Test system and method for simulating crystallization of waterproof and drainage system of tunnel and environment in tunnel
By simulating the crystallization of the tunnel drainage system and the environmental testing system in the cave, the crystallization change pattern and unknown blockage risk location of the tunnel drainage system in the high-temperature section are solved, and the optimization design of the tunnel drainage system and the environmental changes in the cave are realized. Study of rules.
Patent Information
- Application Number
- CN202411153116.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-12
AI Technical Summary
The existing technology cannot effectively simulate and analyze the crystallization pattern of tunnel drainage prevention system, especially in high ground temperature sections, resulting in unknown locations of hot water seepage form and crystal blockage risk, affecting the optimized design of tunnel drainage prevention system and the environment inside the tunnel. Research on the laws of change.
A simulated tunnel drainage prevention system crystallization and in-hole environment testing system was designed, including tunnel model, drainage prevention system model, pressurized seepage device, pressure stabilization device and water supply device. By controlling the pressure and temperature in the pressurized chamber, the simulation is simulated. Hot water penetrates and precipitates crystals, measure the quality of the crystals and the risk of blockage, and monitors the temperature and humidity changes in the hole.
The analysis of the crystallization rate and blockage risk location of the drainage prevention system under different water pressures is realized, revealing the temperature and humidity changes caused by hot water flowing into the ditch, and providing a scientific basis to guide the optimization design of the tunnel drainage prevention system.
Smart Images

Figure CN118937644A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel drainage system crystallization and in-tunnel environment testing, and in particular to a system for simulating tunnel drainage system crystallization and in-tunnel environment testing. Background Art
[0002] Crystallization is a common type of disaster that causes failure of tunnel drainage systems. When groundwater infiltrates through the initial support shotcrete, calcium hydroxide, calcium aluminate, etc. in the concrete react with CO2 in the air and groundwater to generate crystalline ions. When groundwater rich in crystalline ions passes through the annular blind pipe, longitudinal blind pipe, and transverse blind pipe, the crystalline ions combine with each other to form crystals and deposit and adhere to the inner wall of the blind pipe. As time goes by, the crystals inside the blind pipe gradually accumulate or even block it, causing the tunnel drainage system to fail, resulting in an increase in water pressure on the outside of the lining, and the lining structure is at risk of cracking.
[0003] The Sichuan-Tibet Railway tunnel uses drainage plates, longitudinal blind pipes, and transverse blind pipes as the main components of the drainage system. However, the existing test equipment for studying the crystallization of tunnel drainage systems mainly consists of three parts: annular blind pipes, longitudinal blind pipes, and transverse blind pipes, and it is impossible to explore the crystallization of drainage plates. In addition, high geothermal sections along the Sichuan-Tibet Railway are widely distributed, with many hot springs exposed, and the seepage path of underground hot water is complex and changeable. When underground hot water is exposed in front of the tunnel, the form and location of hot water seepage are unknown, and the crystallization rate and blockage risk location of the tunnel drainage system are unclear, which cannot guide the optimization design of the tunnel drainage system. After the hot water seeps out, it passes through the tunnel drainage system and flows into the ditch. The evaporation of hot water in the ditch will quickly change the temperature and humidity environment of the tunnel.
[0004] How to simulate the change of crystallization rate of hot water containing crystalline ions on drainage plates, longitudinal blind pipes and transverse blind pipes after underground hot water infiltrates through the initial support shotcrete under different water pressures, analyze the risk location of crystallization blockage, and further reveal the change of temperature and humidity in the cave caused by evaporation of hot water after flowing into the ditch is a key issue that needs to be urgently solved in the crystallization treatment of high geothermal hot water tunnels. Summary of the invention
[0006] In view of the above problems existing in the prior art, the purpose of the present invention is to provide a system and method for simulating crystallization of tunnel drainage system and in-tunnel environment testing to solve the above problems.
[0007] In order to solve the above technical problems, the present invention adopts the following technical solution: a system for simulating crystallization of tunnel drainage system and testing the environment inside the tunnel, comprising:
[0008] Tunnel model;
[0009] A drainage system model installed in the tunnel model;
[0010] The pressurized water seepage device comprises: a shell, a piston and a driving mechanism; the shell is arranged outside the tunnel model; the piston is slidably installed between the tunnel model and the shell, and the tunnel model, the shell and the piston form a closed pressurized cavity; the driving mechanism can drive the piston to slide in the length direction of the tunnel model;
[0011] A pressure stabilizing device capable of stabilizing the pressure in the pressurized chamber; and
[0012] The water supply device can supply water into the pressurized cavity.
