Air system for simulating aero-engine sealing and simulation method
By designing a combination system of multiple chambers and gas flow paths in simulated aircraft engine sealing performance tests, the chamber temperature and pressure are independently controlled, and the bypass pipelines are used to achieve rapid heating and cooling, solving inaccurate sealing performance and heating cooling The problem of long time improves the accuracy of testing efficiency and sealing performance measurement.
Patent Information
- Application Number
- CN202411113043.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-14
AI Technical Summary
In the current stage of the simulated aircraft engine sealing performance test, the sealing performance is inaccurate through the pressure differential control method, and the tester's heating and cooling time is long.
Design an air system that simulates the seal of the aircraft engine, including the test adapter section and the gas flow path. Through the combination of multiple chambers and gas flow paths, the temperature and pressure of the chamber are independently controlled, and multiple gas flow paths are used to achieve rapid Heat and cool down, and achieve high-flow gas heat exchange through the bypass pipeline.
It realizes the actual working conditions of seals in aero engines, improves the accuracy and test efficiency of seal performance measurement, and shortens the heating and cooling time of the tester.
Smart Images

Figure CN118936896A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to a sealing system, and in particular relates to an air system and a simulation method for simulating the sealing of an aero-engine. Background Art
[0002] The dynamic seals of the main body of an aircraft engine are mainly composed of bearing cavity seals, gas flow path seals and shaft end seals. Among them, the temperature conditions of the bearing cavity seals and gas flow path seals are relatively harsh, and the sealing temperature of some sealing devices can reach above 500°C. The main function of the bearing cavity seal is to prevent high-temperature air from entering the bearing cavity, and the main function of the gas flow path seal is interstage throttling to prevent high-pressure side air or gas from flowing to the low-pressure side. Nowadays, the sealing tester uses a single-channel high-temperature intake and exhaust method to exchange heat for the test transition section, thereby establishing a high-temperature working environment. When simulating engine working conditions, due to the single gas flow path, the pressure difference control method is often used for testing. That is, the low-pressure side is set to normal pressure, and the high-pressure side pressure and temperature environment are established by the intake and exhaust method. Summary of the invention
[0003] In view of the above problems, the present invention proposes an air system for simulating the sealing of an aircraft engine, comprising:
[0004] A test transition section, which is a sealed container, and has a plurality of chambers inside; the plurality of chambers are arranged in sequence, and two adjacent chambers are connected;
[0005] A test piece, the test piece is installed inside the test transition section; and the test piece is installed at the connection point of two adjacent chambers;
[0006] A gas flow path, each of the chambers being connected to a gas flow path;
[0007] The temperature and pressure of different chambers are controlled by different gas flow paths, thereby achieving the sealing performance of the simulated test piece under different actual working conditions.
[0008] Further, the chamber includes a first chamber, a second chamber and a third chamber;
[0009] The first chamber and the second chamber are connected via a first gap, and a test piece is installed inside the second chamber and near the first gap;
[0010] The second chamber is connected to the third chamber via a second gap, and a test piece is installed inside the second chamber and near the second gap.
[0011] Further, the gas flow path includes a first gas flow path; the first gas flow path is connected to the first chamber;
[0012] The first gas flow path includes a first gas inlet branch and a first gas outlet branch.
[0013] Furthermore, the inlet end of the first air inlet branch is connected to the air source, and the outlet end of the first air inlet branch is connected to the first chamber;
[0014] The first air intake branch is provided with a first filter, a first pressure regulating valve, a first electric regulating valve, a first air intake solenoid valve, a first air intake flow meter and a first heater in sequence from the inlet end to the outlet end.
[0015] Furthermore, a second heater is provided on the first air intake branch, and the second heater is located between the outlet end of the first air intake branch and the first heater.
[0016] Furthermore, the first gas flow path further includes a first intake bypass branch,
[0017] The inlet end of the first air intake bypass branch is connected to the outlet end of the first electric regulating valve, and the outlet end of the first air intake bypass branch is connected to the inlet end of the first heater;
[0018] A first intake bypass solenoid valve is provided on the first intake bypass branch.
[0019] Furthermore, a first cooling branch is provided on the first air intake branch, an inlet end of the first cooling branch is connected to the first air intake branch, and the inlet end of the first cooling branch is located at an outlet end of the first heater and / or an outlet end of the second heater;
[0020] The first cooling branch is provided with a first bypass cooler and a first bypass solenoid valve in sequence from the inlet to the outlet.
