Pre-pressing air cushion type underwater rock plug blasting device and blasting method

By using pre-pressure air cushion type underwater rock plug blasting device in underwater rock plug blasting, wave removal pits and pressurization systems buffer the blasting shock wave, the threat of blasting shock wave to the gate and the efficiency of plugging operation in underwater rock plug blasting is solved. The problem of low efficiency and safety of the reservoir and tunnel are achieved.

CN118936256APending Publication Date: 2024-11-12CHINA WATER RESOURCES PEARL RIVER PLANNING SURVERYING & DESIGNING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411301869.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the passage of reservoirs and water diversion tunnels, the existing underwater rock plug blasting methods have the safety threat of blasting shock wave to the gate and the problems of large amount of casting and demolition projects and low efficiency. The technical complexity leads to high construction costs and construction periods. long.

Method used

The pre-pressurized air cushion type underwater rock plug blasting device is adopted. By setting up wave-removing pits and pressurization systems at the inlet of the tunnel, the air cushion section and slope section are used to buffer the blasting shock wave, and water is poured into the wave-removing pit to form a water cushion to reduce rock slag Splash and clogging risks, avoid plugging and dismantling operations.

Benefits of technology

Effectively dissipate energy and blasting shock waves, reduce rock slag splash, simplify construction processes, shorten construction periods, reduce project investment, improve construction efficiency and safety, and avoid the complexity of plugging operations and underwater inspections in traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118936256A_ABST
    Figure CN118936256A_ABST
Patent Text Reader

Abstract

The invention provides a pre-pressing air cushion type underwater rock plug blasting device and blasting method. The blasting device comprises a tunnel, and a rock plug is arranged at a water inlet of the tunnel; the gate shaft assembly comprises a first gate shaft, the first gate shaft is located at a water outlet of the tunnel, and a first gate is arranged in the first gate shaft; the wave absorbing pit is arranged at the water inlet of the tunnel, the wave absorbing pit is provided with a wave absorbing pit inlet and a wave absorbing pit outlet, the wave absorbing pit inlet is located on one side of the rock plug, and the wave absorbing pit outlet is communicated with the water inlet of the tunnel. Due to the fact that the wave absorbing pit is arranged, the wave absorbing pit can resist and contain blasting shock waves by means of the strength of the rock mass, the blasting shock waves are reflected and collided in the wave absorbing pit, energy dissipation and blocking of the blasting shock waves are achieved, under the condition that a plug is not arranged for plugging, the operations of pouring, dismantling, water filling and water draining of the plug in a traditional blasting process are avoided, and the blasting efficiency is improved. The process is simplified, the construction efficiency is improved, the construction period is shortened, and the project investment is greatly saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of blasting devices, and in particular to a pre-compressed air cushion type underwater rock plug blasting device and a blasting method. Background Art

[0002] With the development of industrial and agricultural production and life, it is often necessary to divert water from water-rich areas to water-deficient areas in order to achieve resource allocation and water balance between regions and promote social and economic development. When the water level of the reservoir in the water supply area is high and the water level in the water receiving area is low, the water from the reservoir can be diverted to the water receiving area by gravity by building water diversion tunnels and channels, without the need to use water pumps, thereby saving operating costs. In this water intake method, when the elevation of the water intake sill of the water diversion tunnel is low and the reservoir is a newly built reservoir, the water level in the reservoir area is low, the water intake is exposed above the water surface, and construction can be carried out on dry land, and the reservoir hole of the water intake is easy to achieve. However, in many cases, the reservoir has been stored and operated, and the sill of the water intake of the newly built water diversion tunnel is often located near the dead water level of the reservoir, which is tens of meters or even hundreds of meters below the water surface of the reservoir. At this time, there are two conventional methods to achieve the penetration of the reservoir hole:

[0003] 1) Lower the reservoir water level to below the sill elevation of the tunnel water intake to create dry land construction conditions for the water intake. This method is stable and reliable, but it requires lowering the reservoir water level to below the sill elevation of the water intake of the diversion tunnel, which will affect the operation efficiency of the reservoir, is too costly, and may not even be allowed.

[0004] 2) Build a deep water cofferdam in the reservoir area near the water intake of the water diversion tunnel to enclose the water intake, and then drain the water in the cofferdam to create dry land construction conditions for the water intake construction. After the project is completed, the cofferdam will be removed to achieve the connection of the reservoir tunnel. This method will bring huge engineering investment and a long construction period, which is very uneconomical.

[0005] How to efficiently and economically connect the reservoir tunnel without lowering the water level of the reservoir and affecting the operation of the reservoir is a difficult problem that needs to be solved urgently. Experts at home and abroad have proposed the use of underwater rock plug blasting to achieve the connection between the existing reservoir and the newly built tunnel. Underwater rock plug blasting is an effective, convenient and economical construction method for building a tunnel inlet on an existing reservoir or lake. Its construction process is characterized by excavating the tunnel to the bottom of the reservoir, adjacent to a certain thickness of rock mass (i.e., rock plug). After the tunnel is built, the reserved rock mass is blasted away at one time by blasting, so that the tunnel and the reservoir are connected. In this way, the blasted inlet has the expected shape and meets the hydraulic requirements for the inlet. At the same time, it is necessary to ensure that the impact of the blasting on the surrounding rock mass and nearby buildings is reduced to an acceptable level.

[0006] Rock plug blasting has the characteristics of low cost, fast construction speed, and the construction period is not affected by seasons. Therefore, it has been increasingly used in the construction of underwater water inlet projects. However, underwater rock plug blasting is usually close to various hydraulic structures and hillsides, and some are even close to river dams. In addition, the construction work is carried out under deep water pressure, so the safety issue is very prominent and the absolute safety of blasting must be guaranteed. At the same time, rock plugs can only be blasted through once, which requires the water inlet to be well formed and the surrounding rock to be stable. Therefore, blasting must be carefully designed and constructed.