[0013] Preferably, the driving mechanism comprises: a base, a guide rod and a driving motor; the driving motor is fixedly mounted on the base, the guide rod is mounted on the piston along the sliding direction of the piston, and the driving motor can drive the guide rod to move along the sliding direction of the piston.
[0014] Preferably, the pressure stabilizing device includes: a liquid storage tank, a sealing baffle, a driving member and a one-way valve; the sealing baffle is slidably installed in the liquid storage tank, and the sealing baffle and the liquid storage tank are arranged in cooperation, the driving member can push the sealing baffle to slide, and the liquid storage tank is connected to the pressurized chamber through the one-way valve.
[0015] Preferably, the pressure stabilizing device further comprises: a water pump and a water inlet pipe; one end of the water inlet pipe is connected to the liquid storage tank, and the water pump is installed on the water inlet pipe.
[0016] Preferably, the water supply device includes: a solution tank, a high-pressure pipe, a booster pump and a heater; one end of the high-pressure pipe is connected to the solution tank, and the other end of the high-pressure pipe is connected to the pressurized cavity; the booster pump is installed on the high-pressure pipe; and the heater is installed in the solution tank.
[0017] Preferably, it further comprises a negative pressure component, which is fixedly mounted on the housing and communicates with the pressurized cavity.
[0018] Preferably, the tunnel model comprises: a support frame, an initial support model, a secondary lining model, a support baffle and a face baffle; the secondary lining model is sleeved on the outside of the initial support model, and the initial support model and the secondary lining model are both installed on the support frame; the initial support model and the secondary lining model are respectively installed with support baffles and face baffles at the front and rear ends.
[0019] Preferably, the drainage system model includes: a drainage board, a longitudinal blind pipe, a transverse blind pipe and a ditch; the drainage board is installed between the initial support model and the secondary lining model; the longitudinal blind pipe is installed at the lower end of the drainage board, one end of the longitudinal blind pipe is closed, and the other end is connected to the transverse blind pipe; the ditch is located below the transverse blind pipe.
[0020] Preferably, it also includes: a temperature and humidity monitoring component and a ventilation component; the temperature and humidity monitoring component and the ventilation component are installed in the tunnel model hole.
[0021] A method for simulating crystallization of a tunnel drainage system and testing the environment inside the tunnel, using any of the above-mentioned systems for simulating crystallization of a tunnel drainage system and testing the environment inside the tunnel, comprising the following steps:
[0022] Weigh and record the drainage system model and assemble the overall test system;
[0023] Controlling the driving mechanism to drive the piston to move so as to form negative pressure in the pressurizing chamber;
[0024] The water supply device is controlled to supply hot water into the pressurized cavity under the dual action of negative pressure;
[0025] The driving mechanism is controlled again to drive the piston to move and squeeze the hot water in the pressurized cavity to reach the set lining external water pressure value;
[0026] The pressure in the pressurized cavity is stabilized by a pressure stabilizing device, and the temperature and humidity changes in the tunnel model are monitored;
[0027] Under the action of pressure, hot water penetrates the tunnel model and gradually precipitates crystals on the drainage system model;
[0028] The mass of crystals on each part of the drainage system model was measured, and the risk locations of crystal blockage were identified.
[0029] Compared with the prior art, the present invention has at least the following advantages:
[0030] 1. In the present invention, the driving mechanism drives the piston to slide, and the piston applies a pressure to the hot water in the pressurized cavity; so that the hot water penetrates the tunnel model under the set external water pressure of the lining, and with the continuous seepage of the high-temperature crystalline ion aqueous solution, the pressure of the hot water in the pressurized cavity gradually decreases, and the pressure of the hot water in the pressurized cavity is maintained at the set external water pressure value of the lining through the pressure stabilizing device; so that crystals gradually precipitate and deposit on the drainage system model and adhere to its surface; in this way, the crystallization rate change law and crystallization blockage risk position of the drainage system model under different seepage pressures can be analyzed.
