Ore room top column cementing support method adopting upward filling mining method

By constructing a filling strength and thickness model, combining construction information, the integrated support of suspended pillars and cemented filling is reserved, and the problem of independence of the cemented support design and construction of the mining roof column in the upward filling mining method is solved, and the problem of independence of the cemented support design and construction of the mining house is improved. The stability and security of the roof column of the mining house are realized, and information management and efficient mining are realized.

CN118934013APending Publication Date: 2024-11-12CENT SOUTH UNIV

Patent Information

Application Number
CN202410949851.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the existing upward filling mining method, the design and construction of the roof column cemented support of the mining house are relatively independent and lack of overall consideration, resulting in a single support design information and unreasonable use of construction information, resulting in unreasonable design and increased rework, and it is difficult to accurately determine. Fill body strength and thickness.

Method used

Designing the support method of mine house, including determining the strength and thickness model of the filling body, reserving integrated support of suspended pillars and cemented filling body, integrating construction process information, optimizing support design, and ensuring the stability of the filling patio through engineering geological data calculation sex.

Benefits of technology

It improves the pertinence and effectiveness of mining room support, enhances the stability and safety of the top column, reduces rework and maintenance costs, realizes integrated information management, and ensures the safety and efficiency of the mining process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118934013A_ABST
    Figure CN118934013A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of upward filling mining, and discloses an upward filling mining method mine room top column cementing support method, which comprehensively considers the mutual influence between a support structure and a construction process, and integrates a large amount of useful information in the construction process as a support design reference. Information integration of super-chamber support design and construction process parameters is realized, the super-chamber project management efficiency and level are improved, and safety, economy and high efficiency are realized; meanwhile, the stress and displacement distribution state of the chamber cemented filling body under the condition of full load of trackless equipment can be accurately analyzed through a method for constructing a filling body strength and thickness model, and a theoretical basis can be provided for compressive strength and thickness design of the chamber cemented filling body; the maximum vertical displacement value and the maximum vertical stress value of the chamber cemented filling body under the condition of full load of trackless equipment serve as basic parameters, the influence of the quality of the chamber cemented filling body on the stability is analyzed, and the chamber cemented filling body meets the operation requirement of the trackless equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of upward filling mining, and in particular relates to a method for cementing and supporting roof pillars of a mine room in an upward filling mining method. Background Art

[0002] The upward horizontal layered filling method is one of the most widely used filling mining methods at home and abroad. Its characteristics are: the ore block is divided into a mine room and a pillar, the mine room is mined first, and the pillar is mined later. The mine room is mined in layers (horizontal layers or inclined layers) from bottom to top. After each one or several layers are mined, filling is carried out in time to maintain the surrounding rock of the upper and lower plates and create working conditions for continuous mining; the pillars are mined by the filling method or other appropriate methods according to a reasonable mining sequence. It is suitable for mining high-grade, scarce, and precious ore bodies with unstable surrounding rocks, where the surface is not allowed to collapse, and where the mining conditions are complex, such as water bodies, railway trunk lines, ore bodies under major buildings, and ore bodies with the risk of spontaneous combustion. Among the filling mining methods, the upward filling mining method is widely used. The upward filling mining method divides the mine room into layers in vertical height and mines layer by layer from bottom to top. A filling skylight is arranged in the mine room to inject filling materials, and sometimes it is also used for lifting equipment, materials, ventilation and pedestrians. After each layer is mined, backfilling is carried out immediately, and ore chutes and pedestrian shafts (also used as drainage wells) are built in the backfill body. The mining process includes rock drilling, ore collapse, ore removal, construction of pedestrian shafts and ore chutes, construction of partition walls, backfilling and laying of cemented floor plates, etc. A high-strength cemented floor plate is laid on the top of each layer backfill body to reduce the depletion and loss of ore during ore removal and improve the efficiency of ore removal; however, the design and construction of the cemented support of the roof column of the existing upward backfill mining method are relatively independent or disconnected from each other, and the combination of support design and construction is not considered in an overall manner, which leads to a single source of information in the support design stage, making it difficult to verify the rationality of the design, and a large amount of useful information generated in the construction stage is not reasonably used; the construction process and procedures will directly affect the redistribution of stress in the surrounding rock of the backfill shaft, and the support design stage often does not combine the construction process information, resulting in unreasonable support design and increased rework; at the same time, the strength and thickness of the backfill body cannot be accurately determined.

[0003] Through the above analysis, the problems and defects of the prior art are as follows:

[0004] (1) The existing upward filling mining method of roof column cementation support design and construction are relatively independent or disconnected, and the support design and construction process are not considered in an integrated manner. This leads to a single source of information in the support design stage, making it difficult to verify the rationality of the design, while a large amount of useful information generated in the construction stage is not reasonably utilized; the construction technology and procedures will directly affect the redistribution of stress in the surrounding rock of the filling shaft, and the support design stage often does not combine the construction process information, resulting in unreasonable support design and increased rework.

[0005] (2) The strength and thickness of the filling cannot be accurately determined. Summary of the invention

[0006] In view of the problems existing in the prior art, the present invention provides a method for cementing and supporting roof pillars of a mine room in an upward filling mining method.

[0007] The present invention is achieved in that a method for cementing and supporting the roof pillars of a mine room in an upward filling mining method comprises:

[0008] Step 1: Mineral chamber design and determination of cemented filling strength and thickness

[0009] 1. Mine room design:

[0010] Design the mine room structure and support plan to ensure the stability of the mine room during the mining and filling process. This design not only includes the shaft support, but also covers the support structure of the entire mine room to ensure effective support for key parts such as the mine room roof pillar.

[0011] 2. Model construction of filling strength and thickness:

[0012] Based on the structure of the mine chamber and mining conditions, a filling strength and thickness model is constructed. The model should comprehensively consider factors such as ore body quality, mining depth, geological conditions, etc. to predict the required strength and thickness of the filling.

[0013] 3. Determination of cemented filling parameters:

[0014] Based on the constructed filling strength and thickness model, the specific strength and thickness required for the cemented filling are determined to meet the requirements of mine room stability and support strength.

[0015] Step 2: Filling process and roof support

[0016] 1. Reserve suspension pillars:

[0017] When mining the uppermost layer in the mine room, four suspension pillars are reserved. These pillars are used to form an integrated support structure with the cemented filling body after mining is completed.