[0007] However, since the rock plug blasting method involves many influencing factors, complex technology, and very little related theoretical analysis and computational research, the method is still almost at the level of empirical judgment.

[0008] The main processes of rock blasting at present are:

[0009] 1) The gate well construction is completed and the tunnel construction reaches the downstream of the rock plug;

[0010] 2) The tunnel downstream of the gate shaft is sealed with a concrete plug;

[0011] 3) Networking of charging in rock plugs;

[0012] 4) Fill the tunnel with water through the gate well;

[0013] 5) Implement rock plug blasting to achieve the connection between the reservoir and the tunnel;

[0014] 6) After blasting, conduct underwater inspection;

[0015] 7) After passing the inspection, close the emergency gate in the gate well;

[0016] 8) Drain the water between the emergency gate and the tunnel plug by means of water pumps or other methods;

[0017] 9) Manually remove the concrete plug of the tunnel downstream of the gate shaft, discharge the slag through the gate shaft, and clean it up;

[0018] 10) Working gates in gate wells;

[0019] 11) After the emergency gate is lifted in the gate shaft, the working gate can be used to control the water supply from the reservoir to the tunnel to realize water diversion.

[0020] During blasting, water is usually injected into the tunnel for pre-pressure (the water level is lower than the reservoir water level). On the one hand, the water injected into the tunnel can dissipate the energy of the blasted rock debris, preventing the rock debris from flying into the tunnel and causing blockage; on the other hand, water is injected into the tunnel to basically balance the water pressure of the reservoir after the blasting, effectively preventing the reservoir water from rushing into the tunnel in large quantities and quickly after the blasting, carrying rock debris into the tunnel and causing blockage or siltation. In order to maintain a certain water pressure in the tunnel, water can be blocked by the working gate under the gate shaft, or a plug can be used to block water in the tunnel downstream of the gate shaft. However, when the rock plug is blasted, the tunnel water flow can transmit the blasting shock wave to the gate shaft, generating a large impact force and endangering the safety of the gate. In order to prevent the blasting shock wave from damaging the gate, the gate is not used to directly block water at present, but a concrete plug is used in the tunnel downstream of the gate shaft for temporary blocking. This method can ensure the safety of the gate, but there are also the following problems: before blasting, a temporary reinforced concrete plug needs to be poured in the deep well tunnel, and after blasting, the water in the deep well needs to be drained first, and then the plug in the deep well tunnel needs to be removed. However, due to the small space in the deep well, the pouring and removal of the plug is large, and the hard plug needs to be removed manually, which has low removal efficiency. Summary of the invention

[0021] The embodiment of the present application provides a pre-compression air cushion type underwater rock plug blasting device and a blasting method to solve the problems existing in the related technology. The technical solution is as follows:

[0022] In a first aspect, an embodiment of the present application provides a pre-compression air cushion underwater rock plug blasting device, comprising:

[0023] A tunnel, wherein a rock plug is provided at a water inlet of the tunnel;

[0024] A gate well assembly, the gate well assembly comprising a first gate well, the first gate well being located at the water outlet of the tunnel, a first gate being arranged in the first gate well, the first gate being used to control the opening and closing of the water outlet of the tunnel;

[0025] A wave-breaking pit is arranged at the water inlet of the tunnel, and the wave-breaking pit has a wave-breaking pit entrance and a wave-breaking pit exit, the wave-breaking pit entrance is located on one side of the rock plug, and the wave-breaking pit exit is communicated with the water inlet of the tunnel.

[0026] In one embodiment, the wave-breaking pit is arranged in an axisymmetric manner, and the symmetry axis of the wave-breaking pit coincides with the symmetry axis of the rock plug, and the wave-breaking pit outlet is located at the upper part of the wave-breaking pit.

[0027] In one embodiment, the cross section of the wave-breaking pit perpendicular to the symmetry axis is circular or approximately circular, and the pit wall of the wave-breaking pit directly facing the rock plug is a spherical surface.

[0028] In one embodiment, an exit channel is provided at the exit of the wave-breaking pit, the wave-breaking pit is connected to the tunnel through the exit channel, a dam is provided on the bottom inner wall of the exit channel, and a gap is provided between the dam and the upper inner wall of the exit channel.

[0029] In one embodiment, a slag collecting pit and a reflective inverted ridge are provided in the tunnel, and both the slag collecting pit and the reflective inverted ridge are located between the outlet channel and the first gate shaft, the slag collecting pit is located below the reflective inverted ridge, and the bottom of the reflective inverted ridge is lower than the outlet channel.

[0030] In one embodiment, the tunnel has a slope section, the slope section is located between the slag collection pit and the first gate shaft, one end of the slope section is connected to the slag collection pit, and the other end of the slope section extends obliquely upward relative to one end of the slope section.

[0031] In one embodiment, the tunnel also has an air cushion section, which is located between the slope section and the first gate shaft. The air cushion section has a first end and a second end, the first end is connected to the other end of the slope section, and the second end is connected to the first gate shaft. The second end of the air cushion section extends obliquely upward relative to the first end, and the slope of the air cushion section is smaller than the slope of the slope section.

[0032] In one embodiment, the gate well assembly further includes a second gate well, which is located on one side of the first gate well, the second gate well is communicated with the tunnel, and a second gate for controlling the water flow in the tunnel is arranged in the second gate well.

[0033] In one embodiment, the pre-compression air cushion underwater rock plug blasting device further comprises:

[0034] A pressurization system, the pressurization system includes an air compressor and an air pipe, the air compressor is located on an operating platform above the first gate shaft, one end of the air pipe is connected to the air compressor, and the other end of the air pipe passes through the first gate shaft and is connected to the inside of the tunnel; a pressure gauge and an exhaust pipe are provided on the air pipe, and a control valve is provided on the exhaust pipe, and the control valve is used to control the connection between the air pipe and the air outside the tunnel.