[0031] 2. In the present invention, the driving mechanism drives the piston to move, discharges the air in the pressurized chamber, and then opens the negative pressure component. At the same time, the driving mechanism drives the piston to move in the opposite direction. The negative pressure component and the reverse movement of the piston form a negative pressure in the pressurized chamber through the cooperation. In this way, when water is injected into the pressurized chamber through the water supply device, the high-temperature hot water in the solution tank quickly enters the pressurized chamber through the high-pressure pipe under the dual effects of negative pressure suction and positive pressure injection of the booster pump. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the specific implementation of the present invention, the following will briefly introduce the drawings required for use in the specific implementation. In all the drawings, each element or part is not necessarily drawn according to the actual scale.
[0033] Figure 1 A stereoscopic diagram of a system for simulating crystallization of a tunnel drainage system and testing the environment inside the tunnel provided in an embodiment of the present invention.
[0034] Figure 2 A cross-sectional view of a system for simulating crystallization of a tunnel drainage system and testing the environment inside the tunnel provided in an embodiment of the present invention.
[0035] Figure 3 A three-dimensional diagram of a drainage system model provided in an embodiment of the present invention.
[0036] Figure 4 A flow chart of a method for simulating crystallization of a tunnel drainage system and testing the environment inside the tunnel provided in an embodiment of the present invention.
[0037] Figure numerals: 1-tunnel model, 11-support frame, 12-initial support model, 13-secondary lining model, 14-support baffle, 15-face baffle, 2-drainage system model, 21-drainage board, 22-longitudinal blind pipe, 23-transverse blind pipe, 24-ditch, 3-pressurized water seepage device, 31-shell, 32-piston, 33-pressurized cavity, 34-base, 35-guide rod, 36-drive motor, 4-pressure stabilizing device, 41-liquid storage tank, 42-sealing baffle, 43-drive member, 44-check valve, 45-water pump, 46-water inlet pipe, 5-water supply device, 51-solution tank, 52-high-pressure pipe, 53-boosting pump, 54-heater, 55-negative pressure component, 6-temperature and humidity monitoring component, 7-ventilation component. DETAILED DESCRIPTION
[0038] The following embodiments of the technical solution of the present invention are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and are therefore only used as examples, and cannot be used to limit the protection scope of the present invention.
[0039] In the present invention, it is necessary to understand that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0040] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0041] See also Figure 1-Figure 3 , the embodiment provided by the present invention: a system for simulating crystallization of tunnel drainage system and testing environment in the cave, comprising: a tunnel model 1, a drainage system model 2, a pressurized water seepage device 3, a pressure stabilizing device 4 and a water supply device 5; the drainage system model 2 is installed in the tunnel model 1; the pressurized water seepage device 3 comprises: a shell 31, a piston 32 and a driving mechanism; the shell 31 is covered on the outside of the tunnel model 1; the piston 32 is slidably installed between the tunnel model 1 and the shell 31, and the tunnel model 1, the shell 31 and the piston 32 form a closed pressurized cavity 33; the driving mechanism can drive the piston 32 to slide in the length direction of the tunnel model 1; the pressure stabilizing device 4 can stabilize the pressure in the pressurized cavity 33; the water supply device 5 can supply water to the pressurized cavity 33. Further, it also comprises: a temperature and humidity monitoring component 6 and a ventilation component 7; the temperature and humidity monitoring component 6 and the ventilation component 7 are installed in the tunnel model 1; ventilation is carried out toward the tunnel model 1 through the ventilation component 7, and the temperature and humidity in the tunnel model 1 are monitored through the temperature and humidity monitoring component 6.
[0042] During specific implementation, there is heated deionized water in the pressurized cavity 33, and the driving mechanism is controlled to move. The driving mechanism drives the piston 32 to slide, and the piston 32 applies a pressure to the hot water in the pressurized cavity 33; so that the hot water penetrates the tunnel model 1, and with the continuous seepage of the high-temperature crystalline ion water solution, the hot water pressure in the pressurized cavity 33 gradually decreases, and the hot water pressure in the pressurized cavity 33 is maintained at the set lining external water pressure value through the pressure stabilizing device 4; so that crystals gradually precipitate and deposit on the drainage system model 2 and adhere to its surface; in this way, the changing law of the crystallization rate of the drainage system model under different seepage pressures and the risk position of crystallization blockage can be analyzed.