[0021] Furthermore, the first outlet branch is provided with a first cooler, a first exhaust main line solenoid valve, a first exhaust flow meter and a fourth electric regulating valve in sequence from the inlet to the outlet.
[0022] Furthermore, a first gas outlet bypass branch is provided on the first gas outlet branch, the inlet of the first gas outlet bypass branch is connected to the inlet of the first exhaust main line solenoid valve, and the outlet of the first gas outlet bypass branch is connected to the outlet of the first exhaust flow meter.
[0023] Furthermore, a first temperature sensor and a first pressure sensor are provided on the first chamber.
[0024] Further, the gas flow path further comprises a second gas flow path, and the second gas flow path is connected to the second chamber;
[0025] The second gas flow path includes a second gas inlet branch and a second gas outlet branch.
[0026] Furthermore, the inlet end of the second air inlet branch is connected to the air source, and the outlet end of the second air inlet branch is connected to the second chamber;
[0027] The second air intake branch is provided with a second filter, a second pressure regulating valve, a second electric regulating valve, a second air intake main line solenoid valve, a second air intake flow meter and a third heater in sequence from the inlet to the outlet.
[0028] Furthermore, the second gas flow path further includes a second intake bypass branch;
[0029] The inlet of the second air intake bypass branch is connected to the inlet of the second air intake main line solenoid valve, and the outlet of the second air intake bypass branch is connected to the outlet of the second air intake flow meter. A second air intake bypass solenoid valve is provided on the second air intake bypass branch.
[0030] Furthermore, a second cooling branch is provided on the second air intake branch, an inlet end of the second cooling branch is connected to the second air intake branch, and the inlet end of the second cooling branch is located at an outlet end of the third heater;
[0031] The second cooling branch is provided with a second bypass cooler and a second bypass solenoid valve in sequence from the inlet to the outlet.
[0032] Furthermore, the second outlet branch is provided with a second exhaust cooler, a second exhaust main line solenoid valve, a second exhaust flow meter and a fifth electric regulating valve in sequence from the inlet to the outlet.
[0033] Furthermore, a second gas outlet bypass branch is provided on the second gas outlet branch, and an inlet of the second gas outlet bypass branch is connected to an inlet of the second exhaust main line solenoid valve.
[0034] The outlet of the second gas outlet bypass branch is connected to the outlet of the second exhaust gas flow meter.
[0035] Furthermore, a second temperature sensor and a second pressure sensor are provided on the second chamber.
[0036] Further, the gas flow path includes a third gas flow path; the third gas flow path is connected to the third chamber;
[0037] The third gas flow path includes a third gas inlet branch,
[0038] The inlet of the third air inlet branch is connected to the air source, and the outlet of the third air inlet branch is connected to the third chamber;
[0039] The third air intake branch is provided with a third filter, a third pressure stabilizing valve and a third electric regulating valve in sequence from the inlet to the outlet.
[0040] A method for simulating the air system of an aircraft engine seal, using the above system, is characterized in that it includes the following steps:
[0041] Place the test piece at the connection point between the two test chambers.
[0042] According to the set test temperature, the gas flow paths passing through the different test chambers are heated;
[0043] After the test chamber reaches the set temperature, turn on the corresponding flow meter to measure the inlet and outlet air flows;
[0044] The inlet and outlet flow rates of the metering flowmeter are counted and the sealing leakage of the test piece at the test temperature is calculated.
[0045] Further, counting the inlet flow rate and outlet flow rate of the metering flow meter and calculating the sealing leakage of the test piece at the test temperature includes the following steps:
[0046] Record the measured value of the first inlet flow meter of the first gas flow path as W 11 , the first exhaust gas flow meter measured value is W 12 ,
[0047] Record the measured value of the second inlet flow meter of the second gas flow path as W 21 , the second exhaust gas flow meter measured value is W 22 , under the condition of stable pressure and temperature, the air flow rate W leaking from the first chamber to the third chamber is calculated by the formula;
[0048] W=W 21 +(W 11 -W 12 )-W 22 .
[0049] Beneficial effects:
[0050] 1. The actual pressure of the test chamber of the present invention can be independently controlled by three gas flow paths, which can truly simulate the actual working conditions of the seals in the aircraft engine, and effectively solve the problem of inaccurate sealing performance caused by simulating the actual working conditions through pressure difference at this stage.