[0035] In a second aspect, an embodiment of the present application provides a pre-compression air cushion underwater rock plug blasting method, which is applied to a pre-compression air cushion underwater rock plug blasting device as described in any one of the above items, and the pre-compression air cushion underwater rock plug blasting method comprises the following steps:

[0036] excavating a first gate well, and excavating a tunnel along the bottom of the first gate well to the upstream reservoir until the tunnel extends to one side of the rock plug;

[0037] Excavating a wave-breaking pit at the water inlet of the tunnel, so that the wave-breaking pit entrance of the wave-breaking pit is located on one side of the rock plug, and the wave-breaking pit outlet of the wave-breaking pit is connected to the water inlet of the tunnel;

[0038] injecting water of a certain depth into the wave-breaking pit to form a water cushion;

[0039] Closing the first gate in the first gate shaft to put the tunnel in a closed state, and inflating air into the tunnel to make the air pressure in the tunnel reach a predetermined value;

[0040] The rock plug is blasted to achieve communication between the reservoir and the tunnel, and the mixed gas in the tunnel is discharged after the air pressure in the tunnel is stabilized.

[0041] The advantages or beneficial effects of the above technical solution include at least:

[0042] The underwater rock plug blasting device of the embodiment of the present application includes a tunnel, a gate well assembly and a wave-breaking pit. The rock plug is located at the water inlet of the tunnel, the wave-breaking pit is located on one side of the rock plug, and the gate well assembly includes a first gate well, which is located at the water outlet of the tunnel, and a first gate is arranged in the first gate well. When the underwater rock plug blasting device is used, firstly, explosives for blasting are installed on the rock plug, and a certain depth of water is injected into the wave-breaking pit to form a water cushion, and the first gate is closed to ensure that the tunnel is in a closed state, and then the rock plug is blasted. Since the embodiment of the present application is provided with a wave-breaking pit, the wave-breaking pit can rely on the strength of the rock mass to resist and accommodate the blasting shock wave, so that the blasting shock wave is reflected and collided in the wave-breaking pit, thereby realizing the energy dissipation and blocking of the blasting shock wave. By injecting water into the wave-breaking pit, the water resistance can dissipate the energy of the high-speed splashing rock debris, reduce the rock debris from flying out of the wave-breaking pit, and avoid the rock debris from damaging the first gate. Since the embodiment of the present application is provided with a wave-breaking pit, and water can be injected into the wave-breaking pit to form a water cushion, without providing a plug for sealing, the pouring, removal, filling and drainage operations of the plug in the traditional blasting process are avoided, the process is simplified, the construction efficiency is improved, the construction period is shortened, and the project investment is greatly saved.

[0043] The above summary is for illustrative purposes only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments and features described above, further aspects, embodiments and features of the present application will be readily apparent by reference to the accompanying drawings and the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In the accompanying drawings, unless otherwise specified, the same reference numerals throughout the multiple drawings represent the same or similar parts or elements. These drawings are not necessarily drawn to scale. It should be understood that these drawings only depict some embodiments disclosed in the present application and should not be regarded as limiting the scope of the present application.

[0045] Figure 1 It is a structural schematic diagram of an underwater rock plug blasting device;

[0046] Figure 2 It is a partial schematic diagram of the underwater rock plug blasting device;

[0047] Figure 3 Another partial schematic diagram of the underwater rock plug blasting device;

[0048] Figure 4 for Figure 1 Sectional view in the AA direction;

[0049] Figure 5 for Figure 1 Cross-sectional view in the BB direction;

[0050] Figure 6 for Figure 1 Cross-sectional view in CC direction;

[0051] Description of reference numerals:

[0052] 1. Tunnel; 2. Gate shaft assembly; 3. Pressurization system; 4. Wave-breaking pit; 5. Rock plug; 41. Wave-breaking pit entrance; 42. Wave-breaking pit exit; 21. First gate shaft; 6. First gate; 31. Air compressor; 32. Air pipe; 7. Operating platform; 33. Pressure gauge; 34. Control valve; 8. Exit channel; 9. Barrier; 10. Slag collection pit; 11. Reflection inverted sill; 12. Slope section; 13. Air cushion section; 22. Second gate shaft; 14. Second gate; 15. Water cushion; 16. Reservoir. DETAILED DESCRIPTION

[0053] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present application. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.

[0054] Embodiment 1:

[0055] like Figures 1 to 6As shown, the embodiment of the present application provides a pre-pressurized air cushion underwater rock plug blasting device, including a tunnel 1, a gate well assembly 2 and a wave-breaking pit 4. Among them, a rock plug 5 is provided at the water inlet of the tunnel 1; the wave-breaking pit 4 is provided at the water inlet of the tunnel 1, and the wave-breaking pit 4 has a wave-breaking pit entrance 41 and a wave-breaking pit exit 42, the wave-breaking pit entrance 41 is located on one side of the rock plug 5, and the wave-breaking pit exit 42 is connected to the water inlet of the tunnel 1. The gate well assembly 2 includes a first gate well 21, the first gate well 21 is located at the water outlet of the tunnel 1, and a first gate 6 is provided in the first gate well 21, and the first gate 6 is used to control the opening and closing of the water outlet of the tunnel 1.

[0056] When the underwater rock plug blasting device of the embodiment of the present application is used, firstly, explosives for blasting are installed on the rock plug 5, and water of a certain depth is injected into the wave-breaking pit 4 to form a water cushion 15, and the first gate 6 is closed to ensure that the tunnel 1 is in a closed state, and finally the rock plug 5 is blasted. Since the embodiment of the present application is provided with the wave-breaking pit 4, the wave-breaking pit 4 can rely on the strength of the rock mass to resist and accommodate the blasting shock wave, so that the blasting shock wave is reflected and collided in the wave-breaking pit 4, thereby achieving energy dissipation and blocking of the blasting shock wave. By injecting water into the wave-breaking pit 4, the resistance of the water can dissipate the energy of the high-speed splashing rock debris and reduce the rock debris from flying out of the wave-breaking pit 4. Since the embodiment of the present application is provided with the wave-breaking pit 4, without setting a plug for sealing, the pouring, removal, filling and drainage operations of the plug in the traditional blasting process are avoided, the process is simplified, the construction efficiency is improved, the construction period is shortened, and the project investment is greatly saved.