[0043] See also Figure 1-Figure 3 In other embodiments, the driving mechanism includes: a base 34, a guide rod 35 and a driving motor 36; the driving motor 36 is fixedly mounted on the base 34, the guide rod 35 is mounted on the piston 32 along the sliding direction of the piston 32, and the driving motor 36 can drive the guide rod 35 to move along the sliding direction of the piston 32. In specific implementation, the driving motor 36 is actuated, the driving motor 36 drives the guide rod 35 to move, and the guide rod 35 pushes the piston 32 to slide. Specifically, the driving mechanism can be other structures that can drive the piston 32 to slide.
[0044] See also Figure 1-Figure 3 In other embodiments, the pressure stabilizing device 4 includes: a liquid storage tank 41, a sealing baffle 42, a driving member 43 and a one-way valve 44; the sealing baffle 42 is slidably installed in the liquid storage tank 41, and the sealing baffle 42 and the liquid storage tank 41 are arranged in cooperation, the driving member 43 can push the sealing baffle 42 to slide, and the liquid storage tank 41 is connected to the pressurized cavity 33 through the one-way valve 44. In specific implementation, the driving member 43 can be a jack, a hydraulic cylinder, a cylinder and other structures, the liquid storage tank 41 is filled with heated deionized water, the driving member 43 is controlled to move, the driving member 43 drives the sealing baffle 42 to slide, and the sealing baffle 42 squeezes the hot water in the liquid storage tank 41 into the pressurized cavity 33, and by controlling the squeezing speed of the driving member 43, the water pressure in the pressurized cavity 33 can be kept constant; the one-way valve 44 limits the hot water in the pressurized cavity 33 from flowing into the liquid storage tank 41. Furthermore, the pressure stabilizing device 4 further includes: a water pump 45 and a water inlet pipe 46; one end of the water inlet pipe 46 is connected to the liquid storage tank 41, and the water pump 45 is installed on the water inlet pipe 46. The water pump 45 pumps hot water into the liquid storage tank 41 through the water inlet pipe 46.
[0045] See also Figure 1-Figure 3In other embodiments, the water supply device 5 includes: a solution tank 51, a high-pressure pipe 52, a booster pump 53 and a heater 54; one end of the high-pressure pipe 52 is connected to the solution tank 51, and the other end of the high-pressure pipe 52 is connected to the pressurized cavity 33; the booster pump 53 is installed on the high-pressure pipe 52; and the heater 54 is installed in the solution tank 51. In specific implementation, deionized water is filled in the solution tank 51, and the heater 54 is turned on to heat the deionized water to a set temperature value; the booster pump 53 pumps the hot water in the solution tank 51 into the pressurized cavity 33 through the high-pressure pipe 52. Further, it also includes a negative pressure component 55, which is fixedly installed on the housing 31 and is connected to the pressurized cavity 33. In a specific implementation, the negative pressure component 55 can be an air pump; the driving mechanism drives the piston 32 to move, discharges the air in the pressurized chamber 33, and then opens the negative pressure component 55. At the same time, the driving mechanism drives the piston 32 to move in the opposite direction, and a negative pressure is formed in the pressurized chamber 33 through the cooperation of the negative pressure component 55 and the piston 32. In this way, when water is injected into the pressurized chamber 33 through the water supply device 5, the high-temperature hot water in the solution tank 51 quickly enters the pressurized chamber 33 through the high-pressure pipe 52 under the dual effects of negative pressure suction and positive pressure injection of the booster pump 53.
