Optimal selection method for hole-lane communication mode
Through the combination of numerical simulation and theoretical calculation, the layout parameters of high-pull tunnels and high-level drilling or oblique drilling are optimized, which solves the problem of high-gas release in coal mines, improves the gas extraction effect, reduces the gas concentration in the upper corner, and ensures that The production safety of coal mines.
Patent Information
- Application Number
- CN202411120181.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-12
AI Technical Summary
During coal mining, the coupling of high ground stress, high gas pressure and cracks is severely damaged by the mine, especially the frequent gas accidents in the comprehensive release working face of high gas, and it is difficult to completely solve the problem of upper corners in existing high-pull lanes, especially in When there is a high mining and a lot of coal left.
Through numerical simulation and theoretical calculation, the results of movement failure of mining overcast rocks under high-pull tunnel conditions are determined, combined with high-level drilling or oblique drilling, the drilling arrangement parameters are optimized, goaf model is established, and gas migration and concentration distribution are simulated. Regularly, choose reasonable gas treatment measures.
It enhances the gas extraction effect, reduces the gas concentration at the upper corner, and provides support for the safe production of coal mines.
Smart Images

Figure CN118933992A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mining, and in particular relates to a method for optimizing a hole-lane connection mode. Background Art
[0002] With the improvement of intelligent and mechanized coal mining, although the coal cutting speed of coal mining machines has been continuously improved and the coal production efficiency has been improved, it also causes strong mining disturbance to the surrounding rock. At the same time, with the increase of mining depth, there are high ground stress and high gas pressure. The mine hazards caused by the mutual coupling of the three factors will be more serious. Gas accidents in the upper corners and return air lanes are frequent. Gas accidents are also one of the main causes of coal mine safety accidents. Gas problems in high-gas fully mechanized caving working faces are more worthy of attention.
[0003] Common extraction methods used in underground coal mines include directional long drilling, upper corner buried pipes, high-position drilling and other measures. Among them, high-extraction lanes have the advantages of large extraction volume and stable extraction. In recent years, they have gradually become the main means of controlling high-gas fully-mechanized caving working faces. With the increase of mining intensity during the advancement of the mining face, the better the formation of cracks, the more obvious the extraction effect of high-extraction lanes. In actual mining, high-extraction lanes are generally arranged in the fracture zone, which is not prone to collapse, and can effectively extract gas throughout the entire mining period. In turn, the gas concentration generated during mining is reduced, and the gas concentration in the upper corner is reduced.
[0004] However, in the case of large mining height and a lot of coal residue, it is difficult to solve the upper corner problem only by high extraction tunnel. Therefore, by combining high extraction tunnel with high-position drilling or oblique drilling, we analyze different mining stages and select reasonable gas control measures. Then, by optimizing the drilling layout parameters, we provide a theoretical basis for on-site drilling layout. Summary of the invention
[0005] The purpose of the present invention is to provide a method for optimizing the hole-lane connection mode. The present invention is based on numerical simulation to determine the advantages and disadvantages of combining high-extraction lanes with high-position drilling or oblique drilling under different advancement conditions.
[0006] The present invention adopts the following technical solution: A method for optimizing the hole-lane interconnection mode comprises the following steps: The first step is to obtain the geological parameters of the coal seam to be mined and the gas emission law; The second step is to obtain the overburden movement and damage results under the condition of high extraction tunnel through theoretical calculation and numerical simulation, and determine the height of caving zone and fracture zone; The third step is to establish a goaf model with high-extraction lane combined with high-position drilling or oblique drilling, simulate the gas migration law of the goaf, the air leakage law of the goaf, the gas concentration distribution law of the working face and the upper corner under different goaf models, and compare and analyze the gas control characteristics under the two hole-lane connection modes of high-extraction lane combined with high-position drilling or oblique drilling; The fourth step is to optimize the drilling layout parameters.