[0051] 2. In order to achieve rapid heating and cooling of the tester and improve the test efficiency, the present invention respectively sets independent bypass pipes on the heated intake air flow path and the exhaust air flow path. When the tester is heated and cooled, the pipeline where the mass flow meter is located is closed and the bypass is opened, so that large-flow gas heat exchange can be realized to achieve the test effect of rapid heating or cooling.
[0052] 3. The present invention provides large-flow bypass pipelines on the intake air path and the exhaust air path, which effectively reduces the heating time and cooling time of the tester.
[0053] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0055] Figure 1 A schematic diagram of an air system simulating the sealing of an aircraft engine in an embodiment of the present invention is shown;
[0056] Figure 2 A schematic diagram of the first gas flow path in an embodiment of the present invention is shown.
[0057] Figure 3 A schematic diagram of the second gas flow path in an embodiment of the present invention is shown.
[0058] Figure 4 A schematic diagram of the third gas flow path in an embodiment of the present invention is shown.
[0059] In the figure, 1, test transition section; 2, test piece; 3, chamber; 31, first chamber; 32, second chamber; 33, third chamber; 100, gas flow path;
[0060] 10. First gas flow path; 101. First filter; 102. First pressure regulating valve; 103. First electric regulating valve; 104. First intake bypass solenoid valve; 105. First intake flow meter; 106. First heater; 107. First cooler; 108. First bypass solenoid valve; 109. First temperature sensor; 110. First pressure sensor; 111. First cooler; 112. Second heater; 113. First exhaust main solenoid valve; 114. First exhaust bypass solenoid valve; 115. First exhaust flow meter; 116. First intake solenoid valve; 117. First intake branch; 118. First outlet branch; 119. First intake bypass branch; 120. First outlet bypass branch; 121. First cooling branch; 122. Fourth electric regulating valve;
[0061] 20, second gas flow path; 201, second filter; 202, second pressure regulating valve; 203, second electric regulating valve; 204, second intake bypass solenoid valve; 205, second intake flow meter; 206, third heater; 207, second bypass solenoid valve; 208, second bypass cooler; 209, second temperature sensor; 210, second pressure sensor; 211, second exhaust cooler; 212, second exhaust main solenoid valve; 213, second exhaust bypass solenoid valve; 214, second exhaust flow meter; 215, second intake main solenoid valve; 216, second intake branch; 217, second outlet branch; 218, second intake bypass branch; 219, second outlet bypass branch; 220, second cooling branch; 221, fifth electric regulating valve;
[0062] 30. Third gas flow path; 301. Third filter; 302. Third pressure regulating valve; 303. Third electric regulating valve; 304. Third pressure sensor; 305. Third air intake branch. DETAILED DESCRIPTION
[0063] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0064] Implementation method 1:
[0065] like Figure 1 As shown, Figure 1 FIG. 1 is a schematic diagram of an air system simulating an aircraft engine seal in an embodiment of the present invention. Figure 1 , an air system and simulation method for simulating the sealing of an aero-engine, comprising:
[0066] The test transition section 1 is a sealed container, and a plurality of chambers 3 are arranged inside the test transition section 1; the plurality of chambers 3 are arranged in sequence, and two adjacent chambers 3 are connected;
[0067] A test piece 2, the test piece 2 is installed inside the test transition section 1; and the test piece 2 is installed at the connection point between two adjacent chambers 3;
[0068] The gas flow path 100 is connected to each chamber 3 .
[0069] The temperature and pressure of different chambers 3 are controlled by different gas flow paths 100, thereby achieving the sealing performance of the simulated test piece 2 under different actual working conditions.
[0070] The chamber 3 includes a first chamber 31, a second chamber 32 and a third chamber 33;
[0071] The first chamber 31 and the second chamber 32 are connected via a first gap, and a test piece 2 is installed inside the second chamber 32 and near the first gap;
[0072] The second chamber 32 and the third chamber 33 are connected via a second gap, and a test piece 2 is installed inside the second chamber 32 and near the second gap.
[0073] like Figure 2 As shown, Figure 2 FIG. 1 is a schematic diagram showing a first gas flow path 10 in an embodiment of the present invention. Figure 2 , the gas flow path 100 includes a first gas flow path 10, and the chamber 3 is a first chamber 31; the first gas flow path 10 is connected to the first chamber 31;
[0074] The first gas flow path 10 includes a first gas inlet branch 117;
[0075] The inlet end of the first air inlet branch 117 is connected to the air source, and the outlet end of the first air inlet branch 117 is connected to the first chamber 31;
[0076] The first air intake branch 117 is provided with a first filter 101 , a first pressure regulating valve 102 , a first electric regulating valve 103 , a first air intake solenoid valve 116 , a first air intake flow meter 105 and a first heater 106 in sequence from the inlet end to the outlet end.