[0046] See also Figure 1-Figure 3 In other embodiments, the tunnel model 1 includes: a support frame 11, an initial support model 12, a secondary lining model 13, a support baffle 14 and a face baffle 15; the secondary lining model 13 is sleeved on the outside of the initial support model 12, and the initial support model 12 and the secondary lining model 13 are both installed on the support frame 11; the support baffle 14 and the face baffle 15 are installed at the front and rear ends of the initial support model 12 and the secondary lining model 13. Further, the drainage system model 2 includes: a drainage board 21, a longitudinal blind pipe 22, a transverse blind pipe 23 and a ditch 24; the drainage board 21 is installed between the initial support model 12 and the secondary lining model 13; the drainage board 21 is closely attached to the outer surface of the secondary lining model 13; the longitudinal blind pipe 22 is installed at the lower end of the drainage board 21, one end of the longitudinal blind pipe 22 is closed, and the other end is connected to the transverse blind pipe 23; the ditch 24 is located below the transverse blind pipe 23. During specific implementation, under the action of water pressure, high-temperature hot water is pressurized and penetrates through the initial support model 12, and the crystallized ions in the shotcrete of the initial support model 12 are precipitated into the hot water. Then, the high-temperature crystallized ion aqueous solution passes through the drainage board 21, the longitudinal blind pipe 22 and the transverse blind pipe 23 and flows into the ditch 24.
[0047] See also Figure 4 Another embodiment of the present invention is a method for testing the crystallization of a tunnel drainage system and the environment inside the tunnel, using any one of the above-mentioned systems for testing the crystallization of a tunnel drainage system and the environment inside the tunnel, comprising the following steps:
[0048] Weigh the drainage board 21, the longitudinal blind pipe 22 and the transverse blind pipe 23, and then assemble the tunnel model 1, the drainage system model 2, the pressurized water seepage device 3, the pressure stabilizing device 4 and the water supply device 5;
[0049] The driving motor 36 drives the piston 32 to move forward through the guide rod 35 to discharge the air in the pressurized chamber 33; then the negative pressure assembly 55 is turned on and the guide rod 35 and the piston 32 are driven backward through the driving motor 36 to form a negative pressure in the pressurized chamber 33;
[0050] Close the valves on the negative pressure assembly 55 and the high-pressure pipe 52; after the heater 54 heats the deionized water to the set temperature value, under the dual effects of the booster pump 53 and the negative pressure in the pressurized chamber 33, the hot water in the solution tank 51 is pumped into the pressurized chamber 33 through the high-pressure pipe 52;
[0051] The driving motor 36 drives the piston 32 to move forward again through the guide rod 35, squeezing the hot water to the set water pressure value outside the lining; then the driving motor 36 is turned off;
[0052] The ventilation component 7 and the temperature and humidity monitoring component 6 are turned on, and the temperature and humidity monitoring component 6 is used to monitor the changing pattern of temperature and humidity in the cave caused by the evaporation of hot water in the ditch 24; when the water pressure in the pressurized cavity 33 drops, the water pump 45 is turned on to pump the high-temperature hot water in the solution tank 51 into the liquid storage tank 41, and the water pump 45 is turned off. The driving member 43 is turned on and the sealing baffle 42 is pushed to squeeze the hot water in the liquid storage tank 41, and the hot water enters the pressurized cavity 33 from the liquid storage tank 41 through the one-way valve 44, and the water pressure is kept constant at the set water pressure value outside the lining.
[0053] Under the action of water pressure, high-temperature hot water is pressurized and penetrates through the initial support model 12, and the crystallized ions in the shotcrete of the initial support model 12 are precipitated into the hot water, and then the high-temperature crystallized ion aqueous solution passes through the anti-drainage board 21, the longitudinal blind pipe 22 and the transverse blind pipe 23 and flows into the ditch 24;
[0054] Remove the drainage system model 2; put the drainage board 21, the longitudinal blind pipe 22 and the transverse blind pipe 23 into a drying box for drying and then weighing; subtract the weights from the initial measured net weights to obtain the mass of crystals attached to the drainage board 21, the longitudinal blind pipe 22 and the transverse blind pipe 23, analyze the proportion of crystals in each part, and propose the risk location of crystallization blockage.
[0055] By changing the initially set water pressure value on the outer side of the lining and repeating the above steps, we can explore the changing patterns of the crystallization rate and amount of the tunnel drainage system under different seepage pressures and reveal the evolution characteristics of the temperature and humidity in the tunnel over time.
[0056] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. A system for simulating crystallization of tunnel drainage system and testing the environment inside the tunnel, characterized in that: include: Tunnel model; A drainage system model installed in the tunnel model; The pressurized water seepage device comprises: a shell, a piston and a driving mechanism; the shell is arranged outside the tunnel model; the piston is slidably installed between the tunnel model and the shell, and the tunnel model, the shell and the piston form a closed pressurized cavity; the driving mechanism can drive the piston to slide in the length direction of the tunnel model; A pressure stabilizing device capable of stabilizing the pressure in the pressurized chamber; and The water supply device can supply water into the pressurized cavity.