[0007] Furthermore, the geological parameters of the coal seam in the first step include coal body density ρ, shear modulus G, bulk modulus K, internal friction angle θ, cohesion B, and tensile strength C.
[0008] Furthermore, the method for determining the height of the caving zone and the fracture zone in the second step is as follows: the height N of the caving zone in the goaf is calculated by theoretical calculation. 冒 , fracture zone height N 裂 , N 冒 and N 裂 All are range values, the upper limit is recorded as N 裂1 、N 冒1 , the lower limit is recorded as N 裂2 、N 冒2 ; The evolution law of the goaf during mining is obtained by numerical simulation, including: modeling the coal seam and overlying rock through the numerical simulation software FLAC3D, studying the stress and plasticity change law of the overlying rock during the goaf formation process, and analyzing the caving zone height L 冒 and the fracture zone height L 裂 , and the vertical stress M 垂 ; N 冒2 <L 冒 ±0.5m<N 冒1 , N 裂2 <L 裂 <N 裂1 , after meeting the requirements, 冒 and L 裂 Round off to determine the final height of the caving zone and fracture zone in the goaf.
[0009] Furthermore, the drilling arrangement parameters in the fourth step include drilling diameter, drilling spacing, extraction negative pressure and drilling angle; the optimization is designed using the response surface method, and the method of mathematical combination is applied to combine 4 factors and 5 level values to determine the total number of experimental schemes A, where A is a positive integer, and the numerical values of drilling diameter, drilling spacing, extraction negative pressure and drilling angle are all between the maximum and minimum values of the coal seam to be studied.
[0010] The beneficial effects of the present invention are as follows: The present invention collects on-site coal seam parameters to ensure the authenticity and reliability of the results; determines the height of the fissure zone and the caving zone in the goaf under the condition of high extraction tunnel by combining theoretical calculation and numerical simulation; the height of the fissure zone and the caving zone in the goaf under the condition of high extraction tunnel obtained by theoretical calculation is a range value, and the fissure zone and the caving zone in the goaf under the condition of high extraction tunnel obtained by simulation are specific values, therefore, the theoretical calculation and numerical simulation are combined to determine the size of the fissure zone and the caving zone in the goaf under the condition of high extraction tunnel, and the goaf model is established according to the rationalized values, including two basic models of high extraction tunnel combined with oblique drilling and high extraction tunnel combined with high-position drilling, and the response surface method is used to establish a drilling arrangement scheme with 4 factors and 5 horizontal values, and the drilling diameter, drilling spacing, extraction negative pressure, and drilling angle are comprehensively analyzed to determine the most effective drilling arrangement parameters. Enhance the gas extraction effect, reduce the gas concentration in the upper corner, and provide support for the safe production of top coal caving. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 This is the coal seam model diagram of FLAC3D software; Figure 2 This is the model diagram of different advancement distances of the working face of FLENT software; Figure 3 This is a model diagram of two gas control modes under 400m of the FLENT software working face, where a is high-extraction lane + oblique drilling; b is high-extraction lane + high-position drilling; Figure 4 This is the response surface analysis diagram; Among them: 1-high extraction lane; 2-return air lane; 3-inlet air lane; 4-working face; 5-caving zone; 6-fissure zone; 7-oblique drilling hole; 8-high-position drilling hole. DETAILED DESCRIPTION
[0012] The following will clearly describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0013] A method for optimizing the hole-lane interconnection mode comprises the following steps: The first step is to obtain the geological parameters of the coal seam to be mined and the gas emission law; The second step is to obtain the overburden movement and damage results under the condition of high extraction tunnel through theoretical calculation and numerical simulation, and determine the height of caving zone and fracture zone; The third step is to establish a goaf model with high-extraction lane combined with high-position drilling or oblique drilling, simulate the gas migration law of the goaf, the air leakage law of the goaf, the gas concentration distribution law of the working face and the upper corner under different goaf models, and compare and analyze the gas control characteristics under the two hole-lane connection modes of high-extraction lane combined with high-position drilling or oblique drilling; The fourth step is to optimize the drilling layout parameters.
