Automatic pile length measuring method based on weight

By using weight-based automatic measurement methods in pipe pile construction, combined with GNSS receiver and weighing sensor, the problems of inaccurate pile length measurement and human factors in the prior art are solved, and automatic and accurate pile length measurement is achieved , improve construction quality and cost-effectiveness.

CN118936386APending Publication Date: 2024-11-12SICHUAN HUASHI CONCRETE PILE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411264250.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the prior art, it is difficult to accurately measure the pile length in pipe pile construction, and human factors lead to data distortion during the measurement process, affecting the quality and safety of pile foundations, and hidden projects lead to increased costs.

Method used

Using automatic weight-based measurement method, by importing construction drawing information into the pile machine control system, combining GNSS receiver and weighing sensor, the pile position coordinates are automatically identified and the pipe pile weight is measured, and the pipe pile length is calculated to avoid human participation. .

Benefits of technology

It realizes automatic and accurate measurement of pile length during construction, saves labor costs, improves construction quality and data traceability, and reduces the impact of human factors on the results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118936386A_ABST
    Figure CN118936386A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic pile length measuring method based on weight, which comprises the following steps: pre-importing construction drawing information into a control system of a pile machine, the construction drawing information comprising the coordinate of each pile position, the tubular pile specification of each pile position and the weight P per meter of the tubular pile corresponding to the tubular pile specification; when the tubular pile is lifted through a lifting appliance on a pile machine, the weight acting on the lifting appliance in the lifting process of the tubular pile is measured in real time, and the weight is transmitted to a control system in real time; and when the weight fluctuation is smaller than the set value and lasts for more than set time, the weight is the weight M of the pipe pile. The pile position coordinates of current construction are automatically recognized through a pile position recognition system and are combined with construction drawing information imported into a control system in advance to determine the weight P per meter of the pipe pile at the pile position, and the length L of the pipe pile is obtained according to the formula L = M / P. The length of the pipe pile can be automatically measured, measurement is accurate, manual participation is not needed, and the influence of manual participation on the result in the measurement process is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the measurement of relevant parameters in pipe pile construction, in particular to an automatic measurement method for the length of a pipe pile, and belongs to the technical field of pipe pile construction. Background Art

[0002] Pile foundation is a foundation form with high bearing capacity, wide application range and long history. It is widely used in high-rise buildings, ports, bridges and other projects. It is mainly used to improve the bearing capacity of the foundation and is the most widely used deep foundation form. Pile foundation can be divided into two categories according to the construction method: cast-in-place piles and precast piles. Precast piles are increasingly widely used in the market due to their advantages such as visible and controllable quality, low cost, short construction period and clean site.

[0003] Prefabricated piles include wooden piles, steel piles, pipe piles, etc., among which pipe piles are the most widely used. The construction methods are generally hammering and static pressure. Hammering means driving the pipe piles into the ground with a pile driver.

[0004] One of the main control items of pile foundation quality is bearing capacity, and the depth of soil and pile bottom elevation of the pipe pile are both key factors affecting the bearing capacity. Ensuring the depth of soil and pile bottom elevation is crucial to the quality of the pile foundation. The depth of soil and pile bottom elevation are calculated by combining the pile length with other data. The existing pile length measurement is generally a static test, that is, the measurement is carried out before construction, usually by measuring with a tape measure. Although it is relatively simple, it requires 1-2 surveyors and 1 supervisor to complete the measurement together, which consumes a lot of manpower costs. At the same time, the pile length is the most important settlement data for the pile foundation project. In addition, the pile foundation project is a hidden project. After the pipe pile is driven into the ground, it is difficult to accurately measure the pile length. It is not traceable. Therefore, it is easy to cause distortion of pile length data due to human factors, which brings huge risks to the quality and safety of the pile foundation and also generates a lot of unnecessary costs for the construction unit. Therefore, how to objectively and accurately measure the pile length during the construction process is particularly important, and it is also a technical problem that technicians in this field need to solve urgently. Summary of the invention

[0005] In view of the above-mentioned deficiencies in the prior art, the object of the present invention is to provide an automatic pile length measurement method, which can automatically measure the length of the pipe pile accurately without the need for human intervention, thus avoiding the influence of human intervention on the measurement result.