[0077] Specifically, the first filter 101 can filter water vapor and impurities in the air to obtain relatively pure air. The first pressure regulating valve 102 controls the intake pressure, the first electric regulating valve 103 adjusts the intake / exhaust pressure and flow, the first intake flow meter 105 measures the mass flow of air passing through the flow path, and the first heater 106 heats the air initially entering the heater.
[0078] In the above embodiment, another optional implementation is that a second heater 112 is further provided on the first air intake branch 117 , and the second heater 112 is located between the outlet end of the first air intake branch 117 and the first heater 106 .
[0079] Specifically, the second heater 112 heats the outlet gas of the first heater 106 again. The first gas flow path 10 uses two heaters connected in series and independently controlled to raise the inlet temperature to 600°C (i.e., the temperature of the first chamber 31 can reach 600°C at most), and the maximum test pressure can reach 2.0MPa; the first chamber 31 is a high temperature test chamber.
[0080] In the implementation of the present invention, the first gas flow path 10 further includes a first intake bypass branch 119.
[0081] The inlet end of the first air intake bypass branch 119 is connected to the outlet end of the first electric regulating valve 103 , and the outlet end of the first air intake bypass branch 119 is connected to the inlet end of the first heater 106 ;
[0082] A first intake bypass solenoid valve 104 is provided on the first intake bypass branch 119 .
[0083] In the implementation of the present invention, a first cooling branch 121 is provided on the first air intake branch 117, an inlet end of the first cooling branch 121 is connected to the first air intake branch 117, and the inlet end of the first cooling branch 121 is located at the outlet end of the first heater 106 and / or the outlet end of the second heater 112;
[0084] The first cooling branch 121 is provided with a first bypass cooler 107 and a first bypass solenoid valve 108 in sequence from the inlet to the outlet.
[0085] Specifically, the first bypass cooler 107 cools the high-temperature air passing therethrough, and the first bypass solenoid valve 108 is used to open and close the first cooling branch 121. When the corresponding first heater 106 or second heater 112 needs to be cooled quickly, the first bypass solenoid valve 108 of the first cooling branch 121 at its outlet end is opened, and then the first air intake solenoid valve 116 is closed and the first air intake bypass solenoid valve 104 is opened, so that the corresponding heater can be cooled quickly.
[0086] In the above embodiment, another optional implementation is that the first gas flow path 10 includes a first gas outlet branch 118,
[0087] The first outlet branch 118 is provided with a first cooler 111 , a first exhaust main line solenoid valve 113 , a first exhaust flow meter 115 and a fourth electric regulating valve 122 in sequence from the inlet to the outlet.
[0088] Preferably, a first outlet bypass branch 120 is provided on the first outlet branch 118 , the inlet of the first outlet bypass branch 120 is connected to the inlet of the first exhaust main line solenoid valve 113 , and the outlet of the first outlet bypass branch 120 is connected to the outlet of the first exhaust flowmeter 115 .
[0089] Preferably, a first temperature sensor 109 and a first pressure sensor 110 are provided on the first chamber 31 . The first temperature sensor 109 is located at the entrance of the first intake branch 117 ; the first pressure sensor 110 is located between the second intake branch 216 and the second outlet branch 217 .
[0090] Specifically, the first temperature sensor 109 and the first pressure sensor 110 measure the temperature and pressure of the first chamber 31 respectively.
[0091] Working principle of the first gas flow path 10: The gas source gas passes through the first filter 101 and the first pressure regulating valve 102 to stabilize the intake pressure, the gas passes through the first electric regulating valve 103 to adjust the flow, the air enters the first intake flow meter 105 to measure the intake flow, the gas enters the first heater 106 for heating, and the heated gas passes through the second heater 112 to reach the temperature specified in the test and enters the first chamber 31. The maximum temperature of the first chamber 31 can reach 600°C, which is a high-temperature chamber. The first pressure sensor 110 on the first chamber 31 controls the opening of the first electric regulating valve 103 through feedback regulation to adjust the test pressure. Part of the air entering the first chamber 31 leaks to the second chamber 32 through the seal, and part of it enters the first exhaust flow meter 115 after being cooled to room temperature by the first cooler 111. The leakage of the sealing device can be calculated by the difference between the two flow meters. When the tester needs to be cooled, the first air intake bypass solenoid valve 104 and the first exhaust bypass solenoid valve 114 are opened, and the first exhaust main solenoid valve 113 and the first air intake solenoid valve 116 are closed, so that the first chamber 31, the first heater 106 and the second heater 112 are cooled quickly. 11 , the exhaust flow rate on the first outlet branch 118 is W 12 When the intake pressure remains unchanged, the difference between the two is the seal leakage W1 = W 11 -W 12 .
