the anchor body. A fixed pipe rack is set up every 1.5m. The grouting pipe is inserted in the middle of the anchor body. The grouting pipe should be a plastic pipe with an outer diameter of 25mm and inserted into the bottom of the hole. The free section of the anchor needs to be coated with butter and wrapped with an isolation tube. S3: According to the construction drawings, accurately measure and mark the hole positions of the anchor bolts; adjust the anchor drilling rig to the appropriate angle, align it with the center of the hole position, and ensure that the drilling rig is stable; S4: Use casing follow-up drilling technology, a three-step drilling method, and maintain a moderate construction speed during drilling to avoid collapse in the hole due to excessive drilling speed; ensure that the inner tube is not larger than the outer tube by 10 cm to ensure the quality of the hole; S5: Slowly lower the processed anchor body (including grouting pipe) into the hole to ensure that the anchor is in the correct position without distortion or jamming; In the specific implementation, the steel strands are 2 / 3 / 4 bundles of φ15.2 prestressed steel strands (strength grade 1860MPa). To ensure the protective layer of the steel strands in the hole, a fixed pipe rack is set up every 1.5m. The grouting pipe is inserted in the middle of the rod body. The grouting pipe should be a plastic pipe with an outer diameter of 25mm and inserted into the bottom of the hole. The free section of the anchor rod should be coated with butter and wrapped with an isolation pipe. The cutting length of the anchor rod is the design length plus 1.5m.

[0025] S6: Use a cement mortar pump to inject cement mortar for one grouting. The water-cement ratio is 0.5-0.55, and the cement dosage is not less than 30kg / m. During the grouting process, it is necessary to pay attention to the loss of slurry and make up the slurry in time if necessary. After one grouting, if the slurry loss is large, it is necessary to make up the grouting at the hole before the initial setting of the anchor slurry to ensure that the slurry in the anchor section is full. Specifically, ordinary Portland cement with a grade of P.O42.5 was used as cement, medium sand was used as sand, and the cement mortar ratio was 1:3 (weight ratio). Every 30 cement mortar test blocks were made into 2 groups, with 3 blocks in each group.

[0026] S7: After the primary grouting strength reaches 5MPa, secondary high-pressure grouting is carried out. The grouting pressure is not less than 2.5-5.0MPa, the cement volume of the secondary grouting is not less than 50kg / m, and the grouting pipe outlet is located 0.5m above the bottom of the hole; During the specific implementation, all anchor rods adopt the secondary high-pressure grouting process. The secondary high-pressure grouting should be carried out after the primary grouting strength reaches 5MPa. The grouting pressure shall not be less than 2.5-5.0MPa, and the cement volume of the secondary grouting shall not be less than 50kg / m. The grouting outlet of the secondary grouting pipe is located 0.5m above the bottom of the hole. The grouting pipe is made of polyethylene pipe. There are two grouting pipes with the same length as the anchor hole. The exposed length of the anchor head steel strand is not less than 600mm. Within the 2 / 3 anchoring length at the rear end, a grouting hole is arranged every 30cm on the plastic pipe at a radial angle of 120° clockwise and sealed with tape. The head of the grouting pipe is bent and tied securely with lead wire. The secondary grouting pipe is located 0.5m above the bottom of the hole, and the high-pressure grouting pipe is tied to the isolation frame with the steel strand; S8: After the grouting is completed, the anchor rods are maintained as necessary to ensure that the anchor strength meets the design requirements. When the anchor strength reaches 15MPa (generally 7 days after the second high-pressure grouting), prestress is applied according to the design requirements to tension the anchor rods. During the tensioning process, the load needs to be loaded gently to avoid damage to the anchor rods. In specific implementation, after the anchor body strength reaches 15MPa (generally 7 days after the second high-pressure grouting), and the concrete strength of the crown beam reaches more than 70% of the design value, prestress is applied according to the design requirements, the anchor rod is tensioned, and the anchor head is tightened. Before the anchor rod is locked, the anchor rod is pre-tensioned 1 to 2 times according to 20% of the standard value of the axial tension. Each time, the anchor tool clip should be loosened to level the steel strand, so that the rod body is straight and all parts are in close contact. The anchor rod tensioning should be loaded gently; S9: Inspect the anchor rod after tensioning, check whether the anchor rod displacement and pressure gauge pressure are stable. After acceptance, lock the anchor rod. Pre-tensioning is required before locking, and the tensioning value is fine-tuned according to actual conditions to ensure that the anchor rod prestress loss is stable and meets the locking load requirements.