[0006] The technical solution of the present invention is achieved in this way: A weight-based automatic pile length measurement method is carried out in the following steps: 1) Import construction drawing information into the pile driver control system in advance. The construction drawing information includes the coordinates of each pile position, the pile specifications of each pile position, and the weight P of the pile per meter corresponding to the pile specifications. The pile specifications include the pile diameter and wall thickness. 2) When the pile is lifted by the lifting device on the pile driver, the weight acting on the lifting device during the lifting process is measured in real time, and the weight is transmitted to the control system in real time; when the weight fluctuation is less than the set value and lasts for more than the set time, the pile is considered to be completely off the ground, and the weight at this time is the pile weight M; 3) The pile position identification system automatically identifies the coordinates of the current pile position under construction and combines them with the construction drawing information pre-imported into the control system in step 1) to determine the weight P of the pile per meter at the pile position, that is, the pile length L=M / P.

[0007] Furthermore, the pile position identification system includes a GNSS receiver, which is two GNSS receivers symmetrically arranged on the left and right sides along the longitudinal center of the pile driver platform. The two GNSS receivers are fixed to the positions of the pipe piles to be constructed and are located at the three vertices of an isosceles triangle. The coordinates of two of the vertices in the isosceles triangle are directly measured by the two GNSS receivers, and the coordinates of the third vertex are obtained by calculation. The coordinates of the third vertex are the coordinates of the pile position currently under construction.

[0008] Furthermore, antenna brackets are respectively provided at the positions of the two GNSS receivers on the pile driver platform, and the two GNSS receivers are arranged on the top ends of the corresponding antenna brackets.

[0009] Furthermore, the pile length L is in meters and is rounded up.

[0010] Furthermore, the lifting device is a hook and there are two of them, each hook is provided with a weighing sensor, and during the lifting process, the sum of the readings of the two weighing sensors is the weight acting on the lifting device during the pipe pile lifting process.

[0011] Furthermore, the hoisting device is a hook and there are two of them. A winch is provided on the pile driver platform, a pile frame is provided in the center in front of the pile driver platform, a traction fixed pulley is provided on the upper end of the pile frame, each hook is connected to one end of a traction steel rope, and the other end of the traction steel rope is connected to the winch after changing direction through the traction fixed pulley; a weighing sensor is provided between the pile frame and the traction fixed pulley; during the lifting process, the reading of the weighing sensor is the weight acting on the hoisting device during the pipe pile lifting process.

[0012] Preferably, in step 2), the set value is 50 kg; and the set time is 5 seconds.

[0013] Compared with the prior art, the present invention has the following beneficial effects: The present invention realizes automatic measurement of pile length in the lifting link of pipe pile construction, does not change the existing lifting operation, and does not require human participation. It only needs to adapt the existing pile driver structure (add a weighing sensor on the hook or the traction fixed pulley), and the modification is simple. The present invention avoids the influence of human participation in the measurement process on the result, and saves labor costs. The present invention calculates the length by the weight of the pipe pile. Since the pile length in the specification is an integer meter, such as 10 meters, 12 meters, and 15 meters, the finally calculated pile length L is determined in meters and rounded according to the rounding rule. Therefore, even if there is a slight error in the weighing sensor during measurement, it will be offset by rounding and will not affect the final result. Therefore, the accuracy and installation requirements of the weight sensor are relatively low, the cost is low, and it is easier to implement.

[0014] The data obtained by the measurement of the present invention directly enters the construction system and can be viewed by all parties, which effectively realizes the supervision of the construction process, is conducive to the improvement of construction quality, and the settlement data is also more accurate and scientific. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 - A schematic diagram of the structure of the pile driver and other related mechanisms involved in the pile length measurement of the present invention.

[0016] Figure 2 - Schematic diagram of pipe pile lifting according to the present invention. DETAILED DESCRIPTION