[0018] 2. Filling and solidification of cementing filling materials:

[0019] The cementing filling material is filled into the space to be filled by filling the skylight. After the cementing filling body solidifies, it is integrated with the four suspension pillars to jointly support the roof column of the mine room, thereby enhancing the stability and bearing capacity of the roof column.

[0020] Further optimized design of mine support method

[0021] Calculation of engineering geological data:

[0022] Detailed calculation and analysis of the engineering geological data of the j-th section of the backfill shaft and mine room, which should include but not be limited to the physical and chemical properties of the rock, groundwater conditions, stress distribution, etc., in order to scientifically formulate a mine room support plan.

[0023] Further, the method for designing the mine room support is as follows:

[0024] (1) Calculate the engineering geological data of the jth section of the filled shaft; j = 1, 2, 3, 4, ...,

[0025] When j=1, the preferred order in the calculation is the engineering geological data calculated using the second measurement data of the j-th section of the filled shaft, and the engineering geological data calculated using the first measurement data.

[0026] When j≥2, the preferred order in the calculation is the engineering geological data calculated using the second measurement data of the j-th section of the filled shaft, the engineering geological data calculated using the second measurement data of the j-1-th section of the filled shaft, and the engineering geological data calculated using the first measurement data.

[0027] The first measurement data is measurement data in engineering geological survey, and the second measurement data is measurement data in the construction process.

[0028] The second measurement data includes third measurement data and fourth measurement data, wherein the third measurement data is measurement data in the actual exposure of surrounding rock measurement process, and the fourth measurement data is measurement data in the construction drilling process, and the engineering geological data includes lithology classification, rock formation occurrence parameters, rock mass integrity parameters, rock strength parameters, and groundwater status parameters;

[0029] (2) using the engineering geological data of the jth section of the filled shaft to determine the surrounding rock classification of the jth section of the filled shaft; designing n support schemes for the jth section of the filled shaft according to the obtained surrounding rock classification of the jth section of the filled shaft, where n≥2; judging the construction feasibility of each support scheme designed for the jth section of the filled shaft, and discarding unfeasible support schemes;

[0030] (3) Design the construction process steps of each feasible support scheme for the j-th section of the filling shaft; use the monitoring measurement data to adjust the construction process steps of each feasible support scheme; determine whether the construction period and cost of the construction process steps of each feasible support scheme meet the project requirements, and input the feasible support schemes and their construction process steps that meet the project requirements into the database; let j = j + 1 and jump to the first step.

[0031] Furthermore, the method further comprises:

[0032] Calculate the comprehensive evaluation score S of each feasible support scheme i=q 1 %×A i +q 2 %×B i +q 3 %×C i , the support scheme with the highest comprehensive evaluation score and the construction period and cost that meet the requirements is selected as the optimal support scheme, among which S i ∈[0, 100], q 1 %、q 2 %、q 3 % are the weights of safety evaluation score, construction period evaluation score and cost evaluation score in the comprehensive evaluation score, respectively. i , B i , C i They are respectively the safety evaluation score, construction period evaluation score, and cost evaluation score of the i-th feasible support scheme.

[0033] Further, the engineering geological data calculated using the third measurement data has a higher priority in the calculation than the engineering geological data calculated using the fourth measurement data.

[0034] Furthermore, the engineering geological data also includes blasting block size parameters, and the second measurement data also includes fifth measurement data, the fifth measurement data is measurement data during the construction blasting process, and the engineering geological data calculated using the fifth measurement data has a lower priority in the calculation than the engineering geological data calculated using the third measurement data, and its priority is higher than the priority of the engineering geological data calculated using the fourth measurement data.

[0035] Further, the method for constructing the filling body strength and thickness model is as follows:

[0036] 1) Analysis of the mechanical effects and stability influencing factors of the cemented filling body in the mine room, and construction of the mechanical model of the cemented filling body in the mine room:

[0037] 2) Analysis of stress and displacement distribution of cemented filling in the mine room, and establishment of strength and thickness model of cemented filling in the mine room:

[0038] According to the mechanical model of the cemented filling body of the mine room, the vertical displacement and vertical stress distribution state of the cemented filling body of the mine room under the vertical load of the fully loaded trackless equipment are analyzed by using the basic solution of the elastic mechanics theory of Bushines. The vertical stress and vertical displacement state of the cemented filling body of the mine room under the horizontal load of the fully loaded trackless equipment are analyzed by using the basic solution of the elastic mechanics theory of Sayruti.

[0039] According to the principle of stress superposition, the vertical stress and vertical displacement distribution of the cemented filling body of the mine room under the combined action of the vertical load and horizontal load of the fully loaded trackless equipment are analyzed;

[0040] According to the vertical stress distribution state of the cemented filling body of the mine room under the load of the fully loaded trackless equipment, the maximum vertical stress of the cemented filling body of the mine room is determined to meet the strength design requirements of the normal operation of the fully loaded trackless equipment and consider a certain safety factor to establish the compressive strength model of the cemented filling body of the mine room;

[0041] According to the vertical displacement distribution state of the cemented filling body of the mine room under the load of the fully loaded trackless equipment, the maximum vertical displacement of the cemented filling body of the mine room is determined. According to the relationship between the vertical displacement, thickness, elastic modulus, stress and strain of the cemented filling body of the mine room, the thickness model of the cemented filling body of the mine room is established on the premise that the cemented filling body of the mine room is still in an elastic state after the maximum deformation, considering a certain safety factor.

[0042] Furthermore, the mechanical effect and stability influencing factors of the cemented filling body of the mine room are as follows:

[0043] The stope structure characteristics of the upward horizontal layer filling mining method are: no matter what form is used to recover the layers, the stope roof is the ore body, and the floor is the cemented filling body of the mine room;

[0044] The mechanical effect of the cemented filling body in the mine room is as follows: the cemented filling body in the mine room, as a working platform for continued mining, needs to meet the conditions for the operation of fully loaded trackless equipment and ensure stability and integrity in the process of serving layered mining;

[0045] Factors affecting the stability of the cemented filling body of the mine room: The direct cause of the destruction of the cemented filling body of the mine room is that the stress value of the load acting on the cemented filling body of the mine room when the fully loaded trackless equipment is running is greater than the design strength. The load acting on the cemented filling body of the mine room when the fully loaded trackless equipment is running is divided into vertical load and horizontal load.