[0014] Example The embodiment of the present invention discloses a preferred method for hole-lane connection mode. The present invention will be described in detail below by taking the specific example of selecting the drilling type and drilling arrangement parameters of the 15101 working face of a certain mine under the influence of mining dynamic pressure. Mine engineering overview: The 15201 working face is generally high in the middle and low on both sides, with the S2 anticline in the middle, the axial direction is close to EW, and it is inclined to E; the 15# coal seam has a stable occurrence, a simple structure, undeveloped coal seam bedding, and relatively developed joints. This coal seam is a stable and mineable coal seam. The average coal thickness of the working face is 4 m. According to the contour analysis of the bottom plate of the 15# coal seam, the inclination of the coal seam is between -7° and 17°. The strike length of the mining working face is 1037m and the dip length is 200m. The high extraction lane is arranged at a distance of 37.5m from the bottom plate of the 15# coal seam, and the return air lane is 26.7m. The lithology of the overlying strata on the 15201 working face is shown in Table 1, and a model is established according to Table 1.
[0015] Table 1 Lithology of overlying strata on 15201 working face According to the geological conditions of the coal seam, the mechanical parameters of the block model are assigned, the grid is divided, and a numerical simulation physical model is formed. The parameters of the coal seam are shown in Table 2.
[0016] Table 2 Coal and rock strata parameters Before the actual working face is mined, the initial stress equilibrium state of the model will be affected by the vertical stress caused by the gravity of the overlying rock strata. Since the model is not modeled from the surface, there are still coal and rock strata at the top of the model. Therefore, the vertical force caused by the gravity of the upper unsimulated area needs to be equivalent to the average load on the top surface of the model, calculated according to the following formula: , where: P is the load, kg / (m 2 ); D is the height of the coal-rock layer without model, m; ρ is the density of the coal-rock layer, kg / m 3 ; g is the local gravity acceleration, m / s 2 .
[0017] Combined with the actual mining progress of the mine, the temporal and spatial evolution of the mining fracture field under different mining distances was simulated, and the movement and destruction of the overburden during the advancement of the mining face were analyzed; the height of the caving zone L was obtained. 冒=10.7m, fracture zone height L 裂 =30.3m.
[0018] The heights of the caving zone and the fracture zone are calculated using the theoretical formula described in Table 3.
[0019] Table 3 Theoretical formula Among them: α is the correction coefficient, α=1.0~1.3; M is the thickness of the coal seam.
[0020] M is 4m, α is 1.3, and the range of the caving zone N can be obtained by substituting it into the formula 冒 、Fissure zone range N 裂 , the specific parameters are as follows: .
[0021] Comply with N 冒2 <L 冒 ±0.5m<N 冒1 , N 裂2 <L 裂 <N 裂1 , for L 冒 The L crack is rounded off to the nearest whole number and used as the size of the model caving zone and fracture zone. The caving zone is taken as 10m and the fracture zone is taken as 30m.
[0022] Consult the mine data to obtain the gas emission volume of the coal seam working face, the goaf, the adjacent layers and the surrounding rock.
[0023] According to the different mining stages, condition one is to establish four mining models of 100m, 200m, 300m, and 400m; condition two is two mining condition models of high extraction lane combined with oblique drilling and high extraction lane combined with high-position drilling; under the two conditions, there are a total of eight models. After comparing and analyzing the gas concentration law of the upper corner, the air leakage law of the goaf, and the gas migration law, it is concluded that under the mining conditions of 100m and 200m, the high extraction lane combined with high-position drilling is more suitable; under the mining conditions of 300m and 400m, the high extraction lane combined with oblique drilling is more suitable.