[0017] The specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0018] The present invention provides a weight-based automatic pile length measurement method, which is carried out according to the following steps: 1) Import construction drawing information into the pile driver control system in advance. The construction drawing information includes the coordinates of each pile position, the pile specifications of each pile position, and the weight P of the pile per meter corresponding to the pile specifications. The pile specifications include the pile diameter and wall thickness. 2) When the pipe pile is lifted by the hanger on the pile driver, the weight acting on the hanger during the lifting process of the pipe pile is measured in real time, and the weight is transmitted to the control system in real time; when the weight fluctuation is less than 50kg and lasts for more than 5 seconds, the pipe pile is considered to be completely off the ground, and the weight at this time is the weight M of the pipe pile. Since the pipe pile usually shakes when it is just lifted off the ground, the weight often fluctuates to a certain extent, and the maximum value that appears during the fluctuation process is usually larger than the actual weight of the pipe pile, so it is necessary to wait until the pipe pile is stable before taking a reading, and then the true weight of the pipe pile can be obtained. If you have to wait until the reading is completely free of fluctuations, it will take a long time, which will affect the construction efficiency and will not substantially improve the measurement results. Therefore, the present invention considers the pipe pile to be in a stable state when the fluctuation is small and lasts for a certain period of time, and such treatment will not affect the final pile length measurement result.

[0019] 3) The pile position identification system automatically identifies the coordinates of the current pile position under construction, and combines them with the construction drawing information pre-imported into the control system in step 1) to determine the weight P of the pipe pile per meter corresponding to the pile position, and the length of the pipe pile L=M / P can be obtained.

[0020] Figure 1 It is a structural schematic diagram of a pile driver and other related mechanisms (such as a lifting mechanism and pile position identification) involved in pile length measurement of the present invention. Figure 2 This is a schematic diagram of the pipe pile hoisting of the present invention. Figure 1 and Figure 2 It can be seen that the pile driver 1 includes a pile driver platform 2 and a pile frame 3 arranged in the middle of the front end of the pile driver platform. The sling is a hook 4 and there are two of them, and each hook 4 is provided with a weighing sensor 5. A winch 6 is provided on the pile driver platform 2, and a traction fixed pulley 7 is provided on the upper end of the pile frame 3. Each hook 4 is connected to one end of a traction steel rope 8, and the other end of the traction steel rope 8 is connected to the winch 6 after changing direction through the traction fixed pulley 7. The winch drives the traction steel rope to be retracted and released to achieve the lifting of the pipe pile 10. During the lifting process, the sum of the readings of the two weighing sensors 5 is the weight M acting on the sling during the lifting process of the pipe pile 10. In actual operation, the measurement is started only when the sum of the readings of the two weighing sensors 5 exceeds 1t, and the weight is monitored in real time at this time. This is because the lifting weight may be greater than 1 t only after the lifting begins, and the lifting process only accounts for a small part of the entire construction process. Most of the time, there is no need to monitor the weight. It is only monitored after the weight exceeds 1 t. This can save system resources and also reflect that the pile driver is currently in the lifting stage of operation.

[0021] The present invention can also modify the traction fixed pulley 7 through which the traction steel rope of the hook passes without setting the weighing sensor on the hook, that is, set the weighing sensor between the pile frame 3 and the traction fixed pulley 7. During the lifting process, the reading of the weighing sensor is the weight M acting on the hanger during the lifting process of the pile. By measuring the change in the force of the traction fixed pulley through the weighing sensor, the weight of the pile can also be measured based on the same principle.

[0022] Furthermore, the pile position identification system includes GNSS receivers 9, which are two GNSS receivers 9 symmetrically arranged along the longitudinal center of the pile driver platform. The two GNSS receivers 9 are fixed to the positions of the pipe piles 10 (or pile frames) to be constructed and are located at the three vertices of the isosceles triangle, that is, the three side lengths and three angles of the isosceles triangle are known. The coordinates of two vertices (vertices corresponding to the two base angles) in the isosceles triangle are directly measured by the two GNSS receivers 9, and the coordinates of the third vertex (vertices corresponding to the top angle) are obtained through simple mathematical calculations based on the information of the isosceles triangle. The coordinates of the third vertex are the coordinates of the pile position currently under construction.

[0023] Antenna brackets 11 are respectively provided at the positions of the two GNSS receivers 9 on the pile driver platform 2, and the two GNSS receivers 9 are arranged at the top of the corresponding antenna brackets 11. In the present invention, the GNSS receiver 9 is arranged at the top of the antenna bracket 11, and the antenna bracket 11 is located in an open position of the pile driver platform 2 away from the pile frame 3, so that the influence of the pile frame 3, the hammer frame 12, etc. on the GNSS receiver 9 can be avoided, and the coordinate measurement can be accurately performed.

[0024] The pile length L is in meters and is rounded up.