[0092] like Figure 3 As shown, Figure 3 FIG. 2 shows a schematic diagram of the second gas flow path 20 in an embodiment of the present invention. Figure 3 , the gas flow path 100 further includes a second gas flow path 20, and the chamber 3 is a second chamber 32; the second gas flow path 20 is connected to the second chamber 32;
[0093] The second gas flow path 20 includes a second gas inlet branch 216;
[0094] The inlet end of the second air inlet branch 216 is connected to the air source, and the outlet end of the second air inlet branch 216 is connected to the second chamber 32;
[0095] The second air intake branch 216 is provided with a second filter 201, a second pressure regulating valve 202, a second electric regulating valve 203, a second air intake main line solenoid valve 215, a second air intake flow meter 205 and a third heater 206 in sequence from the inlet to the outlet.
[0096] Specifically, the second filter 201 can filter water vapor and impurities in the air to obtain relatively pure air. The second pressure regulating valve 202 controls the intake pressure, the second electric regulating valve 203 adjusts the intake / exhaust pressure and flow, the second intake flow meter 205 measures the mass flow of air passing through the flow path, and the third heater 206 heats the air initially entering the heater.
[0097] In the implementation of the present invention, the second gas flow path 20 further includes a second intake bypass branch 218;
[0098] The inlet of the second intake bypass branch 218 is connected to the inlet of the second intake main line solenoid valve 215 , and the outlet of the second intake bypass branch 218 is connected to the outlet of the second intake flowmeter 205 . A second intake bypass solenoid valve 204 is provided on the second intake bypass branch 218 .
[0099] Preferably, a second cooling branch 220 is provided on the second air intake branch 216, and an inlet end of the second cooling branch 220 is connected to the second air intake branch 216, so that the inlet of the second cooling branch 220 is located at the outlet end of the third heater 206;
[0100] The second cooling branch 220 is provided with a second bypass cooler 208 and a second bypass solenoid valve 207 in sequence from the inlet to the outlet.
[0101] Specifically, the second cooling branch 220 cools the high-temperature air passing therethrough, and the second bypass solenoid valve 207 is used to open and close the second cooling branch 220. When the third heater 206 needs to be cooled quickly, the second bypass solenoid valve 207 is opened, and then the second air intake main solenoid valve 215 is closed and the second air intake bypass solenoid valve 204 is opened, so that the third heater 206 can be cooled quickly.
[0102] In the implementation of the present invention, the second gas flow path 20 includes a second gas outlet branch 217,
[0103] The second exhaust branch 217 is provided with a second exhaust cooler 211 , a second exhaust main electromagnetic valve 212 , a second exhaust flow meter 214 and a fifth electric regulating valve 221 in sequence from the inlet to the outlet.
[0104] Specifically, the second exhaust gas cooler 211 cools down the high-temperature air passing therethrough.
[0105] In the implementation of the present invention, a second outlet bypass branch 219 is provided on the second outlet branch 217, and the inlet of the second outlet bypass branch 219 is connected to the inlet of the second exhaust main line solenoid valve 212.
[0106] The outlet of the second exhaust bypass branch 219 is connected to the outlet of the second exhaust flow meter 214 .
[0107] In the above embodiment, another optional implementation is that a second temperature sensor 209 and a second pressure sensor 210 are provided on the second chamber 32;
[0108] The second temperature sensor 209 is located at the outlet of the second intake branch 216;
[0109] The second pressure sensor 210 is located between the second intake branch 216 and the second outlet branch 217 .
[0110] Specifically, the second temperature sensor 209 and the second pressure sensor 210 measure the temperature and pressure of the current position respectively.