[0057] In one embodiment, the pre-pressurized air cushion underwater rock plug blasting device further includes a pressurizing system 3, which includes an air compressor 31 and an air pipe 32. The air compressor 31 is located on the operating platform 7 above the first gate well 21, one end of the air pipe 32 is connected to the air compressor 31, and the other end of the air pipe 32 passes through the first gate well 21 and is connected to the inside of the tunnel 1. The air compressor 31 is used to inflate the tunnel 1, and an air cushion is formed between the rock plug 5 and the first gate 6. During blasting, the bombardment gas expands and compresses the air cushion, thereby reducing the bombardment gas pressure, buffering the impact of the bombardment gas on the first gate 6, and preventing the bombardment gas from damaging the first gate 6.

[0058] Furthermore, a pressure gauge 33 and an exhaust pipe are provided on the air pipe 32, and a control valve 34 is provided on the exhaust pipe, and the control valve 34 is used to control the connection between the air pipe 32 and the air outside the tunnel 1. Preferably, the air pipe 32 can be pre-buried in the concrete lining of the first gate shaft 21, and the diameter of the air pipe 32 is preferably 0.05 to 0.3 m. Since the control valve 34 is installed on the air pipe 32, the exhaust of the air pipe 32 can be controlled by the control valve 34. Since the pressure gauge 33 is provided on the air pipe 32, the air pressure in the tunnel 1 can be detected by the pressure gauge 33, and the pressurization system 3 can pressurize the air in the tunnel 1 to a predetermined value before blasting, and can also discharge the air in the tunnel 1 after the blasting is completed and the air pressure in the tunnel 1 reaches equilibrium.

[0059] In order to make the wave-breaking pit 4 have a better energy dissipation effect on the blasting shock wave, in one embodiment, the wave-breaking pit 4 is arranged in an axisymmetric manner, and the symmetry axis of the wave-breaking pit 4 coincides with the symmetry axis of the rock plug 5, and the wave-breaking pit outlet 42 is located at the upper part of the wave-breaking pit 4. Furthermore, the cross section of the wave-breaking pit 4 perpendicular to the symmetry axis is circular or approximately circular, the pit wall of the wave-breaking pit 4 facing the rock plug 5 is a spherical surface, and the extension line of the symmetry axis of the wave-breaking pit 4 passes through the center of the rock plug 5.

[0060] The overall shape of the wave-breaking pit 4 is set to a pear-shaped structure with a small cross section at one end close to the rock plug 5 and a large cross section at one end away from the rock plug 5, and the wave-breaking pit 4 is set to an axisymmetric structure, so that the shock wave generated when the rock plug 5 is blasted can be reflected and collided multiple times in the wave-breaking pit 4, achieving a better effect of dissipating and blocking the shock wave. Since the overall shape of the wave-breaking pit 4 is set to a pear-shaped structure, it is more conducive to the reflection of the shock wave in the pit, the balance of the force on the water body in the wave-breaking pit 4, and the reduction of the stress state of the surrounding rock lining in the tunnel 1.

[0061] Since water is injected into the wave-breaking pit 4, the resistance of the water can dissipate the energy of the high-speed splashing rock debris, thereby effectively reducing the collision and friction of the rock debris on the surrounding rock lining, and protecting the surrounding rock lining. Since the extension line of the symmetry axis of the wave-breaking pit 4 passes through the center of the rock plug 5, the force on the water in the wave-breaking pit 4 is more balanced, thereby suppressing the rolling of the water body and suppressing the water flow from carrying the rock debris out of the wave-breaking pit 4.

[0062] Since the symmetry axis of the wave-breaking pit 4 coincides with the symmetry axis of the rock plug 5, that is, the wave-breaking pit 4 is axially symmetrical with respect to the symmetry axis of the rock plug 5, so as to satisfy the impact of the shock wave and the explosion pressure in the axially symmetrical wave-breaking pit 4, the impact received by the wave-breaking pit 4 is roughly axially symmetrical, so as to suppress the rotation and tumbling of the mixture of water, steam and rock blocks in the wave-breaking pit 4 due to uneven pressure, thereby reducing the leakage of rock blocks.

[0063] In one embodiment, in order to better dissipate the energy of the shock wave generated by the blasting and better intercept the splashing slag, an outlet channel 8 is provided at the outlet 42 of the wave-breaking pit 4, and the wave-breaking pit 4 is connected to the tunnel 1 through the outlet channel 8. A dam 9 is provided on the bottom inner wall of the outlet channel 8, and a gap is provided between the dam 9 and the upper inner wall of the outlet channel 8.

[0064] The barrier 9 can be cast with concrete and firmly connected to the surrounding rock in the outlet channel 8 through anchor rods. The height h of the barrier 9 can be 0.3-1.5m and the width can be 0.5-3m. The specific height and width of the barrier 9 can be determined by hydraulic calculation of the water injected into the wave-breaking pit 4. The surface where the barrier 9 connects with the spherical pit wall of the wave-breaking pit 4 is a curved surface, so that the spherical surface of the barrier 9 and the wave-breaking pit 4 are smoothly transitioned to form a complete curved surface, so that the splashed rock debris can fall into the wave-breaking pit 4 along the curved surface.