[0024] The response surface analysis method was used to design the simulation scheme and obtain the optimal arrangement parameters of the drilling holes. Taking 400 m as an example, the scheme and results are shown in Table 4.
[0025] Table 4 Simulation scheme and results Under the condition of mining 400m, the oblique cutting drilling is selected, and its layout parameters are drilling diameter 130mm, drilling spacing 7m, extraction negative pressure 18kPa, and drilling angle 21°. The influence of drilling angle is more significant.
[0026] Other conclusions drawn using response surface analysis are as follows: Under the condition of mining at a depth of 100m, high-position drilling was selected, and its layout parameters were drilling diameter 170mm, drilling spacing 3m, extraction negative pressure 22kPa, and drilling angle 21°.
[0027] Under the condition of mining at a depth of 200m, high-position drilling was selected, and its layout parameters were drilling diameter 150mm, drilling spacing 5m, extraction negative pressure 20kPa, and drilling angle 21°.
[0028] Under the condition of mining 300m, oblique drilling is selected, and its layout parameters are drilling diameter 130mm, drilling spacing 5m, extraction negative pressure 18kPa, and drilling angle 19°.
[0029] It should be noted that, in this application, relational terms such as "first" and "second" are only used to refer to One entity or operation is distinguished from another entity or operation without necessarily requiring or implying any such actual relationship or order between these entities or operations. Moreover, the terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus comprising a series of elements includes not only those elements, but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus. In the absence of further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article, or apparatus comprising the element.
[0030] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for optimizing the hole-lane interconnection mode, characterized in that: The steps include: The first step is to obtain the geological parameters of the coal seam to be mined and the gas emission law; The second step is to obtain the overburden movement and damage results under the condition of high extraction tunnel through theoretical calculation and numerical simulation, and determine the height of caving zone and fracture zone; The third step is to establish a goaf model with high-extraction lane combined with high-position drilling or oblique drilling, simulate the gas migration law of the goaf, the air leakage law of the goaf, the gas concentration distribution law of the working face and the upper corner under different goaf models, and compare and analyze the gas control characteristics under the two hole-lane connection modes of high-extraction lane combined with high-position drilling or oblique drilling; The fourth step is to optimize the drilling layout parameters.
2. The optimization method of a hole-lane connection mode according to claim 1, characterized in that: The geological parameters of the coal seam in the first step include coal body density ρ, shear modulus G, bulk modulus K, internal friction angle θ, cohesion B, and tensile strength C.
3. The optimization method of a hole-lane connection mode according to claim 1, characterized in that: The method for determining the height of the caving zone and the fracture zone in the second step is as follows: The height N of the caving zone in the goaf is calculated theoretically. 冒 , fracture zone height N 裂 , N 冒 and N 裂 All are range values, the upper limit is recorded as N 裂1 、N 冒1 , the lower limit is recorded as N 裂2 、N 冒2 ; The evolution law of the goaf during mining is obtained by numerical simulation, including: modeling the coal seam and overlying rock through the numerical simulation software FLAC3D, studying the stress and plasticity change law of the overlying rock during the goaf formation process, and analyzing the caving zone height L. 冒 and the fracture zone height L 裂 , and the vertical stress M 垂 ; N 冒2 <L 冒 ±0.5m<N 冒1 , N 裂2 <L 裂 <N 裂1 , after meeting the requirements, 冒 and L 裂 Round off to determine the final height of the caving zone and fracture zone in the goaf.
4. The optimization method of a hole-lane connection mode according to claim 1, characterized in that: The drilling arrangement parameters in the fourth step include drilling diameter, drilling spacing, extraction negative pressure and drilling angle; the optimization is designed using the response surface method, and the method of mathematical combination is used to combine 4 factors and 5 level values to determine the total number of experimental schemes A, where A is a positive integer, and the numerical values of drilling diameter, drilling spacing, extraction negative pressure and drilling angle are all between the maximum and minimum values of the coal seam to be studied.