[0111] Working principle of the second gas flow path 20: The gas source gas passes through the second filter 201 and is stabilized by the second pressure regulating valve 202 to keep the intake pressure stable. The gas passes through the second electric regulating valve 203 to adjust the flow rate. The air enters the second intake flow meter 205 to measure the intake flow rate. The gas enters the third heater 206 for heating. The heated gas passes into the second chamber 32. The maximum temperature of the second chamber 32 can reach 400°C, which is a medium-temperature chamber. The second pressure sensor 210 on the test chamber controls the opening of the second electric regulating valve 203 through feedback regulation to adjust the test pressure. Part of the air entering the second chamber 32 leaks into the third chamber 33 through the seal, and part of it passes through the second exhaust cooler 211 and is cooled to room temperature before entering the second exhaust flow meter 214 on the exhaust pipeline. When the tester needs to be cooled, the tester and the third heater 206 are quickly cooled by opening the second intake bypass solenoid valve 204 and the second exhaust bypass solenoid valve 213. Leakage measurement method of the second gas flow path 20: The intake flow rate on the second intake branch 216 is W 21 , the exhaust flow rate on the second outlet branch 217 is W 22 When the intake pressure remains unchanged, the difference between the two is the seal leakage W2 = W 21 -W 22 .
[0112] like Figure 4 As shown, Figure 4 FIG. 3 is a schematic diagram showing a third gas flow path 30 in an embodiment of the present invention. Figure 4 , the gas flow path 100 further includes a third gas flow path 30, and the chamber 3 is a third chamber 33; the third gas flow path 30 is connected to the third chamber 33;
[0113] The third gas flow path 30 includes a third air intake branch 305, the inlet of the third air intake branch 305 is connected to the gas source, and the outlet of the third air intake branch 305 is connected to the third chamber 33; a third pressure sensor 304 is provided on the third chamber 33, and the third pressure sensor 304 is used to detect the pressure of the third chamber 33. The third air intake branch 305 is provided with a third filter 301, a third pressure regulating valve 302 and a third electric regulating valve 303 from the inlet to the outlet.
[0114] Working principle of the third gas flow path 30: The gas source gas passes through the third filter 301 and the third pressure-stabilizing valve 302 to stabilize the intake pressure, and the flow rate is adjusted by feedback regulation to control the third electric regulating valve 303, thereby controlling the pressure of the test chamber. The third gas flow path 30 is a room temperature fluid pipeline, and the third chamber 33 is a normal temperature chamber with a maximum test pressure of 0.8MPa. The three gas flow paths in the present invention can simulate the gas environment conditions under three environments: room temperature, medium temperature and high temperature, and can cover all working conditions of the dynamic sealing devices of aircraft engines at this stage. The three gas flow paths can be used individually, or two or three can be used at the same time. When setting the control interface, the gas flow path used is in a lit state on the operation interface. The control principle when the three flow paths are used at the same time is as follows Figure 1 shown.
[0115] Implementation method 2:
[0116] An air system simulation method for simulating the sealing of an aircraft engine, using the above system, comprises the following steps:
[0117] Place the test piece 2 at the connection point between the two test chambers 3.
[0118] According to the set test temperature, the gas flow paths 100 of the different test chambers 3 are heated;
[0119] After the test chamber reaches the set temperature, turn on the corresponding flow meter to measure the inlet and outlet air flows;
[0120] The inlet and outlet air flows of the metering flowmeter are counted and the sealing leakage of the test piece 2 at the test temperature is calculated.
[0121] Specifically, counting the metering flowmeter and calculating the sealing leakage of the test piece 2 at the test temperature include the following steps:
[0122] Record the measured value of the first intake air flow meter 105 of the first gas flow path 10 as W 11 , the first exhaust gas flow meter 115 measures W 12 ,
[0123] Record the measured value of the second inlet flow meter 205 of the second gas flow path 20 as W21 , the second exhaust gas flow meter 214 measures W 22 , under the condition of stable pressure and temperature, the air flow rate W leaking from the first chamber 31 to the third chamber 33;
[0124] W=W 21 +(W 11 -W 12 )-W 22 .
[0125] Main application conditions: Double-stage sealing test device, double-stage sealing divides the test chamber into three independent chambers, of which the high-pressure chamber can be the first chamber 31 and the second chamber 32. The first chamber 31 and the second chamber 32 can be switched by the air intake method according to the different working temperature. The temperature of the high-temperature chamber is not more than 600℃, and the temperature of the low-temperature chamber is not more than 400℃. The mass flow meter on the air intake pipeline of the first gas flow path 10 measures W 11 , the mass flow rate on the exhaust pipe is W 12 , the mass flow meter on the inlet pipe of the second gas flow path 20 measures W 21 , the mass flow rate on the exhaust pipe is W 22 , under the condition of stable pressure and temperature, the air flow rate W leaking from the first chamber 31 to the third chamber 33 is W=W 21 +(W 11 -W 12 )-W 22 .