[0065] Since the barrier 9 is provided in the outlet channel 8, the reflection of the shock wave can be further increased, the shock wave leakage can be reduced, and the containment and energy dissipation effect of the wave-breaking pit 4 on the blasting shock wave can be enhanced. The setting of the barrier 9 can better intercept the splashing rock debris and prevent the rock debris from flying out of the wave-breaking pit 4. In addition, the setting of the barrier 9 can reduce the flow cross-section of the water flow, form a blocking effect on the water flow from the reservoir 16 after blasting into the tunnel 1, suppress the water flow speed, and further suppress the water flow from carrying the rock debris out of the wave-breaking pit 4.

[0066] It should be noted that the barrier 9 has little blocking effect on the low-speed water flow during normal operation, and the head loss of the low-speed water flow is very small, which hardly affects the normal water diversion.

[0067] In one embodiment, in order to further dissipate the energy of the shock wave leaking out of the wave-breaking pit 4, a slag collecting pit 10 and a reflective inverted ridge 11 are provided in the tunnel 1. The slag collecting pit 10 and the reflective inverted ridge 11 are both located between the outlet channel 8 and the first gate shaft 21, the slag collecting pit 10 is located below the reflective inverted ridge 11, and the bottom of the reflective inverted ridge 11 is lower than the outlet channel 8.

[0068] By setting the reflective inverted ridge 11, the shock wave leaking out of the wave-breaking pit 4 can be further blocked and reflected, so that the shock wave is further attenuated to avoid the shock wave from damaging the first gate 6. A certain amount of water needs to be injected into the slag collection pit 10 before blasting, so that the rock debris splashed out of the wave-breaking pit 4 falls into the slag collection pit 10 after being reflected by the reflective inverted ridge 11, so as to prevent the rock debris generated by the blasting from splashing into the tunnel 1 to form siltation and blockage. The slag collection pit 10 can be lined with concrete, and the depth of water injected into the slag collection pit 10 can be 2 to 5 meters, so that the splashing rock debris can be dissipated by the resistance of water.

[0069] Preferably, the spatial cross-section of the slag pit 10 above the water surface should be larger than the cross-section of the tunnel 1 , so as to prevent the bombardment gas from bringing water and slag out of the slag pit 10 .

[0070] In one embodiment, in order to further prevent slag from entering the tunnel 1, the tunnel 1 has a slope section 12, which is located between the slag collection pit 10 and the first gate shaft 21. One end of the slope section 12 is connected to the slag collection pit 10, and the other end of the slope section 12 extends obliquely upward relative to the one end of the slope section 12. The tunnel 1 also has an air cushion section 13, which is located between the slope section 12 and the first gate shaft 21. The air cushion section 13 has a first end and a second end, the first end is connected to the other end of the slope section 12, the second end is connected to the first gate shaft 21, the second end of the air cushion section 13 extends obliquely upward relative to the first end, and the slope of the air cushion section 13 is smaller than the slope of the slope section 12.

[0071] In this embodiment, the slope of the air cushion section 13 is set to be smaller than the slope of the slope section 12. Figure 1 As shown in the figure, the elevation of the tunnel 1 is higher at the end near the first gate 6, and lower at the end near the slag pit 10, that is, the elevations from point E, point D to point C in the figure decrease successively, and the slope of the CD section is greater than the slope of the DE section. Among them, the DE section is an air cushion section 13. Since a predetermined amount of gas is filled into the tunnel 1 through the pressurizing system 3, after the rock plug 5 is blasted, the water in the reservoir 16 will flow into the tunnel 1 and compress the air in the tunnel 1 until equilibrium is reached. Since the DE section is an air cushion section 13, the inflowing water flow is difficult to reach or reaches the air cushion section 13 at a low speed, so the water flow cannot bring the slag to the DE section. After the rock plug 5 is blasted through, the inflowing water may reach the CD section, and the water flow velocity may be relatively high and may carry rock debris. Therefore, the slope of the CD section is designed to be steeper, which is beneficial to reducing the inflowing water into the DE section of the tunnel 1, and is also beneficial for the rock debris carried by the inflowing water to slide again through the CD section into the slag collection pit 10, thereby avoiding the accumulation and blockage of the tunnel 1 by the rock debris.

[0072] The gate shaft assembly 2 also includes a second gate shaft 22, which is located on one side of the first gate shaft 21 and communicates with the tunnel 1. A second gate 14 for controlling the water flow in the tunnel 1 is arranged inside the second gate shaft 22. The first gate shaft 21 is located upstream of the second gate shaft 22. After the first gate shaft 21 is lowered, the tunnel 1 can be sealed. Before the rock plug 5 is blasted, the first gate 6 can withstand the preset pressure of the air in the tunnel 1; after the blasting, the first gate 6 can withstand the transient pressure of the water-gas mixed flow in the tunnel 1. The second gate 14 can be used to control the water diversion flow. After the rock plug 5 is blasted, the second gate 14 can also withstand the transient pressure of the water-gas mixed flow in the tunnel 1.

[0073] In this embodiment, due to the provision of the wave-breaking pit 4 and the barrier 9, when the rock plug 5 is blasted, the shock wave is reflected and countered multiple times on the wall surfaces of the wave-breaking pit 4 and the barrier 9, and the main energy of the shock wave in the tunnel 1 is attenuated, and only about 10% of the shock wave leaks out from the outlet channel 8. The shock wave leaked out through the outlet channel 8 of the wave-breaking pit 4 encounters the reflection inverted ridge 11, so that the shock wave is reflected multiple times at the reflection inverted ridge 11, the slope section 12 and the slag collection pit 10 and is further attenuated, thereby reducing most of the shock wave energy, so that the shock wave at the first gate shaft 21 is at a very safe level, thereby ensuring the safety of the first gate shaft 21.

[0074] It should be noted that the lifting and lowering of the first gate shaft 21 and the second gate shaft 22 is a prior art, and the lifting and lowering can be achieved by a winch or the like.