[0027] During specific implementation, when the anchor rod is tensioned, the anchor rod should be inspected first, and tensioned to 1.4 times the axial standard value in 10 levels (no clips are placed in the anchor head during this tensioning), and maintained for 10 minutes. The anchor rod displacement and pressure gauge pressure under this tensioning value should be able to remain stable. When the pressure gauge pressure is unstable or the anchor rod displacement is unstable, the anchor rod should be judged as unqualified and reported to the management personnel; if it is qualified, the anchor should be withdrawn and then locked (a clip is placed in the anchor head). Since the prestressed tendons will cause prestress loss due to shrinkage deformation and friction when the anchor rod is locked and for a period of time after locking, the test anchor rod is tensioned to 1.2 times the designed locking value and locked. After locking, the axial force of the anchor rod is measured regularly until the axial force of the anchor rod is stable. The stable value of the axial force of the anchor rod is compared with the tensioning value when locked, and the tensioning value when locked is fine-tuned to achieve the locking load requirement after the prestress loss of the anchor rod is stabilized.

[0028] The process principle of the present invention is as follows: the casing follow-up drilling process is adopted, and the drilling method of construction is carried out every three jumps. After the anchor cable is holed, the steel strand is immediately put in. The cement mortar is injected with a cement mortar pump for the first grouting. The cement mortar is added with an early strength agent to make it solidify as soon as possible. After the initial setting, the secondary grouting is carried out. The secondary grouting uses cement slurry. The adjacent holes are constructed no less than 12 hours after the grouting, which effectively ensures the construction quality of the anchor cable.

[0029] Example 1 like Figure 2 As shown, the deep foundation pit support of the Qingxu Sunshine International Business Center project adopts prestressed anchor cable construction. However, as shown in the figure above, there are many geological sand layers and the groundwater level is high. It is a water-rich sand layer. The traditional construction method will cause hole collapse, sand gushing and other phenomena, and will also cause cracks in Zilin Road.

[0030] The casing follow-up drilling technology was adopted, the drilling method of three-step drilling was adopted, the cement slurry was replaced with cement mortar with higher consistency, and the grouting pump was replaced. This construction technology ensured the quality of anchor hole formation, and also solved the crack problem of Zilin Road, so that the vertical and horizontal displacement of the cracks would no longer change.

[0031] like Figure 3 and Figure 4 As shown, through Figure 3 and Figure 4 According to the comparison in the previous study, after the construction process was adjusted to the anchor cable construction technology in the water-rich sand layer, the deformation trend was significantly improved, the bearing capacity of the deep foundation pit support was improved, the influence of this adverse geology was eliminated as much as possible, the cost investment was reduced, and it was increasingly favored by construction engineering companies.

[0032] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. Combined disassembly grouting anchor, characterized in that: include: The anchor body is composed of a plurality of bundles of prestressed steel strands, wherein the prestressed steel strands are 2, 3 or 4 bundles, and each bundle is a 7X15.2X1860 grade bonded prestressed steel strand; The grouting pipe system includes a primary grouting pipe and a secondary grouting pipe. The primary grouting pipe is a plastic pipe with an outer diameter of 25 mm, which is used for the initial injection of cement mortar. The secondary grouting pipe is made of a polyethylene pipe, and its grout outlet is located 0.5 m above the bottom of the hole, and the exposed length of the anchor head steel strand is not less than 600 mm. The secondary grouting pipe is arranged with a grout outlet hole every 30 cm in a radial direction of 120° clockwise within the range of the rear end 2 / 3 anchoring length, and is sealed with adhesive tape; Fixed pipe racks are set up every 1.5m along the anchor body to support and protect the prestressed steel strands; Isolation device, including butter and isolation tube, used to wrap the free section of anchor rod to prevent mortar from penetrating; Grouting material: cement mortar with a consistency of about 60mm, a water-cement ratio of 0.5-0.55, a cement dosage of not less than 30kg / m, ordinary Portland cement with a grade of P.O42.5, and medium sand with a ratio of 1:3 (weight ratio); The disassembly and locking device is used for locking the anchor rod after tensioning and disassembly when necessary, including an anchor tool clip and a pre-tensioning adjustment mechanism.