[0126] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein; and these modifications or substitutions do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An air system simulating the seal of an aircraft engine, It is characterized in that include: A test transition section (1), the test transition section (1) is a sealed container, and a plurality of chambers (3) are arranged inside the test transition section (1); the plurality of chambers (3) are arranged in sequence, and two adjacent chambers (3) are connected; A test piece (2), the test piece (2) being installed inside the test transition section (1); and the test piece (2) being installed at the connecting point between two adjacent chambers (3); A gas flow path (100), wherein each of the chambers (3) is connected to a gas flow path (100); The temperature and pressure of different chambers (3) are controlled by different gas flow paths (100), thereby achieving the sealing performance of the simulated test piece (2) under different actual working conditions.
2. An air system for simulating the sealing of an aircraft engine according to claim 1, It is characterized in that The chamber (3) comprises a first chamber (31), a second chamber (32) and a third chamber (33); The first chamber (31) and the second chamber (32) are connected via a first gap, and a test piece (2) is installed inside the second chamber (32) and close to the first gap; The second chamber (32) and the third chamber (33) are connected via a second gap, and a test piece (2) is installed inside the second chamber (32) and close to the second gap.
3. An air system for simulating the sealing of an aircraft engine according to claim 2, It is characterized in that The gas flow path (100) comprises a first gas flow path (10); the first gas flow path (10) is connected to the first chamber (31); The first gas flow path (10) comprises a first gas inlet branch (117) and a first gas outlet branch (118).
4. An air system for simulating the sealing of an aircraft engine according to claim 3, It is characterized in that The inlet end of the first air inlet branch (117) is connected to an air source, and the outlet end of the first air inlet branch (117) is connected to the first chamber (31); The first air intake branch (117) is provided with a first filter (101), a first pressure regulating valve (102), a first electric regulating valve (103), a first air intake solenoid valve (116), a first air intake flow meter (105) and a first heater (106) in sequence from the inlet end to the outlet end.
5. An air system for simulating the sealing of an aircraft engine according to claim 4, It is characterized in that A second heater (112) is also provided on the first air intake branch (117), and the second heater (112) is located between the outlet end of the first air intake branch (117) and the first heater (106).
6. An air system for simulating the sealing of an aircraft engine according to claim 4 or 5, It is characterized in that The first gas flow path (10) further includes a first intake bypass branch (119), The inlet end of the first air intake bypass branch (119) is connected to the outlet end of the first electric regulating valve (103), and the outlet end of the first air intake bypass branch (119) is connected to the inlet end of the first heater (106); A first intake bypass solenoid valve (104) is provided on the first intake bypass branch (119).
7. An air system for simulating the sealing of an aircraft engine according to claim 6, It is characterized in that A first cooling branch (121) is provided on the first air intake branch (117), an inlet end of the first cooling branch (121) is connected to the first air intake branch (117), and the inlet end of the first cooling branch (121) is located at the outlet end of the first heater (106) and / or the outlet end of the second heater (112); The first cooling branch (121) is provided with a first bypass cooler (107) and a first bypass solenoid valve (108) in sequence from the inlet to the outlet.
8. An air system for simulating the sealing of an aircraft engine according to claim 3, It is characterized in that The first outlet branch (118) is provided with a first cooler (111), a first exhaust main line solenoid valve (113), a first exhaust flow meter (115) and a fourth electric regulating valve (122) in sequence from the inlet to the outlet.
9. An air system for simulating the sealing of an aircraft engine according to claim 8, It is characterized in that A first gas outlet bypass branch (120) is provided on the first gas outlet branch (118); an inlet of the first gas outlet bypass branch (120) is connected to an inlet of the first exhaust main line solenoid valve (113); and an outlet of the first gas outlet bypass branch (120) is connected to an outlet of a first exhaust flow meter (115).
10. An air system for simulating the sealing of an aircraft engine according to claim 7, It is characterized in that A first temperature sensor (109) and a first pressure sensor (110) are provided on the first chamber (31).
11. An air system for simulating the sealing of an aircraft engine according to claim 2, It is characterized in that The gas flow path (100) further comprises a second gas flow path (20), wherein the second gas flow path (20) is connected to the second chamber (32); The second gas flow path (20) comprises a second gas inlet branch (216) and a second gas outlet branch (217).