[0075] Embodiment 2:

[0076] The present embodiment is described in detail below with reference to the first embodiment:

[0077] The present application provides a pre-pressurized air cushion underwater rock plug blasting method, which is applied to the pre-pressurized air cushion underwater rock plug blasting device as described in the first embodiment. The pre-pressurized air cushion underwater rock plug blasting method comprises the following steps:

[0078] S1: excavate the first gate shaft 21 , and excavate the tunnel 1 along the bottom of the first gate shaft 21 to the upstream reservoir 16 , until the tunnel 1 extends to one side of the rock plug 5 .

[0079] Before excavating the first gate well 21, excavation can be first carried out on the selected mountain to arrange the operating platform 7, and an air compressor 31 and an air pipe 32 can be set on the operating platform 7 above the first gate well 21. The air pipe 32 is pre-buried inside the first gate well 21, and one end of the air pipe 32 is connected to the air compressor 31. Then the first gate well 21 and the second gate well 22 are excavated downward from the operating platform 7, and lined, and the air pipe 32 and wires are pre-buried. Among them, the air pipe 32 can be pre-buried in the lining of the first gate well 21, and a pressure gauge 33 and an exhaust pipe can be set on the air pipe 32, and a control valve 34 can be set on the exhaust pipe. The tunnel 1 is excavated along the bottom of the first gate well 21 and the second gate well 22 to the upstream reservoir 16 until the tunnel 1 extends to one side of the rock plug 5.

[0080] S2: excavating a wave-breaking pit 4 at the water inlet of the tunnel 1 , so that a wave-breaking pit inlet 41 of the wave-breaking pit 4 is located on one side of the rock plug 5 , and a wave-breaking pit outlet 42 of the wave-breaking pit 4 is connected to the water inlet of the tunnel 1 .

[0081] When excavating the tunnel 1 , a sill 9 , a reflective sill 11 and a slag collection pit 10 are sequentially arranged between the wave-breaking pit 4 and the first gate shaft 21 , and the other end of the air pipe 32 passes through the first gate shaft 21 and is placed in the tunnel 1 .

[0082] When excavating the tunnel 1, lining protection is required, and an outlet channel 8 is provided at the wave-breaking pit outlet 42 of the wave-breaking pit 4, so that the dam 9 is placed in the outlet channel 8. After the air pipe 32 passes through the first gate shaft 21 and enters the tunnel 1, the air pipe 32 in the tunnel 1 can be pre-buried in the lining in the tunnel 1. When excavating the tunnel 1, the reflective dam 11, the wave-breaking pit 4 outlet channel 8 and the wave-breaking pit 4 can be dug out in sequence, and then the dam 9 is cast, and the slag collection pit 10 is excavated and lined.

[0083] Then, the blasthole position is selected on the rock plug 5 and the blasthole is drilled. The explosive for blasting is loaded into the blasthole. The blasting of the explosive can be controlled through networking. The blasting of the rock plug 5 adopts the drilling delay detonation. The charge amount of each drill hole is small, 1-3kg / m per hole, and each blasthole is delayed by 20-100ms to avoid the simultaneous detonation of each blasthole, thereby reducing the single-shot charge amount, so as to reduce the impact energy wave peak value and the maximum instantaneous pressure of the detonation gas.

[0084] S3: Inject water to a certain depth into the wave-breaking pit 4 and the slag collection pit 10 to form a water cushion 15. The water in the wave-breaking pit 4 and the slag collection pit 10 can be injected by inserting a water pipe into the blasthole, or directly injected into the wave-breaking pit 4 through a water pump and a water pipe.

[0085] S4: Close the first gate 6 in the first gate shaft 21, start the air compressor 31 to inflate the tunnel 1, so that the air pressure in the tunnel 1 reaches a predetermined value. Then blast the rock plug 5 to achieve the connection between the reservoir 16 and the tunnel 1. After the air pressure in the tunnel 1 is stable, exhaust the gas in the tunnel 1 through the air pipe 32. After the air pressure in the tunnel 1 is stable, exhaust the gas in the tunnel 1 through the air pipe 32. After the mixed gas in the tunnel 1 is exhausted, move the second gate 14 in the second gate shaft 22 downward to close the second gate 14, and then slowly open the first gate 6.

[0086] When the first gate 6 is closed, the control valve 34 on the air pipe 32 is also closed to ensure that the tunnel 1 is in a closed state and the inside of the tunnel 1 is isolated from the outside atmosphere. Then, the air compressor 31 is started to inflate the tunnel 1 so that the air pressure in the tunnel 1 reaches a predetermined value P1.

[0087] The tunnel 1 is sealed by the first gate 6, so that an air cushion is formed between the rock plug 5 and the first gate 6 of the sealed tunnel 1; and the air compressor 31 is used to pressurize the inside of the tunnel 1. When the explosion occurs, the detonation gas expands and compresses the air cushion, so that the pressure of the detonation gas decreases and the pressure of the air cushion increases until a certain dynamic equilibrium is reached, at which time the pressure value in the tunnel 1 is Pe. Since the tunnel 1 is long, the air cushion in front of the first gate 6 can be greatly deformed, which can greatly reduce the pressure of the detonation gas, thereby greatly buffering the impact of the detonation gas on the first gate 6, making the impact generated by the blasting gas land softly, thereby avoiding the impact of the detonation gas to damage the first gate 6.

[0088] When the tunnel 1 is sealed, its internal air pressure value is P0. Before the blasting, air is filled into the tunnel 1 through the air compressor 31, so that the air pressure in the tunnel 1 increases by Pz and reaches the predetermined value P1, P1=P0+Pz. Pz should be determined by calculation and satisfy Pe<the hydrostatic pressure Pc at the first gate 6 after the blasting. When calculating Pe, from a safety perspective, it can be assumed that the detonation gas expands into the tunnel 1 instead of leaking into the reservoir 16; then the total volume Vz of the detonation gas under standard atmospheric pressure can be estimated based on the amount of explosives; then, based on the volume V1 and pressure P1 of the enclosed gas in the original tunnel 1, the air pressure Pe in the tunnel 1 after the blasting can be estimated according to the gas state equation. When Pe<Pc, the design load of the first gate 6 does not need to be increased, thereby saving construction costs.