[0046] Furthermore, the mechanical model of the cemented filling body of the mine room is:

[0047] The vertical load and horizontal load of the fully loaded trackless equipment directly act on the cemented filling body of the mine room through the tires. There is surface contact between the two. The cemented filling body of the mine room is regarded as a half-space body. The mechanical model of the cemented filling body of the mine room can be divided into the half-space body being subjected to vertical uniformly distributed load on the boundary and the half-space body being subjected to horizontally uniformly distributed load on the boundary. To simplify the analysis, the mechanical model can be simplified to the half-space body being subjected to vertical concentrated force on the boundary and the half-space body being subjected to horizontal concentrated force on the boundary.

[0048] Furthermore, the mechanical effect and stability influencing factors of the cemented filling body of the mine room are analyzed:

[0049] According to the typical process characteristics of the upward horizontal layered filling mining method in different stope structures, the mechanical effect of the cemented filling body in the mine room as a working platform for continued mining in the stope is analyzed to meet the requirements for normal operation of fully loaded trackless equipment; the strength requirements and stability influencing factors of the cemented filling body in the mine room are analyzed.

[0050] Furthermore, the mechanical model of the cemented filling body of the mine is constructed:

[0051] According to the mechanical effect of the cemented filling body in the mine room and the load characteristics imposed on the cemented filling body in the mine room when the fully loaded trackless equipment is running, a mechanical model of the cemented filling body in the mine room is constructed, and the vertical load mechanical model and the horizontal load mechanical model are established.

[0052] In combination with the above technical solutions and the technical problems solved, the advantages and positive effects of the technical solutions to be protected by the present invention are as follows:

[0053] First, the present invention comprehensively considers the mutual influence between the support structure and the construction process by designing the mine room support method, integrates a large amount of useful information in the construction process as a reference for support design, realizes the information integration of the super mine room support design and the construction process parameters, improves the efficiency and level of super mine room engineering management, and achieves safety, economy and high efficiency; at the same time, by constructing the filling body strength and thickness model method, the stress and displacement distribution state of the mine room cemented filling body under the condition of full load of trackless equipment can be accurately analyzed, which can provide a theoretical basis for the compressive strength and thickness design of the mine room cemented filling body; based on the maximum vertical displacement and maximum vertical stress values ​​of the mine room cemented filling body under the condition of full load of trackless equipment, the influence of the quality of the mine room cemented filling body on the stability is analyzed, and the mine room cemented filling body meets the requirements of trackless equipment operation, considering a certain safety factor, and constructs a compressive strength and thickness design model of the mine room cemented filling body.

[0054] Second, the present invention comprehensively considers the mutual influence between the support structure and the construction process by designing the mine room support method, integrates a large amount of useful information in the construction process as a reference for support design, realizes the information integration of the super mine room support design and the construction process parameters, improves the efficiency and level of super mine room engineering management, and achieves safety, economy and high efficiency; at the same time, by constructing the filling body strength and thickness model method, the stress and displacement distribution state of the mine room cemented filling body under the condition of full load of trackless equipment can be accurately analyzed, which can provide a theoretical basis for the compressive strength and thickness design of the mine room cemented filling body; based on the maximum vertical displacement and maximum vertical stress values ​​of the mine room cemented filling body under the condition of full load of trackless equipment, the influence of the quality of the mine room cemented filling body on the stability is analyzed, and the mine room cemented filling body meets the requirements of trackless equipment operation, considering a certain safety factor, and constructs a compressive strength and thickness design model of the mine room cemented filling body.

[0055] Third, the method for cementing and supporting the roof pillars of the upward filling mining method proposed in the present invention embodies the following significant technical advances compared with the prior art:

[0056] 1. Improve the pertinence and effectiveness of mine support: By introducing the filling strength and thickness model into the mine support design, this method can more accurately determine the strength and thickness of the cemented filling, thereby improving the stability and safety of the mine roof column in a targeted manner. This method is personalized according to specific engineering geological data and mine characteristics, and has higher efficiency and applicability than the traditional one-size-fits-all support solution.

[0057] 2. Innovative support structure design: Four suspension pillars are reserved during the topmost layer mining, and these pillars are used to form an integrated support structure with the cemented filling body. This design innovation effectively utilizes the synergy between the filling material and the mine room structure, significantly enhancing the bearing capacity and anti-deformation ability of the top pillar. The application of this integrated support structure is a technological advancement that is difficult to achieve with traditional methods.

[0058] 3. Optimized application of engineering geological data: By calculating the engineering geological data of the section where the fill shaft is located and designing the shaft support plan based on these data, this method can ensure the stability of the fill shaft during the entire filling process. This precise calculation and design based on actual geological conditions improves the reliability of the support structure and reduces potential safety risks.

[0059] 4. Enhanced protection of the top pillars of the mine room: By precisely controlling the strength and thickness of the cemented filling body and by pre-reserving the integrated support structure formed by the suspended pillars and the cemented filling body, the stability and safety of the top pillars of the mine room during the mining process are significantly improved. This method effectively solves the problem of easy damage to the top pillars in the upward filling mining method, prolongs the service life of the mine room, and reduces the cost of maintenance and reconstruction.

[0060] The method provided by the present invention embodies significant technological progress in improving the pertinence and effectiveness of mine room support, innovative support structure design, optimized application of engineering geological data, and enhanced protection of mine room roof pillars, and provides a comprehensive and effective solution for the stability and safety of mine room roof pillars in the upward filling mining method. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 It is a flow chart of the method for cementing and supporting the roof pillars of a mine room in an upward filling mining method provided by an embodiment of the present invention.

[0062] Figure 2 It is a flow chart of a method for designing a mine room support provided by an embodiment of the present invention.

[0063] Figure 3 It is a flow chart of the method for constructing a filling body strength and thickness model provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0064] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0065] The present invention provides a specific implementation scheme of a method for cementing and supporting a roof column of a mine room in an upward filling mining method as follows:

[0066] 1. Mine support design stage

[0067] 1) Geological data collection and analysis

[0068] Collect geological data of the mine and its surrounding areas, including rock types, mechanical properties, and development of joints and fissures.

[0069] Analyze geological data to assess potential failure modes and stability of mine roof pillars.

[0070] 2) Support plan formulation

[0071] Based on the geological analysis results, a comprehensive mine support plan is formulated, including shaft support and support measures for the entire mine.

[0072] The specific form and arrangement of the support structure are determined taking into account factors such as the shape, size, and mining sequence of the mine room.