12. An air system for simulating an aircraft engine seal according to claim 11, It is characterized in that The inlet end of the second air inlet branch (216) is connected to an air source, and the outlet end of the second air inlet branch (216) is connected to the second chamber (32); The second air intake branch (216) is provided with a second filter (201), a second pressure regulating valve (202), a second electric regulating valve (203), a second air intake main line solenoid valve (215), a second air intake flow meter (205) and a third heater (206) in sequence from the inlet to the outlet.
13. An air system for simulating an aircraft engine seal according to claim 12, It is characterized in that The second gas flow path (20) further includes a second intake bypass branch (218); The inlet of the second air intake bypass branch (218) is connected to the inlet of the second air intake main line solenoid valve (215), and the outlet of the second air intake bypass branch (218) is connected to the outlet of the second air intake flow meter (205). A second air intake bypass solenoid valve (204) is provided on the second air intake bypass branch (218).
14. An air system for simulating an aircraft engine seal according to claim 13, It is characterized in that A second cooling branch (220) is provided on the second air intake branch (216), an inlet end of the second cooling branch (220) is connected to the second air intake branch (216), and the inlet end of the second cooling branch (220) is located at the outlet end of the third heater (206); The second cooling branch (220) is provided with a second bypass cooler (208) and a second bypass solenoid valve (207) in sequence from the inlet to the outlet.
15. An air system for simulating an aircraft engine seal according to claim 11, It is characterized in that The second outlet branch (217) is provided with a second exhaust cooler (211), a second exhaust main line solenoid valve (212), a second exhaust flow meter (214) and a fifth electric regulating valve (221) in sequence from the inlet to the outlet.
16. An air system for simulating an aircraft engine seal according to claim 14, It is characterized in that A second gas outlet bypass branch (219) is provided on the second gas outlet branch (217), and an inlet of the second gas outlet bypass branch (219) is connected to an inlet of a second exhaust main line solenoid valve (212). The outlet of the second gas outlet bypass branch (219) is connected to the outlet of the second exhaust gas flow meter (214).
17. An air system for simulating an aircraft engine seal according to claim 15, It is characterized in that A second temperature sensor (209) and a second pressure sensor (210) are provided on the second chamber (32).
18. An air system for simulating an aircraft engine seal according to claim 2, It is characterized in that The gas flow path (100) comprises a third gas flow path (30); the third gas flow path (30) is connected to the third chamber (33); The third gas flow path (30) comprises a third gas inlet branch (305), The inlet of the third air inlet branch (305) is connected to the air source, and the outlet of the third air inlet branch (305) is connected to the third chamber (33); The third air intake branch (305) is provided with a third filter (301), a third pressure stabilizing valve (302) and a third electric regulating valve (303) in sequence from the inlet to the outlet.
19. A method for simulating an air system for simulating the sealing of an aircraft engine, using the system according to any one of claims 1 to 18, It is characterized in that The following steps are included: Place the test piece (2) at the connection point between the two chambers (3) to be tested. According to the set test temperature, heating the gas flow paths (100) passing through the different test chambers (3) corresponding to the test chambers; After the test chamber (3) reaches the set temperature, the corresponding flow meter is turned on to measure the inlet and outlet air flows; The inlet and outlet air flows of the metering flowmeter are counted and the sealing leakage of the test piece (2) at the test temperature is calculated.
20. The air system simulation method for simulating the sealing of an aircraft engine according to claim 19, It is characterized in that Counting the inlet and outlet flow rates of the metering flow meter and calculating the sealing leakage of the test piece (2) at the test temperature comprises the following steps: The measured value of the first inlet flow meter (105) of the first gas flow path (10) is recorded as W 11 , the measurement value of the first exhaust gas flow meter (115) is W 12 , The measured value of the second inlet flow meter (205) of the second gas flow path (20) is recorded as W 21 , the second exhaust gas flow meter (214) measures a value of W 22 , under the condition of stable pressure and temperature, the air flow rate W leaking from the first chamber (31) to the third chamber (33) is calculated by the formula; W=W 21 +(W 11 -IN 12 )-IN 22 。
Citation Information
Patent Citations
Aero-engine sealing test device
CN115979519A
Dynamic test bench for simulating aero-engine graphite sealing device
CN220690459U
Engine Leak Detector and Leak Detection Method
US20100095746A1
Method and device for tightness testing of a test object having at least two separate chambers
WO1982001590A1
Cited By
Dynamic sealing device and power system
CN119508491A