[0089] Due to the deformability of the air cushion, it can play a good buffering role on the transient pressure of the water flow from the reservoir 16 into the tunnel 1, greatly reducing the transient pressure peak in the tunnel 1, and ensuring that the dynamic pressure of the transient flow does not exceed 30% of the static water pressure of the tunnel 1 (that is, the design load of the control gate of the normal water transfer tunnel 1). Therefore, there is no need to increase the design load of the first gate 6 due to the blasting shock wave and the explosion gas, thereby saving the project cost.

[0090] After the rock plug 5 is blasted, the pressure data of the pressure gauge 33 is observed. After the pressure in the tunnel 1 is stabilized, the control valve 34 on the gas pipe 32 is opened to exhaust the mixed gas in the tunnel 1. After the mixed gas in the tunnel 1 is exhausted, the second gate 14 is moved downward to close the second gate 14, and then the first gate 6 is slowly opened. After checking that everything is correct, the water flow in the tunnel 1 is controlled by the second gate 14 to complete the connection between the reservoir 16 and the tunnel 1.

[0091] The underwater rock plug blasting method of the embodiment of the present application can make the blasting shock wave reflect and collide multiple times in the wave-breaking pit 4 by setting the wave-breaking pit 4, thereby achieving the effect of dissipating and blocking the shock wave. Since the high-pressure detonation gas generated by the explosives during the blasting will expand rapidly and move toward the first gate well 21 and the second gate well 22, it will impact the first gate 6 used to seal the tunnel 1, causing safety hazards. Therefore, a barrier 9 is set in the outlet channel 8 to reduce the flow section of the outlet channel 8, increase the resistance to the leakage of the detonation gas, and thus reduce the leakage flow and movement speed of the detonation gas.

[0092] After the rock plug 5 is blasted, the water in the reservoir 16 will flow into the tunnel 1 because the pressure value Pe in the tunnel 1 is less than the hydrostatic pressure Pc at the first gate 6. If the velocity of the flowing water is high, the rock debris after blasting may be carried into the tunnel 1, causing siltation or blockage. In this embodiment, by setting a wave-breaking pit 4 and setting the water depth in the wave-breaking pit 4 to 3-5m, when blasting, the rock debris is subjected to the resistance of water after meeting water and is dissipated, and the speed drops rapidly. On the one hand, the collision and friction of the rock debris on the wall of the wave-breaking pit 4 is weakened, and the wall of the wave-breaking pit 4 is protected; at the same time, the water cushion 15 can reduce the movement speed of the rock debris, suppress the movement speed and distance of the rock debris, thereby confining most of the rock debris in the wave-breaking pit 4, thereby reducing the possibility of rock debris entering the tunnel 1 and causing siltation or blockage.

[0093] The wave-breaking pit outlet 42 of the wave-breaking pit 4 is located at a high position, which can reduce the rock debris at the bottom of the wave-breaking pit 4 being brought into the tunnel 1 by the water flow. The barrier 9 can reduce the flow cross-section of the outlet channel 8, increase the resistance of the inflowing water fluid to leak out, thereby reducing the leakage flow and movement speed of the water flow, thereby inhibiting the ability of the water flow to carry the rock debris, thereby reducing the possibility of the water flow bringing the rock debris to the tunnel 1 to cause siltation or blockage.

[0094] The overall shape of the wave-breaking pit 4 is set so that the wave-breaking pit 4 is axially symmetrical with respect to the symmetry axis of the rock plug 5, which can ensure that the blasting gas pressure and the center of the inflowing water flow are roughly aligned with the center of the wave-breaking pit 4, so as to reduce the unevenness of the water surface pressure in the wave-breaking pit 4, to suppress the churning of the water flow in the wave-breaking pit 4, and thus reduce the rock debris being carried out of the wave-breaking pit 4 by the water flow.

[0095] The pressure value of the pre-pressure air cushion is P1, and the pressure value rises to Pe after blasting. Pe can be controlled to be slightly smaller than Pc by calculation to reduce the pressure difference at the water inlet of tunnel 1, thereby reducing the speed of water from reservoir 16 pouring into wave-breaking pit 4, thereby reducing the ability of the pouring water flow to carry rocks, thereby reducing the possibility of water flow carrying rock debris to tunnel 1 to cause siltation or blockage. Due to the splashing of rocks or the carrying effect of water and air flow, a small amount of rock debris after blasting may still enter tunnel 1 from the exit channel 8 of wave-breaking pit 4. By setting the reflection ridge and slope section 12, the number of reflections of rock debris can be increased, the movement direction of rock debris can be changed, and the rock debris can be directed to the slag collection pit 10. Filling the slag collection pit 10 with water can inhibit the movement of rock debris and collect the rock debris, so as to further avoid the possibility of rock debris entering tunnel 1 and causing siltation or blockage.

[0096] The underwater rock plug blasting method of the present application is feasible and safe, avoiding the pouring, removal, filling and drainage operations of the plug in the traditional blasting process, simplifying the process, improving the construction efficiency, shortening the construction period, and greatly saving the project investment. Since the pouring and removal of the plug are avoided, the damage to the tunnel 1 lining, gate well and gate slot caused by the removal of the plug and the slag discharge construction is also avoided, and the drainage of the gate well is avoided, which simplifies the operation process and steps of the underwater rock plug 5 blasting, thereby facilitating the control of the construction process, improving the project quality, and reducing the construction safety risk.