[0073] 3) Construction of filling strength and thickness model

[0074] Based on numerical analysis methods (such as finite element method, discrete element method, etc.), a mathematical model of filling body strength and thickness is established.

[0075] Taking into account factors such as the physical and mechanical properties of the filling material and the filling process, the reasonable strength and thickness of the cemented filling body are determined through model calculation.

[0076] 2. The uppermost layer of the mining room

[0077] 1) Reserve suspension pillars

[0078] During the mining process of the uppermost layer in the mine room, four suspension pillars are reserved according to the design requirements.

[0079] Ensure that the location, spacing and installation quality of the suspension struts meet the requirements of the support plan.

[0080] 2) Filling patio construction

[0081] After the mining is completed, the filling shaft construction begins. Ensure the construction quality and stability of the shaft so that the cementing filling material can be injected into the space to be filled.

[0082] 3) Injection and solidification of cementitious filling materials

[0083] The cementitious filling material is injected into the space to be filled through the filling well.

[0084] Control the filling speed and filling amount to ensure that the cementitious filling material is evenly distributed and fills the entire space to be filled.

[0085] After the cementitious filling material solidifies, a cementitious filling body with certain strength and stability is formed.

[0086] 4) Integrated support structure

[0087] After the cementitious filling solidifies, it is integrated with the four suspension pillars to jointly support the roof pillars of the mine room.

[0088] Regularly inspect and maintain the support structure to ensure its stability and safety.

[0089] 3. Safety monitoring and assessment of mine support

[0090] 1) Monitoring equipment installation

[0091] Install displacement, stress and other monitoring equipment inside the mine room and on key support structures.

[0092] 2) Data collection and analysis

[0093] Collect monitoring data in real time and analyze the deformation and stress distribution of mine roof columns and supporting structures.

[0094] Based on the data analysis results, the safety and stability of the mine support structure are evaluated.

[0095] 3) Safety assessment and measure adjustment

[0096] According to the safety assessment results, formulate corresponding measures and adjustment plans.

[0097] If necessary, the supporting structure shall be reinforced or adjusted to ensure safe production in the mine.

[0098] Through the above implementation scheme, the effective implementation of the roof column cementation support method of the upward filling mining method can be ensured, and the safety and stability of the mine room can be improved. In practical applications, appropriate adjustments and optimizations should be made according to specific geological conditions and mining needs.

[0099] The implementation of the top pillar cementation support method for the up-fill mining method involves detailed engineering and geological analysis to ensure the stability and safety of the mine. The following are the detailed implementation steps of this method:

[0100] 1) Support scheme design stage:

[0101] Conduct engineering geological surveys of the entire mine, including rock mechanical properties, groundwater conditions, etc., to obtain detailed geological data.

[0102] Design support schemes for the roof and side walls of the mine room based on geological data and mine room characteristics. This includes shaft support and support measures for the entire mine room.

[0103] Use engineering geological data and filling material characteristics (such as strength, rheological properties) to establish the filling body strength and thickness model. This may require the use of numerical simulation software for mechanical analysis and simulation.

[0104] 2) Determination of filling body strength and thickness:

[0105] Based on the above model, the appropriate strength and thickness of the cementitious filling material are determined to ensure that it can withstand the pressure of the mine roof and side walls, while considering the impact of future mining operations on its stability.

[0106] Design the mix ratio and construction plan of the cemented filling body to ensure that the filling body has both sufficient strength and certain fluidity for easy injection.

[0107] 3) Mine room recovery and pillar reservation:

[0108] In the mining stage of the uppermost layer of the mine room, four suspension pillars are reserved. These pillars not only play a temporary supporting role in the mining process of the mine room, but also bear the responsibility of the stability of the mine room roof together with the cemented filling body in the subsequent filling stage.

[0109] After the mining of mineral resources is completed, the reserved skylight is used to inject cementitious filling materials into the space to be filled.

[0110] 4) Filling and support:

[0111] After the cementitious fill material is injected, its flow and setting process needs to be monitored to ensure that the fill is uniform and there are no significant voids or weak points.

[0112] After the filling material solidifies, a strength test is required to verify whether it meets the design requirements. The cemented filling body and the suspension support are integrated to jointly bear the top column load and enhance the structural stability.

[0113] 5) Stability monitoring and evaluation:

[0114] During the entire filling and solidification process, the stability indicators of the mine chamber, such as displacement, stress changes, etc., are continuously monitored.

[0115] Assess the stability of the mine roof pillars based on monitoring data and adjust the support plan or reinforce them if necessary.

[0116] Through the above steps, the cementation support of the mine room roof pillar can be effectively achieved to ensure the safety and stability of the mine room during the filling mining process. The successful implementation of this method requires the integration of interdisciplinary knowledge, including geotechnical engineering, mining engineering, materials science, etc., as well as strict on-site management and technical monitoring.

[0117] The following are two specific embodiments for further illustrating the practical application of the above-mentioned method for cementing support of roof pillars in the upward filling mining method:

[0118] Embodiment 1:

[0119] In a metal mine, the mine room presents a multi-layer structure and the ore body occurrence conditions are relatively complex. In order to ensure the stability of the mine room roof, the above-mentioned cementation support method is used during the mining process.

[0120] First, during the design of the mine support, the engineering team fully considered the support requirements of the entire mine. They not only designed the support for the shaft, but also conducted a modeling analysis of the strength and thickness of the filling body of the entire mine. Based on the model, the appropriate strength and thickness of the cemented filling body were determined to ensure the stability of the mine roof during the mining process.

[0121] In the mining stage of the uppermost layer of the mine room, four suspension pillars were reserved according to the method. When the mining was completed, the cementing filling material was injected into the space to be filled through the filling shaft. After the filling material solidified, it formed a stable supporting structure together with the suspension pillars, which significantly enhanced the stability of the mine room roof pillars.

[0122] In addition, in order to ensure the stability of the shaft during the filling process, the engineering team also calculated the engineering geological data of the section where the shaft was filled in detail, and formulated a specific support plan based on this data. This measure effectively ensured the safety and effectiveness of the entire mine support structure.

[0123] By implementing the above-mentioned cementation support method, the metal mine successfully ensured the stability of the mine room roof pillars during the mining process, reduced the risk of safety accidents, and improved mining efficiency.