2. A simulated tunnel drainage system crystallization and in-tunnel environment testing system according to claim 1, characterized in that: The driving mechanism comprises: a base, a guide rod and a driving motor; the driving motor is fixedly mounted on the base, the guide rod is mounted on the piston along the sliding direction of the piston, and the driving motor can drive the guide rod to move along the sliding direction of the piston.
3. A simulated tunnel drainage system crystallization and in-tunnel environment testing system according to claim 1, characterized in that: The pressure stabilizing device includes: a liquid storage tank, a sealing baffle, a driving member and a one-way valve; the sealing baffle is slidably installed in the liquid storage tank, and the sealing baffle and the liquid storage tank are arranged in coordination, the driving member can push the sealing baffle to slide, and the liquid storage tank is connected to the pressurized cavity through the one-way valve.
4. A simulated tunnel drainage system crystallization and in-tunnel environment testing system according to claim 3, characterized in that: The pressure stabilizing device further comprises: a water pump and a water inlet pipe; one end of the water inlet pipe is connected to the liquid storage tank, and the water pump is installed on the water inlet pipe.
5. A simulated tunnel drainage system crystallization and in-tunnel environment testing system according to claim 1, characterized in that: The water supply device includes: a solution tank, a high-pressure pipe, a booster pump and a heater; one end of the high-pressure pipe is connected to the solution tank, and the other end of the high-pressure pipe is connected to the pressurized cavity; the booster pump is installed on the high-pressure pipe; and the heater is installed in the solution tank.
6. A simulated tunnel drainage system crystallization and in-tunnel environment testing system according to claim 5, characterized in that: It also includes a negative pressure component, which is fixedly mounted on the shell and is connected to the pressurized cavity.
7. The system for testing crystallization and in-tunnel environment of simulated tunnel drainage system according to claim 1, characterized in that: The tunnel model comprises: a support frame, an initial support model, a secondary lining model, a support baffle and a face baffle; the secondary lining model is sleeved on the outside of the initial support model, and the initial support model and the secondary lining model are both installed on the support frame; the support baffle and the face baffle are respectively installed at the front and rear ends of the initial support model and the secondary lining model.
8. A simulated tunnel drainage system crystallization and in-tunnel environment testing system according to claim 7, characterized in that: The drainage system model includes: a drainage board, a longitudinal blind pipe, a transverse blind pipe and a ditch; the drainage board is installed between the initial support model and the secondary lining model; the longitudinal blind pipe is installed at the lower end of the drainage board, one end of the longitudinal blind pipe is closed, and the other end is connected to the transverse blind pipe; the ditch is located below the transverse blind pipe.
9. A simulated tunnel drainage system crystallization and in-tunnel environment testing system according to claim 1, characterized in that: Also includes: Temperature and humidity monitoring components and ventilation components; the temperature and humidity monitoring components and ventilation components are installed in the tunnel model hole.
10. A method for simulating crystallization of tunnel drainage system and testing the environment inside the tunnel, characterized in that: A system for testing crystallization and in-tunnel environment of a simulated tunnel drainage system according to any one of claims 1 to 9 is used, comprising the following steps: Weigh and record the drainage system model and assemble the overall test system; Controlling the driving mechanism to drive the piston to move so as to form negative pressure in the pressurizing chamber; Controlling the water supply device to supply hot water into the pressurized cavity under the dual action of negative pressure; The driving mechanism is controlled again to drive the piston to move and squeeze the hot water in the pressurized cavity to reach the set lining external water pressure value; The pressure in the pressurized cavity is stabilized by a pressure stabilizing device, and the temperature and humidity changes in the tunnel model are monitored; Under the action of pressure, hot water penetrates the tunnel model and gradually precipitates crystals on the drainage system model; The mass of crystals on each part of the drainage system model was measured, and the risk locations of crystal blockage were identified.
Citation Information
Cited By
Device and method for testing influence of ditch heat insulation layer on temperature and humidity in tunnel hole
CN119985613A
Device and method for testing influence of ditch cover plate on temperature and humidity in tunnel hole
CN120102618A