2. The combined disassembly grouting anchor rod according to claim 1 is characterized in that: During the processing and installation of the anchor body, a casing-following drilling process and a three-step drilling construction method are adopted to ensure the quality of the hole and prevent water and sand gushing.

3. The combined disassembly grouting anchor according to claim 1 is characterized in that: The primary grouting is carried out by a cement mortar pump, and secondary high-pressure grouting is carried out after initial setting. The grouting pressure is not less than 2.5-5.0 MPa, and the amount of cement for the secondary grouting is not less than 50 kg / m.

4. The combined disassembly grouting anchor rod according to claim 1 is characterized in that: The anchor bolt tensioning is carried out after the anchor body strength reaches 15MPa (generally 7 days after the second high-pressure grouting), and is locked after tensioning to 1.2 times the designed locking value. The anchor bolt axial force is measured and adjusted regularly to ensure the stability of prestress loss.

5. Grouting anchor construction process, characterized in that: The following steps are involved: S1: Construction preparation, ensuring that the required materials such as prestressed steel strands, grouting pipes, cement mortar, early strength agent, etc. are in place and meet the quality requirements; checking whether the anchor drill, grouting bucket, grouting pump, mortar pump and other equipment are in good condition, and conducting necessary debugging; cleaning and leveling the construction site to ensure that there is no debris in the construction area to facilitate the entry and operation of equipment; S2: According to the design requirements, the prestressed steel strands are cut into the required length and assembled into the anchor body. A fixed pipe rack is set up every 1.5m. The grouting pipe is inserted in the middle of the anchor body. The grouting pipe should be a plastic pipe with an outer diameter of 25mm and inserted into the bottom of the hole. The free section of the anchor needs to be coated with butter and wrapped with an isolation tube. S3: According to the construction drawings, accurately measure and mark the hole positions of the anchor bolts; adjust the anchor drilling rig to the appropriate angle, align it with the center of the hole position, and ensure that the drilling rig is stable; S4: Use casing follow-up drilling technology, a three-step drilling method, and maintain a moderate construction speed during drilling to avoid collapse in the hole due to excessive drilling speed; ensure that the inner tube is not larger than the outer tube by 10 cm to ensure the quality of the hole; S5: Slowly lower the processed anchor body (including grouting pipe) into the hole to ensure that the anchor is in the correct position without distortion or jamming; S6: Use a cement mortar pump to inject cement mortar for one grouting. The water-cement ratio is 0.5-0.55, and the cement dosage is not less than 30kg / m. During the grouting process, it is necessary to pay attention to the loss of slurry and make up the slurry in time if necessary. After one grouting, if the slurry loss is large, it is necessary to make up the grouting at the hole before the initial setting of the anchor slurry to ensure that the slurry in the anchor section is full. S7: After the primary grouting strength reaches 5MPa, secondary high-pressure grouting is carried out. The grouting pressure is not less than 2.5-5.0MPa, the cement volume of the secondary grouting is not less than 50kg / m, and the grouting pipe outlet is located 0.5m above the bottom of the hole; S8: After the grouting is completed, the anchor rods are maintained as necessary to ensure that the anchor strength meets the design requirements. When the anchor strength reaches 15MPa (generally 7 days after the second high-pressure grouting), prestress is applied according to the design requirements to tension the anchor rods. During the tensioning process, the load needs to be loaded gently to avoid damage to the anchor rods. S9: Inspect the anchor rod after tensioning, check whether the anchor rod displacement and pressure gauge pressure are stable. After acceptance, lock the anchor rod. Pre-tensioning is required before locking, and the tensioning value is fine-tuned according to actual conditions to ensure that the anchor rod prestress loss is stable and meets the locking load requirements.