[0124] Embodiment 2:

[0125] In a large coal mine, due to the poor ore body conditions, the stability of the mine room roof pillars has become an important issue. In order to solve this problem, the mine decided to use the above-mentioned cementation support method for mine room support.

[0126] During the design phase, the mine organized a team of experts to comprehensively plan the support scheme for the mine room. In addition to the support design for the shaft, detailed modeling and analysis of the strength and thickness of the mine room filling body were also carried out. Based on these analysis results, appropriate cemented filling body parameters were determined to ensure the safety of the mine room roof pillars during the mining process.

[0127] During the mining process, the mine strictly follows the above method. In the uppermost layer mining stage of the mine room, four suspension pillars are reserved, and cementing filling materials are injected into the space to be filled through the filling shaft. After the filling material solidifies, it forms a stable support system together with the suspension pillars, effectively improving the stability of the mine room top pillar.

[0128] At the same time, in order to ensure the stability of the filling shaft, the mine also formulated a detailed support plan based on the engineering geological data of the section where the filling shaft is located. This measure ensures the safety and stability of the entire mine room support structure.

[0129] By implementing the above-mentioned cementation support method, the coal mine successfully improved the stability of the mine room roof pillars, reduced safety risks during the mining process, and improved the mining efficiency of coal resources.

[0130] The method for cementing and supporting the roof pillars of a mine room in an upward filling mining method provided by the present invention comprises the following steps:

[0131] 1. In the stage of designing the mine support, not only the shaft support but also the support scheme of the whole mine is included, and a model of the strength and thickness of the filling body is constructed; based on the model, the strength and thickness of the cemented filling body are determined to ensure the stability and safety of the mine roof pillar;

[0132] 2. In the uppermost layer mining stage of the mine room, four suspension pillars are reserved for injecting cementing filling materials into the space to be filled through the filling shaft after the mining is completed; after the cementing filling materials solidify, the cementing filling body and the four suspension pillars are integrated into one to jointly support the top pillar of the mine room and enhance the stability of the top pillar of the mine room;

[0133] 3. Furthermore, when designing the mine support method, it includes calculating the engineering geological data of the section where the fill shaft is located (recorded as the jth section) to guide the formulation of the shaft support plan and ensure the stability of the shaft during the filling process, thereby supporting the safety and effectiveness of the entire mine support structure.

[0134] This method provides a comprehensive and systematic solution for the cementation support of the mine room roof in the upward filling mining method by integrating the mine room design support, the determination of the strength and thickness of the cemented filling body, and the specific calculation of the filling shaft support plan, ensuring the stability and safety of the mining process.

[0135] like Figure 1 As shown, the present invention provides a method for cementing and supporting the roof pillars of a mine room in an upward filling mining method, comprising the following steps:

[0136] S101, build a mine room and design mine room support; construct a filling strength and thickness model; determine the strength and thickness of the cemented filling based on the filling strength and thickness model;

[0137] S102, when mining the uppermost layer of the mine room, four suspension pillars are reserved. After mining is completed, the cementing filling material is filled into the space to be filled through the filling shaft to form a cementing filling body. After the cementing filling body solidifies, it becomes one with the four suspension pillars to jointly support the roof pillar of the mine room.

[0138] like Figure 2 As shown, the design method of mine room support provided by the present invention is as follows:

[0139] S201, calculating the engineering geological data of the jth section of the filled shaft;

[0140] j = 1, 2, 3, 4, ...,

[0141] When j=1, the preferred order in the calculation is the engineering geological data calculated using the second measurement data of the j-th section of the filled shaft, and the engineering geological data calculated using the first measurement data.

[0142] When j≥2, the preferred order in the calculation is the engineering geological data calculated using the second measurement data of the j-th section of the filled shaft, the engineering geological data calculated using the second measurement data of the j-1-th section of the filled shaft, and the engineering geological data calculated using the first measurement data.

[0143] The first measurement data is measurement data in engineering geological survey, and the second measurement data is measurement data in the construction process.

[0144] The second measurement data includes third measurement data and fourth measurement data, wherein the third measurement data is measurement data in the actual exposure of surrounding rock measurement process, and the fourth measurement data is measurement data in the construction drilling process, and the engineering geological data includes lithology classification, rock formation occurrence parameters, rock mass integrity parameters, rock strength parameters, and groundwater status parameters;

[0145] S202, using the engineering geological data of the j-th section of the filled shaft, determine the surrounding rock classification of the j-th section of the filled shaft; design n support schemes for the j-th section of the filled shaft according to the obtained surrounding rock classification of the j-th section of the filled shaft, where n≥2; determine the construction feasibility of each support scheme designed for the j-th section of the filled shaft, and discard unfeasible support schemes;

[0146] S203, design the construction process procedures of each feasible support scheme for the j-th section of the filling shaft; use the monitoring measurement data to adjust the construction process procedures of each feasible support scheme; determine whether the construction period and cost of the construction process procedures of each feasible support scheme meet the project requirements, and input the feasible support schemes and their construction process procedures that meet the project requirements into the database; let j=j+1, and jump to the first step.

[0147] The method provided by the present invention also includes:

[0148] Calculate the comprehensive evaluation score S of each feasible support scheme i =q 1 %×A i +q 2 %×B i +q 3 %×C i , the support scheme with the highest comprehensive evaluation score and the construction period and cost that meet the requirements is selected as the optimal support scheme, among which S i ∈[0, 100], q 1 %、q 2 %、q 3 % are the weights of safety evaluation score, construction period evaluation score and cost evaluation score in the comprehensive evaluation score, respectively. i , B i , C i They are respectively the safety evaluation score, construction period evaluation score, and cost evaluation score of the i-th feasible support scheme.

[0149] The engineering geological data calculated using the third measurement data provided by the present invention has a higher priority in the calculation than the engineering geological data calculated using the fourth measurement data.

[0150] The engineering geological data provided by the present invention also includes blasting block size parameters, and the second measurement data also includes fifth measurement data, and the fifth measurement data is the measurement data during the construction blasting process. The engineering geological data calculated using the fifth measurement data has a lower preferred order in the calculation than the engineering geological data calculated using the third measurement data, and its preferred order is higher than the preferred order of the engineering geological data calculated using the fourth measurement data.