[0025] In order to realize automatic measurement and real-time measurement, the present invention also specially establishes a real-time measurement system for pile length. In addition to the control system of the pile driver, the measurement system also includes a solution unit. The output of the weighing sensor is connected to the control unit and the solution unit at the same time, and the detection data of the GNSS receiver is transmitted to the solution unit in real time. During the lifting process of the pipe pile, the control system measures the weight M acting on the hanger during the lifting process of the pipe pile in real time. When the weight M fluctuates less than the set value and is stable for more than the set time, it is considered that the pipe pile has completely left the ground, and the weight M is the weight of the pipe pile. The control unit instructs the solution unit to automatically solve the pile position coordinates through the detection data of the GNSS receiver obtained at this moment, and the pile position coordinates are fed back to the control system. The control system is combined with the pre-imported construction drawing information to determine the weight P of the pipe pile per meter corresponding to the pile position, and then the weight P of the pipe pile per meter and the weight M of the pipe pile are transmitted to the solution unit, and the pile length can be calculated by L=M / P, realizing automatic real-time measurement and automatic results. On-site operators can view relevant information on the pile driver display screen configured by the measurement system, or monitor and view it in the background or mobile terminal, so as to facilitate the retrieval of relevant parameters.

[0026] Finally, it should be noted that the above examples of the present invention are merely examples for illustrating the present invention, and are not intended to limit the embodiments of the present invention. Although the applicant has described the present invention in detail with reference to the preferred embodiments, for those of ordinary skill in the art, other different forms of changes and modifications can be made based on the above description. It is impossible to list all the embodiments here. Any obvious changes or modifications derived from the technical solution of the present invention are still within the scope of protection of the present invention.

Claims

1. A weight-based automatic pile length measurement method, Features: Follow the steps below, 1) Import construction drawing information into the pile driver control system in advance. The construction drawing information includes the coordinates of each pile position, the pile specifications of each pile position, and the weight P of the pile per meter corresponding to the pile specifications. The pile specifications include the pile diameter and wall thickness. 2) When the pile is lifted by the lifting device on the pile driver, the weight acting on the lifting device during the lifting process is measured in real time, and the weight is transmitted to the control system in real time; when the weight fluctuation is less than the set value and lasts for more than the set time, the pile is considered to be completely off the ground, and the weight at this time is the pile weight M; 3) The pile position identification system automatically identifies the coordinates of the current pile position under construction and combines them with the construction drawing information pre-imported into the control system in step 1) to determine the weight P of the pile per meter at the pile position, that is, the pile length L=M / P.

2. A weight-based automatic pile length measurement method according to claim 1, Features: The pile position identification system includes a GNSS receiver, which is two GNSS receivers symmetrically arranged on the left and right sides along the longitudinal center of the pile driver platform. The two GNSS receivers are fixed to the positions of the pipe piles to be constructed and are located at the three vertices of an isosceles triangle. The coordinates of two vertices in the isosceles triangle are directly measured by the two GNSS receivers, and the coordinates of the third vertex are obtained by calculation. The coordinates of the third vertex are the coordinates of the pile position currently under construction.

3. The method for automatic pile length measurement based on weight according to claim 2, Features: Antenna brackets are respectively arranged at the positions of the two GNSS receivers on the pile driver platform, and the two GNSS receivers are arranged at the top ends of the corresponding antenna brackets.

4. The method for automatic pile length measurement based on weight according to claim 1, Features: The pile length L is in meters and is rounded up.

5. The method for automatic pile length measurement based on weight according to claim 1, Features: The lifting device is a hook and there are two of them, each hook is provided with a weighing sensor, and during the lifting process, the sum of the readings of the two weighing sensors is the weight acting on the lifting device during the pipe pile lifting process.

6. The method for automatic pile length measurement based on weight according to claim 1, Features: The lifting device is a hook, and there are two of them. A winch is provided on the pile driver platform. A pile frame is provided in the center in front of the pile driver platform. A traction fixed pulley is provided on the upper end of the pile frame. Each hook is connected to one end of a traction steel rope, and the other end of the traction steel rope is connected to the winch after changing direction through the traction fixed pulley. A weighing sensor is provided between the pile frame and the traction fixed pulley. During the lifting process, the reading of the weighing sensor is the weight acting on the lifting device during the pipe pile lifting process.

7. The method for automatic pile length measurement based on weight according to claim 1, Features: In step 2), the set value is 50 kg; the set time is 5 seconds.