[0097] The present application can effectively eliminate the adverse effects of the blasting shock wave on the first gate 6 through the joint work of the wave-breaking pit 4, the dam 9, the reflective dam 11, the slag collection pit 10, the first gate 6 and the pressurization system 3, effectively avoid the damage of the water hammer wave to the gate well slot, effectively prevent the gushing water from bringing the rock debris to the tunnel 1 to form siltation and blockage, and effectively reduce the transient flow pressure peak of the tunnel 1. In addition, the present application can greatly buffer the water hammer pressure of the water flow in the tunnel 1 through the setting of the dam 9 and the air cushion section 13, thereby effectively reducing the dynamic load impact of the gushing transient flow on the first gate 6. Therefore, compared with the gate of the conventional tunnel 1 working normally, the present application can create a better hydraulic environment in the tunnel, so that the dynamic load pressure borne by the gate is smaller. When designing the structural strength of the first gate 6, there is no need to increase the design load due to the blasting shock wave and the gushing water impact, thereby improving the utilization rate of the gate material. Although the present application directly adopts the first gate 6 to seal the tunnel 1, the first gate 6 still only needs to be designed for bearing capacity according to the static and dynamic water pressures of the normal operation of the tunnel 1, and there is no need to increase the design bearing capacity due to the blasting water blocking situation, that is, there is no need to increase the cost of the first gate 6 due to the blasting water blocking. The present invention simplifies the process of underwater rock plug blasting, reduces the difficulty of design and implementation, and is conducive to the promotion and application of underwater rock plug blasting methods.

[0098] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples, unless they are contradictory.

[0099] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0100] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A pre-pressurized air cushion underwater rock plug blasting device, characterized in that: include: A tunnel, wherein a rock plug is provided at a water inlet of the tunnel; A gate well assembly, the gate well assembly comprising a first gate well, the first gate well being located at the water outlet of the tunnel, a first gate being arranged in the first gate well, the first gate being used to control the opening and closing of the water outlet of the tunnel; A wave-breaking pit is arranged at the water inlet of the tunnel, and the wave-breaking pit has a wave-breaking pit entrance and a wave-breaking pit exit, the wave-breaking pit entrance is located on one side of the rock plug, and the wave-breaking pit exit is communicated with the water inlet of the tunnel.

2. The pre-compression air cushion underwater rock plug blasting device according to claim 1, characterized in that: The wave-breaking pit is arranged in an axisymmetric manner, and the symmetry axis of the wave-breaking pit coincides with the symmetry axis of the rock plug, and the wave-breaking pit outlet is located at the upper part of the wave-breaking pit.

3. The pre-compression air cushion underwater rock plug blasting device according to claim 2, characterized in that: The cross section of the wave-breaking pit perpendicular to the symmetry axis is circular or approximately circular, and the pit wall of the wave-breaking pit directly facing the rock plug is a spherical surface.

4. The pre-compression air cushion underwater rock plug blasting device according to claim 1, characterized in that: An exit passage is arranged at the exit of the wave-breaking pit, the wave-breaking pit is connected with the tunnel through the exit passage, a dam is arranged on the bottom inner wall of the exit passage, and a gap is formed between the dam and the upper inner wall of the exit passage.

5. The pre-compression air cushion underwater rock plug blasting device according to claim 4, characterized in that: A slag collecting pit and a reflective inverted ridge are provided in the tunnel, and both the slag collecting pit and the reflective inverted ridge are located between the outlet channel and the first gate shaft. The slag collecting pit is located below the reflective inverted ridge, and the bottom of the reflective inverted ridge is lower than the outlet channel.

6. The pre-compression air cushion underwater rock plug blasting device according to claim 5, characterized in that: The tunnel has a slope section, which is located between the slag collection pit and the first gate shaft. One end of the slope section is connected to the slag collection pit, and the other end of the slope section extends obliquely upward relative to one end of the slope section.

7. The pre-compression air cushion underwater rock plug blasting device according to claim 6, characterized in that: The tunnel also has an air cushion section, which is located between the slope section and the first gate shaft. The air cushion section has a first end and a second end, the first end is connected to the other end of the slope section, and the second end is connected to the first gate shaft. The second end of the air cushion section extends obliquely upward relative to the first end, and the slope of the air cushion section is smaller than the slope of the slope section.

8. The pre-compression air cushion underwater rock plug blasting device according to any one of claims 1 to 7, characterized in that: The gate well assembly also includes a second gate well, which is located on one side of the first gate well and communicates with the tunnel. A second gate for controlling the water flow in the tunnel is arranged in the second gate well.

9. The pre-compression air cushion underwater rock plug blasting device according to any one of claims 1 to 7, characterized in that: The pre-pressurized air cushion underwater rock plug blasting device also includes: A pressurization system, the pressurization system includes an air compressor and an air pipe, the air compressor is located on an operating platform above the first gate shaft, one end of the air pipe is connected to the air compressor, and the other end of the air pipe passes through the first gate shaft and is connected to the inside of the tunnel; a pressure gauge and an exhaust pipe are provided on the air pipe, and a control valve is provided on the exhaust pipe, and the control valve is used to control the connection between the air pipe and the air outside the tunnel.

10. A pre-pressurized air cushion underwater rock plug blasting method, characterized in that: The pre-compression air cushion type underwater rock plug blasting method is applied to the pre-compression air cushion type underwater rock plug blasting device according to any one of claims 1 to 9, and the pre-compression air cushion type underwater rock plug blasting method comprises the following steps: excavating a first gate well, and excavating a tunnel along the bottom of the first gate well to the upstream reservoir until the tunnel extends to one side of the rock plug; Excavating a wave-breaking pit at the water inlet of the tunnel, so that the wave-breaking pit entrance of the wave-breaking pit is located on one side of the rock plug, and the wave-breaking pit outlet of the wave-breaking pit is connected to the water inlet of the tunnel; injecting water of a certain depth into the wave-breaking pit to form a water cushion; Closing the first gate in the first gate shaft to put the tunnel in a closed state, and inflating air into the tunnel to make the air pressure in the tunnel reach a predetermined value; The rock plug is blasted to achieve communication between the reservoir and the tunnel, and the mixed gas in the tunnel is discharged after the air pressure in the tunnel is stabilized.