[0151] like Figure 3 As shown, the method for constructing the filling body strength and thickness model provided by the present invention is as follows:

[0152] S301, Analysis of the mechanical effects and stability influencing factors of the cemented filling body in the mine room, and construction of a mechanical model of the cemented filling body in the mine room:

[0153] S302, stress and displacement distribution state analysis of the cemented filling body in the mine room, and establishment of the strength and thickness model of the cemented filling body in the mine room:

[0154] According to the mechanical model of the cemented filling body of the mine room, the vertical displacement and vertical stress distribution state of the cemented filling body of the mine room under the vertical load of the fully loaded trackless equipment are analyzed by using the basic solution of the elastic mechanics theory of Bushines. The vertical stress and vertical displacement state of the cemented filling body of the mine room under the horizontal load of the fully loaded trackless equipment are analyzed by using the basic solution of the elastic mechanics theory of Sayruti.

[0155] According to the principle of stress superposition, the vertical stress and vertical displacement distribution of the cemented filling body of the mine room under the combined action of the vertical load and horizontal load of the fully loaded trackless equipment are analyzed;

[0156] According to the vertical stress distribution state of the cemented filling body of the mine room under the load of the fully loaded trackless equipment, the maximum vertical stress of the cemented filling body of the mine room is determined to meet the strength design requirements of the normal operation of the fully loaded trackless equipment and consider a certain safety factor to establish the compressive strength model of the cemented filling body of the mine room;

[0157] According to the vertical displacement distribution state of the cemented filling body of the mine room under the load of the fully loaded trackless equipment, the maximum vertical displacement of the cemented filling body of the mine room is determined. According to the relationship between the vertical displacement, thickness, elastic modulus, stress and strain of the cemented filling body of the mine room, the thickness model of the cemented filling body of the mine room is established on the premise that the cemented filling body of the mine room is still in an elastic state after the maximum deformation, considering a certain safety factor.

[0158] The mechanical effect and stability influencing factors of the mine room cemented filling body provided by the present invention are as follows:

[0159] The stope structure characteristics of the upward horizontal layer filling mining method are: no matter what form is used to recover the layers, the stope roof is the ore body, and the floor is the cemented filling body of the mine room;

[0160] The mechanical effect of the cemented filling body in the mine room is as follows: the cemented filling body in the mine room, as a working platform for continued mining, needs to meet the conditions for the operation of fully loaded trackless equipment and ensure stability and integrity in the process of serving layered mining;

[0161] Factors affecting the stability of the cemented filling body of the mine room: The direct cause of the destruction of the cemented filling body of the mine room is that the stress value of the load acting on the cemented filling body of the mine room when the fully loaded trackless equipment is running is greater than the design strength. The load acting on the cemented filling body of the mine room when the fully loaded trackless equipment is running is divided into vertical load and horizontal load.

[0162] The mechanical model of the cemented filling body of the mine provided by the present invention is:

[0163] The vertical load and horizontal load of the fully loaded trackless equipment directly act on the cemented filling body of the mine room through the tires. There is surface contact between the two. The cemented filling body of the mine room is regarded as a half-space body. The mechanical model of the cemented filling body of the mine room can be divided into the half-space body being subjected to vertical uniformly distributed load on the boundary and the half-space body being subjected to horizontally uniformly distributed load on the boundary. To simplify the analysis, the mechanical model can be simplified to the half-space body being subjected to vertical concentrated force on the boundary and the half-space body being subjected to horizontal concentrated force on the boundary.

[0164] Analysis of the mechanical effects and stability influencing factors of the cemented filling body of the mine provided by the present invention:

[0165] According to the typical process characteristics of the upward horizontal layered filling mining method in different stope structures, the mechanical effect of the cemented filling body in the mine room as a working platform for continued mining in the stope is analyzed to meet the requirements for normal operation of fully loaded trackless equipment; the strength requirements and stability influencing factors of the cemented filling body in the mine room are analyzed.

[0166] The present invention provides a mechanical model for building a cemented filling body in a mine:

[0167] According to the mechanical effect of the cemented filling body in the mine room and the load characteristics imposed on the cemented filling body in the mine room when the fully loaded trackless equipment is running, a mechanical model of the cemented filling body in the mine room is constructed, and the vertical load mechanical model and the horizontal load mechanical model are established.

[0168] The present invention comprehensively considers the mutual influence between the support structure and the construction process by designing the mine room support method, integrates a large amount of useful information in the construction process as a reference for support design, realizes the information integration of the super mine room support design and the construction process parameters, improves the efficiency and level of super mine room engineering management, and achieves safety, economy and high efficiency; at the same time, by constructing the filling body strength and thickness model method, the stress and displacement distribution state of the mine room cemented filling body under the condition of full load of trackless equipment can be accurately analyzed, which can provide a theoretical basis for the compressive strength and thickness design of the mine room cemented filling body; based on the maximum vertical displacement and maximum vertical stress values ​​of the mine room cemented filling body under the condition of full load of trackless equipment, the influence of the quality of the mine room cemented filling body on the stability is analyzed, and the mine room cemented filling body meets the requirements of the operation of trackless equipment, considering a certain safety factor, and constructs the compressive strength and thickness design model of the mine room cemented filling body.

[0169] The present invention comprehensively considers the mutual influence between the support structure and the construction process by designing the mine room support method, integrates a large amount of useful information in the construction process as a reference for support design, realizes the information integration of the super mine room support design and the construction process parameters, improves the efficiency and level of super mine room engineering management, and achieves safety, economy and high efficiency; at the same time, by constructing the filling body strength and thickness model method, the stress and displacement distribution state of the mine room cemented filling body under the condition of full load of trackless equipment can be accurately analyzed, which can provide a theoretical basis for the compressive strength and thickness design of the mine room cemented filling body; based on the maximum vertical displacement and maximum vertical stress values ​​of the mine room cemented filling body under the condition of full load of trackless equipment, the influence of the quality of the mine room cemented filling body on the stability is analyzed, and the mine room cemented filling body meets the requirements of the operation of trackless equipment, considering a certain safety factor, and constructs the compressive strength and thickness design model of the mine room cemented filling body.

[0170] The present invention provides a method for cementing support of roof pillars in a mine room in an upward filling mining method, aiming to enhance the stability and safety of the roof pillars in the mine room. The specific implementation scheme is as follows:

[0171] 1. Mine support design:

[0172] In the early stage of mine room design, the structural characteristics of the mine room and mining conditions are comprehensively considered to design the support plan. This includes not only the support of the shaft, but also the overall support structure of the mine room. Through in-depth analysis of the mine room support requirements, it is ensured that the design plan can meet the stability and safety requirements of the mine room during the mining process.

[0173] 2. Model construction of filling strength and thickness:

[0174] A model of fill strength and thickness is constructed based on the specific conditions of the mine chamber. This model predicts the required fill strength and thickness based on the mine chamber’s geological data, mining depth, and expected mining intensity to ensure that the mine chamber’s roof pillars are adequately supported during mining.

[0175] 3. Determination of strength and thickness of cemented filling body:

[0176] According to the constructed model, determine the strength and thickness of the cemented filling body. Select the appropriate cementing material and calculate the required amount of material to ensure that the cemented filling body can meet the designed strength and thickness requirements, thereby providing stable support for the mine roof pillars.

[0177] 4. Reservation and filling of suspension pillars:

[0178] When mining the uppermost layer of the mine room, four suspension pillars are reserved. After the mining is completed, the cementing filling material is filled into the space to be filled through the filling shaft to form a cementing filling body. After the cementing filling body solidifies, it becomes one with the four suspension pillars to jointly support the top pillar of the mine room.

[0179] 5. Design of the filling shaft support scheme:

[0180] The engineering geological data of the filling shaft are calculated and analyzed, and the support plan of the shaft is designed based on the analysis results to ensure the stability of the shaft during the filling process and provide safety guarantee for the formation of cemented filling body.

[0181] Technical advantages:

[0182] Comprehensive support solution: This invention not only takes into account the support of the shaft, but also comprehensively considers the overall support needs of the mine room, providing a comprehensive solution to enhance the stability and safety of the mine room roof pillars.

[0183] Accurate backfill design: By constructing a backfill strength and thickness model, the strength and thickness of the cemented backfill are accurately determined to ensure that the backfill can effectively support the mine roof pillars, thereby improving the reliability of the cemented support of the mine roof pillars.

[0184] Innovative integrated design of suspension pillars and filling body: The reserved suspension pillars and the cemented filling body are formed into one after solidification. This innovative design increases the supporting force of the roof pillars of the mine room and improves the safety of the mining process.

[0185] Through the implementation of the above scheme, the present invention can effectively solve the cementation support problem of the roof pillars of the mine room in the upward filling mining method, and provide strong technical support for the safe production of the mining industry.

[0186] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any modifications, equivalent substitutions and improvements made by any technician familiar with the technical field within the technical scope disclosed by the present invention and within the spirit and principle of the present invention should be covered by the protection scope of the present invention.

Claims

1. A method for cementing and supporting the roof pillars of a mine room in an upward filling mining method. It is characterized in that The following steps are involved: In the mine support design stage, not only the shaft support but also the support plan of the entire mine is included, and a model of the strength and thickness of the filling body is constructed; based on this model, the strength and thickness of the cemented filling body are determined to ensure the stability and safety of the mine roof pillar; In the mining stage of the uppermost layer in the mine room, four suspension pillars are reserved for injecting cementing filling materials into the space to be filled through the filling shaft after the mining is completed; After the cementing filling material solidifies, the cementing filling body is integrated with the four suspension pillars to jointly support the top pillar of the mine room and enhance the stability of the top pillar of the mine room; When designing the mine support method, it includes calculating the engineering geological data of the section where the fill shaft is located, so as to guide the formulation of the shaft support plan and ensure the stability of the shaft during the filling process.

2. The method for cementing and supporting the roof pillars of the upward filling mining method according to claim 1, It is characterized in that The following steps are involved: 1) In the mine support design stage, the stability requirements of the shaft support and the entire mine are comprehensively considered. This method not only relies on traditional engineering geological surveys and rock mechanics analysis, but also introduces advanced simulation technology to predict the behavior of the mine under different working conditions. A detailed fill strength and thickness model is created that can be adjusted to the size, depth and operating conditions of different chambers, ensuring applicability and flexibility in a variety of situations. 2) Use laboratory tests and field trials to determine the optimal cementitious fill mix, taking into account the flowability, early strength development and long-term stability of the fill material. Intelligent monitoring technology is used to monitor the strength development and setting behavior of the filling body in real time to achieve real-time data-driven decision support. 3) The suspension pillars reserved during the mining stage are made of high-strength, adjustable new materials to improve their stability and adaptability under complex stress conditions. Apply advanced filling technology to ensure that the cementitious filling material is evenly distributed in the mine chamber to avoid local weaknesses caused by uneven filling. 4) Establish a multi-parameter real-time monitoring system including surface displacement, internal displacement of the mine room, stress and environmental parameters to comprehensively evaluate the stability of the mine room. Combining data analysis and machine learning algorithms, the collected monitoring data is deeply analyzed to achieve intelligent early warning and management of mine room stability.

3. The method for cementing and supporting the roof pillars of the upward filling mining method according to claim 1, It is characterized in that The design of the mine room support method is as follows: (1) Calculate the engineering geological data of the jth section of the backfill shaft; j=1,2,3,4,…, When j=1, the preferred order in the calculation is the engineering geological data calculated using the second measurement data of the j-th section of the filled shaft, and the engineering geological data calculated using the first measurement data. When j≥2, the preferred order in the calculation is the engineering geological data calculated using the second measurement data of the j-th section of the filled shaft, the engineering geological data calculated using the second measurement data of the j-1-th section of the filled shaft, and the engineering geological data calculated using the first measurement data. The first measurement data is measurement data in engineering geological survey, and the second measurement data is measurement data in the construction process. The second measurement data includes third measurement data and fourth measurement data, wherein the third measurement data is measurement data in the actual exposure of surrounding rock measurement process, and the fourth measurement data is measurement data in the construction drilling process, and the engineering geological data includes lithology classification, rock formation occurrence parameters, rock mass integrity parameters, rock strength parameters, and groundwater status parameters; (2) using the engineering geological data of the jth section of the filled shaft to determine the surrounding rock classification of the jth section of the filled shaft; designing n support schemes for the jth section of the filled shaft according to the obtained surrounding rock classification of the jth section of the filled shaft, where n≥2; judging the construction feasibility of each support scheme designed for the jth section of the filled shaft, and discarding unfeasible support schemes; (3) Design and obtain the construction process of each feasible support scheme for the jth section of the backfill shaft; use the monitoring measurement data to adjust the construction process of each feasible support scheme; determine whether the construction period and cost of the construction process of each feasible support scheme meet the project requirements, and input the feasible support scheme and its construction process that meet the project requirements into the database; Let j=j+1 and jump to the first step.

4. The method for cementing and supporting the roof pillars of the upward filling mining method according to claim 3, It is characterized in that The method further comprises: Calculate the comprehensive evaluation score Si = q1% × Ai + q2% × Bi + q3% × Ci of each feasible support scheme, and select the support scheme with the highest comprehensive evaluation score and the construction period and cost that meet the requirements as the optimal support scheme, where Si∈[0, 100], q1%, q2%, q3% are the weights of the safety evaluation score, construction period evaluation score, and cost evaluation score in the comprehensive evaluation score, respectively, and Ai, Bi, Ci are the safety evaluation score, construction period evaluation score, and cost evaluation score of the i-th feasible support scheme, respectively.

5. The method for cementing and supporting the roof pillars of the upward filling mining method according to claim 3, It is characterized in that The engineering geological data calculated using the third measurement data has a higher priority in the calculation than the engineering geological data calculated using the fourth measurement data; the engineering geological data also includes blasting block size parameters, the second measurement data also includes fifth measurement data, the fifth measurement data is measurement data during the construction blasting process, the engineering geological data calculated using the fifth measurement data has a lower priority in the calculation than the engineering geological data calculated using the third measurement data, and its priority is higher than the priority of the engineering geological data calculated using the fourth measurement data.

6. The method for cementing and supporting the roof pillars of the upward filling mining method according to claim 1, It is characterized in that The method for constructing the filling body strength and thickness model is as follows: 1) Analysis of the mechanical effects and stability influencing factors of the cemented filling body in the mine room, and construction of the mechanical model of the cemented filling body in the mine room: 2) Analysis of stress and displacement distribution of cemented filling in the mine room, and establishment of strength and thickness model of cemented filling in the mine room: According to the mechanical model of the cemented filling body of the mine room, the vertical displacement and vertical stress distribution state of the cemented filling body of the mine room under the vertical load of the fully loaded trackless equipment are analyzed by using the basic solution of the elastic mechanics theory of Bushines. The vertical stress and vertical displacement state of the cemented filling body of the mine room under the horizontal load of the fully loaded trackless equipment are analyzed by using the basic solution of the elastic mechanics theory of Sayruti. According to the principle of stress superposition, the vertical stress and vertical displacement distribution of the cemented filling body of the mine room under the combined action of the vertical load and horizontal load of the fully loaded trackless equipment are analyzed; According to the vertical stress distribution state of the cemented filling body of the mine room under the load of the fully loaded trackless equipment, the maximum vertical stress of the cemented filling body of the mine room is determined to meet the strength design requirements of the normal operation of the fully loaded trackless equipment and consider a certain safety factor to establish the compressive strength model of the cemented filling body of the mine room; According to the vertical displacement distribution state of the cemented filling body of the mine room under the load of the fully loaded trackless equipment, the maximum vertical displacement of the cemented filling body of the mine room is determined. According to the relationship between the vertical displacement, thickness, elastic modulus, stress and strain of the cemented filling body of the mine room, the thickness model of the cemented filling body of the mine room is established on the premise that the cemented filling body of the mine room is still in an elastic state when the maximum deformation occurs, and a certain safety factor is considered.

7. The method for cementing and supporting the roof pillars of the upward filling mining method according to claim 6, It is characterized in that The factors affecting the mechanical effect and stability of the cemented filling body in the mine room are as follows: The stope structure characteristics of the upward horizontal layer filling mining method are: no matter what form is used to recover the layers, the stope roof is the ore body, and the floor is the cemented filling body of the mine room; The mechanical effect of the cemented filling body in the mine room is as follows: the cemented filling body in the mine room, as a working platform for continued mining, needs to meet the conditions for the operation of fully loaded trackless equipment and ensure stability and integrity in the process of serving layered mining; Factors affecting the stability of the cemented filling body of the mine room: The direct cause of the destruction of the cemented filling body of the mine room is that the stress value of the load acting on the cemented filling body of the mine room when the fully loaded trackless equipment is running is greater than the design strength. The load acting on the cemented filling body of the mine room when the fully loaded trackless equipment is running is divided into vertical load and horizontal load.

8. The method for cementing and supporting the roof pillars of the upward filling mining method according to claim 6, It is characterized in that The mechanical model of the cemented filling body of the mine is: The vertical load and horizontal load of the fully loaded trackless equipment directly act on the cemented filling body of the mine room through the tires. There is surface contact between the two. The cemented filling body of the mine room is regarded as a half-space body. The mechanical model of the cemented filling body of the mine room can be divided into the half-space body being subjected to vertical uniformly distributed load on the boundary and the half-space body being subjected to horizontally uniformly distributed load on the boundary. To simplify the analysis, the mechanical model can be simplified to the half-space body being subjected to vertical concentrated force on the boundary and the half-space body being subjected to horizontal concentrated force on the boundary.

9. The method for cementing and supporting the roof pillars of the upward filling mining method according to claim 6, It is characterized in that Analysis of the mechanical effects and stability influencing factors of the cemented filling in the mine: According to the typical process characteristics of upward horizontal layered filling mining method in different stope structures, the mechanical effect of the cemented filling body in the mine room as a working platform for continued mining in the stope is analyzed to meet the requirements for normal operation of fully loaded trackless equipment. Analyze the strength requirements and stability influencing factors of the cemented filling body of the mine room.

10. The method for cementing and supporting the roof pillars of the upward filling mining method according to claim 6, It is characterized in that The mechanical model of the cemented filling body of the mine is constructed as follows: According to the mechanical effect of the cemented filling body in the mine room and the load characteristics imposed on the cemented filling body in the mine room when the fully loaded trackless equipment is running, a mechanical model of the cemented filling body in the mine room is constructed, and the vertical load mechanical model and the horizontal load mechanical model are established.

Citation Information

Patent Citations

  • House pillar changeable panel upward demix filling mining method

    CN101858217A

  • Deep well supporting design method

    CN107575234A

  • Stope room top column cementing support method adopting upward filling mining method

    CN113202553A

  • Construction method of strength and thickness model of upward horizontal layered filling mining method surface filling body

    CN113266353A

  • Procedure for angular characterisation of strata and earth surface movement process at underground mining of ore deposits

    RU2390635C1

Cited By

  • Intelligent data acquisition and optimization control system applied to mine filling system

    CN119575827A